CN108004877A - A kind of sponge urban ecology square road foundation structure - Google Patents

A kind of sponge urban ecology square road foundation structure Download PDF

Info

Publication number
CN108004877A
CN108004877A CN201711223191.8A CN201711223191A CN108004877A CN 108004877 A CN108004877 A CN 108004877A CN 201711223191 A CN201711223191 A CN 201711223191A CN 108004877 A CN108004877 A CN 108004877A
Authority
CN
China
Prior art keywords
sump
foundation structure
vertical drainage
sponge urban
urban ecology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711223191.8A
Other languages
Chinese (zh)
Other versions
CN108004877B (en
Inventor
王立圆
汤俊杰
谢玄业
陈韵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Green Co
Original Assignee
Guangzhou Green Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Green Co filed Critical Guangzhou Green Co
Priority to CN201711223191.8A priority Critical patent/CN108004877B/en
Publication of CN108004877A publication Critical patent/CN108004877A/en
Application granted granted Critical
Publication of CN108004877B publication Critical patent/CN108004877B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C15/00Pavings specially adapted for footpaths, sidewalks or cycle tracks
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • A01G25/06Watering arrangements making use of perforated pipe-lines located in the soil
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/04Pavings made of prefabricated single units made of bricks
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/02Methods or installations for obtaining or collecting drinking water or tap water from rain-water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Health & Medical Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of sponge urban ecology square road foundation structure,Including road deck and roadbase,The roadbase include between the upper and lower every porous base course,Impermeable water-base,Multiple vertical drainage sumps are interval between the porous base course and impermeable water-base and are backfilled formed with roadbed soil layer,The draining sump is distributed from centre to both sides with cascade arrangement,It is connected between the adjacent vertical drainage sump by transverse drainage duct,The vertical drainage sump in outermost both sides is connected by transverse drainage duct with externally drained facility,Catchmented well construction three-dimensional drain system by porous base course and vertical drainage,Under the ponding that oozes each vertical drainage sump is flowed to by porous base course,Ponding in each vertical drainage sump is discharged by transverse drainage duct again,Achieve the purpose that rapidly to discharge ponding,Ponding is avoided to gather.

Description

A kind of sponge urban ecology square road foundation structure
Technical field
The present invention relates to garden path field of engineering technology, more particularly to a kind of sponge urban ecology square Road base junction Structure.
Background technology
At present, shown according to existing city square pavement damage situation research, be to cause into the water in pavement structure Or the main reason for aggravation pavement damage, it can not be discharged rapidly after being seeped into sub-surface under ponding, it is corrosion-damaged to occur ponding, drop The service life on low city square road surface.Therefore, in city square road construction and maintenance engineering, the draining inside road surface is set Count it is most important, how by penetrate into road surface inside ponding discharge rapidly road pavement performance and service life have it is important Influence.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of quick, efficiently discharge ponding sponge urban ecology square Road foundation structure.
Technical solution used by solve above-mentioned technical problem:A kind of sponge urban ecology square road foundation structure, Including road deck and roadbase, the roadbase include between the upper and lower every porous base course, impermeable water-base, described Multiple vertical drainage sumps are interval between water-base and impermeable water-base and are backfilled formed with roadbed soil layer, the draining Sump is distributed from centre to both sides with cascade arrangement, passes through transverse drainage duct between the adjacent vertical drainage sump It is connected, the vertical drainage sump in outermost both sides is connected by transverse drainage duct with externally drained facility.
Further, the road deck is made of permeable brick combination, and the porous base course is poured by pervious concrete Form, the impermeable water-base is poured by water tight concrete to be formed, and the vertical drainage sump is filled by crushed-gravel to be formed.
Further, the vertical drainage sump Bottom Altitude successively decreases successively from centre to both sides, the transverse drainage Pipeline and vertical drainage bottom of catchmenting are connected.
Further, the waterproof substrate top surface is equipped with anti-seepage geomembrane material.
Further, the porous base course is equipped with the air hose communicated with outside.
Further, the plantation groove with the plantation soil body, the transverse drainage duct and externally drained facility are further included Between be additionally provided with water storage box, be equipped with conduit pipe between the plantation groove and water storage box, described conduit pipe one end is wound Curl is embedded in the planting soil body of plantation groove, and the conduit pipe other end leads to water storage box bottom, the diversion Water-absorbing sponge is equipped with pipeline.
Further, the water storage box is equipped with horizontal pass pipe road, and the elevation in the horizontal pass pipe road is higher than laterally row The elevation of waterpipe, the horizontal pass pipe road connect with externally drained facility.
Beneficial effect:In this sponge urban ecology square road foundation structure, catchmented by porous base course and vertical drainage Well construction three-dimensional drain system, under the ponding that oozes each vertical drainage sump is flowed to by porous base course, each vertical drainage catchments Ponding in well is discharged by transverse drainage duct again, is achieveed the purpose that rapidly to discharge ponding, is avoided ponding from gathering.
Brief description of the drawings
The present invention is described further with reference to the accompanying drawings and examples;
Fig. 1 is the structure diagram of the embodiment of the present invention.
Embodiment
With reference to Fig. 1, a kind of sponge urban ecology square road foundation structure of the present invention, including road deck 10 and Road Base Layer 20, road deck 10 are laid with by permeable brick and formed, roadbase 20 include between the upper and lower every porous base course 21, impermeable water base Layer 22, multiple vertical drainage sumps 23 are interval between porous base course 21 and impermeable water-base 22 and are backfilled formed with road Base soil layer 24, wherein, porous base course 21 is poured by pervious concrete to be formed, and impermeable water-base 22 pours structure by water tight concrete Into, vertical drainage sump 23 is filled by crushed-gravel to be formed, and rainwater ponding passes through and is seeped into porous base course 21 under road deck 10, 21 internal water accumulation of porous base course is oozed under can continuing or horizontal seepage flow, and the ponding of seepage flow is collected by vertical drainage sump 23 to converge Poly-, vertical drainage sump 23 is distributed from centre to both sides with cascade arrangement, i.e., 23 Bottom Altitude of vertical drainage sump from Centre is successively decreased successively to both sides, is connected between adjacent vertical drainage sump 23 by transverse drainage duct 25, in outermost The vertical drainage sump 23 of both sides is connected by transverse drainage duct 25 with externally drained facility, converges in vertical drainage collection Ponding in well 23 is discharged by transverse drainage duct 25 again, so as to achieve the purpose that rapidly to discharge ponding.
Wherein, vertical drainage sump 23 is stepped design, effectively will can quickly be arranged in middle inside ponding To both sides, ponding is avoided to gather.
Vertical drainage sump 23 is preferably to be filled and form by crushed-gravel, it is internal with crushed-gravel can to ponding with Filtration is precipitated, avoids transverse drainage duct 25 from resulting in blockage.
Preferably, impermeable 22 top surface of water-base is equipped with anti-seepage geomembrane material, it is downward can to prevent that internal ponding from continuing Seepage flow, forces inner product current to strengthen drainage effect to neighbouring vertical drainage sump 23.
Preferably, porous base course 21 is equipped with the air hose communicated with outside, air hose can introduce natural wind, accelerate to inside Ponding flowing discharge.
Preferably, the plantation groove 30 with the plantation soil body is further included, transverse drainage duct 25 and externally drained facility Between be additionally provided with water storage box 40, be equipped with conduit pipe 31 between plantation groove 30 and water storage box 40,31 one end of conduit pipe is rolled up Coiled is embedded in the planting soil body of plantation groove 30, and 31 other end of conduit pipe leads to 40 bottom of water storage box, diversion Water-absorbing sponge is equipped with pipeline 31, under the ponding transverse drainage duct 25 that oozes be discharged in water storage box 40, a small amount of rainwater can be saved, Since with water-absorbing sponge, the water in water storage box 40 can be incorporated into plantation groove by conduit pipe 31 in conduit pipe 31 30, irrigated for green plants.
In addition, water storage box 40 is additionally provided with the horizontal pass pipe road 41 to connect with externally drained facility, horizontal pass pipe road 41 Elevation be higher than the elevation of transverse drainage duct 25, the ponding oozed under a large amount of can pass through horizontal pass pipe after entering water storage box 40 Road 41 discharges, and makes only to save part water in water storage box 40, contributes to the quick discharge of heavy rain rainwater.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing, but the invention is not restricted to above-mentioned embodiment party Formula, can also be before present inventive concept not be departed from the knowledge that the technical field those of ordinary skill possesses Put that various changes can be made.

Claims (7)

  1. A kind of 1. sponge urban ecology square road foundation structure, it is characterised in that:It is described including road deck and roadbase Roadbase include between the upper and lower every porous base course, impermeable water-base, be spaced between the porous base course and impermeable water-base Equipped with multiple vertical drainage sumps and backfill formed with roadbed soil layer, the draining sump is from centre to both sides with staged Arranged distribution, is connected between the adjacent vertical drainage sump by transverse drainage duct, in described in outermost both sides Vertical drainage sump is connected by transverse drainage duct with externally drained facility.
  2. 2. sponge urban ecology square road foundation structure according to claim 1, it is characterised in that:The road deck It is made of permeable brick combination, the porous base course is poured by pervious concrete to be formed, and the impermeable water-base is by waterproof mixed Solidifying soil pours composition, and the vertical drainage sump is filled by crushed-gravel to be formed.
  3. 3. sponge urban ecology square road foundation structure according to claim 1 or 2, it is characterised in that:It is described vertical Draining sump Bottom Altitude successively decreases successively from centre to both sides, and the transverse drainage duct and vertical drainage bottom of catchmenting are connected Connect.
  4. 4. sponge urban ecology square road foundation structure according to claim 1 or 2, it is characterised in that:It is described impermeable Water-base top surface is equipped with anti-seepage geomembrane material.
  5. 5. sponge urban ecology square road foundation structure according to claim 1 or 2, it is characterised in that:It is described permeable Basic unit is equipped with the air hose communicated with outside.
  6. 6. sponge urban ecology square road foundation structure according to claim 1, it is characterised in that:Further include with kind The plantation groove of the soil body is planted, water storage box is additionally provided between the transverse drainage duct and externally drained facility, in the planting groove Conduit pipe is equipped between ditch and water storage box, conduit pipe one end winding curl is embedded in the planting soil of plantation groove In vivo, the conduit pipe other end leads to water storage box bottom, and water-absorbing sponge is equipped with the conduit pipe.
  7. 7. sponge urban ecology square road foundation structure according to claim 6, it is characterised in that:The water storage box is set There is the horizontal pass pipe road to connect with externally drained facility, the elevation in the horizontal pass pipe road is higher than the height of transverse drainage duct Journey.
CN201711223191.8A 2017-11-29 2017-11-29 Ecological square road roadbed structure of sponge city Active CN108004877B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711223191.8A CN108004877B (en) 2017-11-29 2017-11-29 Ecological square road roadbed structure of sponge city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711223191.8A CN108004877B (en) 2017-11-29 2017-11-29 Ecological square road roadbed structure of sponge city

Publications (2)

Publication Number Publication Date
CN108004877A true CN108004877A (en) 2018-05-08
CN108004877B CN108004877B (en) 2024-05-07

Family

ID=62054449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711223191.8A Active CN108004877B (en) 2017-11-29 2017-11-29 Ecological square road roadbed structure of sponge city

Country Status (1)

Country Link
CN (1) CN108004877B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162164A (en) * 2018-10-19 2019-01-08 袁子琪 Eliminate the spongeization method of city part waterlogging
CN110924261A (en) * 2019-12-04 2020-03-27 北京林业大学 An urban honeycomb water storage, irrigation and vibration reduction period structure
CN119083264A (en) * 2024-09-19 2024-12-06 保利长大工程有限公司 Water drainage system and construction method for roadside filling area

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10511154A (en) * 1994-10-14 1998-10-27 コベントリー ユニバーシティー Pavement structure for spill and flood treatment
US20110229262A1 (en) * 2008-11-28 2011-09-22 Bridge Co., Ltd. Pavement body, method for constructing pavement body, and mold form for concrete
CN103510441A (en) * 2013-10-16 2014-01-15 江苏省镇江市路桥工程总公司 Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN105155377A (en) * 2015-09-10 2015-12-16 成都聚智工业设计有限公司 Roadbed structure close to expressway pier
CN205012192U (en) * 2015-09-28 2016-02-03 安徽省交通规划设计研究总院股份有限公司 Be used for inside drainage system in highway sag vertical curve bottom road surface
CN107178021A (en) * 2017-06-30 2017-09-19 中国冶集团有限公司 It is a kind of to strengthen the sponge urban ecology square rainwater utilization structure of retaining
CN107178043A (en) * 2017-06-05 2017-09-19 长沙理工大学 A kind of coarse-grained soil high-fill roadbed discharge structure and its construction technology
CN207659819U (en) * 2017-11-29 2018-07-27 广州市绿化公司 A kind of sponge urban ecology square road foundation structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10511154A (en) * 1994-10-14 1998-10-27 コベントリー ユニバーシティー Pavement structure for spill and flood treatment
US20110229262A1 (en) * 2008-11-28 2011-09-22 Bridge Co., Ltd. Pavement body, method for constructing pavement body, and mold form for concrete
CN103510441A (en) * 2013-10-16 2014-01-15 江苏省镇江市路桥工程总公司 Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN105155377A (en) * 2015-09-10 2015-12-16 成都聚智工业设计有限公司 Roadbed structure close to expressway pier
CN205012192U (en) * 2015-09-28 2016-02-03 安徽省交通规划设计研究总院股份有限公司 Be used for inside drainage system in highway sag vertical curve bottom road surface
CN107178043A (en) * 2017-06-05 2017-09-19 长沙理工大学 A kind of coarse-grained soil high-fill roadbed discharge structure and its construction technology
CN107178021A (en) * 2017-06-30 2017-09-19 中国冶集团有限公司 It is a kind of to strengthen the sponge urban ecology square rainwater utilization structure of retaining
CN207659819U (en) * 2017-11-29 2018-07-27 广州市绿化公司 A kind of sponge urban ecology square road foundation structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162164A (en) * 2018-10-19 2019-01-08 袁子琪 Eliminate the spongeization method of city part waterlogging
CN110924261A (en) * 2019-12-04 2020-03-27 北京林业大学 An urban honeycomb water storage, irrigation and vibration reduction period structure
CN119083264A (en) * 2024-09-19 2024-12-06 保利长大工程有限公司 Water drainage system and construction method for roadside filling area
CN119083264B (en) * 2024-09-19 2025-04-04 保利长大工程有限公司 Water drainage system and construction method for roadside filling area

Also Published As

Publication number Publication date
CN108004877B (en) 2024-05-07

Similar Documents

Publication Publication Date Title
CN110249844B (en) Street tree pool with water storage and drainage device
CN112982072B (en) Green belt water storage and drainage curbstone system and water storage and drainage method
CN105804198A (en) Greenbelt structure integrating rainwater storage and utilization
CN206467914U (en) The discharge structure of planted roof
CN209941698U (en) Side slope drainage structure capable of being recycled
CN110847196A (en) A Loess Plateau Ecological Governance Structure and Its Governance Method Considering Solar Energy Utilization
CN109267445A (en) A kind of sponge urban ecology road rain water is regulated and stored system
CN106088305A (en) Greenery patches and construction method thereof with underground conservation pool
CN108004877A (en) A kind of sponge urban ecology square road foundation structure
CN101091448B (en) Irrigation and drainage pipes
CN206667420U (en) Sponge city high-effective penetrating type greenery patches constructs
CN206844095U (en) Grid type rain-water drainage and collection system
CN106499033B (en) A road green belt system for drainage and water retention
CN101213925B (en) Drought resisting method for man-made forest construction and foster
CN205189099U (en) Water storage device of collection, storage and cyclic utilization rainwater
CN112252343A (en) Side slope packway with drainage and landscape greening irrigation functions and construction method thereof
CN212224049U (en) Building district sponge city rainwater collection system
CN114592574A (en) An intelligent landscape drainage method and drainage device
CN207659819U (en) A kind of sponge urban ecology square road foundation structure
CN209924025U (en) Rainwater garden
CN106381853A (en) Combined type irrigation and drainage channel and construction method thereof
CN213847790U (en) High-position flower bed
CN212294957U (en) Stagnation type regulating and storage sponge parking lot
CN213741140U (en) Have slope packway of drainage and view afforestation irrigation concurrently
CN204940056U (en) A kind of greening discharge conduit of catchwork irrigation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Country or region after: China

Address after: 510000 self compiled 077 rooms at the first floor of No. 2429 Xingang East Road, Haizhuqu District, Guangzhou, Guangdong.

Applicant after: Guangzhou greening Co.,Ltd.

Address before: 510000 self compiled 077 rooms at the first floor of No. 2429 Xingang East Road, Haizhuqu District, Guangzhou, Guangdong.

Applicant before: GUANGZHOU GREENING Co.

Country or region before: China

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant