CN108110674A - A kind of transmission line of electricity major diameter tackle pulley opening and closing structure - Google Patents
A kind of transmission line of electricity major diameter tackle pulley opening and closing structure Download PDFInfo
- Publication number
- CN108110674A CN108110674A CN201711315190.6A CN201711315190A CN108110674A CN 108110674 A CN108110674 A CN 108110674A CN 201711315190 A CN201711315190 A CN 201711315190A CN 108110674 A CN108110674 A CN 108110674A
- Authority
- CN
- China
- Prior art keywords
- opening
- block
- column
- diameter
- transmission line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及一种输电线路大直径滑车组开闭结构,大直径滑车组的结构包括上横梁、固定立柱、开口立柱、滑轮以及开闭组件,上横梁的横向两端下部分别安装有固定立柱的上端以及开口立柱的上端,在固定立柱与开口立柱的中部之间限位安装有多个滑轮,在开口立柱的上端与上横梁之间安装有一开闭组件。本发明能够使工作时安全程度提高,降低了工作强度,使工作中开、闭时间缩短,节约人工。
The invention relates to an opening and closing structure of a large-diameter pulley block of a power transmission line. The structure of the large-diameter block block includes an upper beam, a fixed column, an opening column, a pulley, and an opening and closing assembly. The upper end and the upper end of the open column, a plurality of pulleys are installed between the fixed column and the middle part of the open column, and an opening and closing assembly is installed between the upper end of the open column and the upper beam. The invention can improve the safety degree during work, reduce the work intensity, shorten the opening and closing time during work, and save labor.
Description
技术领域technical field
本发明涉及110kV以上高压输电线路施工领域,尤其是一种输电线路大直径滑车组开闭结构。The invention relates to the construction field of high-voltage transmission lines above 110kV, in particular to an opening and closing structure of a large-diameter pulley block of a transmission line.
背景技术Background technique
在导线展放过程中,需要进行高空作业。将挂在杆塔上的大直径滑车组进行开、闭。用于牵引导线的牵引绳导入到大直径滑车组内和导线导出大直径滑车组以外。《输电线路大直径滑车组开闭结构装置》就应用在此过程中。In the process of laying out the wires, high-altitude operations are required. Open and close the large-diameter block block hanging on the pole tower. The traction rope used for pulling the lead is introduced into the large-diameter block and the lead is exported outside the large-diameter block. The "Structure Device for Opening and Closing the Large-diameter Pulley Group of Transmission Lines" is applied in this process.
在110kV以上高压输电线路放线时,均需采用大直径滑车组来完成。工作时需要将每基杆塔上所挂的大直径滑车组进行导引绳的导入,然后将大直径滑车组进行闭合。待放线工作完成后再将大直径滑车组打开,然后放到地面。每一组大直径滑车组均需要在高空中开、闭各一次。When setting out high voltage transmission lines above 110kV, it is necessary to use large diameter pulley block to complete. During work, it is necessary to introduce the guide ropes of the large-diameter block blocks hung on each base tower, and then close the large-diameter block blocks. After the setting-out work is completed, the large-diameter block block is opened and then placed on the ground. Each group of large-diameter blocks needs to be opened and closed once in high altitude.
目前,大直径滑车组高空作业进行开、闭时通常采用两种方法:①采用工具为5吨倒链利用杆塔横梁将打开的大直径滑车组侧立柱吊起,与大直径滑车组上横梁进行插销链接。使得大直径滑车组闭合。随着放线工作的完成再将大直径滑车组用同样的方法打开。将大直径滑车组拆除落到地面上。采用在此项高空作业工作环节,需要至少2-3名人员完成,工作强度大、用时长,而且使用的工具(5吨倒链、2根钢丝扣、2个U环总重约40kg)笨重、安全程度低。操作不便。②利用杆塔下机动绞磨将钢丝绳通过杆塔上的转向滑轮,将大直径滑车组侧立柱吊起进行开、闭操作。采用此方法需要两人在杆塔上作业,而且还要有地面人员配合,同时需要机械的使用。At present, two methods are usually used for the opening and closing of large-diameter tackle groups during high-altitude operations: ①Use a tool of 5 tons to reverse the chain and use the tower beam to lift the opened large-diameter tackle group side column, and carry out the operation with the large-diameter tackle group upper beam. Pin link. This closes the large diameter block. With the completion of the setting-out work, the large-diameter block block is opened in the same way. Remove the block block with large diameter and drop it to the ground. In this high-altitude operation, at least 2-3 people are required to complete the work. The work intensity is high and the time is long, and the tools used (5 tons of chains, 2 wire buckles, and 2 U rings with a total weight of about 40kg) are heavy. , Low security. Inconvenient to operate. ② Use the motorized winch mill under the tower to pass the steel wire rope through the turning pulley on the tower, and lift the side column of the large-diameter block block for opening and closing operations. Adopt this method to need two people to work on pole tower, and also will have ground personnel to cooperate, need the use of machinery simultaneously.
经过检索查询不属于现有技术;也没有任何单位或者个人存在着同样的发明或者发明的申请。而且,本结构不仅改变了开、闭大直径滑车组受力点,而且所采用的工具是专用的。具有突出的实质性特点和显著的进步。与现有的工艺截然不同,简单易于操作,可以广泛用于输电线路施工中去。杆塔之间的转场极为方便。进行推广后具有很广泛的应用前景和经济效果。After searching and searching, it does not belong to the prior art; nor does any unit or individual have the same invention or application for the invention. Moreover, this structure not only changes the stress points of the open and close large-diameter pulley blocks, but also uses special tools. Has outstanding substantive features and notable progress. It is completely different from the existing technology, simple and easy to operate, and can be widely used in the construction of transmission lines. The transition between poles and towers is extremely convenient. After being popularized, it has wide application prospects and economic effects.
发明内容Contents of the invention
本发明的目的在于克服现有技术的不足,提供一种安装牢固可靠,拆除方便,使用可靠的输电线路大直径滑车组开闭结构。The object of the present invention is to overcome the deficiencies of the prior art, and provide a large-diameter pulley block opening and closing structure for a transmission line that is firm and reliable in installation, convenient in dismantling, and reliable in use.
本发明解决其技术问题是采取以下技术方案实现的:The present invention solves its technical problem and realizes by taking the following technical solutions:
一种输电线路大直径滑车组开闭结构,大直径滑车组的结构包括上横梁、固定立柱、开口立柱、滑轮以及开闭组件,上横梁的横向两端下部分别安装有固定立柱的上端以及开口立柱的上端,在固定立柱与开口立柱的中部之间限位安装有多个滑轮,其特征在于:在开口立柱的上端与上横梁之间安装有一开闭组件,An opening and closing structure of a large-diameter pulley block for a power transmission line. The structure of the large-diameter block block includes an upper beam, a fixed column, an opening column, a pulley, and an opening and closing assembly. On the upper end of the column, a plurality of pulleys are installed between the fixed column and the middle part of the open column. It is characterized in that: an opening and closing assembly is installed between the upper end of the open column and the upper beam.
开闭组件包括延伸板、连接挂板、调节销钉、丝杠以及调节螺母,在开口立柱的上端固装有一延伸板,该延伸板的上部一侧铰装有一连接挂板的下端,连接挂板的上端制有销孔并装有调节销钉,在上横梁制有与调节销钉相匹配的销孔;延伸板的上部另一侧铰装有丝杠的一端,丝杠的中部能够穿过上横梁的端部,并且在上横梁上方的丝杠上啮合安装有一调节螺母。The opening and closing assembly includes an extension plate, a connecting hanging plate, an adjusting pin, a lead screw and an adjusting nut. An extending plate is fixed on the upper end of the opening column, and a lower end of the connecting hanging plate is hinged on one side of the upper part of the extending plate. The upper end of the extension plate is made with a pin hole and is equipped with an adjusting pin, and the upper beam is made with a pin hole matching the adjusting pin; the other side of the upper part of the extension plate is hinged with one end of the screw, and the middle part of the screw can pass through the upper beam. end, and an adjusting nut is engaged and installed on the lead screw above the upper beam.
而且,所述延伸板的宽度大于开口立柱的宽度。Moreover, the width of the extension plate is greater than the width of the opening column.
而且,所述丝杠的另一端固装有一吊环。Moreover, the other end of the lead screw is fixedly equipped with a lifting ring.
而且,所述用于安装配合安装丝杠的上横梁端部固装/制成插入式开口槽,丝杠能够由该插入式开口槽的侧边摆转插入或脱离上横梁。Moreover, the end of the upper beam used for installing and fitting the lead screw is fixed/made into a plug-in open slot, and the lead screw can be swung into or out of the upper beam from the side of the plug-in open slot.
而且,所述连接挂板为两片式结构,两片结构相同的连接挂板对称设置在上横梁的前、后两端。Moreover, the connecting hanging board is a two-piece structure, and the two connecting hanging boards with the same structure are symmetrically arranged at the front and rear ends of the upper beam.
而且,所述连接挂板上端的销孔处均安装均布加强环。Moreover, evenly distributed reinforcement rings are installed at the pin holes at the top of the connecting hanging plate.
而且,所述开口立柱与延伸板之间采用实心矩形钢块焊接加固。Moreover, solid rectangular steel blocks are welded and reinforced between the open column and the extension plate.
而且,所述插入式开口槽的上端面为调节平台,调节平台上安装有凸块。Moreover, the upper end surface of the plug-in open slot is an adjustment platform, on which projections are installed.
本发明的优点和积极效果是:Advantage and positive effect of the present invention are:
1、本发明能够使工作时安全程度提高:由于高空作业区域变小,减少了高空交叉作业。改变了大直径滑车组开、闭时受力点。由原先杆塔横梁与大直径滑车组侧立柱受力,变为大直径滑车组自身钢板横梁与大直径滑车组侧立柱受力,高空中大直径滑车组的晃动减少了。1. The present invention can improve the safety level during work: because the high-altitude operation area becomes smaller, the high-altitude cross operation is reduced. The force point when the large-diameter block block is opened and closed has been changed. The force of the original tower beam and the side column of the large-diameter tackle group is changed to the force of the steel plate beam of the large-diameter tackle group and the side column of the large-diameter tackle group, and the shaking of the large-diameter tackle group in the high altitude is reduced.
2、本发明降低了工作强度:由于本发明仅需要一把扳手即可完成,使原有参与的工器具都不需要,节省了运输、攀登杆塔上下垂直运输极为轻盈便利。2. The present invention reduces the work intensity: because the present invention only needs a wrench to complete, the original participating tools are not needed, saving transportation, and the vertical transportation of climbing poles and towers is very light and convenient.
3、本发明使工作中开、闭时间缩短:由于施工工序较原先减少,从而操作简单,因此时间极大的得到压缩。3. The present invention shortens the opening and closing time during work: due to the reduction of construction procedures compared with the original one, the operation is simple, so the time is greatly compressed.
4、本发明节约人工:采用本发明整个工序完成仅仅需要一名操作人员即可完成,节省了人力投入,去掉了机械使用,降低了消耗。4. The present invention saves labor: only one operator is needed to complete the entire process by adopting the present invention, which saves manpower input, eliminates the use of machinery, and reduces consumption.
5、本发明装置部分组件均与大直径滑车组相连接,不存在个别组件操作过程中分离脱落的风险,保持高空作业期间高空坠物的不发生,从而进一步提高了施工过程的安全性。5. Some components of the device of the present invention are connected with large-diameter block blocks, so there is no risk of separation and falling of individual components during operation, and the occurrence of falling objects during high-altitude operations is kept, thereby further improving the safety of the construction process.
附图说明Description of drawings
图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2为图1的右视图;Fig. 2 is the right view of Fig. 1;
图3为图1的一个使用状态示意图;Fig. 3 is a schematic diagram of a usage state of Fig. 1;
图4为图1的另一使用状态示意图;Fig. 4 is a schematic diagram of another usage state of Fig. 1;
图5为开闭组件的局部放大示意图。Fig. 5 is a partially enlarged schematic diagram of the opening and closing assembly.
具体实施方式Detailed ways
下面结合附图并通过具体实施例对本发明作进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。The present invention will be further described in detail below in conjunction with the accompanying drawings and through specific embodiments. The following embodiments are only descriptive, not restrictive, and cannot limit the protection scope of the present invention.
一种输电线路大直径滑车组开闭结构,大直径滑车组的结构包括上横梁1、固定立柱11、开口立柱9、滑轮10以及开闭组件,上横梁的横向一端下部安装有固定立柱的上端,上横梁的横向另一端安装有开口立柱的上端,在固定立柱与开口立柱的中部之间连接有横梁(图中未示出),并在该横梁上限位安装有多个滑轮;An opening and closing structure of a large-diameter block block for a power transmission line. The structure of the large-diameter block block includes an upper beam 1, a fixed column 11, an opening column 9, a pulley 10, and an opening and closing assembly. , the upper end of the open column is installed on the other lateral end of the upper beam, and a beam (not shown) is connected between the fixed column and the middle part of the open column, and a plurality of pulleys are installed on the upper limit of the beam;
本发明的创新点在于:The innovation point of the present invention is:
在开口立柱的上端与上横梁之间安装有一开闭组件,该开闭组件的具体结构参见附图1至4所示,开闭组件包括延伸板8、连接挂板5、调节销钉2、丝杠6以及调节螺母4,在开口立柱的上端固装有一延伸板,延伸板的宽度大于开口立柱的宽度,该延伸板的上部一侧铰装有一连接挂板的下端,连接挂板的上端制有销孔并装有调节销钉,在上横梁制有与调节销孔相匹配的销孔13;An opening and closing assembly is installed between the upper end of the opening column and the upper beam. The specific structure of the opening and closing assembly is shown in Figures 1 to 4. The opening and closing assembly includes an extension plate 8, a connecting hanging plate 5, an adjustment pin 2, a wire Bar 6 and adjusting nut 4 are fixedly equipped with an extension plate at the upper end of the opening column. The width of the extension plate is greater than the width of the opening column. There are pin holes and adjusting pins are installed, and the upper beam is formed with pin holes 13 matching the adjusting pin holes;
延伸板的上部另一侧铰装有一压力轴承支架7,该压力轴承支架上端限位铰装有丝杠的一端,丝杠的另一端固装有一吊环3可根据需要配合吊车使用,方便行进大幅度的开、闭作业;The other side of the upper part of the extension plate is hinged with a pressure bearing bracket 7, the upper end of the pressure bearing bracket is hinged with one end of the lead screw, and the other end of the lead screw is fixed with a lifting ring 3, which can be used with a crane as required to facilitate large-scale travel. The opening and closing operation of the amplitude;
丝杠的中部能够穿过上横梁的端部,并且在上横梁上方的丝杠上啮合安装有一调节螺母4,转动该调节螺母能够调节丝杠进行上下移动,从而拉紧或放开上横梁与开口立柱;通过大直径滑车组本身的梁柱之间相互作用,调节开口立柱的上下幅度,从而使连接挂板能够得到放松进行开闭。The middle part of the screw can pass through the end of the upper beam, and an adjusting nut 4 is engaged on the screw above the upper beam. Turning the adjusting nut can adjust the screw to move up and down, thereby tightening or releasing the upper beam and the upper beam. Opening column: Through the interaction between the beams and columns of the large-diameter block block itself, the upper and lower ranges of the opening column are adjusted, so that the connecting hanging plate can be loosened for opening and closing.
参见附图2所示,用于安装配合安装丝杠的上横梁端部固装/制成插入式开口槽12,丝杠能够由该插入式开口槽的侧边摆转插入或脱离上横梁。Referring to shown in accompanying drawing 2, be used for installing the upper crossbeam end that cooperates to install lead screw and fix/make plug-in type opening groove 12, leading screw can swing and insert or break away from the upper crossbeam by the side of this plug-in type open groove.
连接挂板5为两片式结构,两片结构相同的连接挂板对称设置在上横梁的前后两端,共同承载受力,保证支撑强度;在连接挂板上端的销孔处均安装均布加强环,延长使用寿命,加固过程不改变原有的大直径滑车组受力状态和受力强度。The connecting hanging plate 5 is a two-piece structure, and the two connecting hanging plates with the same structure are symmetrically arranged on the front and rear ends of the upper beam, and jointly bear the force to ensure the supporting strength; The reinforcement ring prolongs the service life, and the reinforcement process does not change the stress state and strength of the original large-diameter block block.
开口立柱与延伸板进行加固,采用实心矩形钢块焊接牢固。The opening column and the extension plate are reinforced, and solid rectangular steel blocks are welded firmly.
参见附图5所示,插入式开口槽的上端面为调节平台,调节平台上安装有凸块14,作为调节平台的保护定位结构。Referring to the accompanying drawing 5, the upper end surface of the plug-in open slot is an adjustment platform, and a bump 14 is installed on the adjustment platform as a protection positioning structure for the adjustment platform.
本结构在大直径滑车组横梁、侧立柱的基础上进行改造,将原有大直径滑车组上横梁钢板在一端延伸出一部分,将原侧立柱上端设计成挂板连接。侧立柱向外延伸一部分形成下端铰接。与上横梁延长出来的梁头插口平面通过丝杠、上端紧固螺栓连接。This structure is modified on the basis of large-diameter block beams and side columns. A part of the original large-diameter block upper beam steel plate is extended at one end, and the upper end of the original side columns is designed as a hanging plate connection. A part of the side column extends outward to form a lower hinge. The socket plane of the beam head extended from the upper cross beam is connected by a lead screw and a fastening bolt at the upper end.
工作方式如下:It works like this:
工作开始后,内侧连接挂板工作,外侧丝杠打开。将牵引绳放置在通过丝杠与连接挂板之间,该位置作为过渡区间。After the work starts, the inner side connects the hanging plate to work, and the outer leading screw opens. Place the traction rope between the lead screw and the connecting hanging plate, and this position is used as a transition zone.
合上丝杠用上端紧固螺栓调节大直径滑车组侧立柱上下幅度,使丝杠承载滑车重量从而使内侧的连接挂板连接螺栓放松;Close the lead screw and use the fastening bolts at the upper end to adjust the vertical range of the side column of the large-diameter tackle group, so that the lead screw can bear the weight of the tackle and loosen the connecting bolts on the inner connecting plate;
拆开连接挂板将牵引绳导入滑车内,然后再行还原,将连接挂板重新安装。Disassemble the connecting hanging plate and guide the traction rope into the block, then restore it, and reinstall the connecting hanging plate.
放松丝杠螺栓,使大直径滑车组正常工作,完成了牵引绳入滑车的全过程,整个过程平稳安全。Loosen the lead screw bolts to make the large-diameter block block work normally, and complete the whole process of the traction rope entering the block block, and the whole process is smooth and safe.
本结构可以完全代替了原有的5吨倒链及钢丝扣的使用,代替了机械使用,减少作业人员的投入。This structure can completely replace the use of the original 5-ton down chain and steel wire buckle, replace the use of machinery, and reduce the investment of operators.
尽管为说明目的公开了本发明的实施例和附图,但是本领域的技术人员可以理解:在不脱离本发明及所附权利要求的精神和范围内,各种替换、变化和修改都是可能的,因此,本发明的范围不局限于实施例和附图所公开的内容。Although the embodiments and drawings of the present invention are disclosed for the purpose of illustration, those skilled in the art can understand that various replacements, changes and modifications are possible without departing from the spirit and scope of the present invention and the appended claims Therefore, the scope of the present invention is not limited to what is disclosed in the embodiments and drawings.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711315190.6A CN108110674A (en) | 2017-12-12 | 2017-12-12 | A kind of transmission line of electricity major diameter tackle pulley opening and closing structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711315190.6A CN108110674A (en) | 2017-12-12 | 2017-12-12 | A kind of transmission line of electricity major diameter tackle pulley opening and closing structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108110674A true CN108110674A (en) | 2018-06-01 |
Family
ID=62209565
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201711315190.6A Pending CN108110674A (en) | 2017-12-12 | 2017-12-12 | A kind of transmission line of electricity major diameter tackle pulley opening and closing structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108110674A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114013866A (en) * | 2021-11-26 | 2022-02-08 | 靖江市高新窑炉材料有限公司 | A collection device for endangering change waste material |
| CN115800093A (en) * | 2022-09-19 | 2023-03-14 | 天津送变电工程有限公司 | Adjustable wheelbase pay-off block |
-
2017
- 2017-12-12 CN CN201711315190.6A patent/CN108110674A/en active Pending
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114013866A (en) * | 2021-11-26 | 2022-02-08 | 靖江市高新窑炉材料有限公司 | A collection device for endangering change waste material |
| CN114013866B (en) * | 2021-11-26 | 2024-05-24 | 靖江市高新窑炉材料有限公司 | Collecting device for hazardous waste |
| CN115800093A (en) * | 2022-09-19 | 2023-03-14 | 天津送变电工程有限公司 | Adjustable wheelbase pay-off block |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201458596U (en) | Crane with self-dismounting device | |
| CN204897151U (en) | Transmission line tower integral hoisting specialized tool that acts as go -between | |
| CN203924874U (en) | Attaching pole is from lifting appliance | |
| CN103545751A (en) | Overhead transmission line ground wire optical cable fittings replacement bracket | |
| CN202529736U (en) | Combined movable lifting frame | |
| CN101877460B (en) | Extreme high voltage combined paying off pulley | |
| CN108110674A (en) | A kind of transmission line of electricity major diameter tackle pulley opening and closing structure | |
| CN101402436A (en) | Method and apparatus for disassembling cargo boom of climbing tower crane | |
| CN208648556U (en) | A kind of steel structure girder sling and jig | |
| CN105110205B (en) | A kind of reverse method for dismounting of derrick crane | |
| CN114873445B (en) | Lifting tooling and lifting method for prefabricated bridge components | |
| CN212222219U (en) | Adjustable arch rib installation hoisting device | |
| CN206417777U (en) | A kind of suspender of gravity-center adjustable position | |
| CN101767753B (en) | A kind of vertical lifting belt hoisting method | |
| CN210286650U (en) | Lifting and moving tool for valve body on vertical trap of natural gas separator | |
| CN218813232U (en) | Auxiliary mounting, dismounting and fixing device for prestressed box girder tensioning jack | |
| CN201495028U (en) | Large-tonnage tunnel concrete segment horizontal hoisting tool | |
| CN211923462U (en) | Operation platform for the construction of a twisted steel structure leaning tower with a steel box with any section in space | |
| CN109368478A (en) | Fixing system and floor slab removal and lifting method | |
| CN204040498U (en) | A kind of steel work Multi-section column lifting automatic decoupling device | |
| CN208916606U (en) | It is a kind of large size I-shape construction construction use suspender | |
| CN203284167U (en) | Hanging cable pulley overhauling device of large bridge crane | |
| CN201388018Y (en) | UHV combined pay-off tackle | |
| CN221821654U (en) | Hydraulic support balancing and upper protecting jack dismounting device | |
| CN210084765U (en) | Split type crane towing pulley |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180601 |