CN107956225A - Discarded small-size coal mine top panel area administers the processing method for reducing the increment of groundwater - Google Patents

Discarded small-size coal mine top panel area administers the processing method for reducing the increment of groundwater Download PDF

Info

Publication number
CN107956225A
CN107956225A CN201711174589.7A CN201711174589A CN107956225A CN 107956225 A CN107956225 A CN 107956225A CN 201711174589 A CN201711174589 A CN 201711174589A CN 107956225 A CN107956225 A CN 107956225A
Authority
CN
China
Prior art keywords
area
slip casting
increment
groundwater
filled layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711174589.7A
Other languages
Chinese (zh)
Inventor
李曦滨
蒋向明
任虎俊
蔺国华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA NATIONAL ADMINISTRATION OF COAL GEOLOGY HYDROLOGY GEOLOGIC BUREAU
Hydrogeology Bureau of China National Administration of Coal Geology
Original Assignee
CHINA NATIONAL ADMINISTRATION OF COAL GEOLOGY HYDROLOGY GEOLOGIC BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA NATIONAL ADMINISTRATION OF COAL GEOLOGY HYDROLOGY GEOLOGIC BUREAU filed Critical CHINA NATIONAL ADMINISTRATION OF COAL GEOLOGY HYDROLOGY GEOLOGIC BUREAU
Priority to CN201711174589.7A priority Critical patent/CN107956225A/en
Publication of CN107956225A publication Critical patent/CN107956225A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/002Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/004Sealing liners

Abstract

The processing method for reducing the increment of groundwater is administered the present invention provides discarded small-size coal mine top panel area, slip casting filled layer of one interval of water flowing fractured zone bottom as Regional is selected according to the position feature of fissure zone, the construction station of main vertical hole or main round is determined according to the position feature of Goaf Area and earth's surface curved bel;The drilling construction for leading vertical hole or main round is carried out, along main vertical hole or main round deflecting to slip casting filled layer, carries out the drilling construction of branched hole;Region slip casting is carried out by branched hole, slurries are made to be diffused in slip casting filled layer by pressurization, each branched hole grout mixing mutually overlaps, grout curing grouting behind shaft or drift lining filled layer forms closure surface layer, the increment of groundwater of the Atmospheric precipitation to abandoned mine Goaf Area in target area is reduced by blocking surface layer, the excretion of discarded Technique of Coal Mine Drainage is significantly cut down, the processing total amount and operating cost of waste water control is greatly reduced.

Description

Discarded small-size coal mine top panel area administers the processing method for reducing the increment of groundwater
Technical field
The invention belongs to the wastewater treating technology field in colliery, is administered more particularly, to discarded small-size coal mine top panel area Reduce the processing method of the increment of groundwater.
Background technology
There are a large amount of mined out discarded small-size coal mines in south China karst area, in typical southern karst Area, precipitation enters behind coal seam goaf forms the mine water of iron content, manganese superelevation through immersion, and mine water is from pithead or earth's surface Karst corridor, crack outflow heel row enter surface water and underground water, cause serious water environment pollution.
At present, domestic treating mine drainage uses end-o f-pipe -control mode more, builds relevant treatment in the end of sewage discharge and sets Apply, since south China precipitation is big, karst cranny development is more, recharge of ground water condition is preferable, cause sewage load Larger, processing cost remains high.Simultaneously as small coal mines disperse unordered while there are the coal mining cash that a large amount of earth's surfaces are stacked Stone, causes the intractability of waste water of mine very big.
The content of the invention
In view of this, the present invention is directed to propose discarded small-size coal mine top panel area administers the place for reducing the increment of groundwater Reason method, improves the regulation effect of waste water of mine by reducing the waste water increment of mine.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
Discarded small-size coal mine top panel area administers the processing method for reducing the increment of groundwater, includes the following steps:
S1:Region including abandoned mine is set to target area, target area further includes Goaf Area, to underground Earth's surface curved bel on the permeable fissure zone in goaf, fissure zone, fissure zone include roof caving band and water flowing fractured zone;
S2:Worked by survey for the purpose of locating hydrogeological resources and gather target area hydrogeologic condition, determine Goaf Area, top plate Caving zone, water flowing fractured zone, the position feature of earth's surface curved bel;
Determine that underground water enters the water supplementing method of Goaf Area by roof caving band and water flowing fractured zone respectively;
S3:Note of one interval of water flowing fractured zone bottom as Regional is selected according to the position feature of fissure zone Filled layer is starched, determines distribution occasion, trend and the tendency Distribution Characteristics of slip casting filled layer;
S4:The construction station of main vertical hole or main round is determined according to the position feature of Goaf Area and earth's surface curved bel, According to the distribution occasion of slip casting filled layer, trend and the construction location and technical parameter that are inclined to Distribution Characteristics branched hole, branched hole For horizontal pinniform oriented branch hole or fan-shaped branched hole;
S5:The drilling construction for leading vertical hole or main round is carried out, along main vertical hole or main round deflecting to slip casting filled layer, into The drilling construction of row branched hole;
S6:Region slip casting is carried out by branched hole, slurries is diffused in slip casting filled layer by pressurization, it is each A branched hole grout mixing mutually overlaps, and grout curing grouting behind shaft or drift lining filled layer forms closure surface layer, is subtracted by blocking surface layer The increment of groundwater of few Atmospheric precipitation to abandoned mine Goaf Area in target area.
Further, in step S2, survey for the purpose of locating hydrogeological resources work includes geological drilling work and hydrogeophysical prospecting work.
Further, in step S2:
The position feature of Goaf Area includes:Distribution, area, depth and ponding situation;
Roof caving band, water flowing fractured zone position spy include:Distribution, depth and cranny development degree.
Further, in the step S2, the water supplementing method of roof caving band and water flowing fractured zone includes:Vertical Infiltration Infiltrated with lateral runoff;The water supplementing method in Goaf Area domain includes:Water source of inundation in mine, water filling channel.
Further, the interval system of selection of the slip casting filled layer is:The top plate determined by hydrogeologic condition collapses The position feature for falling band, water flowing fractured zone and earth's surface curved bel determines the position feature of slip casting filled layer.
Relative to the prior art, discarded small-size coal mine top panel area of the present invention, which is administered, reduces the increment of groundwater Processing method have the advantage that:At the top of the Goaf Area in discarded colliery, formed and blocked by Regional slip casting Face, closure face reach with respect to the water-permeable passage of water proof cut-out Goaf Area and reduce sewage benefit of the Atmospheric precipitation to abandoned mine To amount, the excretion for discarding Technique of Coal Mine Drainage is significantly cut down, the processing total amount and operating cost of waste water control is greatly reduced.
Brief description of the drawings
The attached drawing for forming the part of the invention is used for providing further understanding the invention, the present invention The schematic description and description of creation is used to explain the invention, does not form the improper restriction to the invention. In the accompanying drawings:
Fig. 1 is the schematic diagram of the target area described in the embodiment of the present invention
Description of reference numerals:
10- Goaf Areas;20- fissure zones;21- roof caving bands;22- water flowing fractured zones;30- earth's surface curved bels; 31- slip casting filled layers.
Embodiment
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the invention can To be mutually combined.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", the orientation or position of the instruction such as " outer " Relation is based on orientation shown in the drawings or position relationship, is for only for ease of description the invention and simplifies description, without It is instruction or implies that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore not It is understood that as the limitation to the invention.In addition, term " first ", " second " etc. are only used for description purpose, without being understood that To indicate or implying relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", One or more this feature can be expressed or be implicitly included to the feature of " second " etc..In the description of the invention In, unless otherwise indicated, " multiple " are meant that two or more.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in the description of the invention Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one Ground connects;Can mechanically connect or be electrically connected;It can be directly connected, the indirect phase of intermediary can also be passed through Even, can be the connection inside two elements.For the ordinary skill in the art, can be managed by concrete condition Solve concrete meaning of the above-mentioned term in the invention.
The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments creates.
Problem to be solved by this invention is:Existing country's treating mine drainage uses end-o f-pipe -control mode more, in sewage Relevant treatment facility is built in the end of discharge, since south China precipitation is big, karst cranny development is more, underground water is mended It is preferable to condition, cause sewage load larger, processing cost remains high.Simultaneously as small coal mines disperse it is unordered, at the same time There are the coal mining spoil that a large amount of earth's surfaces are stacked, cause the intractability of waste water of mine very big.
A kind of discarded small-size coal mine top panel area is provided in a kind of embodiment of the present invention and administers the reduction recharge of ground water The processing method of amount, as shown in Figure 1, including the following steps:
S1:Region including abandoned mine is set to target area, target area further includes Goaf Area 10, Xiang Di Earth's surface curved bel 30 on the permeable fissure zone 20 in lower goaf 10, fissure zone 20, fissure zone 20 include roof caving band 21 With water flowing fractured zone 22;
S2:Worked by survey for the purpose of locating hydrogeological resources and gather target area hydrogeologic condition, determine Goaf Area 10, top Plate caving zone 21, water flowing fractured zone 22, the position feature of earth's surface curved bel 30;
Determine that underground water enters the moisturizing side of Goaf Area 10 by roof caving band 21 and water flowing fractured zone 22 respectively Formula;
S3:One interval of 22 bottom of water flowing fractured zone is selected as Regional according to the position feature of fissure zone 20 Slip casting filled layer 31, determine the distribution occasion of slip casting filled layer 31, trend and tendency Distribution Characteristics;
S4:The construction of main vertical hole or main round is determined according to the position feature of Goaf Area 10 and earth's surface curved bel 30 Station, according to the distribution occasion of slip casting filled layer 31, trend and the construction location and technology ginseng that are inclined to Distribution Characteristics branched hole Number, branched hole are horizontal pinniform oriented branch hole or fan-shaped branched hole;
S5:The drilling construction for leading vertical hole or main round is carried out, along main vertical hole or main round deflecting to slip casting filled layer 31, Carry out the drilling construction of branched hole;
S6:Region slip casting is carried out by branched hole, slurries is diffused in slip casting filled layer 31 by pressurization, often One branched hole grout mixing mutually overlaps, and grout curing grouting behind shaft or drift lining filled layer 31 forms closure surface layer, by blocking face Layer reduces the increment of groundwater of the Atmospheric precipitation to abandoned mine Goaf Area 10 in target area.
The technical program passes through Regional slip casting and forms closure face, envelope at the top of the Goaf Area 10 in discarded colliery Stifled face reaches the sewage supply for reducing Atmospheric precipitation to abandoned mine with respect to the water-permeable passage of water proof cut-out Goaf Area 10 Amount, significantly cuts down the excretion of discarded Technique of Coal Mine Drainage, and the processing total amount and operating cost of waste water control is greatly reduced.
Wherein, the survey for the purpose of locating hydrogeological resources work in above-mentioned steps S2 includes geological drilling work and hydrogeophysical prospecting work;Ground The position feature in lower goaf 10 includes:Distribution, area, depth and ponding situation;Roof caving band 21, water producing fractures 22 position spy of band includes:Distribution, depth and cranny development degree;The moisturizing of roof caving band 21 and water flowing fractured zone 22 Mode includes:Vertical Infiltration and lateral runoff infiltrate;The water supplementing method in 10 domain of Goaf Area includes:Water source of inundation in mine, fill Aquaporin.
In step S3, the interval system of selection of slip casting filled layer 31 is:The roof caving determined by hydrogeologic condition Position feature with 21, water flowing fractured zone 22 and earth's surface curved bel 30 determines the position feature of slip casting filled layer 31.
The foregoing is merely the preferred embodiment of the invention, is not intended to limit the invention creation, all at this Within the spirit and principle of innovation and creation, any modification, equivalent replacement, improvement and so on, should be included in the invention Protection domain within.

Claims (5)

1. discarded small-size coal mine top panel area administers the processing method for reducing the increment of groundwater, it is characterised in that:Including as follows Step:
S1:Region including abandoned mine is set to target area, target area further includes Goaf Area, to Goaf Area Earth's surface curved bel on permeable fissure zone, fissure zone, fissure zone include roof caving band and water flowing fractured zone;
S2:Worked by survey for the purpose of locating hydrogeological resources and gather target area hydrogeologic condition, determine Goaf Area, roof caving Band, water flowing fractured zone, the position feature of earth's surface curved bel;
Determine that underground water enters the water supplementing method of Goaf Area by roof caving band and water flowing fractured zone respectively;
S3:An interval for selecting water flowing fractured zone bottom according to the position feature of fissure zone is filled as the slip casting of Regional Layer, determines distribution occasion, trend and the tendency Distribution Characteristics of slip casting filled layer;
S4:The construction station of main vertical hole or main round is determined according to the position feature of Goaf Area and earth's surface curved bel, according to The distribution occasion of slip casting filled layer, trend and the construction location and technical parameter that are inclined to Distribution Characteristics branched hole, branched hole is water Flat pinniform oriented branch hole or fan-shaped branched hole;
S5:The drilling construction for leading vertical hole or main round is carried out, along main vertical hole or main round deflecting to slip casting filled layer, carries out branch The drilling construction in hole;
S6:Region slip casting is carried out by branched hole, slurries is diffused in slip casting filled layer by pressurization, each branch Hole grout mixing mutually overlaps, and grout curing grouting behind shaft or drift lining filled layer forms closure surface layer, and air is reduced by blocking surface layer The increment of groundwater of the precipitation to abandoned mine Goaf Area in target area.
2. discarded small-size coal mine top panel area according to claim 1 administers the processing method for reducing the increment of groundwater, It is characterized in that:In step S2, survey for the purpose of locating hydrogeological resources work includes geological drilling work and hydrogeophysical prospecting work.
3. discarded small-size coal mine top panel area according to claim 1 administers the processing method for reducing the increment of groundwater, It is characterized in that, in step S2:
The position feature of Goaf Area includes:Distribution, area, depth and ponding situation;
Roof caving band, water flowing fractured zone position spy include:Distribution, depth and cranny development degree.
4. discarded small-size coal mine top panel area according to claim 1 administers the processing method for reducing the increment of groundwater, It is characterized in that, in step S2:
The water supplementing method of roof caving band and water flowing fractured zone includes:Vertical Infiltration and lateral runoff infiltrate;
The water supplementing method in Goaf Area domain includes:Water source of inundation in mine, water filling channel.
5. discarded small-size coal mine top panel area according to claim 1 administers the processing method for reducing the increment of groundwater, It is characterized in that, the interval system of selection of slip casting filled layer is:By the definite roof caving band of survey for the purpose of locating hydrogeological resources work, lead The position feature of water fissure zone and earth's surface curved bel, determines the position feature of slip casting filled layer.
CN201711174589.7A 2017-11-22 2017-11-22 Discarded small-size coal mine top panel area administers the processing method for reducing the increment of groundwater Pending CN107956225A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711174589.7A CN107956225A (en) 2017-11-22 2017-11-22 Discarded small-size coal mine top panel area administers the processing method for reducing the increment of groundwater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711174589.7A CN107956225A (en) 2017-11-22 2017-11-22 Discarded small-size coal mine top panel area administers the processing method for reducing the increment of groundwater

Publications (1)

Publication Number Publication Date
CN107956225A true CN107956225A (en) 2018-04-24

Family

ID=61963942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711174589.7A Pending CN107956225A (en) 2017-11-22 2017-11-22 Discarded small-size coal mine top panel area administers the processing method for reducing the increment of groundwater

Country Status (1)

Country Link
CN (1) CN107956225A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112830531A (en) * 2021-01-04 2021-05-25 吉林大学 Method for treating acidic water pollution source head of abandoned mine
CN112963199A (en) * 2021-02-03 2021-06-15 中煤水文局集团有限公司 Mine underground water regulation and storage method and regulation and storage system
CN113233525A (en) * 2021-04-29 2021-08-10 中国地质调查局武汉地质调查中心 Underground water flow field-based pyrite mountain land sewage pollution remediation and treatment method
CN114592549A (en) * 2022-04-10 2022-06-07 吉林大学 Method for treating source of leachate polluted underground water of valley type tailing pond

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050234A (en) * 2016-05-26 2016-10-26 中国神华能源股份有限公司 Construction technique for protecting underground water in coal mining process
CN106351660A (en) * 2016-09-23 2017-01-25 中国神华能源股份有限公司 Method for regulating and controlling underground water resource of coal mining region
CN106869966A (en) * 2017-03-02 2017-06-20 宿州学院 A kind of method for blocking of absciss layer water supply source
CN107288657A (en) * 2017-08-04 2017-10-24 山东科技大学 The weak cementing rock mass seepage failure area slip casting integrated control method of top of underground

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050234A (en) * 2016-05-26 2016-10-26 中国神华能源股份有限公司 Construction technique for protecting underground water in coal mining process
CN106351660A (en) * 2016-09-23 2017-01-25 中国神华能源股份有限公司 Method for regulating and controlling underground water resource of coal mining region
CN106869966A (en) * 2017-03-02 2017-06-20 宿州学院 A kind of method for blocking of absciss layer water supply source
CN107288657A (en) * 2017-08-04 2017-10-24 山东科技大学 The weak cementing rock mass seepage failure area slip casting integrated control method of top of underground

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112830531A (en) * 2021-01-04 2021-05-25 吉林大学 Method for treating acidic water pollution source head of abandoned mine
CN112830531B (en) * 2021-01-04 2022-02-25 吉林大学 Method for treating acidic water pollution source head of abandoned mine
CN112963199A (en) * 2021-02-03 2021-06-15 中煤水文局集团有限公司 Mine underground water regulation and storage method and regulation and storage system
CN113233525A (en) * 2021-04-29 2021-08-10 中国地质调查局武汉地质调查中心 Underground water flow field-based pyrite mountain land sewage pollution remediation and treatment method
CN114592549A (en) * 2022-04-10 2022-06-07 吉林大学 Method for treating source of leachate polluted underground water of valley type tailing pond

Similar Documents

Publication Publication Date Title
CN107956225A (en) Discarded small-size coal mine top panel area administers the processing method for reducing the increment of groundwater
AU2017410432B2 (en) Method for controlling subsidence area caused by underground mining in adjoining open-pit mine
CN110593874B (en) Full-filling method for strong and weak full mining of coal mine
CN108894727A (en) The water-retaining method of ground level directional drilling slip casting closure overlying strata water producing fractures main channel
CN107935301A (en) Discarded small-size coal mine acid mine water comprehensive processing method
CN105201513A (en) Shaft construction method for rail transit
CN101881169A (en) Sublevel shrinkage caving stage open stope afterwards filling mining method
CN102808628A (en) Construction method of passage of large-section tunnel by water diversion fault
CN103615285A (en) Stope route arrangement mode and method beneficial to roof-contacted filling
CN103032097A (en) Tunnel drainage structure applicable to water-rich strata under unsymmetrical pressure and construction method thereof
CN104632220A (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN105781575A (en) Water-rich stratum pipe piece combination structure and construction method thereof
CN109026012A (en) Vertical shaft surrounding rock supporting structure and its excavation supporting method
CN105332733A (en) Strip filling method of conventional mining face goaf pumping cementing materials
CN109458185A (en) Overlapping crossing parallel tunneling shield construction method up and down
CN105134254B (en) A kind of tunnel surface drilling sleeve pipe sealing device and its operating procedure
CN217841648U (en) Existing shield stratum grouting reinforcement system based on WSS construction method for tunnel downward penetration
CN102678124B (en) Method for back-filling surface subsidence area based on underground metal mineral deposit mining
CN108952725B (en) Low dilution mining method suitable for gentle dip thin ore body
CN109268063A (en) The method for constructing gob side entry retaining shield lane wall using drift-sand filling net cage
CN104088637A (en) Method for second mining of upper-group shallow residual coal under coal seam group conditions
CN106168133A (en) Open-air pit fill method
CN101718100A (en) Underground complex integrally co-constructed implementation design method
CN108798676A (en) A kind of Subway Tunnel main track surface vertical shaft start tunneling method
CN108222945A (en) Utilize the construction method of main and auxiliary layering sap excavating extra-large cross-section Underground Subway Station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180424

RJ01 Rejection of invention patent application after publication