CN107806198A - The body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one - Google Patents
The body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one Download PDFInfo
- Publication number
- CN107806198A CN107806198A CN201711243903.2A CN201711243903A CN107806198A CN 107806198 A CN107806198 A CN 107806198A CN 201711243903 A CN201711243903 A CN 201711243903A CN 107806198 A CN107806198 A CN 107806198A
- Authority
- CN
- China
- Prior art keywords
- bearing
- steel pipe
- heat insulation
- plate
- light steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 101
- 238000009413 insulation Methods 0.000 title claims abstract description 80
- 239000002131 composite material Substances 0.000 title claims abstract description 60
- 238000005034 decoration Methods 0.000 claims abstract description 50
- 229910000831 Steel Inorganic materials 0.000 claims description 79
- 239000010959 steel Substances 0.000 claims description 79
- 239000004567 concrete Substances 0.000 claims description 44
- 229920002678 cellulose Polymers 0.000 claims description 16
- 239000001913 cellulose Substances 0.000 claims description 16
- 239000000835 fiber Substances 0.000 claims description 7
- 239000004568 cement Substances 0.000 claims description 6
- 239000011372 high-strength concrete Substances 0.000 claims description 6
- 229920002748 Basalt fiber Polymers 0.000 claims description 5
- 238000005215 recombination Methods 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 5
- -1 polypropylene Polymers 0.000 claims description 4
- 239000004743 Polypropylene Substances 0.000 claims description 3
- 230000002708 enhancing Effects 0.000 claims description 3
- 239000003365 glass fiber Substances 0.000 claims description 3
- 229920001155 polypropylene Polymers 0.000 claims description 3
- 229920000915 polyvinyl chloride Polymers 0.000 claims description 3
- 230000003014 reinforcing Effects 0.000 claims description 3
- 229920003002 synthetic resin Polymers 0.000 claims description 3
- 239000000057 synthetic resin Substances 0.000 claims description 3
- 239000011381 foam concrete Substances 0.000 claims 1
- 239000011120 plywood Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 35
- 238000005516 engineering process Methods 0.000 abstract description 12
- 238000000034 method Methods 0.000 abstract description 12
- 230000000694 effects Effects 0.000 abstract description 6
- 239000011178 precast concrete Substances 0.000 description 4
- 238000009417 prefabrication Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 210000003205 Muscles Anatomy 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 238000003912 environmental pollution Methods 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000006011 modification reaction Methods 0.000 description 2
- 230000001737 promoting Effects 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 240000003917 Bambusa tulda Species 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001163600 Bathylaco nigricans Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 208000008425 Protein Deficiency Diseases 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000000284 resting Effects 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/562—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with fillings between the load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/04—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/04—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
- E04C2/049—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres completely or partially of insulating material, e.g. cellular concrete or foamed plaster
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/04—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
- E04C2/06—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres reinforced
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/30—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
- E04C2/38—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels
- E04C2/384—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels with a metal frame
Abstract
The present invention provides a kind of body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one, belongs to technical field of buildings, some body composite boards of Fast Installation heat insulation decorative load-bearing one are placed on bottom girder, be connected wall and wall connecting, wall with beam using bolt;The effect and advantage of the present invention is that the wall to be formed, the Fast Installation technical system construction is simple of beam are quick, collection load-bearing, insulation, decoration integrated, and stress performance is good, saves the duration, reduces cost;The overall coordination performance of wall is good, and energy-efficient performance is high, using entirety without heat bridge technology, has good heat-insulating property;Significantly improve anti-seismic performance;Using dry construction, simplify construction technology, and connector quantity is greatly reduced, be obviously improved it and industrialize efficiency.Wallboard density is greatly reduced, reduces wall piece quantity, reduces connection, is easy to process, transport and lift.Connect process significantly to simplify, execute-in-place is easy, reduces cost.China's housing industrialization development process is promoted, reduces resource and energy resource consumption.
Description
Technical field
The invention belongs to technical field of buildings, is related to a kind of building energy conservation wall, is adopted more particularly to a kind of energy saving building
The body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one.
Background technology
Assembly concrete building refers to based on the concrete prefabricated element with factorial praluction, pass through site-assembled side
The concrete structure class building construction of formula design-build.The assembly method of component pours overlapping layer concrete, steel after typically having scene
Pouring concrete connection etc. after muscle anchors, bar connecting can be connected, welded using sleeve grouting, mechanically connected and reserving hole overlaps
The ways such as connection.In the 1980s, in the popular prefabricated big plate house in China, due to structural integrity is poor, seepage,
The reasons such as cracks on floor slab, the hidden danger and defect of many influence structure safety and normal use be present, gradually by cast-in-place concrete knot
Structure is substituted.But with the application of current emerging prefabricated concrete structure, particularly introduce in recent years many external first
Enter technology, localized prefabricated concrete structure is built new technology and just gradually formed.
As the quickening of China " building industrialization, housing industrialization " process, and the continuous of Chinese " demographic dividend " subtract
Less, the waste appearance of building trade recruitment, the trend of housing industry industrialization are increasingly obvious.The application weight of prefabricated concrete structure
Newly turn into current research focus.All parts of the country continue to bring out out the new technology of residential housing prefabricated concrete structure, new model.
Precast reinforced concrete structure is one of important directions of China's building structure development, and it is advantageous to China's building industrialization
Development, production efficiency is improved, save the energy, develop Green environmental-protection building, and be advantageous to improve and ensure construction engineering quality.
Compared with cast-in-situ construction method, precast reinforced concrete structure is advantageous to green construction, because fabricated construction can more meet
Saving land, save, saving the requirement such as material, water saving and environmental protection for green construction, reduces the negative effect to environment, including reduce and make an uproar
Sound, airborne dust is prevented, is reduced environmental pollution, transport is cleaned, reduces place interference, saves resource and the energy such as water, electricity, material, abided by
Follow the principle of sustainable development.Moreover, fabricated construction can continuously complete multiple or whole processes of engineering in order, from
And the engineering machinery type and quantity marched into the arena are reduced, the time of resting of procedure connection is eliminated, realizes interchange operation, reduction is applied
Worker person, so as to improve work efficiency, reduction supplies consumption, reduce environmental pollution, provided safeguard for green construction.In addition, assembled
Structure largely reduces building waste (account for municipal refuse total amount 30% -40%), such as steel scrap muscle, waste iron wire, useless bamboo
Timber, discarded concrete etc..
Assembly concrete building can be divided into two major classes of full assembling and part assembling according to assembling degree height.Full assembling
Building is generally limited to low layer or the relatively low tier building of requirements for fortification against earthquake;Part assembling concrete construction main member is general
Using prefabricated components, at the scene connected by cast-in-place concrete, form the building of cast in place and precast construction.
North America region is mainly based on America & Canada, because prefabricated/prestressed concrete association (PCI) studies for a long period of time
With promoting pre-cast building, the Specification of precast concrete is also very perfect, so its assembly concrete Application in Building is non-
It is often universal.The pre-cast building of North America mainly includes building prefabrication exterior wall and structure prefabricated components two are serial greatly, and prefabricated components are total to
It is that maximization and prestressing force are combined with feature, structural reinforcement and connecting structure can be optimized.Reduce making and installation workload, contracting
The short construction period, fully demonstrate industrialization, standardization and Technical Economy feature.In 20th century, the pre-cast building of North America is main
For the non-antidetonation fortified defence area of low layer.Due to the earthquake effect in California area, antidetonation and on the middle and senior level prefabricated is paid much attention in recent years
The engineer applied technical research of structure.PCI is published recently《Precast concrete Aseismic Design》One book, from theory and practice
Analyze the Aseismic Design problem of pre-cast building, the newest section for summarizing many precast construction Aseismic Designs is ground into angle system
Fruit, to instructing precast construction design and engineer applied popularization that there is very strong directive significance.
Europe is the cradle of pre-cast building, and the road of building industrialization has been begun to early in the 17th century.Second of the world is big
After the war, due to human resources shortage, Europe further research and probe building industrialization pattern.Either economically developed north
Europe, West Europe, or Eastern Europe underdeveloped, all actively carrying out the design and construction side of prefabrication and assembly construction concrete construction always
Formula.The design and construction experience of many pre-cast buildings is have accumulated, various special precast building systems is formd and standardizes general
Pre-manufactured product series, and a series of precast concrete engineering specifications and application manual have been worked out, to promoting precast concrete complete
The application in the world serves very important effect.
Japan and South Korea have used for reference the successful experience of America and Europe, on the basis of the standardized designs construction of pre-cast building is explored,
With reference to oneself requirement, breakthrough is achieved in terms of precast construction system globality antidetonation and shock design.With representative
Property achievement two 58 floor for being Japan 2008 and being built up using prefabrication and assembly construction frame structure Tokyo Tower.It is meanwhile Japanese pre-
Concrete construction System Design processed, making and the standard criterion of construction are also very perfect, and the prefabricated specification used at present has《It is prefabricated mixed
Coagulate geotechnological journey》(JASSl0) and《Concrete curtain wall》(JASSl4).
China from the sixties in 20th century five begin one's study assembly concrete building design and construction technology, form one
Serial assembly concrete building system, more typical building system have assembled single storey industry workshop building system, assembling
Formula multistory frame building system, assembled large panel building system etc..To the application of assembly concrete building the 1980s
Reach the period of full bloom, many places in the whole nation all form the assembly concrete industry of design, making and construction and installation integration
Change architectural mode, assembly concrete is built and turns into two kinds of most important building bodies using the masonry building of prefabricated hollow floor
System, application popularization rate is up to more than 70%.Because many limitations and deficiency, China be present in the function and physical property of assembled architecture
Assembly concrete architectural design and construction technology R & D Level do not catch up with also social demand and Building technology development change,
To mid-term the 1990s, assembly concrete building is gradually substituted by full cast-in-place concrete building system.At present except dress
Applied with formula single storey industry workshop building system outside wide, the engineer applied of other prefabrication systems is few.In advance
The globality of structural seismic processed and the specialized research of management in design and operation are inadequate, cause its Technical Economy poor, are to cause
The basic reason that precast construction stagnates for a long time.
At present, prefabricated concrete structure is wet construction, and complicated construction technique, cost is high, and due to wall density
Greatly, therefore wallboard can not be prefabricated larger, otherwise can run into series of problems in processing, transport and hoisting engineering, additionally, due to
The presence of heat-insulation layer, no matter inside holding, sandwich heat preservation or external thermal insulation are set, can significantly reduce the globality of wall piece, separately
Outside, connected mode is more complicated, and execute-in-place runs into more difficulty, and adds the duration, and cost is obviously improved.
The content of the invention
In order to solve above-mentioned technical problem, the present invention provides a kind of bluk recombination of Fast Installation heat insulation decorative load-bearing one
Plate in-line wall, can solve the problem that the overall coordination performance of assembly concrete energy-saving wall, improve energy-efficient performance, using with compared with
The insulation material of high intensity and bond performance.Using dry construction, simplify construction technology, and connector quantity is greatly reduced, show
Writing lifting, it industrializes efficiency.Wallboard density is greatly reduced, reduces wall piece quantity, reduces connection, reduces and processing, transport and hanging
Fill in engineering, the series of problems caused by wallboard weight is excessive.Process is connected by simplifying, reduces execute-in-place difficulty,
Significantly shorten the duration, reduce cost.China's housing industrialization development process is promoted, reduces resource and energy resource consumption.
The technical solution adopted by the present invention is as follows:
The body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one, including the body composite board of Fast Installation heat insulation decorative load-bearing one
(1), bottom girder (2), back timber (3) and bolt (4),
The bottom of in-line wall is bottom girder (2), along bottom girder (2) length direction, by some Fast Installation heat insulation decorative load-bearings one
Composite plate (1) is placed on bottom girder (2), is mutually close between the body composite board of Fast Installation heat insulation decorative load-bearing one (1), forms a word
Shape wall, the body composite board of Fast Installation heat insulation decorative load-bearing one (1) is connected using bolt (4);Link position is two quick peaces
Each installation reserved opening (1-11) of the adjacent side of the body composite board of heat insulation decorative load-bearing one (1) is filled, reserved opening (1- is each installed
11) 4 bolts (4) of installation in;
The body composite board of Fast Installation heat insulation decorative load-bearing one (1) and bottom girder (2) are connected using bolt (4), link position is fast
Each installation reserved opening (1-11) of the speed installation body composite board of heat insulation decorative load-bearing one (1) bottom, each installs reserved opening (1-
11) 4 bolts (4) of installation in;
In in-line coping installation back timber (3), using bolt (4) by the body composite board of Fast Installation heat insulation decorative load-bearing one
(1) and back timber (3) connection, link position are that each installation at the top of the body composite board of Fast Installation heat insulation decorative load-bearing one (1) is pre-
Mouth (1-11) is stayed, 4 bolts (4) of installation in reserved opening (1-11) are each installed.
Further, the body composite board of Fast Installation heat insulation decorative load-bearing one (1) include interior decoration flaggy (1-1),
Exterior decoration flaggy (1-2), vertical light steel pipe (1-3), vertically connect end plate (1-4), horizontal light steel pipe (1-5), horizontal connection
End plate (1-6), bubble concrete layer (1-7), macroporous cellulose net (1-8), insulation tension member (1-9), adjustable screw (1-10)
With installation reserved opening (1-11),
The body composite board of Fast Installation heat insulation decorative load-bearing one (1) is rectangular slab, and side is interior decoration flaggy (1-1) wherein,
It is exterior decoration flaggy (1-2) in opposite side, interior decoration flaggy (1-1) and exterior decoration flaggy (1-2) are reinforcing fiber
Concrete slab, side sets vertical and equally distributed enhancing tooth respectively in plate;
Decorative plies (1-1) and exterior decoration flaggy (1-2) are middle indoors, set equally distributed vertical light steel pipe (1-3),
Vertical light steel pipe (1-3) erects to 2/5ths that the distance of plate left and right ends is vertically light steel pipe (1-3) spacing to half
To light steel pipe (1-3) elongated setting up and down, and high-strength concrete, strength of high strength concrete C40-C60 are filled in inside;Vertical
Light steel pipe (1-3) upper and lower ends are respectively vertical connection end plate (1-4), vertically connect end plate (1-4) and vertical light steel pipe (1-3)
Welding, it is rectangular slab vertically to connect end plate (1-4);
In the horizontal direction, set it is some be parallel to each other and equally distributed horizontal light steel pipe (1-5), horizontal light steel pipe (1-5) is extremely
The distance of plate upper and lower ends is horizontal light steel pipe (1-5) spacing 2/5ths to half, horizontal light steel pipe (1-5) with it is perpendicular
It is identical with size to light steel pipe (1-3) selection type, between vertical light steel pipe (1-3), horizontal light steel pipe (1-5) with vertically
Light steel pipe (1-3) welding, light steel pipe (1-5) inner opposite end of level in outside weld with vertical light steel pipe (1-3), lateral ends
Horizontal connection end plate (1-6) is set, and horizontal connection end plate (1-6) respectively extends the bluk recombination of Fast Installation heat insulation decorative load-bearing one
The left and right outward flange of plate;4 adjustable screws (1-10) are respectively opened up on the horizontal connection end plate (1-6) at wall both ends, can
Mode screw (1-10) is strip hole, is rectangle among strip hole, and both ends are semicircle;Adjustable screw (1-10) is located at respectively
Four angles of horizontal connection end plate (1-6), adjacent adjustable screw (1-10) is mutually vertical, and one of them adjustable spiral shell
The midpoint of another adjustable screw (1-10) is pointed in hole (1-10), and adjustable screw (1-10) is horizontal or vertical;When one end is same
When one position adjustable screw (1-10) is horizontal, then the adjustable screw (1-10) of other end correspondence position vertically, when one end is same
When one position adjustable screw (1-10) is vertical, then the adjustable screw (1-10) of other end correspondence position is horizontal;Vertical light steel
Pipe (1-3) and the horizontal gently distance of the central plane where steel pipe (1-5) and interior decoration flaggy (1-1) are and exterior decoration plate
The 1/2 ~ 1 of the distance of layer (1-2);
Vertical macroporous cellulose net (1- is set respectively inside and outside vertical light steel pipe (1-3) and horizontal light steel pipe (1-5)
8);The mesh diameter of macroporous cellulose net (1-8) is 3-10mm, and macroporous cellulose net (1-8) extends Fast Installation and held up and down
The outward flange of the heat insulation decoration integrated composite plate (1) of weight;
Decorative plies (1-1), exterior decoration flaggy (1-2) are respectively pre-buried indoors is incubated tension member (1-9), the insulation of both sides
Tension member (1-9) is corresponded and is connected with each other, and insulation tension member (1-9) transverse and longitudinal is in a row;
Full bubble concrete layer (1-7) is poured between decorative plies (1-1), exterior decoration flaggy (1-2) indoors;
Vertical connection end plate (1-4) and horizontal connection end plate (1-6) and coupled vertical light steel pipe (1-3) and level
Installation reserved opening (1-11), installation reserved opening (1-11) are reserved in decorative plies (1-1) side indoors for the end of light steel pipe (1-5)
For rectangle, vertically connect end plate (1-4) and horizontal connection end plate (1-6) and expose in installation reserved opening (1-11).
Further, the interior decoration flaggy (1-1) preferentially uses cement fibrolite plate, thickness 5-15mm;Quick
It is straight to install the interior decoration flaggy (1-1) of the surface side of the body composite board of heat insulation decorative load-bearing one, in bubble concrete layer
Equally distributed vertical rib is carried inside (1-7).
Further, the exterior decoration flaggy (1-2) uses cement fibrolite plate, thickness 10-40mm;In Fast Installation
The exterior decoration flaggy (1-2) of the surface side of the body composite board of heat insulation decorative load-bearing one is straight or with uniform vertical pressure
Trace, equally distributed vertical rib is carried inside bubble concrete layer (1-7).
Further, the thermal conductivity factor of the bubble concrete layer (1-7) is 0.06-0.08W/ (m.K), and its dry volume is close
Spend for 300-400kg/m3。
Further, the macroporous cellulose net (1-8) is polypropylene fiber net, steel wire, wire netting or basalt fibre,
Mesh diameter is 3-10mm.
Further, insulation tension member (1-9) the prioritizing selection PVC tension members, glass fibre tension member, synthetic resin
Tension member or basalt fibre tension member.
Beneficial effects of the present invention:
The effect and advantage of the present invention is that the wall to be formed, the Fast Installation technical system construction is simple of beam are quick, collection load-bearing, is protected
Warm, decoration integrated, stress performance is good, saves the duration, reduces cost;The overall coordination performance of wall is good, and energy-efficient performance is high, adopts
With entirety without heat bridge technology, heat bridge can be effectively cut off, there is good heat-insulating property;Significantly improve anti-seismic performance;Using
Dry construction, simplify construction technology, and connector quantity is greatly reduced, be obviously improved it and industrialize efficiency.Wallboard is greatly reduced
Density, wall piece quantity is reduced, reduce connection, be easy to process, transport and lift.Connect process significantly to simplify, execute-in-place is very
It is simple and convenient, significantly shorten the duration, reduce cost.China's housing industrialization development process is promoted, reduces resource and energy resource consumption.
Brief description of the drawings
Fig. 1 is the body composite board in-line wall schematic diagram of Fast Installation heat insulation decorative load-bearing one.
Fig. 2 is elevational schematic view on the inside of the body composite board of Fast Installation heat insulation decorative load-bearing one.
Fig. 3 is the body composite board indoor perspective diagram of Fast Installation heat insulation decorative load-bearing one.
Fig. 4 is Fig. 2 A-A diagrammatic cross-sections.
Fig. 5 is the side view perspective diagram of the body composite board of Fast Installation heat insulation decorative load-bearing one.
In figure, 1 is the body composite board of Fast Installation heat insulation decorative load-bearing one;2 be bottom girder;3 be back timber;4 be bolt;
1-1 is interior decoration flaggy;1-2 is exterior decoration flaggy;1-3 is vertical light steel pipe;1-4 is vertical connection end plate;1-5
For horizontal light steel pipe;1-6 is horizontal connection end plate;1-7 is bubble concrete layer;1-8 is macroporous cellulose net;1-9 draws for insulation
Tie part;1-10 is adjustable screw;1-11 is installation reserved opening.
Embodiment
In order to further illustrate the present invention, below in conjunction with the accompanying drawings and the present invention is described in detail embodiment, but not
They can be interpreted as limiting the scope of the present invention.
Embodiment:The body composite board in-line wall such as Fig. 1 ~ Fig. 5 institutes of Fast Installation heat insulation decorative load-bearing one proposed by the present invention
Show.
As shown in Figure 1:The body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one, is filled by Fast Installation load bearing heat preserving
Adorn a body composite board (1), bottom girder (2), back timber (3) and bolt (4) composition;
Bottom is bottom girder (2), and along bottom girder (2) length direction, some body composite boards of Fast Installation heat insulation decorative load-bearing one (1) are put
In on bottom girder (2), mutually it is close between the body composite board of Fast Installation heat insulation decorative load-bearing one (1), in-line wall is formed, using spiral shell
Bolt (4) connects the body composite board of Fast Installation heat insulation decorative load-bearing one (1);Link position is that two Fast Installation load bearing heat preservings fill
Each installation reserved opening (1-11) of the adjacent side of a body composite board (1) is adornd, 4 spiral shells of installation in reserved opening (1-11) are each installed
Bolt (4);
The body composite board of Fast Installation heat insulation decorative load-bearing one (1) and bottom girder (2) are connected using bolt (4), link position is fast
Each installation reserved opening (1-11) of the speed installation body composite board of heat insulation decorative load-bearing one (1) bottom, each installs reserved opening (1-
11) 4 bolts (4) of installation in;
In in-line coping installation back timber (3), using bolt (4) by the body composite board of Fast Installation heat insulation decorative load-bearing one
(1) and back timber (3) connection, link position are that each installation at the top of the body composite board of Fast Installation heat insulation decorative load-bearing one (1) is pre-
Mouth (1-11) is stayed, 4 bolts (4) of installation in reserved opening (1-11) are each installed.
As shown in Fig. 2 ~ 5:The body composite board of Fast Installation heat insulation decorative load-bearing one is by interior decoration flaggy (1-1), outdoor dress
Plaque layer (1-2), vertical light steel pipe (1-3), vertically connect end plate (1-4), horizontal light steel pipe (1-5), horizontal connection end plate (1-
6), bubble concrete layer (1-7), macroporous cellulose net (1-8), insulation tension member (1-9), adjustable screw (1-10) and installation are pre-
Mouth (1-11) is stayed to form, it is characterised in that:
The body composite board of Fast Installation heat insulation decorative load-bearing one is rectangular slab, and side is interior decoration flaggy (1-1) wherein, another
Side is exterior decoration flaggy (1-2), and interior decoration flaggy (1-1) and exterior decoration flaggy (1-2) are reinforcing fiber coagulation
Native plate, side sets vertical and equally distributed enhancing tooth respectively in plate.
As shown in Figure 2:Vertical connection end plate (1-4) and horizontal connection end plate (1-6) and it is coupled it is vertical gently
Installation reserved opening (1-11) is reserved in decorative plies (1-1) side indoors for the end of steel pipe (1-3) and horizontal light steel pipe (1-5),
It is rectangle to install reserved opening (1-11), vertically connects end plate (1-4) and horizontal connection end plate (1-6) in installation reserved opening (1-11)
Inside expose.
As shown in Figure 3:Decorative plies (1-1) and exterior decoration flaggy (1-2) are middle indoors, set equally distributed perpendicular
To light steel pipe (1-3), vertical light steel pipe (1-3) to five that the distance of plate left and right ends is vertically light steel pipe (1-3) spacing/
Two to half, vertical light steel pipe (1-3) elongated setting up and down, and high-strength concrete, strength of high strength concrete are filled in inside
For C40-C60;It is respectively vertical connection end plate (1-4) in vertical light steel pipe (1-3) upper and lower ends, vertically connects end plate (1-4)
Welded with vertical light steel pipe (1-3), it is rectangular slab vertically to connect end plate (1-4);
In the horizontal direction, set it is some be parallel to each other and equally distributed horizontal light steel pipe (1-5), horizontal light steel pipe (1-5) is extremely
The distance of plate upper and lower ends is horizontal light steel pipe (1-5) spacing 2/5ths to half, horizontal light steel pipe (1-5) with it is perpendicular
It is identical with size to light steel pipe (1-3) selection type, between vertical light steel pipe (1-3), horizontal light steel pipe (1-5) with vertically
Light steel pipe (1-3) welding, light steel pipe (1-5) inner opposite end of level in outside weld with vertical light steel pipe (1-3), lateral ends
Horizontal connection end plate (1-6) is set, and horizontal connection end plate (1-6) respectively extends the bluk recombination of Fast Installation heat insulation decorative load-bearing one
The left and right outward flange of plate.
As shown in Figures 4 and 5:4 adjustable screw (1- are respectively opened up on the horizontal connection end plate (1-6) at wall both ends
10), adjustable screw (1-10) is strip hole, is rectangle among strip hole, and both ends are semicircle;Adjustable screw (1-10) point
Not Wei Yu horizontal connection end plate (1-6) four angles, adjacent adjustable screw (1-10) is mutually vertical, and one of them can
Mode screw (1-10) points to the midpoint of another adjustable screw (1-10), and adjustable screw (1-10) is horizontal or vertical;When
When the adjustable screw of one end same position (1-10) is horizontal, then the adjustable screw (1-10) of other end correspondence position vertically, when
When the adjustable screw of one end same position (1-10) is vertical, then the adjustable screw (1-10) of other end correspondence position is horizontal;It is perpendicular
It is and outdoor to the central plane where light steel pipe (1-3) and horizontal light steel pipe (1-5) and the distance of interior decoration flaggy (1-1)
The 1/2 ~ 1 of the distance of decorative plies (1-2);
Vertical macroporous cellulose net (1- is set respectively inside and outside vertical light steel pipe (1-3) and horizontal light steel pipe (1-5)
8);The mesh diameter of macroporous cellulose net (1-8) is 3-10mm, and macroporous cellulose net (1-8) extends Fast Installation and held up and down
The outward flange of the heat insulation decoration integrated composite plate (1) of weight;
Decorative plies (1-1), exterior decoration flaggy (1-2) are respectively pre-buried indoors is incubated tension member (1-9), the insulation of both sides
Tension member (1-9) is corresponded and is connected with each other, and insulation tension member (1-9) transverse and longitudinal is in a row;
Full bubble concrete layer (1-7) is poured between decorative plies (1-1), exterior decoration flaggy (1-2) indoors;
The interior decoration flaggy (1-1) preferentially uses cement fibrolite plate, thickness 5-15mm;Filled in Fast Installation load bearing heat preserving
The interior decoration flaggy (1-1) for adoring the surface side of a body composite board is straight, with equal inside bubble concrete layer (1-7)
The vertical rib of even distribution;
The exterior decoration flaggy (1-2) uses cement fibrolite plate, thickness 10-40mm;In Fast Installation heat insulation decorative load-bearing
The exterior decoration flaggy (1-2) of the surface side of one body composite board is straight or with uniform vertical impression, in foam coagulation
Equally distributed vertical rib is carried inside soil layer (1-7);
The thermal conductivity factor of the bubble concrete layer (1-7) is 0.06-0.08W/ (m.K), and its dry volume density is 300-
400kg/m3;
The macroporous cellulose net (1-8) is polypropylene fiber net, steel wire, wire netting or basalt fibre, mesh diameter 3-
10mm;
Insulation tension member (1-9) prioritizing selection PVC tension members, glass fibre tension member, synthetic resin tension member or the Black Warrior
Rock fiber tension member.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (7)
1. the body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one, including the bluk recombination of Fast Installation heat insulation decorative load-bearing one
Plate (1), bottom girder (2), back timber (3) and bolt (4), it is characterised in that:
The bottom of the in-line wall is bottom girder (2), along bottom girder (2) length direction, by some Fast Installation heat insulation decorative load-bearings
One body composite board (1) is placed on bottom girder (2), is mutually close between the body composite board of Fast Installation heat insulation decorative load-bearing one (1), is formed
In-line wall, the body composite board of Fast Installation heat insulation decorative load-bearing one (1) is connected using bolt (4);Link position is two fast
Each installation reserved opening (1-11) of the adjacent side of the speed installation body composite board of heat insulation decorative load-bearing one (1), each installs reserved opening
4 bolts (4) of installation in (1-11);
The body composite board of Fast Installation heat insulation decorative load-bearing one (1) and bottom girder (2) are connected using bolt (4), link position is fast
Each installation reserved opening (1-11) of the speed installation body composite board of heat insulation decorative load-bearing one (1) bottom, each installs reserved opening (1-
11) 4 bolts (4) of installation in;
In in-line coping installation back timber (3), using bolt (4) by the body composite board of Fast Installation heat insulation decorative load-bearing one
(1) and back timber (3) connection, link position are that each installation at the top of the body composite board of Fast Installation heat insulation decorative load-bearing one (1) is pre-
Mouth (1-11) is stayed, 4 bolts (4) of installation in reserved opening (1-11) are each installed.
2. the body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one according to claim 1, it is characterised in that:Institute
Stating the body composite board of Fast Installation heat insulation decorative load-bearing one (1) includes interior decoration flaggy (1-1), exterior decoration flaggy (1-2), erects
To light steel pipe (1-3), vertically connect end plate (1-4), horizontal light steel pipe (1-5), horizontal connection end plate (1-6), foam concrete
Layer (1-7), macroporous cellulose net (1-8), insulation tension member (1-9), adjustable screw (1-10) and installation reserved opening (1-11), its
It is characterised by:
The body composite board of Fast Installation heat insulation decorative load-bearing one (1) is rectangular slab, and side is interior decoration flaggy (1-1) wherein,
It is exterior decoration flaggy (1-2) in opposite side, interior decoration flaggy (1-1) and exterior decoration flaggy (1-2) are reinforcing fiber
Concrete slab, side sets vertical and equally distributed enhancing tooth respectively in plate;
Decorative plies (1-1) and exterior decoration flaggy (1-2) are middle indoors, set equally distributed vertical light steel pipe (1-3),
Vertical light steel pipe (1-3) erects to 2/5ths that the distance of plate left and right ends is vertically light steel pipe (1-3) spacing to half
To light steel pipe (1-3) elongated setting up and down, and high-strength concrete, strength of high strength concrete C40-C60 are filled in inside;Vertical
Light steel pipe (1-3) upper and lower ends are respectively vertical connection end plate (1-4), vertically connect end plate (1-4) and vertical light steel pipe (1-3)
Welding, it is rectangular slab vertically to connect end plate (1-4);
In the horizontal direction, set it is some be parallel to each other and equally distributed horizontal light steel pipe (1-5), horizontal light steel pipe (1-5) is extremely
The distance of plate upper and lower ends is horizontal light steel pipe (1-5) spacing 2/5ths to half, horizontal light steel pipe (1-5) with it is perpendicular
It is identical with size to light steel pipe (1-3) selection type, between vertical light steel pipe (1-3), horizontal light steel pipe (1-5) with vertically
Light steel pipe (1-3) welding, light steel pipe (1-5) inner opposite end of level in outside weld with vertical light steel pipe (1-3), lateral ends
Horizontal connection end plate (1-6) is set, and horizontal connection end plate (1-6) respectively extends the bluk recombination of Fast Installation heat insulation decorative load-bearing one
The left and right outward flange of plate;4 adjustable screws (1-10) are respectively opened up on the horizontal connection end plate (1-6) at wall both ends, can
Mode screw (1-10) is strip hole, is rectangle among strip hole, and both ends are semicircle;Adjustable screw (1-10) is located at respectively
Four angles of horizontal connection end plate (1-6), adjacent adjustable screw (1-10) is mutually vertical, and one of them adjustable spiral shell
The midpoint of another adjustable screw (1-10) is pointed in hole (1-10), and adjustable screw (1-10) is horizontal or vertical;When one end is same
When one position adjustable screw (1-10) is horizontal, then the adjustable screw (1-10) of other end correspondence position vertically, when one end is same
When one position adjustable screw (1-10) is vertical, then the adjustable screw (1-10) of other end correspondence position is horizontal;Vertical light steel
Pipe (1-3) and the horizontal gently distance of the central plane where steel pipe (1-5) and interior decoration flaggy (1-1) are and exterior decoration plate
The 1/2 ~ 1 of the distance of layer (1-2);
Vertical macroporous cellulose net (1- is set respectively inside and outside vertical light steel pipe (1-3) and horizontal light steel pipe (1-5)
8);The mesh diameter of macroporous cellulose net (1-8) is 3-10mm, and macroporous cellulose net (1-8) extends Fast Installation and held up and down
The outward flange of the heat insulation decoration integrated composite plate (1) of weight;
Decorative plies (1-1), exterior decoration flaggy (1-2) are respectively pre-buried indoors is incubated tension member (1-9), the insulation of both sides
Tension member (1-9) is corresponded and is connected with each other, and insulation tension member (1-9) transverse and longitudinal is in a row;
Full bubble concrete layer (1-7) is poured between decorative plies (1-1), exterior decoration flaggy (1-2) indoors;
Vertical connection end plate (1-4) and horizontal connection end plate (1-6) and coupled vertical light steel pipe (1-3) and level
Installation reserved opening (1-11), installation reserved opening (1-11) are reserved in decorative plies (1-1) side indoors for the end of light steel pipe (1-5)
For rectangle, vertically connect end plate (1-4) and horizontal connection end plate (1-6) and expose in installation reserved opening (1-11).
3. the body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one according to claim 2, it is characterised in that institute
State interior decoration flaggy (1-1) and preferentially use cement fibrolite plate, thickness 5-15mm;In Fast Installation heat insulation decorative load-bearing one
The interior decoration flaggy (1-1) of the surface side of composite plate is straight, carries and is uniformly distributed inside bubble concrete layer (1-7)
Vertical rib.
4. the body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one according to claim 2, it is characterised in that institute
State exterior decoration flaggy (1-2) and use cement fibrolite plate, thickness 10-40mm;It is integrally multiple in Fast Installation heat insulation decorative load-bearing
The exterior decoration flaggy (1-2) of the surface side of plywood is straight or with uniform vertical impression, in bubble concrete layer (1-
7) it is internal to carry equally distributed vertical rib.
5. the body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one according to claim 2, it is characterised in that institute
The thermal conductivity factor for stating bubble concrete layer (1-7) is 0.06-0.08W/ (m.K), and its dry volume density is 300-400kg/m3。
6. the body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one according to claim 2, it is characterised in that institute
It is polypropylene fiber net, steel wire, wire netting or basalt fibre to state macroporous cellulose net (1-8), mesh diameter 3-10mm.
7. the body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one according to claim 2, it is characterised in that institute
State insulation tension member (1-9) prioritizing selection PVC tension members, glass fibre tension member, synthetic resin tension member or basalt fibre
Tension member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711243903.2A CN107806198A (en) | 2017-11-30 | 2017-11-30 | The body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711243903.2A CN107806198A (en) | 2017-11-30 | 2017-11-30 | The body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107806198A true CN107806198A (en) | 2018-03-16 |
Family
ID=61590263
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711243903.2A Pending CN107806198A (en) | 2017-11-30 | 2017-11-30 | The body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107806198A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090188187A1 (en) * | 2008-01-24 | 2009-07-30 | Nucor Corporation | Composite wall and floor system |
CN101831963A (en) * | 2009-01-09 | 2010-09-15 | 冯刚克 | Novel multipurpose composite insulation board and construction method and processing device thereof |
CN202577860U (en) * | 2012-04-01 | 2012-12-05 | 青岛德才装饰安装工程有限公司 | Pottery plate side-perforating hanging piece |
CN203603316U (en) * | 2013-11-06 | 2014-05-21 | 苏州金螳螂建筑装饰股份有限公司 | Integrated light partition wall system with ultrahigh space |
CN105888099A (en) * | 2016-06-03 | 2016-08-24 | 湖南省建筑工程集团总公司 | Heat preservation and decoration integrated composite wall serving as building outer wall and construction method of integrated composite wall |
CN207812740U (en) * | 2017-11-30 | 2018-09-04 | 沈阳建筑大学 | One body composite board linear type wall of Fast Installation heat insulation decorative load-bearing |
-
2017
- 2017-11-30 CN CN201711243903.2A patent/CN107806198A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090188187A1 (en) * | 2008-01-24 | 2009-07-30 | Nucor Corporation | Composite wall and floor system |
CN101831963A (en) * | 2009-01-09 | 2010-09-15 | 冯刚克 | Novel multipurpose composite insulation board and construction method and processing device thereof |
CN202577860U (en) * | 2012-04-01 | 2012-12-05 | 青岛德才装饰安装工程有限公司 | Pottery plate side-perforating hanging piece |
CN203603316U (en) * | 2013-11-06 | 2014-05-21 | 苏州金螳螂建筑装饰股份有限公司 | Integrated light partition wall system with ultrahigh space |
CN105888099A (en) * | 2016-06-03 | 2016-08-24 | 湖南省建筑工程集团总公司 | Heat preservation and decoration integrated composite wall serving as building outer wall and construction method of integrated composite wall |
CN207812740U (en) * | 2017-11-30 | 2018-09-04 | 沈阳建筑大学 | One body composite board linear type wall of Fast Installation heat insulation decorative load-bearing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121107B (en) | Assemble type concrete slab and its plate dry type connection method | |
CN207812740U (en) | One body composite board linear type wall of Fast Installation heat insulation decorative load-bearing | |
CN207597635U (en) | One body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing | |
CN207597695U (en) | One body composite board of Fast Installation heat insulation decorative load-bearing | |
CN207892081U (en) | One body composite board T shape walls of Fast Installation heat insulation decorative load-bearing | |
CN107747378A (en) | The body composite board processing method of Fast Installation heat insulation decorative load-bearing one | |
CN204876313U (en) | Take mesh frame clip heart light partition wall board | |
CN206616695U (en) | A kind of concrete panel and girt strip floor dry type connecting node | |
CN107806198A (en) | The body composite board in-line wall of Fast Installation heat insulation decorative load-bearing one | |
CN206016048U (en) | Assemble type concrete slab | |
CN206034685U (en) | Integrated system is gone along with sb. to guard him to structure of wide post husked kaoliang of dry -type link pack formula concrete | |
CN206016002U (en) | Assembly concrete beam | |
CN109296074A (en) | A kind of assembly concrete column beam connecting node | |
CN107747365A (en) | The body composite board T-shaped wall of Fast Installation heat insulation decorative load-bearing one | |
CN107761992A (en) | The body composite board L-shaped wall of Fast Installation heat insulation decorative load-bearing one | |
CN107762055A (en) | The body composite board of Fast Installation heat insulation decorative load-bearing one | |
CN108360720A (en) | A kind of netted raw bamboo skeleton-lightweight aggregate concrete composite floor | |
CN106759877A (en) | Assembly concrete node and its dry type connection method | |
CN204081186U (en) | A kind of space truss structure is used for the steel structure modularization tier of local-style dwelling houses | |
CN106284741B (en) | Dry type is linked and packed the structural envelope integrated system of the wide pillar height beam of formula concrete | |
CN106284739A (en) | Assembly concrete entirety is without heat bridge gusset | |
CN206408743U (en) | A kind of assembly concrete node | |
CN106320601B (en) | Assembly concrete is whole without heat bridge board wall and its vertical connection method | |
CN208441226U (en) | Dry construction bilayer core plate sleeper shear connector assembly concrete wallboard | |
CN206189606U (en) | Whole afebril bridge plate wall of assembled concrete and running -on floor connected node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180316 |
|
RJ01 | Rejection of invention patent application after publication |