CN107934862B - A kind of electric power apparatus for examination and repair - Google Patents

A kind of electric power apparatus for examination and repair Download PDF

Info

Publication number
CN107934862B
CN107934862B CN201711330152.8A CN201711330152A CN107934862B CN 107934862 B CN107934862 B CN 107934862B CN 201711330152 A CN201711330152 A CN 201711330152A CN 107934862 B CN107934862 B CN 107934862B
Authority
CN
China
Prior art keywords
fixed
mounting plate
block
hydraulic cylinder
strut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711330152.8A
Other languages
Chinese (zh)
Other versions
CN107934862A (en
Inventor
李国海
赵宝成
郑权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao hundred million Information technology share Co., Ltd
Original Assignee
Qingdao Hundred Million Information Technology Share Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Hundred Million Information Technology Share Co Ltd filed Critical Qingdao Hundred Million Information Technology Share Co Ltd
Priority to CN201711330152.8A priority Critical patent/CN107934862B/en
Publication of CN107934862A publication Critical patent/CN107934862A/en
Application granted granted Critical
Publication of CN107934862B publication Critical patent/CN107934862B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • B66F11/042Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations actuated by lazy-tongs mechanisms or articulated levers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS, OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Abstract

The present invention relates to a kind of apparatus for examination and repair more particularly to a kind of electric power apparatus for examination and repair.A kind of the technical problem to be solved in the present invention is to provide safety loading coefficients electric power apparatus for examination and repair that is high, time saving and energy saving, can be improved electric power overhaul working efficiency.In order to solve the above-mentioned technical problem, the present invention provides such a electric power apparatus for examination and repair, include universal wheel, spill frame, supporting mechanism, elevating mechanism, the first fixed plate, the first mounting plate, the second mounting plate, third mounting plate, railing, fixed mechanism, auxiliary body and gripping body;Universal wheel is installed on spill frame bottom, and supporting mechanism is installed on spill frame both sides, and elevating mechanism is installed on bottom in spill frame, and the first fixed plate and elevating mechanism output end are sequentially connected.Effect that is high, time saving and energy saving, can be improved electric power overhaul working efficiency that invention achieves safety loading coefficients.

Description

A kind of electric power apparatus for examination and repair
Technical field
The present invention relates to a kind of apparatus for examination and repair more particularly to a kind of electric power apparatus for examination and repair.
Background technique
When overhauling the electric power facility of eminence, it usually needs service personnel ascends a height operation, and operator generallys use safety Band suspension either carries out climbing of ascending a height using easy ladder, safety belt with contacted between repair apparatus, and use terraced When son climbing, traditional common ladder upper end is without fixed device, and the people that when use were it not for profession carries out handrail, and upper end is easy Slip or fall ladder, the operation that causes to ascend a height is very dangerous, can also occupy many staff, reduce working efficiency, and deposit In very big security risk, during carrying out electric power emergency repair, generally require to carry out power equipment pincers worker processing, therefore pass through The tools such as vice bench often are needed, and current electric power overhaul device is not equipped with these tools, and frequent the climbing down of worker is needed to climb up A little tools are taken, are taken a substantial amount of time, while also being brought a great deal of trouble to service personnel, and power worker omits sometimes Some service kits, worker will also climb down to take or other people climb up and pass him, do so and take a substantial amount of time.
Existing apparatus for examination and repair haves the shortcomings that above-mentioned, therefore needs to research and develop that a kind of safety loading coefficient is high, time saving and energy saving, energy Enough improve the electric power apparatus for examination and repair of electric power overhaul working efficiency.
Summary of the invention
(1) technical problems to be solved
The present invention in order to overcome existing apparatus for examination and repair exist overhaul eminence electric power facility when, it usually needs maintenance people Member ascends a height operation, and operator generallys use safety belt suspension and either carries out climbing of ascending a height, safety belt using easy ladder When with being contacted between repair apparatus, and use ladder climbing, traditional common ladder upper end is without fixed device, when use The people that were it not for profession carries out handrail, and easily slip or fall ladder for upper end, and the operation that causes to ascend a height is very dangerous, can also occupy very much Staff, reduce working efficiency, and there is very big security risks often to need during carrying out electric power emergency repair Pincers worker processing is carried out to power equipment, therefore be frequently necessary to the tools such as vice bench, and current electric power overhaul device is not equipped with These tools need worker is frequent to climb down to climb up and take a little tools, take a substantial amount of time, while also bringing to service personnel Very big trouble, and power worker omits some service kits sometimes, worker will also climb down to take or other people climb up and pass To him, the shortcomings that taking a substantial amount of time is done so, the technical problem to be solved in the present invention is to provide a kind of safety loading coefficients Electric power apparatus for examination and repair that is high, time saving and energy saving, can be improved electric power overhaul working efficiency.
(2) technical solution
In order to solve the above-mentioned technical problems, the present invention provides such a electric power apparatus for examination and repair, include universal wheel, Spill frame, elevating mechanism, the first fixed plate, the first mounting plate, the second mounting plate, third mounting plate, railing, is consolidated supporting mechanism Determine mechanism, auxiliary body and gripping body;Universal wheel is installed on spill frame bottom, and supporting mechanism is installed on spill frame both sides, Elevating mechanism is installed on bottom in spill frame, and the first fixed plate and elevating mechanism output end are sequentially connected, and the first mounting plate is affixed At the top of the first fixed plate;Second mounting plate is fixed in first mounting plate one end, and it is another that third mounting plate is articulated with the first mounting plate One end;Multiple railings are uniformly fixed in side before and after the first mounting plate;Fixed mechanism is installed on banister top, and fixed mechanism with Third mounting plate matches;Auxiliary body is installed on the second mounting plate side, and auxiliary body is located above the first mounting plate;Folder Mechanism is taken to be installed on side of second mounting plate far from auxiliary body;
Supporting mechanism includes installs case, the first elastic component, pressing plate, compression bar, the second fixed plate and T shape inserted link;Installs case Side is fixed in spill frame side, and the other side is provided with for perforative first pilot hole of T shape inserted link;Installs case top, bottom are opened There is the second pilot hole, compression bar top is affixed with pressing plate;The second pilot hole is run through in compression bar bottom, and affixed with the second fixed plate;Pressure By connecting at the top of the first elastic component and installs case, compression bar is equipped with the jack for the inserting cooperation of T shape inserted link in board bottom portion;
Elevating mechanism includes the first fixed block, the second fixed block, first hydraulic cylinder, swing arm, third fixed block, the 4th Fixed block, second hydraulic cylinder, the 5th fixed block and third hydraulic cylinder;First fixed block, the second fixed block are fixed in spill frame Interior bottom;Swing arm one end and the second fixed block are hinged, and the other end and third hydraulic cylinder are hinged;First hydraulic cylinder bottom and first Fixed block is hinged, and first hydraulic cylinder output end is articulated with swing arm side by third fixed block, and second hydraulic cylinder bottom passes through 4th fixed block is articulated with swing arm side, and second hydraulic cylinder output end is articulated with third hydraulic cylinder side by the 5th fixed block Portion, the first fixed plate and third hydraulic cylinder output end are sequentially connected;
Fixed mechanism includes the 6th fixed block, L shape bar, magnet and iron block;L shape bar is hinged by the 6th fixed block In banister top, iron block is embedded in third mounting plate side, and magnet is embedded in L shape bar end, and iron block is connect with magnet magnetism;
Auxiliary body includes vice bench, first manual reel, the first bracing wire, hook and link;Vice bench one end hinge It is connected to the second mounting plate side, the other end is affixed with link;First manual reel is fixed in the second mounting plate side, and is located at Above vice bench;First bracing wire one end is wire-wrapped in first manual reel, and the other end and hook are affixed;Hook and link snapping;
Gripping body include the second manual reel, the second bracing wire, the first strut, the second strut, the first arc fixture block, Second arc fixture block and the second elastic component;Second manual reel is fixed in the second mounting plate side;Second bracing wire one end solderless wrapped connection It is affixed at the top of the second manual reel, the other end and the second strut;First strut side lower end is articulated with the second strut side Lower end, the first arc fixture block are fixed in the first strut bottom, and the second arc fixture block is fixed in the second strut bottom, the first arc folder It is connected between block, the second arc fixture block by the second elastic component.
It preferably, further include having rubber pad;Rubber pad is fixed at the top of the first mounting plate.
It preferably, further include having third strut and handle;Third strut is fixed in spill arch;Handle is fixed in third Strut side, and be located above supporting mechanism.
Preferably, also it is recessed at the top of vice bench fluted.
Working principle: originally, worker pushes the apparatus for examination and repair to corresponding position, and operates supporting mechanism, in order to this The work of apparatus for examination and repair, at this point, running elevating mechanism, so that the first fixed plate bottoms out, then worker opens fixed machine Then structure climbs up the first mounting plate to open third mounting plate, and take the tool for needing to overhaul, and is then shut off third peace Loading board, then third mounting plate is fixed with fixed mechanism, auxiliary body is opened simultaneously, the tool of various maintenance is put into auxiliary body It on output end, avoids worker and often climbs down to climb up and take a little tools, save a large amount of time, then, worker operates elevator Structure then drives worker to rise, avoids work so that elevating mechanism output end drives the first mounting plate to rise by the first fixed plate People overhauls power equipment using ladder climbing, improves the safety of worker, also improves working efficiency;When worker forgets certain When kind tool, worker can operate gripping body, so that gripping body output end is put into bottom, other workers be made to operate catching devices Structure output end clamps certain tool, and worker operates gripping body again, certain tool is removed, and avoids power worker sometimes Omit some service kits, worker will also climb down to take or other people climb up the case where passing him, save a large amount of time; Since multiple railings are uniformly fixed in the first mounting plate front and back side, the safety of worker can be increased;In this way, having reached safety Property coefficient effect that is high, time saving and energy saving, can be improved electric power overhaul working efficiency.
Because supporting mechanism includes installs case, the first elastic component, pressing plate, compression bar, the second fixed plate and T shape inserted link;Peace Vanning side is fixed in spill frame side, and the other side is provided with for perforative first pilot hole of T shape inserted link;Installs case top, bottom It is provided with the second pilot hole, compression bar top is affixed with pressing plate;The second pilot hole is run through in compression bar bottom, and solid with the second fixed plate It connects;By connecting at the top of the first elastic component and installs case, compression bar is equipped with the jack for the inserting cooperation of T shape inserted link for pressing plate bottom;Institute Pressing plate is firmly pushed with worker, the first elastic component is compressed, and pressing plate is made to drive the second fixed plate to move down by compression bar, At this point, T shape inserted link is inserted into jack by worker, then the second fixed plate supports spill frame;When not needing the second fixed plate branch When supportting spill frame, worker extracts T shape inserted link, so that T shape inserted link is extracted from jack, at this point, bullet of the pressing plate in the first elastic component It is moved up under power effect, so that pressing plate drives the second fixed plate to move up by compression bar, therefore the second fixed plate no longer supports Spill frame.
Because elevating mechanism include the first fixed block, the second fixed block, first hydraulic cylinder, swing arm, third fixed block, 4th fixed block, second hydraulic cylinder, the 5th fixed block and third hydraulic cylinder;First fixed block, the second fixed block are fixed in recessed Bottom in shape frame;Swing arm one end and the second fixed block are hinged, and the other end and third hydraulic cylinder are hinged;First hydraulic cylinder bottom with First fixed block is hinged, and first hydraulic cylinder output end is articulated with swing arm side, second hydraulic cylinder bottom by third fixed block It is articulated with swing arm side by the 4th fixed block, second hydraulic cylinder output end is articulated with third hydraulic cylinder by the 5th fixed block Side, the first fixed plate and third hydraulic cylinder output end are sequentially connected;So worker operates first hydraulic cylinder, first hydraulic cylinder is defeated Outlet drives swing arm to increase or reduce, meanwhile, start second hydraulic cylinder, third hydraulic cylinder, second hydraulic cylinder output end band Dynamic third hydraulic cylinder is increased or is reduced, third hydraulic cylinder output end drives the first fixed plate to increase or reduce, that is, increase or Person reduces the first mounting plate, in this way, achieving the effect that go up and down worker's height.
Because fixed mechanism includes the 6th fixed block, L shape bar, magnet and iron block;L shape bar passes through the 6th fixed block It is articulated with banister top, iron block is embedded in third mounting plate side, and magnet is embedded in L shape bar end, and iron block is connect with magnet magnetism; So worker rotates L shape bar, so that magnet is connect with iron block no longer magnetism, so that worker opens third mounting plate;Work as needs When fixed third mounting plate, L shape bar is rotated again, so that iron block is connect with magnet magnetism.
Because auxiliary body includes vice bench, first manual reel, the first bracing wire, hook and link;Vice bench one End is articulated with the second mounting plate side, and the other end is affixed with link;First manual reel is fixed in the second mounting plate side, and Above vice bench;First bracing wire one end is wire-wrapped in first manual reel, and the other end and hook are affixed;Hook and link button It connects;So worker moves up vice bench, and operates first manual reel, so that first manual reel puts the first bracing wire Out, then the hook that the first bracing wire is released is hooked link by worker, so that vice bench is fixed, then worker can put in vice bench A little service kits, avoid worker and often climb down to climb up and take a little tools, save a large amount of time, when not needing using vice bench When, hook can be removed from link, and operate first manual reel and the first bracing wire is withdrawn, thus saving the Space on one mounting plate increases the scope of activities of worker.
Because gripping body includes the second manual reel, the second bracing wire, the first strut, the second strut, the first arc Fixture block, the second arc fixture block and the second elastic component;Second manual reel is fixed in the second mounting plate side;Second bracing wire one end It is wire-wrapped in the second manual reel, the other end and the second strut top are affixed;First strut side lower end is articulated with the second strut Side lower end, the first arc fixture block are fixed in the first strut bottom, and the second arc fixture block is fixed in the second strut bottom, the first arc It is connected between clevis block, the second arc fixture block by the second elastic component;So when worker forgets to take a little service kits, and at this time Through aloft when, worker can operate the second reel and release the second bracing wire, then the second bracing wire is by the first strut, second Bar, the first arc fixture block, the second arc fixture block, the second elastic component are placed into the position that other workers can touch, then work People presses the first strut, the second strut is not put, so that the first arc fixture block, the second arc fixture block mutually deviate from, at this point, will maintenance Tool is put between the first arc fixture block, the second arc fixture block, and unclamps the first strut, the second strut, the first arc fixture block, the Two arc fixture blocks are mutually drawn close under the elastic force effect of the second elastic component, then the first arc fixture block, the second arc fixture block clamp inspection Tool is repaired, then worker operates the second reel and retracts the second bracing wire, and pinnacled worker can remove service kit at this time, It avoids power worker and omits some service kits sometimes, worker will also climb down to take or other people climb up and pass his feelings Condition saves a large amount of time.
Because further including having rubber pad;Rubber pad is fixed at the top of the first mounting plate;Increase the frictional force of the first mounting plate, Skidding when preventing the first mounting plate of worker from walking about, improves the safety of the apparatus for examination and repair.
Because further including having third strut and handle;Third strut is fixed in spill arch;Handle is fixed in third branch Bar side portion, and be located above supporting mechanism;Worker can haul handle and pull the apparatus for examination and repair, in order to the mobile maintenance of worker Device.
Because it is fluted to be also recessed at the top of vice bench;Prevent the apparatus for examination and repair shake when, tool fallen down from vice bench or Tool is rolled down automatically and is fallen, to prevent tool from pounding on other people head, improves safety.
(3) beneficial effect
The present invention supports spill frame by supporting mechanism, in order to the work of the apparatus for examination and repair, by elevating mechanism to the Worker on one mounting plate carries out lifting processing, avoids worker using ladder climbing to overhaul power equipment, improves worker Safety, also improve working efficiency, by the fixed third mounting plate of fixed mechanism, third mounting plate avoided to automatically open, The safety for improving worker places service kit by auxiliary body's output end, avoids worker and often climbs down to climb up and takes Tool saves a large amount of time, and the tool for clamping some omissions by gripping body avoids power worker sometimes to eminence Some service kits can be omitted, worker will also climb down to take or other people climb up the case where passing him, when saving a large amount of Between, it solves existing when overhauling the electric power facility of eminence, it usually needs service personnel ascends a height operation, and operator usually adopts Hung with safety belt and climbing of ascending a height either carried out using easy ladder, safety belt with contacted between repair apparatus, and When being climbed using ladder, without fixed device, the people that when use were it not for profession carries out handrail for traditional common ladder upper end, Easily slip or fall ladder for upper end, and the operation that causes to ascend a height is very dangerous, can also occupy many staff, reduces work effect Rate, and there is very big security risks, during carrying out electric power emergency repair, generally require to add power equipment progress pincers worker Work, therefore be frequently necessary to the tools such as vice bench, and current electric power overhaul device is not equipped with these tools needs worker frequent It climbs down to climb up and takes a little tools, take a substantial amount of time, while also being brought a great deal of trouble to service personnel, and power worker has When can omit some service kits, worker will also climb down to take or other people climb up and pass him, do so consume it is a large amount of The shortcomings that time, in this way, achieved the effect that safety loading coefficient it is high, it is time saving and energy saving, can be improved electric power overhaul working efficiency.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is the schematic view of the front view of supporting mechanism of the present invention.
Fig. 3 is the schematic view of the front view of elevating mechanism of the present invention.
Fig. 4 is the schematic view of the front view of fixed mechanism of the present invention.
Fig. 5 is the first schematic view of the front view of auxiliary body of the present invention.
Fig. 6 is the schematic view of the front view of gripping body of the present invention.
Fig. 7 is second of schematic view of the front view of the invention.
Fig. 8 is second of schematic view of the front view of auxiliary body of the present invention.
The label in accompanying drawing is: 1- universal wheel, 2- spill frame, 3- supporting mechanism, 31- installs case, the first pilot hole of 32-, The first elastic component of 33-, 34- pressing plate, 35- compression bar, the second fixed plate of 36-, 37-T shape inserted link, the second pilot hole of 38-, 39- jack, 4- elevating mechanism, the first fixed block of 41-, the second fixed block of 42-, 43- first hydraulic cylinder, 44- swing arm, 45- third fixed block, The 4th fixed block of 46-, 47- second hydraulic cylinder, the 5th fixed block of 48-, 49- third hydraulic cylinder, the first fixed plate of 5-, 6- first pacify Loading board, the second mounting plate of 7-, 8- third mounting plate, 9- railing, 10- fixed mechanism, the 6th fixed block of 101-, 102-L shape bar, 103- magnet, 104- iron block, 11- auxiliary body, 111- vice bench, 112- first manual reel, the first bracing wire of 113-, 114- Hook, 115- link, 12- gripping body, the manual reel of 121- second, the second bracing wire of 122-, the first strut of 123-, 124- the Two struts, 125- the first arc fixture block, 126- the second arc fixture block, the second elastic component of 127-, 13- rubber pad, 14- third branch Bar, 15- handle, 16- groove.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of electric power apparatus for examination and repair includes as shown in figures 1-8 universal wheel 1, spill frame 2, supporting mechanism 3, elevator Structure 4, the first fixed plate 5, the first mounting plate 6, the second mounting plate 7, third mounting plate 8, railing 9, fixed mechanism 10, auxiliary body 11 and gripping body 12;Universal wheel 1 is installed on 2 bottom of spill frame, and supporting mechanism 3 is installed on 2 both sides of spill frame, elevating mechanism 4 are installed on bottom in spill frame 2, and the first fixed plate 5 is sequentially connected with 4 output end of elevating mechanism, and the first mounting plate 6 is fixed in the One fixed plate, 5 top;Second mounting plate 7 is fixed in 6 one end of the first mounting plate, and it is another that third mounting plate 8 is articulated with the first mounting plate 6 One end;Multiple railings 9 are uniformly fixed in 6 front and back side of the first mounting plate;Fixed mechanism 10 is installed on 9 top of railing, and fixed Mechanism 10 is matched with third mounting plate 8;Auxiliary body 11 is installed on 7 side of the second mounting plate, and auxiliary body 11 is located at the One mounting plate, 6 top;Gripping body 12 is installed on the second side of the mounting plate 7 far from auxiliary body 11.
Supporting mechanism 3 includes installs case 31, the first elastic component 33, pressing plate 34, compression bar 35, the second fixed plate 36 and T shape Inserted link 37;31 side of installs case is fixed in 2 side of spill frame, and the other side is provided with for perforative first pilot hole 32 of T shape inserted link 37; 31 top of installs case, bottom are provided with the second pilot hole 38, and 35 top of compression bar is affixed with pressing plate 34;35 bottom of compression bar runs through second Pilot hole 38, and it is affixed with the second fixed plate 36;It is pressed by being connected at the top of the first elastic component 33 and installs case 31 34 bottom of pressing plate Bar 35 is equipped with the jack 39 for the inserting cooperation of T shape inserted link 37.
Elevating mechanism 4 includes that the first fixed block 41, the second fixed block 42, first hydraulic cylinder 43, swing arm 44, third are solid Determine block 45, the 4th fixed block 46, second hydraulic cylinder 47, the 5th fixed block 48 and third hydraulic cylinder 49;First fixed block 41, second Fixed block 42 is fixed in bottom in spill frame 2;44 one end of swing arm and the second fixed block 42 are hinged, and the other end is hydraulic with third Cylinder 49 is hinged;43 bottom of first hydraulic cylinder and the first fixed block 41 are hinged, and 43 output end of first hydraulic cylinder passes through third fixed block 45 are articulated with 44 side of swing arm, and 47 bottom of second hydraulic cylinder is articulated with 44 side of swing arm by the 4th fixed block 46, and second 47 output end of hydraulic cylinder is articulated with 49 side of third hydraulic cylinder, the first fixed plate 5 and third hydraulic cylinder by the 5th fixed block 48 The transmission connection of 49 output ends.
Fixed mechanism 10 includes the 6th fixed block 101, L shape bar 102, magnet 103 and iron block 104;L shape bar 102 It is articulated with 9 top of railing by the 6th fixed block 101, iron block 104 is embedded in 8 side of third mounting plate, and magnet 103 is kept off embedded in L shape 102 end of bar, iron block 104 are connect with 103 magnetism of magnet.
Auxiliary body 11 includes vice bench 111, first manual reel 112, the first bracing wire 113, hook 114 and link 115;111 one end of vice bench is articulated with 7 side of the second mounting plate, and the other end and link 115 are affixed;First manual reel 112 It is fixed in 7 side of the second mounting plate, and is located at 111 top of vice bench;First bracing wire, 113 one end is wire-wrapped in first manual reel 112, the other end and hook 114 are affixed;Hook 114 and 115 snapping of link.
Gripping body 12 includes the second manual reel 121, the second bracing wire 122, the first strut 123, the second strut 124, the first arc fixture block 125, the second arc fixture block 126 and the second elastic component 127;Second manual reel 121 is fixed in Two mounting plates, 7 side;Second bracing wire, 122 one end is wire-wrapped in the second manual reel 121,124 top of the other end and the second strut It is affixed;First strut, 123 side lower end is articulated with 124 side lower end of the second strut, and the first arc fixture block 125 is fixed in first 123 bottom of bar, the second arc fixture block 126 are fixed in 124 bottom of the second strut, the first arc fixture block 125, the second arc fixture block It is connected between 126 by the second elastic component 127.
It further include having rubber pad 13;Rubber pad 13 is fixed in 6 top of the first mounting plate.
It further include having third strut 14 and handle 15;Third strut 14 is fixed in 2 top of spill frame;Handle 15 is fixed in Three struts, 14 side, and it is located at 3 top of supporting mechanism.
The top of vice bench 111 is also recessed fluted 16.
Working principle: originally, worker pushes the apparatus for examination and repair to corresponding position, and operates supporting mechanism 3, in order to this The work of apparatus for examination and repair, at this point, running elevating mechanism 4, so that the first fixed plate 5 bottoms out, then worker, which opens, is fixed Then the first mounting plate 6 is climbed up to open third mounting plate 8 by mechanism 10, and take the tool for needing to overhaul, and is then shut off Third mounting plate 8, then third mounting plate 8 is fixed with fixed mechanism 10, auxiliary body 11 is opened simultaneously, by the tool of various maintenance It puts on 11 output end of auxiliary body, avoids worker and often climb down to climb up and take a little tools, save a large amount of time, then, Worker operates elevating mechanism 4, so that 4 output end of elevating mechanism drives the first mounting plate 6 to rise by the first fixed plate 5, then band Start building people rising, avoid worker using ladder climbing to overhaul power equipment, improve the safety of worker, also improve work Make efficiency;When worker forgets certain tool, worker can operate gripping body 12, so that 12 output end of gripping body is put into bottom Portion makes other workers operate 12 output end of gripping body and clamps certain tool, and worker operates gripping body 12 again, by certain work Tool is removed, and is avoided power worker and is omitted some service kits sometimes, and worker will also climb down to take or other people climb up and pass The case where to him, saves a large amount of time;Since multiple railings 9 are uniformly fixed in 6 front and back side of the first mounting plate, Ke Yizeng Process the safety of people;In this way, having reached safety loading coefficient effect that is high, time saving and energy saving, can be improved electric power overhaul working efficiency Fruit.
Because supporting mechanism 3 includes installs case 31, the first elastic component 33, pressing plate 34, compression bar 35,36 and of the second fixed plate T shape inserted link 37;31 side of installs case is fixed in 2 side of spill frame, and the other side is provided with for perforative first pilot hole of T shape inserted link 37 32;31 top of installs case, bottom are provided with the second pilot hole 38, and 35 top of compression bar is affixed with pressing plate 34;35 bottom of compression bar is run through Second pilot hole 38, and it is affixed with the second fixed plate 36;34 bottom of pressing plate at the top of the first elastic component 33 and installs case 31 by connecting It connects, compression bar 35 is equipped with the jack 39 for the inserting cooperation of T shape inserted link 37;So worker firmly pushes pressing plate 34, the first elastic component 33 It is compressed, and pressing plate 34 is made to drive the second fixed plate 36 to move down by compression bar 35, at this point, worker inserts T shape inserted link 37 Enter in jack 39, then the second fixed plate 36 supports spill frame 2;When not needing the second fixed plate 36 support spill frame 2, work People extracts T shape inserted link 37, so that T shape inserted link 37 is extracted from jack 39, at this point, pressing plate 34 is made in the elastic force of the first elastic component 33 It is moved up under, so that pressing plate 34 drives the second fixed plate 36 to move up by compression bar 35, therefore the second fixed plate 36 is no longer Support spill frame 2.
Because elevating mechanism 4 includes the first fixed block 41, the second fixed block 42, first hydraulic cylinder 43, swing arm 44, Three fixed blocks 45, the 4th fixed block 46, second hydraulic cylinder 47, the 5th fixed block 48 and third hydraulic cylinder 49;First fixed block 41, Second fixed block 42 is fixed in bottom in spill frame 2;44 one end of swing arm and the second fixed block 42 are hinged, the other end and third Hydraulic cylinder 49 is hinged;43 bottom of first hydraulic cylinder and the first fixed block 41 are hinged, and 43 output end of first hydraulic cylinder is solid by third To determine block 45 and is articulated with 44 side of swing arm, 47 bottom of second hydraulic cylinder is articulated with 44 side of swing arm by the 4th fixed block 46, 47 output end of second hydraulic cylinder is articulated with 49 side of third hydraulic cylinder, the first fixed plate 5 and third liquid by the 5th fixed block 48 The transmission connection of 49 output end of cylinder pressure;So worker operates first hydraulic cylinder 43,43 output end of first hydraulic cylinder drives swing arm 44 It increases or reduces, meanwhile, start second hydraulic cylinder 47, third hydraulic cylinder 49,47 output end of second hydraulic cylinder drives third liquid Cylinder pressure 49 is increased or is reduced, 49 output end of third hydraulic cylinder drives the first fixed plate 5 to increase perhaps reduction and increases or drop Low first mounting plate 6, in this way, achieving the effect that go up and down worker's height.
Because fixed mechanism 10 includes the 6th fixed block 101, L shape bar 102, magnet 103 and iron block 104;L shape bar 102 are articulated with 9 top of railing by the 6th fixed block 101, and iron block 104 is embedded in 8 side of third mounting plate, and magnet 103 is embedded in L shape 102 end of bar, iron block 104 are connect with 103 magnetism of magnet;So worker rotates L shape bar 102, so that magnet 103 and iron block 104 no longer magnetic connections, so that worker opens third mounting plate 8;When needing fixed third mounting plate 8, L shape gear is rotated again Bar 102, so that iron block 104 is connect with 103 magnetism of magnet.
Because auxiliary body 11 includes vice bench 111, first manual reel 112, the first bracing wire 113,114 and of hook Link 115;111 one end of vice bench is articulated with 7 side of the second mounting plate, and the other end and link 115 are affixed;First manual reel 112 are fixed in 7 side of the second mounting plate, and are located at 111 top of vice bench;First bracing wire, 113 one end be wire-wrapped in first manual around Line wheel 112, the other end and hook 114 are affixed;Hook 114 and 115 snapping of link;So worker moves up vice bench 111, and First manual reel 112 is operated, so that first manual reel 112 releases the first bracing wire 113, then worker draws first The hook 114 that line 113 is released hooks link 115, so that vice bench 111 is fixed, then worker can put a little inspections in vice bench 111 Tool is repaired, worker is avoided and often climbs down to climb up and take a little tools, saves a large amount of time, when not needing using vice bench 111 When, hook 114 can be removed from link 115, and operate first manual reel 112 and withdraw the first bracing wire 113 i.e. Can, to save the space on the first mounting plate 6, increase the scope of activities of worker.
Because gripping body 12 includes the second manual reel 121, the second bracing wire 122, the first strut 123, second Bar 124, the first arc fixture block 125, the second arc fixture block 126 and the second elastic component 127;Second manual reel 121 is fixed in Second mounting plate, 7 side;Second bracing wire, 122 one end is wire-wrapped in the second manual reel 121, and the other end and the second strut 124 push up Portion is affixed;First strut, 123 side lower end is articulated with 124 side lower end of the second strut, and the first arc fixture block 125 is fixed in first 123 bottom of strut, the second arc fixture block 126 are fixed in 124 bottom of the second strut, the first arc fixture block 125, the second arc fixture block It is connected between 126 by the second elastic component 127;So when worker forgets to take a little service kits, and at this time aloft when, work People can operate the second reel and release the second bracing wire 122, then the second bracing wire 122 by the first strut 123, the second strut 124, First arc fixture block 125, the second arc fixture block 126, the second elastic component 127 are placed into the position that other workers can touch, Then worker presses the first strut 123, the second strut 124 is not put, so that the first arc fixture block 125,126 phase of the second arc fixture block Mutually deviate from, at this point, service kit is put between the first arc fixture block 125, the second arc fixture block 126, and unclamps the first strut 123, the second strut 124, the first arc fixture block 125, the second arc fixture block 126 phase under the elastic force effect of the second elastic component 127 It mutually draws close, then the first arc fixture block 125, the second arc fixture block 126 clamp service kit, and then the second reel of worker's running will Second bracing wire 122 retracts, and pinnacled worker can remove service kit at this time, avoids power worker and omits sometimes Service kit, worker will also climb down to take or other people climb up the case where passing him, save a large amount of time.
Because further including having rubber pad 13;Rubber pad 13 is fixed in 6 top of the first mounting plate;Increase the first mounting plate 6 Frictional force, skidding when preventing the first mounting plate of worker 6 from walking about, improves the safety of the apparatus for examination and repair.
Because further including having third strut 14 and handle 15;Third strut 14 is fixed in 2 top of spill frame;Handle 15 is affixed In 14 side of third strut, and it is located at 3 top of supporting mechanism;Worker can haul handle 15 and pull the apparatus for examination and repair, in order to Worker moves the apparatus for examination and repair.
Because the top of vice bench 111 is also recessed fluted 16;When preventing the apparatus for examination and repair from shaking, tool is from vice bench 111 It falls down or tool is rolled down automatically and fallen, to prevent tool from pounding on other people head, improve safety.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (4)

1. a kind of electric power apparatus for examination and repair, which is characterized in that include universal wheel (1), spill frame (2), supporting mechanism (3), rise Descending mechanism (4), the first mounting plate (6), the second mounting plate (7), third mounting plate (8), railing (9), is consolidated the first fixed plate (5) Determine mechanism (10), auxiliary body (11) and gripping body (12);Universal wheel (1) is installed on spill frame (2) bottom, supporting mechanism (3) spill frame (2) both sides are installed on, elevating mechanism (4) is installed on spill frame (2) interior bottom, the first fixed plate (5) and lifting The transmission connection of mechanism (4) output end, the first mounting plate (6) are fixed at the top of the first fixed plate (5);Second mounting plate (7) is affixed In the first mounting plate (6) one end, third mounting plate (8) is articulated with the first mounting plate (6) other end;Multiple railings (9) are uniformly solid It is connected to the first mounting plate (6) front and back side;Fixed mechanism (10) is installed at the top of railing (9), and fixed mechanism (10) and third Mounting plate (8) matches;Auxiliary body (11) is installed on the second mounting plate (7) side, and auxiliary body (11) is located at the first peace Above loading board (6);Gripping body (12) is installed on the side of the second mounting plate (7) far from auxiliary body (11);
Supporting mechanism (3) includes installs case (31), the first elastic component (33), pressing plate (34), compression bar (35), the second fixed plate (36) and T shape inserted link (37);Installs case (31) side is fixed in spill frame (2) side, and the other side is provided with to be passed through for T shape inserted link (37) The first pilot hole (32) worn;Installs case (31) top, bottom are provided with the second pilot hole (38), compression bar (35) top and pressing plate (34) affixed;The second pilot hole (38) are run through in compression bar (35) bottom, and affixed with the second fixed plate (36);Pressing plate (34) bottom is logical It crosses at the top of the first elastic component (33) and installs case (31) and connect, compression bar (35) is equipped with the jack for T shape inserted link (37) inserting cooperation (39);
Elevating mechanism (4) include the first fixed block (41), the second fixed block (42), first hydraulic cylinder (43), swing arm (44), Third fixed block (45), the 4th fixed block (46), second hydraulic cylinder (47), the 5th fixed block (48) and third hydraulic cylinder (49); First fixed block (41), the second fixed block (42) are fixed in spill frame (2) interior bottom;Swing arm (44) one end is fixed with second Hingedly, the other end and third hydraulic cylinder (49) are hinged for block (42);First hydraulic cylinder (43) bottom and the first fixed block (41) hingedly, First hydraulic cylinder (43) output end is articulated with swing arm (44) side, second hydraulic cylinder (47) bottom by third fixed block (45) It is articulated with swing arm (44) side by the 4th fixed block (46), second hydraulic cylinder (47) output end passes through the 5th fixed block (48) It is articulated with third hydraulic cylinder (49) side, the first fixed plate (5) and third hydraulic cylinder (49) output end are sequentially connected;
Fixed mechanism (10) includes the 6th fixed block (101), L shape bar (102), magnet (103) and iron block (104);L shape gear Bar (102) is articulated at the top of railing (9) by the 6th fixed block (101), and iron block (104) is embedded in third mounting plate (8) side, magnetic Iron (103) is embedded in L shape bar (102) end, and iron block (104) is connect with magnet (103) magnetism;
Auxiliary body (11) includes vice bench (111), first manual reel (112), the first bracing wire (113), hook (114) With link (115);Vice bench (111) one end is articulated with the second mounting plate (7) side, and the other end and link (115) are affixed;First Manual reel (112) is fixed in the second mounting plate (7) side, and is located above vice bench (111);First bracing wire (113) one End is wire-wrapped in first manual reel (112), and the other end and hook (114) are affixed;Link up with (114) and link (115) snapping;
Gripping body (12) includes the second manual reel (121), the second bracing wire (122), the first strut (123), second Bar (124), the first arc fixture block (125), the second arc fixture block (126) and the second elastic component (127);Second manual reel (121) it is fixed in the second mounting plate (7) side;Second bracing wire (122) one end is wire-wrapped in the second manual reel (121), another End and the second strut (124) top are affixed;First strut (123) side lower end is articulated with the second strut (124) side lower end, the One arc fixture block (125) is fixed in the first strut (123) bottom, and the second arc fixture block (126) is fixed in the second strut (124) bottom Portion is connected between the first arc fixture block (125), the second arc fixture block (126) by the second elastic component (127).
2. a kind of electric power apparatus for examination and repair according to claim 1, which is characterized in that further include having rubber pad (13);Rubber Rubber mat (13) is fixed at the top of the first mounting plate (6).
3. a kind of electric power apparatus for examination and repair according to claim 2, which is characterized in that further include have third strut (14) and Handle (15);Third strut (14) is fixed at the top of spill frame (2);Handle (15) is fixed in third strut (14) side, and position Above supporting mechanism (3).
4. a kind of electric power apparatus for examination and repair according to claim 3, which is characterized in that be also recessed at the top of vice bench (111) Fluted (16).
CN201711330152.8A 2017-12-13 2017-12-13 A kind of electric power apparatus for examination and repair Active CN107934862B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711330152.8A CN107934862B (en) 2017-12-13 2017-12-13 A kind of electric power apparatus for examination and repair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711330152.8A CN107934862B (en) 2017-12-13 2017-12-13 A kind of electric power apparatus for examination and repair

Publications (2)

Publication Number Publication Date
CN107934862A CN107934862A (en) 2018-04-20
CN107934862B true CN107934862B (en) 2019-05-17

Family

ID=61942964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711330152.8A Active CN107934862B (en) 2017-12-13 2017-12-13 A kind of electric power apparatus for examination and repair

Country Status (1)

Country Link
CN (1) CN107934862B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108715111B (en) * 2018-06-19 2020-03-10 湖南城市学院 Workbench for wall painting of art students
CN110713148B (en) * 2019-10-19 2021-02-02 湖北洁能工程技术开发公司 Automatic climbing frame system for mounting cloth bag air pipe
CN110967531A (en) * 2019-11-25 2020-04-07 国网山东省电力公司滨州市沾化区供电公司 Electric power operation and maintenance tool detection frame

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201209106Y (en) * 2008-04-09 2009-03-18 武汉特鹏机械设备有限公司 Crank type aerial working platform
CN203065116U (en) * 2012-12-21 2013-07-17 杭州爱知工程车辆有限公司 Overhead working truck
CN103387195A (en) * 2013-07-15 2013-11-13 浙江鼎力机械股份有限公司 Aerial work platform
CN203602322U (en) * 2013-10-12 2014-05-21 南京晨光水山电液特装有限公司 Fixed-type aerial work platform with lifting function
CN103964346A (en) * 2014-04-09 2014-08-06 洛阳巨亚彩钢工程有限公司 High-altitude operation machine
CN204057888U (en) * 2014-09-02 2014-12-31 河南重工起重机集团有限公司 A kind of Multifunction high-altitude operation platform
CN104591052B (en) * 2015-01-19 2018-07-03 河南亿翔专用汽车有限公司 Oil electric mixed dynamic walking aerial work platform
CN204752134U (en) * 2015-06-18 2015-11-11 徐挺 Telescopic aerial working platform
CN205277112U (en) * 2015-12-02 2016-06-01 鑫鉝铝业股份有限公司 Door plant positioner of cabinet body
CN205709758U (en) * 2016-07-05 2016-11-23 洪铮铮 A kind of aerial work platform for building
CN206126782U (en) * 2016-10-27 2017-04-26 衢州福创工业设计有限公司 High altitude construction machine with hydraulic pressure self -collapsing gate

Also Published As

Publication number Publication date
CN107934862A (en) 2018-04-20

Similar Documents

Publication Publication Date Title
CN107934862B (en) A kind of electric power apparatus for examination and repair
CN104538892B (en) Electrician backpack type self-unlocking lifting tool kit
CN202673195U (en) Device for connecting drill pipes with three-joint unit
CN108452451A (en) Mobile power line shaft tower climbs personal safety guard method and device
CN102720448A (en) Device and method for connecting drill rod with three-joint unit
CN110711365A (en) Pole-climbing device suitable for electric power overhaul and use method
CN108579025A (en) A kind of electric pole inspection platform voluntarily climbing device
CN207847047U (en) A kind of height scaffolding
CN206901724U (en) Kerbstone installation auxiliary device
CN206976942U (en) A kind of power construction wire-sending device
CN107064574A (en) Breaker p-wire hitch bar
CN1125935C (en) Technology for installing great-diameter prestressed reinforced concrete pipe
CN107120075B (en) A kind of application method of oil well repairing operation equipment
CN208856732U (en) A kind of elevator rope changer
CN201010254Y (en) Elastic lock opening device of container
CN201894789U (en) Deep well saving device
CN205973423U (en) Steel column exchanges hoist device soon
CN206956559U (en) Quick peace for guardrail template in Bridge guardrail concrete pouring construction tears equipment open
CN104047624A (en) Hydraulic automatic cable feeding device of anchor cable
CN206773024U (en) Breaker p-wire hitch bar
CN110131589A (en) A kind of towed main push-towing rope inspection vehicle of stepping
CN201268563Y (en) Crank pin hoisting apparatus
CN204729027U (en) A kind of oil well repairing operation device
CN203856488U (en) Hydraulic automatic anchor cable feeding device
JP2014105035A (en) Method for replacing main rope of elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190422

Address after: Room 1501-1510, Times International Plaza, 168 Shandong Road, North District, Qingdao City, Shandong Province

Applicant after: Qingdao hundred million Information technology share Co., Ltd

Address before: 136000 No. 777 Central East Road, Tiedong District, Siping City, Jilin Province

Applicant before: Feng Guangji

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant