CN108000332B - A kind of air-conditioning installation copper pipe cutting equipment - Google Patents

A kind of air-conditioning installation copper pipe cutting equipment Download PDF

Info

Publication number
CN108000332B
CN108000332B CN201711137664.2A CN201711137664A CN108000332B CN 108000332 B CN108000332 B CN 108000332B CN 201711137664 A CN201711137664 A CN 201711137664A CN 108000332 B CN108000332 B CN 108000332B
Authority
CN
China
Prior art keywords
air
plate
bottom plate
bearing seat
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711137664.2A
Other languages
Chinese (zh)
Other versions
CN108000332A (en
Inventor
吴溶
赖景明
薛贵金
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Ainengju Technology Co., Ltd.
Original Assignee
Shenzhen Ainengju Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Ainengju Technology Co Ltd filed Critical Shenzhen Ainengju Technology Co Ltd
Priority to CN201711137664.2A priority Critical patent/CN108000332B/en
Publication of CN108000332A publication Critical patent/CN108000332A/en
Application granted granted Critical
Publication of CN108000332B publication Critical patent/CN108000332B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B27/00Other grinding machines or devices
    • B24B27/06Grinders for cutting-off
    • B24B27/0683Accessories therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B41/00Component parts such as frames, beds, carriages, headstocks
    • B24B41/06Work supports, e.g. adjustable steadies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B47/00Drives or gearings; Equipment therefor
    • B24B47/20Drives or gearings; Equipment therefor relating to feed movement

Abstract

The present invention relates to a kind of cutting equipment more particularly to a kind of air-conditioning installation copper pipe cutting equipments.The technical problem to be solved in the present invention is to provide it is a kind of it is time saving and energy saving, cutting speed is fast, will not be by air-conditioning installation copper pipe cutting equipment that cutting tool injures in cutting process.In order to solve the above-mentioned technical problems, the present invention provides such a air-conditioning installation copper pipe cutting equipments, include bottom plate etc.;Bottom plate top left side is equipped with apparatus for placing, and bottom plate top right side is equipped with cutter device, and cutter device is located on front side of apparatus for placing, and the cutting part of cutter device is located at below apparatus for placing.The present invention, which is contacted by hold-down devices, without people with air-conditioner pipe, to be pressed it and moves down, convenient and efficient, and it is fast to have reached time saving and energy saving, cutting speed, in cutting process, the effect that will not be injured by cutting tool.

Description

A kind of air-conditioning installation copper pipe cutting equipment
Technical field
The present invention relates to a kind of cutting equipment more particularly to a kind of air-conditioning installation copper pipe cutting equipments.
Background technique
Air-conditioning, that is, air regulator.Refer to manually means, to the temperature, humidity of surrounding air in building/structures, clean The process that the parameters such as cleanliness, speed are adjusted and control.
In air-conditioning installation, air-conditioner pipe can be all used, and air-conditioner pipe is installed for convenience, can all be cut to it, and people It is time-consuming and laborious, cutting speed is slow when work cuts air-conditioner pipe, it is easy to be injured by cutting tool in cutting process, therefore urgently Need to research and develop it is a kind of it is time saving and energy saving, cutting speed is fast, in cutting process, will not be cut by the air-conditioning installation that cutting tool injures with copper pipe Cut equipment.
Summary of the invention
(1) technical problems to be solved
It is time-consuming and laborious, cutting speed is slow when the present invention manually cuts air-conditioner pipe to overcome, hold in cutting process The shortcomings that easily being injured by cutting tool, the technical problem to be solved in the present invention is to provide it is a kind of it is time saving and energy saving, cutting speed is fast, cut It, will not be by air-conditioning installation copper pipe cutting equipment that cutting tool injures during cutting.
(2) technical solution
In order to solve the above-mentioned technical problems, the present invention provides such a air-conditioning installation copper pipe cutting equipments, including There are bottom plate, apparatus for placing and cutter device, bottom plate top left side is equipped with apparatus for placing, and bottom plate top right side is equipped with cutter device, Cutter device is located on front side of apparatus for placing, and the cutting part of cutter device is located at below apparatus for placing.
Preferably, apparatus for placing includes sleeve, motion bar, spring and arc placement plate, and the bottom plate top left and right sides is all Sleeve is installed, motion bar is equipped in sleeve, is slidably matched in motion bar and sleeve, in motion bar bottom end and sleeve between bottom It is connected with spring, motion bar top is equipped with arc placement plate, and left and right sides arc placement plate is arranged symmetrically.
Preferably, cutter device includes supporting plate, first bearing seat, strut, second bearing seat, bull stick, turning handle, connector And grinding wheel, bottom plate top center are equipped with strut, strut top is equipped with second bearing seat, and bottom plate top right side is equipped with branch Plate, supporting plate lower part is Embedded to be equipped with first bearing seat, and bull stick, bull stick are connected between first bearing seat and second bearing seat On front side of sleeve, bull stick right end is equipped with turning handle, and bull stick left end is equipped with connector, grinding wheel, grinding wheel are equipped on connector Immediately below the arc placement plate of the left and right sides.
It preferably, further include having hold-down devices, hold-down devices include riser, top plate, slide bar, N-shaped frame, arc block and cross Plate, bottom plate top left side are equipped with riser, and riser is located on the left of left hand sleeves, are equipped with top plate, top plate right side opening at the top of riser There is through-hole, slide bar is equipped in through-hole, slide bar bottom end is equipped with N-shaped frame, and N-shaped frame left and right ends symmetrical expression is equipped with arc block, Arc block is located above arc placement plate, and top end of sliding rod is equipped with transverse slat.
It preferably, further include having driving device, driving device includes 3rd bearing seat, shaft, gear, latch, support Plate, detent and bracing wire, supporting plate top is Embedded to be equipped with 3rd bearing seat, and shaft, shaft are equipped in 3rd bearing seat Right end is equipped with gear, and bracing wire is wound in shaft, and bracing wire tail end is connect with transverse slat bottom right, is equipped with support at the top of supporting plate Plate is equipped with detent among support plate bottom, and detent is located at right above gear, and detent is engaged with gear, bull stick right part Latch is installed, latch is located at immediately below gear, latch and Gear Contact.
It preferably, further include having button and warning lamp, left hand sleeves top right side is equipped with button, bottom plate top left side peace Equipped with warning lamp, for warning lamp between left hand sleeves and riser, warning lamp and button have circuit connection.
It preferably, further include having motor, the first belt pulley, the second belt pulley and flat belt, bottom plate top right side is equipped with Motor, motor is in being horizontally disposed with, and the output shaft of motor is connected with the first belt pulley by shaft coupling, and shaft right part is equipped with second Belt pulley, the second belt pulley are located at right above the first belt pulley, are connected with flat belt between the second belt pulley and the first belt pulley.
It preferably, further include having framework, bottom plate top left side is equipped with framework, and grinding wheel is located in framework.
Preferably, further include having rubber slab, rubber slab is installed between the arc block medial surface of the left and right sides.
Working principle: personnel are operated first, air-conditioner pipe is placed on apparatus for placing, then air-conditioning is pinned by apparatus for placing Pipe moves down, meanwhile, cutter device is rotated, and then air-conditioner pipe is moved down and contacted with the cutting part of cutter device, cutting Air-conditioner pipe is cut in the cutting part rotation of device.After the completion of air-conditioner pipe cutting, can stop operating cutter device, pine It turns on the aircondition pipe, apparatus for placing restores to original position, and operator can remove air-conditioner pipe.
Because apparatus for placing includes sleeve, motion bar, spring and arc placement plate, the left and right sides is all installed at the top of bottom plate There is sleeve, motion bar is equipped in sleeve, is slidably matched in motion bar and sleeve, is connected between bottom in motion bar bottom end and sleeve Have a spring, motion bar top is equipped with arc placement plate, left and right sides arc placement plate be it is arranged symmetrically, being operated first personnel will Air-conditioner pipe is placed in the arc placement plate of the left and right sides, then is pressed air-conditioner pipe and moved down, and air-conditioner pipe moves downwards through arc Placement plate drives motion bar to move down, spring-compressed, and operator can be rotated cutter device, and then air-conditioner pipe moves down It is contacted with the cutting part of cutter device, cutter device cuts air-conditioner pipe.After the completion of air-conditioner pipe cutting, it can unclamp Air-conditioner pipe, because of the effect of spring, motion bar, which moves up, drives arc placement plate to move up recovery to original position, can will cut Good air-conditioner pipe is removed.
Because cutter device include supporting plate, first bearing seat, strut, second bearing seat, bull stick, turning handle, connector and Grinding wheel, bottom plate top center are equipped with strut, and strut top is equipped with second bearing seat, and bottom plate top right side is equipped with supporting plate, Supporting plate lower part is Embedded to be equipped with first bearing seat, and bull stick, bull stick position are connected between first bearing seat and second bearing seat On front side of sleeve, bull stick right end is equipped with turning handle, and bull stick left end is equipped with connector, and grinding wheel, grinding wheel position are equipped on connector Immediately below the arc placement plate of the left and right sides, when operator, which presses air-conditioner pipe, to be moved down, operator rotatably turns Handle, turning handle rotation drive bar rotation, and bar rotation band movement connector rotates, and connector rotation drives grinding wheel rotation, and then works as Air-conditioner pipe moves down when contacting with grinding wheel, and air-conditioner pipe is cut in grinding wheel rotation.After the completion of air-conditioner pipe cutting, Ji Keting Rotation stop turn handle.
Because further including having hold-down devices, hold-down devices include riser, top plate, slide bar, N-shaped frame, arc block and transverse slat, Bottom plate top left side is equipped with riser, and riser is located on the left of left hand sleeves, and top plate is equipped at the top of riser, is provided on the right side of top plate logical Hole, through-hole is interior to be equipped with slide bar, and slide bar bottom end is equipped with N-shaped frame, and N-shaped frame left and right ends symmetrical expression is equipped with arc block, arc Block is located above arc placement plate, and top end of sliding rod is equipped with transverse slat, when air-conditioner pipe is placed in arc placement plate, operator It can be moved down by motion plate, transverse slat moves down band moving slide-bar and moves down, and slide bar, which moves down, drives N-shaped frame to moving down Dynamic, N-shaped frame moves down drive left and right sides arc block and moves down, and left and right sides arc block is moved down to be connect with air-conditioner pipe Touching, and then left and right sides arc block moves down and air-conditioner pipe is driven to move down and cut.After the completion of air-conditioner pipe cutting, because The effect of spring, left and right sides arc block move up recovery to original position.In this way, operator can be made more easily to press air-conditioning Pipe moves down.
Because further including having driving device, driving device include 3rd bearing seat, shaft, gear, latch, support plate, Detent and bracing wire, supporting plate top is Embedded to be equipped with 3rd bearing seat, and shaft, shaft right end are equipped in 3rd bearing seat Gear is installed, bracing wire is wound in shaft, bracing wire tail end is connect with transverse slat bottom right, is equipped with support plate at the top of supporting plate, is propped up Detent is installed, detent is located at right above gear, and detent is engaged with gear, and bull stick right part is equipped among fagging bottom Latch, latch are located at immediately below gear, latch and Gear Contact, when operator rotates turning handle, band while bar rotation Dynamic latch rotation, when latch turns to top, latch and Gear Contact, and then latch rotation driven gear rotates, detent Prevent gear from turning round, gear rotation drives shaft rotation, and shaft rotation is by bracing wire around rising, and then bracing wire pulls transverse slat to moving down It is dynamic, and then drive left and right sides arc block to move down and contacted with air-conditioner pipe, and drive air-conditioner pipe to move down and cut.When Air-conditioner pipe cutting after the completion of, turning handle stops operating, and then latch stops operating, operator can pull detent not with gear Engagement, then pull transverse slat to move up drive left and right sides arc block and move up recovery to original position, unclamp detent.Such as This, is moved down when rotating turning handle without operator by motion plate, time saving and energy saving.
Because further including having button and warning lamp, left hand sleeves top right side is equipped with button, the installation of bottom plate top left side There is warning lamp, warning lamp is between left hand sleeves and riser, and warning lamp and button have circuit connection, when air-conditioner pipe moves down When arc placement plate being driven to move down, arc placement plate moves down and button contacts, and warning lamp lights, that is, illustrates air-conditioner pipe Range is had moved to, and illustrates that air-conditioner pipe has been cut and completes, operator can stop operating turning handle.In this way, It can prevent air-conditioner pipe from moving down always.
Because further including having motor, the first belt pulley, the second belt pulley and flat belt, bottom plate top right side is equipped with electricity Machine, motor is in being horizontally disposed with, and the output shaft of motor is connected with the first belt pulley by shaft coupling, and shaft right part is equipped with the second skin Belt wheel, the second belt pulley are located at right above the first belt pulley, are connected with flat belt between the second belt pulley and the first belt pulley, when When having power supply, operator can start motor rotation, and motor rotation drives the first pulley rotation, and the first pulley rotation is logical Cross flat belt drive the second pulley rotation, the second pulley rotation drive bar rotation, and then drive grinding wheel to air-conditioner pipe into Row cutting.After the completion of air-conditioner pipe cutting, motor can be closed.In this way, bar rotation is driven without manual rotation's turning handle, it is time saving It is laborsaving.
Because further including having framework, bottom plate top left side is equipped with framework, and grinding wheel is located in framework, when grinding wheel rotation, Framework, which can prevent people's hand from contacting with grinding wheel, leads to injury.
Because further including having rubber slab, rubber slab is installed between the arc block medial surface of the left and right sides, when arc block is downward When mobile drive air-conditioner pipe moves down, rubber block is contacted with air-conditioner pipe, and then increases the frictional force with it, and prevents air-conditioner pipe It moves left and right, meanwhile, more firm air-conditioner pipe of pressing moves down.
(3) beneficial effect
The present invention, which is contacted by hold-down devices, without people with air-conditioner pipe, to be pressed it and moves down, convenient and efficient, has reached province Shi Shengli, cutting speed are fast, in cutting process, the effect that will not be injured by cutting tool.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the third schematic view of the front view of the invention.
Fig. 4 is the 4th kind of schematic view of the front view of the invention.
Fig. 5 is the 5th kind of schematic view of the front view of the invention.
Fig. 6 is the left view structural representation of arc block of the present invention.
The label in accompanying drawing is: 1- bottom plate, 2- apparatus for placing, 21- sleeve, 22- motion bar, 23- spring, 24- arc are put Set plate, 3- cutter device, 31- supporting plate, 32- first bearing seat, 33- strut, 34- second bearing seat, 35- bull stick, 36- turning handle, 37- connector, 38- grinding wheel, 4- hold-down devices, 41- riser, 42- top plate, 43- through-hole, 44- slide bar, 45-n type frame, 46- arc Block, 47- transverse slat, 5- driving device, 51- 3rd bearing seat, 52- shaft, 53- gear, 54- latch, 55- support plate, 56- non-return Pawl, 57- bracing wire, 6- button, 7- warning lamp, 8- motor, the first belt pulley of 9-, the second belt pulley of 10-, 11- flat belt, 12- frame Body, 13- rubber slab.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of air-conditioning installation copper pipe cutting equipment includes as shown in figures 1 to 6 bottom plate 1, apparatus for placing 2 and cutting dress 3 are set, 1 top left side of bottom plate is equipped with apparatus for placing 2, and 1 top right side of bottom plate is equipped with cutter device 3, and cutter device 3, which is located at, places dress 2 front sides are set, the cutting part of cutter device 3 is located at 2 lower section of apparatus for placing.
Embodiment 2
A kind of air-conditioning installation copper pipe cutting equipment includes as shown in figures 1 to 6 bottom plate 1, apparatus for placing 2 and cutting dress 3 are set, 1 top left side of bottom plate is equipped with apparatus for placing 2, and 1 top right side of bottom plate is equipped with cutter device 3, and cutter device 3, which is located at, places dress 2 front sides are set, the cutting part of cutter device 3 is located at 2 lower section of apparatus for placing.
Apparatus for placing 2 includes sleeve 21, motion bar 22, spring 23 and arc placement plate 24, the 1 top left and right sides of bottom plate Be fitted with sleeve 21, motion bar 22 be equipped in sleeve 21, is slidably matched in motion bar 22 and sleeve 21,22 bottom end of motion bar and Spring 23 is connected in sleeve 21 between bottom, 22 top of motion bar is equipped with arc placement plate 24, and left and right sides arc is placed Plate 24 is arranged symmetrically.
Embodiment 3
A kind of air-conditioning installation copper pipe cutting equipment includes as shown in figures 1 to 6 bottom plate 1, apparatus for placing 2 and cutting dress 3 are set, 1 top left side of bottom plate is equipped with apparatus for placing 2, and 1 top right side of bottom plate is equipped with cutter device 3, and cutter device 3, which is located at, places dress 2 front sides are set, the cutting part of cutter device 3 is located at 2 lower section of apparatus for placing.
Apparatus for placing 2 includes sleeve 21, motion bar 22, spring 23 and arc placement plate 24, the 1 top left and right sides of bottom plate Be fitted with sleeve 21, motion bar 22 be equipped in sleeve 21, is slidably matched in motion bar 22 and sleeve 21,22 bottom end of motion bar and Spring 23 is connected in sleeve 21 between bottom, 22 top of motion bar is equipped with arc placement plate 24, and left and right sides arc is placed Plate 24 is arranged symmetrically.
Cutter device 3 include supporting plate 31, first bearing seat 32, strut 33, second bearing seat 34, bull stick 35, turning handle 36, Connector 37 and grinding wheel 38,1 top center of bottom plate are equipped with strut 33, and 33 top of strut is equipped with second bearing seat 34, bottom plate 1 Top right side is equipped with supporting plate 31, and 31 lower part of supporting plate is Embedded to be equipped with first bearing seat 32, first bearing seat 32 and second Bull stick 35 is connected between bearing block 34, bull stick 35 is located at 21 front side of sleeve, and 35 right end of bull stick is equipped with turning handle 36, and bull stick 35 is left End is equipped with connector 37, and grinding wheel 38 is equipped on connector 37, and grinding wheel 38 is located at immediately below left and right sides arc placement plate 24.
Embodiment 4
A kind of air-conditioning installation copper pipe cutting equipment includes as shown in figures 1 to 6 bottom plate 1, apparatus for placing 2 and cutting dress 3 are set, 1 top left side of bottom plate is equipped with apparatus for placing 2, and 1 top right side of bottom plate is equipped with cutter device 3, and cutter device 3, which is located at, places dress 2 front sides are set, the cutting part of cutter device 3 is located at 2 lower section of apparatus for placing.
Apparatus for placing 2 includes sleeve 21, motion bar 22, spring 23 and arc placement plate 24, the 1 top left and right sides of bottom plate Be fitted with sleeve 21, motion bar 22 be equipped in sleeve 21, is slidably matched in motion bar 22 and sleeve 21,22 bottom end of motion bar and Spring 23 is connected in sleeve 21 between bottom, 22 top of motion bar is equipped with arc placement plate 24, and left and right sides arc is placed Plate 24 is arranged symmetrically.
Cutter device 3 include supporting plate 31, first bearing seat 32, strut 33, second bearing seat 34, bull stick 35, turning handle 36, Connector 37 and grinding wheel 38,1 top center of bottom plate are equipped with strut 33, and 33 top of strut is equipped with second bearing seat 34, bottom plate 1 Top right side is equipped with supporting plate 31, and 31 lower part of supporting plate is Embedded to be equipped with first bearing seat 32, first bearing seat 32 and second Bull stick 35 is connected between bearing block 34, bull stick 35 is located at 21 front side of sleeve, and 35 right end of bull stick is equipped with turning handle 36, and bull stick 35 is left End is equipped with connector 37, and grinding wheel 38 is equipped on connector 37, and grinding wheel 38 is located at immediately below left and right sides arc placement plate 24.
It further include having hold-down devices 4, hold-down devices 4 include riser 41, top plate 42, slide bar 44, N-shaped frame 45, arc block 46 and transverse slat 47,1 top left side of bottom plate is equipped with riser 41, and riser 41 is located at 21 left side of left hand sleeves, installs at the top of riser 41 There is top plate 42, through-hole 43 is provided on the right side of top plate 42, is equipped with slide bar 44 in through-hole 43,44 bottom end of slide bar is equipped with N-shaped frame 45, N-shaped 45 left and right ends of frame symmetrical expression is equipped with arc block 46, and arc block 46 is located at 24 top of arc placement plate, 44 top of slide bar peace Equipped with transverse slat 47.
It further include having driving device 5, driving device 5 includes 3rd bearing seat 51, shaft 52, gear 53, latch 54, branch Fagging 55, detent 56 and bracing wire 57,31 top of supporting plate is Embedded to be equipped with 3rd bearing seat 51, peace in 3rd bearing seat 51 Equipped with shaft 52,52 right end of shaft is equipped with gear 53, and bracing wire 57,57 tail end of bracing wire and 47 bottom, right of transverse slat are wound in shaft 52 Side connects, and is equipped with support plate 55 at the top of supporting plate 31, detent 56 is equipped among 55 bottom of support plate, detent 56 is located at tooth Right above wheel 53, detent 56 is engaged with gear 53, and 35 right part of bull stick is equipped with latch 54, under latch 54 is located at gear 53 just Side, latch 54 are contacted with gear 53.
It further include having button 6 and warning lamp 7,21 top right side of left hand sleeves is equipped with button 6,1 top left side of bottom plate peace Equipped with warning lamp 7, for warning lamp 7 between left hand sleeves 21 and riser 41, warning lamp 7 and button 6 have circuit connection.
It further include having motor 8, the first belt pulley 9, the second belt pulley 10 and flat belt 11,1 top right side of bottom plate is equipped with Motor 8, for motor 8 in being horizontally disposed with, the output shaft of motor 8 is connected with the first belt pulley 9, the installation of 52 right part of shaft by shaft coupling Have the second belt pulley 10, the second belt pulley 10 is located at right above the first belt pulley 9, the second belt pulley 10 and the first belt pulley 9 it Between be connected with flat belt 11.
It further include having framework 12,1 top left side of bottom plate is equipped with framework 12, and grinding wheel 38 is located in framework 12.
Further include having rubber slab 13, rubber slab 13 is installed between 46 medial surface of left and right sides arc block.
Working principle: being operated first personnel and air-conditioner pipe be placed on apparatus for placing 2, then pins sky by apparatus for placing 2 Pipe is adjusted to move down, meanwhile, cutter device 3 is rotated, and then air-conditioner pipe is moved down and contacted with the cutting part of cutter device 3, Air-conditioner pipe is cut in the cutting part rotation of cutter device 3.After the completion of air-conditioner pipe cutting, can stop operating cutting dress 3 are set, air-conditioner pipe is unclamped, apparatus for placing 2 restores to original position, and operator can remove air-conditioner pipe.
Because apparatus for placing 2 includes sleeve 21, motion bar 22, spring 23 and arc placement plate 24, left and right at the top of bottom plate 1 Two sides are fitted with sleeve 21, and motion bar 22 is equipped in sleeve 21, is slidably matched in motion bar 22 and sleeve 21,22 bottom of motion bar It is connected with spring 23 between bottom in end and sleeve 21,22 top of motion bar is equipped with arc placement plate 24, left and right sides arc Placement plate 24 be it is arranged symmetrically, be operated first personnel and air-conditioner pipe be placed in left and right sides arc placement plate 24, then press sky Pipe is adjusted to move down, air-conditioner pipe moves downwards through arc placement plate 24 and motion bar 22 is driven to move down, and spring 23 compresses, behaviour Making personnel can be rotated cutter device 3, and then air-conditioner pipe is moved down and contacted with the cutting part of cutter device 3, cutter device 3 Air-conditioner pipe is cut.After the completion of air-conditioner pipe cutting, air-conditioner pipe can be unclamped, because of the effect of spring 23, motion bar 22 to Upper mobile drive arc placement plate 24 moves up recovery to original position, can remove the air-conditioner pipe of well cutting.
Because cutter device 3 includes supporting plate 31, first bearing seat 32, strut 33, second bearing seat 34, bull stick 35, turns Handle 36, connector 37 and grinding wheel 38,1 top center of bottom plate are equipped with strut 33, and 33 top of strut is equipped with second bearing seat 34, 1 top right side of bottom plate is equipped with supporting plate 31, and 31 lower part of supporting plate is Embedded to be equipped with first bearing seat 32, first bearing seat 32 with Bull stick 35 is connected between second bearing seat 34, bull stick 35 is located at 21 front side of sleeve, and 35 right end of bull stick is equipped with turning handle 36, bull stick 35 left ends are equipped with connector 37, and grinding wheel 38 is equipped on connector 37, and grinding wheel 38 is being located at left and right sides arc placement plate 24 just Lower section, when operator, which presses air-conditioner pipe, to be moved down, operator can be rotated turning handle 36, and the rotation of turning handle 36 drives bull stick 35 rotations, the rotation band movement connector 37 of bull stick 35 rotate, and the rotation of connector 37 drives grinding wheel 38 to rotate, and then when air-conditioner pipe is downward When mobile and grinding wheel 38 contacts, air-conditioner pipe is cut in the rotation of grinding wheel 38.After the completion of air-conditioner pipe cutting, it can stop operating Turning handle 36.
Because further including having hold-down devices 4, hold-down devices 4 include riser 41, top plate 42, slide bar 44, N-shaped frame 45, arc Shape block 46 and transverse slat 47,1 top left side of bottom plate are equipped with riser 41, and riser 41 is located at 21 left side of left hand sleeves, 41 top of riser Top plate 42 is installed, through-hole 43 is provided on the right side of top plate 42, is equipped with slide bar 44 in through-hole 43,44 bottom end of slide bar is equipped with N-shaped frame 45, 45 left and right ends of N-shaped frame symmetrical expression is equipped with arc block 46, and arc block 46 is located at 24 top of arc placement plate, 44 top of slide bar Transverse slat 47 is installed, when air-conditioner pipe is placed in arc placement plate 24, operator can be moved down by motion plate 47, horizontal Plate 47 moves down band moving slide-bar 44 and moves down, and slide bar 44, which moves down, drives N-shaped frame 45 to move down, and N-shaped frame 45 is downward Mobile that left and right sides arc block 46 is driven to move down, left and right sides arc block 46 is moved down to be contacted with air-conditioner pipe, and then left Right two sides arc block 46, which moves down, drives air-conditioner pipe to move down and cut.After the completion of air-conditioner pipe cutting, because of spring 23 Effect, left and right sides arc block 46 moves up recovery to original position.In this way, operator can be made more easily to press air-conditioner pipe It moves down.
Because further including having driving device 5, driving device 5 includes 3rd bearing seat 51, shaft 52, gear 53, latch 54, support plate 55, detent 56 and bracing wire 57,31 top of supporting plate is Embedded to be equipped with 3rd bearing seat 51,3rd bearing seat Shaft 52 is installed, 52 right end of shaft is equipped with gear 53, and bracing wire 57,57 tail end of bracing wire and transverse slat 47 are wound in shaft 52 in 51 Bottom right connects, and is equipped with support plate 55 at the top of supporting plate 31, detent 56, detent 56 are equipped among 55 bottom of support plate Right above gear 53, detent 56 is engaged with gear 53, and 35 right part of bull stick is equipped with latch 54, and latch 54 is located at gear 53 Underface, latch 54 are contacted with gear 53, and when operator rotates turning handle 36,54 turns of latch are driven while bull stick 35 rotates Dynamic, when latch 54 turns to top, latch 54 is contacted with gear 53, and then 54 rotation driven gear 53 of latch rotates, non-return Pawl 56 prevents gear 53 from turning round, and the rotation of gear 53 drives shaft 52 to rotate, the rotation of shaft 52 by bracing wire 57 around rising, and then bracing wire 57 It pulls transverse slat 47 to move down, and then drives left and right sides arc block 46 to move down and contacted with air-conditioner pipe, and drive air-conditioner pipe It moves down and is cut.After the completion of air-conditioner pipe cutting, turning handle 36 stops operating, and then latch 54 stops operating, operator Member can pull detent 56 not engage with gear 53, then transverse slat 47 is pulled to move up drive left and right sides arc block 46 upwards It is mobile to restore to original position, unclamp detent 56.In this way, by motion plate 47 to moving down when rotating turning handle 36 without operator It is dynamic, it is time saving and energy saving.
Because further including having button 6 and warning lamp 7,21 top right side of left hand sleeves is equipped with button 6,1 top left of bottom plate Side is equipped with warning lamp 7, and for warning lamp 7 between left hand sleeves 21 and riser 41, warning lamp 7 and button 6 have circuit connection, when Air-conditioner pipe, which moves down, drives arc placement plate 24 when moving down, and arc placement plate 24 is moved down to be contacted with button 6, warning Lamp 7 lights, that is, illustrates that air-conditioner pipe has moved to range, and illustrates that air-conditioner pipe has been cut and complete, and operator is Can stop operating turning handle 36.In this way, can prevent air-conditioner pipe from moving down always.
Because further including having motor 8, the first belt pulley 9, the second belt pulley 10 and flat belt 11,1 top right side of bottom plate peace Equipped with motor 8, for motor 8 in being horizontally disposed with, the output shaft of motor 8 is connected with the first belt pulley 9,52 right part of shaft by shaft coupling Second belt pulley 10 is installed, the second belt pulley 10 is located at right above the first belt pulley 9, the second belt pulley 10 and the first belt pulley Flat belt 11 is connected between 9, when there is power supply, operator can start the rotation of motor 8, and the rotation of motor 8 drives the first skin Belt wheel 9 rotates, and the rotation of the first belt pulley 9 drives the rotation of the second belt pulley 10 by flat belt 11, and the second belt pulley 10 rotates band Turn bar 35 rotates, and then grinding wheel 38 is driven to cut air-conditioner pipe.After the completion of air-conditioner pipe cutting, motor 8 can be closed. In this way, drive bull stick 35 to rotate without manual rotation's turning handle 36, it is time saving and energy saving.
Because further including having framework 12,1 top left side of bottom plate is equipped with framework 12, and grinding wheel 38 is located in framework 12, works as sand When 38 rotation of wheel, framework 12, which can prevent people's hand from contacting with grinding wheel 38, leads to injury.
Because further including having rubber slab 13, rubber slab 13 is installed between 46 medial surface of left and right sides arc block, works as arc Block 46, which moves down, drives air-conditioner pipe when moving down, and rubber block is contacted with air-conditioner pipe, and then increases and its frictional force, and prevents Only air-conditioner pipe moves left and right, meanwhile, more firm air-conditioner pipe of pressing moves down.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (5)

1. a kind of air-conditioning installation copper pipe cutting equipment, which is characterized in that include bottom plate (1), apparatus for placing (2) and cutting dress It sets (3), bottom plate (1) top left side is equipped with apparatus for placing (2), and bottom plate (1) top right side is equipped with cutter device (3), cutter device (3) it is located on front side of apparatus for placing (2), the cutting part of cutter device (3) is located at below apparatus for placing (2);Apparatus for placing (2) packet Sleeve (21), motion bar (22), spring (23) and arc placement plate (24) are included, the left and right sides is fitted at the top of bottom plate (1) Sleeve (21), sleeve (21) is interior to be equipped with motion bar (22), is slidably matched in motion bar (22) and sleeve (21), motion bar (22) bottom It is connected with spring (23) between end and sleeve (21) interior bottom, motion bar (22) top is equipped with arc placement plate (24), left and right Two sides arc placement plate (24) is arranged symmetrically;Cutter device (3) includes supporting plate (31), first bearing seat (32), strut (33), second bearing seat (34), bull stick (35), turning handle (36), connector (37) and grinding wheel (38), bottom plate (1) top center peace Equipped with strut (33), strut (33) top is equipped with second bearing seat (34), and bottom plate (1) top right side is equipped with supporting plate (31), Supporting plate (31) lower part is Embedded to be equipped with first bearing seat (32), is connected between first bearing seat (32) and second bearing seat (34) It is connected to bull stick (35), bull stick (35) is located on front side of sleeve (21), and bull stick (35) right end is equipped with turning handle (36), bull stick (35) left end It is equipped with connector (37), is equipped on connector (37) grinding wheel (38), grinding wheel (38) is located at left and right sides arc placement plate (24) immediately below;It further include having hold-down devices (4), hold-down devices (4) include riser (41), top plate (42), slide bar (44), n Type frame (45), arc block (46) and transverse slat (47), bottom plate (1) top left side are equipped with riser (41), and riser (41) is located at left side It on the left of sleeve (21), is equipped with top plate (42) at the top of riser (41), is provided with through-hole (43) on the right side of top plate (42), set in through-hole (43) Have slide bar (44), slide bar (44) bottom end is equipped with N-shaped frame (45), and N-shaped frame (45) left and right ends symmetrical expression is equipped with arc block (46), arc block (46) is located above arc placement plate (24), and slide bar (44) top is equipped with transverse slat (47);It further include having driving Device (5), driving device (5) include 3rd bearing seat (51), shaft (52), gear (53), latch (54), support plate (55), detent (56) and bracing wire (57), supporting plate (31) top is Embedded to be equipped with 3rd bearing seat (51), 3rd bearing seat (51) it is equipped with shaft (52) in, shaft (52) right end is equipped with gear (53), and bracing wire (57), bracing wire are wound in shaft (52) (57) tail end is connect with transverse slat (47) bottom right, is equipped with support plate (55) at the top of supporting plate (31), in support plate (55) bottom Between be equipped with detent (56), detent (56) is located at right above gear (53), and detent (56) is engaged with gear (53), bull stick (35) right part is equipped with latch (54), and latch (54) is located at immediately below gear (53), and latch (54) is contacted with gear (53).
2. a kind of air-conditioning installation copper pipe cutting equipment according to claim 1, which is characterized in that further include having button (6) it is equipped with button (6) with warning lamp (7), left hand sleeves (21) top right side, bottom plate (1) top left side is equipped with warning lamp (7), warning lamp (7) is located between left hand sleeves (21) and riser (41), and there are circuit connection in warning lamp (7) and button (6).
3. a kind of air-conditioning installation copper pipe cutting equipment according to claim 2, which is characterized in that further include having motor (8), the first belt pulley (9), the second belt pulley (10) and flat belt (11), bottom plate (1) top right side are equipped with motor (8), electricity In being horizontally disposed with, the output shaft of motor (8) is connected with the first belt pulley (9) machine (8) by shaft coupling, the installation of shaft (52) right part Have the second belt pulley (10), the second belt pulley (10) is located at right above the first belt pulley (9), the second belt pulley (10) and the first skin Flat belt (11) are connected between belt wheel (9).
4. a kind of air-conditioning installation copper pipe cutting equipment according to claim 3, which is characterized in that further include having framework (12), bottom plate (1) top left side is equipped with framework (12), and grinding wheel (38) is located in framework (12).
5. a kind of air-conditioning installation copper pipe cutting equipment according to claim 4, which is characterized in that further include having rubber slab (13), rubber slab (13) are installed between left and right sides arc block (46) medial surface.
CN201711137664.2A 2017-11-16 2017-11-16 A kind of air-conditioning installation copper pipe cutting equipment Active CN108000332B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711137664.2A CN108000332B (en) 2017-11-16 2017-11-16 A kind of air-conditioning installation copper pipe cutting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711137664.2A CN108000332B (en) 2017-11-16 2017-11-16 A kind of air-conditioning installation copper pipe cutting equipment

Publications (2)

Publication Number Publication Date
CN108000332A CN108000332A (en) 2018-05-08
CN108000332B true CN108000332B (en) 2019-08-02

Family

ID=62052557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711137664.2A Active CN108000332B (en) 2017-11-16 2017-11-16 A kind of air-conditioning installation copper pipe cutting equipment

Country Status (1)

Country Link
CN (1) CN108000332B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111037691B (en) * 2020-01-17 2021-12-03 何炳朋 Bark scraping device for wood processing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203901070U (en) * 2014-05-14 2014-10-29 中山市迈进高尔夫用品有限公司 Cutting machine
CN203956215U (en) * 2014-07-14 2014-11-26 广东志高科创铜业有限公司 A kind of efficient copper pipe cutting equipment
CN106881656A (en) * 2015-12-15 2017-06-23 湖北新冶钢汽车零部件有限公司 One rolls the simple cutter sweep of six gear shafts
CN107116440A (en) * 2017-06-12 2017-09-01 芜湖天航科技(集团)股份有限公司 Wire rod blanking device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8065943B2 (en) * 2000-09-18 2011-11-29 Sd3, Llc Translation stop for use in power equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203901070U (en) * 2014-05-14 2014-10-29 中山市迈进高尔夫用品有限公司 Cutting machine
CN203956215U (en) * 2014-07-14 2014-11-26 广东志高科创铜业有限公司 A kind of efficient copper pipe cutting equipment
CN106881656A (en) * 2015-12-15 2017-06-23 湖北新冶钢汽车零部件有限公司 One rolls the simple cutter sweep of six gear shafts
CN107116440A (en) * 2017-06-12 2017-09-01 芜湖天航科技(集团)股份有限公司 Wire rod blanking device

Also Published As

Publication number Publication date
CN108000332A (en) 2018-05-08

Similar Documents

Publication Publication Date Title
CN206083976U (en) Steel tube automatic cutting machine
CN111438739B (en) Automatic pushing device for toilet paper cutting
CN110497483B (en) Pretreatment system for manufacturing logs by solid wood boards
CN205821865U (en) Cloth curve guillotine
CN108000332B (en) A kind of air-conditioning installation copper pipe cutting equipment
CN104979579A (en) Polymer battery adhesive tape mechanism
CN207362572U (en) Cloth cutter
CN108213274B (en) A kind of cutting equipment for cable
CN111645128B (en) Cut supplementary cutting equipment of magnolia officinalis
CN210172446U (en) Convenient wiring of removing is with tailorring device
CN114986587B (en) Hybrid circuit part manufacturing device applied to energy-saving equipment assembly
CN108493850B (en) Power cable peeling device
CN216990085U (en) Plate shearing machine
CN108453965B (en) Automatic clamping and placing Grinder and its method
CN113087381B (en) Cutting device for glass curtain wall
CN204680724U (en) A kind of polymer battery automatic adhesive-tape application mechanism
CN212469961U (en) Square iron plate side cut processingequipment for building
CN211713488U (en) Cloth tailoring platform
CN111687733B (en) Outdoor cement railing armrest platform maintenance equipment
CN204430989U (en) A kind of ceramic circular arc machine
CN207013996U (en) One kind is used for metallic door punching and edger unit
CN106028781B (en) Vertical plug-in unit feed appliance
CN107310277B (en) Color card T-bar hook code printer
CN219214136U (en) Riveting ring device for producing automobile seat sleeves
CN111053314A (en) Positioning and indicating device for cut-parts feeding for clothing manufacturing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190712

Address after: 518000 No. 4 Yintian Road, Xixiang Street, Baoan District, Shenzhen City, Guangdong Province, Block D 202, Huafeng Baoan Zhigu Science and Technology Innovation Park

Applicant after: Shenzhen Ainengju Technology Co., Ltd.

Address before: 343000 Mailbox No. 32 of Qingyuan College Student Entrepreneurship Base, Ji'an City, Jiangxi Province

Applicant before: Zhou Liang

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A copper pipe cutting equipment for air conditioning installation

Effective date of registration: 20210521

Granted publication date: 20190802

Pledgee: Bank of Jiangsu Limited by Share Ltd. Shenzhen branch

Pledgor: Shenzhen Ainengju Technology Co.,Ltd.

Registration number: Y2021980003864

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220531

Granted publication date: 20190802

Pledgee: Bank of Jiangsu Limited by Share Ltd. Shenzhen branch

Pledgor: Shenzhen Ainengju Technology Co.,Ltd.

Registration number: Y2021980003864

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Copper pipe cutting equipment for air conditioning installation

Effective date of registration: 20220606

Granted publication date: 20190802

Pledgee: Bank of Jiangsu Limited by Share Ltd. Shenzhen branch

Pledgor: Shenzhen Ainengju Technology Co.,Ltd.

Registration number: Y2022980007144

PE01 Entry into force of the registration of the contract for pledge of patent right