CN107964964A CN201710700521.1A CN201710700521A CN107964964A CN 107964964 A CN107964964 A CN 107964964A CN 201710700521 A CN201710700521 A CN 201710700521A CN 107964964 A CN107964964 A CN 107964964A
Authority
CN
China
Prior art keywords
slope
fiber
layer
wire
mesh
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710700521.1A
Other languages
Chinese (zh)
Inventor
董世远
张成梁
荣立明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Jing Xiu Painting Far Ecological Science And Technology Co Ltd
Environmental Protection Research Institute of Light Industry
Original Assignee
Henan Jing Xiu Painting Far Ecological Science And Technology Co Ltd
Environmental Protection Research Institute of Light Industry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Jing Xiu Painting Far Ecological Science And Technology Co Ltd, Environmental Protection Research Institute of Light Industry filed Critical Henan Jing Xiu Painting Far Ecological Science And Technology Co Ltd
Priority to CN201710700521.1A priority Critical patent/CN107964964A/en
Publication of CN107964964A publication Critical patent/CN107964964A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00—Excavations; Bordering of excavations; Making embankments
    • E02D17/20—Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

高陡边坡创面防雨水冲刷纤维制,包括岩质坡形创面,岩质坡形创面的表面,即岩质坡形表面上设置高次团粒基质层,高次团粒基质层外表面覆盖种子层,高次团粒基质层内包含固定在岩质坡形表面的铁丝网,该铁丝网牵拉高次团粒基质,构成铁丝网上固定可降解纤维,该可降解纤维从基质层和种子层穿过并露出种子层表面。本发明设计的高陡边坡创面防雨水冲刷纤维制成技术及其施工方法,通过在基质层设置快速降解纤维,解决基质不能充分吸收水分的技术问题,大大的提高了植被成活率,同时可以有效防止雨水冲刷纤维层,保证纤维层固定在边坡创面上。

High and steep slope wounds are made of rain-proof fiber, including rock slope wounds, and the surface of rock slope wounds, that is, a high-order aggregate matrix layer is set on the rock slope-shaped surface, and the outer surface of the high-order aggregate matrix layer is covered with a seed layer , the high-order aggregate matrix layer contains wire mesh fixed on the slope-shaped rock surface, and the wire mesh pulls the high-order aggregate matrix to form a fixed degradable fiber on the wire mesh. The degradable fiber passes through the matrix layer and the seed layer and exposes the seeds layer surface. The rain-proof anti-scouring fiber manufacturing technology and construction method for high and steep slope wounds designed by the present invention solve the technical problem that the matrix cannot fully absorb water by setting fast-degradable fibers in the matrix layer, greatly improving the survival rate of vegetation, and at the same time can Effectively prevent rainwater from scouring the fiber layer and ensure that the fiber layer is fixed on the slope wound surface.

Description

高陡边坡创面防雨水冲刷纤维制成技术及其施工方法Fabrication technology and construction method of rain-proof fiber for high and steep slope wounds

技术领域technical field

本发明属于园林绿化领域,具体涉及一种高陡边坡创面防雨水冲刷纤维制成技术及其施工方法。The invention belongs to the field of landscaping, and in particular relates to a technique for making anti-rainwater scour fiber for high and steep slope wounds and a construction method thereof.

背景技术Background technique

高速公路路基、堤坝等陡坡环境需要种植植被防止水土流失。由于陡坡上的土层极易被雨水冲涮流失,造成绿色植被不易成活。越是植被不能成活,水土流失就越严重。由此园林绿化工作者想了许多办法,比如喷泥浆造土然后加盖固定网再播种草籽等,但由于泥土层附着力差,坡形坡度较陡,施工方法不规范,在植被根系未深入陡坡坡体之前仍容易产生土层滑落或大量土壤流失,种植的植被无法存活等情况发生,虽然高次团粒材料的应用,使得土壤的团粒性提高,基本解决了作为土壤的基质流失,但是,岩质坡形面,由于坡形的存在,水流速度快,尤其高陡坡的情况,当雨水或者浇水时,包含高次团粒材料的基质没有充分吸收表面流水水分就流失了,使得作为土壤的基质水分不足,造成干旱。Vegetation needs to be planted in steep slope environments such as expressway roadbeds and dams to prevent soil erosion. Because the soil layer on the steep slope is easily washed away by rainwater, it is difficult for green vegetation to survive. The more the vegetation cannot survive, the more serious the soil erosion will be. As a result, landscaping workers have thought of many methods, such as spraying mud to make soil, then covering with fixed nets, and then sowing grass seeds, etc., but due to poor adhesion of the soil layer, steep slope, and irregular construction methods, the vegetation root system is not yet developed. Before going deep into the steep slope, it is still easy to cause the soil layer to slide or a large amount of soil loss, and the planted vegetation cannot survive. Although the application of high-grade aggregate materials improves the aggregate of the soil and basically solves the loss of the soil matrix, but , rocky slope surface, due to the existence of the slope shape, the water flow speed is fast, especially in the case of high and steep slopes. When it rains or waters, the matrix containing high-order aggregate materials will lose without fully absorbing the surface water, making it as a soil. Insufficient moisture in the substrate causes drought.

发明内容Contents of the invention

为了解决现有高次团粒材料的基质不能充分吸收水分的技术问题,本发明设计的高陡边坡创面防雨水冲刷纤维制成技术及其施工方法,通过在基质层设置快速降解纤维,解决基质不能充分吸收水分的技术问题,大大的提高了植被成活率,同时可以有效防止雨水冲刷纤维层,保证纤维层固定在边坡创面上。In order to solve the technical problem that the matrix of existing high-order aggregate materials cannot fully absorb water, the technology and construction method of the high-steep slope wound surface anti-rainwater erosion fiber manufacturing technology and construction method designed by the present invention solve the problem of matrix degradation by setting fast-degradable fibers in the matrix layer. The technical problem of not being able to fully absorb water has greatly improved the survival rate of vegetation, and at the same time can effectively prevent rainwater from scouring the fiber layer and ensure that the fiber layer is fixed on the slope wound surface.

本发明所采用的技术方案如下:The technical scheme adopted in the present invention is as follows:

高陡边坡创面防雨水冲刷纤维制,包括岩质坡形创面,岩质坡形创面的表面,即岩质坡形表面上设置高次团粒基质层,高次团粒基质层外表面覆盖种子层,高次团粒基质层内包含固定在岩质坡形表面的铁丝网,该铁丝网牵拉高次团粒基质,构成铁丝网上固定可降解纤维,该可降解纤维从基质层和种子层穿过并露出种子层表面。High and steep slope wounds are made of rain-proof fiber, including rock slope wounds, and the surface of rock slope wounds, that is, a high-order aggregate matrix layer is set on the rock slope-shaped surface, and the outer surface of the high-order aggregate matrix layer is covered with a seed layer , the high-order aggregate matrix layer contains wire mesh fixed on the slope-shaped rock surface, and the wire mesh pulls the high-order aggregate matrix to form a fixed degradable fiber on the wire mesh. The degradable fiber passes through the matrix layer and the seed layer and exposes the seeds layer surface.

高陡边坡创面防雨水冲刷纤维制,所述可降解纤维,为快速降解塑料薄膜、植物纤维的麦草、稻草、秸秆。The wound surface of the high and steep slope is made of anti-rainwater erosion fiber, and the degradable fiber is wheat straw, rice straw or straw that rapidly degrades plastic film and plant fiber.

所述的高陡边坡创面防雨水冲刷纤维,所述可降解纤维的长度为20-60cm。As for the anti-rainwater scour fiber for high and steep slope wounds, the length of the degradable fiber is 20-60 cm.

所述的高陡边坡创面防雨水冲刷纤维,所述可降解纤维形成横向间隔5-20cm,纵向间隔80-100cm蓬松网状,蓬松网状可降解纤维由麻绳缠绕绑扎在铁丝网上。As for the anti-rainwater scour fibers on high and steep slope wounds, the degradable fibers form a fluffy mesh with a horizontal interval of 5-20 cm and a longitudinal interval of 80-100 cm, and the fluffy mesh-like degradable fibers are wound and bound on the barbed wire by hemp rope.

所述的高陡边坡创面防雨水冲刷纤维,所述可降解纤维形成横向间隔5-20cm,纵向间隔80-100cm蓬松网状,蓬松网状可降解纤维由麻绳缠绕绑扎在铁丝网上,为可降解纤维整理成3—5cm直径的束,在铁丝网网孔之间横向间隔5-20cm自上而下用植物纤维穿插填充网孔,穿插纤维厚度在3cm-5cm,横向两组纤维材料结合部分采用铁丝或麻绳绑扎连接,增加横向纤维骨架部分的韧性,使得每条横向纤维骨架成为一个整体并与底层附着平台铁丝网连接牢固;在横向纤维骨架铺设完毕后纵向部分采用2-3mm粗天然麻绳,纵向间隔80-100cm对横向纤维骨架与铁丝网进行一体绑扎,每条纵向麻绳采用半结方法从顶部开始缠绕绑扎,将铁丝网与横向纤维骨架牢固绑扎在底层铁丝网和锚件上,使得横向主纤维骨架、纵向纤维骨架与底部铁丝网形成交织网状结构。As for the anti-rainwater erosion fiber on the high and steep slope wound, the degradable fiber forms a fluffy mesh with a horizontal interval of 5-20cm and a longitudinal interval of 80-100cm. The degradable fibers are sorted into bundles with a diameter of 3-5cm, and the horizontal interval between the wire mesh meshes is 5-20cm, and the mesh holes are interspersed with plant fibers from top to bottom, and the thickness of the interspersed fibers is 3cm-5cm. Iron wire or hemp rope is bound and connected to increase the toughness of the transverse fiber skeleton, so that each transverse fiber skeleton becomes a whole and is firmly connected with the bottom attachment platform barbed wire; after the horizontal fiber skeleton is laid, the longitudinal part adopts 2-3mm thick natural hemp rope , the longitudinal interval of 80-100cm is used to bind the horizontal fiber skeleton and the barbed wire together. Each longitudinal hemp rope is wound and bound from the top with a half-knot method. The fiber skeleton, the longitudinal fiber skeleton and the bottom barbed wire form an interwoven network structure.

所述的高陡边坡创面防雨水冲刷纤维,所述铁丝网为两层,两层铁丝网间隔设置。As for the anti-rainwater scour fiber on the wound surface of high and steep slopes, the barbed wire net has two layers, and the two layers of barbed wire nets are arranged at intervals.

所述的高陡边坡创面防雨水冲刷纤维,所述固定在岩质坡形表面的丝网,为丝网由U型卡固定在岩质坡形表面;所述铁丝网的材质,为裸露钢丝、铁丝或者钢丝绳;或者所述铁丝网的材质,为包覆塑料的钢丝、铁丝或者钢丝绳,或者尼龙绳。The anti-rainwater scour fiber for the high and steep slope wound surface, the wire mesh fixed on the slope-shaped surface of the rock is a wire mesh fixed on the slope-shaped surface of the rock by U-shaped clips; the material of the wire mesh is exposed steel wire , iron wire or steel wire rope; or the material of the barbed wire mesh is plastic-coated steel wire, iron wire or steel wire rope, or nylon rope.

高陡边坡创面防雨水冲刷纤维制成技术及其施工方法,所述坡形创面绿化施工方法包括如下步骤:High and steep slope wound anti-rainwater erosion fiber manufacturing technology and construction method thereof, the slope-shaped wound greening construction method includes the following steps:

(1)平整坡面、清除浮石;(1) Level the slope and remove pumice;

(2)安装锚杆;(2) Install the anchor rod;

(3)悬挂丝网、铺设基材附着平台;(3) Suspend the wire mesh and lay the substrate attachment platform;

(4)填充加筋、铺设纤维骨架层;(4) Filling and reinforcement, laying fiber skeleton layer;

(5)基材配置、基质营养层材料培养; (5) Substrate configuration, matrix nutrient layer material cultivation;

(6)分级加压、多级加压设备喷播基质层和种子层;(6) Gradual pressurization and multi-stage pressurization equipment spray the substrate layer and seed layer;

(7)再喷播纤维保护层;(7) Then spray the fiber protective layer;

(8)渗灌综合养护系统。(8) Seepage irrigation comprehensive maintenance system.

所述的高陡边坡创面防雨水冲刷纤维制成技术及其施工方法的步骤,包括:The steps of the technology of making the anti-rainwater scour fiber for high and steep slope wounds and its construction method include:

(1)平整坡面、清除浮石,平整坡面应遵循由上而下、分段分区进行的原则,破碎清理松动的岩石和危岩体,对局部异常陡倾的区域进行适当削方处理,采用人工或机械撬挖的方式对强风化层进行挖除,以及创面部分全部的垃圾、杂草、树根、废渣等妨碍施工的障碍物进行清理,创面部分尽量平整顺滑避免有较大的突起和凹陷,对大型孤石采用综合景观处理方案,结合后期整体创面绿化植物结构,尽可能使得孤石能与坡面植被形成和谐独特的景观效果,对清理出来的杂物、废弃物及时转运并合理处置,避免二次污染。(1) Slope leveling and removal of pumice. Slope leveling should follow the principle of top-down, segmented and partitioned, broken and cleaned loose rocks and dangerous rock masses, and properly cut squares in areas with abnormally steep slopes. Use manual or mechanical excavation to excavate the strong weathered layer, and clean up all the garbage, weeds, tree roots, waste residues and other obstacles that hinder the construction of the wound. The wound should be as smooth and smooth as possible to avoid large For protrusions and depressions, a comprehensive landscape treatment plan is adopted for large boulders, combined with the overall wound greening plant structure in the later stage, so that the boulders can form a harmonious and unique landscape effect with the vegetation on the slope as much as possible, and the cleaned up debris and wastes are transported in time And dispose of it reasonably to avoid secondary pollution.

(2)安装锚杆,针对不同坡面地质结构结合当地气候水文特点,采用传统的护坡方式对坡面进行加固处理,如锚杆锚索护坡、格状框条护坡、主动防护网、被动防护网、柔性防护网护坡等常用的几种护坡处理方法,对除水泥喷砼护坡之外的传统坡面进行防护,保持坡面稳定坚固,为后续喷播绿化施工创造良好的前提条件避免次生灾害的产生。(2) Install anchor rods, according to different slope geological structures and local climate and hydrological characteristics, adopt traditional slope protection methods to reinforce the slope surface, such as anchor rod and cable slope protection, lattice frame slope protection, active protection net, passive protection Several commonly used slope protection treatment methods, such as net and flexible protective net slope protection, protect the traditional slope surface except cement sprayed concrete slope protection, keep the slope stable and firm, and create good preconditions for subsequent spraying greening construction to avoid secondary The occurrence of disasters.

(3)悬挂丝网、铺设基材附着平台,采用镀锌钩花铁丝网搭建底层基材附着平台,针对不同的创面选择型号不同的铁丝网,配合U型卡或锚杆固件进行加固;铺设时,铁丝网应顺沿坡面从上到下进行铺设,拉紧至坡底再实施打锚杆固定,然后铺设下一幅;两幅网边搭接宽度不少于一个网眼,应用铁丝扎紧,两网之间有空隙也应用铁丝扎牢固;坡顶用主锚杆固定铁丝网时,应将铁丝网固定在锚杆中间,然后打入;局部凹陷较深坡面铺网前采用人工填充部分种植土或植物纤维,使得坡面整体平整;异常陡峭部分坡体采用挂双层铁丝网增加底层平台强度和附着力,有利于后续基材喷播作业;基材铁丝网平台搭建应对整个坡面形成全覆盖,使得整个铁丝网形成一个统一的受力面,在坡面岩石崩塌、风华剥落时能将局部集中荷载向四周均材质,均匀传递冲击力以充分发挥整个系统的防护能力,即局部受载,整体作用,从而使系统能承受较大的荷载并降低单根锚杆的锚固力要求,从而起到对坡面整体防护的作用;铺设铁丝网完成后,针对局部特别陡峭部分可以在坡面上间隔订横木,横木规格结合坡面实际情况,以有利于喷播基材附着为标准增设横木;横木要与坡面牢固结合,针对不同情况选用U型卡、钢钉、螺纹钢、膨胀栓等多种方式结合加固横木。(3) Hang the wire mesh and lay the base material attachment platform. Use galvanized hooked wire mesh to build the base material attachment platform. Choose different types of wire mesh for different wounds, and use U-shaped clips or anchor rods for reinforcement; when laying, The barbed wire mesh should be laid along the slope from top to bottom, tightened to the bottom of the slope and then anchored to fix it, and then the next one should be laid; the overlapping width of the two mesh sides should not be less than one mesh, and should be tied tightly with iron wire. If there are gaps between the nets, they should also be tied firmly with iron wires; when the main anchor is used to fix the barbed wire on the top of the slope, the barbed wire should be fixed in the middle of the anchor and then driven in; before laying the net on a partially depressed slope, artificially fill part of the planting soil or The plant fiber makes the slope as a whole smooth; the abnormally steep part of the slope is hung with double-layer barbed wire to increase the strength and adhesion of the bottom platform, which is conducive to the subsequent base material spraying operation; The entire barbed wire forms a unified force-bearing surface. When the rocks on the slope collapse and the weather peels off, the local concentrated load can be distributed to the surrounding material, and the impact force can be evenly transmitted to give full play to the protection ability of the entire system, that is, the local load, the overall effect, In this way, the system can bear a large load and reduce the anchoring force requirements of a single anchor rod, thus playing the role of overall protection on the slope; after the wire mesh is laid, cross-bars can be ordered at intervals on the slope for the particularly steep part. The specifications of the crossbar are combined with the actual situation of the slope, and the crossbar is added to facilitate the attachment of the sprayed substrate; the crossbar must be firmly combined with the slope, and various methods such as U-shaped clips, steel nails, screw steel, and expansion bolts are used for different situations. Reinforce the crossbar.

(4)填充加筋、铺设纤维骨架层,采用20-60cm左右长度的天然植物纤维,根据施工所在不同区域选用不同的纤维材料如稻草、麦秸、玉米秸秆等各种农作物秸秆为原材料,整理成3—5cm直径的束,在铁丝网网孔之间横向间隔5-20cm自上而下用植物纤维穿插填充网孔,根据坡面的陡峭成度定间隔,一般坡陡的地方密一些,坡缓的地方间隔大一些,穿插纤维厚度在3cm-5cm左右,并保持穿插纤维材料的透气性、蓬松性,部分凹陷坡面适当增加厚度;横向两组纤维材料结合部分采用铁丝或麻绳绑扎连接,增加横向纤维骨架部分的韧性,使得每条横向纤维骨架成为一个整体并与底层附着平台铁丝网连接牢固;在横向纤维骨架铺设完毕后纵向部分采用2-3mm粗天然麻绳,纵向间隔80-100cm对横向纤维骨架与铁丝网进行一体绑扎,每条纵向麻绳采用半结方法从顶部开始缠绕绑扎,将铁丝网与横向纤维骨架牢固绑扎在底层铁丝网和锚件上,使得横向主纤维骨架、纵向纤维骨架与底部铁丝网形成交织网状结构。(4) Filling and reinforcing, laying fiber skeleton layer, using natural plant fibers with a length of about 20-60cm, and choosing different fiber materials such as straw, wheat straw, corn straw and other crop straws as raw materials according to different areas of construction, and sorting them into For bundles with a diameter of 3-5cm, the horizontal interval between the wire mesh meshes is 5-20cm, and the mesh holes are interspersed with plant fibers from top to bottom. The interval is determined according to the steepness of the slope. The interspersed fiber thickness is about 3cm-5cm, and the air permeability and fluffiness of the interspersed fiber material are maintained, and the thickness of some concave slopes is appropriately increased; the horizontal two groups of fiber materials are bound and connected by iron wire or hemp rope. Increase the toughness of the transverse fiber skeleton, so that each transverse fiber skeleton becomes a whole and is firmly connected with the bottom attachment platform barbed wire; after the horizontal fiber skeleton is laid, the longitudinal part adopts 2-3mm thick natural hemp rope, and the longitudinal interval is 80-100cm. The horizontal fiber skeleton and the barbed wire are bound together, and each longitudinal hemp rope is wound and bound from the top using a half-knot method, and the barbed wire and the horizontal fiber skeleton are firmly bound to the bottom wire mesh and the anchor, so that the horizontal main fiber skeleton, the longitudinal fiber skeleton and the The bottom barbed wire forms an interwoven mesh structure.

(5)基材配置、基质营养层材料培养,营养层是为了满足幼苗生长发育而专门配制的含有多种矿质营养,疏松通气,保水保肥能力强,无病虫害的床土;营养层一般由种植土与腐熟厩肥混合配制而成,经过特殊工艺进行堆积发酵;发酵过后的营养材料与粉碎筛分后的干牛粪以3:1的比例进行混合;培养好的营养基在喷播作业前要测定PH值,结合当地喷播用种植土的酸碱性,有针对性的调节营养基的PH值,使得喷播基材更有利于植物群落的生长;营养层堆积发酵的具体方案:(5) Substrate configuration, matrix nutrient layer material cultivation, the nutrient layer is specially prepared to meet the growth and development of seedlings, containing a variety of mineral nutrients, loose ventilation, strong water and fertilizer retention, and no pests and diseases; the nutrient layer is generally composed of Planting soil and decomposed manure are mixed and prepared, and they are stacked and fermented through a special process; the fermented nutrient material is mixed with the dried cow dung after crushing and screening at a ratio of 3:1; the cultivated nutrient base is sprayed before sowing To determine the pH value, combined with the acidity and alkalinity of the local planting soil for spraying, adjust the pH value of the nutrient base in a targeted manner, so that the spraying base material is more conducive to the growth of the plant community; the specific plan for the accumulation and fermentation of the nutrient layer:

1、物料配比。 1.5吨干牛粪(新鲜粪便约2.5吨)加1公斤有机肥发酵剂,将粉碎后的花生壳40%,玉米芯48%,棉籽饼粉4%~5%,过磷酸钙1%,草木灰1%~2%,尿素0.3%~0.5%,石灰2%~3%的材料比例进行混合,(或锯末、稻壳等替代物)按牛粪与混合材料1:3的比例混匀;1. Ratio of materials. 1.5 tons of dry cow manure (about 2.5 tons of fresh manure) plus 1 kg of organic fertilizer starter, crushed peanut shells 40%, corncobs 48%, cottonseed cake powder 4%~5%, superphosphate 1%, plant ash 1%~2%, 0.3%~0.5% urea, 2%~3% lime for mixing, (or sawdust, rice husk and other substitutes) mixed according to the ratio of cow dung and mixed materials 1:3;

2、物料建堆。在做堆时不能做的太小太矮,太小会影响发酵,高度在1.5米~2米,宽度2米,长度在2~4米以上的堆发酵;2. Building piles of materials. When making a heap, you can’t make it too small or too short, too small will affect the fermentation, the height of the heap is 1.5 meters to 2 meters, the width is 2 meters, and the length is more than 2 to 4 meters;

3、温度要求。启动温度应在15℃以上;3. Temperature requirements. The starting temperature should be above 15°C;

4、水分要求。发酵物料的水分应控制在65%左右;4. Moisture requirements. The moisture content of the fermentation material should be controlled at about 65%;

5、翻堆通气。发酵过程注意适当供氧与翻堆(温度升至75℃或以上时要翻倒几次),升温控制在65℃左右,温度太高对养分有影响;5. Turn the pile for ventilation. During the fermentation process, pay attention to proper oxygen supply and turning over (turn over several times when the temperature rises to 75°C or above), and control the temperature rise at about 65°C. If the temperature is too high, it will affect the nutrients;

6、发酵完成。一般15天内可发酵完成,物料呈黑褐色,温度开始降至常温,表明发酵完成。如锯末、木屑、稻壳类辅料过多时,应延长发酵时间,待充分腐熟;6. Fermentation is complete. Generally, the fermentation can be completed within 15 days, the material is dark brown, and the temperature begins to drop to normal temperature, indicating that the fermentation is completed. If there are too many auxiliary materials such as sawdust, wood chips, and rice husks, the fermentation time should be extended until they are fully decomposed;

7、发酵完成后晾干处理并封袋包装减缓肥效流失;7. After the fermentation is completed, dry it and pack it in bags to slow down the loss of fertilizer effect;

(6)分级加压、多级加压设备喷播基质层和种子层,利用高扬程喷播机和增压泵实现物料充分混合与输送距离的有效结合,通过多级加压配合吊篮作业,在坡面纤维骨架层上喷播6-8cm厚度的基质营养层,配比为,种植土49%,特制营养材料50%,土壤改良剂0.5%,保水剂0.5%,通过专用喷播设备分2-3次将配比好的基质材料喷射在骨架层上,待基质层厚度达到要求后,再喷播1-1.5cm厚拌合有综合草种的种子层,从而完成基材的喷播作业。(6) Gradual pressurization and multi-stage pressurization equipment spray the substrate layer and seed layer, use high-lift spraying machine and booster pump to realize the effective combination of material mixing and conveying distance, and cooperate with hanging basket operation through multi-stage pressurization , Spray and sow a 6-8cm thick matrix nutrient layer on the slope fiber skeleton layer, the ratio is 49% of planting soil, 50% of special nutrient material, 0.5% of soil improver, 0.5% of water retaining agent, through special spraying equipment Spray the matrix material with a good ratio on the skeleton layer in 2-3 times. After the thickness of the matrix layer meets the requirements, spray a 1-1.5cm thick seed layer mixed with comprehensive grass seeds to complete the spraying of the substrate. Broadcast homework.

(7)喷射纤维保护层,喷播完种子层之后,采用特制纤维材料,在种子层上再喷播0.5-1cm左右厚度的特种纤维材料,从而对整个基质层进一步防护; 纤维保护层喷播完成后,用专用无纺布或遮阳网对整个施工作业面进行覆盖防护。(7) Spray the fiber protective layer. After the seed layer is sprayed, use special fiber materials, and then spray special fiber materials with a thickness of about 0.5-1cm on the seed layer, so as to further protect the entire matrix layer; fiber protective layer spraying After completion, use special non-woven fabrics or sunshade nets to cover and protect the entire construction work surface.

(8)渗灌综合养护系统,包括:雨水收集系统、过滤系统、输送管、插入式渗灌头。根据不同坡面铺设不同密度的渗灌管道做到全覆盖。(8) Comprehensive maintenance system for infiltration irrigation, including: rainwater collection system, filtration system, delivery pipe, plug-in infiltration irrigation head. Lay infiltration irrigation pipes of different densities according to different slopes to achieve full coverage.

采用上述技术方案,本发明具有以下有益效果:By adopting the above technical scheme, the present invention has the following beneficial effects:

由于本发明在构成铁丝网的铁丝或者钢丝上固定可降解纤维,该可降解纤维从基质层和种子层穿过并露出种子层表面。这样,可降解纤维降解后,在基质层留下可降解纤维占据的空腔,由于该可降解纤维从基质层和种子层穿过并露出种子层表面,可降解纤维占据的空腔也从基质层和种子层穿过并露出种子层表面,这样,即使高陡坡的情况,水流速度很快,尤其,当雨水或者浇水时,包含高次团粒材料的基质没有充分吸收表面流水水分就流失了,使得作为土壤的基质水分不足,造成干旱。由于可降解纤维,为植物纤维的麦草、稻草、秸秆,降解后补充为基质层肥料;由于可降解纤维的长度为20-60cm,形成横向间隔5-20cm,纵向间隔80-100cm蓬松网状,构成基质中的加强筋,避免喷播在上面的基质浆液流挂,并使结合后的基质牢固,不脱落;可降解纤维缠绕绑扎在铁丝网的部分,降解后形成较大的空腔,这样在基质层中形成粗细不同相互联通的通道,有利于水分的吸收,同时可以有效防止雨水冲刷纤维层,保证纤维层固定在边坡创面上。Since the present invention fixes degradable fibers on the iron wires or steel wires constituting the barbed wire, the degradable fibers pass through the matrix layer and the seed layer and expose the surface of the seed layer. In this way, after the degradable fiber is degraded, the cavity occupied by the degradable fiber is left in the matrix layer. The layer and the seed layer pass through and expose the surface of the seed layer, so that even in the case of high and steep slopes, the water flow rate is very fast, especially when it rains or waters, the substrate containing high-order aggregate materials does not fully absorb the surface water and loses water , making the soil moisture insufficient, resulting in drought. Due to the degradable fibers, wheat straw, rice straw, and straw, which are plant fibers, are degraded and supplemented as matrix layer fertilizers; since the length of the degradable fibers is 20-60cm, a fluffy network with a horizontal interval of 5-20cm and a longitudinal interval of 80-100cm is formed. Constitute the reinforcing ribs in the matrix to prevent the matrix slurry sprayed on it from hanging, and make the combined matrix firm and not fall off; the degradable fiber is wound and bound on the part of the barbed wire, and a large cavity is formed after degradation, so in Interconnected channels of different thicknesses are formed in the matrix layer, which is conducive to the absorption of water, and can effectively prevent rainwater from scouring the fiber layer to ensure that the fiber layer is fixed on the slope wound surface.

附图说明Description of drawings

图1是本发明可降解纤维缠绕绑扎在铁丝网的主视结构示意图;Fig. 1 is the schematic diagram of the front view structure of the degradable fiber of the present invention wound and bound on the barbed wire;

图2是本发明可降解纤维缠绕绑扎在铁丝网的纵向剖面结构示意图。Fig. 2 is a schematic view of the longitudinal section structure of the degradable fiber of the present invention wound and bound on the barbed wire.

岩质坡形创面1,铁丝网2,可降解纤维3,麻绳4。Rock slope wound surface 1, barbed wire 2, biodegradable fiber 3, hemp rope 4.

具体实施方式Detailed ways

下面结合附图对本发明的具体实施方式作进一步详细的说明:Below in conjunction with accompanying drawing, specific embodiment of the present invention is described in further detail:

如图1、图2所示,高陡边坡创面防雨水冲刷纤,包括岩质坡形创面,岩质坡形创面的表面,即岩质坡形表面1上设置高次团粒基质层,高次团粒基质层外表面覆盖种子层,高次团粒基质层内包含固定在岩质坡形表面的铁丝网2,该铁丝网2牵拉高次团粒基质,构成铁丝网上固定可降解纤维3,该可降解纤维从基质层和种子层穿过并露出种子层表面。As shown in Fig. 1 and Fig. 2, the anti-rainwater erosion fiber of the high and steep slope wound surface includes the rocky slope-shaped wound, and the surface of the rocky slope-shaped wound, that is, the high-order aggregate matrix layer is set on the rocky slope-shaped surface 1, and the high The outer surface of the secondary aggregate matrix layer is covered with the seed layer, and the high-order aggregate matrix layer contains a wire mesh 2 fixed on the slope-shaped surface of the rock. The wire mesh 2 pulls the high-order aggregate matrix to form a fixed degradable fiber 3 on the wire mesh. Fibers pass through the matrix layer and the seed layer to expose the surface of the seed layer.

所述的高陡边坡创面防雨水冲刷纤维,所述可降解纤维3,为快速降解塑料薄膜、植物纤维的麦草、稻草、秸秆。The rain-proof fiber for high and steep slope wounds, the degradable fiber 3 is wheat straw, rice straw, or straw that rapidly degrades plastic films and plant fibers.

所述的高陡边坡创面防雨水冲刷纤维,所述可降解纤维3的长度为20-60cm。The length of the degradable fiber 3 is 20-60cm in the anti-rainwater erosion fiber for the high and steep slope wound.

所述的高陡边坡创面防雨水冲刷纤维,所述可降解纤维3形成横向间隔5-20cm,纵向间隔80-100cm蓬松网状,蓬松网状可降解纤维由麻绳4缠绕绑扎在铁丝网2上。As for the anti-rainwater erosion fiber on the high and steep slope wound surface, the degradable fiber 3 forms a fluffy mesh with a horizontal interval of 5-20 cm and a longitudinal interval of 80-100 cm. .

所述的高陡边坡创面防雨水冲刷纤维,所述可降解纤维形成横向间隔5-20cm,纵向间隔80-100cm蓬松网状,蓬松网状可降解纤维由麻绳4缠绕绑扎在铁丝网2上,为可降解纤维3整理成3—5cm直径的束,在铁丝网2网孔之间横向间隔5-20cm自上而下用植物纤维3穿插填充网孔,穿插纤维厚度在3cm-5cm,横向两组纤维材料结合部分采用铁丝或麻绳4绑扎连接,增加横向纤维骨架部分的韧性,使得每条横向纤维骨架成为一个整体并与底层附着平台铁丝网连接牢固;在横向纤维骨架铺设完毕后纵向部分采用2-3mm粗天然麻绳4,纵向间隔80-100cm对横向纤维骨架与铁丝网进行一体绑扎,每条纵向麻绳4采用半结方法从顶部开始缠绕绑扎,将铁丝网与横向纤维骨架牢固绑扎在底层铁丝网和锚件上,使得横向主纤维骨架、纵向纤维骨架与底部铁丝网形成交织网状结构。The anti-rainwater scour fiber for the high and steep slope wound surface, the degradable fiber forms a fluffy mesh with a horizontal interval of 5-20 cm and a longitudinal interval of 80-100 cm, and the fluffy mesh-shaped degradable fiber is wound and bound on the barbed wire 2 by hemp rope 4, Organize the degradable fibers 3 into bundles with a diameter of 3-5cm, and insert and fill the mesh holes with plant fibers 3 from top to bottom at a horizontal interval of 5-20cm between the meshes of the barbed wire 2, with the thickness of the interspersed fibers at 3cm-5cm, two groups in the horizontal direction The fiber material bonding part is bound and connected with iron wire or hemp rope 4 to increase the toughness of the transverse fiber skeleton part, so that each transverse fiber skeleton becomes a whole and is firmly connected with the bottom attachment platform barbed wire; - 3mm thick natural hemp rope 4, with a longitudinal interval of 80-100cm to bind the horizontal fiber skeleton and the barbed wire mesh together, each longitudinal hemp rope 4 is wound and tied from the top with a half-knot method, and the barbed wire mesh and the horizontal fiber skeleton are firmly bound to the bottom barbed wire And the anchor, so that the horizontal main fiber skeleton, the longitudinal fiber skeleton and the bottom barbed wire form an interwoven network structure.

所述的高陡边坡创面防雨水冲刷纤维,所述铁丝网2为两层,两层铁丝网2间隔设置。As for the anti-rainwater scour fiber on the high and steep slope wound surface, the barbed wire 2 has two layers, and the two layers of barbed wire 2 are arranged at intervals.

所述的高陡边坡创面防雨水冲刷纤维,所述固定在岩质坡形表面1的铁丝网2,铁丝网2由U型卡固定在岩质坡形表面1;所述铁丝网1的材质,为裸露钢丝、铁丝或者钢丝绳;或者所述铁丝网的材质,为包覆塑料的钢丝、铁丝或者钢丝绳,或者尼龙绳。The anti-rainwater erosion fiber of the high and steep slope wound, the barbed wire 2 fixed on the rocky slope surface 1, the barbed wire 2 is fixed on the rocky slope surface 1 by a U-shaped clip; the material of the barbed wire 1 is Bare steel wires, iron wires or steel wire ropes; or the material of the barbed wire mesh is plastic-coated steel wires, iron wires or steel wire ropes, or nylon ropes.

高陡边坡创面防雨水冲刷纤维制成技术及其施工方法,所述坡形创面绿化施工方法包括如下步骤:High and steep slope wound anti-rainwater erosion fiber manufacturing technology and construction method thereof, the slope-shaped wound greening construction method includes the following steps:

(1)平整坡面、清除浮石。(1) Level the slope and remove pumice.

(2)安装锚杆。(2) Install the anchor rod.

(3)悬挂铁丝网2、铺设基材附着平台。(3) Hang barbed wire 2. Lay the base material attachment platform.

(4)填充加筋、铺设纤维骨架层。(4) Filling and reinforcement, laying fiber skeleton layer.

(5)基材配置、基质营养层材料培养。 (5) Substrate configuration, matrix nutrient layer material cultivation.

(6)分级加压、多级加压设备喷播基质层和种子层。(6) Gradual pressurization and multi-stage pressurization equipment spray the substrate layer and seed layer.

(7)再喷播纤维保护层。(7) Then spray the fiber protective layer.

(8)渗灌综合养护系统。(8) Seepage irrigation comprehensive maintenance system.

高陡边坡创面防雨水冲刷纤维制成技术及其施工方法,施工方法步骤如下:Fabrication technology and construction method of anti-rainwater erosion fiber for high and steep slope wound surface, the construction method steps are as follows:

(1)平整坡面、清除浮石,平整坡面应遵循由上而下、分段分区进行的原则,破碎清理松动的岩石和危岩体,对局部异常陡倾的区域进行适当削方处理,采用人工或机械撬挖的方式对强风化层进行挖除,以及创面部分全部的垃圾、杂草、树根、废渣等妨碍施工的障碍物进行清理,创面部分尽量平整顺滑避免有较大的突起和凹陷,对大型孤石采用综合景观处理方案,结合后期整体创面绿化植物结构,尽可能使得孤石能与坡面植被形成和谐独特的景观效果,对清理出来的杂物、废弃物及时转运并合理处置,避免二次污染。(1) Slope leveling and removal of pumice. Slope leveling should follow the principle of top-down, segmented and partitioned, broken and cleaned loose rocks and dangerous rock masses, and properly cut squares in areas with abnormally steep slopes. Use manual or mechanical excavation to excavate the strong weathered layer, and clean up all the garbage, weeds, tree roots, waste residues and other obstacles that hinder the construction of the wound. The wound should be as smooth and smooth as possible to avoid large For protrusions and depressions, a comprehensive landscape treatment plan is adopted for large boulders, combined with the overall wound greening plant structure in the later stage, so that the boulders can form a harmonious and unique landscape effect with the vegetation on the slope as much as possible, and the cleaned up debris and wastes are transported in time And dispose of it reasonably to avoid secondary pollution.

(2)安装锚杆,针对不同坡面地质结构结合当地气候水文特点,采用传统的护坡方式对坡面进行加固处理,如锚杆锚索护坡、格状框条护坡、主动防护网、被动防护网、柔性防护网护坡等常用的几种护坡处理方法,对除水泥喷砼护坡之外的传统坡面进行防护,保持坡面稳定坚固,为后续喷播绿化施工创造良好的前提条件避免次生灾害的产生。(2) Install anchor rods, according to different slope geological structures and local climate and hydrological characteristics, adopt traditional slope protection methods to reinforce the slope surface, such as anchor rod and cable slope protection, lattice frame slope protection, active protection net, passive protection Several commonly used slope protection treatment methods, such as net and flexible protective net slope protection, protect the traditional slope surface except cement sprayed concrete slope protection, keep the slope stable and firm, and create good preconditions for subsequent spraying greening construction to avoid secondary The occurrence of disasters.

(3)悬挂铁丝网2、铺设基材附着平台,采用镀锌钩花铁丝网2搭建底层基材附着平台,针对不同的创面选择型号不同的铁丝网2,配合U型卡或锚杆固件进行加固;铺设时,铁丝网2应顺沿坡面从上到下进行铺设,拉紧至坡底再实施打锚杆固定,然后铺设下一幅;两幅网边搭接宽度不少于一个网眼,应用铁丝扎紧,两网之间有空隙也应用铁丝扎牢固;坡顶用主锚杆固定铁丝网2时,应将铁丝网2固定在锚杆中间,然后打入;局部凹陷较深坡面铺网前采用人工填充部分种植土或植物纤维,使得坡面整体平整;异常陡峭部分坡体采用挂双层铁丝网2增加底层平台强度和附着力,有利于后续基材喷播作业;基材铁丝网2平台搭建应对整个坡面形成全覆盖,使得整个铁丝网2形成一个统一的受力面,在坡面岩石崩塌、风华剥落时能将局部集中荷载向四周均材质,均匀传递冲击力以充分发挥整个系统的防护能力,即局部受载,整体作用,从而使系统能承受较大的荷载并降低单根锚杆的锚固力要求,从而起到对坡面整体防护的作用;铺设铁丝网2完成后,针对局部特别陡峭部分可以在坡面上间隔订横木,横木规格结合坡面实际情况,以有利于喷播基材附着为标准增设横木;横木要与坡面牢固结合,针对不同情况选用钢钉、螺纹钢、膨胀栓等多种方式结合加固横木。(3) Suspend barbed wire 2. Lay the substrate attachment platform. Use galvanized hooked wire mesh 2 to build the bottom substrate attachment platform. Choose different types of barbed wire 2 for different wounds, and use U-shaped clips or anchor rods for reinforcement; Lay , the barbed wire 2 should be laid along the slope from top to bottom, tightened to the bottom of the slope and then fixed with anchor rods, and then lay the next one; If there is a gap between the two nets, it should also be tied firmly with iron wires; when the main anchor is used to fix the iron wire 2 on the top of the slope, the iron wire 2 should be fixed in the middle of the anchor, and then driven in; Part of the planting soil or plant fiber is filled to make the slope as a whole smooth; the abnormally steep part of the slope is hung with double-layer barbed wire 2 to increase the strength and adhesion of the bottom platform, which is conducive to the subsequent base material spraying operation; the base material barbed wire 2 platform is built to deal with the entire The slope surface forms full coverage, so that the entire barbed wire 2 forms a unified force-bearing surface, and when the slope rocks collapse or the weather peels off, the local concentrated load can be distributed to the surrounding materials, and the impact force can be evenly transmitted to give full play to the protection ability of the entire system. That is, local loading and overall action, so that the system can withstand larger loads and reduce the anchoring force requirements of a single anchor rod, thereby playing the role of overall protection for the slope; The crossbars can be ordered at intervals on the slope. The specifications of the crossbars are combined with the actual conditions of the slope, and the crossbars are added to facilitate the attachment of the sprayed substrate. The crossbars should be firmly combined with the slope, and steel nails, screw steel, and expansion bolts should be selected for different situations. And other ways to combine reinforcement crossbar.

(4)填充加筋、铺设纤维骨架层,采用20-60cm左右长度的天然植物纤维,根据施工所在不同区域选用不同的纤维材料如稻草、麦秸、玉米秸秆等各种农作物秸秆为原材料,整理成3—5cm直径的束,在铁丝网2网孔之间横向间隔5-20cm自上而下用植物纤维穿插填充网孔,根据坡面的陡峭成度定间隔,一般坡陡的地方密一些,坡缓的地方间隔大一些,穿插纤维厚度在3cm-5cm左右,并保持穿插纤维材料的透气性、蓬松性,部分凹陷坡面适当增加厚度;横向两组纤维材料结合部分采用铁丝或麻绳4绑扎连接,增加横向纤维骨架部分的韧性,使得每条横向纤维骨架成为一个整体并与底层附着平台铁丝网2连接牢固;在横向纤维骨架铺设完毕后纵向部分采用2-3mm粗天然麻绳4,纵向间隔80-100cm对横向纤维骨架与铁丝网2进行一体绑扎,每条纵向麻绳4采用半结方法从顶部开始缠绕绑扎,将铁丝网2与横向纤维骨架牢固绑扎在底层铁丝网2和锚件上,使得横向主纤维骨架、纵向纤维骨架与底部铁丝网2形成交织网状结构,达到增加喷播基材附着力保持喷播基材保水性、透气性、疏水性的目的,在降低喷播基材土的比重同时,增加喷播基材的韧性,防止雨水冲刷、渗透导致喷播层滑坡。植物纤维骨架在覆盖喷播层之后,在土壤中慢慢分解的过程中可以有效补充植物生长所需的有机质,在农作物秸秆分解时产生的有机酸能促进土壤中难溶性磷酸盐转化为弱酸可溶性磷酸盐,大大改善土壤肥效并进一步改善土壤蓄水保墒效果,为表层植物生长提供良好的生长环境,促进创面1微生态循环系统的形成。(4) Filling and reinforcing, laying fiber skeleton layer, using natural plant fibers with a length of about 20-60cm, and choosing different fiber materials such as straw, wheat straw, corn straw and other crop straws as raw materials according to different areas of construction, and sorting them into 3-5cm diameter bundles, between the 2 meshes of the barbed wire at a horizontal interval of 5-20cm from top to bottom, interspersed with plant fibers to fill the mesh holes, and set the interval according to the steepness of the slope. The interval between the slow places is larger, the thickness of the interspersed fibers is about 3cm-5cm, and the air permeability and fluffiness of the interspersed fiber materials are maintained, and the thickness of some concave slopes is appropriately increased; the joint part of the two groups of fiber materials in the horizontal direction is bound with iron wire or hemp rope 4 Connection, increase the toughness of the transverse fiber skeleton part, so that each transverse fiber skeleton becomes a whole and is firmly connected with the bottom attachment platform barbed wire 2; after the horizontal fiber skeleton is laid, the longitudinal part adopts 2-3mm thick natural hemp rope 4, and the longitudinal interval 80-100cm, the horizontal fiber skeleton and the barbed wire 2 are bound together, and each longitudinal hemp rope 4 is wound and bound from the top using a half-knot method, and the barbed wire 2 and the transverse fiber skeleton are firmly bound on the bottom barbed wire 2 and the anchor, so that the horizontal The main fiber skeleton, the longitudinal fiber skeleton and the bottom barbed wire 2 form an interwoven network structure to increase the adhesion of the sprayed substrate to maintain the water retention, air permeability and hydrophobicity of the sprayed substrate, and reduce the specific gravity of the sprayed substrate soil. At the same time, increase the toughness of the sprayed substrate to prevent rainwater erosion and penetration from causing landslides in the sprayed layer. After covering the spraying layer, the plant fiber skeleton can effectively supplement the organic matter needed for plant growth during the process of slowly decomposing in the soil. The organic acid produced when the crop straw decomposes can promote the transformation of insoluble phosphate in the soil into weakly acid-soluble Phosphate can greatly improve the soil fertilizer efficiency and further improve the effect of soil water storage and moisture conservation, provide a good growth environment for the growth of surface plants, and promote the formation of the wound surface 1 micro-ecological circulation system.

(5)基材配置、基质营养层材料培养,营养层是为了满足幼苗生长发育而专门配制的含有多种矿质营养,疏松通气,保水保肥能力强,无病虫害的床土;营养层一般由种植土与腐熟厩肥混合配制而成,经过特殊工艺进行堆积发酵;发酵过后的营养材料与粉碎筛分后的干牛粪以3:1的比例进行混合;培养好的营养基在喷播作业前要测定PH值,结合当地喷播用种植土的酸碱性,有针对性的调节营养基的PH值,使得喷播基材更有利于植物群落的生长。营养层堆积发酵的具体方案:(5) Substrate configuration, matrix nutrient layer material cultivation, the nutrient layer is specially prepared to meet the growth and development of seedlings, containing a variety of mineral nutrients, loose ventilation, strong water and fertilizer retention, and no pests and diseases; the nutrient layer is generally composed of Planting soil and decomposed manure are mixed and prepared, and they are stacked and fermented through a special process; the fermented nutrient material is mixed with the dried cow dung after crushing and screening at a ratio of 3:1; the cultivated nutrient base is sprayed before sowing To determine the pH value, combined with the acidity and alkalinity of the local planting soil for spraying, adjust the pH value of the nutrient base in a targeted manner, so that the spraying substrate is more conducive to the growth of plant communities. The specific scheme of nutrient layer accumulation fermentation:

1、物料配比。 1.5吨干牛粪(新鲜粪便约2.5吨)加1公斤有机肥发酵剂,将粉碎后的花生壳40%,玉米芯48%,棉籽饼粉4%~5%,过磷酸钙1%,草木灰1%~2%,尿素0.3%~0.5%,石灰2%~3%的材料比例进行混合,(或锯末、稻壳等替代物)按牛粪与混合材料1:3的比例混匀。1. Ratio of materials. 1.5 tons of dry cow manure (about 2.5 tons of fresh manure) plus 1 kg of organic fertilizer starter, crushed peanut shells 40%, corncobs 48%, cottonseed cake powder 4%~5%, superphosphate 1%, plant ash 1%~2%, 0.3%~0.5% urea, and 2%~3% lime are mixed, (or sawdust, rice husk and other substitutes) mixed at a ratio of 1:3 between cow dung and mixed materials.

2、物料建堆。在做堆时不能做的太小太矮,太小会影响发酵,高度在1.5米~2米,宽度2米,长度在2~4米以上的堆发酵。2. Building piles of materials. When making a heap, you can’t make it too small or too short. Too small will affect the fermentation. Heap fermentation with a height of 1.5 meters to 2 meters, a width of 2 meters, and a length of more than 2 to 4 meters.

3、温度要求。启动温度应在15℃以上。3. Temperature requirements. The starting temperature should be above 15°C.

4、水分要求。发酵物料的水分应控制在65%左右。4. Moisture requirements. The moisture content of the fermentation material should be controlled at about 65%.

5、翻堆通气。发酵过程注意适当供氧与翻堆(温度升至75℃或以上时要翻倒几次),升温控制在65℃左右,温度太高对养分有影响。5. Turn the pile for ventilation. During the fermentation process, pay attention to proper oxygen supply and turning over the compost (turn over several times when the temperature rises to 75°C or above), and control the temperature rise at around 65°C. Too high a temperature will affect the nutrients.

6、发酵完成。一般15天内可发酵完成,物料呈黑褐色,温度开始降至常温,表明发酵完成。如锯末、木屑、稻壳类辅料过多时,应延长发酵时间,待充分腐熟。6. Fermentation is complete. Generally, the fermentation can be completed within 15 days, the material is dark brown, and the temperature begins to drop to normal temperature, indicating that the fermentation is completed. If there are too many auxiliary materials such as sawdust, wood chips, and rice husks, the fermentation time should be extended until they are fully decomposed.

7、发酵完成后晾干处理并封袋包装减缓肥效流失。7. After the fermentation is completed, dry it and pack it in bags to slow down the loss of fertilizer efficiency.

通过本技术培养的基质层营养土有机质含量高,养分全,土壤结构合理,有益微生物活跃,其特点是土壤有营养、具有良好的土壤生态环境,能满足作物健康成长;保水保肥能力强,能提高植物成活率。The nutrient soil in the matrix layer cultivated by this technology has high organic matter content, complete nutrients, reasonable soil structure, and active beneficial microorganisms. It is characterized by nutritious soil and a good soil ecological environment, which can meet the healthy growth of crops; strong water and fertilizer retention capacity, Can improve plant survival rate.

(6)分级加压、多级加压设备喷播基质层和种子层4,利用高扬程喷播机和增压泵实现物料充分混合与输送距离的有效结合,通过多级加压配合吊篮作业,在坡面纤维骨架层上喷播6-8cm厚度的基质营养层,配比为,种植土49%,特制营养材料50%,土壤改良剂0.5%,保水剂0.5%,通过专用喷播设备分2-3次将配比好的基质材料喷射在骨架层上,待基质层厚度达到要求后,再喷播1-1.5cm厚拌合有综合草种的种子层4,从而完成基材的喷播作业。(6) Gradual pressurization and multi-stage pressurization equipment are used to spray the substrate layer and seed layer 4, and the high-lift sprayer and booster pump are used to achieve the effective combination of material mixing and conveying distance, and the hanging basket is matched with multi-stage pressurization For operation, spray and sow a 6-8cm thick matrix nutrient layer on the slope fiber skeleton layer, with a ratio of 49% planting soil, 50% special nutrient material, 0.5% soil improver, and 0.5% water-retaining agent, through special spraying The equipment sprays the matrix material with a good ratio on the skeleton layer in 2-3 times. After the thickness of the matrix layer reaches the requirement, the seed layer 4 mixed with comprehensive grass species is sprayed to a thickness of 1-1.5cm to complete the substrate. spraying operations.

传统喷播机在物料输送距离上受机器本身限制,很难在超过150米的坡面进行喷播作业。液压式输送泵输送距离可以满足要求,但因为输送泵物料拌合不均匀、粘合剂、土壤改良剂、纤维材料等无法充分搅拌均匀,导致防雨水冲刷效果不能满足要求。所以目前传统的喷播作业设备很难在坡高超过150米的坡面进行有效喷播作业。The traditional spraying machine is limited by the machine itself in terms of material conveying distance, and it is difficult to carry out spraying operations on slopes exceeding 150 meters. The conveying distance of the hydraulic conveying pump can meet the requirements, but because the conveying pump materials are not mixed uniformly, adhesives, soil improvers, fiber materials, etc. cannot be fully stirred evenly, the effect of preventing rainwater erosion cannot meet the requirements. Therefore, it is difficult for traditional spraying operation equipment to perform effective spraying operations on slopes with a slope height of more than 150 meters.

本技术采用恒睿机械专用双级节能高扬程喷播机,配合恒睿机械发明的增压泵从而实现物料充分混合与输送距离的有效结合,特别针对高陡峭边坡采用高空吊篮作业,从而解决了高陡坡面物料输送困难、喷播基材防雨水冲刷效果差、施工效率低、成本过高等传统喷播作业施工中的种种困难,能对高陡峭边坡有效进行喷播绿化作业。通过多级加压配合吊篮作业,很好的解决了目前国内针对超过150米的坡面进行有效喷播作业,本技术突破了传统喷播设备的局限,通过多级、多台加压泵的组合可以有效实现对坡面斜坡长度1000米以内的创面1进行有效喷播作业。本技术填补了国内和国外在喷播绿化中的技术空白,很好的解决了特高陡峭创面1山体的生态修复技术难题。This technology adopts Hengrui Machinery's special two-stage energy-saving high-lift sprayer, cooperates with the booster pump invented by Hengrui Machinery to realize the effective combination of material mixing and conveying distance, especially for high and steep slopes using high-altitude hanging baskets, so that It solves various difficulties in the construction of traditional spraying operations such as difficulty in material transportation on high and steep slopes, poor rain-proof effect of spraying substrates, low construction efficiency, and high cost, and can effectively carry out spraying and greening operations on high and steep slopes. Through multi-stage pressurization and hanging basket operation, it is a good solution to the current domestic effective spraying operation for slopes exceeding 150 meters. This technology breaks through the limitations of traditional spraying equipment, through multi-stage and multiple pressurized pumps The combination can effectively realize the effective spraying operation on the wound surface 1 with a slope length of less than 1000 meters. This technology fills up the technical gap in spraying and greening at home and abroad, and solves the technical problem of ecological restoration of ultra-high and steep wounds 1 mountain.

(7)喷射特种纤维保护层,喷播完种子层4之后,采用特制纤维材料,在种子层4上再喷播0.5-1cm左右厚度的特种纤维材料,从而对整个基质层进一步防护,本技术中采用的特种纤维材料,可以有效对种子层4进行防雨水冲刷防护,同时起到很好的保水、透气作用,避免雨水冲刷导致基质材料滑落导致绿化失败。纤维保护层喷播完成后,用专用无纺布或遮阳网对整个施工作业面进行覆盖防护,保温、保湿的同时对幼苗期植被加强保护作用,进一步防止雨水对喷播基材冲刷,保证最终绿化效果。(7) Spray the special fiber protective layer. After spraying the seed layer 4, use special fiber materials to spray and sow special fiber materials with a thickness of about 0.5-1cm on the seed layer 4, so as to further protect the entire substrate layer. This technology The special fiber material used in the seed layer can effectively protect the seed layer 4 against rain erosion, and at the same time play a good role in water retention and ventilation, so as to prevent the rain erosion from causing the matrix material to slip and cause greening failure. After the spraying of the fiber protective layer is completed, the entire construction work surface is covered and protected with special non-woven fabrics or sunshade nets, which can protect the vegetation at the seedling stage while maintaining heat and moisturizing, and further prevent rainwater from scouring the sprayed base material to ensure the final green effect.

(8)渗灌综合养护系统,包括:雨水收集系统、过滤系统、输送管、插入式渗灌头。根据不同坡面铺设不同密度的渗灌管道做到全覆盖。(8) Comprehensive maintenance system for infiltration irrigation, including: rainwater collection system, filtration system, delivery pipe, plug-in infiltration irrigation head. Lay infiltration irrigation pipes of different densities according to different slopes to achieve full coverage.

插入式根部渗灌装置,包括一圆柱状插杆以及一插杆帽;插杆尾端具有便于插入地下的锥端,其顶面开有延伸至锥端附近的中心孔,插杆下部的中心孔侧壁上开设有多数个渗水孔;所述中心孔内对应套设有过滤网,插杆帽活动盖设在插杆的顶端。本技术采用的插地式根部渗灌装置,插杆插入使用后可拔出,达到可便于清理维护、重复使用的功效,在中心孔内设有过滤网,可阻止土、砂粒通过渗水孔而进入中心孔,避免中心孔受堵,确保渗灌畅通有效。The plug-in root seepage irrigation device includes a cylindrical plunger and a plunger cap; the tail end of the plunger has a conical end for easy insertion into the ground, and its top surface has a central hole extending to the vicinity of the cone end. The center of the lower part of the plunger is A plurality of water seepage holes are opened on the side wall of the hole; a filter screen is correspondingly set in the central hole, and the movable cover of the plunger cap is arranged on the top of the plunger. The ground-inserting root seepage irrigation device adopted in this technology can be pulled out after the inserting rod is inserted to achieve the effect of easy cleaning, maintenance and repeated use. There is a filter in the center hole, which can prevent soil and sand from passing through the seepage hole. Enter the center hole to avoid blockage of the center hole and ensure smooth and effective seepage irrigation.

Claims (9)

1.高陡边坡创面防雨水冲刷纤维,包括岩质坡形创面,岩质坡形创面的表面,即岩质坡形表面上设置高次团粒基质层,高次团粒基质层外表面覆盖种子层,高次团粒基质层内包含固定在岩质坡形表面的铁丝网,该铁丝网牵拉高次团粒基质,其特征在于:构成铁丝网上固定可降解纤维,该可降解纤维从基质层和种子层穿过并露出种子层表面。1. Anti-rain erosion fiber for high and steep slope wounds, including rock slope wounds, the surface of rock slope wounds, that is, a high-order aggregate matrix layer is set on the rock slope surface, and the outer surface of the high-order aggregate matrix layer is covered with seeds layer, the high-order aggregate matrix layer contains wire mesh fixed on the slope-shaped surface of the rock, and the wire mesh pulls the high-order aggregate matrix. Pass through and expose the surface of the seed layer. 2.根据权利要求1所述的高陡边坡创面防雨水冲刷纤维,其特征在于:所述可降解纤维,为快速降解塑料薄膜、植物纤维的麦草、稻草、秸秆。2. The rain-proof fiber for high and steep slope wounds according to claim 1, characterized in that: the degradable fiber is rapidly degradable plastic film, plant fiber wheat straw, straw, straw. 3.根据权利要求2所述的高陡边坡创面防雨水冲刷纤维,其特征在于:所述可降解纤维的长度为20-60cm。3. The anti-rain erosion fiber for high and steep slope wounds according to claim 2, characterized in that: the length of the degradable fiber is 20-60 cm. 4.根据权利要求3所述的高陡边坡创面防雨水冲刷纤维,其特征在于:所述可降解纤维形成横向间隔5-20cm,纵向间隔80-100cm蓬松网状,蓬松网状可降解纤维由麻绳缠绕绑扎在铁丝网上。4. The rain-proof fiber for high and steep slope wounds according to claim 3, characterized in that: the degradable fibers form a fluffy mesh with a horizontal interval of 5-20 cm and a longitudinal interval of 80-100 cm, and the fluffy mesh-shaped degradable fiber Wrapped with hemp rope and tied to the barbed wire. 5.根据权利要求4所述的高陡边坡创面防雨水冲刷纤维,其特征在于:所述可降解纤维形成横向间隔5-20cm,纵向间隔80-100cm蓬松网状,蓬松网状可降解纤维由麻绳缠绕绑扎在铁丝网上,为可降解纤维整理成3—5cm直径的束,在铁丝网网孔之间横向间隔5-20cm自上而下用植物纤维穿插填充网孔,穿插纤维厚度在3cm-5cm,横向两组纤维材料结合部分采用铁丝或麻绳绑扎连接,增加横向纤维骨架部分的韧性,使得每条横向纤维骨架成为一个整体并与底层附着平台铁丝网连接牢固;在横向纤维骨架铺设完毕后纵向部分采用2-3mm粗天然麻绳,纵向间隔80-100cm对横向纤维骨架与铁丝网进行一体绑扎,每条纵向麻绳采用半结方法从顶部开始缠绕绑扎,将铁丝网与横向纤维骨架牢固绑扎在底层铁丝网和锚件上,使得横向主纤维骨架、纵向纤维骨架与底部铁丝网形成交织网状结构。5. The rain-proof fiber for high and steep slope wounds according to claim 4, characterized in that: the degradable fibers form a fluffy mesh with a transverse interval of 5-20 cm and a longitudinal interval of 80-100 cm, and the fluffy mesh-shaped degradable fiber The hemp rope is wound and bound on the barbed wire, and the degradable fibers are arranged into bundles of 3-5cm in diameter, and the horizontal interval between the meshes of the barbed wire is 5-20cm, and the mesh is filled with plant fibers from top to bottom, and the thickness of the interspersed fibers is 3cm- 5cm, the two groups of fiber materials in the horizontal direction are tied with iron wire or hemp rope to increase the toughness of the horizontal fiber skeleton, so that each horizontal fiber skeleton becomes a whole and is firmly connected with the bottom attachment platform barbed wire; after the horizontal fiber skeleton is laid The longitudinal part is made of 2-3mm thick natural hemp rope, and the horizontal fiber skeleton and the barbed wire are bound together at an interval of 80-100cm in the longitudinal direction. On the bottom barbed wire and anchors, the horizontal main fiber skeleton, the longitudinal fiber skeleton and the bottom barbed wire form an interwoven network structure. 6.根据权利要求5所述的高陡边坡创面防雨水冲刷纤维,其特征在于:所述铁丝网为两层,两层铁丝网间隔设置。6. The anti-rainwater erosion fiber for high and steep slope wounds according to claim 5, characterized in that: the barbed wire has two layers, and the two layers of barbed wire are arranged at intervals. 7.根据权利要求6所述的高陡边坡创面防雨水冲刷纤维,其特征在于:所述固定在岩质坡形表面的丝网,为丝网由U型卡固定在岩质坡形表面;所述铁丝网的材质,为裸露钢丝、铁丝或者钢丝绳;或者所述铁丝网的材质,为包覆塑料的钢丝、铁丝或者钢丝绳,或者尼龙绳。7. The anti-rainwater erosion fiber for high and steep slope wounds according to claim 6, characterized in that: the wire mesh fixed on the slope-shaped surface of the rock is that the wire mesh is fixed on the slope-shaped surface of the rock by U-shaped clips ; The material of the barbed wire is bare steel wire, iron wire or steel wire rope; or the material of the barbed wire is plastic-coated steel wire, iron wire or steel wire rope, or nylon rope. 8.高陡边坡创面防雨水冲刷纤维制成技术及其施工方法,其特征在于:所述坡形创面绿化施工方法包括如下步骤:8. The technology and construction method of anti-rainwater erosion fiber for high and steep slope wounds, characterized in that: the greening construction method for slope-shaped wounds includes the following steps: (1)平整坡面、清除浮石;(1) Level the slope and remove pumice; (2)安装锚杆;(2) Install the anchor rod; (3)悬挂丝网、铺设基材附着平台;(3) Suspend the wire mesh and lay the substrate attachment platform; (4)填充加筋、铺设纤维骨架层;(4) Filling and reinforcement, laying fiber skeleton layer; (5)基材配置、基质营养层材料培养; (5) Substrate configuration, matrix nutrient layer material cultivation; (6)分级加压、多级加压设备喷播基质层和种子层;(6) Gradual pressurization and multi-stage pressurization equipment spray the substrate layer and seed layer; (7)再喷播纤维保护层;(7) Then spray the fiber protective layer; (8)渗灌综合养护系统。(8) Seepage irrigation comprehensive maintenance system. 9.根据权利要求8所述的高陡边坡创面防雨水冲刷纤维维制成技术及其施工方法的施工步骤,其特征在于:所述施工方法包括:9. According to claim 8, the high and steep slope wound anti-rainwater erosion fiber maintenance technology and the construction steps of its construction method are characterized in that: the construction method comprises: (1)平整坡面、清除浮石,平整坡面应遵循由上而下、分段分区进行的原则,破碎清理松动的岩石和危岩体,对局部异常陡倾的区域进行适当削方处理,采用人工或机械撬挖的方式对强风化层进行挖除,以及创面部分全部的垃圾、杂草、树根、废渣等妨碍施工的障碍物进行清理,创面部分尽量平整顺滑避免有较大的突起和凹陷,对大型孤石采用综合景观处理方案,结合后期整体创面绿化植物结构,尽可能使得孤石能与坡面植被形成和谐独特的景观效果,对清理出来的杂物、废弃物及时转运并合理处置,避免二次污染;(1) Slope leveling and removal of pumice. Slope leveling should follow the principle of top-down, segmented and partitioned, broken and cleaned loose rocks and dangerous rock masses, and properly cut squares in areas with abnormally steep slopes. Use manual or mechanical excavation to excavate the strong weathered layer, and clean up all the garbage, weeds, tree roots, waste residues and other obstacles that hinder the construction of the wound. The wound should be as smooth and smooth as possible to avoid large For protrusions and depressions, a comprehensive landscape treatment plan is adopted for large boulders, combined with the overall wound greening plant structure in the later stage, so that the boulders can form a harmonious and unique landscape effect with the vegetation on the slope as much as possible, and the cleaned up debris and wastes are transported in time And dispose of it reasonably to avoid secondary pollution; (2)安装锚杆,针对不同坡面地质结构结合当地气候水文特点,采用传统的护坡方式对坡面进行加固处理,如锚杆锚索护坡、格状框条护坡、主动防护网、被动防护网、柔性防护网护坡等常用的几种护坡处理方法,对除水泥喷砼护坡之外的传统坡面进行防护,保持坡面稳定坚固,为后续喷播绿化施工创造良好的前提条件避免次生灾害的产生;(2) Install anchor rods, according to different slope geological structures and local climate and hydrological characteristics, adopt traditional slope protection methods to reinforce the slope surface, such as anchor rod and cable slope protection, lattice frame slope protection, active protection net, passive protection Several commonly used slope protection treatment methods, such as net and flexible protective net slope protection, protect the traditional slope surface except cement sprayed concrete slope protection, keep the slope stable and firm, and create good preconditions for subsequent spraying greening construction to avoid secondary the occurrence of disasters; (3)悬挂丝网、铺设基材附着平台,采用镀锌钩花铁丝网搭建底层基材附着平台,针对不同的创面选择型号不同的铁丝网,配合U型卡或锚杆固件进行加固;铺设时,铁丝网应顺沿坡面从上到下进行铺设,拉紧至坡底再实施打锚杆固定,然后铺设下一幅;两幅网边搭接宽度不少于一个网眼,应用铁丝扎紧,两网之间有空隙也应用铁丝扎牢固;坡顶用主锚杆固定铁丝网时,应将铁丝网固定在锚杆中间,然后打入;局部凹陷较深坡面铺网前采用人工填充部分种植土或植物纤维,使得坡面整体平整;异常陡峭部分坡体采用挂双层铁丝网增加底层平台强度和附着力,有利于后续基材喷播作业;基材铁丝网平台搭建应对整个坡面形成全覆盖,使得整个铁丝网形成一个统一的受力面,在坡面岩石崩塌、风华剥落时能将局部集中荷载向四周均材质,均匀传递冲击力以充分发挥整个系统的防护能力,即局部受载,整体作用,从而使系统能承受较大的荷载并降低单根锚杆的锚固力要求,从而起到对坡面整体防护的作用;铺设铁丝网完成后,针对局部特别陡峭部分可以在坡面上间隔订横木,横木规格结合坡面实际情况,以有利于喷播基材附着为标准增设横木;横木要与坡面牢固结合,针对不同情况选用U型卡、钢钉、螺纹钢、膨胀栓等多种方式结合加固横木;(3) Hang the wire mesh and lay the base material attachment platform. Use galvanized hooked wire mesh to build the base material attachment platform. Choose different types of wire mesh for different wounds, and use U-shaped clips or anchor rods for reinforcement; when laying, The barbed wire mesh should be laid along the slope from top to bottom, tightened to the bottom of the slope and then anchored to fix it, and then the next one should be laid; the overlapping width of the two mesh sides should not be less than one mesh, and should be tied tightly with iron wire. If there are gaps between the nets, they should also be tied firmly with iron wires; when the main anchor is used to fix the barbed wire on the top of the slope, the barbed wire should be fixed in the middle of the anchor and then driven in; before laying the net on a partially depressed slope, artificially fill part of the planting soil or The plant fiber makes the slope as a whole smooth; the abnormally steep part of the slope is hung with double-layer barbed wire to increase the strength and adhesion of the bottom platform, which is conducive to the subsequent base material spraying operation; The entire barbed wire forms a unified force-bearing surface. When the rocks on the slope collapse and the weather peels off, the local concentrated load can be distributed to the surrounding material, and the impact force can be evenly transmitted to give full play to the protection ability of the entire system, that is, the local load, the overall effect, In this way, the system can bear a large load and reduce the anchoring force requirements of a single anchor rod, thus playing the role of overall protection on the slope; after the wire mesh is laid, cross-bars can be ordered at intervals on the slope for the particularly steep part. The specifications of the crossbar are combined with the actual situation of the slope, and the crossbar is added to facilitate the attachment of the sprayed substrate; the crossbar must be firmly combined with the slope, and various methods such as U-shaped clips, steel nails, screw steel, and expansion bolts are used for different situations. Reinforcement crossbar; (4)填充加筋、铺设纤维骨架层,采用20-60cm左右长度的天然植物纤维,根据施工所在不同区域选用不同的纤维材料如稻草、麦秸、玉米秸秆等各种农作物秸秆为原材料,整理成3—5cm直径的束,在铁丝网网孔之间横向间隔5-20cm自上而下用植物纤维穿插填充网孔,根据坡面的陡峭成度定间隔,一般坡陡的地方密一些,坡缓的地方间隔大一些,穿插纤维厚度在3cm-5cm左右,并保持穿插纤维材料的透气性、蓬松性,部分凹陷坡面适当增加厚度;横向两组纤维材料结合部分采用铁丝或麻绳绑扎连接,增加横向纤维骨架部分的韧性,使得每条横向纤维骨架成为一个整体并与底层附着平台铁丝网连接牢固;在横向纤维骨架铺设完毕后纵向部分采用2-3mm粗天然麻绳,纵向间隔80-100cm对横向纤维骨架与铁丝网进行一体绑扎,每条纵向麻绳采用半结方法从顶部开始缠绕绑扎,将铁丝网与横向纤维骨架牢固绑扎在底层铁丝网和锚件上,使得横向主纤维骨架、纵向纤维骨架与底部铁丝网形成交织网状结构;(4) Filling and reinforcing, laying fiber skeleton layer, using natural plant fibers with a length of about 20-60cm, and choosing different fiber materials such as straw, wheat straw, corn straw and other crop straws as raw materials according to different areas of construction, and sorting them into For bundles with a diameter of 3-5cm, the horizontal interval between the wire mesh meshes is 5-20cm, and the mesh holes are interspersed with plant fibers from top to bottom. The interval is determined according to the steepness of the slope. The interspersed fiber thickness is about 3cm-5cm, and the air permeability and fluffiness of the interspersed fiber material are maintained, and the thickness of some concave slopes is appropriately increased; the horizontal two groups of fiber materials are bound and connected by iron wire or hemp rope. Increase the toughness of the transverse fiber skeleton, so that each transverse fiber skeleton becomes a whole and is firmly connected with the bottom attachment platform barbed wire; after the horizontal fiber skeleton is laid, the longitudinal part adopts 2-3mm thick natural hemp rope, and the longitudinal interval is 80-100cm. The horizontal fiber skeleton and the barbed wire are bound together, and each longitudinal hemp rope is wound and bound from the top using a half-knot method, and the barbed wire and the horizontal fiber skeleton are firmly bound to the bottom wire mesh and the anchor, so that the horizontal main fiber skeleton, the longitudinal fiber skeleton and the The barbed wire at the bottom forms an interwoven mesh structure; (5)基材配置、基质营养层材料培养,营养层是为了满足幼苗生长发育而专门配制的含有多种矿质营养,疏松通气,保水保肥能力强,无病虫害的床土;营养层一般由种植土与腐熟厩肥混合配制而成,经过特殊工艺进行堆积发酵;发酵过后的营养材料与粉碎筛分后的干牛粪以3:1的比例进行混合;培养好的营养基在喷播作业前要测定PH值,结合当地喷播用种植土的酸碱性,有针对性的调节营养基的PH值,使得喷播基材更有利于植物群落的生长;营养层堆积发酵的具体方案:(5) Substrate configuration, matrix nutrient layer material cultivation, the nutrient layer is specially prepared to meet the growth and development of seedlings, containing a variety of mineral nutrients, loose ventilation, strong water and fertilizer retention, and no pests and diseases; the nutrient layer is generally composed of Planting soil and decomposed manure are mixed and prepared, and they are stacked and fermented through a special process; the fermented nutrient material is mixed with the dried cow dung after crushing and screening at a ratio of 3:1; the cultivated nutrient base is sprayed before sowing To determine the pH value, combined with the acidity and alkalinity of the local planting soil for spraying, adjust the pH value of the nutrient base in a targeted manner, so that the spraying base material is more conducive to the growth of the plant community; the specific plan for the accumulation and fermentation of the nutrient layer: 1、物料配比: 1.5吨干牛粪(新鲜粪便约2.5吨)加1公斤有机肥发酵剂,将粉碎后的花生壳40%,玉米芯48%,棉籽饼粉4%~5%,过磷酸钙1%,草木灰1%~2%,尿素0.3%~0.5%,石灰2%~3%的材料比例进行混合,(或锯末、稻壳等替代物)按牛粪与混合材料1:3的比例混匀;1. Material ratio: 1.5 tons of dry cow manure (about 2.5 tons of fresh manure) plus 1 kg of organic fertilizer starter, crushed peanut shells 40%, corncobs 48%, cottonseed cake powder 4%~5%, over Calcium phosphate 1%, plant ash 1%~2%, urea 0.3%~0.5%, lime 2%~3% for mixing, (or sawdust, rice husk and other substitutes) according to cow dung and mixed materials 1:3 The ratio is mixed; 2、物料建堆:在做堆时不能做的太小太矮,太小会影响发酵,高度在1.5米~2米,宽度2米,长度在2~4米以上的堆发酵;2. Building a pile of materials: When making a pile, you can’t make it too small or too short. Too small will affect the fermentation. Heap fermentation with a height of 1.5 meters to 2 meters, a width of 2 meters, and a length of 2 to 4 meters; 3、温度要求:启动温度应在15℃以上;3. Temperature requirements: the starting temperature should be above 15°C; 4、水分要求:发酵物料的水分应控制在65%左右;4. Moisture requirement: the moisture content of the fermentation material should be controlled at about 65%; 5、翻堆通气:发酵过程注意适当供氧与翻堆(温度升至75℃或以上时要翻倒几次),升温控制在65℃左右,温度太高对养分有影响;5. Turn over and ventilate: pay attention to proper oxygen supply and turn over during the fermentation process (turn over several times when the temperature rises to 75°C or above), and control the temperature rise at about 65°C. If the temperature is too high, it will affect the nutrients; 6、发酵完成:一般15天内可发酵完成,物料呈黑褐色,温度开始降至常温,表明发酵完成;如锯末、木屑、稻壳类辅料过多时,应延长发酵时间,待充分腐熟;6. Fermentation is completed: Generally, the fermentation can be completed within 15 days. The material is dark brown, and the temperature begins to drop to room temperature, indicating that the fermentation is completed; if there are too many auxiliary materials such as sawdust, wood chips, and rice husks, the fermentation time should be extended until they are fully decomposed; 7、发酵完成后晾干处理并封袋包装减缓肥效流失;7. After the fermentation is completed, dry it and pack it in bags to slow down the loss of fertilizer effect; (6)分级加压、多级加压设备喷播基质层和种子层,利用高扬程喷播机和增压泵实现物料充分混合与输送距离的有效结合,通过多级加压配合吊篮作业,在坡面纤维骨架层上喷播6-8cm厚度的基质营养层,配比为,种植土49%,特制营养材料50%,土壤改良剂0.5%,保水剂0.5%,通过专用喷播设备分2-3次将配比好的基质材料喷射在骨架层上,待基质层厚度达到要求后,再喷播1-1.5cm厚拌合有综合草种的种子层,从而完成基材的喷播作业;(6) Gradual pressurization and multi-stage pressurization equipment spray the substrate layer and seed layer, use high-lift spraying machine and booster pump to realize the effective combination of material mixing and conveying distance, and cooperate with hanging basket operation through multi-stage pressurization , Spray and sow a 6-8cm thick matrix nutrient layer on the slope fiber skeleton layer, the ratio is 49% of planting soil, 50% of special nutrient material, 0.5% of soil improver, 0.5% of water retaining agent, through special spraying equipment Spray the matrix material with a good ratio on the skeleton layer in 2-3 times. After the thickness of the matrix layer meets the requirements, spray a 1-1.5cm thick seed layer mixed with comprehensive grass seeds to complete the spraying of the substrate. broadcast job; (7)喷射纤维保护层,喷播完种子层之后,采用特制纤维材料,在种子层上再喷播0.5-1cm左右厚度的特种纤维材料,从而对整个基质层进一步防护; 纤维保护层喷播完成后,用专用无纺布或遮阳网对整个施工作业面进行覆盖防护;(7) Spray the fiber protective layer. After the seed layer is sprayed, use special fiber materials, and then spray special fiber materials with a thickness of about 0.5-1cm on the seed layer, so as to further protect the entire matrix layer; fiber protective layer spraying After completion, cover and protect the entire construction work surface with special non-woven fabrics or sunshade nets; (8)渗灌综合养护系统,包括:雨水收集系统、过滤系统、输送管、插入式渗灌头;根据不同坡面铺设不同密度的渗灌管道做到全覆盖。(8) Comprehensive maintenance system for infiltration irrigation, including: rainwater collection system, filtration system, delivery pipe, plug-in infiltration irrigation head; infiltration irrigation pipes of different densities are laid according to different slopes to achieve full coverage.
CN201710700521.1A 2017-08-16 2017-08-16 Technology and its construction method is made in high gradient slope surface of a wound preventing rain wash fiber Pending CN107964964A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710700521.1A CN107964964A (en) 2017-08-16 2017-08-16 Technology and its construction method is made in high gradient slope surface of a wound preventing rain wash fiber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710700521.1A CN107964964A (en) 2017-08-16 2017-08-16 Technology and its construction method is made in high gradient slope surface of a wound preventing rain wash fiber

Publications (1)

Publication Number Publication Date
CN107964964A true CN107964964A (en) 2018-04-27

Family

ID=61997532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710700521.1A Pending CN107964964A (en) 2017-08-16 2017-08-16 Technology and its construction method is made in high gradient slope surface of a wound preventing rain wash fiber

Country Status (1)

Country Link
CN (1) CN107964964A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110073757A (en) * 2019-06-11 2019-08-02 轻工业环境保护研究所 A kind of greening method of high precipitous rock slope surface
CN110670606A (en) * 2019-09-24 2020-01-10 山东大学 Straw-type ecological slope protection structure and method
CN110710439A (en) * 2019-11-21 2020-01-21 中国电建集团江西省电力建设有限公司 Vegetation restoration process and structure of high and steep slope
CN112900458A (en) * 2021-01-25 2021-06-04 浙江安盛爆破工程有限公司 Slope protection device and slope restoration method applying same
CN113853862A (en) * 2021-09-29 2021-12-31 大连地拓环境科技有限公司 Trapezoidal spray seeding method for easy-sliding rock slope by using soft soil matrix
CN114658010A (en) * 2022-04-02 2022-06-24 王茜 Mine ecological restoration system
CN115281008A (en) * 2022-07-06 2022-11-04 湖南旭晟环境科技有限公司 Mine restoration is with anti-skidding slope vegetation net convenient to installation
AT526895A1 (en) * 2023-02-09 2024-08-15 Friedrich Franek Dipl Ing Dr Flat element as a greening aid, its design and application

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101089299A (en) * 2007-07-09 2007-12-19 三峡大学 Cement slope ecological recovery method
CN101696574A (en) * 2009-10-30 2010-04-21 河南国网宝泉抽水蓄能有限公司 Ecological protection method for high steep side slope
CN102138428A (en) * 2011-04-07 2011-08-03 北京林丰源生态科技有限公司 Vegetation restoration method adopting plant fiber blanket with assist of slurry spraying
CN102864784A (en) * 2012-10-09 2013-01-09 西安科技大学 Highway soil slope flood damage prevention method
CN104255280A (en) * 2014-10-23 2015-01-07 陈洪凯 High and steep rocky slope vegetation planting method
CN105210619A (en) * 2015-09-29 2016-01-06 路域生态工程有限公司 For microbial matrices blanket and the installation method of side slope, revetment vegetation repair
CN105684687A (en) * 2016-01-05 2016-06-22 中山大学 Slope ecology protection vegetation blanket

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101089299A (en) * 2007-07-09 2007-12-19 三峡大学 Cement slope ecological recovery method
CN101696574A (en) * 2009-10-30 2010-04-21 河南国网宝泉抽水蓄能有限公司 Ecological protection method for high steep side slope
CN102138428A (en) * 2011-04-07 2011-08-03 北京林丰源生态科技有限公司 Vegetation restoration method adopting plant fiber blanket with assist of slurry spraying
CN102864784A (en) * 2012-10-09 2013-01-09 西安科技大学 Highway soil slope flood damage prevention method
CN104255280A (en) * 2014-10-23 2015-01-07 陈洪凯 High and steep rocky slope vegetation planting method
CN105210619A (en) * 2015-09-29 2016-01-06 路域生态工程有限公司 For microbial matrices blanket and the installation method of side slope, revetment vegetation repair
CN105684687A (en) * 2016-01-05 2016-06-22 中山大学 Slope ecology protection vegetation blanket

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110073757A (en) * 2019-06-11 2019-08-02 轻工业环境保护研究所 A kind of greening method of high precipitous rock slope surface
CN110670606A (en) * 2019-09-24 2020-01-10 山东大学 Straw-type ecological slope protection structure and method
CN110710439A (en) * 2019-11-21 2020-01-21 中国电建集团江西省电力建设有限公司 Vegetation restoration process and structure of high and steep slope
CN112900458A (en) * 2021-01-25 2021-06-04 浙江安盛爆破工程有限公司 Slope protection device and slope restoration method applying same
CN112900458B (en) * 2021-01-25 2022-04-22 浙江安盛爆破工程有限公司 Slope protection device and slope restoration method applying same
CN113853862A (en) * 2021-09-29 2021-12-31 大连地拓环境科技有限公司 Trapezoidal spray seeding method for easy-sliding rock slope by using soft soil matrix
CN114658010A (en) * 2022-04-02 2022-06-24 王茜 Mine ecological restoration system
CN115281008A (en) * 2022-07-06 2022-11-04 湖南旭晟环境科技有限公司 Mine restoration is with anti-skidding slope vegetation net convenient to installation
CN115281008B (en) * 2022-07-06 2023-08-25 湖南旭晟环境科技有限公司 Mine is with anti-skidding slope vegetation net of being convenient for installation
AT526895A1 (en) * 2023-02-09 2024-08-15 Friedrich Franek Dipl Ing Dr Flat element as a greening aid, its design and application
AT526895B1 (en) * 2023-02-09 2025-04-15 Friedrich Franek Dipl Ing Dr Flat element as a greening aid, its design and application

Similar Documents

Publication Publication Date Title
CN107964961A (en) High gradient slope surface of a wound top layer moss preventing rain wash technology and its construction method
CN111887067B (en) Method for ecological restoration of artificial vegetation on high and steep rock slope
CN101818499B (en) Revegetation system on steep rocky slopes and implementing method thereof
CN108589743B (en) Ecological geogrid for slope protection
CN106900342A (en) Integrated half rockmass high slope revegetation guard method
CN107964963B (en) Repair technology and construction method for high-steep slope wound surface fiber skeleton aggregate structure
CN104196006B (en) Desertification soil remediation method
CN107382608A (en) A kind of vegetation is multiple green to sow grass seeds by duster auxiliary material, sow grass seeds by duster material and the multiple green construction method of vegetation without native composite fibre
CN102652480A (en) Vegetation recovery method for acid metal mine solid waste stock dump
CN110485441A (en) It repairs with leaching net formula ecological slope protection structure and its construction method of sowing grass seeds by duster in mine
CN112211203A (en) High-strength structure organic fiber composite repair method for high and steep slope
CN108547307A (en) Protecting slope ecology method based on artificial loam
CN110219310A (en) Drainage pipe combines the frame grid type vegetation soil cement bank protecting method and facility of the multi-functional reinforced bands that draw water
CN103821151A (en) Slope greening method and system with water storage and draining functions
CN210946834U (en) Immersed net type ecological slope protection structure for mine restoration
CN114931069A (en) Ecological restoration anti-erosion fiber spray-seeding method
CN116267079B (en) Method for recovering vegetation of coal gangue mountain by using starch-based biodegradable plant-growing bag
CN214301781U (en) A kind of slope ecological restoration structure
CN110761302A (en) Nutrient medium for rock slope greening and construction process thereof
CN113216222A (en) Green plant ecological side slope protection system with communication structure and construction method thereof
CN110073757A (en) A kind of greening method of high precipitous rock slope surface
CN206220106U (en) A kind of greening side slope ruggedized construction
CN107964962B (en) Technology for tightly combining wound surface hair generation and matrix layer of high and steep slope and construction method thereof
CN211531989U (en) A plant living bag and restore domatic system for ecological bank protection
CN212506332U (en) Slope anchor hanging net structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180427

RJ01 Rejection of invention patent application after publication