CN108035423B - Potential energy pressurized rainwater drainage and storage system and method for sponge city - Google Patents
Potential energy pressurized rainwater drainage and storage system and method for sponge city Download PDFInfo
- Publication number
- CN108035423B CN108035423B CN201711319216.4A CN201711319216A CN108035423B CN 108035423 B CN108035423 B CN 108035423B CN 201711319216 A CN201711319216 A CN 201711319216A CN 108035423 B CN108035423 B CN 108035423B
- Authority
- CN
- China
- Prior art keywords
- rainwater
- valve
- pipeline
- electric valve
- electric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000005381 potential energy Methods 0.000 title claims abstract description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 197
- 230000001105 regulatory effect Effects 0.000 claims abstract description 32
- 239000002351 wastewater Substances 0.000 claims abstract description 27
- 239000010865 sewage Substances 0.000 claims abstract description 26
- 238000009825 accumulation Methods 0.000 claims abstract description 5
- 239000007788 liquid Substances 0.000 claims description 20
- 230000003068 static effect Effects 0.000 claims description 17
- 239000002689 soil Substances 0.000 claims description 7
- 238000007599 discharging Methods 0.000 claims description 3
- 239000003673 groundwater Substances 0.000 claims description 3
- 239000002927 high level radioactive waste Substances 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims 4
- 230000002000 scavenging effect Effects 0.000 claims 2
- 239000010841 municipal wastewater Substances 0.000 claims 1
- 230000000149 penetrating effect Effects 0.000 claims 1
- 230000035515 penetration Effects 0.000 claims 1
- 238000009423 ventilation Methods 0.000 description 6
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 230000008595 infiltration Effects 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 238000006424 Flood reaction Methods 0.000 description 1
- 238000005273 aeration Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000011372 high-strength concrete Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/02—Arrangement of sewer pipe-lines or pipe-line systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/108—Rainwater harvesting
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种用于海绵城市的势能加压雨水排蓄系统及方法。The invention relates to a potential energy pressurized rainwater drainage and storage system and method for a sponge city.
背景技术Background technique
海绵城市,是新一代城市雨洪管理概念,是指城市在适应环境变化和应对雨水带来的自然灾害等方面具有良好的“弹性”,也可称之为“水弹性城市”。国际通用术语为“低影响开发雨水系统构建”。下雨时吸水、蓄水、渗水、净水,需要时将蓄存的水“释放”并加以利用。Sponge city is a new generation of urban stormwater management concept. It refers to the city's good "elasticity" in adapting to environmental changes and responding to natural disasters caused by rainwater. It can also be called "water elastic city". The international general term is "low-impact development stormwater system construction". When it rains, it absorbs, stores, infiltrates, and purifies water, and "releases" the stored water for use when needed.
建设海绵城市,首先要扭转观念。以“慢排缓释”和“蓄存错峰”为雨水系统主要设计理念,既避免了洪涝,又有效的收集了雨水。To build a sponge city, we must first reverse the concept. Taking "slow drainage and slow release" and "storage and staggered peaks" as the main design concepts of the rainwater system, it not only avoids floods, but also effectively collects rainwater.
雨水斗是设在屋面雨水由天沟进入雨水管道的入口处。雨水斗有整流格栅装置,能迅速排除屋面雨水,格栅具有整流作用,避免形成过大的旋涡,稳定斗前水位,减少掺气,迅速排除屋面雨水、雪水,并能有效阻挡较大杂物。雨水斗收集的雨水进入雨水管道,流至雨水箱中,当雨水箱储存的雨水超过某一液位时,经溢流管排出。The rainwater bucket is located at the entrance where the roof rainwater enters the rainwater pipe from the gutter. The rainwater bucket has a rectification grille device, which can quickly drain roof rainwater. The grille has a rectification effect, avoids the formation of excessive vortices, stabilizes the water level in front of the bucket, reduces aeration, quickly drains roof rainwater and snow water, and can effectively block large sundries. The rainwater collected by the rainwater bucket enters the rainwater pipe and flows into the rainwater tank. When the rainwater stored in the rainwater tank exceeds a certain level, it is discharged through the overflow pipe.
重力流是指雨水在雨水管内,依靠重力的作用(坡度)向前流动,一般为不充满流,适合雨水量较小时的排水;压力流是指通过给雨水加压,使雨水形成快速满流的状态流动,适合雨水量较大时使用。Gravity flow refers to the rainwater flowing forward in the rainwater pipe relying on the action of gravity (slope), which is generally not full flow, which is suitable for drainage when the amount of rainwater is small; pressure flow refers to the rapid full flow of rainwater by pressurizing the rainwater The state flows, suitable for use when the amount of rain is large.
在我国很多城市中,都存在雨水排放不畅的问题,具体产生的原因可以大致分为以下几个方面:In many cities in our country, there is a problem of poor drainage of rainwater. The specific reasons can be roughly divided into the following aspects:
①地面拦污堵塞严重。雨季来临的时候,在较强降雨的影响下,城市排水管道因为管径等原因,使得排水速度满足不了要求,同时,雨水管道内夹带来自地面的泥沙、树叶和部分生活垃圾等,给管道的清理和疏通维护带来了很大的困难。① Ground pollution blockage is serious. When the rainy season comes, under the influence of strong rainfall, the drainage speed of urban drainage pipes cannot meet the requirements due to the pipe diameter and other reasons. Cleaning and dredging maintenance posed great difficulties.
②雨水管道出水口受阻。当前我国大部分城市的雨水,是通过雨水管道就近排入河流等水体。但是很多位于平原地区的城市,因为受到所在位置地形的制约,出水口采用淹没式,使得出水口的位置要低于水体的水位。在雨季,水体水位普遍上涨,受到水体水位的顶托,雨水管道里面的水流速度减慢,造成了排水管道的排水能力降低。当雨季来临的时候低洼地段长时间的存在积水问题,影响了周边居民的通行。②The water outlet of the rainwater pipe is blocked. At present, the rainwater in most cities in my country is discharged into rivers and other water bodies nearby through rainwater pipes. However, in many cities located in plain areas, due to the constraints of the location and terrain, the water outlet is submerged, so that the location of the water outlet is lower than the water level of the water body. During the rainy season, the water level of the water body generally rises, and being supported by the water level of the water body, the water flow in the rainwater pipe slows down, resulting in a reduction in the drainage capacity of the drainage pipe. When the rainy season comes, there is a long-term waterlogging problem in low-lying areas, which affects the traffic of surrounding residents.
③城市雨水管道之间缺乏必要的连通。当前雨水管道一般会建成几个独立的排水系统来进行雨水排除,各个排水系统之间互不连通。但是在实际的排水过程中,因为雨水管道各个系统的汇水多少、集水的时间有其不确定性,所以在汛期雨水高峰流量不可能同时发生,各个排水系统的排水能力也就不一样。③ Lack of necessary connection between urban rainwater pipes. At present, the rainwater pipeline generally builds several independent drainage systems for rainwater drainage, and the drainage systems are not connected to each other. However, in the actual drainage process, due to the uncertainty of the amount of water collected by each system of the rainwater pipeline and the time of water collection, it is impossible for the peak flow of rainwater to occur at the same time during the flood season, and the drainage capacity of each drainage system is also different.
PHC管桩,即预应力高强度混凝土管桩。是采用先张预应力离心成型工艺,并经过10个大气压、1800 ℃ 左右的蒸汽养护,制成一种空心圆筒型混凝土预制构件,标准节长为10m ,直径从300mm~800mm,混凝土强度等级≥C80。 PHC 管桩是由侧阻力和端阻力共同承受上部荷载,且对持力层起伏变化大的地质条件适应性强,因此适应地域广,建筑类型多。在大型建筑中,PHC管桩的使用量很大,单个项目的使用量经常达到数百甚至数千根,桩基深度可达数十米。为保护桩下端以及封底、防止管内进土,防止桩移位,有效提高管桩的单桩承载力,PHC 管桩进行压桩施工时,常在PHC 管桩的端头部位安装桩尖。桩尖有十字型和尖头型等。针对使用桩尖阻力和桩身侧面与土之间的摩擦力共同来承担上部结构荷载摩擦PHC管桩,其桩尖仍然在软土层中。PHC pipe piles are prestressed high-strength concrete pipe piles. It adopts the pre-tensioned prestressed centrifugal forming process, and after 10 atmospheric pressure and steam curing at about 1800 ℃, it is made into a hollow cylindrical concrete prefabricated component. The standard section length is 10m, the diameter is from 300mm to 800mm, and the concrete strength level ≥C80. The PHC pipe pile bears the upper load jointly by the side resistance and the end resistance, and has strong adaptability to the geological conditions with large undulations and changes in the bearing layer, so it is suitable for a wide range of areas and various types of buildings. In large-scale buildings, PHC pipe piles are used in a large amount, and the usage of a single project often reaches hundreds or even thousands, and the depth of the pile foundation can reach tens of meters. In order to protect the lower end of the pile and the bottom seal, prevent soil from entering the pipe, prevent the pile from shifting, and effectively improve the single pile bearing capacity of the pipe pile, when the PHC pipe pile is used for pile construction, a pile tip is often installed at the end of the PHC pipe pile. There are cross-type and pointed-type pile points. In view of using the pile tip resistance and the friction between the side of the pile body and the soil to bear the superstructure load friction PHC pipe pile, the pile tip is still in the soft soil layer.
发明内容Contents of the invention
本发明所要解决的技术问题是,提供一种当雨天降雨量较大,地面雨水排出不顺畅时,可以将雨水进行零耗能加压,使雨水在管道中的流态由不充满流变为充满流,提高雨水管的排放能力,能很好地解决超高层或高层建筑周围地面产生积水问题的用于海绵城市的势能加压雨水排蓄系统及方法。The technical problem to be solved by the present invention is to provide a method that can pressurize the rainwater with zero energy consumption when the rainfall on the rainy day is large and the drainage of the rainwater on the ground is not smooth, so that the flow state of the rainwater in the pipeline changes from not full to flowing. The potential energy pressurized rainwater drainage and storage system and method for the sponge city can be well solved by filling the flow, improving the discharge capacity of the rainwater pipe, and solving the problem of water accumulation on the ground around the super high-rise or high-rise buildings.
本发明解决其技术问题所采用的技术方案是:The technical solution adopted by the present invention to solve its technical problems is:
本发明之用于海绵城市的势能加压雨水排蓄系统,包括雨水箱、废水箱、第一溢流管、第二溢流管、市政污水管网、市政雨水管网和过滤器,还设有第一电动阀、第二电动阀、第三电动阀、第一止回阀、第二止回阀、第四电动阀、第五电动阀、第六电动阀、第三止回阀、第七电动阀、第四止回阀、第八电动阀、第九电动阀、第五止回阀、第六止回阀、第十电动阀、第一电动调节阀、第一活塞式储水罐、第二活塞式储水罐、第八止回阀、第九止回阀和控制器;The potential energy pressurized rainwater drainage and storage system for sponge city of the present invention comprises a rainwater tank, a waste water tank, a first overflow pipe, a second overflow pipe, a municipal sewage pipe network, a municipal rainwater pipe network and a filter, and is also provided with The first electric valve, the second electric valve, the third electric valve, the first check valve, the second check valve, the fourth electric valve, the fifth electric valve, the sixth electric valve, the third check valve, the seventh Electric valve, fourth check valve, eighth electric valve, ninth electric valve, fifth check valve, sixth check valve, tenth electric valve, first electric regulating valve, first piston water storage tank, The second piston type water storage tank, the eighth check valve, the ninth check valve and the controller;
所述第一电动阀的一端与同室外地面排水口相连的管道相连接,另一端通过管路与第一止回阀相连接,所述第一止回阀通过管道与第二活塞式储水罐的右端相连接;所述第二活塞式储水罐的右端通过管路第二止回阀相连接,所述第二止回阀通过管道与第二电动阀相连接,所述第二电动阀通过管路与两端分别设有第三止回阀的管路相连接,其中一个第三止回阀通过管路与市政雨水管网相连接,另一个第三止回阀通过管路与第九电动阀相连接,所述第九电动阀分别通过管路与第二活塞式储水罐左端相连接、通过管路与同雨水箱相连的第一溢流管相连接;One end of the first electric valve is connected to the pipeline connected to the outdoor ground drain, and the other end is connected to the first check valve through the pipeline, and the first check valve is connected to the second piston type water storage through the pipeline. The right end of the tank is connected; the right end of the second piston type water storage tank is connected through the second check valve of the pipeline, and the second check valve is connected with the second electric valve through the pipeline, and the second electric valve The valve is connected to the pipeline with the third check valve at both ends through the pipeline, one of the third check valve is connected to the municipal rainwater pipe network through the pipeline, and the other third check valve is connected to the third check valve through the pipeline. Nine electric valves are connected, and the ninth electric valve is respectively connected to the left end of the second piston-type water storage tank through pipelines, and connected to the first overflow pipe connected to the rainwater tank through pipelines;
所述第八电动阀的一端与同室外地面排水口相连的管道相连接,另一端通过管路与第二活塞式储水罐左端相连接;One end of the eighth electric valve is connected to the pipeline connected to the outdoor ground drain, and the other end is connected to the left end of the second piston-type water storage tank through the pipeline;
所述第一活塞式储水罐内设有第一活塞板,所述第二活塞式储水罐设有第二活塞板,所述第一活塞板通过连杆与第二活塞板相连接,所述第二活塞式储水罐的右端上部设有液位检测器;The first piston-type water storage tank is provided with a first piston plate, the second piston-type water storage tank is provided with a second piston plate, and the first piston plate is connected with the second piston plate through a connecting rod, The upper right end of the second piston type water storage tank is provided with a liquid level detector;
所述第四电动阀的一端分别通过管路与第六止回阀相连接、通过管路与第七电动阀相连接,所述第六止回阀通过管路与雨水箱相连接,所述第七电动阀通过管路与第五止回阀相连接,所述第五止回阀通过管路与第一活塞式储水罐的右端相连接,所述第四电动阀的另一端通过管路与第四止回阀相连接,所述第四止回阀通过管理与第一活塞式储水罐的左端相连接;One end of the fourth electric valve is respectively connected to the sixth check valve and the seventh electric valve through the pipeline, and the sixth check valve is connected to the rainwater tank through the pipeline. The seventh electric valve is connected to the fifth check valve through a pipeline, the fifth check valve is connected to the right end of the first piston-type water storage tank through a pipeline, and the other end of the fourth electric valve is connected to the right end of the fourth electric valve through a pipeline. The road is connected with the fourth check valve, and the fourth check valve is connected with the left end of the first piston type water storage tank through management;
所述第三电动阀的一端通过管路与废水箱相连接,另一端分别通过管路与第十电动阀相连接、通过管路与第一电动调节阀相连接,所述第十电动阀分别通过管路与第八止回阀相连接、通过管路与市政污水管网相连接,所述第一电动调节阀通过管路与第九止回阀相连接,所述第九止回阀通过管路与第一活塞式储水罐的左端相连接,所述第八止回阀分别通过管路与第五电动阀相连接、通过管路与第六电动阀相连接,所述第五电动阀通过管路与第一活塞式储水罐的左端相连接,所述第六电动阀通过管路与第一活塞式储水罐的右端相连接;One end of the third electric valve is connected to the waste water tank through the pipeline, the other end is connected to the tenth electric valve through the pipeline, and connected to the first electric regulating valve through the pipeline, and the tenth electric valve is respectively The eighth check valve is connected through the pipeline, and the municipal sewage pipe network is connected through the pipeline. The first electric regulating valve is connected with the ninth check valve through the pipeline, and the ninth check valve passes through The pipeline is connected to the left end of the first piston-type water storage tank, the eighth check valve is respectively connected to the fifth electric valve through the pipeline, and connected to the sixth electric valve through the pipeline, and the fifth electric valve The valve is connected to the left end of the first piston-type water storage tank through a pipeline, and the sixth electric valve is connected to the right end of the first piston-type water storage tank through a pipeline;
所述废水箱的上端分别通过管路与过滤器相连接、通过管路与第二溢流管相连接,所述第二溢流管通过管路与市政污水管网相连接。The upper end of the waste water tank is respectively connected with the filter through the pipeline, and connected with the second overflow pipe through the pipeline, and the second overflow pipe is connected with the municipal sewage pipe network through the pipeline.
进一步,还设有第二电动调节阀、第七止回阀、密闭挡水板和PHC桩,所述第二电动调节阀的一端通过管路与第二止回阀和第二电动阀之间的管路相连接,所述第二电动调节阀的另一端通过管路与位于PHC桩中的第七止回阀相连接,所述密闭挡水板安装在PHC桩内,位于第七止回阀下方,所述PHC桩的桩尖上设有渗透孔,所述PHC桩的桩尖内设有第一水压传感器。Further, a second electric regulating valve, a seventh check valve, an airtight water baffle and a PHC pile are also provided, and one end of the second electric regulating valve passes between the pipeline and the second check valve and the second electric valve. The other end of the second electric regulating valve is connected with the seventh check valve located in the PHC pile through the pipeline, and the airtight water retaining plate is installed in the PHC pile and located in the seventh check valve Below the valve, the tip of the PHC pile is provided with a seepage hole, and the tip of the PHC pile is provided with a first water pressure sensor.
进一步,所述市政雨水管网内设有液位传感器和第二水压传感器。Further, a liquid level sensor and a second water pressure sensor are provided in the municipal rainwater pipe network.
进一步,所述第二活塞式储水罐的右端设有第三水压传感器。Further, a third water pressure sensor is provided at the right end of the second piston-type water storage tank.
进一步,所述第一活塞式储水罐的右端上部设有第一换气阀,所述第二活塞式储水罐的左端上部设有第二换气阀。Further, a first ventilation valve is provided on the upper part of the right end of the first piston-type water storage tank, and a second ventilation valve is provided on the upper part of the left end of the second piston-type water storage tank.
进一步,所述第一活塞式储水罐、第二活塞式储水罐设于地下室机房内。Further, the first piston-type water storage tank and the second piston-type water storage tank are arranged in the basement machine room.
本发明之用于海绵城市的势能加压雨水排蓄方法,具体过程如下:The potential energy pressurized rainwater drainage and storage method for the sponge city of the present invention, the specific process is as follows:
初始状态:未降雨时,屋顶雨水箱内没有蓄水,第一活塞板和第二活塞板紧贴左壁面,所有阀门均处于关闭状态,废水箱正常收集建筑物高区的废水,当收集的废水超过某一液位时,从第二溢流管排出至市政污水管网,或者打开第三电动阀和第十电动阀直接将废水排出市政污水管网;Initial state: when there is no rainfall, there is no water storage in the roof rainwater tank, the first piston plate and the second piston plate are close to the left wall, all valves are closed, and the waste water tank normally collects waste water from the high area of the building. When the waste water exceeds a certain level, it is discharged from the second overflow pipe to the municipal sewage pipe network, or the third electric valve and the tenth electric valve are opened to directly discharge the waste water to the municipal sewage pipe network;
工况一:当雨天降雨量较大,地面雨水排出不顺畅时,开启第一电动阀和第二电动阀,让雨水由管道进入第二活塞式储水罐,第二活塞式储水罐逐渐装满水,当液位检测器检测到水位超过某一规定值时,发出信号给控制器,控制器控制第三电动阀开启,利用高位废水箱的静压力推动第一活塞板和第二活塞板至活塞壁最右端,将第二活塞式储水罐的雨水加压排出至市政雨水管网;由于此时雨水箱已经收集了雨水,开启第七电动阀,第一活塞式储水罐中的污水则利用高位雨水箱的静压力,经第五电动阀排至市政污水管网;Working condition 1: When the rainfall is heavy in rainy days and the rainwater on the ground is not discharged smoothly, the first electric valve and the second electric valve are opened to let the rainwater enter the second piston water storage tank from the pipeline, and the second piston water storage tank gradually Filled with water, when the liquid level detector detects that the water level exceeds a certain value, it sends a signal to the controller, and the controller controls the opening of the third electric valve, and uses the static pressure of the high-level waste water tank to push the first piston plate and the second piston plate to the rightmost end of the piston wall, and pressurize the rainwater in the second piston-type water storage tank to discharge to the municipal rainwater pipe network; since the rainwater tank has collected rainwater at this time, open the seventh electric valve, and the first piston-type water storage tank The sewage is discharged to the municipal sewage pipe network through the fifth electric valve through the static pressure of the high-level rainwater tank;
工况二:当雨天降雨量较大,地面雨水排出不顺畅时,开启第一电动阀和第二电动阀,让雨水由管道进入第二活塞式储水罐,第二活塞式储水罐逐渐装满水,当液位检测器检测到水位超过某一规定值时,发出信号给控制器,控制器控制第四电动阀开启,此时高位雨水箱已经收集到了雨水,利用这部分雨水的静压力,将第一活塞板和第二活塞板推动至活塞壁最右端,将第二活塞式储水罐的雨水加压排出至市政雨水管网;开启第七电动阀,利用雨水箱静压力将第一活塞板和第二活塞板推动至活塞壁最左端,第一活塞式储水罐中的雨水排出,或者直接开启第五电动阀将第一活塞式储水罐中的雨水排至市政污水管网;Working condition 2: When the rainfall is heavy in rainy days and the rainwater on the ground is not discharged smoothly, the first electric valve and the second electric valve are opened to let the rainwater enter the second piston water storage tank from the pipeline, and the second piston water storage tank gradually Filled with water, when the liquid level detector detects that the water level exceeds a certain value, it sends a signal to the controller, and the controller controls the fourth electric valve to open. At this time, the high-level rainwater tank has collected rainwater. pressure, push the first piston plate and the second piston plate to the rightmost end of the piston wall, pressurize and discharge the rainwater in the second piston water storage tank to the municipal rainwater pipe network; open the seventh electric valve, use the static pressure of the rainwater tank to discharge the rainwater in the The first piston plate and the second piston plate are pushed to the leftmost end of the piston wall, and the rainwater in the first piston water storage tank is discharged, or the fifth electric valve is directly opened to discharge the rainwater in the first piston water storage tank to the municipal sewage pipe net;
工况三:当雨天降雨量较大,地面雨水排出不顺畅时,开启第一电动阀和第二电动阀,让雨水由管道进入第二活塞式储水罐,第二活塞式储水罐逐渐装满水,当液位检测器检测到水位超过某一规定值时,发出信号给控制器,控制器控制第八电动阀开启,地面雨水从第二活塞式储水罐左侧管道进入,直接推动第二活塞板至活塞壁最右端,将第二活塞式储水罐的雨水加压排出至市政雨水管,这样一来,即收集了又一部分地面雨水,又利用地面雨水静压力将已经收集的雨水排出;第二次收集的雨水可以当雨水排出压力减少时,直接开启第九电动阀泄流至市政雨水管网。Working condition 3: When there is a lot of rainfall in rainy days and the drainage of rainwater on the ground is not smooth, open the first electric valve and the second electric valve to let the rainwater enter the second piston water storage tank from the pipeline, and the second piston water storage tank gradually Filled with water, when the liquid level detector detects that the water level exceeds a certain value, it sends a signal to the controller, and the controller controls the eighth electric valve to open, and the ground rainwater enters from the left pipe of the second piston-type water storage tank, directly Push the second piston plate to the rightmost end of the piston wall, and pressurize the rainwater in the second piston type water storage tank to discharge to the municipal rainwater pipe. In this way, another part of the ground rainwater is collected, and the collected rainwater is collected by the static pressure of the ground rainwater. Rainwater discharge; the rainwater collected for the second time can be discharged to the municipal rainwater pipe network by directly opening the ninth electric valve when the rainwater discharge pressure decreases.
进一步,该方法所用系统还设有第二电动调节阀、第七止回阀、密闭挡水板和PHC桩,所述第二电动调节阀的一端通过管路与第二止回阀和第二电动阀之间的管路相连接,所述第二电动调节阀的另一端通过管路与位于PHC桩中的第七止回阀相连接,所述密闭挡水板安装在PHC桩内,位于第七止回阀下方,所述PHC桩的桩尖上设有渗透孔,所述PHC桩的桩尖内设有第一水压传感器;Further, the system used in this method is also provided with a second electric regulating valve, a seventh check valve, a sealed water baffle and a PHC pile, one end of the second electric regulating valve is connected to the second check valve and the second The pipelines between the electric valves are connected, the other end of the second electric regulating valve is connected with the seventh check valve located in the PHC pile through the pipeline, and the airtight water retaining plate is installed in the PHC pile, located in Below the seventh check valve, the tip of the PHC pile is provided with a permeation hole, and the tip of the PHC pile is provided with a first water pressure sensor;
相应的,所述方法设有工况四:在工况一、工况二、工况三的基础上,其余运行方式不变,只将第二电动阀的开启改变为第一电动调节阀的开启,将加压雨水排至PHC管桩,进而通过渗透作用排至地下土壤中。Correspondingly, the method is provided with working condition 4: on the basis of working condition 1, working
本发明以活塞式储水罐为雨水收集装置,旨在雨天地面积水较多时,对地面雨水收集并进行加压排放至市政雨水管,提高排放效率,所加的压力则来自于高层废水箱或雨水箱。The invention uses a piston-type water storage tank as a rainwater collection device. It aims at collecting ground rainwater and discharging it to municipal rainwater pipes under pressure when there is a lot of water on the ground in rainy days, so as to improve the discharge efficiency. The added pressure comes from high-rise waste water tanks or rainwater tank.
与现有技术相比,本发明具有以下优点:Compared with the prior art, the present invention has the following advantages:
(1)利用超高层或高层建筑的高位水箱作为动力水箱,利用其静压力来推动活塞加压排出雨水,不需要消耗电力驱动水泵,实现雨水零能耗加压;(1) Use the high-level water tank of a super-high-rise or high-rise building as a power water tank, use its static pressure to push the piston to pressurize and discharge rainwater, and do not need to consume electricity to drive the water pump to achieve zero-energy pressurization of rainwater;
(2)地面雨水经加压排出,使得雨水在管道中的流态从不充满流变为充满流,单位时间内管道的过流量加大,显著提高雨水管在暴雨时的过流能力,避免超高层或高层建筑地面积水。(2) The rainwater on the ground is discharged under pressure, so that the flow state of the rainwater in the pipe changes from a non-full flow to a full flow, and the flow of the pipe per unit time increases, which significantly improves the flow capacity of the rainwater pipe during the rainstorm and avoids excessive flow. Water accumulation on high-rise or high-rise building ground.
此外,本发明可利用管桩的深度和PHC管桩内的空间放置加压雨水管,在桩尖开设渗透孔使雨水能加压渗透至土壤中,补充地下水。In addition, the present invention can utilize the depth of the pipe pile and the space in the PHC pipe pile to place a pressurized rainwater pipe, and open a permeation hole at the pile tip so that rainwater can pressurize and infiltrate into the soil to replenish groundwater.
附图说明Description of drawings
图1是本发明之用于海绵城市的势能加压雨水排蓄系统实施例的结构示意图;Fig. 1 is the structural representation of the embodiment of the potential energy pressurized rainwater drainage and storage system for sponge city of the present invention;
图中:1、第一电动阀,2、第二电动阀,3、液位检测器,4、控制器,5、第三电动阀,6、第一止回阀,7、第二止回阀,8、第四电动阀,9、第五电动阀,10、第六电动阀,11、第三止回阀,12、第七电动阀,13、第四止回阀,14、第八电动阀,15、第九电动阀,16、第一换气阀,17、第二换气阀,18、第五止回阀,19、雨水箱,20、废水箱,21、第一溢流管,22、第二溢流管,23、第六止回阀,24、第一电动调节阀,25、第七止回阀,26、密闭挡水板,27、渗透孔,28、桩尖,29、PHC桩,30、第十电动阀,31、第二电动调节阀,32、市政雨水管网,33、液位传感器,34、过滤器,35、第一水压传感器,36、第一活塞式储水罐,37、第一活塞板,38、第二活塞式储水罐,39、第二活塞板,40、第八止回阀,41、第九止回阀,42、第二水压传感器,43、第三水压传感器。In the figure: 1. The first electric valve, 2. The second electric valve, 3. The liquid level detector, 4. The controller, 5. The third electric valve, 6. The first check valve, 7. The second check valve Valve, 8, the fourth electric valve, 9, the fifth electric valve, 10, the sixth electric valve, 11, the third check valve, 12, the seventh electric valve, 13, the fourth check valve, 14, the eighth Electric valve, 15, ninth electric valve, 16, first ventilation valve, 17, second ventilation valve, 18, fifth check valve, 19, rainwater tank, 20, waste water tank, 21, first overflow Pipe, 22, the second overflow pipe, 23, the sixth check valve, 24, the first electric regulating valve, 25, the seventh check valve, 26, the airtight water retaining plate, 27, the seepage hole, 28, the pile point , 29. PHC pile, 30. Tenth electric valve, 31. Second electric regulating valve, 32. Municipal rainwater pipe network, 33. Liquid level sensor, 34. Filter, 35. First water pressure sensor, 36. First Piston type water storage tank, 37, the first piston plate, 38, the second piston type water storage tank, 39, the second piston plate, 40, the eighth check valve, 41, the ninth check valve, 42, the second Water pressure sensor, 43, the third water pressure sensor.
具体实施方式Detailed ways
以下结合附图及实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
参照图1,本实施例之用于海绵城市的势能加压雨水排蓄系统,包括雨水箱19、废水箱20、第一溢流管21、第二溢流管22、市政污水管网、市政雨水管网32和过滤器34,还设有第一电动阀1、第二电动阀2、第三电动阀5、第一止回阀6、第二止回阀7、第四电动阀8、第五电动阀9、第六电动阀10、第三止回阀11、第七电动阀12、第四止回阀13、第八电动阀14、第九电动阀15、第五止回阀18、第六止回阀23、第十电动阀30、第一电动调节阀24、第一活塞式储水罐36、第二活塞式储水罐38、第八止回阀40、第九止回阀41和控制器4;Referring to Fig. 1, the potential energy pressurized rainwater drainage and storage system for the sponge city of the present embodiment includes a
所述第一电动阀1的一端与同室外地面排水口相连的管道相连接,另一端通过管路与第一止回阀6相连接,所述第一止回阀6通过管道与第二活塞式储水罐38的右端相连接;所述第二活塞式储水罐38的右端通过管路第二止回阀7相连接,所述第二止回阀7分别通过管道与第二电动阀2相连接,所述第二电动阀2通过管路与两端分别设有第三止回阀11的管路相连接,其中一个第三止回阀11通过管路与市政雨水管网32相连接,另一个第三止回阀11通过管路与第九电动阀15相连接,所述第九电动阀15分别通过管路与第二活塞式储水罐38左端相连接、通过管路与同雨水箱19相连的第一溢流管21相连接;One end of the first electric valve 1 is connected to the pipeline connected to the outdoor ground drain, and the other end is connected to the
所述第八电动阀14的一端与同室外地面排水口相连的管道相连接,另一端通过管路与第二活塞式储水罐38左端相连接;One end of the eighth
所述第一活塞式储水罐36内设有第一活塞板37,所述第二活塞式储水罐38设有第二活塞板39,所述第一活塞板37通过连杆与第二活塞板39相连接,所述第二活塞式储水罐38的右端上部设有液位检测器3;The first piston-type
所述第四电动阀8的一端分别通过管路与第六止回阀23相连接、通过管路与第七电动阀12相连接,所述第六止回阀23通过管路与雨水箱19相连接,所述第七电动阀12通过管路与第五止回阀18相连接,所述第五止回阀18通过管路与第一活塞式储水罐36的右端相连接,所述第四电动阀8的另一端通过管路与第四止回阀13相连接,所述第四止回阀13通过管理与第一活塞式储水罐36的左端相连接;One end of the fourth electric valve 8 is connected to the
所述第三电动阀5的一端通过管路与废水箱20相连接,另一端分别通过管路与第十电动阀30相连接、通过管路与第一电动调节阀24相连接,所述第十电动阀30分别通过管路与第八止回阀40相连接、通过管路与污水管网相连接,所述第一电动调节阀24通过管路与第九止回阀41相连接,所述第九止回阀41通过管路与第一活塞式储水罐36的左端相连接,所述第八止回阀40分别通过管路与第五电动阀9相连接、通过管路与第六电动阀10相连接,所述第五电动阀9通过管路与第一活塞式储水罐36的左端相连接,所述第六电动阀10通过管路与第一活塞式储水罐36的右端相连接;One end of the third electric valve 5 is connected to the
所述废水箱20的上端分别通过管路与过滤器34相连接、通过管路与第二溢流管22相连接,所述第二溢流管22通过管路与市政污水管网相连接。The upper end of the
本实施例中,还设有第二电动调节阀31、第七止回阀25、密闭挡水板26和PHC桩29;所述第二电动调节阀31的一端通过管路与第二止回阀7和第二电动阀2之间的管路相连接,所述第二电动调节阀31的另一端通过管路与位于PHC桩29中的第七止回阀25相连接,所述密闭挡水板26安装在PHC桩29内,位于第七止回阀25下方,所述PHC桩29的桩尖28上设有渗透孔27,所述PHC桩29的桩尖28内设有第一水压传感器35。In this embodiment, a second electric control valve 31, a
本实施例中,所述市政雨水管网32内设有液位传感器33和第二水压传感器42。In this embodiment, the municipal
本实施例中,所述第二活塞式储水罐38的右端设有第三水压传感器43。In this embodiment, a third
本实施例中,所述第一活塞式储水罐36的右端上部设有第一换气阀16,所述第二活塞式储水罐38的左端上部设有第二换气阀17。In this embodiment, a
本实施例中,所述第一活塞式储水罐36、第二活塞式储水罐38设于地下室机房内。In this embodiment, the first piston-type
本实施例之用于海绵城市的势能加压雨水排蓄方法,具体过程如下:The potential energy pressurized rainwater storage method for the sponge city of the present embodiment, the specific process is as follows:
初始状态:未降雨时,屋顶雨水箱19内没有蓄水,第一活塞板37和第二活塞板39紧贴左壁面,所有阀门均处于关闭状态,废水箱20正常收集建筑物高区的废水,当收集的废水超过某一液位时,从第二溢流管22排出至市政污水管网,或者打开第三电动阀5和第十电动阀30直接将废水排出市政污水管网;Initial state: when there is no rainfall, there is no water storage in the
工况一:当雨天降雨量较大,地面雨水排出不顺畅时,开启第一电动阀1和第二电动阀2,让雨水由管道进入第二活塞式储水罐38,第二活塞式储水罐38逐渐装满水,当液位检测器3检测到水位超过某一规定值(比如水面距离顶板小于5厘米时)时,发出信号给控制器4,控制器4控制第三电动阀5开启,利用高位废水箱20的静压力推动第一活塞板37和第二活塞板39至活塞壁最右端,将第二活塞式储水罐38的雨水加压排出至市政雨水管网32;由于此时雨水箱19已经收集了雨水,开启第七电动阀12,第一活塞式储水罐36中的污水则利用高位雨水箱19的静压力,经第五电动阀9排至市政污水管网;Working condition 1: When the rainfall is large in rainy days and the rainwater on the ground is not discharged smoothly, the first electric valve 1 and the second
工况二:当雨天降雨量较大,地面雨水排出不顺畅时,开启第一电动阀1和第二电动阀2,让雨水由管道进入第二活塞式储水罐38,第二活塞式储水罐38逐渐装满水,当液位检测器3检测到水位超过某一规定值时,发出信号给控制器4,控制器4控制第四电动阀8开启,此时高位雨水箱19已经收集到了雨水,利用这部分雨水的静压力,将第一活塞板37和第二活塞板39推动至活塞壁最右端,将第二活塞式储水罐38的雨水加压排出至市政雨水管网32;开启第七电动阀12,利用雨水箱19静压力将第一活塞板37和第二活塞板39推动至活塞壁最左端,第一活塞式储水罐36中的雨水排出,或者直接开启第五电动阀9将第一活塞式储水罐36中的雨水排至市政污水管网;Working condition 2: When the rainfall is large in rainy days and the rainwater on the ground is not discharged smoothly, the first electric valve 1 and the second
工况三:当雨天降雨量较大,地面雨水排出不顺畅时,开启第一电动阀1和第二电动阀2,让雨水由管道进入第二活塞式储水罐38,第二活塞式储水罐38逐渐装满水,当液位检测器3检测到水位超过某一规定值时,发出信号给控制器4,控制器4控制第八电动阀14开启,地面雨水从第二活塞式储水罐38左侧管道进入,直接推动第二活塞板39至活塞壁最右端,将第二活塞式储水罐38的水(雨水)加压排出至市政雨水管网32,这样一来,即收集了又一部分地面雨水,又利用地面雨水静压力将已经收集的雨水排出;第二次收集的雨水可以当雨水排出压力减少时,直接开启第九电动阀15泄流至市政雨水管网32;Working condition 3: When the rainfall is large in rainy days and the rainwater on the ground is not discharged smoothly, the first electric valve 1 and the second
工况四:在工况一、工况二、工况三的基础上,其余运行方式不变,只将第二电动阀2的开启改变为第一电动调节阀24的开启,将加压雨水排至PHC管桩,进而通过渗透作用排至地下土壤中。Working condition 4: On the basis of working condition 1, working
在本发明的工作过程中,不需要消耗电力驱动水泵,实现雨水零能耗加压,使雨水在管道中的流态从不充满流变为充满流,单位时间内管道的过流量加大,显著提高雨水管在暴雨时的过流能力,避免超高层或高层建筑地面积水。同时由于采用一大一小两个活塞,在排水压力已经足够的情况下,只用较小体积的污水(雨水)便可以达到排放较大体积雨水的效果,节省了高位水箱中的污水(雨水),使单位体积的高位水箱中的水能加压更多体积的雨水。这样雨水便能更有效率的排出。In the working process of the present invention, there is no need to consume electric power to drive the water pump, so as to realize zero-energy pressurization of rainwater, so that the flow state of rainwater in the pipeline changes from non-full flow to full flow, and the flow rate of the pipeline per unit time increases. Significantly improve the flow capacity of rainwater pipes during heavy rain, and avoid water accumulation on the ground of super high-rise or high-rise buildings. At the same time, due to the use of two pistons, one large and one small, when the drainage pressure is sufficient, only a small volume of sewage (rainwater) can achieve the effect of discharging a large volume of rainwater, saving the sewage (rainwater) in the high-level water tank. ), so that the water in the high water tank per unit volume can pressurize more volumes of rainwater. In this way, rainwater can be drained more efficiently.
例如:某一超高层建筑,其高位水箱具有100m水柱的静压力,第一活塞板37和第二活塞板39的面积比为1:5,压力=压强*面积,在静压力一定的情况下,第一活塞式储水罐36与第二活塞式储水罐38内的压力比为5:1,忽略压力损失时,第二活塞式储水罐38内的压力约为20m水柱。如果第二活塞式储水罐38内的压头较大,存在对附近井盖产生冲击的问题时,可以单独设立一根排水管,将雨水引至较远处的下游地方排出,从而不影响附近雨水的排出。For example: in a super high-rise building, its high-level water tank has a static pressure of 100m water column, the area ratio of the
水压调节:第二电动调节阀31可以根据第二活塞板39右侧雨水压出端的压力来调节废水进入活塞的流量和压力。通过调节废水进入活塞的流量和压力来调节雨水压出的流量和压力,避免在市政雨水管32暴雨形成充满流时,雨水超压进入市政雨水管网。避免形成反溢现象。Water pressure adjustment: the second electric regulating valve 31 can adjust the flow and pressure of the waste water entering the piston according to the pressure of the rainwater outlet end on the right side of the
市政雨水管网32的充满度和加压雨水喷入口的压力分别可通过液位传感器33和加压雨水喷入口的第二水压传感器42进行监测,非极端暴雨情况下,市政雨水管网32未充满的情况下,即使雨水超压喷入市政雨水管,也不会导致雨水返溢现象。但当市政雨水管网32的充满的情况下,喷入市政雨水管网32的加压雨水的压力比市政雨水管网内的压力高的数值不应大于管网顶部埋深,否则就会导致雨水返溢。所以活塞雨水压出腔体和加压雨水喷入口分别设有第三水压传感器43,并将压力信号反馈到控制器4,在加压排入市政雨水管道的工况下,控制器4根据预设的程序对第二电动调节阀31进行控制。The fullness of the municipal
第二电动调节阀31可根据PHC管桩下部的水压值调节进入PHC管桩的雨水压力和流量,避免雨水超压从桩头喷出在桩头形成空洞,影响桩头承载力。回灌状态下,活塞雨水压出腔体内的第三水压传感器43和PHC管桩下部雨水回灌腔体内的第一水压传感器35的测得的水压力反馈到控制器4,进而控制器4控制第二电动调节阀31和第一电动调节阀24的动作和开度,使得加压回灌压力在合理范围内。The second electric regulating valve 31 can adjust the pressure and flow of rainwater entering the PHC pipe pile according to the water pressure value of the lower part of the PHC pipe pile, so as to prevent the overpressure of rainwater from spraying out from the pile head to form a cavity at the pile head and affect the bearing capacity of the pile head. In the recharging state, the water pressure measured by the third
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711319216.4A CN108035423B (en) | 2017-12-12 | 2017-12-12 | Potential energy pressurized rainwater drainage and storage system and method for sponge city |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711319216.4A CN108035423B (en) | 2017-12-12 | 2017-12-12 | Potential energy pressurized rainwater drainage and storage system and method for sponge city |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108035423A CN108035423A (en) | 2018-05-15 |
CN108035423B true CN108035423B (en) | 2023-05-09 |
Family
ID=62102541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711319216.4A Active CN108035423B (en) | 2017-12-12 | 2017-12-12 | Potential energy pressurized rainwater drainage and storage system and method for sponge city |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108035423B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110005224B (en) * | 2019-04-22 | 2021-02-19 | 孝感市工程咨询设计集团有限公司 | Environment-friendly energy-saving building |
CN110284549B (en) * | 2019-06-24 | 2021-04-27 | 中交园林(山东)有限公司 | Greenery patches rainwater is collected and is recycled device |
CN110409559A (en) * | 2019-08-23 | 2019-11-05 | 陈奕旭 | Outdoor catchment of one kind is discharged cooling system |
CN112095738A (en) * | 2020-09-15 | 2020-12-18 | 张金富 | Rainwater recycling system leaks in seepage of environmental protection terrace that permeates water |
CN112814073B (en) * | 2021-02-24 | 2022-03-29 | 深圳市恒和装饰设计工程有限公司 | Green building for urban sewage circulation |
CN118197744B (en) * | 2024-05-17 | 2024-07-30 | 福建镕宏科技实业有限公司 | Outdoor dry-type transformer for photovoltaic power generation inversion |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102071736A (en) * | 2010-12-08 | 2011-05-25 | 江苏中天环境工程有限公司 | Rainwater-controlled sewage discharge device |
CN203049695U (en) * | 2013-01-25 | 2013-07-10 | 王文东 | Energy-saving high-rise water supply system for secondary pressurization |
JP2014118734A (en) * | 2012-12-17 | 2014-06-30 | Kiyohide Ishii | High quality rainwater acquisition apparatus |
CN106400933A (en) * | 2016-12-09 | 2017-02-15 | 安徽理工大学 | Roof rainwater source regulating device based on sponge city concept and running method |
CN106836438A (en) * | 2017-02-21 | 2017-06-13 | 徐光智 | Step for municipal Storm Sewer Network blocks water with water system of regulating and storing |
CN106996135A (en) * | 2017-04-05 | 2017-08-01 | 中铁建设集团有限公司 | A kind of intelligent peak rain-water accumulating heat-extraction system and method based on city integrated piping lane |
WO2017164596A1 (en) * | 2015-06-23 | 2017-09-28 | 지성산업개발(주) | Eco-friendly filtration water-collection tank and rainwater recirculation system using same |
-
2017
- 2017-12-12 CN CN201711319216.4A patent/CN108035423B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102071736A (en) * | 2010-12-08 | 2011-05-25 | 江苏中天环境工程有限公司 | Rainwater-controlled sewage discharge device |
JP2014118734A (en) * | 2012-12-17 | 2014-06-30 | Kiyohide Ishii | High quality rainwater acquisition apparatus |
CN203049695U (en) * | 2013-01-25 | 2013-07-10 | 王文东 | Energy-saving high-rise water supply system for secondary pressurization |
WO2017164596A1 (en) * | 2015-06-23 | 2017-09-28 | 지성산업개발(주) | Eco-friendly filtration water-collection tank and rainwater recirculation system using same |
CN106400933A (en) * | 2016-12-09 | 2017-02-15 | 安徽理工大学 | Roof rainwater source regulating device based on sponge city concept and running method |
CN106836438A (en) * | 2017-02-21 | 2017-06-13 | 徐光智 | Step for municipal Storm Sewer Network blocks water with water system of regulating and storing |
CN106996135A (en) * | 2017-04-05 | 2017-08-01 | 中铁建设集团有限公司 | A kind of intelligent peak rain-water accumulating heat-extraction system and method based on city integrated piping lane |
Also Published As
Publication number | Publication date |
---|---|
CN108035423A (en) | 2018-05-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108035423B (en) | Potential energy pressurized rainwater drainage and storage system and method for sponge city | |
CN101967841B (en) | Method and device for implementing primary rainwater closure in municipal network system | |
CN109281352B (en) | Rainwater recycling system based on clean energy | |
CN201762694U (en) | Dam flow guiding device | |
CN106759646A (en) | A kind of sponge urban pavement rain water collecting system and installation method | |
CN1948639A (en) | Water taking gallery of self flow type for underground reservoir | |
CN106192665A (en) | A kind of sponge urban road rain infiltration system and construction method thereof | |
CN105714723A (en) | Urban road rainwater collection treatment and application system | |
CN204876016U (en) | Pipeline formula rain flood regulation utilizes system | |
CN210287993U (en) | Ecological permeable pavement structure applied to sponge city | |
CN201089953Y (en) | System for collection and comprehensive utilization of city rainwater | |
CN204343257U (en) | The rubber dam of the wear-resistant steel plate of a kind of autocontrol band | |
CN211172270U (en) | Forebay rainwater garden system for large roof | |
CN112031114A (en) | Seepage stagnation type storage regulation sponge parking lot and rainwater storage regulation method | |
CN209429194U (en) | Rainwater recycling system based on clean energy | |
CN207863099U (en) | A kind of potential energy pressurization rainwater for sponge city arranges storage system | |
CN202157297U (en) | Gate control type urban rain and flood regulation, control and utilization system | |
CN201952879U (en) | Cutoff apparatus used in municipal rainwater pipe network for cutting off the rainwater flow of the initial period | |
CN201874083U (en) | Land-saving and energy-saving reservoir type pumping station drainage device for down digging channels | |
CN208266612U (en) | A kind of town road structure | |
CN217974577U (en) | Off-line rainwater regulation and storage tank | |
CN207512863U (en) | Rainwater penetration system | |
CN205777667U (en) | Assembled self-loopa bio-toilet | |
CN211547984U (en) | Deep tunnel drainage shaft with energy dissipation function | |
CN102535579A (en) | Ecological storing system for road rainwater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 100144 Shijingshan Road, Shijingshan District, Shijingshan District, Beijing Applicant after: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd. Applicant after: NORTH CHINA University OF TECHNOLOGY Applicant after: CHINA RAILWAY CONSTRUCTION GROUP BEIJING ENGINEERING Co.,Ltd. Address before: 100144 Beijing City, Shijingshan District Jin Yuan Zhuang Road No. 5 Applicant before: NORTH CHINA University OF TECHNOLOGY Applicant before: CHINA RAILWAY CONSTRUCTION GROUP BEIJING ENGINEERING Co.,Ltd. Applicant before: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd. |
|
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Kuan Inventor after: Song Yingfang Inventor after: Yu Wenhong Inventor after: Yan Hui Inventor after: Zhang Xiangdong Inventor after: Wang Yonghua Inventor after: Liu Zheng Inventor after: Shi Liyan Inventor after: Gong Ziyang Inventor after: Song Lin Inventor before: Yu Wenhong Inventor before: Song Yingfang Inventor before: Wang Kuan Inventor before: Yan Hui Inventor before: Zhang Xiangdong Inventor before: Wang Yonghua Inventor before: Liu Zheng Inventor before: Shi Liyan Inventor before: Gong Ziyang Inventor before: Song Lin |
|
GR01 | Patent grant | ||
GR01 | Patent grant |