CN107989596A - A simulated wellbore device and a simulation experiment system for oil-gas-water three-phase flow - Google Patents

A simulated wellbore device and a simulation experiment system for oil-gas-water three-phase flow Download PDF

Info

Publication number
CN107989596A
CN107989596A CN201710231897.2A CN201710231897A CN107989596A CN 107989596 A CN107989596 A CN 107989596A CN 201710231897 A CN201710231897 A CN 201710231897A CN 107989596 A CN107989596 A CN 107989596A
Authority
CN
China
Prior art keywords
oil
simulation wellbore
wellbore hole
plate
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710231897.2A
Other languages
Chinese (zh)
Other versions
CN107989596B (en
Inventor
郑庆龙
高振涛
马文衡
张玮
王静
胡建林
陈亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201710231897.2A priority Critical patent/CN107989596B/en
Publication of CN107989596A publication Critical patent/CN107989596A/en
Application granted granted Critical
Publication of CN107989596B publication Critical patent/CN107989596B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00—Survey of boreholes or wells
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a simulation shaft device and an oil-gas-water three-phase flow simulation experiment system, and belongs to the field of oilfield machinery. The device comprises a simulation shaft and a plate-shaped bracket, wherein one end of the simulation shaft is connected with the plate-shaped bracket through a rotating piece; the rotating member includes: an input line in vertical communication with the end of the simulated wellbore; the support is fixedly arranged on the plate-shaped bracket and used for fixing the input pipeline; a derrick vertically connected with the right side wall of the plate-shaped support; the motor and the speed reducer which are connected through the coupling are arranged on the right plate surface of the plate-shaped support; the first pulley is connected with a transmission shaft of the speed reducer; the second pulley is positioned right above the first pulley and is vertically connected with the derrick through a transverse connecting rod; a steel cable with one end fixed on the first pulley and the other end connected with the simulated shaft by sequentially winding around the first pulley and the second pulley; and the power controller is used for controlling the operation of the motor. The device can simulate inclined wells with different slopes, and leakage does not occur in the rotating process.

Description

一种模拟井筒装置及油气水三相流模拟实验系统A simulated wellbore device and a simulation experiment system for oil-gas-water three-phase flow

技术领域technical field

本发明涉及油田机械领域,特别涉及一种模拟井筒装置及油气水三相流模拟实验系统。The invention relates to the field of oilfield machinery, in particular to a simulation wellbore device and an oil-gas-water three-phase flow simulation experiment system.

背景技术Background technique

在原油开采中,经常会遇到多相流现象,例如原油一般均为油、气、水三相混合的流体,因而研究油、气、水三相流在油田生产中具有重要的意义。目前可将产液剖面组合仪、流量计等器件置于油井中以检测待开采原油的相关参数,进而制定合理的原油开采方案。而产业剖面组合仪、流量计等器件的检测标准需要通过在实验室进行三相流模拟实验来校准,并且在进行模拟实验时,需要使用一种装置来模拟井筒,以便于精确地获取模拟结果,因此提供一种模拟井筒装置是十分必要的。In crude oil extraction, multiphase flow phenomena are often encountered. For example, crude oil is generally a three-phase mixed fluid of oil, gas and water. Therefore, the study of three-phase flow of oil, gas and water is of great significance in oilfield production. At present, devices such as liquid production profile combination instrument and flow meter can be placed in the oil well to detect the relevant parameters of the crude oil to be extracted, and then formulate a reasonable crude oil extraction plan. The detection standards of industrial profile combination instruments, flowmeters and other devices need to be calibrated by performing three-phase flow simulation experiments in the laboratory, and when conducting simulation experiments, a device needs to be used to simulate the wellbore in order to obtain accurate simulation results , so it is very necessary to provide a simulated wellbore device.

现有技术中提供的模拟井筒装置中的模拟井筒为直筒状,通过水平放置或者竖直放置来模拟水平井筒或者竖直井筒,通过混合机将油罐、水管、气罐中的油、气、水混合后输入水平井筒或者竖直井筒,并产液剖面组合仪、流量计等器件固定在模拟井筒内,以进行三相流体模拟实验。The simulated wellbore in the simulated wellbore device provided in the prior art is straight, placed horizontally or vertically to simulate a horizontal wellbore or a vertical wellbore, and the oil, gas, and oil in the oil tank, water pipe, and gas tank are mixed by a mixer. After the water is mixed, it is input into the horizontal wellbore or vertical wellbore, and the liquid production profile combination instrument, flow meter and other devices are fixed in the simulated wellbore to carry out the three-phase fluid simulation experiment.

发明人发现现有技术至少存在以下问题:The inventor finds that the prior art has at least the following problems:

现有技术提供的模拟井筒装置中的模拟井筒为水平模拟井筒或者竖直模拟井筒,只能模拟水平井或者竖直井,不能模拟具有不同斜度的斜井。The simulated wellbore in the simulated wellbore device provided by the prior art is a horizontal simulated wellbore or a vertical simulated wellbore, which can only simulate horizontal wells or vertical wells, and cannot simulate inclined wells with different inclinations.

发明内容Contents of the invention

本发明实施例所要解决的技术问题在于,提供了一种在可以模拟水平井和竖直井的前提下,还可以模拟具有不同斜度斜井的模拟井筒装置及油气水三相流模拟实验系统。具体技术方案如下:The technical problem to be solved by the embodiments of the present invention is to provide a simulated wellbore device and an oil-gas-water three-phase flow simulation experiment system that can simulate inclined wells with different inclinations under the premise of simulating horizontal wells and vertical wells . The specific technical scheme is as follows:

第一方面,本发明实施例提供了一种模拟井筒装置,包括模拟井筒,所述模拟井筒装置还包括:板状支架,所述模拟井筒的一端通过旋转件与所述板状支架连接;所述旋转件包括:与所述模拟井筒端部垂直连通的输入管线;固定设置在所述板状支架上的支座,所述支座包括支座底、相对设置在所述支座底上并用于固定所述输入管线的两个固定板;与所述板状支架右侧壁垂直连接的井架;通过联轴器连接的电机和减速机,均设置在所述板状支架的右部板面上;与所述减速机的传动轴连接的第一滑轮;位于所述第一滑轮的正上方并通过横向连杆与所述井架垂直连接的第二滑轮;一端固定在所述第一滑轮上,并顺次绕过所述第一滑轮、所述第二滑轮使另一端与所述模拟井筒连接的钢缆;动力控制器,用于控制所述电机的运行。In the first aspect, an embodiment of the present invention provides a simulated wellbore device, including a simulated wellbore, and the simulated wellbore device further includes: a plate-shaped support, one end of the simulated wellbore is connected to the plate-shaped support through a rotating member; The rotating member includes: an input pipeline vertically connected to the end of the simulated wellbore; a support fixedly arranged on the plate-shaped support, the support includes a support bottom, which is relatively arranged on the support bottom and used The two fixing plates used to fix the input pipeline; the derrick vertically connected to the right side wall of the plate-shaped support; the motor and the reducer connected by the coupling are all arranged on the right part of the plate-shaped support On: the first pulley connected with the transmission shaft of the reducer; the second pulley located directly above the first pulley and vertically connected with the derrick through a transverse link; one end is fixed on the first pulley , and sequentially bypass the first pulley and the second pulley so that the other end is connected to the simulated shaft; a power controller is used to control the operation of the motor.

具体地,作为优选,所述输入管线与所述模拟井筒之间通过设置密封圈来实现动密封。Specifically, preferably, a sealing ring is provided between the input pipeline and the simulated wellbore to realize dynamic sealing.

具体地,作为优选,所述装置还包括圆心角为90°的轮盘;所述轮盘的一个水平侧壁固定在所述板状支架上,且所述旋转轴的轴线穿过所述轮盘的圆心;所述轮盘上设置有0°-90°的刻度。Specifically, preferably, the device further includes a wheel with a central angle of 90°; a horizontal side wall of the wheel is fixed on the plate-shaped support, and the axis of the rotating shaft passes through the wheel The center of the disc; the roulette is provided with a scale of 0°-90°.

具体地,作为优选,所述模拟井筒装置还包括井筒钢架;所述模拟井筒固定在所述井筒钢架上,所述井筒钢架上设置有一个第一通孔;所述轮盘的板面周缘均匀设置有多个用于与所述第一通孔相对的第二通孔;通过使用杆状固定件穿入所述第一通孔和所述第二通孔将所述井筒钢架和所述轮盘固定连接。Specifically, preferably, the simulated shaft device also includes a shaft steel frame; the simulated shaft is fixed on the shaft steel frame, and a first through hole is arranged on the shaft steel frame; the plate of the wheel A plurality of second through holes opposite to the first through holes are uniformly arranged on the periphery of the surface; It is fixedly connected with the roulette.

具体地,作为优选,所述井架上垂直设置有位于所述板状支架上方的弹簧碰撞器;所述弹簧碰撞器与所述板状支架之间的高度小于所述模拟井筒的长度。Specifically, preferably, the derrick is vertically provided with a spring striker above the plate support; the height between the spring striker and the plate support is less than the length of the simulated shaft.

具体地,作为优选,所述装置还包括与所述动力控制器电连接的行程开关;所述行程开关设置在所述轮盘的顶端;当所述模拟井筒转动至竖直位置时,触碰所述行程开关,所述动力控制器向所述电机发送停止运行的控制指令,所述电机停止运行。Specifically, preferably, the device further includes a travel switch electrically connected to the power controller; the travel switch is arranged on the top of the wheel; when the simulated shaft rotates to the vertical position, touch The travel switch, the power controller sends a control instruction to stop running to the motor, and the motor stops running.

具体地,作为优选,所述模拟井筒的内腔设置有一个模拟油管;所述模拟油管的上端与所述模拟井筒之间设置有用于固定所述模拟油管的环形塞。Specifically, preferably, a simulated oil pipe is provided in the cavity of the simulated wellbore; an annular plug for fixing the simulated oil pipe is provided between the upper end of the simulated oil pipe and the simulated wellbore.

具体地,作为优选,所述井架固定在墙面上。Specifically, preferably, the derrick is fixed on the wall.

第二方面,本发明实施例还提供了一种油气水三相流模拟实验系统,所述系统包括上述模拟井筒装置。In the second aspect, the embodiment of the present invention also provides an oil-gas-water three-phase flow simulation experiment system, which includes the above-mentioned simulation wellbore device.

所述系统还包括:油水分离器、水介质发生器、第一计量器、油介质发生器、第二计量器、空气介质发生器、第三计量器、混合器;所述油水分离器的出水口和出油口分别通过管线与所述水介质发生器、所述油介质发生器的进口连接。The system also includes: an oil-water separator, a water medium generator, a first gauge, an oil medium generator, a second gauge, an air medium generator, a third gauge, and a mixer; the outlet of the oil-water separator The water port and the oil outlet are respectively connected to the inlets of the water medium generator and the oil medium generator through pipelines.

所述水介质发生器、所述第一计量器以及所述油介质发生器、所述第二计量器分别顺次连通并汇合后,再与所述混合器、所述模拟井筒顺次连通。The water medium generator, the first meter, the oil medium generator, and the second meter are respectively connected in sequence and merged, and then communicated with the mixer and the simulated wellbore in sequence.

所述空气介质发生器、所述第三计量器、所述模拟井筒顺次连通。The air medium generator, the third meter, and the simulated wellbore are connected in sequence.

所述模拟井筒通过管线与所述油水分离器的进口连接。The simulated wellbore is connected to the inlet of the oil-water separator through a pipeline.

具体地,作为优选,所述水介质发生器包括通过管线顺次连通的储水罐、第一离心机构、水稳压罐与第一过滤器。Specifically, preferably, the water medium generator includes a water storage tank, a first centrifugal mechanism, a water stabilizing tank and a first filter connected in sequence through pipelines.

所述油介质发生器包括通过管线顺次连通的储油罐、第二离心机构、油稳压罐与第二过滤器。The oil medium generator includes an oil storage tank, a second centrifugal mechanism, an oil surge tank and a second filter connected in sequence through pipelines.

所述第一计量器、所述第二计量器与所述第三计量器均包括通过管线顺次连通的电动截止阀、流量计、电动调节阀。The first meter, the second meter and the third meter all include an electric shut-off valve, a flow meter, and an electric regulating valve connected in sequence through pipelines.

所述空气介质发生器包括通过管线顺次连通的空气压缩机、储气罐、气体调压阀、减压罐、气稳压罐、第三过滤器。The air medium generator includes an air compressor, an air storage tank, a gas pressure regulating valve, a decompression tank, an air pressure stabilizing tank, and a third filter connected in sequence through pipelines.

本发明实施例提供的技术方案带来的有益效果是:The beneficial effects brought by the technical solution provided by the embodiments of the present invention are:

本发明实施例提供的模拟井筒装置,通过将模拟井筒可转动地设置在板状支架的中部,并配合钢缆、电机、减速机、第一滑轮实现转动,进而便于模拟具有预定斜度的斜井。通过设置动力控制器,便于操作人员设定正向转动、倒向转动及旋转角度,并控制电机、减速机的传动动力,以使模拟井筒转动至预定角度。通过设置第二滑轮,便于钢缆上的力充分作用在井筒钢架上,避免模拟井筒无法被拉起,且节省电能。可见,本发明实施例提供的模拟井筒装置在可以模拟水平井和竖直井的前提下,还可以模拟具有不同斜度的斜井,且结构简单。The simulated wellbore device provided by the embodiment of the present invention, by rotatably setting the simulated wellbore in the middle of the plate-shaped support, and cooperating with the steel cable, the motor, the reducer, and the first pulley to realize the rotation, is convenient for simulating a slope with a predetermined slope. well. By setting the power controller, it is convenient for the operator to set the forward rotation, reverse rotation and rotation angle, and control the transmission power of the motor and reducer to make the simulated wellbore rotate to a predetermined angle. By setting the second pulley, it is convenient for the force on the steel cable to fully act on the steel frame of the wellbore, avoiding that the simulated wellbore cannot be pulled up, and saving electric energy. It can be seen that the simulated wellbore device provided by the embodiment of the present invention can simulate inclined wells with different inclinations under the premise of simulating horizontal wells and vertical wells, and has a simple structure.

附图说明Description of drawings

为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For those skilled in the art, other drawings can also be obtained based on these drawings without creative effort.

图1是本发明实施例提供的模拟井筒的结构示意图;Fig. 1 is a schematic structural view of a simulated wellbore provided by an embodiment of the present invention;

图2是本发明实施例提供的油气水三相流模拟实验系统的方法流程图;Fig. 2 is the method flowchart of the oil-gas-water three-phase flow simulation experiment system provided by the embodiment of the present invention;

图3是本发明实施例提供的油气水三相流模拟实验系统的局部图。Fig. 3 is a partial diagram of an oil-gas-water three-phase flow simulation experiment system provided by an embodiment of the present invention.

其中,附图标记分别表示:Wherein, the reference signs represent respectively:

1 模拟井筒装置,1 simulated wellbore device,

101 模拟井筒,101 simulated wellbore,

102 板状支架,102 plate support,

103 井架,103 derrick,

104 电机,104 motor,

105 减速机,105 reducer,

106 第一滑轮,106 first pulley,

107 第二滑轮,107 second pulley,

108 钢缆,108 steel cables,

109 动力控制器,109 power controller,

110 旋转件,110 swivel,

111 轮盘,111 Roulette,

112 井筒钢架,112 shaft steel frame,

113 杆状固定件,113 Rod mount,

114 弹簧碰撞器,114 spring collider,

115 行程开关,115 travel switch,

2 油水分离器,2 oil-water separator,

3 水介质发生器,3 water medium generator,

4 第一计量器,4 first gauge,

5 油介质发生器,5 oil medium generator,

6 第二计量器,6 second gauge,

7 空气介质发生器,7 air medium generator,

8 第三计量器,8 third gauge,

9 混合器,9 mixers,

10 第一阀门,10 first valve,

11 第二阀门,11 Second valve,

12 第三阀门,12 third valve,

13 第四阀门。13 Fourth valve.

具体实施方式Detailed ways

除非另有定义,本发明实施例所用的所有技术术语均具有与本领域技术人员通常理解的相同的含义。为使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明实施方式作进一步地详细描述。Unless otherwise defined, all technical terms used in the embodiments of the present invention have the same meanings as commonly understood by those skilled in the art. In order to make the object, technical solution and advantages of the present invention clearer, the implementation manner of the present invention will be further described in detail below in conjunction with the accompanying drawings.

第一方面,本发明实施例提供了一种模拟井筒装置,如附图1所示,该模拟井筒装置1包括模拟井筒101。板状支架102,模拟井筒的一端通过旋转件与板状支架连接;旋转件包括:与模拟井筒端部垂直连通的输入管线;固定设置在板状支架上的支座,支座包括支座底、相对设置在支座底上并用于固定输入管线的两个固定板。与板状支架102右侧壁垂直连接的井架103。通过联轴器连接的电机104和减速机105,均设置在板状支架102的右部板面上。与减速机105的传动轴连接的第一滑轮106。位于第一滑轮106的正上方并通过横向连杆与井架103垂直连接的第二滑轮107。一端固定在第一滑轮106上,并顺次绕过第一滑轮106、第二滑轮107使另一端与模拟井筒101连接的钢缆108。动力控制器109,用于控制电机104的运行。In a first aspect, an embodiment of the present invention provides a simulated wellbore device. As shown in FIG. 1 , the simulated wellbore device 1 includes a simulated wellbore 101 . Plate-shaped support 102, one end of the simulated wellbore is connected to the plate-shaped support through a rotating part; the rotating part includes: an input pipeline vertically connected with the end of the simulated wellbore; a support fixedly arranged on the plate-shaped support, the support includes a support base 1. Two fixing plates arranged oppositely on the bottom of the support and used to fix the input pipeline. The derrick 103 that is vertically connected with the right side wall of the plate support 102. The motor 104 and the speed reducer 105 connected by the shaft coupling are all arranged on the right part of the plate support 102 . The first pulley 106 connected with the transmission shaft of the speed reducer 105 . The second pulley 107 is located directly above the first pulley 106 and vertically connected to the derrick 103 through a transverse link. One end is fixed on the first pulley 106 , and the steel cable 108 is connected to the simulated shaft 101 at the other end by passing around the first pulley 106 and the second pulley 107 in sequence. The power controller 109 is used to control the operation of the motor 104 .

以下就本发明实施例提供的模拟井筒装置1的工作原理给予描述:The working principle of the simulated wellbore device 1 provided by the embodiment of the present invention is described below:

当需要使模拟井筒101转动预定角度时,操作人员控制动力控制器109,则动力控制器109向与其电连接的电机104发送控制指令,电机104接收控制指令并处理,然后根据控制指令将动力通过联轴器传输给减速器,减速器则将动力通过传动轴传输给第一滑轮106,则第一滑轮106转动,钢缆108随着第一滑轮106转动使缠绕在第一滑轮106上的部分钢缆108的长度变化,则连接模拟井筒101的部分钢缆108绕过第二滑轮107并拉动模拟井筒101转动,直至该模拟井筒101转动至预定角度。为了便于设置第二滑轮107以及避免模拟井筒101转动撞击设置在板状支架102上的电机104和减速机105,设置了与板状支架102右侧壁垂直连接的井架103。When it is necessary to rotate the simulated wellbore 101 by a predetermined angle, the operator controls the power controller 109, and the power controller 109 sends a control command to the motor 104 electrically connected to it, and the motor 104 receives and processes the control command, and then transmits the power through the The shaft coupling is transmitted to the reducer, and the reducer transmits the power to the first pulley 106 through the transmission shaft, then the first pulley 106 rotates, and the steel cable 108 rotates with the first pulley 106 to make the part wound on the first pulley 106 When the length of the cable 108 changes, the part of the cable 108 connected to the simulated shaft 101 goes around the second pulley 107 and pulls the simulated shaft 101 to rotate until the simulated shaft 101 rotates to a predetermined angle. In order to facilitate the setting of the second pulley 107 and avoid the rotation of the simulated shaft 101 from hitting the motor 104 and the reducer 105 on the plate support 102 , a derrick 103 vertically connected to the right side wall of the plate support 102 is provided.

需要说明的是,模拟井筒101可以沿着某一竖直平面转动,并且其转动角可以为0°及90°,即该模拟井筒101在可以模拟水平井和竖直井的前提下,还可以模拟具有不同斜度的斜井。模拟井筒101为透明的有机玻璃材料,并且模拟井筒101的外壁上设置有刻度,以便于操作人员观察模拟井筒101内的油、气、水三相流体的形态,并且在模拟井筒101转动过程中,其内部的油、气、水三相流体不会发生泄露。模拟井筒101的下端还连通有用于输入及输出三相流体的管线,管线上设置有阀门,以便于控制三相流体输入模拟井筒101或者由模拟井筒101输出。It should be noted that the simulated wellbore 101 can rotate along a certain vertical plane, and its rotation angle can be 0° and 90°, that is, the simulated wellbore 101 can also simulate horizontal wells and vertical wells Simulate deviated wells with varying inclinations. The simulated wellbore 101 is a transparent plexiglass material, and the outer wall of the simulated wellbore 101 is provided with a scale, so that the operator can observe the form of the three-phase fluid of oil, gas and water in the simulated wellbore 101, and during the rotation process of the simulated wellbore 101 , the three-phase fluid of oil, gas and water inside will not leak. The lower end of the simulated wellbore 101 is connected with a pipeline for inputting and outputting the three-phase fluid, and a valve is arranged on the pipeline to control the input or output of the three-phase fluid into the simulated wellbore 101 .

动力控制器109可以向电机104发送启动、停止、加速、减速、正向转动、反向转动、转动角度的控制指令,进而便于控制该模拟井筒101实现不同方向、不同速度的转动,并转动至预设角度。为了便于操作人员远程控制,还可以设置能够用于远程程控该动力控制器109的遥控器。The power controller 109 can send control commands for starting, stopping, accelerating, decelerating, forward rotation, reverse rotation, and rotation angle to the motor 104, so as to facilitate the control of the simulated shaft 101 to rotate in different directions and at different speeds, and rotate to preset angle. In order to facilitate remote control by the operator, a remote controller that can be used to remotely program the power controller 109 can also be provided.

减速器可以降低电机104传动的速度,以保证传输给第一滑轮106的动力平稳,进而使模拟井筒101平稳地转动。The speed reducer can reduce the transmission speed of the motor 104 to ensure stable power transmitted to the first pulley 106 , thereby making the simulated shaft 101 rotate smoothly.

基于上述可知,本发明实施例提供的模拟井筒装置1,通过将模拟井筒101可转动地设置在板状支架102的中部,并配合钢缆108、电机104、减速机105、第一滑轮106实现转动,进而便于模拟具有预定斜度的斜井。通过设置动力控制器109,便于操作人员设定正向转动、倒向转动及旋转角度,并控制电机104、减速机105的传动动力,以使模拟井筒101转动至预定角度。通过设置第二滑轮107,便于钢缆108上的力充分作用在模拟井筒101上,避免模拟井筒101无法被拉起,且节省电能。可见,本发明实施例提供的模拟井筒装置1在可以模拟水平井和竖直井的前提下,还可以模拟具有不同斜度的斜井,且结构简单。Based on the above, it can be seen that the simulated wellbore device 1 provided by the embodiment of the present invention is realized by arranging the simulated wellbore 101 rotatably in the middle of the plate-shaped support 102, and cooperating with the steel cable 108, the motor 104, the reducer 105, and the first pulley 106. Rotation, which in turn facilitates the simulation of deviated wells with predetermined inclinations. By setting the power controller 109, it is convenient for the operator to set forward rotation, reverse rotation and rotation angle, and control the transmission power of the motor 104 and the reducer 105, so that the simulated shaft 101 rotates to a predetermined angle. By setting the second pulley 107, the force on the steel cable 108 is facilitated to fully act on the simulated wellbore 101, preventing the simulated wellbore 101 from being pulled up, and saving electric energy. It can be seen that the simulated wellbore device 1 provided by the embodiment of the present invention can also simulate inclined wells with different inclinations on the premise of simulating horizontal wells and vertical wells, and has a simple structure.

输入管线与模拟井筒101之间通过设置密封圈来实现动密封。模拟井筒101可以绕着输入管线旋转,通过设置密封圈可以防止在模拟井筒101转动过程发生三相流体的泄露,并且设置的输入管线需要保证三相流体能够在模拟井筒101中正常流通。A sealing ring is provided between the input pipeline and the simulated wellbore 101 to realize dynamic sealing. The simulated wellbore 101 can rotate around the input pipeline, and the leakage of the three-phase fluid during the rotation of the simulated wellbore 101 can be prevented by setting the sealing ring, and the input pipeline needs to ensure that the three-phase fluid can circulate normally in the simulated wellbore 101.

如附图1所示,本发明实施例提供的装置还包括圆心角为90°的轮盘111;轮盘111的一个水平侧壁固定在板状支架102上,且旋转轴的轴线穿过轮盘111的圆心;轮盘111上设置有0°-90°的刻度。设置上述轮盘111,并使旋转轴的轴线穿过轮盘111的圆心,便于操作人员观察模拟井筒101转动的角度。其中,轮盘111上的刻度为每隔10°间隔设置一个,以便于操作人员清楚的观察模拟井筒101旋转的角度。As shown in Figure 1, the device provided by the embodiment of the present invention also includes a wheel 111 with a central angle of 90°; a horizontal side wall of the wheel 111 is fixed on the plate-shaped support 102, and the axis of the rotating shaft passes through the wheel. The center of the disc 111; the roulette 111 is provided with a scale of 0°-90°. The above-mentioned wheel 111 is provided, and the axis of the rotating shaft passes through the center of the wheel 111 , so that the operator can easily observe the rotation angle of the simulated wellbore 101 . Wherein, the scales on the wheel 111 are set at intervals of 10° so that the operator can clearly observe the rotation angle of the simulated wellbore 101 .

为了避免钢缆108的断裂造成模拟井筒101不能定位,可在模拟井筒101转动至某一角度时,将模拟井筒101与轮盘111固定连接。作为优选,模拟井筒装置1还包括井筒钢架112;模拟井筒101固定在井筒钢架112上,井筒钢架112上设置有一个第一通孔;轮盘111的板面周缘均匀设置有多个用于与第一通孔相对的第二通孔;通过使用杆状固定件113穿入第一通孔和第二通孔将井筒钢架112和轮盘111固定连接,以实现模拟井筒101的定位。这种设置方式简单,还便于操作员人准确地观察模拟井筒101所对应的轮盘111上的角度。In order to prevent the simulated wellbore 101 from being unable to be positioned due to breakage of the steel cable 108, the simulated wellbore 101 can be fixedly connected to the wheel 111 when the simulated wellbore 101 rotates to a certain angle. Preferably, the simulated shaft device 1 also includes a shaft steel frame 112; the simulated shaft 101 is fixed on the shaft steel frame 112, and a first through hole is arranged on the shaft steel frame 112; For the second through hole opposite to the first through hole; by using the rod-shaped fixing member 113 to penetrate the first through hole and the second through hole, the wellbore steel frame 112 and the wheel disc 111 are fixedly connected to realize the simulated wellbore 101 position. This arrangement is simple, and it is also convenient for the operator to accurately observe the angle on the wheel 111 corresponding to the simulated wellbore 101 .

需要说明的是,当设置井筒钢架112后,可以将钢缆108直接固定在井筒钢架112上。It should be noted that, after the wellbore steel frame 112 is set, the steel cable 108 can be directly fixed on the wellbore steel frame 112 .

为了使轮盘111能够适宜地承载模拟井筒101的重力,将轮盘111的半径设置为大于模拟井筒101长度的六分之一。In order to make the wheel 111 properly bear the gravity of the simulated wellbore 101 , the radius of the wheel 111 is set to be greater than one-sixth of the length of the simulated wellbore 101 .

在模拟井筒101转动至90°时,由于惯性作用不能立刻停止,为了避免模拟井筒101直接撞击井架103,如附图1所示,井架103上垂直设置有位于板状支架102上方的弹簧碰撞器114;弹簧碰撞器114与板状支架102之间的高度小于模拟井筒101的长度。如此设置弹簧碰撞器114的高度便于模拟井筒101能够撞击到弹簧碰撞器114上,以起到缓冲作用。When the simulated wellbore 101 rotates to 90°, it cannot stop immediately due to the effect of inertia. In order to avoid the simulated wellbore 101 directly hitting the derrick 103, as shown in Figure 1, the derrick 103 is vertically provided with a spring impactor located above the plate-like support 102 114 ; the height between the spring impactor 114 and the plate support 102 is less than the length of the simulated wellbore 101 . The height of the spring striker 114 is set in such a way that the simulated shaft 101 can hit the spring striker 114 to play a buffering role.

其中,弹簧碰撞器114可以有多种结构,在基于结构简单,容易设置的前提下,以下给出两种实施方式:Wherein, the spring collider 114 can have various structures, and on the premise that the structure is simple and easy to set, two implementation modes are given below:

作为一种实施方式:弹簧碰撞器114包括弹簧,弹簧的两端分别与两个直板的板面中部连接,其中一个直板与井架103固定连接,另一直板上设置有弹性体(如海绵),以防止该直板直接接触模拟井筒101,避免损坏模拟井筒101。As an embodiment: the spring striker 114 includes a spring, and the two ends of the spring are respectively connected to the middle parts of the two straight plates, wherein one of the straight plates is fixedly connected to the derrick 103, and the other straight plate is provided with an elastic body (such as a sponge). In order to prevent the straight plate from directly contacting the simulated wellbore 101 and avoid damaging the simulated wellbore 101 .

作为第二种实施方式:弹簧碰撞器114包括弹簧,以及套装在弹簧上且长度小于弹簧的自然长度的圆筒,弹簧的一端与井架103垂直连接,弹簧的另一端设置有弹性体(如海绵)。在弹簧上套装圆筒用于对弹簧限位,避免弹簧在受力时发生偏斜。As a second embodiment: the spring striker 114 includes a spring, and a cylinder that is sleeved on the spring and has a length less than the natural length of the spring, one end of the spring is vertically connected with the derrick 103, and the other end of the spring is provided with an elastic body (such as a sponge) ). A cylinder is placed on the spring to limit the position of the spring, so as to prevent the spring from deflecting when stressed.

在上述两种实施方式中,当模拟井筒101碰撞弹簧碰撞器114时,通过弹簧的压缩与恢复原状来起到缓冲作用,以减轻模拟井筒101对井架103的冲击力。In the above two implementations, when the simulated wellbore 101 collides with the spring impactor 114 , the spring is compressed and restored to its original shape to play a buffering role, so as to reduce the impact force of the simulated wellbore 101 on the derrick 103 .

如附图1所示,本发明实施例提供的装置还包括与动力控制器109电连接的行程开关115;行程开关115设置在轮盘111的顶端;当模拟井筒101转动至竖直位置时,触碰行程开关115,动力控制器109向电机104发送停止运行的控制指令,电机104停止运行。设置行程开关115便于电机104实现自动停机,避免模拟井筒101过度的转动。其中,行程开关115为本领域技术人员所熟知的部件,能够利用机械运动部件的碰撞使其触头动作来实现接通或分断控制电路,进而达到控制目的,在此不再详述。As shown in Figure 1, the device provided by the embodiment of the present invention also includes a travel switch 115 electrically connected to the power controller 109; the travel switch 115 is arranged on the top of the wheel disc 111; Touch the travel switch 115, the power controller 109 sends a control instruction to stop running to the motor 104, and the motor 104 stops running. Setting the travel switch 115 is convenient for the motor 104 to automatically shut down and avoid excessive rotation of the simulated wellbore 101 . Wherein, the travel switch 115 is a component well known to those skilled in the art, which can make the contacts move by the collision of the mechanical moving parts to realize the connection or disconnection of the control circuit, thereby achieving the purpose of control, and will not be described in detail here.

为了准确地模拟井内的条件,可在模拟井筒101的内腔设置有一个模拟油管,以模拟井筒101内的油管,以便于更精确地获取油、气、水三相流体的相关参数数据。模拟油管的上端与模拟井筒101之间设置有用于固定模拟油管的环形塞,以便于将模拟油管固定设置在模拟井筒101内。为了便于一次性校准具有不同内径的油管,可在井筒钢架112上同时设置两根模拟井筒101,例如可以设置内径为51/2in、7in的两根模拟井筒101,以及在模拟井筒101内设置21/2in的模拟油管,模拟井筒101及模拟油管均为有机玻璃材质的管线。In order to accurately simulate the conditions in the well, a simulated oil pipe can be installed in the inner cavity of the simulated wellbore 101 to simulate the oil pipe in the wellbore 101, so as to obtain relevant parameter data of the three-phase fluid of oil, gas and water more accurately. An annular plug for fixing the simulated oil pipe is arranged between the upper end of the simulated oil pipe and the simulated wellbore 101 so as to fix the simulated oil pipe in the simulated wellbore 101 . In order to facilitate one-time calibration of oil pipes with different inner diameters, two simulated wellbores 101 can be set on the wellbore steel frame 112 at the same time, for example, two simulated wellbores 101 with inner diameters of 5 1/2 in and 7 in can be set, and the simulated wellbores 101 A 2 1/2 in simulated tubing is set inside, and both the simulated wellbore 101 and the simulated tubing are made of plexiglass.

为了便于将检测器件置于该模拟井筒101内,可在模拟井筒101内设置用于固定检测器件的固定件,该固定件的中心或者四周允许多相流流过,该固定件可通过钢丝绳悬挂的方式设置在模拟井筒101内。In order to facilitate placing the detection device in the simulated wellbore 101, a fixture for fixing the detection device can be provided in the simulated wellbore 101, the center or periphery of the fixture allows multiphase flow to flow through, and the fixture can be suspended by a wire rope The method is set in the simulated wellbore 101.

为了避免模拟井筒101在转动过程中,板状支架102及井架103不稳,使井架103固定在墙面上。In order to avoid instability of the plate-shaped support 102 and the derrick 103 during the rotation of the simulated shaft 101 , the derrick 103 is fixed on the wall.

第二方面,本发明实施例提供了一种油气水三相流模拟实验系统,如附图2及附图3所示,该系统包括上述模拟井筒装置1。该系统还包括:油水分离器2、水介质发生器3、第一计量器4、油介质发生器5、第二计量器6、空气介质发生器7、第三计量器8、混合器9。油水分离器2的出水口和出油口分别通过管线与水介质发生器3、油介质发生器5的进口连接;水介质发生器3、第一计量器4以及油介质发生器5、第二计量器6分别顺次连通并汇合后,再与混合器9、模拟井筒101顺次连通。空气介质发生器7、第三计量器8、模拟井筒101顺次连通。模拟井筒101通过管线与油水分离器2的进口连接。In the second aspect, the embodiment of the present invention provides an oil-gas-water three-phase flow simulation experiment system, as shown in Figure 2 and Figure 3 , the system includes the above-mentioned simulation wellbore device 1 . The system also includes: an oil-water separator 2 , a water medium generator 3 , a first meter 4 , an oil medium generator 5 , a second meter 6 , an air medium generator 7 , a third meter 8 , and a mixer 9 . The water outlet and the oil outlet of the oil-water separator 2 are respectively connected with the inlets of the water medium generator 3 and the oil medium generator 5 through pipelines; the water medium generator 3, the first gauge 4 and the oil medium generator 5, the second After the meters 6 are respectively connected and merged in sequence, they are connected with the mixer 9 and the simulated wellbore 101 in sequence. The air medium generator 7, the third gauge 8, and the simulated wellbore 101 are connected in sequence. The simulated wellbore 101 is connected to the inlet of the oil-water separator 2 through a pipeline.

以下就本发明实施例提供的油气水三相流模拟实验系统的工作原理给予描述:The working principle of the oil-gas-water three-phase flow simulation experiment system provided by the embodiment of the present invention is described below:

通过油水分离器2将油、水分离并通过管线分别输入油介质发生器5、水介质发生器3,进入油介质发生器5的油经过第一计量器4计量并输入混合器9中,进入水介质发生器3的水经过第二计量器6计量并输入混合器9中,在混合器9中,油和水混合,并经管线进入模拟井筒101内。与此同时,空气介质发生器7内的空气经过第三计量器8计量,并通过管线与油水混合最后进入模拟井筒101内,此时模拟井筒101内便输入了油、气、水三相混合流体。模拟井筒101中的油、水两相流体还可以通过管线输送到油水分离器2中,以实现油、水的分离及重复使用,空气则可以通过设置在模拟井筒101顶部的排气装置排掉。The oil and water are separated by the oil-water separator 2 and are respectively input into the oil medium generator 5 and the water medium generator 3 through the pipeline, and the oil entering the oil medium generator 5 is metered by the first meter 4 and input into the mixer 9, and enters the The water in the water medium generator 3 is metered through the second meter 6 and input into the mixer 9, in the mixer 9, the oil and water are mixed, and enter the simulated wellbore 101 through the pipeline. At the same time, the air in the air medium generator 7 is measured by the third meter 8, mixed with oil and water through the pipeline, and finally enters the simulated wellbore 101. At this time, the three-phase mixture of oil, gas and water is input into the simulated wellbore 101. fluid. The oil and water two-phase fluid in the simulated wellbore 101 can also be transported to the oil-water separator 2 through pipelines to realize the separation and reuse of oil and water, and the air can be discharged through the exhaust device arranged at the top of the simulated wellbore 101 .

通过油水分离器2、水介质发生器3、第一计量器4、油介质发生器5、第二计量器6、空气介质发生器7、第三计量器8、混合器9与模拟井筒装置1构成油气水三相流模拟实验装置,结构较为简单,成本较低,操作方便,运行维护费用较低。Through the oil-water separator 2, the water medium generator 3, the first meter 4, the oil medium generator 5, the second meter 6, the air medium generator 7, the third meter 8, the mixer 9 and the simulated wellbore device 1 The oil-gas-water three-phase flow simulation experiment device is composed, and the structure is relatively simple, the cost is low, the operation is convenient, and the operation and maintenance cost is low.

如附图3所示,水介质发生器3包括通过管线顺次连通的储水罐、第一离心机构、水稳压罐与第一过滤器,以便于得到纯度高、水压稳定的水相,避免堵塞管线中的其他部件。As shown in Figure 3, the water medium generator 3 includes a water storage tank, a first centrifugal mechanism, a water surge tank and a first filter connected in sequence through pipelines, so as to obtain a water phase with high purity and stable water pressure. , to avoid clogging other components in the pipeline.

油介质发生器5包括通过管线顺次连通的储油罐、第二离心机构、油稳压罐与第二过滤器,以便于得到纯净、油压稳定、流速稳定的油相,以避免堵塞或损害管线中的其他部件。The oil medium generator 5 includes an oil storage tank, a second centrifugal mechanism, an oil surge tank and a second filter connected in sequence through pipelines, so as to obtain a pure oil phase with stable oil pressure and stable flow rate to avoid clogging or damage other components in the pipeline.

第一计量器4、第二计量器6与第三计量器8均包括通过管线顺次连通的电动截止阀、流量计、电动调节阀,设置电动的截止阀和调节阀,便于通过控制电柜来控制流量计的流量,以便于实现模拟具有不同比例的油、气、水三相流。The first meter 4, the second meter 6, and the third meter 8 all include an electric shut-off valve, a flow meter, and an electric regulating valve that are connected in sequence through pipelines. To control the flow of the flowmeter, in order to simulate the three-phase flow of oil, gas and water with different proportions.

空气介质发生器7包括通过管线顺次连通的空气压缩机、储气罐、气体调压阀、减压罐、气稳压罐、第三过滤器,以便于向油、水两相混合流中输入具有纯净、稳定压力特点的气体,以避免堵塞及损害管线内的其他部件。The air medium generator 7 includes an air compressor, an air storage tank, a gas pressure regulating valve, a decompression tank, an air pressure stabilizing tank, and a third filter connected in sequence through pipelines, so as to facilitate oil and water two-phase mixed flow. Input gas with pure, stable pressure characteristics to avoid clogging and damage to other components in the pipeline.

第一离心机构和第二离心机构均为立式离心泵,且立式离心泵的两端均设置有截止阀。Both the first centrifugal mechanism and the second centrifugal mechanism are vertical centrifugal pumps, and both ends of the vertical centrifugal pumps are provided with stop valves.

当模拟井筒101的数量为多个时,以两个模拟井筒101为例,可以设置成如附图3所示的管线与两个模拟井筒101连接,以便于油气水输入模拟井筒101内,即分别输送油气混合物的第一管线和第二管线分别连接两个模拟井筒101的进口,且两条管线上分别设置第一阀门10和第二阀门11,第一管线和第二管线之间还设置有连通的第三管线,第三管线上设置有第三阀门12和第四阀门13,第三阀门12和第四阀门13之间通过另一条管线与油水分离器2的进口连接。通过第一阀门10、第二阀门11、第三阀门12、第四阀门13的相互配合,可实现流体方向的互换。When the number of simulated wellbores 101 is multiple, taking two simulated wellbores 101 as an example, the pipelines shown in Figure 3 can be arranged to be connected to the two simulated wellbores 101, so that oil, gas and water can be input into the simulated wellbores 101, namely The first pipeline and the second pipeline respectively transporting the oil-gas mixture are respectively connected to the inlets of two simulated wellbores 101, and the first valve 10 and the second valve 11 are respectively set on the two pipelines, and there is also a valve between the first pipeline and the second pipeline. There is a third pipeline in communication, and a third valve 12 and a fourth valve 13 are arranged on the third pipeline, and the third valve 12 and the fourth valve 13 are connected to the inlet of the oil-water separator 2 through another pipeline. Through the mutual cooperation of the first valve 10 , the second valve 11 , the third valve 12 and the fourth valve 13 , the exchange of fluid directions can be realized.

本发明实施例提供的油气水三相流模拟实验系统还包括用于控制整个系统的油、水、气三相的流量、流速等相关参数的电控系统。电控系统包括计算机、相关专用软件、智能仪表等部件,通过该电控系统对各种参数进行设定,可实现具有不同参数的油、气、水三相流体进入模拟井筒101内,进而进行相应的模拟实验。The oil-gas-water three-phase flow simulation experiment system provided by the embodiment of the present invention also includes an electronic control system for controlling the flow rate and flow rate of oil, water, and gas three-phase and other related parameters of the entire system. The electronic control system includes computer, related special software, intelligent instruments and other components. By setting various parameters through the electronic control system, the three-phase fluid of oil, gas and water with different parameters can enter the simulated wellbore 101, and then carry out Corresponding simulation experiments.

以上所述仅为本发明的较佳实施例,并不用以限制本发明的保护范围,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in this invention. within the scope of protection of the invention.

Claims (10)

1. a kind of simulation wellbore hole device, including simulation wellbore hole (101), it is characterised in that the simulation wellbore hole device (1) is also wrapped Include:Plate-shaped carrier (102), one end of the simulation wellbore hole (101) are connected by revolving part (110) and the plate-shaped carrier (102) Connect;
The revolving part (110) includes:The intake pipeline connected with the simulation wellbore hole (101) end vertical;
The bearing being fixed on the plate-shaped carrier (102), the bearing include bearing bottom, are oppositely arranged on the bearing On bottom and for fixing two fixed plates of the intake pipeline;
With the plate-shaped carrier (102) right side wall derrick connected vertically (103);
The motor (104) and gear reducer (105) connected by shaft coupling, is arranged at the right part plate of the plate-shaped carrier (102) On face;
With the first pulley (106) of the transmission axis connection of the gear reducer (105);
Positioned at the surface of the first pulley (106) and pass through transverse link and the derrick (103) connected vertically second Pulley (107);
One end is fixed in the first pulley (106), and sequentially around the first pulley (106), the second pulley (107) wirerope (108) for making the other end be connected with the simulation wellbore hole (101);
Power controller (109), for controlling the operation of the motor (104).
2. simulation wellbore hole device according to claim 1, it is characterised in that the intake pipeline and the simulation wellbore hole (101) between dynamic sealing is realized by setting sealing ring.
3. simulation wellbore hole device according to claim 2, it is characterised in that it is 90 ° that described device, which further includes central angle, Wheel disc (111);
One horizontal side wall of the wheel disc (111) is fixed on the plate-shaped carrier (102), and the axis of the rotation axis is worn Cross the center of circle of the wheel disc (111);
0 ° -90 ° of scale is provided with the wheel disc (111).
4. simulation wellbore hole device according to claim 3, it is characterised in that the simulation wellbore hole device (1) further includes well Cylinder steelframe (112);
The simulation wellbore hole (101) is fixed on the pit shaft steelframe (112), and one is provided with the pit shaft steelframe (112) First through hole;
The plate face periphery of the wheel disc (111), which is evenly arranged with, multiple is used for second through hole opposite with the first through hole;
The first through hole and second through hole are penetrated by the pit shaft steelframe (112) by using rod-shaped fixing piece (113) It is fixedly connected with the wheel disc (111).
5. simulation wellbore hole device according to claim 1, it is characterised in that be vertically installed with position on the derrick (103) Spring impinger (114) above the plate-shaped carrier (102);
Height between the spring impinger (114) and the plate-shaped carrier (102) is less than the length of the simulation wellbore hole (101) Degree.
6. simulation wellbore hole device according to claim 3, it is characterised in that described device further includes and the dynamic Control The travel switch (115) that device (109) is electrically connected;
The travel switch (115) is arranged on the top of the wheel disc (111);
When the simulation wellbore hole (101) turns to vertical position, the travel switch (115), the power controller are touched (109) control instruction out of service is sent to the motor (104), the motor (104) is out of service.
7. simulation wellbore hole device according to claim 1, it is characterised in that the inner cavity of the simulation wellbore hole (101) is set There is a simulation oil pipe;
The annular for fixing the simulation oil pipe is provided between the upper end of the simulation oil pipe and the simulation wellbore hole (101) Plug.
8. simulation wellbore hole device according to claim 1, it is characterised in that the derrick (103) is fixed on metope.
9. a kind of oil-gas-water three-phase flow experimental system for simulating, it is characterised in that the system comprises any one of claim 1-8 institutes The simulation wellbore hole device (1) stated;
The system also includes:Oil water separator (2), aqueous medium generator (3), the first meter (4), oil medium generator (5), the second meter (6), air dielectric generator (7), the 3rd meter (8), mixer (9);
The water outlet and oil outlet of the oil water separator (2) pass through pipeline and the aqueous medium generator (3), the oil respectively The import connection of medium generator (5);
The aqueous medium generator (3), first meter (4) and the oil medium generator (5), second metering After device (6) is sequentially connected and converged respectively, then sequentially connect with the mixer (9), the simulation wellbore hole (101);
The air dielectric generator (7), the 3rd meter (8), the simulation wellbore hole (101) sequentially connect;
The simulation wellbore hole (101) is connected by pipeline with the import of the oil water separator (2).
10. system according to claim 9, it is characterised in that the aqueous medium generator (3) is included by pipeline sequentially The water tank of connection, the first centrifugal mechanism, water vacuum tank and first filter;
Oil storage tank that the oil medium generator (5) includes sequentially connecting by pipeline, the second centrifugal mechanism, oily vacuum tank and the Tow filtrator;
First meter (4), second meter (6) include by pipeline sequentially with the 3rd meter (8) Electric check valve, flowmeter, the electric control valve of connection;
Air compressor that the air dielectric generator (7) includes sequentially connecting by pipeline, air accumulator, gas pressure regulating valve, Depressurize tank, gas vacuum tank, the 3rd filter.
CN201710231897.2A 2017-04-11 2017-04-11 Simulation shaft device and oil-gas-water three-phase flow simulation experiment system Active CN107989596B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710231897.2A CN107989596B (en) 2017-04-11 2017-04-11 Simulation shaft device and oil-gas-water three-phase flow simulation experiment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710231897.2A CN107989596B (en) 2017-04-11 2017-04-11 Simulation shaft device and oil-gas-water three-phase flow simulation experiment system

Publications (2)

Publication Number Publication Date
CN107989596A true CN107989596A (en) 2018-05-04
CN107989596B CN107989596B (en) 2021-04-30

Family

ID=62029629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710231897.2A Active CN107989596B (en) 2017-04-11 2017-04-11 Simulation shaft device and oil-gas-water three-phase flow simulation experiment system

Country Status (1)

Country Link
CN (1) CN107989596B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108732064A (en) * 2018-05-18 2018-11-02 中国海洋石油集团有限公司 A kind of high-temperature high-density drilling fluid settlement stability system safety testing device and method
CN108961969A (en) * 2018-06-11 2018-12-07 武汉海王机电工程技术有限公司 A kind of oil well oil-gas water three-phase gas-lift production processing simulation device
CN111127997A (en) * 2020-02-14 2020-05-08 东北石油大学 A wellbore gas-liquid two-phase flow experiment device with variable inclination angle
CN113092732A (en) * 2021-05-07 2021-07-09 青岛理工大学 Natural gas hydrate exploitation simulation and sand production and prevention experimental method
US20220381601A1 (en) * 2021-05-31 2022-12-01 Yangtze University Device for calibrating oil-water two-phase flow sensor
CN116136526A (en) * 2023-03-08 2023-05-19 西南石油大学 Device and method for testing multi-angle drilling fluid settlement stability under high temperature and high pressure conditions

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120304553A1 (en) * 2011-06-02 2012-12-06 National Oilwell Varco, L.P. Drilling rig system with self-elevating drill floor
CN102892970A (en) * 2010-04-12 2013-01-23 国际壳牌研究有限公司 Drilling methods and systems
CN103061745A (en) * 2012-12-18 2013-04-24 中国石油大学(北京) Test device and method for mechanical characteristics of simulation bottom hole assembly
CN203048446U (en) * 2013-01-09 2013-07-10 威乐(中国)水泵系统有限公司 Lifting device of submersible stirrer
CN103323212A (en) * 2013-06-28 2013-09-25 西南石油大学 Experimental device and method for simulating wellbore annulus drilling fluid flow characteristics
CN103452479A (en) * 2013-08-28 2013-12-18 湖南辰州矿业股份有限公司 Angle-adjustable engineering geological drilling rig
CN203463007U (en) * 2013-08-28 2014-03-05 湖南辰州矿业股份有限公司 Adjustable-angle engineering geological drill machine
CN104234708A (en) * 2014-09-11 2014-12-24 西安石油大学 Multifunctional shaft oil-gas-water multi-phase flow simulation experiment device
CN104370229A (en) * 2014-11-18 2015-02-25 中国石油大学(华东) Novel heave compensation system and method for offshore crane
CN204297972U (en) * 2014-11-14 2015-04-29 常州克迈特数控科技有限公司 The machining center of convenient for maintaining
CN204342340U (en) * 2014-11-18 2015-05-20 中国石油大学(华东) Novel offshore crane heave compensation system
CN104776971A (en) * 2015-04-08 2015-07-15 长江大学 Visualization experiment device for liquid and sand carrying of gas flow
CN204532334U (en) * 2015-03-27 2015-08-05 广东石油化工学院 Air drilling takes water experiment instrument test stand angular transformation controlling organization with taking rock
CN204666329U (en) * 2015-04-08 2015-09-23 长江大学 A kind of air-flow is taken liquid and is taken sand visual experimental apparatus
CN204778472U (en) * 2015-07-04 2015-11-18 杭州华泽医药科技有限公司 Construct small -size loop wheel machine
CN205187696U (en) * 2015-12-01 2016-04-27 中铁三局集团有限公司 Rotatable simple and easy lifting device
CN205532573U (en) * 2016-04-13 2016-08-31 中国石油天然气股份有限公司 An experimental device for simulating oil-gas-water three-phase flow

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102892970A (en) * 2010-04-12 2013-01-23 国际壳牌研究有限公司 Drilling methods and systems
US20120304553A1 (en) * 2011-06-02 2012-12-06 National Oilwell Varco, L.P. Drilling rig system with self-elevating drill floor
CN103061745A (en) * 2012-12-18 2013-04-24 中国石油大学(北京) Test device and method for mechanical characteristics of simulation bottom hole assembly
CN203048446U (en) * 2013-01-09 2013-07-10 威乐(中国)水泵系统有限公司 Lifting device of submersible stirrer
CN103323212A (en) * 2013-06-28 2013-09-25 西南石油大学 Experimental device and method for simulating wellbore annulus drilling fluid flow characteristics
CN103452479A (en) * 2013-08-28 2013-12-18 湖南辰州矿业股份有限公司 Angle-adjustable engineering geological drilling rig
CN203463007U (en) * 2013-08-28 2014-03-05 湖南辰州矿业股份有限公司 Adjustable-angle engineering geological drill machine
CN104234708A (en) * 2014-09-11 2014-12-24 西安石油大学 Multifunctional shaft oil-gas-water multi-phase flow simulation experiment device
CN204297972U (en) * 2014-11-14 2015-04-29 常州克迈特数控科技有限公司 The machining center of convenient for maintaining
CN104370229A (en) * 2014-11-18 2015-02-25 中国石油大学(华东) Novel heave compensation system and method for offshore crane
CN204342340U (en) * 2014-11-18 2015-05-20 中国石油大学(华东) Novel offshore crane heave compensation system
CN204532334U (en) * 2015-03-27 2015-08-05 广东石油化工学院 Air drilling takes water experiment instrument test stand angular transformation controlling organization with taking rock
CN104776971A (en) * 2015-04-08 2015-07-15 长江大学 Visualization experiment device for liquid and sand carrying of gas flow
CN204666329U (en) * 2015-04-08 2015-09-23 长江大学 A kind of air-flow is taken liquid and is taken sand visual experimental apparatus
CN204778472U (en) * 2015-07-04 2015-11-18 杭州华泽医药科技有限公司 Construct small -size loop wheel machine
CN205187696U (en) * 2015-12-01 2016-04-27 中铁三局集团有限公司 Rotatable simple and easy lifting device
CN205532573U (en) * 2016-04-13 2016-08-31 中国石油天然气股份有限公司 An experimental device for simulating oil-gas-water three-phase flow

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108732064A (en) * 2018-05-18 2018-11-02 中国海洋石油集团有限公司 A kind of high-temperature high-density drilling fluid settlement stability system safety testing device and method
CN108961969A (en) * 2018-06-11 2018-12-07 武汉海王机电工程技术有限公司 A kind of oil well oil-gas water three-phase gas-lift production processing simulation device
CN111127997A (en) * 2020-02-14 2020-05-08 东北石油大学 A wellbore gas-liquid two-phase flow experiment device with variable inclination angle
CN113092732A (en) * 2021-05-07 2021-07-09 青岛理工大学 Natural gas hydrate exploitation simulation and sand production and prevention experimental method
US20220381601A1 (en) * 2021-05-31 2022-12-01 Yangtze University Device for calibrating oil-water two-phase flow sensor
US11619538B2 (en) * 2021-05-31 2023-04-04 Yangtze University Device for calibrating oil-water two-phase flow sensor
CN116136526A (en) * 2023-03-08 2023-05-19 西南石油大学 Device and method for testing multi-angle drilling fluid settlement stability under high temperature and high pressure conditions
CN116136526B (en) * 2023-03-08 2025-07-11 西南石油大学 Device and method for testing the sedimentation stability of drilling fluid at multiple angles under high temperature and high pressure conditions

Also Published As

Publication number Publication date
CN107989596B (en) 2021-04-30

Similar Documents

Publication Publication Date Title
CN107989596B (en) Simulation shaft device and oil-gas-water three-phase flow simulation experiment system
CN104533404B (en) Visual experimental device for simulating proppant migration in complex fracture network
CN206249696U (en) A kind of liquid, Dual-Phrase Distribution of Gas olid pipeline erosion demonstrating experiment device
CN103048431B (en) Hydrofracture propping agent settlement and permeability testing device
CN109403894B (en) Early overflow and leakage monitoring system for well drilling
CN101881154B (en) Mechanical oil recovery testing platform
CN104879094B (en) A wellbore simulation experiment device for downhole throttling gas wells
CN109209343B (en) Visual simulation experiment device and visual simulation experiment method for liquid-solid two-phase radial flow of rough fracture
CN206329293U (en) One kind simulation gas hydrates horizontal well drilling full hole takes rock experimental provision
CN112986064B (en) Experimental device for simulating karst pipeline network water burst blocking
CN104900131B (en) The experimental method of formation fluid overflow and leakage in a kind of simulation drilling process
CN104196518A (en) Device and method for measuring slippage among gas phase, liquid phase and solid phase in shaft annulus
CN106894982B (en) Pump performance test self assembly experimental provision and its experimental method
CN205532573U (en) An experimental device for simulating oil-gas-water three-phase flow
CN107842357B (en) Hydrate mining artificial lift centrifugal pump characteristic curve testing system and method
CN206960090U (en) A test device for hydraulic sand-carrying capacity of concentric double-pipes in inclined wellbore
CN106401580B (en) Experimental device for lifting wellbore multiphase flow with complex inner boundary and multiple heat sources
CN203037641U (en) Device for settling hydrofracture supporting agent and testing permeability thereof
CN203420706U (en) A variable-angle horizontal well simulation experiment device
CN106441766A (en) Deepwater production vertical pipe multi-phase flow vibration experimental device and method
CN204492810U (en) A gas-liquid two-phase flow variable quality experimental device
CN106680145B (en) Liquid pipeline friction resistance measuring device and method using same
CN107816439A (en) Simulate test device and method that underground true environment carries out centrifugal pump gas-liquid separation efficiency
CN209145582U (en) Visual simulation experimental device for liquid-solid two-phase radial flow in rough fractures
CN206161275U (en) Heterogeneous mixed fluid simulating measurement setup of closed -loop type

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant