CN107909237A - The control method and device of energy consumption equipment in energy internet - Google Patents

The control method and device of energy consumption equipment in energy internet Download PDF

Info

Publication number
CN107909237A
CN107909237A CN201710931061.3A CN201710931061A CN107909237A CN 107909237 A CN107909237 A CN 107909237A CN 201710931061 A CN201710931061 A CN 201710931061A CN 107909237 A CN107909237 A CN 107909237A
Authority
CN
China
Prior art keywords
energy
energy consumption
consumption equipment
data
internet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710931061.3A
Other languages
Chinese (zh)
Inventor
吴妙瑜
罗晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201710931061.3A priority Critical patent/CN107909237A/en
Publication of CN107909237A publication Critical patent/CN107909237A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor

Abstract

The invention discloses a kind of control method and device of energy consumption equipment in energy internet, at least to solve the problems, such as that the energy utilization rate of energy internet in correlation technique is not high.Disclosed method includes:The multi-energy data of power plant in energy internet, energy storage device and energy consumption equipment is monitored;Run at the appointed time according to the energy consumption equipment in the multi-energy data control energy internet monitored or out of service.The present invention improves the energy utilization rate of energy internet.

Description

The control method and device of energy consumption equipment in energy internet
Technical field
The present invention relates to energy Internet technical field, in particular to energy consumption equipment in a kind of energy internet Control method and device.
Background technology
As exploitation of the mankind to the energy uses, fossil energy is fewer and fewer, and facing mankind lack of energy, environmental pollution The problems such as.Reduce use traditional energy on the basis of, except continue to develop new energy, improve energy utilization rate be also one must The means wanted.The advanced Power Electronic Technique of energy internet integrated use, information technology and intelligent management technology will largely by Novel electric power network, the oil web that distributed energy harvester, distributed energy storage device and all kinds load are formed The energy source node interconnection such as network, natural gas network is got up, to realize the energy peer switch of energy in bidirectional flow and shared network. At present, the management to energy internet is mostly based on user experience consideration, the utilization rate of the energy is not done more consideration is given to, therefore How energy internet is managed at present so that the energy is efficiently utilized, and reduces energy loss, be at present urgently Solve the problems, such as.
The content of the invention
The present invention provides a kind of control method and device of energy consumption equipment in energy internet, at least to solve related skill The problem of energy utilization rate is not high in energy internet in art.
According to the one side of the application, there is provided the control method of energy consumption equipment in a kind of energy internet, including:It is right The multi-energy data of power plant, energy storage device and energy consumption equipment in energy internet is monitored;According to the institute monitored Stating multi-energy data controls the energy consumption equipment in the energy internet to run at the appointed time or out of service.
Alternatively, the basis monitors the multi-energy data control the energy consumption equipment run at the appointed time or It is out of service, including:The energy consumption data of the energy consumption equipment to being embodied in the multi-energy data that monitors analyze really The unlatching priority and/or closing priority of the fixed energy consumption equipment, and the energy supply ability of the energy internet, or Person obtains the unlatching priority of the pre-set energy consumption equipment and/or closes priority;According to the energy determined The energy supply ability of internet, and energy consumption described in the unlatching priority of the energy consumption equipment and/or closing two priority classes Equipment is run or out of service in the specified time.
Alternatively, the basis monitors the multi-energy data control the energy consumption equipment run at the appointed time or It is out of service, including:The energy consumption data of the energy consumption equipment is obtained from the multi-energy data monitored;According to the energy consumption The energy consumption data of equipment is determined to consume energy in the energy internet in the first preset time period the energy of highest predetermined number Consume equipment;Supplied in the energy that the energy internet is determined according to the multi-energy data of the power plant and the energy storage device When answering scarce capacity, the highest predetermined number of energy consumption determined is controlled according to the energy surplus of the energy internet Energy consumption equipment in it is part or all of out of service.
Alternatively, the basis monitors the multi-energy data control the energy consumption equipment run at the appointed time or It is out of service, including:The energy consumption data of the energy consumption equipment is obtained from the multi-energy data monitored;Determine pre- second If the variable quantity of at least one energy consumption parameter exceeds the target energy consumption equipment of default variable quantity in energy consumption data in the period;Control The target energy consumption equipment is out of service.
Alternatively, the multi-energy data includes energy parameter, and the energy parameter includes at least a kind of following parameter:Electricity Pressure, electric current, power and electricity.
According to further aspect of the application, there is provided a kind of energy consumption equipment control device, including:Monitoring modular, is used for The multi-energy data of power plant in energy internet, energy storage device and energy consumption equipment is monitored;Control module, is used for The energy consumption equipment in the energy internet is controlled to run or stop at the appointed time according to the multi-energy data monitored Operation.
Alternatively, the control module, including:First determination unit, for body in the multi-energy data to monitoring The energy consumption data of the existing energy consumption equipment carries out analysis and determines the unlatching priority of the energy consumption equipment and/or close preferential Level, and the energy supply ability of the energy internet, or the unlatching of the pre-set energy consumption equipment of acquisition are preferential Level and/or closing priority;First control unit, the energy supply ability for the energy internet determined for basis, And energy consumption equipment described in the unlatching priority and/or closing two priority classes of the energy consumption equipment is run in the specified time It is or out of service.
Alternatively, the control module, including:First acquisition unit, for being obtained from the multi-energy data monitored Take the energy consumption data of the energy consumption equipment;Second determination unit, for being determined according to the energy consumption data of the energy consumption equipment Consume energy the energy consumption equipment of highest predetermined number in first preset time period in the energy internet;Second control unit, is used In determining the energy supply energy of the energy internet according to the multi-energy data of the power plant and the energy storage device When power is insufficient, the energy for the highest predetermined number of energy consumption determined according to the control of the energy surplus of the energy internet Consume part or all of out of service in equipment.
Alternatively, the control module, including:Second acquisition unit, for being obtained from the multi-energy data monitored Take the energy consumption data of the energy consumption equipment;3rd determination unit, for determining in the second preset time period in energy consumption data extremely The variable quantity of one item missing energy consumption parameter exceeds the target energy consumption equipment of default variable quantity;3rd control unit, it is described for controlling Target energy consumption equipment is out of service.
Alternatively, the multi-energy data includes energy parameter, the energy parameter include at least voltage, electric current, power with A kind of and parameter in electricity.
The scheme that embodiments herein provides, by power plant, energy storage device and energy consumption in energy internet The monitoring result of the multi-energy data of equipment, is controlled the run time of energy consumption equipment, enables to the distribution of the energy more Rationally, the energy utilization rate of energy internet is improved.
Brief description of the drawings
Fig. 1 be the embodiment of the present application 1 energy internet in energy consumption equipment control method flow chart;
Fig. 2 be the embodiment of the present application 2 energy internet in energy consumption equipment control device block diagram.
Embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Following description is related to During attached drawing, unless otherwise indicated, the same numbers in different attached drawings represent the same or similar key element.Following exemplary embodiment Described in embodiment do not represent and the consistent all embodiments of the present invention.On the contrary, they be only with it is such as appended The example of the consistent apparatus and method of some aspects being described in detail in claims, of the invention.
Embodiment 1
A kind of control method of energy consumption equipment in energy internet is present embodiments provided, Fig. 1 is the flow chart of this method, As shown in Figure 1, this method includes following processing:
Step 101:The multi-energy data of power plant in energy internet, energy storage device and energy consumption equipment is supervised Survey;
In the present embodiment, the multi-energy data monitored can at least include the produced quantity of energy of power plant, such as send out The generated energy of electric equipment, and the produced quantity of energy of energy storage device, such as the electricity that storage battery is stored, and energy consumption equipment disappear The electricity of consumption, in addition, by being attached with power plant, energy storage device and the energy consumption equipment in energy internet, moreover it is possible to The parameter of the voltage of these equipment, electric current, power and electricity is enough obtained, and can be according to the parameter got to these equipment Controlled accordingly.
Alternatively, energy internet involved in the present embodiment is local energy internet.
Alternatively, the control in the present embodiment to energy consumption equipment includes controlling the batch of energy consumption equipment, for example, control A collection of energy device starts simultaneously at operation in a specified time or terminates operation.
Step 102:Transported at the appointed time according to the energy consumption equipment in the multi-energy data control energy internet monitored It is capable or out of service.
Alternatively, run at the appointed time or behaviour out of service according to the multi-energy data control energy consumption equipment monitored Work can include:The energy consumption data of energy consumption equipment to being embodied in the multi-energy data that monitors is analyzed, and determines energy consumption equipment Unlatching priority and/or close priority, and the energy supply ability of local energy internet, or obtain and pre-set Energy consumption equipment unlatching priority and/or close priority;According to the energy supply energy for the local energy internet determined Fortune is at the appointed time run or stopped to power, and the unlatching priority of energy consumption equipment and/or closing two priority classes energy consumption equipment OK.Wherein, unlatching/closing of corresponding energy consumption equipment can be specifically determined according to the actual energy consumption amount of the energy consumption data monitored Priority, for example, the closing priority of the larger energy consumption equipment of actual energy consumption amount can be set higher, based on this, when the energy is mutual During energy deficiency of networking, the larger energy consumption equipment that consumes energy can be preferentially closed.
Alternatively, run at the appointed time or out of service according to the multi-energy data control energy consumption equipment monitored, also It can include:The energy consumption data of energy consumption equipment is obtained from the multi-energy data monitored;It is true according to the energy consumption data of energy consumption equipment Make the energy consumption equipment for the highest predetermined number that consumes energy in the first preset time period in local energy internet;According to production capacity When the multi-energy data of equipment and energy storage device determines the energy supply scarce capacity of local energy internet, according to the local energy Part or all of stopping in the energy consumption equipment for the highest predetermined number of energy consumption that the energy surplus control of internet is determined Operation.
Alternatively, run at the appointed time or out of service according to the multi-energy data control energy consumption equipment monitored, into One step can also include:The energy consumption data of energy consumption equipment is obtained from the multi-energy data monitored;
Determine the variable quantity of at least one energy consumption parameter in energy consumption data in the second preset time period beyond default change The target energy consumption equipment of amount;The variable quantity of at least one energy consumption parameter in the second preset time period in energy consumption data is beyond pre- If variable quantity then illustrates that the equipment is possible to break down, on this basis, control the target energy consumption equipment out of service.Its In, the energy parameter that multi-energy data includes includes at least any one parameter in voltage, electric current, power and electricity.
The control method of energy consumption equipment can also include in energy internet provided in this embodiment:Local area energy source interconnection Voltage, electric current, power and the electricity of equipment in net are monitored, by being used in identical run time distinct device The contrast of electricity, determines the equipment of power consumption maximum or several equipment that power consumption is larger.Then these are investigated as needed The reason for amount of equipment power consumption is big, with the hidden danger that may be present of discovering device as early as possible, or avoids time-of-use tariffs and uses equipment, ensure peace It is complete and save expense.
The control method of energy consumption equipment further includes early warning to faulty equipment, place in energy internet provided in this embodiment Reason processing, illustrates the processing below by way of an example.
In one example, in the time T1 of setting, if in the voltage of discovering device, electric current, power and electricity The difference of the maxima and minima of any one parameter value reaches a certain given threshold v1, then may determine that the equipment is likely to occur Problem, in that case, can carry out fault pre-alarming processing;If in setting time T1, arbitrary parameter be worth maximum with The difference subtracted of minimum value reaches a certain given threshold v2 (v2>V1), then it can determine whether the equipment fault, carry out at fault alarm Reason;Or further, if in setting time T2, reach early warning number of processing and reach setting number, then can determine whether this Equipment fault, carries out fault alarm.Equipment fault early-warning, alarm can be represented by the mark of different colours, such as pre- police Huang Colour code will shows that alarm is shown with red marker;Buzzer can also be installed near equipment, pass through the buzzer of different frequency To represent early warning or alarm.By carrying out early warning processing to equipment, the equipment run in spite of illness can be found early;To producing line failure The product of pre-warning time section production is investigated, and is found the defective products of product early, is used manpower and material resources sparingly.
The control method of energy consumption equipment can also be by docking producing line system, root in energy internet provided in this embodiment According to the relational expression of energy input/output=specific energy consumption, the specific energy consumption of different producing lines is contrasted, obtains production efficiency height, unit The low producing line of energy consumption, comparative analysis, obtains Optimal Production mode, provides production technology recommendation on improvement etc..Grasp producing line unit energy After consumption, factory can be combined with time-of-use tariffs and reasonably carry out production scheduling.
Embodiment 2
A kind of control device of energy consumption equipment in energy internet is present embodiments provided, Fig. 2 is the block diagram of the device, such as Shown in Fig. 2, which includes following part:
Monitoring modular 21, for the energy number to the power plant in energy internet, energy storage device and energy consumption equipment According to being monitored;
Control module 22, for controlling the energy consumption equipment in energy internet according to the multi-energy data monitored specified Time operation or out of service.
Wherein, involved in the present embodiment to the energy parameter that includes of multi-energy data include at least voltage, electric current, power with And any one parameter in electricity.
Alternatively, the control module 22 in the present embodiment can further include:First determination unit, the unit be used for pair The energy consumption data of the energy consumption equipment embodied in the multi-energy data monitored analyze definite energy consumption equipment unlatching priority and/ Or close priority, and the energy supply ability of energy internet, or obtain pre-set energy consumption equipment unlatching it is excellent First level and/or closing priority;First control unit, for the energy for the energy internet determined according to the first determination unit Deliverability, and the unlatching priority of energy consumption equipment and/or close two priority classes energy consumption equipment at the appointed time run or It is out of service.
Alternatively, the control module 22 in the present embodiment can further include:First acquisition unit, for from monitoring Multi-energy data in obtain energy consumption equipment energy consumption data;Second determination unit, for what is got according to first acquisition unit The energy consumption data of energy consumption equipment is determined in the first preset time period to consume energy in source interconnection net the energy of highest predetermined number Consume equipment;Second control unit, for determining local energy source interconnection according to the multi-energy data of power plant and energy storage device It is highest pre- according to the energy consumption that the control of the energy surplus of local energy internet is determined during the energy supply scarce capacity of net It is if part or all of out of service in the energy consumption equipment of number.
Alternatively, the control module 22 in the present embodiment can further include:Second acquisition unit, for from monitoring Multi-energy data in obtain energy consumption equipment energy consumption data;3rd determination unit, for determining the energy in the second preset time period The variable quantity for consuming at least one energy consumption parameter in data exceeds the target energy consumption equipment of default variable quantity;3rd control unit, is used It is out of service in control targe energy consumption equipment.
On the device in above-described embodiment, wherein unit, module performs the concrete mode of operation related It is described in detail in the embodiment of this method, explanation will be not set forth in detail herein.
Those skilled in the art will readily occur to the present invention its after considering specification and putting into practice invention disclosed herein Its embodiment.This application is intended to cover the present invention any variations, uses, or adaptations, these modifications, purposes or Person's adaptive change follows the general principle of the present invention and the common knowledge in the art do not invented including the present invention Or conventional techniques.Description and embodiments are considered only as exemplary, and true scope and spirit of the invention are by following Claim is pointed out.
It should be appreciated that the invention is not limited in the precision architecture for being described above and being shown in the drawings, and And various modifications and changes may be made without departing from the scope thereof.The scope of the present invention is only limited by appended claim.

Claims (10)

  1. A kind of 1. control method of energy consumption equipment in energy internet, it is characterised in that including:
    The multi-energy data of power plant in energy internet, energy storage device and energy consumption equipment is monitored;
    Controlled according to the multi-energy data that monitors the energy consumption equipment in the energy internet run at the appointed time or It is out of service.
  2. 2. according to the method described in claim 1, it is characterized in that, described in the multi-energy data control that the basis monitors Energy consumption equipment is run or out of service at the appointed time, including:
    The energy consumption data of the energy consumption equipment to being embodied in the multi-energy data that monitors carries out analysis and determines the energy consumption The unlatching priority and/or closing priority of equipment, and the energy supply ability of the energy internet, or obtain advance The unlatching priority and/or closing priority of the energy consumption equipment set;
    According to the energy supply ability for the energy internet determined, and the unlatching priority of the energy consumption equipment and/ Or energy consumption equipment described in closing two priority classes is run or out of service in the specified time.
  3. 3. according to the method described in claim 1, it is characterized in that, described in the multi-energy data control that the basis monitors Energy consumption equipment is run or out of service at the appointed time, including:
    The energy consumption data of the energy consumption equipment is obtained from the multi-energy data monitored;
    Determine to consume energy most in the energy internet in the first preset time period according to the energy consumption data of the energy consumption equipment The energy consumption equipment of high predetermined number;
    The energy supply of the energy internet is being determined according to the multi-energy data of the power plant and the energy storage device During scarce capacity, the highest predetermined number of energy consumption determined according to the control of the energy surplus of the energy internet It is part or all of out of service in energy consumption equipment.
  4. 4. according to the method described in claim 1, it is characterized in that, described in the multi-energy data control that the basis monitors Energy consumption equipment is run or out of service at the appointed time, including:
    The energy consumption data of the energy consumption equipment is obtained from the multi-energy data monitored;
    Determine that the variable quantity of at least one energy consumption parameter in energy consumption data in the second preset time period exceeds default variable quantity Target energy consumption equipment;
    Control the target energy consumption equipment out of service.
  5. 5. method according to any one of claims 1 to 4, it is characterised in that the multi-energy data includes energy parameter, The energy parameter includes at least a kind of following parameter:
    Voltage, electric current, power and electricity.
  6. A kind of 6. energy consumption equipment control device, it is characterised in that including:
    Monitoring modular, for the multi-energy data progress to the power plant in energy internet, energy storage device and energy consumption equipment Monitoring;
    Control module, for being controlled the energy consumption equipment in the energy internet specifying according to the multi-energy data monitored Time operation or it is out of service.
  7. 7. device according to claim 6, it is characterised in that the control module, including:
    First determination unit, the energy consumption data of the energy consumption equipment for being embodied in the multi-energy data to monitoring carry out Analysis determines the unlatching priority of the energy consumption equipment and/or closes priority, and the energy supply of the energy internet Ability, or obtain the unlatching priority of the pre-set energy consumption equipment and/or close priority;
    First control unit, sets for the energy supply ability according to the energy internet determined, and the energy consumption Standby unlatching priority and/or energy consumption equipment described in closing two priority classes are run or out of service in the specified time.
  8. 8. device according to claim 6, it is characterised in that the control module, including:
    First acquisition unit, for obtaining the energy consumption data of the energy consumption equipment from the multi-energy data monitored;
    Second determination unit, for determining the energy in the first preset time period according to the energy consumption data of the energy consumption equipment Consume energy the energy consumption equipment of highest predetermined number in source interconnection net;
    Second control unit, for determining the energy according to the multi-energy data of the power plant and the energy storage device During the energy supply scarce capacity of internet, the energy consumption highest determined is controlled according to the energy surplus of the energy internet The predetermined number energy consumption equipment in it is part or all of out of service.
  9. 9. device according to claim 6, it is characterised in that the control module, including:
    Second acquisition unit, for obtaining the energy consumption data of the energy consumption equipment from the multi-energy data monitored;
    3rd determination unit, for determining the variable quantity of at least one energy consumption parameter in energy consumption data in the second preset time period Beyond the target energy consumption equipment of default variable quantity;
    3rd control unit, for controlling the target energy consumption equipment out of service.
  10. 10. according to the device described in claim 6 to 9 any one, it is characterised in that the multi-energy data is joined including the energy Number, the energy parameter include at least a kind of following parameter:
    Voltage, electric current, power and electricity.
CN201710931061.3A 2017-10-09 2017-10-09 The control method and device of energy consumption equipment in energy internet Pending CN107909237A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710931061.3A CN107909237A (en) 2017-10-09 2017-10-09 The control method and device of energy consumption equipment in energy internet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710931061.3A CN107909237A (en) 2017-10-09 2017-10-09 The control method and device of energy consumption equipment in energy internet

Publications (1)

Publication Number Publication Date
CN107909237A true CN107909237A (en) 2018-04-13

Family

ID=61840191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710931061.3A Pending CN107909237A (en) 2017-10-09 2017-10-09 The control method and device of energy consumption equipment in energy internet

Country Status (1)

Country Link
CN (1) CN107909237A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109255855A (en) * 2018-09-28 2019-01-22 上汽通用五菱汽车股份有限公司 Maintenance method, terminal and the computer readable storage medium of vehicle
CN112651614A (en) * 2020-12-21 2021-04-13 河南德尔液空科技有限公司 Intelligent energy-saving method and system based on air separation equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101752881A (en) * 2008-12-16 2010-06-23 台达电子工业股份有限公司 UPS (uninterrupted power supply) device with low power consumption
US20110126035A1 (en) * 2009-11-25 2011-05-26 Hitachi, Ltd. Energy conservation control method for network system
CN104319774A (en) * 2014-11-05 2015-01-28 珠海格力电器股份有限公司 Monitoring method and device for intelligent community
CN104850026A (en) * 2014-02-14 2015-08-19 苏州三星电子有限公司 Device and method for controlling load of power grid
CN106534264A (en) * 2016-10-14 2017-03-22 国网上海市电力公司 Energy Internet networking method based on resource and load matching
CN106786554A (en) * 2017-01-17 2017-05-31 珠海格力电器股份有限公司 The control method and device of micro-grid system
CN107016532A (en) * 2017-05-26 2017-08-04 云南电网有限责任公司电力科学研究院 A kind of home energy source management terminal, system and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101752881A (en) * 2008-12-16 2010-06-23 台达电子工业股份有限公司 UPS (uninterrupted power supply) device with low power consumption
US20110126035A1 (en) * 2009-11-25 2011-05-26 Hitachi, Ltd. Energy conservation control method for network system
CN104850026A (en) * 2014-02-14 2015-08-19 苏州三星电子有限公司 Device and method for controlling load of power grid
CN104319774A (en) * 2014-11-05 2015-01-28 珠海格力电器股份有限公司 Monitoring method and device for intelligent community
CN106534264A (en) * 2016-10-14 2017-03-22 国网上海市电力公司 Energy Internet networking method based on resource and load matching
CN106786554A (en) * 2017-01-17 2017-05-31 珠海格力电器股份有限公司 The control method and device of micro-grid system
CN107016532A (en) * 2017-05-26 2017-08-04 云南电网有限责任公司电力科学研究院 A kind of home energy source management terminal, system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109255855A (en) * 2018-09-28 2019-01-22 上汽通用五菱汽车股份有限公司 Maintenance method, terminal and the computer readable storage medium of vehicle
CN112651614A (en) * 2020-12-21 2021-04-13 河南德尔液空科技有限公司 Intelligent energy-saving method and system based on air separation equipment

Similar Documents

Publication Publication Date Title
EP3716164A1 (en) Predictive power usage monitoring
CN104734362B (en) A kind of photovoltaic DC-to-AC converter health status monitoring and warning system
CN105006887B (en) A kind of system and method for realizing intelligent power distribution remote monitoring
CN110874692A (en) Alternating current-direct current hybrid regional power grid spot market clearing calculation optimization method and device
CN104319774B (en) Monitoring method and device for intelligent community
CN104184214B (en) A kind of building power load method for supervising
CN104049600B (en) With the system and method for the energy information renewal the value of the confidence related to automated system
CN107112756A (en) Method for Optimal Reactive Power energy expenditure
CN108710099A (en) Capacitance type potential transformer monitoring alarm method and system
CN107909237A (en) The control method and device of energy consumption equipment in energy internet
Wu et al. Improving data center energy efficiency using a cyber-physical systems approach: integration of building information modeling and wireless sensor networks
CN108055181A (en) A kind of smart home wireless control system
CN105391168A (en) Transformer load real-time control method
CN104184145B (en) A kind of building intelligent distribution system
CN110209087A (en) The natural valve station monitoring system and method for city wireless teletransmission based on GPRS
CN105811588A (en) Electric power grid safety running monitoring and communication system
CN203552029U (en) Microgrid control system based on distributed controllers
CN103001231A (en) Integrated and distributed regulating system and method for reactive resources in distribution network
CN106160232A (en) A kind of load monitoring equipment for power system
KR101960688B1 (en) Method of managing power of Machine to Machine device, and network server for managing power of Machine to Machine device
CN106373028A (en) Electric power maintenance system
CN101231523B (en) Control system and method for sensibility charge
Malakhov et al. Adaptation of smard grid technologies
CN106209609A (en) Automatic management application system, method and device between digital convergence gateways
CN114696328A (en) Power line loss analysis method, system and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination