CN108005019A - It is a kind of can the river of fast construction carry hardened system - Google Patents
It is a kind of can the river of fast construction carry hardened system Download PDFInfo
- Publication number
- CN108005019A CN108005019A CN201711246585.5A CN201711246585A CN108005019A CN 108005019 A CN108005019 A CN 108005019A CN 201711246585 A CN201711246585 A CN 201711246585A CN 108005019 A CN108005019 A CN 108005019A
- Authority
- CN
- China
- Prior art keywords
- fixation kit
- fixing piece
- connector
- shackle member
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
- E02B3/106—Temporary dykes
- E02B3/108—Temporary dykes with a filling, e.g. filled by water or sand
Abstract
The present invention relates to dykes and dams flood control field, more particularly to it is a kind of can the river of fast construction carry hardened system, including fixing device and support component, support component is located at fixing device side, fixing device includes the first fixation kit, second fixation kit, 3rd fixation kit and the 4th fixation kit, first fixation kit and the second fixation kit are connected at the top of the 3rd fixation kit and the 4th fixation kit and with the 3rd fixation kit and the 4th fixation kit respectively, first fixation kit and the adjacent side of the second fixation kit are mutually inserted cooperation, 3rd fixation kit and the adjacent side of the 4th fixation kit are mutually inserted cooperation, first fixation kit, second fixation kit, it is equipped with 3rd fixation kit and the 4th fixation kit and the matched Access Division of support component.The present invention temporarily quickly can reinforce dykes and dams in flood, take leave of traditional dam reinforcement using the time transported sandstone and wasted for manually transporting sandstone and the quick convenient transportation reduction of assembling back and forth.
Description
Technical field
Control flood field the present invention relates to dykes and dams, more particularly to it is a kind of can the river of fast construction carry hardened system.
Background technology
At present, all it is often to be blocked using knitting bagged soil for flood, is sealed since woven bag fills soil
It is stifled to need a large amount of manpowers and machinery just to complete, it is quite few simultaneously for fetching earth for urban flood defence, all it is often that high price is purchased
Put yellow sand and pour into woven bag and carry out anti-blocking, particularly even occur use in the work of urban flood defence in recent years and fill rice or grain
The woven bag of food carry out closure excess water phenomenon, after excess water is decorporated people spend huge sums again cleaning flood cause mud and accumulation
Such as the woven bag rubbish on mountain, this is time consuming arduously and is transported back and forth when shipping sandy soil the time for delaying flood fighting.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, it is an object of the present invention to provide it is a kind of can the river of fast construction carry hardened system.
To solve the above problems, the present invention provides following technical scheme:
It is a kind of can the river of fast construction put forward hardened system, including fixing device and support component, the support component is positioned at fixing
Device side is simultaneously engaged by clamping with fixing device, and the fixing device is consolidated including the first fixation kit, the second fixation kit, the 3rd
Determine component and the 4th fixation kit, the first fixation kit and the second fixation kit are located at the 3rd fixation kit and the 4th component respectively
Top is simultaneously connected with the 3rd fixation kit and the 4th fixation kit, first fixation kit and the second fixation kit it is adjacent one
Side is mating, and the 3rd fixation kit and the adjacent side inserting of the 4th fixation kit are closed, first fixation kit, second solid
Determine to be equipped with and the matched Access Division of support component on component, the 3rd fixation kit and the 4th fixation kit.
Further, first fixation kit includes the first fixing piece, the first connector and the first shackle member, and described
One fixing piece is equipped with the first internal thread hole for accommodating the first connector and the first shackle member, first connector and the first card
Fitting is equipped with and external screw thread is engaged with the first internal thread hole, and the side of first fixing piece away from the first internal thread hole is equipped with
First blocked hole identical with the first connector and the second shackle member cross section.
Further, second fixation kit includes the second fixing piece, the second connector and the second shackle member, and described
Two fixing pieces are equipped with the second internal thread hole for accommodating the second connector and the second shackle member, second connector and the second card
Fitting is equipped with and external screw thread is engaged with the second internal thread hole, and the side of second fixing piece away from the second internal thread hole is equipped with
Second blocked hole identical with the second connector and the second shackle member cross section.
Further, the 3rd fixation kit includes the 3rd fixing piece, the 3rd connector and the 3rd shackle member, and described
Three fixing pieces are equipped with the 3rd internal thread hole for accommodating the 3rd connector and the 3rd shackle member, the 3rd connector and the 3rd card
Fitting is equipped with and external screw thread is engaged with the 3rd internal thread hole, and the side of the 3rd fixing piece away from the 3rd internal thread hole is equipped with
Threeth blocked hole identical with the 3rd connector and the 3rd shackle member cross section.
Further, the 4th fixation kit includes the 4th fixing piece, the 4th connector and the 4th shackle member, and described
Four fixing pieces are equipped with the 4th internal thread hole for accommodating the 4th connector and the 4th shackle member, the 4th connector and the 4th card
Fitting is equipped with and external screw thread is engaged with the 4th internal thread hole, and the side of the 4th fixing piece away from the 4th internal thread hole is equipped with
Fourth blocked hole identical with the 4th connector and the 4th shackle member cross section.
Further, identical its is equal for first connector, the second connector, the 3rd connector and the 4th connecting-piece structure
Including horizontally disposed fixing sleeve and take-up pulley, take-up pulley is located in fixing sleeve and is connected with fixing sleeve, the company of being equipped with take-up pulley
Tape splicing, one end storage of connect band with take-up pulley, the other end of connect band is equipped with clamping joint, fixing sleeve madial wall, which is equipped with, to be consolidated
Determine the fixing axle of take-up pulley, fixing sleeve is equipped with the first through hole passed through for clamping band.
Further, closing cap is equipped with the top of the fixing sleeve, spaced square groove is equipped with the top of the closing cap,
Closing cap side is equipped with the fixed block being connected with itself, and the fixing sleeve madial wall is equipped with the annular groove for accommodating closing cap, annular
The locating part that connection is contradicted with fixed block is equipped with groove.
Further, first shackle member, the second shackle member, the 3rd shackle member it is identical with the three or four shackle member structure and
Include horizontally disposed connector sleeve, be equipped with the connector sleeve to accommodate the accommodating chamber of connect band, the connector sleeve outside
Wall is equipped with passes through the second through hole for connect band, and connector sleeve lateral wall is located at the second through hole and is equipped with to lock the lock of connect band
Tight part.
Further, the support component includes the first support plate and the second support plate that are vertically arranged, described first
Fagging is equipped with the shackle member being mutually clamped with the first fixation kit and the 3rd fixation kit close to the side of the first fixation kit, the
One support plate opposite side is equipped with hinged seat, and the supporting rod mating with itself is equipped with hinged seat.
Further, first fixing piece, the second fixing piece, the 3rd fixing piece and the 4th anchor structure are identical and equal
For hollow structure, the first fixing piece, the second fixing piece, the 3rd fixing piece and the 4th fixing piece top are equipped with the water inlet being vertically arranged
Pipeline, the openend of inlet channel are equipped with the lid with its thread fitting, the first fixing piece, the second fixing piece, the 3rd fixing piece
Groove is equipped with the side of the 4th fixing piece, opposite side is equipped with the fin being slidably matched in groove.
Beneficial effect:The present invention it is a kind of can the river of fast construction carry hardened system, when flood occurs to the first fixing piece,
Pour water the first fixing piece in second fixing piece, the 3rd fixing piece and the 4th fixing piece and the second fixing piece is inserted by fin and groove
Connect cooperation to be connected, the first fixing piece and the second fixing piece and the 3rd fixing piece and the 4th fixing piece are mating, fixing sleeve
Taking-up connect band is spun out from the first internal thread hole on the first fixing piece to be plugged in and the connector sleeve on the second fixing piece
It is interior, the first fixing piece and the second fixing piece with crossing connect band and connector sleeve locks, the shackle member of the first support plate side with
The Access Division of first fixing piece and the 3rd fixing piece is mutually clamped, and the supporting rod grafting of the first support plate opposite side in hinged seat with making
First support plate fits closely and on the first fixing piece and the 3rd fixing piece, the present invention can come interim quickly to dike in flood
Dam is reinforced, and traditional dam reinforcement of farewell is using the fortune for manually transporting sandstone and the quick convenient transportation reduction of assembling back and forth
The time for sending sandstone to waste.
Brief description of the drawings
The dimensional structure diagram one of Fig. 1 present invention;
The dimensional structure diagram two of Fig. 2 present invention;
The first fixing piece, the second fixing piece, the 3rd fixing piece and the 4th fixing piece assembling schematic diagram of Fig. 3 present invention;
The first fixing piece, the second fixing piece, the 3rd fixing piece and the 4th fixing piece schematic top plan view of Fig. 4 present invention;
Fig. 5 is the schematic cross-sectional view of line A-A in Fig. 4;
Fig. 6 is the schematic cross-sectional view of line B-B in Fig. 4;
The first fixing piece dimensional structure diagram of Fig. 7 present invention;
The first connector dimensional structure diagram of Fig. 8 present invention;
The first connector schematic cross-sectional view of Fig. 9 present invention;
The first shackle member schematic cross-sectional view of Figure 10 present invention;
Description of reference numerals:Fixing device 1, the first fixation kit 1a, the first fixing piece 1a1, the first connector 1a2, first blocks
Fitting 1a3, the first internal thread hole 1a4, the first blocked hole 1a5, the second fixation kit 1b, the 3rd fixation kit 1c, the 4th are fixed
Component 1d, support component 2, the first support plate 2a, shackle member 2b, hinged seat 2c, supporting rod 2d, fixing sleeve 3, first through hole 3a,
Closing cap 3b, square groove 3c, fixed block 3d, locating part 3e, take-up pulley 4, connect band 4a, clamping joint 4b, connector sleeve 5, second is logical
Hole 5a, locking member 5b, inlet channel 6, lid 6a.
Embodiment
With reference to Figure of description and embodiment, the specific embodiment of the present invention is described in further detail:
Referring to figs. 1 to described in 10 it is a kind of can the river of fast construction carry hardened system, including fixing device 1 and support component 2, institute
State support component 2 to be located at 1 side of fixing device and be engaged by clamping with fixing device 1, the fixing device 1 includes the first fixation group
Part 1a, the second fixation kit 1b, the 3rd fixation kit 1c and the 4th fixation kit 1d, the first fixation kit 1a and the second fixation group
Part 1b connects at the top of the 3rd fixation kit 1c and the 4th component and with the 3rd fixation kit 1c and the 4th fixation kit 1d respectively
Connect, the first fixation kit 1a and the second fixation kit 1b it is adjacent side it is mating, the 3rd fixation kit 1c and the 4th
Side inserting adjacent fixation kit 1d is closed, the first fixation kit 1a, the second fixation kit 1b, the 3rd fixation kit 1c and
It is equipped with 4th fixation kit 1d and 2 matched Access Division of support component.
Operation principle of the present invention, when flood occurs to the first fixing piece 1a1, the second fixing piece, the 3rd fixing piece and
Pour water the first fixing piece 1a1 in four fixing pieces and the second fixing piece is connected by the way that fin and groove are mating, first is solid
Determine part 1a1 and the second fixing piece and the 3rd fixing piece and the 4th fixing piece are mating, fixing sleeve 3 is from the first fixing piece 1a1
The first internal thread hole 1a4 in spin out and take out connect band 4a and be plugged in and in the connector sleeve 5 on the second fixing piece, first is solid
Determine part 1a1 and the second fixing piece with crossing connect band 4a and connector sleeve 5 locks, the shackle member 2b of the first support plate 2a sides with
The Access Division of first fixing piece 1a1 and the 3rd fixing piece is mutually clamped, supporting rod 2d grafting and the hinge of the first support plate 2a opposite sides
Make in joint chair 2c the first support plate 2a fit closely with the first fixing piece 1a1 and the 3rd fixing piece.
The first fixation kit 1a includes the first fixing piece 1a1, the first connector 1a2 and the first shackle member 1a3, described
First fixing piece 1a1 is equipped with the first internal thread hole 1a4 for accommodating the first connector 1a2 and the first shackle member 1a3, and described first
Connector 1a2 and the first shackle member 1a3 is equipped with and external screw thread is engaged with the first internal thread hole 1a4, the first fixing piece 1a1
Side away from the first internal thread hole 1a4 is equipped with first card identical with the first connector 1a2 and the first shackle member 1a3 cross sections
Connect hole 1a5, the first shackle member 1a3 and the first connector 1a2 by screw thread storage with the first fixing piece 1a1 in, the first blocked hole
1a5 is used to contradict the 5th fixing piece and the 5th fixing piece is contradicted and dykes and dams.
The second fixation kit 1b includes the second fixing piece, the second connector and the second shackle member, and described second fixes
Part is equipped with the second internal thread hole for accommodating the second connector and the second shackle member, and second connector and the second shackle member are equal
Equipped with external screw thread is engaged with the second internal thread hole, the side of second fixing piece away from the second internal thread hole is equipped with and second
Identical the second blocked hole of connector and the second shackle member cross section, the second shackle member and the second connector by screw thread storage with
In second fixing piece, the first blocked hole 1a5 is used to contradict the 6th fixing piece and the 6th fixing piece is contradicted and dykes and dams.
The 3rd fixation kit 1c includes the 3rd fixing piece, the 3rd connector and the 3rd shackle member, and the described 3rd fixes
Part is equipped with the 3rd internal thread hole for accommodating the 3rd connector and the 3rd shackle member, and the 3rd connector and the 3rd shackle member are equal
Equipped with external screw thread is engaged with the 3rd internal thread hole, the side of the 3rd fixing piece away from the 3rd internal thread hole is equipped with and the 3rd
Identical the 3rd blocked hole of connector and the 3rd shackle member cross section, the 3rd shackle member and the 3rd connector by screw thread storage with
In 3rd fixing piece, the 3rd blocked hole is used to contradict the 7th fixing piece and the 7th fixing piece is contradicted and dykes and dams.
The 4th fixation kit 1d includes the 4th fixing piece, the 4th connector and the 4th shackle member, and the described 4th fixes
Part is equipped with the 4th internal thread hole for accommodating the 4th connector and the 4th shackle member, and the 4th connector and the 4th shackle member are equal
Equipped with external screw thread is engaged with the 4th internal thread hole, the side of the 4th fixing piece away from the 4th internal thread hole is equipped with and the 4th
Identical the 4th blocked hole of connector and the 4th shackle member cross section, the 4th shackle member and the 4th connector by screw thread storage with
In 4th fixing piece, the 4th blocked hole is used to contradict the 8th fixing piece and the 8th fixing piece is contradicted and dykes and dams.
The first connector 1a2, the second connector, the 3rd connector and identical its of the 4th connecting-piece structure include water
The flat fixing sleeve 3 and take-up pulley 4 set, take-up pulley 4 are located in fixing sleeve 3 and are connected with fixing sleeve 3, the company of being equipped with take-up pulley 4
In one end storage of tape splicing 4a, connect band 4a and take-up pulley 4, the other end of connect band 4a is equipped with clamping joint 4b, the inner side of fixing sleeve 3
Wall is equipped with the fixing axle of fixed take-up pulley 4, and fixing sleeve 3 is equipped with the first through hole 3a passed through for clamping band, and connect band 4a is worn
Cross in first through hole 3a clampings and connector sleeve 5.
The top of fixing sleeve 3 is equipped with the top of closing cap 3b, the closing cap 3b and is equipped with spaced square groove 3c, seals
Closing lid 3b sides and be equipped with the fixed block 3d being connected with itself, 3 madial wall of fixing sleeve is equipped with the annular groove for accommodating closing cap 3b,
It is equipped with the locating part 3e that connection is contradicted with fixed block 3d in annular groove, spaced square groove 3c rotations are driving closing cap
3b rotations make fixed block 3d and locating part 3e conflicts drive fixing sleeve 3 to rotate in the first internal thread hole 1a4 or screw out in first
Outside threaded hole 1a4.
The first shackle member 1a3, the second shackle member, the 3rd shackle member is identical with the three or four shackle member structure and includes
Horizontally disposed connector sleeve 5, the connector sleeve 5 is interior to be equipped with to accommodate the accommodating chamber of connect band 4a, 5 lateral wall of connector sleeve
It is equipped with and passes through the second through hole 5a for connect band 4a, 5 lateral wall of connector sleeve is located at the second through hole 5a and is equipped with to lock connection
Locking member 5b with 4a, locking member 5b prevent the tightening force of connect band 4a take-up pulleys 4 from retracting to lock connect band 4a.
The support component 2 includes the first support plate 2a and the second support plate being vertically arranged, the first support plate 2a
The shackle member being mutually clamped with the first fixation kit 1a and the 3rd fixation kit 1c is equipped with close to the side of the first fixation kit 1a
2b, the first support plate 2a opposite sides are equipped with hinged seat 2c, the supporting rod 2d mating with itself are equipped with hinged seat 2c, be clamped
Part 2b is mutually clamped with the Access Division on the first fixing piece 1a1 and the 3rd fixing piece, hinged seat 2c and branch after the first support plate 2a
Strut 2d is supported the first support plate 2a.
The first fixing piece 1a1, the second fixing piece, the 3rd fixing piece and the 4th anchor structure are identical and be hollow
Structure, the first fixing piece 1a1, the second fixing piece, the 3rd fixing piece and the 4th fixing piece top are equipped with the water inlet pipe being vertically arranged
Road 6, the openend of inlet channel 6 is equipped with to be consolidated with the lid 6a, the first fixing piece 1a1 of its thread fitting, the second fixing piece, the 3rd
The side for determining part and the 4th fixing piece is equipped with groove, opposite side be equipped with the fin that is slidably matched in groove by inlet channel 6 to
After pouring water in first fixing piece 1a1, the second fixing piece, the 3rd fixing piece and the 4th fixing piece with lid 6a by inlet channel 6
Closing.
The above described is only a preferred embodiment of the present invention, any limit not is made to the technical scope of the present invention
System, therefore any subtle modifications, equivalent variations and modifications that every technical spirit according to the present invention makees above example,
In the range of still falling within technical scheme.
Claims (10)
1. it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Including fixing device(1)And support component(2), institute
State support component(2)Positioned at fixing device(1)Side and and fixing device(1)It is engaged by clamping, the fixing device(1)Including
One fixation kit(1a), the second fixation kit(1b), the 3rd fixation kit(1c)With the 4th fixation kit(1d), the first fixation group
Part(1a)With the second fixation kit(1b)It is located at the 3rd fixation kit respectively(1c)With the 4th component at the top of and with the 3rd fixation group
Part(1c)With the 4th fixation kit(1d)Connection, first fixation kit(1a)With the second fixation kit(1b)Adjacent side
It is mating, the 3rd fixation kit(1c)With the 4th fixation kit(1d)Adjacent side inserting is closed, first fixation kit
(1a), the second fixation kit(1b), the 3rd fixation kit(1c)With the 4th fixation kit(1d)On be equipped with and support component(2)
Matched Access Division.
2. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Described first fixes
Component(1a)Including the first fixing piece(1a1), the first connector(1a2)With the first shackle member(1a3), first fixing piece
(1a1)It is equipped with and accommodates the first connector(1a2)With the first shackle member(1a3)The first internal thread hole(1a4), described first connects
Fitting(1a2)With the first shackle member(1a3)It is equipped with and the first internal thread hole(1a4)External screw thread is engaged, described first fixes
Part(1a1)Away from the first internal thread hole(1a4)Side be equipped with and the first connector(1a2)With the first shackle member(1a3)It is transversal
The first identical blocked hole of face(1a5).
3. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Described second fixes
Component(1b)Including the second fixing piece, the second connector and the second shackle member, second fixing piece, which is equipped with, accommodates the second company
Second internal thread hole of fitting and the second shackle member, second connector and the second shackle member are equipped with and the second internal thread hole
External screw thread is engaged, the side of second fixing piece away from the second internal thread hole is equipped with and the second connector and the second shackle member
The second identical blocked hole of cross section.
4. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Described 3rd fixes
Component(1c)Including the 3rd fixing piece, the 3rd connector and the 3rd shackle member, the 3rd fixing piece, which is equipped with, accommodates the 3rd company
3rd internal thread hole of fitting and the 3rd shackle member, the 3rd connector and the 3rd shackle member are equipped with and the 3rd internal thread hole
External screw thread is engaged, the side of the 3rd fixing piece away from the 3rd internal thread hole is equipped with and the 3rd connector and the 3rd shackle member
The 3rd identical blocked hole of cross section.
5. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Described 4th fixes
Component(1d)Including the 4th fixing piece, the 4th connector and the 4th shackle member, the 4th fixing piece, which is equipped with, accommodates the 4th company
4th internal thread hole of fitting and the 4th shackle member, the 4th connector and the 4th shackle member are equipped with and the 4th internal thread hole
External screw thread is engaged, the side of the 4th fixing piece away from the 4th internal thread hole is equipped with and the 4th connector and the 4th shackle member
The 4th identical blocked hole of cross section.
6. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:First connection
Part(1a2), the second connector, the 3rd connector and identical its of the 4th connecting-piece structure include horizontally disposed fixing sleeve(3)
And take-up pulley(4), take-up pulley(4)Positioned at fixing sleeve(3)Interior and and fixing sleeve(3)Connection, take-up pulley(4)It is interior to be equipped with connect band
(4a), connect band(4a)One end storage and take-up pulley(4)It is interior, connect band(4a)The other end be equipped with clamping joint(4b), it is fixed
Set(3)Madial wall is equipped with fixed take-up pulley(4)Fixing axle, fixing sleeve(3)It is equipped with the first through hole passed through for clamping band
(3a).
7. it is according to claim 6 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:The fixing sleeve
(3)Top is equipped with closing cap(3b), the closing cap(3b)Top is equipped with spaced square groove(3c), closing cap(3b)It is other
Side is equipped with the fixed block being connected with itself(3d), the fixing sleeve(3)Madial wall, which is equipped with, accommodates closing cap(3b)Annular groove, ring
It is equipped with shape groove and fixed block(3d)Contradict the locating part of connection(3e).
8. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:First clamping
Part(1a3), the second shackle member, the 3rd shackle member is identical with the 4th shackle member structure and includes horizontally disposed connector sleeve(5),
The connector sleeve(5)It is interior to be equipped with to accommodate connect band(4a)Accommodating chamber, the connector sleeve(5)Lateral wall is equipped with for connecting
Band(4a)Through the second through hole(5a), connector sleeve(5)Lateral wall is located at the second through hole(5a)It is equipped with to lock connect band
(4a)Locking member(5b).
9. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:The support component
(2)Including the first support plate being vertically arranged(2a)With the second support plate, first support plate(2a)Close to the first fixation group
Part(1a)Side be equipped with and the first fixation kit(1a)With the 3rd fixation kit(1c)The shackle member being mutually clamped(2b), first
Support plate(2a)Opposite side is equipped with hinged seat(2c), hinged seat(2c)It is interior to be equipped with the supporting rod mating with itself(2d).
10. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Described first is solid
Determine part(1a1), the second fixing piece, the 3rd fixing piece and the 4th anchor structure it is identical and be hollow structure, the first fixing piece
(1a1), the second fixing piece, be equipped with the inlet channel being vertically arranged at the top of the 3rd fixing piece and the 4th fixing piece(6), water inlet
Pipeline(6)Openend be equipped with lid with its thread fitting(6a), the first fixing piece(1a1), the second fixing piece, the 3rd fix
The side of part and the 4th fixing piece is equipped with groove, and opposite side is equipped with the fin being slidably matched in groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711246585.5A CN108005019B (en) | 2017-12-01 | 2017-12-01 | River that can build fast carries reinforcerment system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711246585.5A CN108005019B (en) | 2017-12-01 | 2017-12-01 | River that can build fast carries reinforcerment system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108005019A true CN108005019A (en) | 2018-05-08 |
CN108005019B CN108005019B (en) | 2020-06-12 |
Family
ID=62055800
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711246585.5A Active CN108005019B (en) | 2017-12-01 | 2017-12-01 | River that can build fast carries reinforcerment system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108005019B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110685253A (en) * | 2019-09-02 | 2020-01-14 | 重庆市水利港航建设集团有限公司 | Flood prevention box for hydraulic engineering |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2644501Y (en) * | 2003-07-15 | 2004-09-29 | 徐俊 | Waterproof wall of dam |
CN203755237U (en) * | 2014-04-09 | 2014-08-06 | 王艳春 | Flood control manger board |
CN105756013A (en) * | 2016-04-21 | 2016-07-13 | 高瞻 | Detachable flood control wall |
CN206090460U (en) * | 2016-09-18 | 2017-04-12 | 辽宁科技大学 | But fast assembly's flood control device |
-
2017
- 2017-12-01 CN CN201711246585.5A patent/CN108005019B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2644501Y (en) * | 2003-07-15 | 2004-09-29 | 徐俊 | Waterproof wall of dam |
CN203755237U (en) * | 2014-04-09 | 2014-08-06 | 王艳春 | Flood control manger board |
CN105756013A (en) * | 2016-04-21 | 2016-07-13 | 高瞻 | Detachable flood control wall |
CN206090460U (en) * | 2016-09-18 | 2017-04-12 | 辽宁科技大学 | But fast assembly's flood control device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110685253A (en) * | 2019-09-02 | 2020-01-14 | 重庆市水利港航建设集团有限公司 | Flood prevention box for hydraulic engineering |
CN110685253B (en) * | 2019-09-02 | 2021-04-02 | 重庆市水利港航建设集团有限公司 | Flood prevention box for hydraulic engineering |
Also Published As
Publication number | Publication date |
---|---|
CN108005019B (en) | 2020-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7344338B2 (en) | Pipeline ballast and method of use | |
CN108005019A (en) | It is a kind of can the river of fast construction carry hardened system | |
CN205781556U (en) | Sealing flange | |
CN108222513A (en) | A kind of prefabricated concrete structure grout sleeve centering die device | |
CN206874296U (en) | A kind of tunnel hollow bolt grouting device | |
RU157233U1 (en) | RING CONCRETE LOADER | |
CN109268031A (en) | Tube coupling can fill the plugging structure and construction method of bag type paste at service channel hole | |
CN100497845C (en) | Mixed grouting device for blocking high-pressure groundwater and mixing method grouting process therefor | |
CN208982851U (en) | Drainage pipeline connection structure | |
CN107489830A (en) | A kind of two segment pipe attachment means | |
CN206487492U (en) | A kind of shield machine single fluid grouting pipe rapid translating two-liquid grouting device | |
CN213256990U (en) | Sand box for casting | |
KR100731173B1 (en) | Connect structure for water pipe | |
CN205606024U (en) | Connecting pipe for petroleum pipeline based on spring -catche spare | |
CN205606035U (en) | Fastening type coupling for petroleum pipeline | |
CN211646042U (en) | Novel road and bridge crack consolidate device | |
CN211716038U (en) | Expansion type sealing tape for stopping leakage | |
CN209041657U (en) | A kind of integral type butterfly valve check-valves loose joint structure | |
KR20060004637A (en) | Connect structure for water pipe | |
RU2257503C1 (en) | Method of applying ballast coating on underwater pipe | |
CN1066698A (en) | Mould bag slip casting (material) dynamic water plugging method and apparatus in the macrovoid | |
CN206054973U (en) | Split type polyethylene solid wall pipe | |
CN218863421U (en) | Butt joint fixing structure for gas pipeline construction | |
CN208107303U (en) | Jacking construction water stop device for opening | |
CN206487493U (en) | A kind of pre-buried ejection for water plugging structure of shield tunnel knocker plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200520 Address after: 350200 305 units of 1 buildings in Jinjiang garden three District, Changle District, Fuzhou, Fujian, China Applicant after: The permanently happy head of district in Fuzhou City wins Information Technology Co.,Ltd. Address before: 274005 Changjiang Road, Peony District, Heze, Shandong Province, No. 887 Applicant before: Dong Hongcan |
|
GR01 | Patent grant | ||
GR01 | Patent grant |