CN107905554A - Fabricated shear wall superimposed sheet connecting integration support system and installation method - Google Patents

Fabricated shear wall superimposed sheet connecting integration support system and installation method Download PDF

Info

Publication number
CN107905554A
CN107905554A CN201711360753.3A CN201711360753A CN107905554A CN 107905554 A CN107905554 A CN 107905554A CN 201711360753 A CN201711360753 A CN 201711360753A CN 107905554 A CN107905554 A CN 107905554A
Authority
CN
China
Prior art keywords
shear wall
superimposed sheet
supporting rack
embedded nut
support plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711360753.3A
Other languages
Chinese (zh)
Inventor
孟宪宏
王亚楠
李广玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201711360753.3A priority Critical patent/CN107905554A/en
Publication of CN107905554A publication Critical patent/CN107905554A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/02Shores or struts; Chocks non-telescopic
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The present invention provides a kind of fabricated shear wall superimposed sheet connecting integration support system and its installation method, fulcrum is used as by the nut being embedded in advance in precast shear wall, support prefabricated superimposed sheet, border width independent of shear wall, cancel floor lower part vertical supporting, it is cost-effective so as to reduce formwork difficulty, and can meet construction precision.Meanwhile the support of this supporting structure concentrates on the top of structure, supported without bottom, there can be the activity that substantial amounts of space supplies bottom personnel.Installation personnel needed for the supporting rack of the supporting structure is few, and execute-in-place is also relatively easy, can effectively solve the problem that the construction difficult problems such as the connection of shear wall superimposed sheet, support plate support.

Description

Fabricated shear wall superimposed sheet connecting integration support system and installation method
Technical field
The invention belongs to building structure technology field, more particularly to a kind of fabricated shear wall superimposed sheet connecting integration Support system and installation method.
Background technology
Growing with assembled architecture, each component connection of assembled architecture will also become frequent and important. In the connection of assembled arthitecutral structure component, shear wall-superimposed sheet connection is a kind of very common presence.In this type of attachment In, one end of superimposed sheet is overlapped on the edge of shear wall, and the top of plate is sling by crane, and bottom carries out vertical supporting.
And shear wall-superimposed sheet connecting node is primarily present three problems:
First, the problem of superimposed sheet bearing length.For shear wall, its protective layer is generally 15-20mm.Taken in practical structures When connecing, since the operation of the scale error of component, construction personnel is horizontal and the factors such as the construction environment at scene, usually very It is difficult accurately smoothly to complete overlap joint, generally require multidisciplinary personnel and coordinate for several times, adjustment could be completed repeatedly, while be difficult to protect Card overlap joint quality.
Second, at the posterior nodal point of shear wall-superimposed sheet overlap joint after pour problem.Superimposed sheet is overlapped on shear wall it Afterwards, side template can be applied to wearing bolt, but the support of end template will be sufficiently complex, in the case where that can not ensure to overlap quality, The support effect of end template can not equally ensure, finally influence connection stiffness.
3rd, the installation of vertical supporting and problem is removed under superimposed sheet.To ensure security, the vertical supporting of superimposed sheet is past Past very complicated, installation procedure is more and complicated.Meanwhile substantial amounts of vertical supporting reduces the activity space of bottom.
The content of the invention
Shuttering supporting is poured for the above-mentioned wall lap of splice at fabricated shear wall superimposed sheet connecting node deficiency, after node And the technical problems such as assembling and disassembling is cumbersome are supported under plate, the present invention provides a kind of for the connection of fabricated shear wall superimposed sheet Supporting structure and installation method.Shear wall side is connected to by embedded nut, extends the lap of splice and adjusting mould is connected at top Board mount, and there is good stress performance, so as to meet the requirement for overlapping precision.
Technical scheme is as follows:
Fabricated shear wall superimposed sheet connecting integration support system, including it is symmetrically disposed on two shear walls(5)The support of inner side Frame(3), supporting rack(3)With superimposed sheet(1)Between the adjusting bolt that sets(4)And support plate(6);Support frame as described above(3)Cut on edge Power wall(5)Side is set up in parallel two, supporting rack(3)Section be irregular frame, its right-angle side corresponds to shear wall respectively(5) And superimposed sheet(1);Relative to shear wall(5)The supporting rack of side(3)Right-angle side on bolt connecting hole is set, by with it is pre-buried Nut(2)Supporting bolt connection shear wall(5)The embedded nut of upper setting(2);Relative to superimposed sheet(1)On supporting rack (3)Right-angle side on connect adjusting bolt(4);When in use, superimposed sheet(1)The supporting rack of lower section(3)It is equipped with support plate (6), supporting rack(3)With support plate(6)Between pass through adjusting bolt(4)Connection, by adjusting supporting rack(3)With support plate(6) Between adjusting bolt(4)Adjust support plate(6)Height.
Further, support frame as described above(3)It is to be welded into two long right-angle sides by equal leg angle to be welded not with steel plate Rule framework, same shear wall(5)Two supporting racks(3)Pass through adjusting bolt(4)With support plate(6)It is connected, so as to support folded Plywood(1).
Further, the same shear wall(5)On two supporting racks(3)Between by weld two parallel to superimposed sheet (1)Strip steel plate increase overall stability, respectively in supporting rack(3)Strip steel is welded at 1/3, the 2/3 of upper short transverse Plate.
Further, the support plate(6)Be by welded steel plate into flute profile slab, support plate(6)Bottom is bilayer, Tapped oval preformed hole is left among lower floor, to connect adjusting bolt(4).
Further, the shear wall(5)Upper setting embedded nut(2), embedded nut(2)By the bolt that matches with Supporting rack(3)It is connected, for by supporting rack(3)It is fixed on shear wall(5)On.
Further, support frame as described above(3)It is equipped with the oval preformed hole on same straight line, embedded nut(2) Supporting bolt pass through preformed hole and embedded nut(2)It is connected, embedded nut(2)Pass through U-shaped muscle(7)With shear wall(5)Connection.
Further, the U-shaped muscle(7)The angle of inclination of relative level is 30-45 °.
Further, the embedded nut(2)The termination for being not connected to bolt carries block(8), block(8)Justify along the termination Week is set in cross.
The installation method of fabricated shear wall superimposed sheet connecting integration support system, including following steps:
A, embedded nut(2)It is embedded in shear wall(5)Regulating position, by shear wall(5)Install, by embedded nut(2)'s Supporting bolt passes through supporting rack(3)On preformed hole and embedded nut(2)It is connected, so that supporting rack(3)It is fixed on shear wall (5)On, bolt does not have to tighten;
B, by spirit level to supporting rack(3)Top surface measures, it is ensured that four supporting racks(3)Top surface gap be less than 5mm, twist Tight bolt;
C, by support plate(6)With supporting rack(3)Pass through adjusting bolt(4)It is connected, carries out second of spirit level measurement;
D, adjusting bolt is passed through(4)Fine setting, then to two support plates(6)Carry out spirit level measurement, it is ensured that error range 5mm it It is interior;
E, superimposed sheet is lifted(1)It is placed in support plate(6)On, will be with support plate(6)Mutually level batten is positioned over supporting rack (3)Right angle, to prevent node from pouring spillage phenomenon, then to superimposed sheet(1)With shear wall(5)Node poured;
F, when node reaches the intensity of code requirement, frame can be supported(3)Dismounting, during dismounting, first loosen adjusting bolt (4), then take out support plate(6), batten, remove with two supporting racks(3)The steel plate of two connected strips, finally removes support Frame(3);
G, with plastic bolt to embedded nut(2)Sealed, for use next time.
Compared with prior art, beneficial effects of the present invention are:
1. the present invention shear wall and superimposed sheet junction in assembly concrete building, by being embedded in precast shear wall in advance In nut as fulcrum, support prefabricated superimposed sheet, independent of the border width of shear wall, cancel floor lower part and vertically prop up Support, so that it is cost-effective to reduce formwork difficulty, and can meet construction precision.Meanwhile the support of this supporting structure concentrates on structure Top, without bottom support, can have substantial amounts of space supply bottom personnel activity.Needed for the supporting rack of the supporting structure Installation personnel is few, and execute-in-place is also relatively easy, can effectively solve the problem that the constructions such as shear wall-superimposed sheet connection, support plate support Problem.
2. the present invention is directed to assembled architecture, the branch modulus problem of node is poured after shear wall and superimposed sheet, using this hair Bright structure can be completed once.Execute-in-place is simple, constructional difficulties when can effectively solve the problem that wallboard overlap joint, after pour node template and add Gu, support, remove the problem of.On the premise of rational structure, make whole supporting structure that there is necessary bearing capacity and rigidity, And meet construction safety requirement at the scene.
Brief description of the drawings
Fig. 1 is supporting rack of the present invention and shear wall superimposed sheet connection diagram.
Fig. 2 is A-A sectional views in Fig. 1.
Fig. 3 is scheme of installation of the present invention between two shear walls.
Fig. 4 is the structure diagram of supporting rack of the present invention.
Fig. 5 is the left view of Fig. 4.
Fig. 6 is shear wall supporting rack in side of the present invention, the top view of support plate.
Fig. 7 is the structure diagram that support plate is connected with adjusting bolt in Fig. 1.
Fig. 8 is adjusting bolt cap plan in Fig. 7.
Fig. 9 is the adjusting bolt plan of Fig. 7.
Figure 10 is 2 plan of embedded nut of the present invention.
Figure 11 is 8 plan of cross block that embedded nut 2 is not connected to bolt end.
Figure 12 is supporting rack, support plate top view between the shear wall of two sides.
Figure 13 is the regulating position schematic diagram that embedded nut 2 of the present invention is installed on shear wall.
In figure:1. superimposed sheet, 2. embedded nuts, 3. supporting racks, 4. adjusting bolts, 5. shear walls, 6. support plates, 7.U types Muscle, 8. blocks.
Embodiment
The present invention will be described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment 1
As shown in figs 1 to 6, a kind of fabricated shear wall superimposed sheet connecting integration support system of the present invention, including be symmetrical arranged Supporting rack 3 in 5 side of shear wall, the adjusting bolt 4 and support plate 6 set between supporting rack 3 and superimposed sheet 1, the support Frame 3 is set up in parallel two along shear wall 5 per side, and the section of supporting rack 3 is irregular frame, its right-angle side corresponds to shear wall respectively 5 and superimposed sheet 1, it is provided with the right-angle side with respect to 5 side of shear wall and is bolted preformed hole, is bolted to shear wall 5 The embedded nut 2 that side is set;Relative to connection adjusting bolt 4 on the right-angle side of superimposed sheet 1, when in use, 5 homonymy of shear wall Connection support plate 6, superimposed sheet 1 are placed in adjacent two supporting racks, 3 upper backup pad of side shear wall 5 in adjusting bolt 4 on supporting rack 3 6 top, the height of support plate 6 is adjusted by the adjusting bolt 4 between adjusting between support plate 6 and supporting rack 3.
As Figure 4-Figure 6, wherein support frame as described above 3 be by two irregular frames by connecting plate connect and compose one it is whole Body, the right-angle side of its irregular frame are welded by equal leg angle, other are welded by steel plate;Supporting rack 3 is used for branch Support top superimposed sheet 1.
As Figure 7-9, the adjusting bolt 4 is mounted between support plate 6 and supporting rack 3, by adjusting adjusting bolt 4 Highly finely tune the level height of support plate 6.
As shown in Fig. 1, Figure 12 and Figure 13,2 periphery of embedded nut set on the shear wall 5 is also respectively provided with symmetrically Inclined 7 reinforcement of U-shaped muscle;The inclined angle of 7 relative level of U-shaped muscle is 30-45 °, and this example selects 45 °.
As shown in Figure 1, setting 4 embedded nuts 2 on the shear wall 5 per side, the embedded nut 2 of both sides is located at same water On horizontal line;Supporting rack 3 is bolted on the embedded nut 2 in shear wall 5, and the load on superimposed sheet 1 passes through supporting rack 3 Embedded nut 2 is transmitted to, further passes to shear wall 5;Two 2 connecting holes of embedded nut are provided with supporting rack 3, are selected suitable Embedded nut 2, embedded nut 2 is connected with preformed hole of the supporting bolt of embedded nut 2 through relevant position, so that fixed branch Support 3;Single 2 connecting hole of embedded nut can ensure it is easy for construction, but there are the problem of the rotation of supporting rack 3, and when pre- Bury 2 connecting hole of nut it is excessive when, then the docking difficulty of 2 connecting hole of embedded nut when can undoubtedly increase construction, so using oval 2 connecting hole of embedded nut of type, can both prevent the rotation of supporting rack 3, the also height of fine-tuning supporting rack 3, and can be effectively Reduce difficulty of construction.
As shown in Figure 2 and Figure 3, the present invention is used for the application method of the supporting rack 3 of fabricated shear wall superimposed sheet connection, bag Include following steps:
(1)Supporting rack 3 is symmetrically disposed on 5 both sides of shear wall two-by-two, the side of supporting rack 3 passes through with 5 side of shear wall respectively The supporting of embedded nut 2 is bolted embedded nut 2, and bolt need not tighten fixation;
(2)3 top surface of supporting rack is measured by spirit level, it is ensured that the top surface gap of four supporting racks 3 is less than 5mm, tightens Bolt;
(3)Support plate 6 is connected by adjusting bolt 4 with supporting rack 3, and support plate 6 is positioned on two supporting racks 3, then into Second of spirit level measurement of row;
(4)Finely tuned by adjusting bolt 4, it is ensured that support plate 6 is parallel to floor;
(5)Lifting superimposed sheet 1 is placed on support plate 6, connects 5 node of superimposed sheet 1 and shear wall, and poured.
When the node poured reaches the intensity of code requirement, the dismounting of structure is supported;Method is as follows:
(1)The adjusting bolt 4 in support plate 6 is loosened, removes support plate 6;
(2)The embedded nut 2 and the supporting bolt of embedded nut 2 that release supporting rack 3 is connected with shear wall 5, remove supporting rack 3.
The present invention Path of Force Transfer be:Superimposed sheet 1 is to supporting rack 3, then by supporting rack 3 to embedded nut 2, by embedded nut 2 are transmitted to shear wall 5.So 3 bearing capacity of supporting rack depends on the coagulation at the self-strength and embedded nut 2 of embedded nut 2 Native intensity, in order to make embedded nut 2 based on drawing stress, so adjusting bolt 4 and support plate 6 are arranged at connection system for guide rail Distal end;Meanwhile it is that the pre-embedded bolt at shear wall 5 adds U-shaped muscle 7 to carry out reinforcement.
Embodiment 2
This example is as different from Example 1:2 periphery of embedded nut set on shear wall 5 described in this example is equipped with U-shaped 7 phase of muscle It it is 30 ° to the inclined angle of horizontal plane.This example support plate 6 using by welded steel plate into a groove profile frame.As Figure 10, Shown in Figure 11, the termination that embedded nut 2 described in this example is not connected to bolt carries block 8, and the block 8 is set along the termination circumference In cross-shaped configuration, fixed beneficial to installation.
Embodiment 3
This example is as different from Example 1:2 periphery of embedded nut set on composite beam 5 described in this example is equipped with U-shaped 7 phase of muscle It it is 40 ° to the inclined angle of horizontal plane.

Claims (9)

1. fabricated shear wall superimposed sheet connecting integration support system, it is characterised in that:Including being symmetrically disposed on two shear walls (5)The supporting rack of inner side(3), supporting rack(3)With superimposed sheet(1)Between the adjusting bolt that sets(4)And support plate(6);It is described Supporting rack(3)Along shear wall(5)Side is set up in parallel two, supporting rack(3)Section be irregular frame, its right-angle side difference Corresponding shear wall(5)And superimposed sheet(1);Relative to shear wall(5)The supporting rack of side(3)Right-angle side on set and be bolted Hole, by with embedded nut(2)Supporting bolt connection shear wall(5)The embedded nut of upper setting(2);Relative to superimposed sheet (1)On supporting rack(3)Right-angle side on connect adjusting bolt(4);When in use, superimposed sheet(1)The supporting rack of lower section(3)On Equipped with support plate(6), supporting rack(3)With support plate(6)Between pass through adjusting bolt(4)Connection, by adjusting supporting rack(3)With Support plate(6)Between adjusting bolt(4)Adjust support plate(6)Height.
2. fabricated shear wall superimposed sheet connecting integration support system according to claim 1, it is characterised in that:It is described Supporting rack(3)It is that the irregular frame that two long right-angle sides and steel plate be welded, same shear wall are welded into by equal leg angle(5) Two supporting racks(3)Pass through adjusting bolt(4)With support plate(6)It is connected, so as to support superimposed sheet(1).
3. fabricated shear wall superimposed sheet connecting integration support system according to claim 1, it is characterised in that:It is described Same shear wall(5)On two supporting racks(3)Between by weld two parallel to superimposed sheet(1)Strip steel plate it is whole to increase Body stability, respectively in supporting rack(3)Strip steel plate is welded at 1/3, the 2/3 of upper short transverse.
4. fabricated shear wall superimposed sheet connecting integration support system according to claim 1, it is characterised in that:It is described Support plate(6)Be by welded steel plate into flute profile slab, support plate(6)Bottom for bilayer, in a lower layer between leave band internal thread Oval preformed hole, for connecting adjusting bolt(4).
5. fabricated shear wall superimposed sheet connecting integration support system according to claim 1, it is characterised in that:It is described Shear wall(5)Upper setting embedded nut(2), embedded nut(2)Pass through the bolt and supporting rack to match(3)It is connected, for inciting somebody to action Supporting rack(3)It is fixed on shear wall(5)On.
6. fabricated shear wall superimposed sheet connecting integration support system according to claim 1, it is characterised in that:It is described Supporting rack(3)It is equipped with the oval preformed hole on same straight line, embedded nut(2)Supporting bolt by preformed hole with Embedded nut(2)It is connected, embedded nut(2)Pass through U-shaped muscle(7)With shear wall(5)Connection.
7. fabricated shear wall superimposed sheet connecting integration support system according to claim 6, it is characterised in that:It is described U-shaped muscle(7)The angle of inclination of relative level is 30-45 °.
8. fabricated shear wall superimposed sheet connecting integration support system according to claim 1, it is characterised in that:It is described Embedded nut(2)The termination for being not connected to bolt carries block(8), block(8)Set along the termination circumference in cross.
9. the installation method of fabricated shear wall superimposed sheet connecting integration support system, it is characterised in that including following Step:
A, embedded nut(2)It is embedded in shear wall(5)Regulating position, by shear wall(5)Install, by embedded nut(2)'s Supporting bolt passes through supporting rack(3)On preformed hole and embedded nut(2)It is connected, so that supporting rack(3)It is fixed on shear wall (5)On, bolt does not have to tighten;
B, by spirit level to supporting rack(3)Top surface measures, it is ensured that four supporting racks(3)Top surface gap be less than 5mm, twist Tight bolt;
C, by support plate(6)With supporting rack(3)Pass through adjusting bolt(4)It is connected, carries out second of spirit level measurement;
D, adjusting bolt is passed through(4)Fine setting, then to two support plates(6)Carry out spirit level measurement, it is ensured that error range 5mm it It is interior;
E, superimposed sheet is lifted(1)It is placed in support plate(6)On, will be with support plate(6)Mutually level batten is positioned over supporting rack (3)Right angle, to prevent node from pouring spillage phenomenon, then to superimposed sheet(1)With shear wall(5)Node poured;
F, when node reaches the intensity of code requirement, frame can be supported(3)Dismounting, during dismounting, first loosen adjusting bolt (4), then take out support plate(6), batten, remove with two supporting racks(3)The steel plate of two connected strips, finally removes support Frame(3);
G, with plastic bolt to embedded nut(2)Sealed, for use next time.
CN201711360753.3A 2017-12-18 2017-12-18 Fabricated shear wall superimposed sheet connecting integration support system and installation method Pending CN107905554A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711360753.3A CN107905554A (en) 2017-12-18 2017-12-18 Fabricated shear wall superimposed sheet connecting integration support system and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711360753.3A CN107905554A (en) 2017-12-18 2017-12-18 Fabricated shear wall superimposed sheet connecting integration support system and installation method

Publications (1)

Publication Number Publication Date
CN107905554A true CN107905554A (en) 2018-04-13

Family

ID=61870143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711360753.3A Pending CN107905554A (en) 2017-12-18 2017-12-18 Fabricated shear wall superimposed sheet connecting integration support system and installation method

Country Status (1)

Country Link
CN (1) CN107905554A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360815A (en) * 2018-04-18 2018-08-03 沈阳建筑大学 Board bottom has the assembled composite beam-plate connection support device and installation method of height difference
CN108385887A (en) * 2018-04-18 2018-08-10 沈阳建筑大学 There are the assembled composite beam-plate connection support device and installation method of height difference in plate top
CN112900641A (en) * 2021-01-18 2021-06-04 四川省星光钢结构有限公司 Assembly type connecting component and mounting method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040118065A1 (en) * 2002-09-13 2004-06-24 Jackson Barry W. Column hung shoring bracket and slab support truss system
CN105649325A (en) * 2016-03-18 2016-06-08 中建科技河南有限公司 Adjustable tripod supporting system and method of fabricated concrete shear wall structure
CN205369978U (en) * 2015-12-28 2016-07-06 中民筑友有限公司 Prefabricated plate support frame
CN105803923A (en) * 2016-03-16 2016-07-27 中铁工程设计咨询集团有限公司 Interurban railway simple support T-beam sidewalk combined structure and combining method
CN107060075A (en) * 2017-04-20 2017-08-18 沈阳建筑大学 A kind of supporting construction connected for fabricated construction beam slab and installation method
CN206681376U (en) * 2017-04-11 2017-11-28 中冶建工集团有限公司 A kind of mounting structure suitable for high-rise building cylinder medial cradle
CN207673045U (en) * 2017-12-18 2018-07-31 沈阳建筑大学 Fabricated shear wall superimposed sheet connecting integration support system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040118065A1 (en) * 2002-09-13 2004-06-24 Jackson Barry W. Column hung shoring bracket and slab support truss system
CN205369978U (en) * 2015-12-28 2016-07-06 中民筑友有限公司 Prefabricated plate support frame
CN105803923A (en) * 2016-03-16 2016-07-27 中铁工程设计咨询集团有限公司 Interurban railway simple support T-beam sidewalk combined structure and combining method
CN105649325A (en) * 2016-03-18 2016-06-08 中建科技河南有限公司 Adjustable tripod supporting system and method of fabricated concrete shear wall structure
CN206681376U (en) * 2017-04-11 2017-11-28 中冶建工集团有限公司 A kind of mounting structure suitable for high-rise building cylinder medial cradle
CN107060075A (en) * 2017-04-20 2017-08-18 沈阳建筑大学 A kind of supporting construction connected for fabricated construction beam slab and installation method
CN207673045U (en) * 2017-12-18 2018-07-31 沈阳建筑大学 Fabricated shear wall superimposed sheet connecting integration support system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360815A (en) * 2018-04-18 2018-08-03 沈阳建筑大学 Board bottom has the assembled composite beam-plate connection support device and installation method of height difference
CN108385887A (en) * 2018-04-18 2018-08-10 沈阳建筑大学 There are the assembled composite beam-plate connection support device and installation method of height difference in plate top
CN112900641A (en) * 2021-01-18 2021-06-04 四川省星光钢结构有限公司 Assembly type connecting component and mounting method

Similar Documents

Publication Publication Date Title
CN107060075A (en) A kind of supporting construction connected for fabricated construction beam slab and installation method
CN109577534A (en) Tool-based hanging die assembly type composite floor slab and construction method
CN207673045U (en) Fabricated shear wall superimposed sheet connecting integration support system
CN107905554A (en) Fabricated shear wall superimposed sheet connecting integration support system and installation method
CN208310219U (en) Board bottom has assembled composite beam-plate connection support device of height difference
CN108797638A (en) Integrated assembled piping lane based on composite bottom board and its construction method
CN208441138U (en) Integrated assembled piping lane based on composite bottom board
KR101714160B1 (en) Steel-Concrete Composite Rahmen Bridge
CN102720371B (en) Butt joint method for multiple upright posts of steel structure module and temporary butt joint fixing device
CN110424601B (en) Concrete pouring anti-floating device for composite floor slab with fabricated structure and implementation method
CN108301546A (en) A kind of big module overlapping contignation of the assembled with plane girder temporary support
CN112267609A (en) Assembled laminated slab of combined plate support and mounting method
CN108360815A (en) Board bottom has the assembled composite beam-plate connection support device and installation method of height difference
CN106979023A (en) The adjustable concrete end mould of Tunnel Second Lining width and its adjusting method
CN208649894U (en) A kind of steel anchor beam and steel corbel unit spelling moulding bed
CN206667465U (en) A kind of supporting construction for the connection of fabricated construction beam slab
CN104500106B (en) A kind of tunnel inverted arch construction mould bases and tunnel inverted arch construction technology
CN208309949U (en) There is assembled composite beam-plate connection support device of height difference on plate top
CN217734853U (en) Adjustable plate buckling template support frame for super-load small-clear-distance beam
CN108385887A (en) There are the assembled composite beam-plate connection support device and installation method of height difference in plate top
CN110284716B (en) Construction method of lifting plate node structure of steel bar truss floor bearing plate
CN213952973U (en) Superimposed sheet bearing structure
CN213774040U (en) Assembled superimposed sheet that compoboard held in palm
CN210122816U (en) Be used for assembled coincide floor bottom plate board seam template reinforcing apparatus
CN110747743A (en) Steel-concrete bridge body pouring construction process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination