CN108089120A - Improve rapid grounding plug-in strip branch wire time measuring accuracy analysis system - Google Patents

Improve rapid grounding plug-in strip branch wire time measuring accuracy analysis system Download PDF

Info

Publication number
CN108089120A
CN108089120A CN201711220259.7A CN201711220259A CN108089120A CN 108089120 A CN108089120 A CN 108089120A CN 201711220259 A CN201711220259 A CN 201711220259A CN 108089120 A CN108089120 A CN 108089120A
Authority
CN
China
Prior art keywords
make control
main break
zhi kaiguan
control module
kaiguan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711220259.7A
Other languages
Chinese (zh)
Inventor
王慧军
邹光毅
吴琦
刘耀中
曹庆
王良锋
赵维国
赵新
黄荣川
黄骏
郭樑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Construction Group East China Electric Power Test And Research Institute Co Ltd
East China Power Test and Research Institute Co Ltd
Original Assignee
China Energy Construction Group East China Electric Power Test And Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Construction Group East China Electric Power Test And Research Institute Co Ltd filed Critical China Energy Construction Group East China Electric Power Test And Research Institute Co Ltd
Priority to CN201711220259.7A priority Critical patent/CN108089120A/en
Publication of CN108089120A publication Critical patent/CN108089120A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers

Abstract

The invention discloses improve rapid grounding plug-in strip branch wire time measuring accuracy analysis system.It is related to earthing switch blade technical field.The branch wire time length for the earthing switch blade that will be used can accurately be detected.Including the main break-make control module of No.1, No. two main break-make control modules, memory and controller;The input terminal of the main break-make control module of No.1 and the input terminal of No. two main break-make control modules are connected, the output terminal of the main break-make control module of No.1 and the output terminal of No. two main break-make control modules are connected, and the control terminal of the main break-make control module of the memory, No.1 and the control terminal of No. two main break-make control modules are connected respectively with controller.

Description

Improve rapid grounding plug-in strip branch wire time measuring accuracy analysis system
Technical field
The present invention relates to earthing switch blade technical fields, and in particular to improves rapid grounding plug-in strip branch wire time measuring accuracy Analysis system.
Background technology
Earthing switch blade is in the long-term use, it may appear that mechanical breakdown generates divide-shut brake and is advanced or delayed, causes division Lock time span cannot be completed on defined time point, so as to influence the divide-shut brake precision of earthing switch blade, to earthing switch blade Control brings uncertain factor.Existing earthing switch blade cannot all make branch wire time length the detection of precision, therefore cause Earthing switch blade is inconvenient when in use accurately to control earthing switch blade.
The content of the invention
The present invention is to solve the deficiency that existing earthing switch blade cannot be detected the precision of branch wire time, provide A kind of that the branch wire time length for the earthing switch blade that will be used accurately can be detected, reliability is high, and security is good to be carried High rapid grounding plug-in strip branch wire time measuring accuracy analysis system.
More than technical problem is solved by following technical proposal:
Rapid grounding plug-in strip branch wire time measuring accuracy analysis system is improved, including the main break-make control module of No.1, two Number main break-make control module, memory and controller;The input terminal of the main break-make control module of No.1 and No. two main break-make controls The input terminal of molding block is connected, the output terminal of the main break-make control module of No.1 and the output of No. two main break-make control modules End is connected, the control terminal of the main break-make control module of the memory, No.1 and the control terminal of No. two main break-make control modules point It is not connected with controller.
When the main break-make control module of No.1 is closed a floodgate, No. two main break-make control modules then in gate-dividing state, otherwise also one Sample, when No. two main break-make control modules are closed a floodgate, the main break-make control module of No.1 is then in gate-dividing state.
When No. two main break-make control modules are closed a floodgate, the main break-make control module of No.1 at this time is then off, this When detect respectively under the control of the controller the main break-make control module of No.1 separating brake reaction duration T1 value and the main break-make of No.1 The value of the combined floodgate reaction duration T2 of control module.When back to back next time in the main break-make control module of No.1 also in separating brake In the case of when carrying out combined floodgate operation to the main break-make control module of No.1, then the T2 before preset closing time point H Time our controller will send reclosing command to the main break-make control module of No.1, and so main break-make control module of No.1 will Plug-in strip is closed at the prespecified closing time point H moment.Lead to next time also in the No.1 master of "on" position when back to back When disconnected control module will carry out separating brake, then the T1 times our controller before preset opening time point J will be to The main break-make control module of No.1 sends separating brake instruction, and so main break-make control module of No.1 will be in prespecified opening time Point J moment minute separating brake knives.
When the main break-make control module of No.1 is closed a floodgate, No. two main break-make control modules at this time are then off, this When detect respectively under the control of the controller No. two main break-make control modules separating brake reaction duration T3 value and No. two main break-makes The value of the combined floodgate reaction duration T4 of control module.When back to back next time in No. two main break-make control modules also in separating brake In the case of when carrying out combined floodgate operation to No. two main break-make control modules, then the T4 before preset closing time point H Time our controller will send reclosing command to No. two main break-make control modules, and such No. two main break-make control modules will Plug-in strip is closed at the prespecified closing time point H moment.When back to back next time logical also in No. two masters of "on" position When disconnected control module will carry out separating brake, then the T3 times our controller before preset opening time point J will be to No. two main break-make control modules send separating brake instruction, and such No. two main break-make control modules will be in prespecified opening time Point J moment minute separating brake knives.
After being detected by the divide-shut brake duration to the main break-make control module of No.1 and No. two main break-make control modules, just It can more accurately the branch wire time length of the earthing switch blade to that will use accurately be detected so that can have when in use Effect accurately controls the divide-shut brake moment of earthing switch blade.Reliability is high, and security is good.
Preferably, further including No.1 node and No. two nodes, the main break-make control module of No.1 is opened including a No.1 left side It closes, No.1 relay and the right switch of No.1, No. two main break-make control modules include No. two left-handed openings, No. two relays and two Number right switch;The left end of the No.1 left-handed opening and the left end of No. two left-handed openings are connected on No.1 node;The No.1 The right end of left-handed opening is connected to the left end of No.1 relay, and the right end of No.1 relay is connected to the left end of the right switch of No.1, and one The right end of number right switch is connected on No. two nodes;The right end of No. two left-handed openings is connected to the left end of No. two relays, and two The right end of number relay is connected to the left end of No. two right switches, and the right end of No. two right switches is connected on No. two nodes.
When detecting the divide-shut brake duration of No.1 relay, No.1 left-handed opening and the right switch of No.1 is first allowed all to disconnect, then The divide-shut brake duration of No.1 relay can be detected under the control of the controller, the divide-shut brake duration of the No.1 relay The as divide-shut brake duration of the main break-make control module of No.1.Similarly, two are first allowed when detecting the divide-shut brake duration of No. two relays, Number left-handed opening and No. two right switches disconnect, and then the divide-shut brake duration of No. two relays can be carried out under the control of the controller Detection, the divide-shut brake duration of No. two relays is the divide-shut brake duration of No. two main break-make control modules.It is this simple in structure, Good reliability is easy to carry out the branch wire time length of earthing switch blade accurate detection control.
Preferably, analysis system further includes the left Zhi Kaiguan of No.1, the right Zhi Kaiguan of No.1, No. two left Zhi Kaiguan, No. two right sides Zhi Kaiguan and detection power supply, one end of the left Zhi Kaiguan of No.1 are connected to one end of No.1 relay, and the left Zhi Kaiguan's of No.1 is another End is connected to an electrode tip of detection power supply;One end of the right Zhi Kaiguan of No.1 is connected to the other end of No.1 relay, No.1 The other end of right Zhi Kaiguan is connected to another electrode tip of detection power supply;One end of No. two left Zhi Kaiguan is connected to No. two relays One end of device, the other end of No. two left Zhi Kaiguan are connected to an electrode tip of detection power supply;One end of No. two right Zhi Kaiguan connects The other end of No. two relays is connected on, the other end of No. two right Zhi Kaiguan is connected to another electrode tip of detection power supply;It is described The control terminal of the right Zhi Kaiguan of control terminal, No.1 of the left Zhi Kaiguan of No.1, the control terminal and No. two right Zhi Kaiguan of No. two left Zhi Kaiguan Control terminal be connected respectively with controller.
When detecting the divide-shut brake duration of No.1 relay, No.1 left-handed opening and the right switch of No.1 is first allowed all to disconnect, then The left Zhi Kaiguan of No.1 and the right Zhi Kaiguan of No.1 is allowed all to be closed, it then under the control of the controller can be to the division of No.1 relay Lock duration is detected, and the divide-shut brake duration of the No.1 relay is the divide-shut brake duration of the main break-make control module of No.1.Together Reason when detecting the divide-shut brake duration of No. two relays, first allows No. two left-handed openings and No. two right switches all to disconnect, and then allows No. two Left Zhi Kaiguan and No. two right Zhi Kaiguan is closed, then under the control of the controller can be to the divide-shut brake duration of No. two relays It is detected, the divide-shut brake duration of No. two relays is the divide-shut brake duration of No. two main break-make control modules.This structure Simply, good reliability is easy to carry out the branch wire time length of earthing switch blade accurate detection control.
Preferably, being equipped with No.1 light emitting diode only on the electric power loop of the right Zhi Kaiguan of No.1, analysis system is also wrapped The No.1 photoelectric sensor for the light that No.1 light emitting diode is sent can only be received by including;Only returned in the power supply of No. two right Zhi Kaiguan Road is equipped with No. two light emitting diodes, and analysis system, which further includes, can only receive No. two of the light that No. two light emitting diodes are sent Photoelectric sensor;No.1 photoelectric sensor and No. two photoelectric sensors are connected respectively with controller.
When detecting the divide-shut brake duration of No.1 relay, No.1 left-handed opening and the right switch of No.1 is first allowed all to disconnect, then The left Zhi Kaiguan of No.1 and the right Zhi Kaiguan of No.1 is allowed all to be closed, if at this time when No.1 relay closes a floodgate if at No.1 light emitting diode In luminance, at this time when No.1 relay separating brake if No.1 light emitting diode be in non-light emitting state.Then in controller Control under, detect and can't detect No.1 to No.1 photoelectric sensor since controller sends to No.1 relay separating brake instruction Time span when light emitting diode sends light is the opening time length of No.1 relay, also the as main break-make control of No.1 The separating brake duration of module.Detection is detected since controller sends reclosing command to No.1 relay to No.1 photoelectric sensor Time span when No.1 light emitting diode sends light is the closing time length of No.1 relay, also the as main break-make of No.1 The combined floodgate duration of control module.It similarly can detect the divide-shut brake duration of No. two main break-make control modules.It is achieved thereby that docking The branch wire time length of ground plug-in strip carries out accurate detection control.
The present invention can reach following effect:
The present invention is examined by the divide-shut brake duration to the main break-make control module of No.1 and No. two main break-make control modules It, just can more accurately the branch wire time length of the earthing switch blade to that will use accurately be detected so that make after survey Used time can effectively accurately control the divide-shut brake moment of earthing switch blade.Reliability is high, and security is good.
Description of the drawings
Fig. 1 is a kind of attachment structure schematic diagram of the present invention.
Fig. 2 is a kind of circuit theory connection structure schematic block diagram of the present invention.
Specific embodiment
The present invention is further illustrated with embodiment below in conjunction with the accompanying drawings.
Embodiment:Rapid grounding plug-in strip branch wire time measuring accuracy analysis system is improved, referring to shown in Fig. 1, Fig. 2.Bag Include 1, No. two main break-make control module 2 of the main break-make control module of No.1, memory 22 and controller 21;The main break-make control of No.1 The input terminal of molding block and the input terminal of No. two main break-make control modules are connected, the output of the main break-make control module of No.1 End be connected with the output terminal of No. two main break-make control modules, the control terminal of the main break-make control module of the memory, No.1 and The control terminal of No. two main break-make control modules is connected respectively with controller.
No.1 node 3 and No. two nodes 4 are further included, the main break-make control module of No.1 includes No.1 left-handed opening 5, No.1 Relay 6 and the right switch 7 of No.1, No. two main break-make control modules include 8, No. two relays 9 of No. two left-handed openings and No. two Right switch 10;The left end of the No.1 left-handed opening and the left end of No. two left-handed openings are connected on No.1 node;The No.1 The right end of left-handed opening is connected to the left end of No.1 relay, and the right end of No.1 relay is connected to the left end of the right switch of No.1, and one The right end of number right switch is connected on No. two nodes;The right end of No. two left-handed openings is connected to the left end of No. two relays, and two The right end of number relay is connected to the left end of No. two right switches, and the right end of No. two right switches is connected on No. two nodes.
Analysis system further includes left 13, No. two right sides of Zhi Kaiguan of the right Zhi Kaiguan of the left Zhi Kaiguan 11 of No.1, No.1 12, two and gets out 14 and detection power supply 15 are closed, one end of the left Zhi Kaiguan of No.1 is connected to one end of No.1 relay, and the left Zhi Kaiguan's of No.1 is another End is connected to an electrode tip of detection power supply;One end of the right Zhi Kaiguan of No.1 is connected to the other end of No.1 relay, No.1 The other end of right Zhi Kaiguan is connected to another electrode tip of detection power supply;One end of No. two left Zhi Kaiguan is connected to No. two relays One end of device, the other end of No. two left Zhi Kaiguan are connected to an electrode tip of detection power supply;One end of No. two right Zhi Kaiguan connects The other end of No. two relays is connected on, the other end of No. two right Zhi Kaiguan is connected to another electrode tip of detection power supply;It is described The control terminal of the right Zhi Kaiguan of control terminal, No.1 of the left Zhi Kaiguan of No.1, the control terminal and No. two right Zhi Kaiguan of No. two left Zhi Kaiguan Control terminal be connected respectively with controller.
No.1 light emitting diode 16 is equipped with only on the electric power loop of the right Zhi Kaiguan of No.1, analysis system, which further includes, to be connect Receive the No.1 photoelectric sensor 17 for the light that No.1 light emitting diode is sent;Only set on the electric power loop of No. two right Zhi Kaiguan There are No. two light emitting diodes 18, analysis system further includes No. two photoelectricity that can only receive the light that No. two light emitting diodes are sent Sensor 19;No.1 photoelectric sensor and No. two photoelectric sensors are connected respectively with controller.In the power supply of the right Zhi Kaiguan of No.1 No.1 light emitting diode then shines during circuit closed.When the electric power loop of No. two right Zhi Kaiguan is closed, No. two light emitting diodes are then It shines.
When the main break-make control module of No.1 is closed a floodgate, No. two main break-make control modules then in gate-dividing state, otherwise also one Sample, when No. two main break-make control modules are closed a floodgate, the main break-make control module of No.1 is then in gate-dividing state.
When No. two main break-make control modules are closed a floodgate, the main break-make control module of No.1 at this time is then off, this When detect respectively under the control of the controller the main break-make control module of No.1 separating brake reaction duration T1 value and the main break-make of No.1 The value of the combined floodgate reaction duration T2 of control module.When back to back next time in the main break-make control module of No.1 also in separating brake In the case of when carrying out combined floodgate operation to the main break-make control module of No.1, then the T2 before preset closing time point H Time our controller will send reclosing command to the main break-make control module of No.1, and so main break-make control module of No.1 will Plug-in strip is closed at the prespecified closing time point H moment.Lead to next time also in the No.1 master of "on" position when back to back When disconnected control module will carry out separating brake, then the T1 times our controller before preset opening time point J will be to The main break-make control module of No.1 sends separating brake instruction, and so main break-make control module of No.1 will be in prespecified opening time Point J moment minute separating brake knives.
When the main break-make control module of No.1 is closed a floodgate, No. two main break-make control modules at this time are then off, this When detect respectively under the control of the controller No. two main break-make control modules separating brake reaction duration T3 value and No. two main break-makes The value of the combined floodgate reaction duration T4 of control module.When back to back next time in No. two main break-make control modules also in separating brake In the case of when carrying out combined floodgate operation to No. two main break-make control modules, then the T4 before preset closing time point H Time our controller will send reclosing command to No. two main break-make control modules, and such No. two main break-make control modules will Plug-in strip is closed at the prespecified closing time point H moment.When back to back next time logical also in No. two masters of "on" position When disconnected control module will carry out separating brake, then the T3 times our controller before preset opening time point J will be to No. two main break-make control modules send separating brake instruction, and such No. two main break-make control modules will be in prespecified opening time Point J moment minute separating brake knives.
When detecting the divide-shut brake duration of No.1 relay, No.1 left-handed opening and the right switch of No.1 is first allowed all to disconnect, then The left Zhi Kaiguan of No.1 and the right Zhi Kaiguan of No.1 is allowed all to be closed, if at this time when No.1 relay closes a floodgate if at No.1 light emitting diode In luminance, at this time when No.1 relay separating brake if No.1 light emitting diode be in non-light emitting state.Then in controller Control under, detect and can't detect No.1 to No.1 photoelectric sensor since controller sends to No.1 relay separating brake instruction Time span when light emitting diode sends light is the opening time length of No.1 relay, also the as main break-make control of No.1 The separating brake duration of module.Detection is detected since controller sends reclosing command to No.1 relay to No.1 photoelectric sensor Time span when No.1 light emitting diode sends light 20 is the closing time length of No.1 relay, and also as No.1 master is led to The combined floodgate duration of disconnected control module.Similarly, No. two left-handed openings and No. two are first allowed when detecting the divide-shut brake duration of No. two relays, Right switch all disconnects, and No. two left Zhi Kaiguan and No. two right Zhi Kaiguan is then allowed all to be closed, if if when No. two relays close a floodgate at this time Then No. two light emitting diodes are in luminance, at this time when No. two relay separating brakes if No. two light emitting diodes be in and do not shine State.Then under the control of the controller, detect since controller sends separating brake instruction to No. two relays to No. two photoelectricity The time span that sensor can't detect when No. two light emitting diodes send light is the opening time length of No. two relays, The separating brake duration of as No. two main break-make control modules.Detection is since controller sends reclosing command to No. two relays to two The time span that number photoelectric sensor detects when No. two light emitting diodes send light is that the closing time of No. two relays is long It spends, also the combined floodgate duration of as No. two main break-make control modules.
When the divide-shut brake duration of No.1 relay is more than 2 times of setting value, then controller sends phonetic order, with control The voice prompting device that device is connected then sends corresponding voice prompt.Prompting staff in time ties up No.1 relay Shield.With should the divide-shut brake durations of No. two relays be more than 2 times of setting value when, then controller sends phonetic order, with control The voice prompting device that device is connected then sends corresponding voice prompt.Prompting staff in time ties up No. two relays Shield.
After being detected by the divide-shut brake duration to the main break-make control module of No.1 and No. two main break-make control modules, just It can more accurately the branch wire time length of the earthing switch blade to that will use accurately be detected so that can have when in use Effect accurately controls the divide-shut brake moment of earthing switch blade.Reliability is high, and security is good.
Embodiments of the present invention are described above in conjunction with attached drawing, however, the implementation is not limited to the above embodiments, this field Those of ordinary skill can be with various changes and modifications may be made within the scope of the appended claims.

Claims (4)

1. improve rapid grounding plug-in strip branch wire time measuring accuracy analysis system, which is characterized in that including the main break-make control of No.1 Molding block, No. two main break-make control modules, memory and controller;The input terminal of the main break-make control module of No.1 and No. two The input terminal of main break-make control module is connected, the output terminal of the main break-make control module of No.1 and No. two main break-make control moulds The output terminal of block is connected, the control terminal of the main break-make control module of the memory, No.1 and No. two main break-make control modules Control terminal is connected respectively with controller.
2. raising rapid grounding plug-in strip branch wire time measuring accuracy analysis system according to claim 1, feature exist In, further include No.1 node and No. two nodes, the main break-make control module of No.1 include No.1 left-handed opening, No.1 relay and The right switch of No.1, No. two main break-make control modules include No. two left-handed openings, No. two relays and No. two right switches;Described one Number left end of left-handed opening and the left end of No. two left-handed openings are connected on No.1 node;The right end connection of the No.1 left-handed opening In the left end of No.1 relay, the right end of No.1 relay is connected to the left end of the right switch of No.1, and the right end of the right switch of No.1 connects It is connected on No. two nodes;The right end of No. two left-handed openings is connected to the left end of No. two relays, and the right end of No. two relays connects The left end of No. two right switches is connected on, the right end of No. two right switches is connected on No. two nodes.
3. raising rapid grounding plug-in strip branch wire time measuring accuracy analysis system according to claim 2, feature exist In analysis system further includes the left Zhi Kaiguan of No.1, the right Zhi Kaiguan of No.1, No. two left Zhi Kaiguan, No. two right Zhi Kaiguan and detection electricity Source, one end of the left Zhi Kaiguan of No.1 are connected to one end of No.1 relay, and the other end of the left Zhi Kaiguan of No.1 is connected to detection electricity One electrode tip in source;One end of the right Zhi Kaiguan of No.1 is connected to the other end of No.1 relay, and the right Zhi Kaiguan's of No.1 is another End is connected to another electrode tip of detection power supply;One end of No. two left Zhi Kaiguan is connected to one end of No. two relays, No. two The other end of left Zhi Kaiguan is connected to an electrode tip of detection power supply;One end of No. two right Zhi Kaiguan is connected to No. two relays The other end, the other end of No. two right Zhi Kaiguan is connected to another electrode tip of detection power supply;The left Zhi Kaiguan's of No.1 The control terminal of the control terminal of the right Zhi Kaiguan of control terminal, No.1, the control terminal of No. two left Zhi Kaiguan and No. two right Zhi Kaiguan respectively with Controller connects.
4. raising rapid grounding plug-in strip branch wire time measuring accuracy analysis system according to claim 3, feature exist In equipped with No.1 light emitting diode only on the electric power loop of the right Zhi Kaiguan of No.1, analysis system, which further includes, can only receive one The No.1 photoelectric sensor for the light that number light emitting diode is sent;No. two hairs are equipped with only on the electric power loop of No. two right Zhi Kaiguan Optical diode, analysis system further include No. two photoelectric sensors that can only receive the light that No. two light emitting diodes are sent;One Number photoelectric sensor and No. two photoelectric sensors are connected respectively with controller.
CN201711220259.7A 2017-11-28 2017-11-28 Improve rapid grounding plug-in strip branch wire time measuring accuracy analysis system Pending CN108089120A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711220259.7A CN108089120A (en) 2017-11-28 2017-11-28 Improve rapid grounding plug-in strip branch wire time measuring accuracy analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711220259.7A CN108089120A (en) 2017-11-28 2017-11-28 Improve rapid grounding plug-in strip branch wire time measuring accuracy analysis system

Publications (1)

Publication Number Publication Date
CN108089120A true CN108089120A (en) 2018-05-29

Family

ID=62173198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711220259.7A Pending CN108089120A (en) 2017-11-28 2017-11-28 Improve rapid grounding plug-in strip branch wire time measuring accuracy analysis system

Country Status (1)

Country Link
CN (1) CN108089120A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2266144Y (en) * 1996-04-27 1997-10-29 张永祥 Off and on time metering device for portable circuit breaker
CN102435942A (en) * 2011-09-06 2012-05-02 武汉义天科技有限公司 Electromagnetic induction system of high-tension switch fracture and test method thereof
US20130119782A1 (en) * 2008-10-08 2013-05-16 Denso Corporation Electric power source circuit and abnormality diagnosis system
CN203870217U (en) * 2014-04-24 2014-10-08 国家电网公司 Double-grounding circuit breaker dynamic characteristic analyzer
CN104101832A (en) * 2014-06-18 2014-10-15 国家电网公司 High voltage circuit breaker movement characteristic test method
CN104934264A (en) * 2015-07-09 2015-09-23 深圳市兰丁科技有限公司 Method of protecting relay and system thereof
CN204719205U (en) * 2015-06-24 2015-10-21 广东电网有限责任公司佛山供电局 Isolating switch time-parameters test simulator
CN206421002U (en) * 2016-10-08 2017-08-18 广东电网有限责任公司湛江供电局 10kV switches point, closing time tester
CN107179500A (en) * 2017-06-19 2017-09-19 国家电网公司 The method that branch wire time is measured during breaker two-terminal-grounding based on orthogonal pulses

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2266144Y (en) * 1996-04-27 1997-10-29 张永祥 Off and on time metering device for portable circuit breaker
US20130119782A1 (en) * 2008-10-08 2013-05-16 Denso Corporation Electric power source circuit and abnormality diagnosis system
CN102435942A (en) * 2011-09-06 2012-05-02 武汉义天科技有限公司 Electromagnetic induction system of high-tension switch fracture and test method thereof
CN203870217U (en) * 2014-04-24 2014-10-08 国家电网公司 Double-grounding circuit breaker dynamic characteristic analyzer
CN104101832A (en) * 2014-06-18 2014-10-15 国家电网公司 High voltage circuit breaker movement characteristic test method
CN204719205U (en) * 2015-06-24 2015-10-21 广东电网有限责任公司佛山供电局 Isolating switch time-parameters test simulator
CN104934264A (en) * 2015-07-09 2015-09-23 深圳市兰丁科技有限公司 Method of protecting relay and system thereof
CN206421002U (en) * 2016-10-08 2017-08-18 广东电网有限责任公司湛江供电局 10kV switches point, closing time tester
CN107179500A (en) * 2017-06-19 2017-09-19 国家电网公司 The method that branch wire time is measured during breaker two-terminal-grounding based on orthogonal pulses

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郝建成: "断路器两端接地时分、合闸时间的测试方法", 《高压电器》 *

Similar Documents

Publication Publication Date Title
CN106841876B (en) A kind of monitoring method of relay protection outlet pressing plate
CN101459302A (en) All-purpose leakage protection plug for ground wire live trip
CN109683012A (en) For measuring load current and for diagnosing unloaded or overload system
CN106707903A (en) Novel permanent magnet mechanism controller for high-voltage circuit breaker
CN106207974B (en) Dc motor protector and its operation method
CN108089120A (en) Improve rapid grounding plug-in strip branch wire time measuring accuracy analysis system
CN110416028A (en) Contactor voltage control circuit and contactor system
CN204070534U (en) Electronic cigarette
CN103941094B (en) Internal-resistance acquisition device for valve-regulated lead acid storage batteries
CN203800556U (en) Microcomputer protection device exit relay drive circuit
CN205880140U (en) Diode test control circuit and test system
CN205374620U (en) Portable digital relay protection tester
CN106653421A (en) Circuit breaker switching-on and switching-off control method
CN207488458U (en) A kind of raising rapid grounding plug-in strip branch wire time measuring accuracy analysis system
CN204269750U (en) Diode open-circuit testing circuit
CN207832954U (en) The test control device and test system of bypass diode
CN203773014U (en) DC 110V online insulation detection apparatus
CN204029084U (en) Cable anti-theft device
CN107592715A (en) A kind of illuminator for power equipment personnel
CN104407252B (en) The safety detection circuit and its detection method of a kind of mining switching machine control button
CN206584199U (en) A kind of novel permanent magnetic mechanics controller of primary cut-out
CN103607824B (en) A kind of controlling apparatus for indicator lamp and system
CN208607271U (en) Relay rear end voltage collection circuit and power supply
CN109688679B (en) Method and device for determining fault reason
CN204887606U (en) Intelligent bulb of function is surveyed to outband portion switch

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180529

RJ01 Rejection of invention patent application after publication