CN107944050A CN201711388615.6A CN201711388615A CN107944050A CN 107944050 A CN107944050 A CN 107944050A CN 201711388615 A CN201711388615 A CN 201711388615A CN 107944050 A CN107944050 A CN 107944050A
Authority
CN
China
Prior art keywords
data
information
electric power
terminal
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711388615.6A
Other languages
Chinese (zh)
Inventor
王继宗
张丽敏
袁军
刘云峰
刘泽群
袁亚琴
卫栋
贾琦
赵昌健
贾培伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
Shanxi Heli Innovation Polytron Technologies Inc
Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Heli Innovation Polytron Technologies Inc, Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical Shanxi Heli Innovation Polytron Technologies Inc
Priority to CN201711388615.6A priority Critical patent/CN107944050A/en
Publication of CN107944050A publication Critical patent/CN107944050A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/27Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/248Presentation of query results
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0635Risk analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention belongs to the technical field of electric power system data management, and in particular to a kind of electric power system data managing method and system based on big data;The technical problem of solution is:There is provided a kind of can improve work efficiency, lifting service quality and electric power system data managing method and system based on big data;The technical solution used for:Including:The data information of backstage typing is received, according to the classification of data, creates different document data bases, and same category of data information is stored in same document data base;The classification of the data includes:Business indicator, work management, rules and regulations, technical standard, responsibility system, power rule of law, atlas information, program management, files on each of customers and assets information;Obtain terminal checks request, and the data information of pre-review is sent to terminal and shown;The present invention is suitable for power domain.

Description

A kind of electric power system data managing method and system based on big data
Technical field
The invention belongs to the technical field of electric power system data management, and in particular to a kind of electric power system based on big data Data managing method and system.
Background technology
Although having formd more comprehensive Information System configuration in the range of Utilities Electric Co., the letter of these systems generation Breath is both dispersed in the different majors system of different departments that are in charge of manging enterprises, is not formed towards whole production safety management data Set, and established due to the data of each system both for professional visual angle and specialized management functional requirement, multi-party letter Lack integrated design and the design of correlation model between breath, it is impossible to formed towards whole operation of power networks state slave power grid to Equipment arrives the specialized visual angle of operation data again, prevents the data between each system to cause to produce wind to power grid security from sharing The analysis of danger cannot cover the possibility risk of power grid security production comprehensively more.
The content of the invention
The present invention overcomes the shortcomings of the prior art, and technical problem to be solved is:Work can be improved by providing one kind Make efficiency, lifting service quality and electric power system data managing method and system based on big data.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of electric power system based on big data Data managing method, including:S101, the data information for receiving backstage typing, according to the classification of data, create different data numbers It is stored according to storehouse, and by same category of data information in same document data base;The classification of the data includes:Business indicator, Work management, rules and regulations, technical standard, responsibility system, power rule of law, atlas information, program management, files on each of customers and assets Information;S102, obtain terminal and check request, and the data information of pre-review sends to terminal and shown.
Preferably, further include:The pre- job content of receiving terminal input;According to pre- job content in subscriber profile data storehouse In find out pre- manipulating object, while the related data information that pre- operation is related to is found out in work management database, and will The information and related data information of pre- manipulating object are sent to terminal.
Specifically, the information of the pre- manipulating object includes:High-risk user list, newly-increased high and low pressure apply to install user list, Customer location, name of contact person, contact phone, the related data information that the pre- operation is related to include:Job instruction and High-risk user's supplies power program;
Preferably, the electric power system data managing method based on big data, further includes:According to the user of pre- manipulating object position Put, generate navigation data and send to terminal.
Preferably, further include:In response to the registration request of user terminal, the log-on message inputted according to user terminal, is User terminal distributes unique login account.
Correspondingly, a kind of electric power system data management system based on big data, including:Document data base establishes unit: The data information of backstage typing is received, according to the classification of data, creates different document data bases, and by same category of data Information is stored in same document data base;The classification of the data includes:Business indicator, work management, rules and regulations, technical bid Standard, responsibility system, power rule of law, atlas information, program management, files on each of customers and assets information;Operate response unit:Obtain and use Family terminal checks request, and the data information of pre-review is sent to terminal and shown.
Preferably, further include:Information receiving unit:The pre- job content of receiving terminal input;Search transmitting element:According to Pre- job content finds out pre- manipulating object in subscriber profile data storehouse, while pre- work is found out in work management database The related data information that industry is related to, and the information of pre- manipulating object and related data information are sent to terminal.
Specifically, the information of the pre- manipulating object includes:High-risk user list, newly-increased high and low pressure apply to install user list, Customer location, name of contact person, contact phone, the related data information that the pre- operation is related to include:Job instruction and High-risk user's supplies power program;
Preferably, the electric power system data management system based on big data, further includes:Navigation generation unit:Made according to pre- The customer location of industry object, generates navigation data and sends to terminal.
Preferably, further include:Register response unit:In response to the registration request of user terminal, inputted according to user terminal Log-on message, distribute unique login account for user terminal.
The present invention has the advantages that compared with prior art:
Method and system provided by the invention, can receive the data information of backstage typing, according to the classification of data, create different Document data base, and same category of data information is stored in same document data base;Request is checked when acquisition terminal, Then the data information of pre-review is sent to terminal and shown;Data information is combed, is classified, stored and managed by the present invention Reason, can complete arrangement, excavation and the analysis to the medium mass data of document data base on the basis of based on big data, work Personnel can have access to required data with terminal, understand Environmental Status in time, save the data to arrange time, greatly improve work effect Rate.
Brief description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings;
Fig. 1 is a kind of flow signal for electric power system data managing method based on big data that the embodiment of the present invention one provides Figure;
Fig. 2 is a kind of structural representation for electric power system data management system based on big data that the embodiment of the present invention one provides Figure;
Fig. 3 is a kind of structural representation of the electric power system data management system based on big data provided by Embodiment 2 of the present invention Figure;
Fig. 4 is a kind of structural representation for electric power system data management system based on big data that the embodiment of the present invention three provides Figure;
Fig. 5 is a kind of structural representation for electric power system data management system based on big data that the embodiment of the present invention four provides Figure;
In figure:101 establish unit for document data base, and 102 be operation response unit, and 103 be information receiving unit, and 104 be to look into Transmitting element is looked for, 105 be navigation generation unit, and 106 be registration response unit.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The part of the embodiment of the present invention, instead of all the embodiments;Based on the embodiments of the present invention, ordinary skill people Member's all other embodiments obtained without creative efforts, belong to the scope of protection of the invention.
Fig. 1 is that a kind of flow for electric power system data managing method based on big data that the embodiment of the present invention one provides is shown It is intended to, as shown in Figure 1, a kind of electric power system data managing method based on big data, including:
S101, the data information for receiving backstage typing, according to the classification of data, create different document data bases, and will be same The data information of classification is stored in same document data base;The classification of the data includes:Business indicator, work management, regulations System, technical standard, responsibility system, power rule of law, atlas information, program management, files on each of customers and assets information;
S102, obtain terminal and check request, and the data information of pre-review sends to terminal and shown.
The present invention is by by the data information typing of work management, effectively improving work of the company in Production&Operations Management Make efficiency, alleviate the labor intensity of staff;By the way that the data information of rules and regulations, technical standard, power rule of law is recorded Enter, staff can according to affiliated function's authority, attention rate, freely subscribe to system content, learned whenever and wherever possible easy to staff Practise relevant knowledge, it is possible to increase professional degree, lifting service quality;By the way that the data information of responsibility system, program management is recorded Enter, embody the idea in management of the supervision of corporate security quality and the supervision of operation flow overall process;By the way that the data of power rule of law is believed Typing is ceased, the popularization and a surname for carrying out legal knowledge are passed through, and help staff to improve legal consciousness;By by files on each of customers, assets The data information typing of information, realizes the basic data management to main specialties such as company's fortune inspection, marketing, integrated managements, convenient Inquiry is had access to, accomplishes assets information comprehensive management.
Specifically, the business indicator includes:Delivery/electricity sales amount, line loss per unit, average electricity price, Business Process System, 10,000 Volt public line breaking number, rural comprehensive rate of qualified voltage, city net/rural power grids power supply reliability, work order report number for repairment, complain and lift 9 class business indicators, the staff such as report number regularly update data, calculate the aggregate-value and same ratio, ring ratio of whole year; The work management includes:Backlog and item of having handled affairs in backlog and item of having handled affairs, marketing work in fortune inspection work, Check outline, standard operation guiding book, repair apparatus correlation atlas related content;The rules and regulations include:Cities and counties of province are each The rules and regulations of net company of level other country are detailed;The technical standard includes:National standard, enterprise's mark, the technical standard of rower are detailed;Institute Stating responsibility system includes:Safety Production Target is detailed, marketing " two systems " is detailed, safety responsibility system is detailed;Institute Stating power rule of law includes:Power monitoring content, labor legal risk content, roundup content;Wrapped in the atlas information Include:Outlet's distribution map, regulation and control operation atlas, 10KV power grids geographical wiring diagram, 10KV individual line subscribers geographical wiring diagram, family table Location drawing etc.;The program management includes:Emergency preplan, accident class prediction scheme, natural calamity class prediction scheme, public health class Prediction scheme, social safety accident event class prediction scheme, scheduling emergency preplan;The files on each of customers includes:High pressure, low pressure, photovoltaic, height The User Profile information of danger user;The assets information includes:Logistics machine account information and Unit account of plant information, logistics machine account information Specifically include:Information of vehicles, house property information, real estate information, Unit account of plant information specifically include 10KV line names, distribution transformer Device detail, 10KV equipment accounts, 10KV overhead line structures account, 0.4kV shaft towers account, comprehensive distribution box(Screen)Equipment account, remain Summary sheet is protected at aftercurrent action protector account, family.
Further, the electric power system data managing method based on big data, further includes:Receiving terminal inputs pre- Job content;Pre- manipulating object is found out in subscriber profile data storehouse according to pre- job content, while in work management data The related data information that pre- operation is related to is found out in storehouse, and the information of pre- manipulating object and related data information were sent to end End;According to the customer location of pre- manipulating object, generate navigation data and send to terminal, help electric-examination to look into staff and quickly arrive Reach, improve work efficiency.
Specifically, the information of the pre- manipulating object includes:High-risk user list, newly-increased high and low pressure apply to install user list, Customer location, name of contact person, contact phone, the related data information that the pre- operation is related to include:Job instruction and High-risk user's supplies power program.
Power supply station's tissue according to belonging to pre- manipulating object, by the condition quick-searchings such as numbering, classification of powering, has access to it The archive informations such as contact phone, power supply plan, contract for the supply and use of electricity, project verification file, environment impact assessment statement, soil licensing, and provide The positional information of pre- manipulating object, is positioned, and quickly generates navigation information, guides powered operation personnel quickly to arrive at place Ground.
Fortune inspection staff is in advance by year, month, day repair schedule and live risk management and control measure whole typing data Storehouse, while association standard operating procedure system is searched by action;On the maintenance same day, automatic push service work to maintenance Staff's account, can click on check that same day service work content, working time, Risk-warning, security management and control are arranged after login Apply, work director and work teams and groups, specific responsibility information, system automatic push this action degree of association such as guardian it is highest Standard operation guiding book, and related geographical wiring diagram and electrical equipment primary connection figure.
Specifically, the high-risk user list that the same day needs to check is pushed to and uses electric-examination by power utility check squad leader with inspection outline Look into staff's terminal, while by high-risk files on each of customers, automatic for power program, customer location and name of contact person, phone Association pushes to power utility check staff terminal, while corresponding job instruction is opened, so as to improve power utility check work people The service ability of member;The Business Process System specific responsibility high and low pressure that increases the same day newly, which applies to install user list and pushes to the electricity consumption of business class, to be reconnoitred Personnel, and the main geographical wiring diagram auto-associating for circuit of the taiwan area information near the user address and taiwan area is pushed, at the same time Corresponding standard operation guiding book is opened, so as to help staff precisely to quickly find taiwan area after reaching scene and help User completes electricity consumption preliminry basic research.
Further, the electric power system data managing method based on big data, further includes:In response to user terminal Registration request, the log-on message inputted according to user terminal, unique login account is distributed for user terminal.
The present invention uses the Encryption Standard algorithm of high security, and the peace of server end need to be first obtained when terminal obtains data Full certification, will also use safer Advanced Encryption Standard, real using quick-searching and Encryption Algorithm based on hash algorithm The quick encryption and decryption of existing file;In daily O&M, repairing service, staff can have access to required data with terminal, in time Understand Environmental Status, save the data to arrange time, greatly improve work efficiency.The present invention can on the basis of based on big data Arrangement, excavation and the analysis to subscriber profile data storehouse, the medium mass data of work management database are completed, enables business department Enough to select push channel and push mode according to actual needs, information should collect the number such as behavior and preference of user after the completion of pushing According to, by using effect analysis by useful information supplement into big data, so as to fulfill the closed loop of information push.
Fig. 2 is that a kind of structure for electric power system data management system based on big data that the embodiment of the present invention one provides is shown It is intended to, as shown in Fig. 2, a kind of electric power system data management system based on big data, including:
Document data base establishes unit 101:The data information of backstage typing is received, according to the classification of data, creates different money Expect database, and same category of data information is stored in same document data base;The classification of the data includes:Operation refers to Mark, work management, rules and regulations, technical standard, responsibility system, power rule of law, atlas information, program management, files on each of customers and Assets information;
Operate response unit 102:Obtain user terminal checks request, and the data information of pre-review is sent to terminal and shown Show.
Fig. 3 shows for a kind of structure of the electric power system data management system based on big data provided by Embodiment 2 of the present invention It is intended to, as shown in figure 3, on the basis of embodiment one, the electric power system data management system based on big data, is also wrapped Include:
Information receiving unit 103:The pre- job content of receiving terminal input;
Search transmitting element 104:Pre- manipulating object is found out in subscriber profile data storehouse according to pre- job content, while in work Make to find out the related data information that pre- operation is related in management database, and the information of pre- manipulating object and related data are believed Breath is sent to terminal.
Specifically, the information of the pre- manipulating object includes:High-risk user list, newly-increased high and low pressure apply to install user list, Customer location, name of contact person, contact phone, the related data information that the pre- operation is related to include:Job instruction and High-risk user's supplies power program;
Fig. 4 is a kind of structural representation for electric power system data management system based on big data that the embodiment of the present invention three provides Figure, as shown in figure 4, on the basis of embodiment two, the electric power system data management system based on big data, further includes:
Navigation generation unit 105:According to the customer location of pre- manipulating object, generate navigation data and send to terminal.
Fig. 5 is that a kind of structure for electric power system data management system based on big data that the embodiment of the present invention four provides is shown It is intended to, as shown in figure 5, on the basis of embodiment three, a kind of electric power system data management system based on big data, is also wrapped Include:
Register response unit 106:In response to the registration request of user terminal, the log-on message that is inputted according to user terminal, for The unique login account of family terminal distribution.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe is described in detail the present invention with reference to foregoing embodiments, it will be understood by those of ordinary skill in the art that:Its according to Can so modify to the technical solution described in foregoing embodiments, either to which part or all technical characteristic into Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (8)

  1. A kind of 1. electric power system data managing method based on big data, it is characterised in that:Including:
    S101, the data information for receiving backstage typing, according to the classification of data, create different document data bases, and will be same The data information of classification is stored in same document data base;The classification of the data includes:Business indicator, work management, regulations System, technical standard, responsibility system, power rule of law, atlas information, program management, files on each of customers and assets information;
    S102, obtain terminal and check request, and the data information of pre-review sends to terminal and shown.
  2. A kind of 2. electric power system data managing method based on big data according to claim 1, it is characterised in that:Also wrap Include:
    The pre- job content of receiving terminal input;
    Pre- manipulating object is found out in subscriber profile data storehouse according to pre- job content, while is looked into work management database The related data information that pre- operation is related to is found out, and the information of pre- manipulating object and related data information are sent to terminal.
  3. A kind of 3. electric power system data managing method based on big data according to claim 2, it is characterised in that:It is described The information of pre- manipulating object includes:High-risk user list, newly-increased high and low pressure apply to install user list, customer location, contact person's surname Name, contact phone, the related data information that the pre- operation is related to include:Job instruction and the confession electricity consumption side of high-risk user Case;
    The electric power system data managing method based on big data, further includes:
    According to the customer location of pre- manipulating object, generate navigation data and send to terminal.
  4. A kind of 4. electric power system data managing method based on big data according to claim 1, it is characterised in that:Also wrap Include:
    In response to the registration request of user terminal, the log-on message inputted according to user terminal is unique for user terminal distribution Login account.
  5. A kind of 5. electric power system data management system based on big data, it is characterised in that:Including:
    Document data base establishes unit:The data information of backstage typing is received, according to the classification of data, creates different data numbers It is stored according to storehouse, and by same category of data information in same document data base;The classification of the data includes:Business indicator, Work management, rules and regulations, technical standard, responsibility system, power rule of law, atlas information, program management, files on each of customers and assets Information;
    Operate response unit:Obtain user terminal checks request, and the data information of pre-review is sent to terminal and shown.
  6. A kind of 6. electric power system data management system based on big data according to claim 5, it is characterised in that:Also wrap Include:
    Information receiving unit:The pre- job content of receiving terminal input;
    Search transmitting element:Pre- manipulating object is found out in subscriber profile data storehouse according to pre- job content, while is being worked The related data information that pre- operation is related to is found out in management database, and by the information of pre- manipulating object and related data information Send to terminal.
  7. A kind of 7. electric power system data management system based on big data according to claim 6, it is characterised in that:It is described The information of pre- manipulating object includes:High-risk user list, newly-increased high and low pressure apply to install user list, customer location, contact person's surname Name, contact phone, the related data information that the pre- operation is related to include:Job instruction and the confession electricity consumption side of high-risk user Case;
    The electric power system data management system based on big data, further includes:
    Navigation generation unit:According to the customer location of pre- manipulating object, generate navigation data and send to terminal.
  8. A kind of 8. electric power system data management system based on big data according to claim 5, it is characterised in that:Also wrap Include:
    Register response unit:In response to the registration request of user terminal, the log-on message inputted according to user terminal, is that user is whole Unique login account is distributed at end.
CN201711388615.6A 2017-12-21 2017-12-21 A kind of electric power system data managing method and system based on big data Pending CN107944050A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711388615.6A CN107944050A (en) 2017-12-21 2017-12-21 A kind of electric power system data managing method and system based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711388615.6A CN107944050A (en) 2017-12-21 2017-12-21 A kind of electric power system data managing method and system based on big data

Publications (1)

Publication Number Publication Date
CN107944050A true CN107944050A (en) 2018-04-20

Family

ID=61941526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711388615.6A Pending CN107944050A (en) 2017-12-21 2017-12-21 A kind of electric power system data managing method and system based on big data

Country Status (1)

Country Link
CN (1) CN107944050A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109146405A (en) * 2018-07-24 2019-01-04 广东长盈科技股份有限公司 A kind of comprehensive social information's management method of networking and system
CN109241168A (en) * 2018-09-20 2019-01-18 南方电网科学研究院有限责任公司 Processing method, device, equipment and the storage medium of the technical standard data of power grid

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101398919A (en) * 2007-09-28 2009-04-01 韩国电力公社 Electric power requirement analytic system for utilizing mode analysis and method thereof
EP2528033A1 (en) * 2011-05-24 2012-11-28 Honeywell International Inc. Virtual sub-metering using combined classifiers
CN103617480A (en) * 2013-11-04 2014-03-05 国家电网公司 Electronic power operation instructor and use method thereof
CN103699556A (en) * 2013-07-30 2014-04-02 汪国斌 Digital local chronicle information system for compiling local chronicle and geographical information
CN104991975A (en) * 2015-07-30 2015-10-21 广东电网有限责任公司佛山供电局 Data query method and system of electric power business systems
CN105631007A (en) * 2015-12-29 2016-06-01 云南电网有限责任公司电力科学研究院 Industry technical information collecting method and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101398919A (en) * 2007-09-28 2009-04-01 韩国电力公社 Electric power requirement analytic system for utilizing mode analysis and method thereof
EP2528033A1 (en) * 2011-05-24 2012-11-28 Honeywell International Inc. Virtual sub-metering using combined classifiers
CN103699556A (en) * 2013-07-30 2014-04-02 汪国斌 Digital local chronicle information system for compiling local chronicle and geographical information
CN103617480A (en) * 2013-11-04 2014-03-05 国家电网公司 Electronic power operation instructor and use method thereof
CN104991975A (en) * 2015-07-30 2015-10-21 广东电网有限责任公司佛山供电局 Data query method and system of electric power business systems
CN105631007A (en) * 2015-12-29 2016-06-01 云南电网有限责任公司电力科学研究院 Industry technical information collecting method and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109146405A (en) * 2018-07-24 2019-01-04 广东长盈科技股份有限公司 A kind of comprehensive social information's management method of networking and system
CN109241168A (en) * 2018-09-20 2019-01-18 南方电网科学研究院有限责任公司 Processing method, device, equipment and the storage medium of the technical standard data of power grid
CN109241168B (en) * 2018-09-20 2022-02-22 南方电网科学研究院有限责任公司 Processing method, device and equipment for technical standard data of power grid and storage medium

Similar Documents

Publication Publication Date Title
CN105373901A (en) Grid fault worksheet handling method, apparatus, and system
CN106875114A (en) The SMS platform optimization system and method for distribution repairing maneuvering platform
CN102646230A (en) Information system for realizing fast power restoration management of power distribution network faults
CN107944050A (en) A kind of electric power system data managing method and system based on big data
CN105096047A (en) Overall process task control and assessment system and realization method thereof
CN102622677A (en) Enterprise safety production management method
CN107979633A (en) A kind of wisdom small towns integrated information system
CN110324180A (en) Automation of transformation substations equipment wide area O&M Security Design Methods
CN103295164A (en) Power grid safety monitoring management information system and management method
CN106203966A (en) Customer-oriented industry expands service platform
CN108334014A (en) A kind of gas monitor and control system
CN107085746A (en) A kind of elevator maintenance enterprise management system based on cloud platform
CN104301412B (en) A kind of big data cloud service centralized management system
CN103914746A (en) Engineering construction flow management control method
CN102999812A (en) Method and system for information management
Nakafuji et al. Distributed resource energy analysis and management system (DREAMS) development for real-time grid operations
CN109102289A (en) A kind of internet service transaction system and method
CN213518339U (en) New energy electric energy metering transaction system based on block chain
CN108052638A (en) The electric power system intelligent information method for pushing and system of a kind of based role
Bartholomew The Smart Grid in Massachusetts: A Proposal for a Consumer Data Privacy Policy
JP2017004291A (en) Power generation management system and method
Sison-Lebrilla et al. HiP-PV: PV visualization and integration update
CN104698344A (en) Automatic early warning processing method for low voltages of customer electric meters
CN104463428A (en) Power grid planning data processing method
Damopolii et al. Policy Analysis of Clean Water Supply System (CWSS) Development (Case Study of Kotamobagu’s CWSS)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210917

Address after: 048000 No. 1 East Street, Xinshi City, Jincheng City, Shanxi Province

Applicant after: JINCHENG ELECTRIC POWER COMPANY OF SHANXI ELECTIRC POWER COPRPRATION OF STATE GRID CORPORATION OF CHINA

Address before: 048000 No. 1 East Street, Xinshi City, Jincheng City, Shanxi Province

Applicant before: JINCHENG ELECTRIC POWER COMPANY OF SHANXI ELECTIRC POWER COPRPRATION OF STATE GRID CORPORATION OF CHINA