CN108118904A CN201810013435.8A CN201810013435A CN108118904A CN 108118904 A CN108118904 A CN 108118904A CN 201810013435 A CN201810013435 A CN 201810013435A CN 108118904 A CN108118904 A CN 108118904A
Authority
CN
China
Prior art keywords
aerated blocks
constructional
column frame
constructional column
concrete
Prior art date
Application number
CN201810013435.8A
Other languages
Chinese (zh)
Inventor
罗勇
王根杰
陈小文
徐卫民
李伟
沈健
刘永丽
高媛
Original Assignee
中铁四局集团建筑工程有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁四局集团建筑工程有限公司 filed Critical 中铁四局集团建筑工程有限公司
Priority to CN201810013435.8A priority Critical patent/CN108118904A/en
Publication of CN108118904A publication Critical patent/CN108118904A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C1/00Building elements of block or other shape for the construction of parts of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The present invention relates to a kind of Constructional Col-umn Construction method, the following a. of step cuts off right angle at the one of aerated blocks and forms unfilled corner aerated blocks, and cutting angle is 30 ° 60 °, and cut-out is in triangular prism;B. constructing structure column frame will build into horse tooth trough by laying bricks or stones with the wall of constructional column junction;C. after the completion of building wall, sealant tape is pasted along horse tooth trough side mouthful, the brushing releasing agent in template reinforces template assembly at constructional column frame, and in constructional column frame top indwelling discharge port;D. concrete is irrigated to constructional column frame.Due to using unfilled corner aerated blocks, horse tooth trough inner corner trim space becomes smaller, and easily consolidates, makes the concrete compaction poured, be not likely to produce voids and pits, hole and stone packing phenomenon, and it is clear to connect raft with masonry, and concrete grading is not easy to be destroyed, and whole perception is good.

Description

A kind of Constructional Col-umn Construction method

Technical field

The present invention relates to building field, more particularly to a kind of Constructional Col-umn Construction method.

Background technology

Constructional column is commonly referred to as concrete-constituted pile, is the predetermined portion in masonry house wall, by constructional reinforcement, and is pressed Concrete column made of the sequence of construction of placing concrete column, constructional column are generally arranged at the half space of staircase after first building a wall Place, longitudinal cross wall junction, the corner of wall, the middle part that wall length reaches five meters will set constructional column.

Horse tooth trough is a kind of building method that brick wall stays Cha Chu, when masonry cannot be built by laying bricks or stones simultaneously, in junction one As to reserve gingival cyst of mucous gland in the newborn stranding, to keep the globality of masonry and stability, be commonly used in the connection of constructional column and wall, refer to construct The part that column protrudes above.

Constructional Col-umn Construction method mainly with Geoplane determines masonry wall displacement at present, meet wall end, corner wall with And constructional column is set up when at right-angled intersection, using first step back into, carry out right angle horse tooth trough reserve, finally carry out template assembly pour It builds, it is not full that such method easily causes concrete density.Voids and pits, hole are generated, and destroys concrete grading, is formed Stone packing phenomenon is not easy to consolidate at tooth socket inner corner trim, and the concrete after pouring molding connects that raft is unintelligible, and perception compares with masonry Difference.

The content of the invention

It is an object of the invention to provide one kind after the completion of constructional column pours, it is clear to connect raft with masonry, is not likely to produce bee Nest pitted skin, hole and stone packing phenomenon, and concrete grading is not easy to be destroyed, the whole good Constructional Col-umn Construction side of perception Method.

In order to achieve the above object, the technical solution adopted by the present invention is:A kind of Constructional Col-umn Construction method, including walking as follows Suddenly:

A. by aerated blocks sprinkle water soak, with saw excision aerated blocks one at right angle formed unfilled corner aerated blocks, cutting angle for 30 °- 60 °, cut-out is in triangular prism;

B. constructing structure column frame will build into horse tooth trough by laying bricks or stones with the wall of constructional column junction, according to often building one layer by laying bricks or stones from bottom to up Aerated blocks, the masonry way for just building a break angle aerated blocks by laying bricks or stones on the aerated blocks repeat to build by laying bricks or stones, the unfilled corner aerated blocks The AB sidelines of cut surface are Chong Die with the CD sidelines of aerated blocks;

C. after the completion of building wall, mouthful sealant tape is pasted along horse tooth trough side, the brushing releasing agent in template, by template assembly plus Gu at constructional column frame, and in constructional column frame top indwelling discharge port;

D. constructional column frame is irrigated, concrete enters from discharge port in constructional column frame, mixed to what is poured with vibrating head Solidifying soil vibrates, and coordinates tapping template with rubber hammer, makes the concrete compaction poured, treats that concrete strength reaches after the completion of pouring To engine request, form removal and discharge port.

The cutting angle is 45 °.

The template assembly reinforcing is reinforced using step fastener.

The cut surface of the unfilled corner aerated blocks polishes flat.

By the way that aerated blocks are cut into unfilled corner aerated blocks, and the cut surface of unfilled corner aerated blocks is polished flat, according under As soon as supreme often build a layer aerated blocks by laying bricks or stones, the masonry way for building a break angle aerated blocks by laying bricks or stones on the aerated blocks repeats to build by laying bricks or stones, institute It is Chong Die with the CD sidelines of aerated blocks to state the AB sidelines of the cut surface of unfilled corner aerated blocks, after the completion of building wall, along horse tooth trough side mouthful Sealant tape is pasted, template is reinforced with step fastener is assembled at constructional column frame, and constructed by the brushing releasing agent in template Column frame top indwelling discharge port, then enters concrete in constructional column frame from discharge port, mixed to what is poured with vibrating head Solidifying soil vibrate rubber hammer cooperation tapping template, treats that concrete strength reaches engine request after the completion of pouring, form removal and Discharge port, due to using unfilled corner aerated blocks, horse tooth trough inner corner trim space becomes smaller, and easily consolidates, makes the concrete compaction poured, be not easy Voids and pits, hole and stone packing phenomenon are generated, it is clear to connect raft with masonry, and concrete grading is not easy to be destroyed, Overall View Sense is good.

Description of the drawings

Fig. 1 is aerated blocks cutting schematic diagram of the present invention;

Fig. 2 is the masonry way schematic diagram of the present invention;

Fig. 3 is the constructional column frame of the present invention and horse tooth trough schematic diagram.

Specific embodiment

With reference to Fig. 1 to Fig. 3, the present invention is described in further detail.

A kind of Constructional Col-umn Construction method, includes the following steps:

A. aerated blocks 10 are sprinkled water wetting before upper wall, with right angle formation unfilled corner aerated blocks 20 at the one of saw excision aerated blocks 10, Cutting angle 11 is 30 ° -60 °, preferably 45 ° of cutting angle 11, and cut-out is in triangular prism, and the cut surface of unfilled corner aerated blocks 20 is polished It is smooth;

B. constructing structure column frame 30 pops up control line in floor face before building by laying bricks or stones, wall position is determined according to control line, will be with structure The wall for making column junction builds into horse tooth trough by laying bricks or stones, as soon as according to often building layer aerated blocks 10 by laying bricks or stones from bottom to up, on the aerated blocks 10 The masonry way for building a break angle aerated blocks 20 by laying bricks or stones repeats to build by laying bricks or stones, and the AB sidelines 21 of the cut surface of the unfilled corner aerated blocks 20 are with adding The CD sidelines 12 of air parcel are overlapped;

C. in masonry panel, the verticality and flatness of metope concrete are ensured, mortar is full, and grey line width will be unified, Metope is cleaned up after the completion of building by laying bricks or stones, after the completion of building wall, pastes sealant tape along horse tooth trough side mouthful, it is ensured that pour coagulation Without the grey phenomenon of dew when native, 30 root of constructional column frame is cleared up, template surface is cleaned up, the demoulding is brushed in template Agent reinforces template at constructional column frame 30 with step fastener is assembled, and in 30 top indwelling discharge port of constructional column frame;

D. constructional column frame 30 is irrigated, concrete enters from discharge port in constructional column frame 30, with vibrating head to pouring Concrete carry out rubber of vibrating, with skin hammer into shape cooperation tapping template, make the concrete compaction poured, pour after the completion of treat strong concrete Degree reaches engine request, form removal and discharge port.

By the way that aerated blocks 10 are cut into unfilled corner aerated blocks 20, and the cut surface of unfilled corner aerated blocks 20 is polished flat, pressed According to as soon as layer aerated blocks 10 are often built by laying bricks or stones from bottom to up, the masonry way of a break angle aerated blocks 20 is built by laying bricks or stones on the aerated blocks 10 Repetition is built by laying bricks or stones, and the AB sidelines 21 of the cut surface of the unfilled corner aerated blocks 20 are be overlapped with the CD sidelines 12 of aerated blocks, and building wall is complete Cheng Hou pastes sealant tape along horse tooth trough side mouthful, the brushing releasing agent in template, and assembled reinforce of template step fastener is being constructed At column frame 30, and in 30 top indwelling discharge port of constructional column frame, concrete is then entered into constructional column frame from discharge port In 30, rubber hammer cooperation tapping template of vibrating is carried out to the concrete poured with vibrating head, concrete strength is treated after the completion of pouring Reach engine request, form removal and discharge port, due to using unfilled corner aerated blocks 20, horse tooth trough inner corner trim space becomes smaller, easily smashes It is real, make the concrete compaction poured, be not likely to produce voids and pits, hole and stone packing phenomenon, it is clear and mixed to connect raft with masonry For solidifying soil class with being not easy to be destroyed, whole perception is good.

Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention It encloses and is defined, on the premise of design spirit of the present invention is not departed from, those of ordinary skill in the art are to the technical side of the present invention The various modifications and improvement that case is made should all be fallen into the protection domain that claims of the present invention determines.

Claims (4)

  1. A kind of 1. Constructional Col-umn Construction method, it is characterised in that:Include the following steps:
    A. by aerated blocks(10)Watering wetting cuts off aerated blocks with saw(10)One at right angle formed unfilled corner aerated blocks(20), Cutting angle(11)For 30 ° -60 °, cut-out is in triangular prism;
    B. constructing structure column frame(30), horse tooth trough will be built by laying bricks or stones with the wall of constructional column junction, according to often building by laying bricks or stones from bottom to up One layer of aerated blocks(10), just in the aerated blocks(10)On build a break angle aerated blocks by laying bricks or stones(20)Masonry way repeat build by laying bricks or stones, The unfilled corner aerated blocks(20)Cut surface AB sidelines(21)With the CD sidelines of aerated blocks(12)Overlapping;
    C. after the completion of building wall, mouthful sealant tape is pasted along horse tooth trough side, the brushing releasing agent in template, by template assembly plus Gu in constructional column frame(30)Place, and in constructional column frame(30)Top indwelling discharge port;
    D. to constructional column frame(30)It is irrigated, concrete enters constructional column frame from discharge port(30)It is interior, with vibrating head pair The concrete poured vibrates, and coordinates tapping template with rubber hammer, makes the concrete compaction poured, coagulation is treated after the completion of pouring Native intensity reaches engine request, form removal and discharge port.
  2. 2. a kind of Constructional Col-umn Construction method as described in claim 1, it is characterised in that:The cutting angle(11)For 45 °.
  3. 3. a kind of Constructional Col-umn Construction method as described in claim 1, it is characterised in that:The template assembly reinforcing is using step Step is tightly reinforced.
  4. 4. a kind of Constructional Col-umn Construction method as described in claim 1, it is characterised in that:The unfilled corner aerated blocks(20)Cutting Face polishes flat.
CN201810013435.8A 2018-01-07 2018-01-07 A kind of Constructional Col-umn Construction method CN108118904A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810013435.8A CN108118904A (en) 2018-01-07 2018-01-07 A kind of Constructional Col-umn Construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810013435.8A CN108118904A (en) 2018-01-07 2018-01-07 A kind of Constructional Col-umn Construction method

Publications (1)

Publication Number Publication Date
CN108118904A true CN108118904A (en) 2018-06-05

Family

ID=62232797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810013435.8A CN108118904A (en) 2018-01-07 2018-01-07 A kind of Constructional Col-umn Construction method

Country Status (1)

Country Link
CN (1) CN108118904A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999408A (en) * 2018-09-29 2018-12-14 北京首钢建设集团有限公司 A kind of building block of constructional column two sides uses the concreting method of chamfering
CN109184103A (en) * 2018-09-30 2019-01-11 恒城建设科技有限公司 Building masonry wall exempts from plastering construction technique
CN109208782A (en) * 2018-09-30 2019-01-15 中国二十二冶集团有限公司 Horse tooth trough building construction method
CN110439182A (en) * 2019-08-19 2019-11-12 广东永和建设集团有限公司 Three layers of one kind, which is poured, smashes Constructional Col-umn Construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6735913B2 (en) * 2002-08-01 2004-05-18 Sanders & Associates Geostructural Engineering, Inc. Block wall system
CN101457556A (en) * 2006-06-16 2009-06-17 罗进南 Core beam constructional column mixed combination wall, building method and relevant building block
CN104453226A (en) * 2014-12-19 2015-03-25 山西省第三建筑工程公司 Secondary structure post formwork erecting and positioning device
CN204531065U (en) * 2015-03-08 2015-08-05 青岛一建集团有限公司 A kind of infilled wall constructional column that effectively can improve Forming Quality
CN106284846A (en) * 2016-09-28 2017-01-04 西安建筑科技大学 A kind of assembled steel reinforced concrete-constituted pile and utilize the system of this post, construction method
CN107165411A (en) * 2017-05-22 2017-09-15 中国五冶集团有限公司 A kind of Constructional Col-umn Construction technique

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6735913B2 (en) * 2002-08-01 2004-05-18 Sanders & Associates Geostructural Engineering, Inc. Block wall system
CN101457556A (en) * 2006-06-16 2009-06-17 罗进南 Core beam constructional column mixed combination wall, building method and relevant building block
CN104453226A (en) * 2014-12-19 2015-03-25 山西省第三建筑工程公司 Secondary structure post formwork erecting and positioning device
CN204531065U (en) * 2015-03-08 2015-08-05 青岛一建集团有限公司 A kind of infilled wall constructional column that effectively can improve Forming Quality
CN106284846A (en) * 2016-09-28 2017-01-04 西安建筑科技大学 A kind of assembled steel reinforced concrete-constituted pile and utilize the system of this post, construction method
CN107165411A (en) * 2017-05-22 2017-09-15 中国五冶集团有限公司 A kind of Constructional Col-umn Construction technique

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999408A (en) * 2018-09-29 2018-12-14 北京首钢建设集团有限公司 A kind of building block of constructional column two sides uses the concreting method of chamfering
CN109184103A (en) * 2018-09-30 2019-01-11 恒城建设科技有限公司 Building masonry wall exempts from plastering construction technique
CN109208782A (en) * 2018-09-30 2019-01-15 中国二十二冶集团有限公司 Horse tooth trough building construction method
CN110439182A (en) * 2019-08-19 2019-11-12 广东永和建设集团有限公司 Three layers of one kind, which is poured, smashes Constructional Col-umn Construction method

Similar Documents

Publication Publication Date Title
US4963054A (en) Frames for constructing pavement boards
US5568994A (en) Landscaping block
CN103266767B (en) Construction method for preventing and treating cracks between concrete structure and filler wall
US9580915B2 (en) Decorative concrete and method of installing the same
US4748788A (en) Surface seeded exposed aggregate concrete and method of producing same
US8079775B2 (en) Non-slick surface-seeded aggregate concrete and method of forming
US4769191A (en) Monolithic surface ornamentation of pre-cast reinforced concrete wall
CN101338595B (en) Construction method of haydite dry concrete wall
CN102003069B (en) Construction method and pouring device for framework masonry infill wall structure
US5803964A (en) Composite building material and system for creating structures from such building material
US5487526A (en) Mold device for forming concrete pathways
US5588262A (en) Landscaping block system
US2893098A (en) Means for applying simulated masonry to walls and the exterior surfaces of buildings
US3874140A (en) Structural wall member with sculptured surface and method of making same
CN104675124B (en) A kind of prefabricated Niche type construction technology of Separate Home electronic box hole to be provided
US20070266656A1 (en) Block-Type Building Stone Used As A Construction Material For Walls
CN102720216A (en) Foundation post-pouring belt template constructing method
GB1098630A (en) Apparatus and method for forming concrete planks or slabs
US6016635A (en) Surface seeded aggregate and method of forming the same
CN105839850B (en) Precompressed construction method is poured into a mould after basement top-down method shaft
CN104213565B (en) A kind of formwork system that is applicable to large-scale deep trouth hole sty bed course and formwork thereof water smashes construction method
CN101041980B (en) Lightweight plaster wall and integral pouring procedure thereof
CN103108733B (en) Plate is produced and processing
CN103615110A (en) Irregular oblique-crossing web-shaped grillage beam hyperbolic roof structure construction method
US20200102740A1 (en) Layered architectural pervious concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180605

RJ01 Rejection of invention patent application after publication