A kind of wind power generation plant for being easy to ignore landform Fast Installation
Technical field
The present invention relates to new energy equipment technical field, is specially a kind of wind-force for being easy to ignore landform Fast Installation
Power generator.
Background technology
New energy is also known as unconventional energy resource, refers to the various energy forms outside traditional energy, refers to and just starts to develop
Or actively research, need the energy promoted, such as solar energy, geothermal energy, wind energy, ocean energy, biomass energy and nuclear fusion energy
Deng the kinetic energy that wind-power electricity generation refers to keep watch switchs to electric energy, and wind is a kind of energy without public hazards, utilizes wind-power electricity generation very ring
Protect, and the electric energy that can be produced is very huge, therefore more and more countries more pay attention to wind-power electricity generation, wind energy is as a kind of clear
Clean regenerative resource, is increasingly paid attention to be subject to countries in the world, its amount of accumulateing is huge, and the water than that can be developed on the earth can be total
Amount also wants 10 times big.
So utilization of the new energy for wind-power electricity generation is most important, as Chinese patent CN 102282363B disclose one
Kind wind power plant, but installation of this wind power plant for body all especially needs to change the ground of installation
Make building, it is impossible to directly installed, especially the poor place of landform is just even more so, directly affects staff to it
Installation effectiveness, and existing wind power plant is because be all outdoor the situation of corrosion often occurs, directly
Normal service life is have impact on, so most important easy to ignore the wind power generation plant of landform Fast Installation for a kind of.
The content of the invention
(1) technical problem solved
In view of the deficiencies of the prior art, the present invention provides a kind of easy to ignore the wind-power electricity generation of landform Fast Installation dress
Put, possess the advantages that ignoring landform Fast Installation and derusting, solve the problems, such as that installation effectiveness is low and short life.
(2) technical solution
To realize the above-mentioned purpose for ignoring landform Fast Installation and derusting, the present invention provides following technical solution:One kind is just
In the wind power generation plant for ignoring landform Fast Installation, including mobile jib, the bottom of the mobile jib is connected with the first ball, institute
State side of first ball away from mobile jib and be fixedly connected with the first fixed plate, the screw top of first fixed plate is connected with position
Symmetrical multiple companies have been fixedly connected with left and right sides of the mobile jib left and right sides and symmetrical two installation bolts, the mobile jib
Extension bar, the one end of the connecting rod away from mobile jib are fixedly connected with installing plate, and the back side of the installing plate offers sliding slot, described
The back side of installing plate is fixedly connected with the limited block directly over sliding slot, and the bottom of the limited block is fixedly connected with spacing bullet
Spring, the inner surface of the sliding slot are connected with sliding block, and the one end of the limit spring away from limited block is fixedly connected on sliding block
Top, the back side of the sliding block offers engagement groove, and the inner surface of the engagement groove is connected with L-shaped bar by shaft,
The bottom of the sliding block is fixedly connected with the supporting rod positioned at sliding slot inner surface, and the back side of the installing plate, which is fixedly connected with, to be located at
Connecting plate of the sliding slot away from connecting rod side, the connecting plate are fixedly connected with multiple locating pieces, the L close to the side of sliding slot
The one end of shape bar away from engagement groove inner surface is plugged on the bottom of locating piece, and the one end of the supporting rod away from sliding block is through installation
Plate is connected with the second ball, and the side of second ball away from supporting rod is fixedly connected with the second fixed plate, and described
The screw top of two fixed plates is connected with the fixing bolt positioned at supporting rod both sides, and the front of the mobile jib is fixedly connected dynamic
Case, is fixedly connected with stepper motor on the inner wall of the headstock bottom, and the output terminal at the top of the stepper motor is fixedly connected
There is threaded rod, threaded one end of the threaded rod away from stepper motor output terminal is connected with loop bar, and the loop bar is away from threaded rod
One end be fixedly connected with limiting plate, offer locating slot, a left side for the limiting plate on the inner wall at left and right sides of the headstock
Right both sides are movably connected in the inner surface of locating slot, and side of the limiting plate away from loop bar is fixedly connected with draw bar, described
The one end of draw bar away from limiting plate is fixedly connected with mounting ring through headstock, and the mounting ring is socketed in the appearance of mobile jib
Face, the inner surface of the mounting ring offer loose slot, and the inner surface of the loose slot is connected with the brush roll that derusts, the master
It is fixedly connected with cabinet at the top of bar, the output terminal on the left of the cabinet is fixedly connected with rotating bar.
Preferably, the installation bolt and the length of fixing bolt are the installation between eight centimetres to 15 centimetres
The reach of bolt and fixing bolt outer surface is between seven centimetres to 14 centimetres.
Preferably, between the length of the limit spring is five centimetres to eight centimetres, the coefficient of elasticity of the limit spring
Do not have for a newton centimetre per cm to ten newton.
Preferably, the quantity of the limit spring is no less than six, and is no less than six limit spring rectangular arrays.
Preferably, the positive shape of the locating piece is square, and the quantity of the locating piece is no less than six, and much
In six locating piece rectangular arrays.
Preferably, the lower surface of first fixed plate and the second fixed plate has been fixedly connected with non-slip mat, described spacing
The outer surface of plate is fixedly connected with wear-resistant pad.
Preferably, between the length of the threaded rod is 12 centimetres to 20 centimetres, the spiral shell of the screw thread rod outer surface
Between line length is ten centimetres to 18 centimetres.
Preferably, the connection mode between the connecting rod and connecting plate and installing plate is welding, the limiting plate and peace
The connection mode filled between ring and draw bar is also welding.
Preferably, between the internal diameter of the brush roll that derusts is six centimetres to eight centimetres, the outside diameter of the brush roll that derusts is ten
Between two centimetres to 15 centimetres.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of easy to ignore the wind power generation plant of landform Fast Installation, tool
Standby following beneficial effect:
1st, should be easy to ignore the wind power generation plant of landform Fast Installation, by setting the first ball, the first fixed plate, peace
Dress bolt, the second ball, the second fixed plate and fixing bolt play the role of adjusting setting angle progress quick regulation, more pass through
Set limit spring, sliding slot and sliding block to have the function that the support pole length to both sides is adjusted, reach even in precipitous
Hillside can also carry out equipment quickly firm installation, the installation effectiveness of staff greatly be lifted, so as to reach saving work
Make the effect of person works' time.
2nd, should be easy to ignore wind power generation plant of landform Fast Installation, by setting stepper motor, threaded rod, spacing
Plate, locating slot and draw bar play the role of the control brush roll that derusts and move up and down and derust, and then automatically to equipment branch
The outer surface of support arrangement carries out the effect of cleaning derusting, ensure that the service life of support device, can so as to reach lifting means
Continue the effect of usage time.
Brief description of the drawings
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is the backsight structural representation of installing plate of the present invention;
Fig. 3 is the internal structure schematic diagram of headstock of the present invention;
Fig. 4 is the overlooking the structure diagram of mounting ring of the present invention.
In figure:1 mobile jib, 2 first balls, 3 first fixed plates, 4 installation bolts, 5 connecting rods, 6 installing plates, 7 sliding slots, 8 limits
Position block, 9 limit springs, 10 sliding blocks, 11 engagement grooves, 12L shapes bar, 13 supporting rods, 14 connecting plates, 15 locating pieces, 16 second balls,
17 second fixed plates, 18 fixing bolts, 19 headstocks, 20 stepper motors, 21 threaded rods, 22 loop bars, 23 limiting plates, 24 positioning
Groove, 25 draw bars, 26 mounting rings, 27 loose slots, 28 are derusted brush roll, 29 cabinets, 30 rotating bars.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment, belongs to the scope of protection of the invention.
Please refer to Fig.1-4, it is a kind of easy to ignore the wind power generation plant of landform Fast Installation, including mobile jib 1, mobile jib 1
Bottom is connected with the first ball 2, and the first side of the ball 2 away from mobile jib 1 is fixedly connected with the first fixed plate 3, and first is solid
The screw top of fixed board 3 is connected with left and right sides of mobile jib 1 and symmetrical two installation bolts 4, the left and right sides of mobile jib 1 are equal
Symmetrical multiple connecting rods 5 are fixedly connected with, the one end of connecting rod 5 away from mobile jib 1 is fixedly connected with installing plate 6, installing plate 6
The back side offers sliding slot 7, and the back side of installing plate 6 is fixedly connected with the limited block 8 directly over sliding slot 7, the bottom of limited block 8
It is fixedly connected with limit spring 9, between the length of limit spring 9 is five centimetres to eight centimetres, the coefficient of elasticity of limit spring 9 is
One newton does not have centimetre per cm to ten newton, and the quantity of limit spring 9 is no less than six, and is in no less than six limit springs 9
Rectangular array, the inner surface of sliding slot 7 are connected with sliding block 10, and the one end of limit spring 9 away from limited block 8 is fixedly connected on cunning
The top of block 10, the back side of sliding block 10 offer engagement groove 11, and the inner surface of engagement groove 11 is connected with L-shaped bar by shaft
12, the bottom of sliding block 10 is fixedly connected with the supporting rod 13 positioned at 7 inner surface of sliding slot, and the back side of installing plate 6 is fixedly connected with position
In connecting plate 14 of the sliding slot 7 away from 5 side of connecting rod, connecting plate 14 is fixedly connected with multiple locating pieces close to the side of sliding slot 7
15,15 positive shape of locating piece is square, and the quantity of locating piece 15 is no less than six, and is in no less than six locating pieces 15
Rectangular array, the one end of L-shaped bar 12 away from 11 inner surface of engagement groove are plugged on the bottom of locating piece 15, and supporting rod 13 is away from sliding block
10 one end is connected with the second ball 16 through installing plate 6, and the second side of the ball 16 away from supporting rod 13 is fixedly connected
There is the second fixed plate 17, the screw top of the second fixed plate 17 is connected with the fixing bolt 18 positioned at 13 both sides of supporting rod, installation
The length of bolt 4 and fixing bolt 18 is between eight centimetres to 15 centimetres, 18 outer surface of installation bolt 4 and fixing bolt
Reach is between seven centimetres to 14 centimetres, passes through and sets the first ball 2, the first fixed plate 3, installation bolt 4, second
Ball 16, the second fixed plate 17 and fixing bolt 18 play the role of adjusting setting angle progress quick regulation, more pass through setting
Limit spring 9, sliding slot 7 and sliding block 10 have the function that 13 length of supporting rod of both sides is adjusted, and reach even in precipitous
Hillside quickly firm installation can be also carried out to equipment, the installation effectiveness of staff is greatly lifted, so as to reach saving
The effect of staff's working time, the front of mobile jib 1 are fixedly connected with headstock 19, are fixed on the inner wall of 19 bottom of headstock
Stepper motor 20 is connected with, the output terminal at the top of stepper motor 20 is fixedly connected with threaded rod 21, and the length of threaded rod 21 is ten
Between two centimetres to 20 centimetres, between the reach of 21 outer surface of threaded rod is ten centimetres to 18 centimetres, threaded rod 21
Threaded one end away from 20 output terminal of stepper motor is connected with loop bar 22, and the one end of loop bar 22 away from threaded rod 21 is fixedly connected with
The lower surface of limiting plate 23, the first fixed plate 3 and the second fixed plate 17 has been fixedly connected with non-slip mat, the outer surface of limiting plate 23
Wear-resistant pad is fixedly connected with, locating slot 24 is offered on the inner wall of the left and right sides of headstock 19, the left and right sides of limiting plate 23 is lived
The dynamic inner surface for being connected to locating slot 24, side of the limiting plate 23 away from loop bar 22 is fixedly connected with draw bar 25, draw bar 25
One end away from limiting plate 23 is fixedly connected with mounting ring 26 through headstock 19, connecting rod 5 and connecting plate 14 and installing plate 6 it
Between connection mode for welding, connection mode between limiting plate 23 and mounting ring 26 and draw bar 25 is also welding, mounting ring
26 are socketed in the outer surface of mobile jib 1, and the inner surface of mounting ring 26 offers loose slot 27, and the inner surface of loose slot 27 is flexibly connected
Derust brush roll 28, and between the internal diameter of the brush roll 28 that derusts is six centimetres to eight centimetres, the outside diameter for the brush roll 28 that derusts is 12 centimetres
To between 15 centimetres, by setting stepper motor 20, threaded rod 21, limiting plate 23, locating slot 24 and draw bar 25 to play control
The effect that the up and down motion of brush roll 28 derusts of derusting is made, and then the outer surface of equipment support device is cleared up automatically
The effect of derusting, ensure that the service life of support device, so as to reach the effect of the sustainable usage time of lifting means, mobile jib
1 top is fixedly connected with cabinet 29, and the output terminal in the left side of cabinet 29 is fixedly connected with rotating bar 30.
When in use, by controlling sliding slider 10 to select suitable location block 15 to be fixed, reach and use most suitable length
The second fixed plate 17 of both sides is fixed in the supporting rod 13 of degree, more by setting the first ball 2 and the second ball 16 to reach
The setting angle of flexible modulation the first fixed plate 3 and the second fixed plate 17, so as to reach easy to ignore the mesh of landform Fast Installation
's.
In conclusion should be easy to ignore the wind power generation plant of landform Fast Installation, by setting the first ball 2, first
Fixed plate 3, installation bolt 4, the second ball 16, the second fixed plate 17 and fixing bolt 18, which play, adjusts setting angle progress quickly
The effect of adjusting, is more adjusted 13 length of supporting rod of both sides by setting limit spring 9, sliding slot 7 and sliding block 10 to reach
Effect, can also equipment be carried out quickly firm installation even in steep hills slope by reaching, and greatly lift staff's
Installation effectiveness, so as to reach the effect for saving staff's working time.
Also, by setting stepper motor 20, threaded rod 21, limiting plate 23, locating slot 24 and draw bar 25 to play control
The brush roll 28 that derusts moves up and down the effect that derusts, and then carries out cleaning to the outer surface of equipment support device automatically and remove
The effect of rust, ensure that the service life of support device, so as to reach the effect of the sustainable usage time of lifting means.
It should be noted that term " comprising ", "comprising" or its any other variant are intended to the bag of nonexcludability
Contain, so that process, method, article or equipment including a series of elements not only include those key elements, but also including
Other elements that are not explicitly listed, or further include as elements inherent to such a process, method, article, or device.
In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including the key element
Process, method, also there are other identical element in article or equipment.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of changes, modification, replace
And modification, the scope of the present invention is defined by the appended.