CN108083102A - Metallurgy handling apparatus - Google Patents

Metallurgy handling apparatus Download PDF

Info

Publication number
CN108083102A
CN108083102A CN201611022664.3A CN201611022664A CN108083102A CN 108083102 A CN108083102 A CN 108083102A CN 201611022664 A CN201611022664 A CN 201611022664A CN 108083102 A CN108083102 A CN 108083102A
Authority
CN
China
Prior art keywords
hook
well
bucket
bung
equalizer bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611022664.3A
Other languages
Chinese (zh)
Inventor
郑桥
石锦
李君伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Crane Works Co Ltd
Original Assignee
Chongqing Crane Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Crane Works Co Ltd filed Critical Chongqing Crane Works Co Ltd
Priority to CN201611022664.3A priority Critical patent/CN108083102A/en
Publication of CN108083102A publication Critical patent/CN108083102A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/12Travelling ladles or similar containers; Cars for ladles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/62Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled
    • B66C1/66Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled for engaging holes, recesses, or abutments on articles specially provided for facilitating handling thereof

Abstract

The present invention discloses a kind of metallurgy handling apparatus, including rotary hanger, gantry hook and well-bucket, rotary hanger includes equalizer bar, flexural pivot is equipped in equalizer bar, the ball pin of flexural pivot is fixedly connected with suspension hook after stretching out equalizer bar, the hook beam of gantry hook is hung on suspension hook, plate hook is installed on hook beam, hook block has well-bucket on plate hook, well-bucket includes square well-bucket body, there are two slides for face setting on the bung hole of well-bucket body, same bung is installed on the sliding block of two slides, bung is connected with pushing meanss, molten steel can be hoisted to objective by the present invention using well-bucket, the bung hole of well-bucket, which is equipped with bung, to prevent molten steel from being spilt in transportational process, lifting system is by the angle of rotatably adjustable suspension hook after weight handling to appointed place, then bung is promoted by cylinder, it can easy-unloading after inclination well-bucket.

Description

Metallurgy handling apparatus
Technical field
The present invention relates to lifting technique fields, and in particular to a kind of metallurgy handling apparatus.
Background technology
One of most common instrument is exactly suspender during hanged weight, and generally crane hoisting system used is equal for existing metallurgy industry Determine gantry hook for wire cable strengthening, structure is single, purposes is single, is only used for handling steel ladle, and principle is direct by steel wire rope It lifts by crane and carries out operation containing the equalizer bar of movable pulley to hang the gantry hook being attached thereto, the steel ladle of handling is generally all heavier, And when using this class formation handling steel ladle, the angle of rotation steel ladle cannot be adjusted after handling to appointed place, is not easy to unload Material, this structure bring inconvenience to production;In addition many factories often adopt for convenience of the well-bucket of discharging handling steel ladle With unenclosed construction, this class formation is spilt during handling if any molten steel easily leads to operating personnel's scald.
The content of the invention
For solution more than technical problem, the present invention provides a kind of metallurgy handling apparatus.
Technical solution is as follows:A kind of metallurgy handling apparatus, key are:Including rotary hanger, the rotary hanger Gantry hook is equipped with, hook block has well-bucket on the gantry hook;
The rotary hanger includes equalizer bar, and flexural pivot is equipped in the equalizer bar, and the ball pin of the flexural pivot stretches out described put down Suspension hook is fixedly connected with after balance beam, the hook beam of the gantry hook is hung on the suspension hook, and plate is installed on the hook beam Hook, hook block is stated well-bucket on the plate hook;
The well-bucket includes square well-bucket body, and face is set there are two slide on the bung hole of the well-bucket body, two Same bung is installed on the sliding block of the slide, which is connected with pushing meanss;
The pushing meanss include cylinder, and the cylinder is horizontally set on the outer wall of the well-bucket body, the bung Bung push-pull rod is equipped with, the piston rod of the cylinder is fixedly connected with the bung push-pull rod.Cylinder is passed through using this scheme Pull movement can push away bung, open or close the bung hole of well-bucket body.
It can utilize well-bucket that molten steel is hoisted to objective using this technical solution, the bung hole of well-bucket, which is equipped with bung, to be prevented Molten steel is spilt in transportational process, adds the security of material transportation, while can also avoid the waste of material, and lifting system will Weight handling can open bung to behind appointed place by pushing meanss, and tilting can easy-unloading after well-bucket.
Further, the front-end and back-end of each slide are respectively equipped with a sliding block limited block.Pass through sliding block limited block The sliding path of bung can be limited, prevents cylinder in pushing course by the completely out bung hole of bung.
Above-mentioned equalizer bar includes the crossbeam that two faces are set, and is fixedly connected to form between two crossbeams by clip The equalizer bar, is respectively equipped with free bearing mounting groove in two crossbeams, and the free bearing mounting groove in two crossbeams is just To setting, the free bearing mounting groove in two crossbeams forms flexural pivot mounting groove, and the flexural pivot is fixedly mounted on the ball It cuts with scissors in mounting groove.Flexural pivot can be taken out together with suspension hook out of equalizer bar after using this scheme, clip is removed, it can be as needed The suspension hook of different model is replaced, while is also convenient for repairing.
Above-mentioned crossbeam is semi-cylindrical, and two crossbeam faces set to form a circular equalizer bar.Using This design two, which is weighed, forms a cylindrical equalizer bar, convenient for clip banding.
Above-mentioned clip includes the clip body of " C " font, and outward bending is formed admittedly two hoop arms of the clip body respectively Determine connecting portion, be fixedly connected between portion and be bolted to connection described in two, the upper end of the bolt is equipped with plus thread, and lower end is set There is left-hand thread, the bolt upper end is pierced by the corresponding portion of being fixedly connected and is threaded with upper locking nut, and the bolt lower end is worn Go out the corresponding portion's rear thread that is fixedly connected and be connected with lower locking nut.It is more secured using this design clip banding, it is not easy to loosen.
Advantageous effect:Advantageous effect using the present invention is that molten steel is hoisted to objective using well-bucket, well-bucket Bung hole, which is equipped with bung, to prevent molten steel from being spilt in transportational process, add the security of material transportation, while can also avoid object The waste of material, lifting system will can open bung after weight handling to appointed place by pushing meanss, after tilting well-bucket Easy-unloading.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structure diagram of suspension hook and equalizer bar;
Fig. 3 is the structure diagram of crossbeam;
Fig. 4 is the structure diagram of well-bucket.
Specific embodiment
With reference to embodiment and attached drawing, the invention will be further described.
As shown in Figs 1-4, a kind of metallurgy handling apparatus, including rotary hanger, the rotary hanger is equipped with gantry hook 5, hook block has well-bucket 6 on the gantry hook 5, and the rotary hanger includes equalizer bar 1, and flexural pivot 4 is equipped in the equalizer bar 1, described The ball pin of flexural pivot 4 is fixedly connected with suspension hook 2 after stretching out the equalizer bar 1, and the hook beam 501 of the gantry hook 5 is hung to be hung described On hook 2, plate hook 502 is installed on the hook beam 501, hook block is stated well-bucket 6 on the plate hook 502, and the well-bucket 6 includes Square well-bucket body 611, face sets that there are two slide 614, two slides 614 on the bung hole of the well-bucket body 611 Sliding block 617 on be installed with same bung 612, which is connected with pushing meanss.
The pushing meanss include cylinder 613, and the cylinder 613 is horizontally set on the outer wall of the well-bucket body 111, The bung 612 is equipped with bung push-pull rod 616, and the piston rod of the cylinder 613 is fixed with the bung push-pull rod 616 to be connected It connects, the front-end and back-end of each slide 614 are respectively equipped with a sliding block limited block 615.
The equalizer bar 1 includes the crossbeam 11 for the semi-cylindrical that two faces are set, and passes through between two crossbeams 11 Clip 3 is fixedly connected to form a circular equalizer bar 1, and free bearing mounting groove 12 is respectively equipped in two crossbeams 11, 12 face of free bearing mounting groove in two crossbeams 11 is set, the free bearing mounting groove 12 in two crossbeams 11 Flexural pivot mounting groove is formed, the flexural pivot 4 is fixedly mounted in the flexural pivot mounting groove, and the clip 3 includes the clip of " C " font Body, outward bending forms a fixed connection portion two of clip body hoop arms respectively, is fixedly connected between portion and leads to described in two It crosses bolt to be fixedly connected, the upper end of the bolt is equipped with plus thread, and lower end is equipped with left-hand thread, and the bolt upper end is pierced by corresponding solid Determine connecting portion and be threaded with upper locking nut, the bolt lower end is pierced by the corresponding portion's rear thread that is fixedly connected and is connected with lower lock Tight nut.
Finally it should be noted that foregoing description is only the preferred embodiment of the present invention, the ordinary skill people of this field Member on the premise of without prejudice to present inventive concept and claim, can make table as multiple types under the enlightenment of the present invention Show, such conversion is each fallen within protection scope of the present invention.

Claims (5)

1. a kind of metallurgy handling apparatus, it is characterised in that:Including rotary hanger, the rotary hanger is equipped with gantry hook (5), Hook block has well-bucket (6) on the gantry hook (5);
The rotary hanger includes equalizer bar (1), is equipped with flexural pivot (4) in the equalizer bar (1), the ball pin of the flexural pivot (4) is stretched Suspension hook (2) is fixedly connected with after going out the equalizer bar (1), the hook beam (501) of the gantry hook (5) is hung in the suspension hook (2) On, plate hook (502) is installed on the hook beam (501), hook block is stated well-bucket (6) on the plate hook (502);
The well-bucket (6) includes well-bucket body (611), and face sets that there are two slides on the bung hole of the well-bucket body (611) (614), same bung (612) is installed on the sliding block (617) of two slides (614), the bung (612) connection There are pushing meanss;
The pushing meanss include cylinder (613), and the cylinder (613) is horizontally set on the outer wall of the well-bucket body (111) On, the bung (612) is equipped with bung push-pull rod (616), piston rod and the bung push-pull rod of the cylinder (613) (616) it is fixedly connected.
2. metallurgy handling apparatus according to claim 1, it is characterised in that:The front end of each slide (614) and Rear end is respectively equipped with a sliding block limited block (615).
3. metallurgy handling apparatus according to claim 1, it is characterised in that:The equalizer bar (1) includes two faces The crossbeam (11) of setting is fixedly connected to form the equalizer bar (1) between two crossbeams (11) by clip (3), two It is respectively equipped with free bearing mounting groove (12) in the crossbeam (11), the free bearing mounting groove (12) in two crossbeams (11) is just To setting, the free bearing mounting groove (12) in two crossbeams (11) forms flexural pivot mounting groove, the fixed peace of the flexural pivot (4) In the flexural pivot mounting groove.
4. metallurgy handling apparatus according to claim 3, it is characterised in that:The crossbeam (11) be semi-cylindrical, two Crossbeam described in root (11) face sets to form a circular equalizer bar (1).
5. metallurgy handling apparatus according to claim 3, it is characterised in that:The clip (3) includes the card of " C " font Bind round body, outward bending forms a fixed connection portion two of clip body hoop arms respectively, is fixedly connected described in two between portion It is bolted to connection, the upper end of the bolt is equipped with plus thread, and lower end is equipped with left-hand thread, and the bolt upper end is pierced by corresponding The portion rear thread of being fixedly connected is connected with upper locking nut, and the bolt lower end is pierced by the corresponding portion's rear thread that is fixedly connected and is connected with Lower locking nut.
CN201611022664.3A 2016-11-21 2016-11-21 Metallurgy handling apparatus Pending CN108083102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611022664.3A CN108083102A (en) 2016-11-21 2016-11-21 Metallurgy handling apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611022664.3A CN108083102A (en) 2016-11-21 2016-11-21 Metallurgy handling apparatus

Publications (1)

Publication Number Publication Date
CN108083102A true CN108083102A (en) 2018-05-29

Family

ID=62168280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611022664.3A Pending CN108083102A (en) 2016-11-21 2016-11-21 Metallurgy handling apparatus

Country Status (1)

Country Link
CN (1) CN108083102A (en)

Similar Documents

Publication Publication Date Title
CN203889877U (en) Cage for overhead operation construction
CN206580454U (en) Steel ladle lifting system
CN206298269U (en) Can automatic discharging combination lifting system
CN206288855U (en) Combination lifting system
CN204474138U (en) A kind of fast hoisting jig
CN108083102A (en) Metallurgy handling apparatus
CN206437781U (en) Rotatable combined sling
CN108083096A (en) Rotatable metallurgical allocation and transportation system
CN108083090A (en) Can automatic discharging metallurgy handling apparatus
CN108083098A (en) Rotatable steel ladle handling apparatus
CN206298270U (en) Self-discharging steel ladle lifting system
CN108100859A (en) Rotatable combined sling used in metallurgy
CN211056518U (en) Wheel hub hoist
CN206298271U (en) Rotatable combination lifting system
CN206298272U (en) Rotatable steel ladle lifting system
CN206427919U (en) Combined sling
CN208135749U (en) Bridge construction gantry crane
CN201228196Y (en) Special slings for rolling mill working roll
CN207030774U (en) Suspension hook antiswing crane dolly
CN107738977A (en) Metallurgy combination handling apparatus
CN108100858A (en) Metallurgy combined sling
CN206367977U (en) A kind of improved hanging apparatus for being exclusively used in large flotation machines barrel module
CN204897154U (en) Big board handling auxiliary fixtures
CN205114803U (en) Can take off wire rope's hoist automatically
CN204639103U (en) A kind of turning device producing ingot casting for vacuum consumable smelting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180529

WD01 Invention patent application deemed withdrawn after publication