CN107905431A - A kind of M types metallic grid steel construction and installation method - Google Patents
A kind of M types metallic grid steel construction and installation method Download PDFInfo
- Publication number
- CN107905431A CN107905431A CN201711244064.6A CN201711244064A CN107905431A CN 107905431 A CN107905431 A CN 107905431A CN 201711244064 A CN201711244064 A CN 201711244064A CN 107905431 A CN107905431 A CN 107905431A
- Authority
- CN
- China
- Prior art keywords
- metallic grid
- types
- type
- hook
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The embodiment of the invention discloses a kind of M types metallic grid steel construction, including ceiling structure body, c-type lightgage steel joist, MB types metallic grid, MB types metallic grid hook, screw rod, the second through hole, tapped through hole, trip bolt and limiting through hole, the installation method of the M type metallic grid steel constructions, take two c-type lightgage steel joists to be arranged in parallel first, take several MB types metallic grids hook card again on c-type lightgage steel joist;Then MB types metallic grid is linked up with using trip bolt and is further fastened with c-type lightgage steel joist, be screwed connecting screw on MB types metallic grid hook;MB type metallic grids are finally installed, by hanging in the limiting through hole of MB type metallic grids for MB types metallic grid hook, the advantageous effect of the invention is MB types metallic grid to be easily fixedly mounted and fixed installation to c-type lightgage steel joist is convenient, and installation method is relatively simple, easy to grasp installation.
Description
Technical field
The present invention relates to ceiling structure field, more particularly to a kind of M types metallic grid steel construction and installation method.
Background technology
M type metallic grid steel constructions refer to the steel structure frame of the top finishing of house living environment.Briefly, it is exactly
Refer to the finishing of ceiling, be one of pith of interior decoration.
Current M type metallic grid steel constructions, MB types metallic grid cannot be easily fixedly mounted and to the light steel of c-type by existing
The problem of fixed installation of keel is inconvenient, and the installation method of current M type metallic grid steel constructions is complex, inconvenience
Installed in grasping.
The content of the invention
The present invention provides a kind of M types metallic grid steel construction and installation method, can solve in the prior art, current M
Type metallic grid steel construction, MB types metallic grid and the fixed installation to c-type lightgage steel joist cannot be easily fixedly mounted by existing
The problem of inconvenient, and the installation method of current M type metallic grid steel constructions is complex, is not easy to grasp asking for installation
Topic.
The present invention provides a kind of M types metallic grid steel construction, including ceiling structure body, c-type lightgage steel joist, MB types gold
Possessive case grid, MB types metallic grid hook, screw rod, the second through hole, tapped through hole, trip bolt and limiting through hole, the furred ceiling knot
Structure body includes two c-type lightgage steel joists and a MB types metallic grid;On two c-type lightgage steel joists respectively
It is fixed with two MB types metallic grid hooks;MB types metallic grid hook include deck, first through hole, limit buckle and
Hook;Top surface opens up the first through hole on the deck;The deck lower side fixes three limit buckles;The hook
Upper end is interspersed in three limit buckles;Threaded hole is offered respectively on two c-type lightgage steel joists;The threaded hole and
The first through hole is threaded with screw rod;The lower end of the hook is connected with the MB types metallic grid;Under the deck
Edge is fixedly connected by the trip bolt with the c-type lightgage steel joist.
It is preferred that the top edge of the c-type lightgage steel joist offers the second through hole.
It is preferred that the lower edge of the c-type lightgage steel joist offers the tapped through hole being adapted with the trip bolt.
It is preferred that the limiting through hole for hanging the hook is provided with the MB types metallic grid.
It is preferred that the lower end of the screw rod is provided with nipple.
It is preferred that it is provided with clamp nut on the nipple.
A kind of installation method of M types metallic grid steel construction, comprises the following steps:
S1, take two c-type lightgage steel joists to be arranged in parallel first, takes several MB types metallic grids hook card light steel of c-type again
On keel;
S2 and then linked up with MB types metallic grid using trip bolt is further fastened with c-type lightgage steel joist, in MB
Be screwed connecting screw on type metallic grid hook;
S3, finally install MB type metallic grids, the limit for hanging over MB type metallic grids that MB types metallic grid is linked up with
In the through hole of position.
Compared with prior art, advantageous effect of the invention is:
1st, the M type metallic grid steel constructions, by setting MB types metallic grid to link up with, and MB types metallic grid hook bag
Deck, first through hole, limit buckle and hook are included, deck therein is fixed on the light steel dragon of c-type by the nipple of screw rod lower end
On bone, the lower end fixed hook of deck, hook is fixedly connected with MB type metallic grids so that MB type metals can easily be fixedly mounted
Grid;
2nd, M type metallic grid steel constructions, by setting screw rod to link up with MB types metallic grid and c-type lightgage steel joist
It is fixed, c-type lightgage steel joist can also be hung in wall top so that the fixed installation to c-type lightgage steel joist is convenient;
3rd, M type metallic grid steel constructions, by being connected with MB type metallic grids, and MB type metals in the lower end of hook
The limiting through hole for hanging hook is provided with grid, improves the firm performance of installation;
4th, the M type metallic grid steel constructions, are fixed by trip bolt and c-type lightgage steel joist by present lower edge and connected
Connect, and the top edge of c-type lightgage steel joist offers the second through hole, and the lower edge of c-type lightgage steel joist offers and trip bolt
Adaptable tapped through hole, the stability of the further installation for improving MB types metallic grid hook;
5th, the installation method of the M type metallic grid steel constructions, takes two c-type lightgage steel joists to be arranged in parallel, takes some first
A MB types metallic grid hook card is again on c-type lightgage steel joist;Then MB types metallic grid is linked up with using trip bolt light with c-type
Steel joist is further fastened, and be screwed connecting screw on MB types metallic grid hook;MB type metal grids are finally installed
Grid, by hanging in the limiting through hole of MB type metallic grids for MB types metallic grid hook, this method is relatively simple, easy to slap
Hold installation.
Brief description of the drawings
Fig. 1 provides a kind of structure diagram of M types metallic grid steel construction for the present invention;
Fig. 2 provides a kind of MB type metallic grid hook structure schematic diagrames of M types metallic grid steel construction for the present invention;
Fig. 3 provides a kind of c-type light gauge steel structure schematic diagram of M types metallic grid steel construction for the present invention;
Fig. 4 is the enlarged structure schematic diagram at A in Fig. 1 of the present invention.
Description of reference numerals:1- ceiling structure bodies;2-C type lightgage steel joists;3-MB type metallic grids;4-MB type metal grids
Grid are linked up with;41- decks;42- first through hole;43- limit buckles;44- is linked up with;5- screw rods;The second through holes of 6-;7- tapped through holes;8-
Trip bolt;9- limiting through hole.
Embodiment
Below in conjunction with the accompanying drawings, the specific embodiment of the present invention is described in detail, it is to be understood that of the invention
Protection domain and from the limitation of embodiment.
As shown in Figures 1 to 4, a kind of M types metallic grid steel construction provided in an embodiment of the present invention, including ceiling structure sheet
It is body 1, c-type lightgage steel joist 2, MB types metallic grid 3, MB types metallic grid hook 4, screw rod 5, the second through hole 6, tapped through hole 7, tight
Gu screw 8 and limiting through hole 9, the ceiling structure body 1 includes two c-type lightgage steel joists 2 and a MB types gold
Possessive case grid 3;Two MB types metallic grid hooks 4 are respectively fixed with two c-type lightgage steel joists 2;The MB types gold
Possessive case grid hook 4 includes deck 41, first through hole 42, limit buckle 43 and hook 44;Top surface opens up described on the deck 41
One through hole 42;41 lower side of deck fixes three limit buckles 43;The upper end of the hook 44 is interspersed in three limits
In position button 43;Threaded hole is offered respectively on two c-type lightgage steel joists 2;42 spiral shell of the threaded hole and the first through hole
Line is connected with screw rod 5;The lower end of the hook 44 is connected with the MB types metallic grid 3;The lower edge of the deck 41 passes through
The trip bolt 8 is fixedly connected with the c-type lightgage steel joist 2.
The top edge of the c-type lightgage steel joist 2 offers the second through hole 6.
The lower edge of the c-type lightgage steel joist 2 offers the tapped through hole 7 being adapted with the trip bolt 8.
The limiting through hole 9 for hanging the hook 44 is provided with the MB types metallic grid 3.
The lower end of the screw rod 5 is provided with nipple.
Clamp nut is provided with the nipple.
A kind of installation method of M types metallic grid steel construction, comprises the following steps:
S1, take two c-type lightgage steel joists 2 to be arranged in parallel first, and taking 4 card of several MB types metallic grids hook, c-type is light again
On steel joist 2;
S2 and then MB types metallic grid hook 4 is further fastened with c-type lightgage steel joist 2 using trip bolt 8,
Be screwed connecting screw 5 on MB types metallic grid hook 4;
S3, finally install MB types metallic grid 3, and the hook 44 of MB types metallic grid hook 4 is hung over MB types metallic grid 3
Limiting through hole 9 in.
The M type metallic grid steel constructions, by setting MB types metallic grid to link up with 4, and 4 bag of MB types metallic grid hook
Deck 41, first through hole 42, limit buckle 43 and hook 44 are included, deck 41 therein is fixed by the nipple of 5 lower end of screw rod
On c-type lightgage steel joist 2, the lower end fixed hook 44 of deck 41, hook 44 is fixedly connected with MB types metallic grid 3 so that can be just
Prompt fixed installation MB type metallic grids;The M type metallic grid steel constructions, by setting screw rod 5 can be by MB type metallic grids
Hook 4 is fixed with c-type lightgage steel joist 2, c-type lightgage steel joist 2 can also be hung in wall top so that the fixation to c-type lightgage steel joist
Install convenient;The M type metallic grid steel constructions, by being connected with MB types metallic grid 3, and MB types gold in the lower end of hook 44
The limiting through hole 9 for hanging hook 44 is provided with possessive case grid 3, improves the firm performance of installation;The M type metallic grid steel knots
Structure, is fixedly connected by present 41 lower edge by trip bolt 8 with c-type lightgage steel joist 2, and c-type lightgage steel joist 2 is upper
Edge has the second through hole 6, and the lower edge of c-type lightgage steel joist 2 offers the tapped through hole 7 being adapted with trip bolt 8, into
The stability of the installation of the raising MB types metallic grid hook 4 of one step;The installation method of the M type metallic grid steel constructions, first
Take two c-type lightgage steel joists 2 to be arranged in parallel, take 4 card of several MB types metallic grids hook again on c-type lightgage steel joist 2;Then it is sharp
MB types metallic grid hook 4 is further fastened with c-type lightgage steel joist 2 with trip bolt 8, is linked up with MB types metallic grid
Be screwed connecting screw 5 on 4;MB types metallic grid 3 is finally installed, the hook 44 of MB types metallic grid hook 4 is hung over into MB
In the limiting through hole 9 of type metallic grid 3, this method is relatively simple, easy to grasp installation.
Disclosed above is only the specific embodiment of the present invention, and still, the embodiment of the present invention is not limited to this, Ren Heben
What the technical staff in field can think change should all fall into protection scope of the present invention.
Claims (7)
- A kind of 1. M types metallic grid steel construction, it is characterised in that:Including ceiling structure body (1), c-type lightgage steel joist (2), MB Type metallic grid (3), MB types metallic grid hook (4), screw rod (5), the second through hole (6), tapped through hole (7), trip bolt (8) With limiting through hole (9), the ceiling structure body (1) includes two c-type lightgage steel joists (2) and a MB types metal Grid (3);Two MB types metallic grid hooks (4) are respectively fixed with two c-type lightgage steel joists (2);The MB Type metallic grid hook (4) includes deck (41), first through hole (42), limit buckle (43) and hook (44);The deck (41) Upper top surface opens up the first through hole (42);Deck (41) lower side fixes three limit buckles (43);The hook (44) upper end is interspersed in three limit buckles (43);Screw thread is offered respectively on two c-type lightgage steel joists (2) Hole;The threaded hole and the first through hole (42) are threaded with screw rod (5);The lower end of the hook (44) is connected with described MB types metallic grid (3);The lower edge of the deck (41) is solid by the trip bolt (8) and the c-type lightgage steel joist (2) Fixed connection.
- 2. a kind of M types metallic grid steel construction as claimed in claim 1, it is characterised in that the c-type lightgage steel joist (2) Top edge offers the second through hole (6).
- 3. a kind of M types metallic grid steel construction as claimed in claim 1, it is characterised in that the c-type lightgage steel joist (2) Lower edge offers the tapped through hole (7) being adapted with the trip bolt (8).
- 4. a kind of M types metallic grid steel construction as claimed in claim 1, it is characterised in that set on MB types metallic grid (3) It is useful for hanging the limiting through hole (9) of the hook (44).
- 5. a kind of M types metallic grid steel construction as described in claim 1-4, it is characterised in that the lower end of screw rod (5) is provided with Nipple.
- 6. a kind of M types metallic grid steel construction as described in claim 1-5, it is characterised in that be provided with nipple tight Gu nut.
- A kind of 7. installation method of M types metallic grid steel construction, it is characterised in that:Comprise the following steps:S1, take two c-type lightgage steel joists (2) to be arranged in parallel first, and taking several MB types metallic grids hook (4) card, c-type is light again On steel joist (2);S2 and then MB types metallic grid hook (4) and c-type lightgage steel joist (2) further carried out using trip bolt (8) tight Gu be screwed connecting screw (5) on MB types metallic grid hook (4);S3, finally install MB types metallic grid (3), and the hook (44) of MB types metallic grid hook (4) is hung over MB type metal grids In the limiting through hole (9) of grid (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711244064.6A CN107905431A (en) | 2017-11-30 | 2017-11-30 | A kind of M types metallic grid steel construction and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711244064.6A CN107905431A (en) | 2017-11-30 | 2017-11-30 | A kind of M types metallic grid steel construction and installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107905431A true CN107905431A (en) | 2018-04-13 |
Family
ID=61849540
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711244064.6A Pending CN107905431A (en) | 2017-11-30 | 2017-11-30 | A kind of M types metallic grid steel construction and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107905431A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206144001U (en) * | 2016-08-12 | 2017-05-03 | 广东华途仕建材实业有限公司 | Combination grid suspended ceiling |
CN206256599U (en) * | 2016-12-06 | 2017-06-16 | 广州迪高建材有限公司 | A kind of grid hangs code |
-
2017
- 2017-11-30 CN CN201711244064.6A patent/CN107905431A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206144001U (en) * | 2016-08-12 | 2017-05-03 | 广东华途仕建材实业有限公司 | Combination grid suspended ceiling |
CN206256599U (en) * | 2016-12-06 | 2017-06-16 | 广州迪高建材有限公司 | A kind of grid hangs code |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103523683B (en) | Construction method for dismantling tower crane by use of small hoisting equipment | |
CN107905431A (en) | A kind of M types metallic grid steel construction and installation method | |
CN207636054U (en) | A kind of novel digital display roof separation indicator | |
JP5675949B2 (en) | Rescue equipment | |
CN207726070U (en) | A kind of auxiliary device for reinforcing container body | |
WO2017071229A1 (en) | Cardiac compression device | |
CN207536136U (en) | A kind of attachment device for aircraft stringer | |
CN201574592U (en) | Safety net fastener | |
CN207672834U (en) | Inclined roof frame steel structure | |
CN205785481U (en) | A kind of specific weight load maintainer | |
CN210375654U (en) | Test device for measuring dynamic response of composite cross arm under wire breakage working condition | |
CN208260055U (en) | Multifunctional combination training instrument | |
CN211974345U (en) | Sleeve fixing device | |
CN201237510Y (en) | Stand used for instrument installation on board | |
CN203754376U (en) | Well lid opening device | |
CN207469106U (en) | A kind of vertical prestressing tensioning auxiliary bearing beam | |
CN206190717U (en) | Can dismantle couple and have this station room that can dismantle couple | |
CN206856963U (en) | A kind of mast Cable head for being used to fix steel wire rope | |
CN207228653U (en) | Fixture off the net is chosen outside new floor edge | |
CN205875728U (en) | First drawknot screw rod of multi -functional receipts | |
CN207881688U (en) | A kind of architectural engineering detection reinforcement type Sopwith staff | |
CN205476547U (en) | Prefabricated wall body stop device | |
CN203872601U (en) | Dual-purpose rod for mountaineering and picking waxberry | |
CN207846812U (en) | It is a kind of to build steel construction of holding court from behind a screen | |
CN210613776U (en) | Operation table board for mobile laboratory instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180413 |
|