CN108005019A - It is a kind of can the river of fast construction carry hardened system - Google Patents

It is a kind of can the river of fast construction carry hardened system Download PDF

Info

Publication number
CN108005019A
CN108005019A CN201711246585.5A CN201711246585A CN108005019A CN 108005019 A CN108005019 A CN 108005019A CN 201711246585 A CN201711246585 A CN 201711246585A CN 108005019 A CN108005019 A CN 108005019A
Authority
CN
China
Prior art keywords
fixation kit
fixing piece
connector
shackle member
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711246585.5A
Other languages
Chinese (zh)
Other versions
CN108005019B (en
Inventor
董洪灿
黄腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
The permanently happy head of district in Fuzhou City wins Information Technology Co.,Ltd.
Original Assignee
董洪灿
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 董洪灿 filed Critical 董洪灿
Priority to CN201711246585.5A priority Critical patent/CN108005019B/en
Publication of CN108005019A publication Critical patent/CN108005019A/en
Application granted granted Critical
Publication of CN108005019B publication Critical patent/CN108005019B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes
    • E02B3/108Temporary dykes with a filling, e.g. filled by water or sand

Abstract

The present invention relates to dykes and dams flood control field, more particularly to it is a kind of can the river of fast construction carry hardened system, including fixing device and support component, support component is located at fixing device side, fixing device includes the first fixation kit, second fixation kit, 3rd fixation kit and the 4th fixation kit, first fixation kit and the second fixation kit are connected at the top of the 3rd fixation kit and the 4th fixation kit and with the 3rd fixation kit and the 4th fixation kit respectively, first fixation kit and the adjacent side of the second fixation kit are mutually inserted cooperation, 3rd fixation kit and the adjacent side of the 4th fixation kit are mutually inserted cooperation, first fixation kit, second fixation kit, it is equipped with 3rd fixation kit and the 4th fixation kit and the matched Access Division of support component.The present invention temporarily quickly can reinforce dykes and dams in flood, take leave of traditional dam reinforcement using the time transported sandstone and wasted for manually transporting sandstone and the quick convenient transportation reduction of assembling back and forth.

Description

It is a kind of can the river of fast construction carry hardened system
Technical field
Control flood field the present invention relates to dykes and dams, more particularly to it is a kind of can the river of fast construction carry hardened system.
Background technology
At present, all it is often to be blocked using knitting bagged soil for flood, is sealed since woven bag fills soil It is stifled to need a large amount of manpowers and machinery just to complete, it is quite few simultaneously for fetching earth for urban flood defence, all it is often that high price is purchased Put yellow sand and pour into woven bag and carry out anti-blocking, particularly even occur use in the work of urban flood defence in recent years and fill rice or grain The woven bag of food carry out closure excess water phenomenon, after excess water is decorporated people spend huge sums again cleaning flood cause mud and accumulation Such as the woven bag rubbish on mountain, this is time consuming arduously and is transported back and forth when shipping sandy soil the time for delaying flood fighting.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, it is an object of the present invention to provide it is a kind of can the river of fast construction carry hardened system.
To solve the above problems, the present invention provides following technical scheme:
It is a kind of can the river of fast construction put forward hardened system, including fixing device and support component, the support component is positioned at fixing Device side is simultaneously engaged by clamping with fixing device, and the fixing device is consolidated including the first fixation kit, the second fixation kit, the 3rd Determine component and the 4th fixation kit, the first fixation kit and the second fixation kit are located at the 3rd fixation kit and the 4th component respectively Top is simultaneously connected with the 3rd fixation kit and the 4th fixation kit, first fixation kit and the second fixation kit it is adjacent one Side is mating, and the 3rd fixation kit and the adjacent side inserting of the 4th fixation kit are closed, first fixation kit, second solid Determine to be equipped with and the matched Access Division of support component on component, the 3rd fixation kit and the 4th fixation kit.
Further, first fixation kit includes the first fixing piece, the first connector and the first shackle member, and described One fixing piece is equipped with the first internal thread hole for accommodating the first connector and the first shackle member, first connector and the first card Fitting is equipped with and external screw thread is engaged with the first internal thread hole, and the side of first fixing piece away from the first internal thread hole is equipped with First blocked hole identical with the first connector and the second shackle member cross section.
Further, second fixation kit includes the second fixing piece, the second connector and the second shackle member, and described Two fixing pieces are equipped with the second internal thread hole for accommodating the second connector and the second shackle member, second connector and the second card Fitting is equipped with and external screw thread is engaged with the second internal thread hole, and the side of second fixing piece away from the second internal thread hole is equipped with Second blocked hole identical with the second connector and the second shackle member cross section.
Further, the 3rd fixation kit includes the 3rd fixing piece, the 3rd connector and the 3rd shackle member, and described Three fixing pieces are equipped with the 3rd internal thread hole for accommodating the 3rd connector and the 3rd shackle member, the 3rd connector and the 3rd card Fitting is equipped with and external screw thread is engaged with the 3rd internal thread hole, and the side of the 3rd fixing piece away from the 3rd internal thread hole is equipped with Threeth blocked hole identical with the 3rd connector and the 3rd shackle member cross section.
Further, the 4th fixation kit includes the 4th fixing piece, the 4th connector and the 4th shackle member, and described Four fixing pieces are equipped with the 4th internal thread hole for accommodating the 4th connector and the 4th shackle member, the 4th connector and the 4th card Fitting is equipped with and external screw thread is engaged with the 4th internal thread hole, and the side of the 4th fixing piece away from the 4th internal thread hole is equipped with Fourth blocked hole identical with the 4th connector and the 4th shackle member cross section.
Further, identical its is equal for first connector, the second connector, the 3rd connector and the 4th connecting-piece structure Including horizontally disposed fixing sleeve and take-up pulley, take-up pulley is located in fixing sleeve and is connected with fixing sleeve, the company of being equipped with take-up pulley Tape splicing, one end storage of connect band with take-up pulley, the other end of connect band is equipped with clamping joint, fixing sleeve madial wall, which is equipped with, to be consolidated Determine the fixing axle of take-up pulley, fixing sleeve is equipped with the first through hole passed through for clamping band.
Further, closing cap is equipped with the top of the fixing sleeve, spaced square groove is equipped with the top of the closing cap, Closing cap side is equipped with the fixed block being connected with itself, and the fixing sleeve madial wall is equipped with the annular groove for accommodating closing cap, annular The locating part that connection is contradicted with fixed block is equipped with groove.
Further, first shackle member, the second shackle member, the 3rd shackle member it is identical with the three or four shackle member structure and Include horizontally disposed connector sleeve, be equipped with the connector sleeve to accommodate the accommodating chamber of connect band, the connector sleeve outside Wall is equipped with passes through the second through hole for connect band, and connector sleeve lateral wall is located at the second through hole and is equipped with to lock the lock of connect band Tight part.
Further, the support component includes the first support plate and the second support plate that are vertically arranged, described first Fagging is equipped with the shackle member being mutually clamped with the first fixation kit and the 3rd fixation kit close to the side of the first fixation kit, the One support plate opposite side is equipped with hinged seat, and the supporting rod mating with itself is equipped with hinged seat.
Further, first fixing piece, the second fixing piece, the 3rd fixing piece and the 4th anchor structure are identical and equal For hollow structure, the first fixing piece, the second fixing piece, the 3rd fixing piece and the 4th fixing piece top are equipped with the water inlet being vertically arranged Pipeline, the openend of inlet channel are equipped with the lid with its thread fitting, the first fixing piece, the second fixing piece, the 3rd fixing piece Groove is equipped with the side of the 4th fixing piece, opposite side is equipped with the fin being slidably matched in groove.
Beneficial effect:The present invention it is a kind of can the river of fast construction carry hardened system, when flood occurs to the first fixing piece, Pour water the first fixing piece in second fixing piece, the 3rd fixing piece and the 4th fixing piece and the second fixing piece is inserted by fin and groove Connect cooperation to be connected, the first fixing piece and the second fixing piece and the 3rd fixing piece and the 4th fixing piece are mating, fixing sleeve Taking-up connect band is spun out from the first internal thread hole on the first fixing piece to be plugged in and the connector sleeve on the second fixing piece It is interior, the first fixing piece and the second fixing piece with crossing connect band and connector sleeve locks, the shackle member of the first support plate side with The Access Division of first fixing piece and the 3rd fixing piece is mutually clamped, and the supporting rod grafting of the first support plate opposite side in hinged seat with making First support plate fits closely and on the first fixing piece and the 3rd fixing piece, the present invention can come interim quickly to dike in flood Dam is reinforced, and traditional dam reinforcement of farewell is using the fortune for manually transporting sandstone and the quick convenient transportation reduction of assembling back and forth The time for sending sandstone to waste.
Brief description of the drawings
The dimensional structure diagram one of Fig. 1 present invention;
The dimensional structure diagram two of Fig. 2 present invention;
The first fixing piece, the second fixing piece, the 3rd fixing piece and the 4th fixing piece assembling schematic diagram of Fig. 3 present invention;
The first fixing piece, the second fixing piece, the 3rd fixing piece and the 4th fixing piece schematic top plan view of Fig. 4 present invention;
Fig. 5 is the schematic cross-sectional view of line A-A in Fig. 4;
Fig. 6 is the schematic cross-sectional view of line B-B in Fig. 4;
The first fixing piece dimensional structure diagram of Fig. 7 present invention;
The first connector dimensional structure diagram of Fig. 8 present invention;
The first connector schematic cross-sectional view of Fig. 9 present invention;
The first shackle member schematic cross-sectional view of Figure 10 present invention;
Description of reference numerals:Fixing device 1, the first fixation kit 1a, the first fixing piece 1a1, the first connector 1a2, first blocks Fitting 1a3, the first internal thread hole 1a4, the first blocked hole 1a5, the second fixation kit 1b, the 3rd fixation kit 1c, the 4th are fixed Component 1d, support component 2, the first support plate 2a, shackle member 2b, hinged seat 2c, supporting rod 2d, fixing sleeve 3, first through hole 3a, Closing cap 3b, square groove 3c, fixed block 3d, locating part 3e, take-up pulley 4, connect band 4a, clamping joint 4b, connector sleeve 5, second is logical Hole 5a, locking member 5b, inlet channel 6, lid 6a.
Embodiment
With reference to Figure of description and embodiment, the specific embodiment of the present invention is described in further detail:
Referring to figs. 1 to described in 10 it is a kind of can the river of fast construction carry hardened system, including fixing device 1 and support component 2, institute State support component 2 to be located at 1 side of fixing device and be engaged by clamping with fixing device 1, the fixing device 1 includes the first fixation group Part 1a, the second fixation kit 1b, the 3rd fixation kit 1c and the 4th fixation kit 1d, the first fixation kit 1a and the second fixation group Part 1b connects at the top of the 3rd fixation kit 1c and the 4th component and with the 3rd fixation kit 1c and the 4th fixation kit 1d respectively Connect, the first fixation kit 1a and the second fixation kit 1b it is adjacent side it is mating, the 3rd fixation kit 1c and the 4th Side inserting adjacent fixation kit 1d is closed, the first fixation kit 1a, the second fixation kit 1b, the 3rd fixation kit 1c and It is equipped with 4th fixation kit 1d and 2 matched Access Division of support component.
Operation principle of the present invention, when flood occurs to the first fixing piece 1a1, the second fixing piece, the 3rd fixing piece and Pour water the first fixing piece 1a1 in four fixing pieces and the second fixing piece is connected by the way that fin and groove are mating, first is solid Determine part 1a1 and the second fixing piece and the 3rd fixing piece and the 4th fixing piece are mating, fixing sleeve 3 is from the first fixing piece 1a1 The first internal thread hole 1a4 in spin out and take out connect band 4a and be plugged in and in the connector sleeve 5 on the second fixing piece, first is solid Determine part 1a1 and the second fixing piece with crossing connect band 4a and connector sleeve 5 locks, the shackle member 2b of the first support plate 2a sides with The Access Division of first fixing piece 1a1 and the 3rd fixing piece is mutually clamped, supporting rod 2d grafting and the hinge of the first support plate 2a opposite sides Make in joint chair 2c the first support plate 2a fit closely with the first fixing piece 1a1 and the 3rd fixing piece.
The first fixation kit 1a includes the first fixing piece 1a1, the first connector 1a2 and the first shackle member 1a3, described First fixing piece 1a1 is equipped with the first internal thread hole 1a4 for accommodating the first connector 1a2 and the first shackle member 1a3, and described first Connector 1a2 and the first shackle member 1a3 is equipped with and external screw thread is engaged with the first internal thread hole 1a4, the first fixing piece 1a1 Side away from the first internal thread hole 1a4 is equipped with first card identical with the first connector 1a2 and the first shackle member 1a3 cross sections Connect hole 1a5, the first shackle member 1a3 and the first connector 1a2 by screw thread storage with the first fixing piece 1a1 in, the first blocked hole 1a5 is used to contradict the 5th fixing piece and the 5th fixing piece is contradicted and dykes and dams.
The second fixation kit 1b includes the second fixing piece, the second connector and the second shackle member, and described second fixes Part is equipped with the second internal thread hole for accommodating the second connector and the second shackle member, and second connector and the second shackle member are equal Equipped with external screw thread is engaged with the second internal thread hole, the side of second fixing piece away from the second internal thread hole is equipped with and second Identical the second blocked hole of connector and the second shackle member cross section, the second shackle member and the second connector by screw thread storage with In second fixing piece, the first blocked hole 1a5 is used to contradict the 6th fixing piece and the 6th fixing piece is contradicted and dykes and dams.
The 3rd fixation kit 1c includes the 3rd fixing piece, the 3rd connector and the 3rd shackle member, and the described 3rd fixes Part is equipped with the 3rd internal thread hole for accommodating the 3rd connector and the 3rd shackle member, and the 3rd connector and the 3rd shackle member are equal Equipped with external screw thread is engaged with the 3rd internal thread hole, the side of the 3rd fixing piece away from the 3rd internal thread hole is equipped with and the 3rd Identical the 3rd blocked hole of connector and the 3rd shackle member cross section, the 3rd shackle member and the 3rd connector by screw thread storage with In 3rd fixing piece, the 3rd blocked hole is used to contradict the 7th fixing piece and the 7th fixing piece is contradicted and dykes and dams.
The 4th fixation kit 1d includes the 4th fixing piece, the 4th connector and the 4th shackle member, and the described 4th fixes Part is equipped with the 4th internal thread hole for accommodating the 4th connector and the 4th shackle member, and the 4th connector and the 4th shackle member are equal Equipped with external screw thread is engaged with the 4th internal thread hole, the side of the 4th fixing piece away from the 4th internal thread hole is equipped with and the 4th Identical the 4th blocked hole of connector and the 4th shackle member cross section, the 4th shackle member and the 4th connector by screw thread storage with In 4th fixing piece, the 4th blocked hole is used to contradict the 8th fixing piece and the 8th fixing piece is contradicted and dykes and dams.
The first connector 1a2, the second connector, the 3rd connector and identical its of the 4th connecting-piece structure include water The flat fixing sleeve 3 and take-up pulley 4 set, take-up pulley 4 are located in fixing sleeve 3 and are connected with fixing sleeve 3, the company of being equipped with take-up pulley 4 In one end storage of tape splicing 4a, connect band 4a and take-up pulley 4, the other end of connect band 4a is equipped with clamping joint 4b, the inner side of fixing sleeve 3 Wall is equipped with the fixing axle of fixed take-up pulley 4, and fixing sleeve 3 is equipped with the first through hole 3a passed through for clamping band, and connect band 4a is worn Cross in first through hole 3a clampings and connector sleeve 5.
The top of fixing sleeve 3 is equipped with the top of closing cap 3b, the closing cap 3b and is equipped with spaced square groove 3c, seals Closing lid 3b sides and be equipped with the fixed block 3d being connected with itself, 3 madial wall of fixing sleeve is equipped with the annular groove for accommodating closing cap 3b, It is equipped with the locating part 3e that connection is contradicted with fixed block 3d in annular groove, spaced square groove 3c rotations are driving closing cap 3b rotations make fixed block 3d and locating part 3e conflicts drive fixing sleeve 3 to rotate in the first internal thread hole 1a4 or screw out in first Outside threaded hole 1a4.
The first shackle member 1a3, the second shackle member, the 3rd shackle member is identical with the three or four shackle member structure and includes Horizontally disposed connector sleeve 5, the connector sleeve 5 is interior to be equipped with to accommodate the accommodating chamber of connect band 4a, 5 lateral wall of connector sleeve It is equipped with and passes through the second through hole 5a for connect band 4a, 5 lateral wall of connector sleeve is located at the second through hole 5a and is equipped with to lock connection Locking member 5b with 4a, locking member 5b prevent the tightening force of connect band 4a take-up pulleys 4 from retracting to lock connect band 4a.
The support component 2 includes the first support plate 2a and the second support plate being vertically arranged, the first support plate 2a The shackle member being mutually clamped with the first fixation kit 1a and the 3rd fixation kit 1c is equipped with close to the side of the first fixation kit 1a 2b, the first support plate 2a opposite sides are equipped with hinged seat 2c, the supporting rod 2d mating with itself are equipped with hinged seat 2c, be clamped Part 2b is mutually clamped with the Access Division on the first fixing piece 1a1 and the 3rd fixing piece, hinged seat 2c and branch after the first support plate 2a Strut 2d is supported the first support plate 2a.
The first fixing piece 1a1, the second fixing piece, the 3rd fixing piece and the 4th anchor structure are identical and be hollow Structure, the first fixing piece 1a1, the second fixing piece, the 3rd fixing piece and the 4th fixing piece top are equipped with the water inlet pipe being vertically arranged Road 6, the openend of inlet channel 6 is equipped with to be consolidated with the lid 6a, the first fixing piece 1a1 of its thread fitting, the second fixing piece, the 3rd The side for determining part and the 4th fixing piece is equipped with groove, opposite side be equipped with the fin that is slidably matched in groove by inlet channel 6 to After pouring water in first fixing piece 1a1, the second fixing piece, the 3rd fixing piece and the 4th fixing piece with lid 6a by inlet channel 6 Closing.
The above described is only a preferred embodiment of the present invention, any limit not is made to the technical scope of the present invention System, therefore any subtle modifications, equivalent variations and modifications that every technical spirit according to the present invention makees above example, In the range of still falling within technical scheme.

Claims (10)

1. it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Including fixing device(1)And support component(2), institute State support component(2)Positioned at fixing device(1)Side and and fixing device(1)It is engaged by clamping, the fixing device(1)Including One fixation kit(1a), the second fixation kit(1b), the 3rd fixation kit(1c)With the 4th fixation kit(1d), the first fixation group Part(1a)With the second fixation kit(1b)It is located at the 3rd fixation kit respectively(1c)With the 4th component at the top of and with the 3rd fixation group Part(1c)With the 4th fixation kit(1d)Connection, first fixation kit(1a)With the second fixation kit(1b)Adjacent side It is mating, the 3rd fixation kit(1c)With the 4th fixation kit(1d)Adjacent side inserting is closed, first fixation kit (1a), the second fixation kit(1b), the 3rd fixation kit(1c)With the 4th fixation kit(1d)On be equipped with and support component(2) Matched Access Division.
2. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Described first fixes Component(1a)Including the first fixing piece(1a1), the first connector(1a2)With the first shackle member(1a3), first fixing piece (1a1)It is equipped with and accommodates the first connector(1a2)With the first shackle member(1a3)The first internal thread hole(1a4), described first connects Fitting(1a2)With the first shackle member(1a3)It is equipped with and the first internal thread hole(1a4)External screw thread is engaged, described first fixes Part(1a1)Away from the first internal thread hole(1a4)Side be equipped with and the first connector(1a2)With the first shackle member(1a3)It is transversal The first identical blocked hole of face(1a5).
3. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Described second fixes Component(1b)Including the second fixing piece, the second connector and the second shackle member, second fixing piece, which is equipped with, accommodates the second company Second internal thread hole of fitting and the second shackle member, second connector and the second shackle member are equipped with and the second internal thread hole External screw thread is engaged, the side of second fixing piece away from the second internal thread hole is equipped with and the second connector and the second shackle member The second identical blocked hole of cross section.
4. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Described 3rd fixes Component(1c)Including the 3rd fixing piece, the 3rd connector and the 3rd shackle member, the 3rd fixing piece, which is equipped with, accommodates the 3rd company 3rd internal thread hole of fitting and the 3rd shackle member, the 3rd connector and the 3rd shackle member are equipped with and the 3rd internal thread hole External screw thread is engaged, the side of the 3rd fixing piece away from the 3rd internal thread hole is equipped with and the 3rd connector and the 3rd shackle member The 3rd identical blocked hole of cross section.
5. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Described 4th fixes Component(1d)Including the 4th fixing piece, the 4th connector and the 4th shackle member, the 4th fixing piece, which is equipped with, accommodates the 4th company 4th internal thread hole of fitting and the 4th shackle member, the 4th connector and the 4th shackle member are equipped with and the 4th internal thread hole External screw thread is engaged, the side of the 4th fixing piece away from the 4th internal thread hole is equipped with and the 4th connector and the 4th shackle member The 4th identical blocked hole of cross section.
6. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:First connection Part(1a2), the second connector, the 3rd connector and identical its of the 4th connecting-piece structure include horizontally disposed fixing sleeve(3) And take-up pulley(4), take-up pulley(4)Positioned at fixing sleeve(3)Interior and and fixing sleeve(3)Connection, take-up pulley(4)It is interior to be equipped with connect band (4a), connect band(4a)One end storage and take-up pulley(4)It is interior, connect band(4a)The other end be equipped with clamping joint(4b), it is fixed Set(3)Madial wall is equipped with fixed take-up pulley(4)Fixing axle, fixing sleeve(3)It is equipped with the first through hole passed through for clamping band (3a).
7. it is according to claim 6 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:The fixing sleeve (3)Top is equipped with closing cap(3b), the closing cap(3b)Top is equipped with spaced square groove(3c), closing cap(3b)It is other Side is equipped with the fixed block being connected with itself(3d), the fixing sleeve(3)Madial wall, which is equipped with, accommodates closing cap(3b)Annular groove, ring It is equipped with shape groove and fixed block(3d)Contradict the locating part of connection(3e).
8. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:First clamping Part(1a3), the second shackle member, the 3rd shackle member is identical with the 4th shackle member structure and includes horizontally disposed connector sleeve(5), The connector sleeve(5)It is interior to be equipped with to accommodate connect band(4a)Accommodating chamber, the connector sleeve(5)Lateral wall is equipped with for connecting Band(4a)Through the second through hole(5a), connector sleeve(5)Lateral wall is located at the second through hole(5a)It is equipped with to lock connect band (4a)Locking member(5b).
9. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:The support component (2)Including the first support plate being vertically arranged(2a)With the second support plate, first support plate(2a)Close to the first fixation group Part(1a)Side be equipped with and the first fixation kit(1a)With the 3rd fixation kit(1c)The shackle member being mutually clamped(2b), first Support plate(2a)Opposite side is equipped with hinged seat(2c), hinged seat(2c)It is interior to be equipped with the supporting rod mating with itself(2d).
10. it is according to claim 1 it is a kind of can the river of fast construction carry hardened system, it is characterised in that:Described first is solid Determine part(1a1), the second fixing piece, the 3rd fixing piece and the 4th anchor structure it is identical and be hollow structure, the first fixing piece (1a1), the second fixing piece, be equipped with the inlet channel being vertically arranged at the top of the 3rd fixing piece and the 4th fixing piece(6), water inlet Pipeline(6)Openend be equipped with lid with its thread fitting(6a), the first fixing piece(1a1), the second fixing piece, the 3rd fix The side of part and the 4th fixing piece is equipped with groove, and opposite side is equipped with the fin being slidably matched in groove.
CN201711246585.5A 2017-12-01 2017-12-01 River that can build fast carries reinforcerment system Active CN108005019B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711246585.5A CN108005019B (en) 2017-12-01 2017-12-01 River that can build fast carries reinforcerment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711246585.5A CN108005019B (en) 2017-12-01 2017-12-01 River that can build fast carries reinforcerment system

Publications (2)

Publication Number Publication Date
CN108005019A true CN108005019A (en) 2018-05-08
CN108005019B CN108005019B (en) 2020-06-12

Family

ID=62055800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711246585.5A Active CN108005019B (en) 2017-12-01 2017-12-01 River that can build fast carries reinforcerment system

Country Status (1)

Country Link
CN (1) CN108005019B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685253A (en) * 2019-09-02 2020-01-14 重庆市水利港航建设集团有限公司 Flood prevention box for hydraulic engineering

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2644501Y (en) * 2003-07-15 2004-09-29 徐俊 Waterproof wall of dam
CN203755237U (en) * 2014-04-09 2014-08-06 王艳春 Flood control manger board
CN105756013A (en) * 2016-04-21 2016-07-13 高瞻 Detachable flood control wall
CN206090460U (en) * 2016-09-18 2017-04-12 辽宁科技大学 But fast assembly's flood control device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2644501Y (en) * 2003-07-15 2004-09-29 徐俊 Waterproof wall of dam
CN203755237U (en) * 2014-04-09 2014-08-06 王艳春 Flood control manger board
CN105756013A (en) * 2016-04-21 2016-07-13 高瞻 Detachable flood control wall
CN206090460U (en) * 2016-09-18 2017-04-12 辽宁科技大学 But fast assembly's flood control device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685253A (en) * 2019-09-02 2020-01-14 重庆市水利港航建设集团有限公司 Flood prevention box for hydraulic engineering
CN110685253B (en) * 2019-09-02 2021-04-02 重庆市水利港航建设集团有限公司 Flood prevention box for hydraulic engineering

Also Published As

Publication number Publication date
CN108005019B (en) 2020-06-12

Similar Documents

Publication Publication Date Title
US7344338B2 (en) Pipeline ballast and method of use
CN108005019A (en) It is a kind of can the river of fast construction carry hardened system
CN205781556U (en) Sealing flange
CN108222513A (en) A kind of prefabricated concrete structure grout sleeve centering die device
CN206874296U (en) A kind of tunnel hollow bolt grouting device
RU157233U1 (en) RING CONCRETE LOADER
CN109268031A (en) Tube coupling can fill the plugging structure and construction method of bag type paste at service channel hole
CN100497845C (en) Mixed grouting device for blocking high-pressure groundwater and mixing method grouting process therefor
CN208982851U (en) Drainage pipeline connection structure
CN107489830A (en) A kind of two segment pipe attachment means
CN206487492U (en) A kind of shield machine single fluid grouting pipe rapid translating two-liquid grouting device
CN213256990U (en) Sand box for casting
KR100731173B1 (en) Connect structure for water pipe
CN205606024U (en) Connecting pipe for petroleum pipeline based on spring -catche spare
CN205606035U (en) Fastening type coupling for petroleum pipeline
CN211646042U (en) Novel road and bridge crack consolidate device
CN211716038U (en) Expansion type sealing tape for stopping leakage
CN209041657U (en) A kind of integral type butterfly valve check-valves loose joint structure
KR20060004637A (en) Connect structure for water pipe
RU2257503C1 (en) Method of applying ballast coating on underwater pipe
CN1066698A (en) Mould bag slip casting (material) dynamic water plugging method and apparatus in the macrovoid
CN206054973U (en) Split type polyethylene solid wall pipe
CN218863421U (en) Butt joint fixing structure for gas pipeline construction
CN208107303U (en) Jacking construction water stop device for opening
CN206487493U (en) A kind of pre-buried ejection for water plugging structure of shield tunnel knocker plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200520

Address after: 350200 305 units of 1 buildings in Jinjiang garden three District, Changle District, Fuzhou, Fujian, China

Applicant after: The permanently happy head of district in Fuzhou City wins Information Technology Co.,Ltd.

Address before: 274005 Changjiang Road, Peony District, Heze, Shandong Province, No. 887

Applicant before: Dong Hongcan

GR01 Patent grant
GR01 Patent grant