CN107804086A - A kind of papery office appliance perforating device - Google Patents

A kind of papery office appliance perforating device Download PDF

Info

Publication number
CN107804086A
CN107804086A CN201711261313.2A CN201711261313A CN107804086A CN 107804086 A CN107804086 A CN 107804086A CN 201711261313 A CN201711261313 A CN 201711261313A CN 107804086 A CN107804086 A CN 107804086A
Authority
CN
China
Prior art keywords
plate
fixedly connected
fixed plate
positioning screw
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711261313.2A
Other languages
Chinese (zh)
Other versions
CN107804086B (en
Inventor
邓海运
梁嘉丽
陈克伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Lingxue Electronic Machinery Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711261313.2A priority Critical patent/CN107804086B/en
Publication of CN107804086A publication Critical patent/CN107804086A/en
Application granted granted Critical
Publication of CN107804086B publication Critical patent/CN107804086B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B42BOOKBINDING; ALBUMS; FILES; SPECIAL PRINTED MATTER
    • B42BPERMANENTLY ATTACHING TOGETHER SHEETS, QUIRES OR SIGNATURES OR PERMANENTLY ATTACHING OBJECTS THERETO
    • B42B5/00Permanently attaching together sheets, quires or signatures otherwise than by stitching
    • B42B5/02Permanently attaching together sheets, quires or signatures otherwise than by stitching by eyelets

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)

Abstract

本发明涉及一种办公用品打孔装置,尤其涉及一种纸质办公用品打孔装置。本发明要解决的技术问题是提供一种纸质办公用品打孔装置。为了解决上述技术问题,本发明提供了这样一种纸质办公用品打孔装置,包括有大固定板、推挡装置、打孔装置、第一升降杆、第一套管、第一定位螺杆、第二套管、第二定位螺杆、第二升降杆和底座;大固定板的上方设置有推挡装置和打孔装置,推挡装置位于打孔装置的右侧,大固定板的下方设置有第一升降杆等;底座位于第一套管和第二套管的下方。本发明所提供的一种纸质办公用品打孔装置,能够轻松的对较厚的文件进行打孔,便于人们将较厚的文件装订在一起,有利于文件的管理保存,能够对文件的高度位置进行方便的调整。

The invention relates to a punching device for office supplies, in particular to a punching device for paper office supplies. The technical problem to be solved by the present invention is to provide a punching device for paper office supplies. In order to solve the above technical problems, the present invention provides such a punching device for paper office supplies, which includes a large fixing plate, a pushing device, a punching device, a first lifting rod, a first sleeve, a first positioning screw, The second casing, the second positioning screw, the second elevating rod and the base; a pushing device and a punching device are arranged above the large fixed plate, the pushing device is located on the right side of the punching device, and the bottom of the large fixed plate is provided with First lifting rod, etc.; the base is located under the first and second bushings. A punching device for paper office supplies provided by the present invention can easily punch thicker files, which is convenient for people to bind thicker files together, is conducive to the management and preservation of files, and can adjust the height of files. The position can be easily adjusted.

Description

一种纸质办公用品打孔装置A punching device for paper office supplies

技术领域technical field

本发明涉及一种办公用品打孔装置,尤其涉及一种纸质办公用品打孔装置。The invention relates to a punching device for office supplies, in particular to a punching device for paper office supplies.

背景技术Background technique

纸为用植物纤维制成的薄片,作为写画、印刷书报、包装等,纸以张计,故纸张一般分为凸版印刷纸、新闻纸、胶版印刷纸、铜版纸、书皮纸、字典纸、拷贝纸和板纸等,办公用品,指人们在日常工作中所使用的辅助用品,办公用品主要被应用于企业单位,它涵盖的种类非常广泛,包括有文件档案用品、桌面用品、办公设备、财务用品、耗材等一系列与工作相关的用品,我国办公用品行业运行目前发展形势良好,该行业企业正逐步向产业化、规模化发展,专业、高效、节能是我国办公用品行业运行的发展方向,我国办公用品行业运行生产的产品品质具备国际市场竞争力,智研数据研究中心随着我国办公用品行业运行需求市场的不断扩大以及出口增长,我国办公用品行业运行迎来一个新的发展机遇,打孔为书籍出版术语,指将活页卡片或各种单张本册页等,按一定规格在订口上打上可以穿联的孔眼,孔的直径一般为三到五毫米之间,打孔的眼数一般为2个,也可根据需要或多或少。Paper is a thin sheet made of plant fibers, used for painting, printing books and newspapers, packaging, etc., paper is counted in sheets, so paper is generally divided into letterpress printing paper, newsprint, offset printing paper, coated paper, book cover paper, dictionary paper, Copy paper and cardboard, etc. Office supplies refer to auxiliary supplies used by people in their daily work. Office supplies are mainly used in business units. It covers a wide range of types, including document and archive supplies, desktop supplies, office equipment, For a series of work-related supplies such as financial supplies and consumables, China's office supplies industry is currently developing well. Enterprises in this industry are gradually developing towards industrialization and scale. Professionalism, high efficiency, and energy saving are the development directions of China's office supplies industry. The quality of products produced by China's office supplies industry is competitive in the international market. With the continuous expansion of China's office supplies industry's operating demand market and export growth, China's office supplies industry has ushered in a new development opportunity. Punching is a term for book publishing, which refers to punching loose-leaf cards or various leaflets, etc., on the binding mouth according to certain specifications. Generally 2, but also more or less according to needs.

现有的文件装订一般使用订书机进行装订,但当文件较厚时,订书机难以进行操作,无法将较厚的文件装订在一起,容易导致文件损毁遗失,影响办公效率,造成严重的损失,影响企业的生产和发展,因此亟需研发一种纸质办公用品打孔装置。The existing document binding generally uses a stapler for binding, but when the document is thick, the stapler is difficult to operate and cannot bind thicker documents together, which will easily lead to damage and loss of documents, affect office efficiency, and cause serious problems. The loss affects the production and development of the enterprise, so there is an urgent need to develop a punching device for paper office supplies.

发明内容Contents of the invention

(1)要解决的技术问题(1) Technical problems to be solved

本发明为了克服现有的文件装订一般使用订书机进行装订,但当文件较厚时,订书机难以进行操作,无法将较厚的文件装订在一起,容易导致文件损毁遗失,影响办公效率,造成严重的损失,影响企业的生产和发展的缺点,本发明要解决的技术问题是提供一种纸质办公用品打孔装置。In order to overcome the existing document binding, the present invention generally uses a stapler for binding, but when the document is thicker, the stapler is difficult to operate and cannot bind thicker documents together, which will easily lead to document damage and loss, affecting office efficiency , cause serious losses, and affect the production and development of enterprises. The technical problem to be solved by the present invention is to provide a punching device for paper office supplies.

(2)技术方案(2) Technical solution

为了解决上述技术问题,本发明提供了这样一种纸质办公用品打孔装置,包括有大固定板、推挡装置、打孔装置、第一升降杆、第一套管、第一定位螺杆、第二套管、第二定位螺杆、第二升降杆和底座;大固定板的上方设置有推挡装置和打孔装置,推挡装置位于打孔装置的右侧,大固定板的下方设置有第一升降杆、第一套管、第一定位螺杆、第二套管、第二定位螺杆和第二升降杆,底座位于第一套管和第二套管的下方,第一升降杆的顶部与大固定板的底部设置为固定连接,第一套管与底座设置为固定连接,第一升降杆滑动式位于第一套管内,第二升降杆滑动式位于第二套管内,第一套管的右侧壁上设置有第一定位螺杆,第一套管与第一定位螺杆设置为螺纹连接,第一定位螺杆与第一升降杆相接触,第一套管与大固定板相接触,第一升降杆与底座相接触,第二升降杆的顶部与大固定板的底部设置为固定连接,第二套管与底座设置为固定连接,第二套管的左侧壁上设置有第二定位螺杆,第二套管与第二定位螺杆设置为螺纹连接,第二定位螺杆与第二升降杆相接触,第二套管与大固定板相接触,第二升降杆与底座相接触,大固定板上开有前后贯穿的第一凹槽,大固定板上开有上下贯穿的第二凹槽,第一凹槽与第二凹槽相连通,第一凹槽与第二凹槽为垂直式设置。In order to solve the above technical problems, the present invention provides such a punching device for paper office supplies, which includes a large fixing plate, a pushing device, a punching device, a first lifting rod, a first sleeve, a first positioning screw, The second casing, the second positioning screw, the second elevating rod and the base; a pushing device and a punching device are arranged above the large fixed plate, the pushing device is located on the right side of the punching device, and the bottom of the large fixed plate is provided with The first lifting rod, the first casing, the first positioning screw, the second casing, the second positioning screw and the second lifting rod, the base is located below the first casing and the second casing, and the top of the first lifting rod The bottom of the large fixed plate is fixedly connected, the first casing and the base are fixedly connected, the first lifting rod is slidingly located in the first casing, the second lifting rod is slidingly located in the second casing, and the first casing There is a first positioning screw on the right side wall, the first sleeve and the first positioning screw are threadedly connected, the first positioning screw is in contact with the first lifting rod, the first sleeve is in contact with the large fixing plate, and the first positioning screw is in contact with the first lifting rod. One lifting rod is in contact with the base, the top of the second lifting rod is fixedly connected to the bottom of the large fixed plate, the second sleeve is fixedly connected to the base, and the left side wall of the second sleeve is provided with a second positioning The screw, the second casing and the second positioning screw are set to be threadedly connected, the second positioning screw is in contact with the second lifting rod, the second sleeve is in contact with the large fixing plate, the second lifting rod is in contact with the base, and the large fixing There is a first groove running through the front and back on the plate, and a second groove running up and down on the large fixed plate. The first groove and the second groove are connected, and the first groove and the second groove are vertical set up.

优选地,推挡装置包括有支撑板、导向套、大导向杆、第三定位螺杆、凹形连接板和挡板;支撑板位于大固定板的上方,支撑板与大固定板设置为固定连接,导向套位于支撑板的上方,导向套与支撑板设置为固定连接,大导向杆滑动式的位于导向套内,导向套的顶部设置有第三定位螺杆,导向套与第三定位螺杆设置为螺纹连接,第三定位螺杆与大导向杆相接触,凹形连接板位于支撑板的左侧,凹形连接板的右侧壁与大导向杆的左端设置为固定连接,挡板位于凹形连接板的左侧,挡板位于打孔装置的右侧,挡板与凹形连接板设置为固定连接,挡板上开有大通孔,大通孔位于凹形连接板的上下侧板之间。Preferably, the pushing device includes a support plate, a guide sleeve, a large guide rod, a third positioning screw, a concave connecting plate and a baffle plate; the support plate is located above the large fixed plate, and the support plate and the large fixed plate are fixedly connected , the guide sleeve is located above the support plate, the guide sleeve and the support plate are fixedly connected, the large guide rod is slidably located in the guide sleeve, the top of the guide sleeve is provided with a third positioning screw, and the guide sleeve and the third positioning screw are set as Threaded connection, the third positioning screw is in contact with the large guide rod, the concave connection plate is located on the left side of the support plate, the right side wall of the concave connection plate is fixedly connected with the left end of the large guide rod, and the baffle is located at the concave connection On the left side of the plate, the baffle is located on the right side of the punching device. The baffle and the concave connecting plate are fixedly connected. There is a large through hole on the baffle, and the large through hole is located between the upper and lower side plates of the concave connecting plate.

优选地,打孔装置包括有第一支架、小导向杆、打孔管、连杆、曲柄、旋转杆、第一轴承和第一旋转盘;第一支架位于挡板的左侧,第一支架的底部与大固定板的顶部设置为固定连接,小导向杆位于挡板的左侧,小导向杆的左端与第一支架的右侧壁设置为固定连接,打孔管套在小导向杆上,打孔管与小导向杆设置为滑动连接,打孔管与挡板上的大通孔相对应,连杆位于第一支架和打孔管的前方,连杆的右下端与打孔管的前侧壁设置为铰接连接,曲柄位于第一支架的左侧,曲柄位于连杆的后方,曲柄的上端与连杆的左上端设置为转动连接,曲柄位于第一支架的前方,旋转杆位于第一支架的左侧,旋转杆的前端与曲柄的后侧壁设置为固定连接,第一轴承位于曲柄的后方,第一轴承的右侧壁与第一支架的左侧壁设置为固定连接,旋转杆与第一轴承设置为过盈连接,第一旋转盘位于第一轴承的后方,第一旋转盘位于第一支架的左侧,第一旋转盘的前侧壁与旋转杆的后端设置为固定连接。Preferably, the punching device includes a first bracket, a small guide rod, a punching pipe, a connecting rod, a crank, a rotating rod, a first bearing and a first rotating disc; the first bracket is located on the left side of the baffle, and the first bracket The bottom of the bottom and the top of the large fixed plate are fixedly connected, the small guide rod is located on the left side of the baffle, the left end of the small guide rod is fixedly connected with the right side wall of the first bracket, and the perforated tube is sleeved on the small guide rod , the perforated pipe and the small guide rod are set to be slidingly connected, the perforated pipe corresponds to the large through hole on the baffle, the connecting rod is located in front of the first bracket and the perforated pipe, and the lower right end of the connecting rod is in front of the perforated pipe. The side wall is arranged to be hingedly connected, the crank is located on the left side of the first bracket, the crank is located at the rear of the connecting rod, the upper end of the crank and the upper left end of the connecting rod are arranged to be rotationally connected, the crank is located in front of the first bracket, and the rotating rod is located at the first On the left side of the bracket, the front end of the rotating rod is fixedly connected to the rear side wall of the crank, the first bearing is located behind the crank, the right side wall of the first bearing is fixedly connected to the left side wall of the first bracket, and the rotating rod Set as interference connection with the first bearing, the first rotating disk is located behind the first bearing, the first rotating disk is located on the left side of the first bracket, and the front side wall of the first rotating disk is fixed to the rear end of the rotating rod connect.

优选地,还包括有托板、支撑杆、滑管、第四定位螺杆、滑板和拉簧;托板位于大固定板的上方,托板位于小导向杆的下方,托板位于挡板的左侧,托板与挡板相接触,滑板位于大固定板的第一凹槽内,滑板与大固定板设置为滑动连接,滑管嵌设在滑板内,滑管位于大固定板的第一凹槽和第二凹槽内,滑管与滑板设置为固定连接,滑管的右侧壁上设置有第四定位螺杆,第四定位螺杆位于第二凹槽的下方,第四定位螺杆与滑管设置为螺纹连接,支撑杆滑动式的位于滑管内,支撑杆的上端与托板的底部设置为固定连接,支撑杆与第四定位螺杆相接触,拉簧位于大固定板的第一凹槽内,拉簧位于滑板的右侧,大固定板和滑板均与拉簧设置为固定连接。Preferably, it also includes a supporting plate, a support rod, a slide pipe, a fourth positioning screw, a sliding plate and an extension spring; the supporting plate is located above the large fixed plate, the supporting plate is located below the small guide rod, and the supporting plate is located on the left side of the baffle plate side, the supporting plate is in contact with the baffle plate, the sliding plate is located in the first groove of the large fixing plate, the sliding plate and the large fixing plate are set to be slidingly connected, the sliding tube is embedded in the sliding plate, and the sliding tube is located in the first groove of the large fixing plate In the groove and the second groove, the slide pipe and the slide plate are fixedly connected, and the right side wall of the slide pipe is provided with a fourth positioning screw, the fourth positioning screw is located below the second groove, and the fourth positioning screw and the slide pipe It is set as threaded connection, the support rod is slidingly located in the slide tube, the upper end of the support rod is fixedly connected with the bottom of the supporting plate, the support rod is in contact with the fourth positioning screw, and the tension spring is located in the first groove of the large fixed plate , the extension spring is located on the right side of the slide plate, and the large fixed plate and the slide plate are fixedly connected with the extension spring.

优选地,还包括有连接轴、第一锥齿轮、第二锥齿轮、旋转轴、第二轴承、第一小固定板、第二旋转盘和第二小固定板;连接轴、第一锥齿轮、第二锥齿轮、旋转轴、第二轴承、第一小固定板、第二旋转盘和第二小固定板均位于第一支架的左侧,连接轴的前端与第一旋转盘的后侧壁设置为固定连接,连接轴的后端与第一锥齿轮的前侧壁设置为固定连接,第二锥齿轮位于第一锥齿轮的下方,第二锥齿轮与第一锥齿轮相啮合,旋转轴的上端与第二锥齿轮的底部设置为固定连接,旋转轴与第二轴承设置为过盈连接,第二轴承嵌设在第一小固定板内,第二轴承与第一小固定板设置为固定连接,第二旋转盘位于第二轴承的下方,第二旋转盘的顶部与旋转轴的下端设置为固定连接,第二小固定板位于第二旋转盘的后方,第二小固定板与第一小固定板设置为固定连接,第二小固定板的底部与大固定板的顶部设置为固定连接。Preferably, it also includes a connecting shaft, a first bevel gear, a second bevel gear, a rotating shaft, a second bearing, a first small fixed plate, a second rotating disk and a second small fixed plate; the connecting shaft, the first bevel gear , the second bevel gear, the rotating shaft, the second bearing, the first small fixed plate, the second rotating disk and the second small fixed plate are all located on the left side of the first bracket, connecting the front end of the shaft and the rear side of the first rotating disk The wall is fixedly connected, the rear end of the connecting shaft is fixedly connected to the front side wall of the first bevel gear, the second bevel gear is located below the first bevel gear, the second bevel gear meshes with the first bevel gear, and rotates The upper end of the shaft is fixedly connected to the bottom of the second bevel gear, the rotating shaft is connected to the second bearing in an interference connection, the second bearing is embedded in the first small fixed plate, and the second bearing is arranged on the first small fixed plate. For fixed connection, the second rotating disc is located below the second bearing, the top of the second rotating disc is fixedly connected to the lower end of the rotating shaft, the second small fixing plate is located behind the second rotating disc, and the second small fixing plate and The first small fixed plate is fixedly connected, and the bottom of the second small fixed plate is fixedly connected with the top of the large fixed plate.

优选地,还包括有齿板、小齿轮、旋转电机和第二支架;齿板、小齿轮、旋转电机和第二支架均位于第一套管与第二套管之间,齿板的顶部与大固定板的底部设置为固定连接,小齿轮位于齿板的左侧,小齿轮与齿板相啮合,旋转电机位于小齿轮的后方,旋转电机与小齿轮设置为固定连接,第二支架的底部与底座的顶部设置为固定连接,第二支架的顶部与旋转电机的底部设置为固定连接。Preferably, it also includes a toothed plate, a pinion, a rotating motor and a second bracket; the toothed plate, the pinion, the rotating motor and the second bracket are all located between the first casing and the second casing, and the top of the toothed plate is in contact with the second casing. The bottom of the large fixed plate is fixedly connected, the pinion is located on the left side of the tooth plate, the pinion is meshed with the tooth plate, the rotating motor is located behind the pinion, the rotating motor and the pinion are fixedly connected, and the bottom of the second bracket The top of the base is fixedly connected, and the top of the second support is fixedly connected with the bottom of the rotating motor.

优选地,还包括有L形板、拉线、拉环和弹簧;L形板位于大固定板的右侧,L形板与大固定板设置为固定连接,L形板的右上部开有孔,拉线穿过L形板的孔,拉线的一端与拉环设置为固定连接,拉线的另一端与大导向杆的右端设置为固定连接,弹簧位于凹形连接板和导向套之间,凹形连接板和导向套均与弹簧设置为固定连接。Preferably, it also includes an L-shaped plate, a pull wire, a pull ring and a spring; the L-shaped plate is located on the right side of the large fixed plate, the L-shaped plate and the large fixed plate are fixedly connected, and the upper right part of the L-shaped plate has a hole. The pull wire passes through the hole of the L-shaped plate, one end of the pull wire is fixedly connected to the pull ring, the other end of the pull wire is fixedly connected to the right end of the large guide rod, the spring is located between the concave connecting plate and the guide sleeve, and the concave connection Both the plate and the guide sleeve are fixedly connected with the spring.

工作原理:因为本发明包括有大固定板、推挡装置、打孔装置、第一升降杆、第一套管、第一定位螺杆、第二套管、第二定位螺杆、第二升降杆和底座,所以使用本发明时,拧松第一定位螺杆和第二定位螺杆,上下移动第一升降杆和第二升降杆,从而第一升降杆和第二升降杆带动大固定板上下移动,调节大固定板至指定位置后,拧紧第一定位螺杆和第二定位螺杆,人们将需要打孔的文件放在推挡装置和打孔装置之间,操作推挡装置和打孔装置对文件进行打孔。Working principle: because the present invention includes a large fixed plate, a pushing device, a punching device, a first lifting rod, a first casing, a first positioning screw, a second casing, a second positioning screw, a second lifting rod and Base, so when using the present invention, unscrew the first positioning screw and the second positioning screw, move the first lifting rod and the second lifting rod up and down, so that the first lifting rod and the second lifting rod drive the large fixed plate to move up and down, adjust After the large fixing plate reaches the designated position, tighten the first positioning screw and the second positioning screw, and people will place the file to be punched between the pushing device and the punching device, and operate the pushing device and the punching device to punch the file. hole.

因为推挡装置包括有支撑板、导向套、大导向杆、第三定位螺杆、凹形连接板和挡板,所以人们可以拧松第三定位螺杆,左右移动大导向杆,从而大导向杆带动凹形连接板进行左右移动,进而凹形连接板带动挡板进行左右移动,调节好挡板的位置后,人们可以拧紧第三定位螺杆对大导向杆进行固定,支撑板对导向套进行固定,导向套对大导向杆的左右移动进行导向。Because the pushing device includes a support plate, a guide sleeve, a large guide rod, a third positioning screw, a concave connecting plate and a baffle, people can unscrew the third positioning screw and move the large guide rod left and right, so that the large guide rod drives The concave connecting plate moves left and right, and then the concave connecting plate drives the baffle to move left and right. After adjusting the position of the baffle, people can tighten the third positioning screw to fix the large guide rod, and the support plate fixes the guide sleeve. The guide sleeve guides the left and right movement of the large guide rod.

因为打孔装置包括有第一支架、小导向杆、打孔管、连杆、曲柄、旋转杆、第一轴承和第一旋转盘,所以当人们需要对文件进行打孔时,旋转第一旋转盘,从而第一旋转盘带动旋转杆进行转动,进而旋转杆带动曲柄进行转动,进而曲柄通过连杆带动打孔管向右移动对文件进行打孔,大通孔为打孔管的运动提供空间,避免磨损,继续旋转第一旋转盘,当曲柄转动至旋转杆的下方时,曲柄通过连杆带动打孔管向左进行移动,小导向杆将打孔管内的纸屑推出,当不需要打孔时,停止旋转第一旋转盘即可。Because the punching device includes a first bracket, a small guide rod, a punching tube, a connecting rod, a crank, a rotating rod, a first bearing, and a first rotating disk, when people need to punch a file, the first rotation disk, so that the first rotating disk drives the rotating rod to rotate, and then the rotating rod drives the crank to rotate, and then the crank drives the perforating tube to move to the right through the connecting rod to punch the file. The large through hole provides space for the movement of the perforating tube. To avoid wear and tear, continue to rotate the first rotating disc. When the crank rotates to the bottom of the rotating rod, the crank drives the punching tube to move to the left through the connecting rod, and the small guide rod pushes out the paper scraps in the punching tube. , stop rotating the first rotating disc.

因为还包括有托板、支撑杆、滑管、第四定位螺杆、滑板和拉簧,所以人们可以拧松第四定位螺杆,上下移动支撑杆,从而支撑杆带动托板进行上下移动,托板移动至指定位置后,拧紧第四定位螺杆对支撑杆进行固定,人们可以将需要打孔的文件放在托板上,当挡板向左移动时,挡板带动托板向左进行移动,从而托板带动支撑杆向左进行移动,进而支撑杆带动滑管、第四定位螺杆和滑板向左进行移动,拉簧拉伸,当挡板向右移动时,滑板在拉簧的作用下带动托板、支撑杆、滑管和第四定位螺杆向右移动,拉簧收缩。Because it also includes supporting plate, support rod, slide tube, fourth positioning screw, slide plate and tension spring, people can unscrew the fourth positioning screw and move the supporting rod up and down, so that the supporting rod drives the supporting plate to move up and down, and the supporting plate After moving to the designated position, tighten the fourth positioning screw to fix the support rod, and people can put the files that need to be punched on the pallet, and when the baffle moves to the left, the baffle drives the pallet to move to the left, thereby The supporting plate drives the supporting rod to move to the left, and then the supporting rod drives the sliding tube, the fourth positioning screw and the sliding plate to move to the left, and the tension spring stretches. When the baffle moves to the right, the sliding plate drives the supporting rod under the action of the tension spring Plate, support rod, slide pipe and the fourth positioning screw move to the right, and extension spring contracts.

因为还包括有连接轴、第一锥齿轮、第二锥齿轮、旋转轴、第二轴承、第一小固定板、第二旋转盘和第二小固定板,所以当要对文件进行打孔时,旋转第二旋转盘,从而第二旋转盘带动旋转轴进行转动,进而旋转轴带动第二锥齿轮进行转动,进而第二锥齿轮带动第一锥齿轮进行转动,进而第一锥齿轮通过连接轴带动第一旋转盘进行转动,第二小固定板对第一小固定板进行固定,第二轴承对旋转轴的转动进行辅助。Because it also includes the connecting shaft, the first bevel gear, the second bevel gear, the rotating shaft, the second bearing, the first small fixed plate, the second rotating disk and the second small fixed plate, so when the file is to be punched , rotate the second rotating disk, so that the second rotating disk drives the rotating shaft to rotate, and then the rotating shaft drives the second bevel gear to rotate, and then the second bevel gear drives the first bevel gear to rotate, and then the first bevel gear passes through the connecting shaft The first rotating disk is driven to rotate, the second small fixing plate fixes the first small fixing plate, and the second bearing assists the rotation of the rotating shaft.

因为还包括有齿板、小齿轮、旋转电机和第二支架,所以当要对大固定板的高度进行调节时,启动旋转电机,从而旋转电机带动小齿轮进行转动,进而小齿轮带动齿板进行上下移动,进而齿板带动大固定板进行上下移动。Because it also includes a toothed plate, a pinion, a rotating motor and a second bracket, so when the height of the large fixed plate is to be adjusted, the rotating motor is started, so that the rotating motor drives the pinion to rotate, and then the pinion drives the toothed plate to rotate. Move up and down, and then the gear plate drives the large fixed plate to move up and down.

因为还包括有L形板、拉线、拉环和弹簧,所以当要移动大导向杆时,向右拉动拉环,从而拉环带动拉线向右运动,进而拉线带动大导向杆向右进行移动,弹簧收缩,放开拉环,大导向杆在弹簧的作用下带动拉线和拉环向左进行移动。Because L-shaped plate, backguy, pull ring and spring are also included, so when the large guide rod is to be moved, the pull ring is pulled to the right, so that the pull ring drives the stay wire to move to the right, and then the pull wire drives the large guide rod to move to the right. The spring shrinks, and the draw ring is released, and the large guide rod drives the stay wire and the draw ring to move to the left under the action of the spring.

(3)有益效果(3) Beneficial effect

本发明所提供的一种纸质办公用品打孔装置,能够轻松的对较厚的文件进行打孔,便于人们将较厚的文件装订在一起,有利于文件的管理保存,能够对文件的高度位置进行方便的调整,便于在文件的不同部位进行打孔,使打孔更加的精确,本发明劳动强度小,性能安全可靠,结构独特,操作简单,使用方便,易于维护维修。A punching device for paper office supplies provided by the present invention can easily punch thicker files, which is convenient for people to bind thicker files together, is conducive to the management and preservation of files, and can adjust the height of files. The position is conveniently adjusted, which is convenient for punching holes in different parts of the file, making the punching more accurate. The invention has low labor intensity, safe and reliable performance, unique structure, simple operation, convenient use, and easy maintenance.

附图说明Description of drawings

图1为本发明的主视图结构示意图。Fig. 1 is a schematic diagram of the structure of the front view of the present invention.

图2为本发明的曲柄的左视图结构示意图。Fig. 2 is a left view structural schematic diagram of the crank of the present invention.

图3为本发明的支撑杆的主视图结构示意图。Fig. 3 is a schematic diagram of the structure of the front view of the support rod of the present invention.

图4为本发明的第一锥齿轮的左视图结构示意图。Fig. 4 is a left view structural diagram of the first bevel gear of the present invention.

图5为本发明的齿板的主视图结构示意图。Fig. 5 is a front view structural diagram of the tooth plate of the present invention.

图6为本发明的拉线的主视图结构示意图。Fig. 6 is a schematic diagram of the structure of the front view of the pull wire of the present invention.

附图中的标记为:1-大固定板,2-推挡装置,3-打孔装置,4-第一升降杆,5-第一套管,6-第一定位螺杆,7-第二套管,8-第二定位螺杆,9-第二升降杆,10-底座,11-第一凹槽,12-第二凹槽,21-支撑板,22-导向套,23-大导向杆,24-第三定位螺杆,25-凹形连接板,26-挡板,31-第一支架,32-小导向杆,33-打孔管,34-连杆,35-曲柄,36-旋转杆,37-第一轴承,38-第一旋转盘,41-托板,42-支撑杆,43-滑管,44-第四定位螺杆,45-滑板,46-拉簧,51-连接轴,52-第一锥齿轮,53-第二锥齿轮,54-旋转轴,55-第二轴承,56-第一小固定板,57-第二旋转盘,58-第二小固定板,61-齿板,62-小齿轮,63-旋转电机,64-第二支架,71-L形板,72-拉线,73-拉环,74-弹簧,261-大通孔。The marks in the accompanying drawings are: 1-large fixed plate, 2-pushing device, 3-punching device, 4-first lifting rod, 5-first sleeve, 6-first positioning screw, 7-second Sleeve, 8-second positioning screw, 9-second lifting rod, 10-base, 11-first groove, 12-second groove, 21-support plate, 22-guide sleeve, 23-big guide rod , 24-the third positioning screw, 25-concave connecting plate, 26-baffle plate, 31-the first bracket, 32-small guide rod, 33-perforated tube, 34-connecting rod, 35-crank, 36-rotation Rod, 37-the first bearing, 38-the first rotating disk, 41-supporting plate, 42-support rod, 43-sliding tube, 44-the fourth positioning screw, 45-slide, 46-extension spring, 51-connecting shaft , 52-the first bevel gear, 53-the second bevel gear, 54-the rotating shaft, 55-the second bearing, 56-the first small fixed plate, 57-the second rotating disk, 58-the second small fixed plate, 61 -tooth plate, 62-pinion, 63-rotary motor, 64-second support, 71-L-shaped plate, 72-guy wire, 73-pull ring, 74-spring, 261-big through hole.

具体实施方式Detailed ways

下面结合附图和实施例对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

实施例1Example 1

一种纸质办公用品打孔装置,如图1-6所示,包括有大固定板1、推挡装置2、打孔装置3、第一升降杆4、第一套管5、第一定位螺杆6、第二套管7、第二定位螺杆8、第二升降杆9和底座10;大固定板1的上方设置有推挡装置2和打孔装置3,推挡装置2位于打孔装置3的右侧,大固定板1的下方设置有第一升降杆4、第一套管5、第一定位螺杆6、第二套管7、第二定位螺杆8和第二升降杆9,底座10位于第一套管5和第二套管7的下方,第一升降杆4的顶部与大固定板1的底部设置为固定连接,第一套管5与底座10设置为固定连接,第一升降杆4滑动式位于第一套管5内,第二升降杆9滑动式位于第二套管7内,第一套管5的右侧壁上设置有第一定位螺杆6,第一套管5与第一定位螺杆6设置为螺纹连接,第一定位螺杆6与第一升降杆4相接触,第一套管5与大固定板1相接触,第一升降杆4与底座10相接触,第二升降杆9的顶部与大固定板1的底部设置为固定连接,第二套管7与底座10设置为固定连接,第二套管7的左侧壁上设置有第二定位螺杆8,第二套管7与第二定位螺杆8设置为螺纹连接,第二定位螺杆8与第二升降杆9相接触,第二套管7与大固定板1相接触,第二升降杆9与底座10相接触,大固定板1上开有前后贯穿的第一凹槽11,大固定板1上开有上下贯穿的第二凹槽12,第一凹槽11与第二凹槽12相连通,第一凹槽11与第二凹槽12为垂直式设置。A paper-based office supplies punching device, as shown in Figure 1-6, includes a large fixed plate 1, a pushing device 2, a punching device 3, a first lifting rod 4, a first sleeve 5, a first positioning Screw rod 6, the second sleeve pipe 7, the second positioning screw rod 8, the second elevating rod 9 and the base 10; the top of the large fixed plate 1 is provided with a pushing device 2 and a punching device 3, and the pushing device 2 is located in the punching device 3, the bottom of the large fixed plate 1 is provided with the first lifting rod 4, the first sleeve 5, the first positioning screw 6, the second sleeve 7, the second positioning screw 8 and the second lifting rod 9, the base 10 is located below the first casing 5 and the second casing 7, the top of the first lifting rod 4 is fixedly connected to the bottom of the large fixed plate 1, the first casing 5 and the base 10 are fixedly connected, the first Lifting rod 4 is slidingly located in the first casing 5, and the second lifting rod 9 is slidingly positioned in the second casing 7. The right side wall of the first casing 5 is provided with a first positioning screw 6, and the first positioning screw 6 is arranged on the first casing. 5 is threadedly connected with the first positioning screw 6, the first positioning screw 6 is in contact with the first elevating rod 4, the first sleeve 5 is in contact with the large fixed plate 1, and the first elevating rod 4 is in contact with the base 10, The top of the second elevating rod 9 is fixedly connected to the bottom of the large fixed plate 1, the second sleeve 7 is fixedly connected to the base 10, and the left side wall of the second sleeve 7 is provided with a second positioning screw 8. The second sleeve 7 is threadedly connected with the second positioning screw 8, the second positioning screw 8 is in contact with the second elevating rod 9, the second sleeve 7 is in contact with the large fixed plate 1, and the second elevating rod 9 is in contact with the base 10 are in contact with each other, the large fixed plate 1 is provided with a first groove 11 that penetrates front and back, and the large fixed plate 1 is provided with a second groove 12 that penetrates up and down, and the first groove 11 communicates with the second groove 12. The first groove 11 and the second groove 12 are arranged vertically.

实施例2Example 2

一种纸质办公用品打孔装置,如图1-6所示,包括有大固定板1、推挡装置2、打孔装置3、第一升降杆4、第一套管5、第一定位螺杆6、第二套管7、第二定位螺杆8、第二升降杆9和底座10;大固定板1的上方设置有推挡装置2和打孔装置3,推挡装置2位于打孔装置3的右侧,大固定板1的下方设置有第一升降杆4、第一套管5、第一定位螺杆6、第二套管7、第二定位螺杆8和第二升降杆9,底座10位于第一套管5和第二套管7的下方,第一升降杆4的顶部与大固定板1的底部设置为固定连接,第一套管5与底座10设置为固定连接,第一升降杆4滑动式位于第一套管5内,第二升降杆9滑动式位于第二套管7内,第一套管5的右侧壁上设置有第一定位螺杆6,第一套管5与第一定位螺杆6设置为螺纹连接,第一定位螺杆6与第一升降杆4相接触,第一套管5与大固定板1相接触,第一升降杆4与底座10相接触,第二升降杆9的顶部与大固定板1的底部设置为固定连接,第二套管7与底座10设置为固定连接,第二套管7的左侧壁上设置有第二定位螺杆8,第二套管7与第二定位螺杆8设置为螺纹连接,第二定位螺杆8与第二升降杆9相接触,第二套管7与大固定板1相接触,第二升降杆9与底座10相接触,大固定板1上开有前后贯穿的第一凹槽11,大固定板1上开有上下贯穿的第二凹槽12,第一凹槽11与第二凹槽12相连通,第一凹槽11与第二凹槽12为垂直式设置。A paper-based office supplies punching device, as shown in Figure 1-6, includes a large fixed plate 1, a pushing device 2, a punching device 3, a first lifting rod 4, a first sleeve 5, a first positioning Screw rod 6, the second sleeve pipe 7, the second positioning screw rod 8, the second elevating rod 9 and the base 10; the top of the large fixed plate 1 is provided with a pushing device 2 and a punching device 3, and the pushing device 2 is located in the punching device 3, the bottom of the large fixed plate 1 is provided with the first lifting rod 4, the first sleeve 5, the first positioning screw 6, the second sleeve 7, the second positioning screw 8 and the second lifting rod 9, the base 10 is located below the first casing 5 and the second casing 7, the top of the first lifting rod 4 is fixedly connected to the bottom of the large fixed plate 1, the first casing 5 and the base 10 are fixedly connected, the first Lifting rod 4 is slidingly located in the first casing 5, and the second lifting rod 9 is slidingly positioned in the second casing 7. The right side wall of the first casing 5 is provided with a first positioning screw 6, and the first positioning screw 6 is arranged on the first casing. 5 is threadedly connected with the first positioning screw 6, the first positioning screw 6 is in contact with the first elevating rod 4, the first sleeve 5 is in contact with the large fixed plate 1, and the first elevating rod 4 is in contact with the base 10, The top of the second elevating rod 9 is fixedly connected to the bottom of the large fixed plate 1, the second sleeve 7 is fixedly connected to the base 10, and the left side wall of the second sleeve 7 is provided with a second positioning screw 8. The second sleeve 7 is threadedly connected with the second positioning screw 8, the second positioning screw 8 is in contact with the second elevating rod 9, the second sleeve 7 is in contact with the large fixed plate 1, and the second elevating rod 9 is in contact with the base 10 are in contact with each other, the large fixed plate 1 is provided with a first groove 11 that penetrates front and back, and the large fixed plate 1 is provided with a second groove 12 that penetrates up and down, and the first groove 11 communicates with the second groove 12. The first groove 11 and the second groove 12 are arranged vertically.

推挡装置2包括有支撑板21、导向套22、大导向杆23、第三定位螺杆24、凹形连接板25和挡板26;支撑板21位于大固定板1的上方,支撑板21与大固定板1设置为固定连接,导向套22位于支撑板21的上方,导向套22与支撑板21设置为固定连接,大导向杆23滑动式的位于导向套22内,导向套22的顶部设置有第三定位螺杆24,导向套22与第三定位螺杆24设置为螺纹连接,第三定位螺杆24与大导向杆23相接触,凹形连接板25位于支撑板21的左侧,凹形连接板25的右侧壁与大导向杆23的左端设置为固定连接,挡板26位于凹形连接板25的左侧,挡板26位于打孔装置3的右侧,挡板26与凹形连接板25设置为固定连接,挡板26上开有大通孔261,大通孔261位于凹形连接板25的上下侧板之间。The pushing device 2 includes a support plate 21, a guide sleeve 22, a large guide rod 23, a third positioning screw 24, a concave connecting plate 25 and a baffle plate 26; the support plate 21 is positioned above the large fixed plate 1, and the support plate 21 and the The large fixed plate 1 is fixedly connected, the guide sleeve 22 is located above the support plate 21, the guide sleeve 22 and the support plate 21 are fixedly connected, the large guide rod 23 is slidably located in the guide sleeve 22, and the top of the guide sleeve 22 is arranged There is a third positioning screw 24, the guide sleeve 22 is threadedly connected with the third positioning screw 24, the third positioning screw 24 is in contact with the large guide rod 23, the concave connecting plate 25 is located on the left side of the support plate 21, and the concave connection The right side wall of plate 25 is fixedly connected with the left end of large guide bar 23, and baffle plate 26 is positioned at the left side of concave connecting plate 25, and baffle plate 26 is positioned at the right side of punching device 3, and baffle plate 26 is connected with concave shape. The plate 25 is fixedly connected, and the baffle plate 26 is provided with a large through hole 261 , and the large through hole 261 is located between the upper and lower side plates of the concave connecting plate 25 .

实施例3Example 3

一种纸质办公用品打孔装置,如图1-6所示,包括有大固定板1、推挡装置2、打孔装置3、第一升降杆4、第一套管5、第一定位螺杆6、第二套管7、第二定位螺杆8、第二升降杆9和底座10;大固定板1的上方设置有推挡装置2和打孔装置3,推挡装置2位于打孔装置3的右侧,大固定板1的下方设置有第一升降杆4、第一套管5、第一定位螺杆6、第二套管7、第二定位螺杆8和第二升降杆9,底座10位于第一套管5和第二套管7的下方,第一升降杆4的顶部与大固定板1的底部设置为固定连接,第一套管5与底座10设置为固定连接,第一升降杆4滑动式位于第一套管5内,第二升降杆9滑动式位于第二套管7内,第一套管5的右侧壁上设置有第一定位螺杆6,第一套管5与第一定位螺杆6设置为螺纹连接,第一定位螺杆6与第一升降杆4相接触,第一套管5与大固定板1相接触,第一升降杆4与底座10相接触,第二升降杆9的顶部与大固定板1的底部设置为固定连接,第二套管7与底座10设置为固定连接,第二套管7的左侧壁上设置有第二定位螺杆8,第二套管7与第二定位螺杆8设置为螺纹连接,第二定位螺杆8与第二升降杆9相接触,第二套管7与大固定板1相接触,第二升降杆9与底座10相接触,大固定板1上开有前后贯穿的第一凹槽11,大固定板1上开有上下贯穿的第二凹槽12,第一凹槽11与第二凹槽12相连通,第一凹槽11与第二凹槽12为垂直式设置。A paper-based office supplies punching device, as shown in Figure 1-6, includes a large fixed plate 1, a pushing device 2, a punching device 3, a first lifting rod 4, a first sleeve 5, a first positioning Screw rod 6, the second sleeve pipe 7, the second positioning screw rod 8, the second elevating rod 9 and the base 10; the top of the large fixed plate 1 is provided with a pushing device 2 and a punching device 3, and the pushing device 2 is located in the punching device 3, the bottom of the large fixed plate 1 is provided with the first lifting rod 4, the first sleeve 5, the first positioning screw 6, the second sleeve 7, the second positioning screw 8 and the second lifting rod 9, the base 10 is located below the first casing 5 and the second casing 7, the top of the first lifting rod 4 is fixedly connected to the bottom of the large fixed plate 1, the first casing 5 and the base 10 are fixedly connected, the first Lifting rod 4 is slidingly located in the first casing 5, and the second lifting rod 9 is slidingly positioned in the second casing 7. The right side wall of the first casing 5 is provided with a first positioning screw 6, and the first positioning screw 6 is arranged on the first casing. 5 is threadedly connected with the first positioning screw 6, the first positioning screw 6 is in contact with the first elevating rod 4, the first sleeve 5 is in contact with the large fixed plate 1, and the first elevating rod 4 is in contact with the base 10, The top of the second elevating rod 9 is fixedly connected to the bottom of the large fixed plate 1, the second sleeve 7 is fixedly connected to the base 10, and the left side wall of the second sleeve 7 is provided with a second positioning screw 8. The second sleeve 7 is threadedly connected with the second positioning screw 8, the second positioning screw 8 is in contact with the second elevating rod 9, the second sleeve 7 is in contact with the large fixed plate 1, and the second elevating rod 9 is in contact with the base 10 are in contact with each other, the large fixed plate 1 is provided with a first groove 11 that penetrates front and back, and the large fixed plate 1 is provided with a second groove 12 that penetrates up and down, and the first groove 11 communicates with the second groove 12. The first groove 11 and the second groove 12 are arranged vertically.

推挡装置2包括有支撑板21、导向套22、大导向杆23、第三定位螺杆24、凹形连接板25和挡板26;支撑板21位于大固定板1的上方,支撑板21与大固定板1设置为固定连接,导向套22位于支撑板21的上方,导向套22与支撑板21设置为固定连接,大导向杆23滑动式的位于导向套22内,导向套22的顶部设置有第三定位螺杆24,导向套22与第三定位螺杆24设置为螺纹连接,第三定位螺杆24与大导向杆23相接触,凹形连接板25位于支撑板21的左侧,凹形连接板25的右侧壁与大导向杆23的左端设置为固定连接,挡板26位于凹形连接板25的左侧,挡板26位于打孔装置3的右侧,挡板26与凹形连接板25设置为固定连接,挡板26上开有大通孔261,大通孔261位于凹形连接板25的上下侧板之间。The pushing device 2 includes a support plate 21, a guide sleeve 22, a large guide rod 23, a third positioning screw 24, a concave connecting plate 25 and a baffle plate 26; the support plate 21 is positioned above the large fixed plate 1, and the support plate 21 and the The large fixed plate 1 is fixedly connected, the guide sleeve 22 is located above the support plate 21, the guide sleeve 22 and the support plate 21 are fixedly connected, the large guide rod 23 is slidably located in the guide sleeve 22, and the top of the guide sleeve 22 is arranged There is a third positioning screw 24, the guide sleeve 22 is threadedly connected with the third positioning screw 24, the third positioning screw 24 is in contact with the large guide rod 23, the concave connecting plate 25 is located on the left side of the support plate 21, and the concave connection The right side wall of plate 25 is fixedly connected with the left end of large guide bar 23, and baffle plate 26 is positioned at the left side of concave connecting plate 25, and baffle plate 26 is positioned at the right side of punching device 3, and baffle plate 26 is connected with concave shape. The plate 25 is fixedly connected, and the baffle plate 26 is provided with a large through hole 261 , and the large through hole 261 is located between the upper and lower side plates of the concave connecting plate 25 .

打孔装置3包括有第一支架31、小导向杆32、打孔管33、连杆34、曲柄35、旋转杆36、第一轴承37和第一旋转盘38;第一支架31位于挡板26的左侧,第一支架31的底部与大固定板1的顶部设置为固定连接,小导向杆32位于挡板26的左侧,小导向杆32的左端与第一支架31的右侧壁设置为固定连接,打孔管33套在小导向杆32上,打孔管33与小导向杆32设置为滑动连接,打孔管33与挡板26上的大通孔261相对应,连杆34位于第一支架31和打孔管33的前方,连杆34的右下端与打孔管33的前侧壁设置为铰接连接,曲柄35位于第一支架31的左侧,曲柄35位于连杆34的后方,曲柄35的上端与连杆34的左上端设置为转动连接,曲柄35位于第一支架31的前方,旋转杆36位于第一支架31的左侧,旋转杆36的前端与曲柄35的后侧壁设置为固定连接,第一轴承37位于曲柄35的后方,第一轴承37的右侧壁与第一支架31的左侧壁设置为固定连接,旋转杆36与第一轴承37设置为过盈连接,第一旋转盘38位于第一轴承37的后方,第一旋转盘38位于第一支架31的左侧,第一旋转盘38的前侧壁与旋转杆36的后端设置为固定连接。The punching device 3 includes a first support 31, a small guide rod 32, a punching pipe 33, a connecting rod 34, a crank 35, a rotating rod 36, a first bearing 37 and a first rotating disk 38; 26, the bottom of the first bracket 31 is fixedly connected with the top of the large fixed plate 1, and the small guide rod 32 is positioned on the left side of the baffle plate 26, and the left end of the small guide rod 32 is connected to the right side wall of the first bracket 31. Set to be fixedly connected, the perforated tube 33 is sleeved on the small guide rod 32, the perforated tube 33 and the small guide rod 32 are arranged to be slidingly connected, the perforated tube 33 corresponds to the large through hole 261 on the baffle plate 26, and the connecting rod 34 Located in front of the first bracket 31 and the perforated tube 33, the lower right end of the connecting rod 34 is hingedly connected to the front side wall of the perforated tube 33, the crank 35 is located on the left side of the first bracket 31, and the crank 35 is located on the connecting rod 34. rear, the upper end of the crank 35 and the upper left end of the connecting rod 34 are set to be rotationally connected; The rear side wall is fixedly connected, the first bearing 37 is positioned at the rear of the crank 35, the right side wall of the first bearing 37 is fixedly connected with the left side wall of the first bracket 31, and the rotating rod 36 and the first bearing 37 are set as Interference connection, the first rotating disk 38 is located behind the first bearing 37, the first rotating disk 38 is located on the left side of the first bracket 31, and the front side wall of the first rotating disk 38 is fixed to the rear end of the rotating rod 36. connect.

实施例4Example 4

一种纸质办公用品打孔装置,如图1-6所示,包括有大固定板1、推挡装置2、打孔装置3、第一升降杆4、第一套管5、第一定位螺杆6、第二套管7、第二定位螺杆8、第二升降杆9和底座10;大固定板1的上方设置有推挡装置2和打孔装置3,推挡装置2位于打孔装置3的右侧,大固定板1的下方设置有第一升降杆4、第一套管5、第一定位螺杆6、第二套管7、第二定位螺杆8和第二升降杆9,底座10位于第一套管5和第二套管7的下方,第一升降杆4的顶部与大固定板1的底部设置为固定连接,第一套管5与底座10设置为固定连接,第一升降杆4滑动式位于第一套管5内,第二升降杆9滑动式位于第二套管7内,第一套管5的右侧壁上设置有第一定位螺杆6,第一套管5与第一定位螺杆6设置为螺纹连接,第一定位螺杆6与第一升降杆4相接触,第一套管5与大固定板1相接触,第一升降杆4与底座10相接触,第二升降杆9的顶部与大固定板1的底部设置为固定连接,第二套管7与底座10设置为固定连接,第二套管7的左侧壁上设置有第二定位螺杆8,第二套管7与第二定位螺杆8设置为螺纹连接,第二定位螺杆8与第二升降杆9相接触,第二套管7与大固定板1相接触,第二升降杆9与底座10相接触,大固定板1上开有前后贯穿的第一凹槽11,大固定板1上开有上下贯穿的第二凹槽12,第一凹槽11与第二凹槽12相连通,第一凹槽11与第二凹槽12为垂直式设置。A paper-based office supplies punching device, as shown in Figure 1-6, includes a large fixed plate 1, a pushing device 2, a punching device 3, a first lifting rod 4, a first sleeve 5, a first positioning Screw rod 6, the second sleeve pipe 7, the second positioning screw rod 8, the second elevating rod 9 and the base 10; the top of the large fixed plate 1 is provided with a pushing device 2 and a punching device 3, and the pushing device 2 is located in the punching device 3, the bottom of the large fixed plate 1 is provided with the first lifting rod 4, the first sleeve 5, the first positioning screw 6, the second sleeve 7, the second positioning screw 8 and the second lifting rod 9, the base 10 is located below the first casing 5 and the second casing 7, the top of the first lifting rod 4 is fixedly connected to the bottom of the large fixed plate 1, the first casing 5 and the base 10 are fixedly connected, the first Lifting rod 4 is slidingly located in the first casing 5, and the second lifting rod 9 is slidingly positioned in the second casing 7. The right side wall of the first casing 5 is provided with a first positioning screw 6, and the first positioning screw 6 is arranged on the first casing. 5 is threadedly connected with the first positioning screw 6, the first positioning screw 6 is in contact with the first elevating rod 4, the first sleeve 5 is in contact with the large fixed plate 1, and the first elevating rod 4 is in contact with the base 10, The top of the second elevating rod 9 is fixedly connected to the bottom of the large fixed plate 1, the second sleeve 7 is fixedly connected to the base 10, and the left side wall of the second sleeve 7 is provided with a second positioning screw 8. The second sleeve 7 is threadedly connected with the second positioning screw 8, the second positioning screw 8 is in contact with the second elevating rod 9, the second sleeve 7 is in contact with the large fixed plate 1, and the second elevating rod 9 is in contact with the base 10 are in contact with each other, the large fixed plate 1 is provided with a first groove 11 that penetrates front and back, and the large fixed plate 1 is provided with a second groove 12 that penetrates up and down, and the first groove 11 communicates with the second groove 12. The first groove 11 and the second groove 12 are arranged vertically.

推挡装置2包括有支撑板21、导向套22、大导向杆23、第三定位螺杆24、凹形连接板25和挡板26;支撑板21位于大固定板1的上方,支撑板21与大固定板1设置为固定连接,导向套22位于支撑板21的上方,导向套22与支撑板21设置为固定连接,大导向杆23滑动式的位于导向套22内,导向套22的顶部设置有第三定位螺杆24,导向套22与第三定位螺杆24设置为螺纹连接,第三定位螺杆24与大导向杆23相接触,凹形连接板25位于支撑板21的左侧,凹形连接板25的右侧壁与大导向杆23的左端设置为固定连接,挡板26位于凹形连接板25的左侧,挡板26位于打孔装置3的右侧,挡板26与凹形连接板25设置为固定连接,挡板26上开有大通孔261,大通孔261位于凹形连接板25的上下侧板之间。The pushing device 2 includes a support plate 21, a guide sleeve 22, a large guide rod 23, a third positioning screw 24, a concave connecting plate 25 and a baffle plate 26; the support plate 21 is positioned above the large fixed plate 1, and the support plate 21 and the The large fixed plate 1 is fixedly connected, the guide sleeve 22 is located above the support plate 21, the guide sleeve 22 and the support plate 21 are fixedly connected, the large guide rod 23 is slidably located in the guide sleeve 22, and the top of the guide sleeve 22 is arranged There is a third positioning screw 24, the guide sleeve 22 is threadedly connected with the third positioning screw 24, the third positioning screw 24 is in contact with the large guide rod 23, the concave connecting plate 25 is located on the left side of the support plate 21, and the concave connection The right side wall of plate 25 is fixedly connected with the left end of large guide bar 23, and baffle plate 26 is positioned at the left side of concave connecting plate 25, and baffle plate 26 is positioned at the right side of punching device 3, and baffle plate 26 is connected with concave shape. The plate 25 is fixedly connected, and the baffle plate 26 is provided with a large through hole 261 , and the large through hole 261 is located between the upper and lower side plates of the concave connecting plate 25 .

打孔装置3包括有第一支架31、小导向杆32、打孔管33、连杆34、曲柄35、旋转杆36、第一轴承37和第一旋转盘38;第一支架31位于挡板26的左侧,第一支架31的底部与大固定板1的顶部设置为固定连接,小导向杆32位于挡板26的左侧,小导向杆32的左端与第一支架31的右侧壁设置为固定连接,打孔管33套在小导向杆32上,打孔管33与小导向杆32设置为滑动连接,打孔管33与挡板26上的大通孔261相对应,连杆34位于第一支架31和打孔管33的前方,连杆34的右下端与打孔管33的前侧壁设置为铰接连接,曲柄35位于第一支架31的左侧,曲柄35位于连杆34的后方,曲柄35的上端与连杆34的左上端设置为转动连接,曲柄35位于第一支架31的前方,旋转杆36位于第一支架31的左侧,旋转杆36的前端与曲柄35的后侧壁设置为固定连接,第一轴承37位于曲柄35的后方,第一轴承37的右侧壁与第一支架31的左侧壁设置为固定连接,旋转杆36与第一轴承37设置为过盈连接,第一旋转盘38位于第一轴承37的后方,第一旋转盘38位于第一支架31的左侧,第一旋转盘38的前侧壁与旋转杆36的后端设置为固定连接。The punching device 3 includes a first support 31, a small guide rod 32, a punching pipe 33, a connecting rod 34, a crank 35, a rotating rod 36, a first bearing 37 and a first rotating disk 38; 26, the bottom of the first bracket 31 is fixedly connected with the top of the large fixed plate 1, and the small guide rod 32 is positioned on the left side of the baffle plate 26, and the left end of the small guide rod 32 is connected to the right side wall of the first bracket 31. Set to be fixedly connected, the perforated tube 33 is sleeved on the small guide rod 32, the perforated tube 33 and the small guide rod 32 are arranged to be slidingly connected, the perforated tube 33 corresponds to the large through hole 261 on the baffle plate 26, and the connecting rod 34 Located in front of the first bracket 31 and the perforated tube 33, the lower right end of the connecting rod 34 is hingedly connected to the front side wall of the perforated tube 33, the crank 35 is located on the left side of the first bracket 31, and the crank 35 is located on the connecting rod 34. rear, the upper end of the crank 35 and the upper left end of the connecting rod 34 are set to be rotationally connected; The rear side wall is fixedly connected, the first bearing 37 is positioned at the rear of the crank 35, the right side wall of the first bearing 37 is fixedly connected with the left side wall of the first bracket 31, and the rotating rod 36 and the first bearing 37 are set as Interference connection, the first rotating disk 38 is located behind the first bearing 37, the first rotating disk 38 is located on the left side of the first bracket 31, and the front side wall of the first rotating disk 38 is fixed to the rear end of the rotating rod 36. connect.

还包括有托板41、支撑杆42、滑管43、第四定位螺杆44、滑板45和拉簧46;托板41位于大固定板1的上方,托板41位于小导向杆32的下方,托板41位于挡板26的左侧,托板41与挡板26相接触,滑板45位于大固定板1的第一凹槽11内,滑板45与大固定板1设置为滑动连接,滑管43嵌设在滑板45内,滑管43位于大固定板1的第一凹槽11和第二凹槽12内,滑管43与滑板45设置为固定连接,滑管43的右侧壁上设置有第四定位螺杆44,第四定位螺杆44位于第二凹槽12的下方,第四定位螺杆44与滑管43设置为螺纹连接,支撑杆42滑动式的位于滑管43内,支撑杆42的上端与托板41的底部设置为固定连接,支撑杆42与第四定位螺杆44相接触,拉簧46位于大固定板1的第一凹槽11内,拉簧46位于滑板45的右侧,大固定板1和滑板45均与拉簧46设置为固定连接。Also include supporting plate 41, support rod 42, slide pipe 43, the 4th positioning screw rod 44, slide plate 45 and extension spring 46; Supporting plate 41 is positioned at the left side of baffle plate 26, and supporting plate 41 contacts with baffle plate 26, and slide plate 45 is positioned at the first groove 11 of large fixed plate 1, and slide plate 45 and large fixed plate 1 are arranged as sliding connection, slide tube 43 is embedded in the slide plate 45, the slide tube 43 is located in the first groove 11 and the second groove 12 of the large fixed plate 1, the slide tube 43 and the slide plate 45 are fixedly connected, and the right side wall of the slide tube 43 is set There is a fourth positioning screw 44, the fourth positioning screw 44 is located below the second groove 12, the fourth positioning screw 44 is threadedly connected to the slide pipe 43, the support rod 42 is slidably located in the slide pipe 43, and the support rod 42 The upper end and the bottom of the supporting plate 41 are fixedly connected, the support rod 42 is in contact with the fourth positioning screw 44, the extension spring 46 is located in the first groove 11 of the large fixed plate 1, and the extension spring 46 is located on the right side of the slide plate 45 , the large fixed plate 1 and the slide plate 45 are fixedly connected with the extension spring 46.

还包括有连接轴51、第一锥齿轮52、第二锥齿轮53、旋转轴54、第二轴承55、第一小固定板56、第二旋转盘57和第二小固定板58;连接轴51、第一锥齿轮52、第二锥齿轮53、旋转轴54、第二轴承55、第一小固定板56、第二旋转盘57和第二小固定板58均位于第一支架31的左侧,连接轴51的前端与第一旋转盘38的后侧壁设置为固定连接,连接轴51的后端与第一锥齿轮52的前侧壁设置为固定连接,第二锥齿轮53位于第一锥齿轮52的下方,第二锥齿轮53与第一锥齿轮52相啮合,旋转轴54的上端与第二锥齿轮53的底部设置为固定连接,旋转轴54与第二轴承55设置为过盈连接,第二轴承55嵌设在第一小固定板56内,第二轴承55与第一小固定板56设置为固定连接,第二旋转盘57位于第二轴承55的下方,第二旋转盘57的顶部与旋转轴54的下端设置为固定连接,第二小固定板58位于第二旋转盘57的后方,第二小固定板58与第一小固定板56设置为固定连接,第二小固定板58的底部与大固定板1的顶部设置为固定连接。Also include connecting shaft 51, the first bevel gear 52, the second bevel gear 53, the rotating shaft 54, the second bearing 55, the first small fixed plate 56, the second rotating disk 57 and the second small fixed plate 58; 51. The first bevel gear 52, the second bevel gear 53, the rotating shaft 54, the second bearing 55, the first small fixed plate 56, the second rotating disk 57 and the second small fixed plate 58 are all located on the left side of the first bracket 31 side, the front end of the connecting shaft 51 is set to be fixedly connected to the rear side wall of the first rotating disk 38, the rear end of the connecting shaft 51 is set to be fixedly connected to the front side wall of the first bevel gear 52, and the second bevel gear 53 is located at the first Below the first bevel gear 52, the second bevel gear 53 meshes with the first bevel gear 52, the upper end of the rotating shaft 54 is fixedly connected to the bottom of the second bevel gear 53, and the rotating shaft 54 and the second bearing 55 are arranged to pass through. surplus connection, the second bearing 55 is embedded in the first small fixing plate 56, the second bearing 55 and the first small fixing plate 56 are fixedly connected, the second rotating disk 57 is located below the second bearing 55, and the second rotating The top of the disc 57 is fixedly connected with the lower end of the rotating shaft 54, and the second small fixed plate 58 is positioned at the rear of the second rotating disc 57, and the second small fixed plate 58 is fixedly connected with the first small fixed plate 56. The bottom of the small fixing plate 58 is fixedly connected to the top of the large fixing plate 1 .

还包括有齿板61、小齿轮62、旋转电机63和第二支架64;齿板61、小齿轮62、旋转电机63和第二支架64均位于第一套管5与第二套管7之间,齿板61的顶部与大固定板1的底部设置为固定连接,小齿轮62位于齿板61的左侧,小齿轮62与齿板61相啮合,旋转电机63位于小齿轮62的后方,旋转电机63与小齿轮62设置为固定连接,第二支架64的底部与底座10的顶部设置为固定连接,第二支架64的顶部与旋转电机63的底部设置为固定连接。It also includes a toothed plate 61, a pinion 62, a rotating motor 63 and a second bracket 64; the toothed plate 61, the pinion 62, the rotating motor 63 and the second bracket 64 are located between the first casing 5 and the second casing 7 Between, the top of the tooth plate 61 and the bottom of the large fixed plate 1 are fixedly connected, the pinion 62 is located on the left side of the tooth plate 61, the pinion 62 is meshed with the tooth plate 61, and the rotating motor 63 is located behind the pinion 62. The rotating motor 63 is fixedly connected to the pinion 62 , the bottom of the second support 64 is fixedly connected to the top of the base 10 , and the top of the second support 64 is fixedly connected to the bottom of the rotating motor 63 .

还包括有L形板71、拉线72、拉环73和弹簧74;L形板71位于大固定板1的右侧,L形板71与大固定板1设置为固定连接,L形板71的右上部开有孔,拉线72穿过L形板71的孔,拉线72的一端与拉环73设置为固定连接,拉线72的另一端与大导向杆23的右端设置为固定连接,弹簧74位于凹形连接板25和导向套22之间,凹形连接板25和导向套22均与弹簧74设置为固定连接。Also include L-shaped plate 71, backguy 72, draw ring 73 and spring 74; L-shaped plate 71 is positioned at the right side of large fixed plate 1, and L-shaped plate 71 and large fixed plate 1 are set to be fixedly connected, and L-shaped plate 71 The upper right part has a hole, and the backguy 72 passes through the hole of the L-shaped plate 71. One end of the backguy 72 is fixedly connected to the pull ring 73, and the other end of the backguy 72 is fixedly connected to the right end of the large guide rod 23. The spring 74 is located at Between the concave connecting plate 25 and the guide sleeve 22 , both the concave connecting plate 25 and the guide sleeve 22 are fixedly connected with the spring 74 .

工作原理:因为本发明包括有大固定板1、推挡装置2、打孔装置3、第一升降杆4、第一套管5、第一定位螺杆6、第二套管7、第二定位螺杆8、第二升降杆9和底座10,所以使用本发明时,拧松第一定位螺杆6和第二定位螺杆8,上下移动第一升降杆4和第二升降杆9,从而第一升降杆4和第二升降杆9带动大固定板1上下移动,调节大固定板1至指定位置后,拧紧第一定位螺杆6和第二定位螺杆8,人们将需要打孔的文件放在推挡装置2和打孔装置3之间,操作推挡装置2和打孔装置3对文件进行打孔。Working principle: Because the present invention includes a large fixed plate 1, a pusher device 2, a punching device 3, a first lifting rod 4, a first casing 5, a first positioning screw 6, a second casing 7, and a second positioning Screw rod 8, second lifting rod 9 and base 10, so when using the present invention, unscrew the first positioning screw rod 6 and the second positioning screw rod 8, move the first lifting rod 4 and the second lifting rod 9 up and down, thereby the first lifting rod The rod 4 and the second elevating rod 9 drive the large fixed plate 1 to move up and down. After adjusting the large fixed plate 1 to the designated position, tighten the first positioning screw 6 and the second positioning screw 8, and people will place the files that need to be punched on the push block. Between the device 2 and the punching device 3, the pushing device 2 and the punching device 3 are operated to punch the document.

因为推挡装置2包括有支撑板21、导向套22、大导向杆23、第三定位螺杆24、凹形连接板25和挡板26,所以人们可以拧松第三定位螺杆24,左右移动大导向杆23,从而大导向杆23带动凹形连接板25进行左右移动,进而凹形连接板25带动挡板26进行左右移动,调节好挡板26的位置后,人们可以拧紧第三定位螺杆24对大导向杆23进行固定,支撑板21对导向套22进行固定,导向套22对大导向杆23的左右移动进行导向。Because the pushing device 2 includes a support plate 21, a guide sleeve 22, a large guide rod 23, a third positioning screw 24, a concave connecting plate 25 and a baffle plate 26, so people can unscrew the third positioning screw 24, and move the large Guide rod 23, thereby large guide rod 23 drives concave connecting plate 25 to move left and right, and then concave connecting plate 25 drives baffle plate 26 to move left and right, after adjusting the position of baffle plate 26, people can tighten the third positioning screw rod 24 The large guide rod 23 is fixed, the support plate 21 fixes the guide sleeve 22, and the guide sleeve 22 guides the left and right movement of the large guide rod 23.

因为打孔装置3包括有第一支架31、小导向杆32、打孔管33、连杆34、曲柄35、旋转杆36、第一轴承37和第一旋转盘38,所以当人们需要对文件进行打孔时,旋转第一旋转盘38,从而第一旋转盘38带动旋转杆36进行转动,进而旋转杆36带动曲柄35进行转动,进而曲柄35通过连杆34带动打孔管33向右移动对文件进行打孔,大通孔261为打孔管33的运动提供空间,避免磨损,继续旋转第一旋转盘38,当曲柄35转动至旋转杆36的下方时,曲柄35通过连杆34带动打孔管33向左进行移动,小导向杆32将打孔管33内的纸屑推出,当不需要打孔时,停止旋转第一旋转盘38即可。Because the punching device 3 includes the first support 31, the small guide rod 32, the punching pipe 33, the connecting rod 34, the crank 35, the rotating rod 36, the first bearing 37 and the first rotating disk 38, so when people need to file When punching, the first rotating disk 38 is rotated, so that the first rotating disk 38 drives the rotating rod 36 to rotate, and then the rotating rod 36 drives the crank 35 to rotate, and then the crank 35 drives the punching pipe 33 to move to the right through the connecting rod 34 The file is punched, and the large through hole 261 provides space for the movement of the punching tube 33 to avoid wear and tear. Continue to rotate the first rotating disk 38. When the crank 35 rotates to the bottom of the rotating rod 36, the crank 35 drives the punching through the connecting rod 34. Hole pipe 33 moves to the left, and little guide rod 32 pushes out the paper dust in the hole pipe 33, when not needing to punch, stop rotating the first rotary disk 38 and get final product.

因为还包括有托板41、支撑杆42、滑管43、第四定位螺杆44、滑板45和拉簧46,所以人们可以拧松第四定位螺杆44,上下移动支撑杆42,从而支撑杆42带动托板41进行上下移动,托板41移动至指定位置后,拧紧第四定位螺杆44对支撑杆42进行固定,人们可以将需要打孔的文件放在托板41上,当挡板26向左移动时,挡板26带动托板41向左进行移动,从而托板41带动支撑杆42向左进行移动,进而支撑杆42带动滑管43、第四定位螺杆44和滑板45向左进行移动,拉簧46拉伸,当挡板26向右移动时,滑板45在拉簧46的作用下带动托板41、支撑杆42、滑管43和第四定位螺杆44向右移动,拉簧46收缩。Because also include supporting plate 41, support rod 42, slide pipe 43, the 4th positioning screw rod 44, slide plate 45 and extension spring 46, so people can unscrew the 4th positioning screw rod 44, move support rod 42 up and down, thereby support rod 42 Drive the supporting plate 41 to move up and down, after the supporting plate 41 moves to the designated position, tighten the fourth positioning screw 44 to fix the support rod 42, people can put the files that need to be punched on the supporting plate 41, when the baffle plate 26 When moving to the left, the baffle plate 26 drives the supporting plate 41 to move to the left, so that the supporting plate 41 drives the support rod 42 to move to the left, and then the support rod 42 drives the slide pipe 43, the fourth positioning screw rod 44 and the slide plate 45 to move to the left , extension spring 46 is stretched, and when baffle plate 26 moves to the right, slide plate 45 drives pallet 41, support bar 42, slide pipe 43 and the 4th positioning screw rod 44 to move to the right under the effect of extension spring 46, extension spring 46 shrink.

因为还包括有连接轴51、第一锥齿轮52、第二锥齿轮53、旋转轴54、第二轴承55、第一小固定板56、第二旋转盘57和第二小固定板58,所以当要对文件进行打孔时,旋转第二旋转盘57,从而第二旋转盘57带动旋转轴54进行转动,进而旋转轴54带动第二锥齿轮53进行转动,进而第二锥齿轮53带动第一锥齿轮52进行转动,进而第一锥齿轮52通过连接轴51带动第一旋转盘38进行转动,第二小固定板58对第一小固定板56进行固定,第二轴承55对旋转轴54的转动进行辅助。Because connecting shaft 51, first bevel gear 52, second bevel gear 53, rotating shaft 54, second bearing 55, first small fixed plate 56, second rotating disc 57 and second small fixed plate 58 are also included, so When the file is to be punched, the second rotating disc 57 is rotated, so that the second rotating disc 57 drives the rotating shaft 54 to rotate, and then the rotating shaft 54 drives the second bevel gear 53 to rotate, and then the second bevel gear 53 drives the second bevel gear 53 to rotate. A bevel gear 52 rotates, and then the first bevel gear 52 drives the first rotating disk 38 to rotate through the connecting shaft 51, the second small fixing plate 58 fixes the first small fixing plate 56, and the second bearing 55 rotates against the rotating shaft 54. The rotation is assisted.

因为还包括有齿板61、小齿轮62、旋转电机63和第二支架64,所以当要对大固定板1的高度进行调节时,启动旋转电机63,从而旋转电机63带动小齿轮62进行转动,进而小齿轮62带动齿板61进行上下移动,进而齿板61带动大固定板1进行上下移动。Because tooth plate 61, pinion 62, rotating motor 63 and second support 64 are also included, so when the height of large fixed plate 1 is to be adjusted, start rotating motor 63, thereby rotating motor 63 drives pinion 62 to rotate , and then the pinion 62 drives the tooth plate 61 to move up and down, and then the tooth plate 61 drives the large fixed plate 1 to move up and down.

因为还包括有L形板71、拉线72、拉环73和弹簧74,所以当要移动大导向杆23时,向右拉动拉环73,从而拉环73带动拉线72向右运动,进而拉线72带动大导向杆23向右进行移动,弹簧74收缩,放开拉环73,大导向杆23在弹簧74的作用下带动拉线72和拉环73向左进行移动。Because L-shaped plate 71, backguy 72, pull ring 73 and spring 74 are also included, so when moving large guide rod 23, pull pull ring 73 to the right, thereby pull ring 73 drives backguy 72 to move to the right, and then backguy 72 Drive the large guide rod 23 to move to the right, the spring 74 shrinks, let go of the draw ring 73, and the large guide rod 23 drives the stay wire 72 and the draw ring 73 to move to the left under the action of the spring 74.

以上所述实施例仅表达了本发明的优选实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形、改进及替代,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express the preferred implementation of the present invention, and the description thereof is relatively specific and detailed, but should not be construed as limiting the patent scope of the present invention. It should be noted that those skilled in the art can make several modifications, improvements and substitutions without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent for the present invention should be based on the appended claims.

Claims (7)

1. a kind of papery office appliance perforating device, it is characterised in that include big fixed plate (1), push and block device (2), punching Device (3), the first elevating lever (4), first sleeve (5), the first positioning screw (6), the second sleeve pipe (7), the second positioning screw (8), the second elevating lever (9) and base (10);Push and block device (2) and perforating device (3) are provided with above big fixed plate (1), Push and block device (2) is located at the right side of perforating device (3), and the first elevating lever (4), first set are provided with below big fixed plate (1) Pipe (5), the first positioning screw (6), the second sleeve pipe (7), the second positioning screw (8) and the second elevating lever (9), base (10) are located at The lower section of first sleeve (5) and the second sleeve pipe (7), the top of the first elevating lever (4) are arranged to solid with the bottom of big fixed plate (1) Fixed connection, first sleeve (5) are arranged to be fixedly connected with base (10), and the first elevating lever (4) slidingtype is located at first sleeve (5) Interior, the second elevating lever (9) slidingtype is located in the second sleeve pipe (7), and the first positioning spiral shell is provided with the right side wall of first sleeve (5) Bar (6), first sleeve (5) are arranged to be threadedly coupled with the first positioning screw (6), the first positioning screw (6) and the first elevating lever (4) it is in contact, first sleeve (5) is in contact with big fixed plate (1), and the first elevating lever (4) is in contact with base (10), second liter The top of drop bar (9) is arranged to be fixedly connected with the bottom of big fixed plate (1), and the second sleeve pipe (7) is arranged to solid with base (10) It is fixed to connect, the second positioning screw (8), the second sleeve pipe (7) and the second positioning screw are provided with the left side wall of the second sleeve pipe (7) (8) it is arranged to be threadedly coupled, the second positioning screw (8) is in contact with the second elevating lever (9), the second sleeve pipe (7) and big fixed plate (1) it is in contact, the second elevating lever (9) is in contact with base (10), and pre-and post perforative first groove is provided with big fixed plate (1) (11) the second groove (12) run through up and down, is provided with big fixed plate (1), the first groove (11) is connected with the second groove (12) Logical, the first groove (11) and the second groove (12) are rectilinear setting.
2. a kind of papery office appliance perforating device according to claim 1, it is characterised in that push and block device (2) includes There are supporting plate (21), guide sleeve (22), big guide rod (23), the 3rd positioning screw (24), spill connecting plate (25) and baffle plate (26);Supporting plate (21) is located at the top of big fixed plate (1), and supporting plate (21) is arranged to be fixedly connected, led with big fixed plate (1) It is located at the top of supporting plate (21) to set (22), guide sleeve (22) is arranged to be fixedly connected with supporting plate (21), big guide rod (23) slidingtype is interior positioned at guide sleeve (22), and the 3rd positioning screw (24), guide sleeve are provided with the top of guide sleeve (22) (22) it is arranged to be threadedly coupled with the 3rd positioning screw (24), the 3rd positioning screw (24) is in contact with big guide rod (23), recessed Shape connecting plate (25) is located at the left side of supporting plate (21), and the left end of the right side wall and big guide rod (23) of spill connecting plate (25) is set It is set to and is fixedly connected, baffle plate (26) is located at the left side of spill connecting plate (25), and baffle plate (26) is located at the right side of perforating device (3), Baffle plate (26) is arranged to be fixedly connected with spill connecting plate (25), and large through-hole (261), large through-hole (261) are provided with baffle plate (26) Between the side plate up and down of spill connecting plate (25).
3. a kind of papery office appliance perforating device according to claim 2, it is characterised in that perforating device (3) includes There are first support (31), small guide rod (32), perforated pipe (33), connecting rod (34), crank (35), swingle (36), clutch shaft bearing And the first rotating disk (38) (37);First support (31) is located at the left side of baffle plate (26), and the bottom of first support (31) is consolidated with big Fixed board is arranged to be fixedly connected at the top of (1), and small guide rod (32) is located at the left side of baffle plate (26), the left end of small guide rod (32) It is arranged to be fixedly connected with the right side wall of first support (31), perforated pipe (33) is enclosed on small guide rod (32), perforated pipe (33) It is arranged to be slidably connected with small guide rod (32), perforated pipe (33) is corresponding with the large through-hole (261) on baffle plate (26), connecting rod (34) set positioned at first support (31) and the front of perforated pipe (33), the front side wall of the bottom righthand side and perforated pipe (33) of connecting rod (34) It is set to and is articulated and connected, crank (35) is located at the left side of first support (31), and crank (35) is located at the rear of connecting rod (34), crank (35) upper end and the left upper end of connecting rod (34) are arranged to be rotatablely connected, and crank (35) is located at the front of first support (31), rotation Bull stick (36) is located at the left side of first support (31), and the front end of swingle (36) is arranged to the company of fixation with the rear wall of crank (35) Connect, clutch shaft bearing (37) is located at the rear of crank (35), the right side wall of clutch shaft bearing (37) and the left side wall of first support (31) It is arranged to be fixedly connected, swingle (36) is arranged to interference with clutch shaft bearing (37) and is connected, and the first rotating disk (38) is located at first The rear of bearing (37), the first rotating disk (38) are located at the left side of first support (31), the front side wall of the first rotating disk (38) with The rear end of swingle (36) is arranged to be fixedly connected.
4. a kind of papery office appliance perforating device according to claim 3, it is characterised in that also include supporting plate (41), support bar (42), slip pipe (43), the 4th positioning screw (44), slide plate (45) and extension spring (46);Supporting plate (41) is positioned at big solid The top of fixed board (1), supporting plate (41) are located at the lower section of small guide rod (32), and supporting plate (41) is located at the left side of baffle plate (26), supporting plate (41) it is in contact with baffle plate (26), slide plate (45) is located in the first groove (11) of big fixed plate (1), and slide plate (45) is fixed with big Plate (1) is arranged to be slidably connected, and slip pipe (43) is embedded in the slide plate (45), and it is first recessed to be located at big fixed plate (1) for slip pipe (43) In groove (11) and the second groove (12), slip pipe (43) is arranged to be fixedly connected with slide plate (45), is set on the right side wall of slip pipe (43) The 4th positioning screw (44) is equipped with, the 4th positioning screw (44) is located at the lower section of the second groove (12), the 4th positioning screw (44) Be arranged to be threadedly coupled with slip pipe (43), support bar (42) slidingtype in the slip pipe (43), the upper end of support bar (42) with The bottom of supporting plate (41) is arranged to be fixedly connected, and support bar (42) is in contact with the 4th positioning screw (44), and extension spring (46) is located at In the first groove (11) of big fixed plate (1), extension spring (46) is located at the right side of slide plate (45), big fixed plate (1) and slide plate (45) It is arranged to be fixedly connected with extension spring (46).
5. a kind of papery office appliance perforating device according to claim 4, it is characterised in that also include connecting shaft (51), first bevel gear (52), second bevel gear (53), rotary shaft (54), second bearing (55), the first small fixed plate (56), Second rotating disk (57) and the second small fixed plate (58);Connecting shaft (51), first bevel gear (52), second bevel gear (53), rotation Rotating shaft (54), second bearing (55), the first small fixed plate (56), the second rotating disk (57) and the second small fixed plate (58) are respectively positioned on The left side of first support (31), the front end of connecting shaft (51) are arranged to be fixedly connected with the rear wall of the first rotating disk (38), even The rear end of spindle (51) is arranged to be fixedly connected with the front side wall of first bevel gear (52), and second bevel gear (53) is positioned at the first cone The lower section of gear (52), second bevel gear (53) are meshed with first bevel gear (52), the upper end of rotary shaft (54) and the second cone The bottom of gear (53) is arranged to be fixedly connected, and rotary shaft (54) is arranged to interference with second bearing (55) and is connected, second bearing (55) it is embedded in the first small fixed plate (56), second bearing (55) is arranged to be fixedly connected with the first small fixed plate (56), the Two rotating disks (57) are located at the lower section of second bearing (55), and the top of the second rotating disk (57) is set with the lower end of rotary shaft (54) To be fixedly connected, the second small fixed plate (58) is located at the rear of the second rotating disk (57), the second small fixed plate (58) and first small Fixed plate (56) is arranged to be fixedly connected, and the bottom of the second small fixed plate (58) at the top of big fixed plate (1) with being arranged to fixed Connection.
6. a kind of papery office appliance perforating device according to claim 5, it is characterised in that also include tooth plate (61), little gear (62), electric rotating machine (63) and second support (64);Tooth plate (61), little gear (62), electric rotating machine (63) and Second support (64) is respectively positioned between first sleeve (5) and the second sleeve pipe (7), top and the big fixed plate (1) of tooth plate (61) Bottom is arranged to be fixedly connected, and little gear (62) is located at the left side of tooth plate (61), and little gear (62) is meshed with tooth plate (61), rotation Rotating motor (63) is located at the rear of little gear (62), and electric rotating machine (63) is arranged to be fixedly connected with little gear (62), second The bottom of frame (64) at the top of base (10) with being arranged to be fixedly connected, top and the electric rotating machine (63) of second support (64) Bottom is arranged to be fixedly connected.
7. a kind of papery office appliance perforating device according to claim 6, it is characterised in that also include L shaped plate (71), bracing wire (72), draw ring (73) and spring (74);L shaped plate (71) is located at the right side of big fixed plate (1), L shaped plate (71) with it is big Fixed plate (1) is arranged to be fixedly connected, and the upper right quarter of L shaped plate (71) is provided with hole, and bracing wire (72) passes through the hole of L shaped plate (71), draws One end of line (72) is arranged to be fixedly connected with draw ring (73), and the other end of bracing wire (72) is set with the right-hand member of big guide rod (23) To be fixedly connected, spring (74) is located between spill connecting plate (25) and guide sleeve (22), spill connecting plate (25) and guide sleeve (22) it is arranged to be fixedly connected with spring (74).
CN201711261313.2A 2017-12-04 2017-12-04 A kind of papery office appliance perforating device Expired - Fee Related CN107804086B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711261313.2A CN107804086B (en) 2017-12-04 2017-12-04 A kind of papery office appliance perforating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711261313.2A CN107804086B (en) 2017-12-04 2017-12-04 A kind of papery office appliance perforating device

Publications (2)

Publication Number Publication Date
CN107804086A true CN107804086A (en) 2018-03-16
CN107804086B CN107804086B (en) 2019-05-17

Family

ID=61589685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711261313.2A Expired - Fee Related CN107804086B (en) 2017-12-04 2017-12-04 A kind of papery office appliance perforating device

Country Status (1)

Country Link
CN (1) CN107804086B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108421884A (en) * 2018-03-14 2018-08-21 晋江盾研机械设计有限公司 It is a kind of to move up and down type perforating device for hardware plank
CN109079523A (en) * 2018-08-31 2018-12-25 无锡三立轴承股份有限公司 The vertical type bench drill of bearing machining
CN109435555A (en) * 2018-12-12 2019-03-08 温州豪克花辊机械有限公司 A kind of fixed device of metal embossing machine
CN114012819A (en) * 2021-11-22 2022-02-08 南阳理工学院 Mechanical perforating device for business administration
CN114654914A (en) * 2022-04-12 2022-06-24 山东劳动职业技术学院(山东劳动技师学院) Automatic arrangement binding means of financial affairs voucher

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11208143A (en) * 1997-10-07 1999-08-03 Spc Co Ltd Binding method using fastener, binding combined with puncher, and fastener therefor
CN205343291U (en) * 2016-01-25 2016-06-29 山东理工职业学院 Voucher perforating device is used to financial affairs
CN206085203U (en) * 2016-10-24 2017-04-12 重庆医药高等专科学校 Financial affairs data is bound and is used puncher
CN206217418U (en) * 2016-11-28 2017-06-06 江西工业工程职业技术学院 New type accounting Financial Billing binder device
CN206242716U (en) * 2016-11-23 2017-06-13 童大鹏 A kind of personnel file management binder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11208143A (en) * 1997-10-07 1999-08-03 Spc Co Ltd Binding method using fastener, binding combined with puncher, and fastener therefor
CN205343291U (en) * 2016-01-25 2016-06-29 山东理工职业学院 Voucher perforating device is used to financial affairs
CN206085203U (en) * 2016-10-24 2017-04-12 重庆医药高等专科学校 Financial affairs data is bound and is used puncher
CN206242716U (en) * 2016-11-23 2017-06-13 童大鹏 A kind of personnel file management binder
CN206217418U (en) * 2016-11-28 2017-06-06 江西工业工程职业技术学院 New type accounting Financial Billing binder device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108421884A (en) * 2018-03-14 2018-08-21 晋江盾研机械设计有限公司 It is a kind of to move up and down type perforating device for hardware plank
CN109079523A (en) * 2018-08-31 2018-12-25 无锡三立轴承股份有限公司 The vertical type bench drill of bearing machining
CN109435555A (en) * 2018-12-12 2019-03-08 温州豪克花辊机械有限公司 A kind of fixed device of metal embossing machine
CN109435555B (en) * 2018-12-12 2023-12-08 浙江中诺智能机械有限公司 Fixing device for metal embossing machine
CN114012819A (en) * 2021-11-22 2022-02-08 南阳理工学院 Mechanical perforating device for business administration
CN114012819B (en) * 2021-11-22 2023-10-24 南阳理工学院 Mechanical punching device for industrial and commercial management
CN114654914A (en) * 2022-04-12 2022-06-24 山东劳动职业技术学院(山东劳动技师学院) Automatic arrangement binding means of financial affairs voucher

Also Published As

Publication number Publication date
CN107804086B (en) 2019-05-17

Similar Documents

Publication Publication Date Title
CN107804086A (en) A kind of papery office appliance perforating device
CN209665544U (en) A kind of paper cutter convenient for arrangement
CN113561257B (en) Accounting voucher book-binding machine
CN206242716U (en) A kind of personnel file management binder
CN111941528A (en) Perforating device of paper office supplies
CN215749599U (en) Accounting document puncher
CN212386087U (en) An automatic folding box mechanism
CN211470152U (en) Page number supplementing support structure
CN211222619U (en) A smart receipt printer
CN218699546U (en) a binding device
CN218365074U (en) Accounting account book perforating machine with limiting device
CN204505921U (en) Movable type drilling device
CN202641037U (en) Threading thick book binding machine
CN211251509U (en) Tangent line device of packing box concora crush indentation with be liable to change die-cutting rule
CN207697139U (en) A kind of fluting cornering machine
CN102673213B (en) Threading thick book binding machine
CN220811181U (en) Book folding and lifting device
CN108621628A (en) A kind of papery office appliance perforating device
CN216803742U (en) Paper positioning and punching device for printing equipment
CN218614476U (en) Bill perforating device for electronic commerce
CN221641142U (en) Punching machine capable of avoiding paper shifting
CN214984322U (en) Paper pressing mechanism of thread binding machine
CN218875672U (en) Perforating device for printed matter printing and binding
CN221936960U (en) Contract binding and punching device
CN221894360U (en) A paper slitting machine for color box processing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190422

Address after: 325005 No. 8 Building, Zhongqian District, Liuhongqiao Road, Ouhai District, Wenzhou City, Zhejiang Province

Applicant after: Lan Guangyuan

Address before: 330100 No. 696 Fenghe South Avenue, Xinjian District, Nanchang City, Jiangxi Province

Applicant before: Deng Haiyun

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201215

Address after: Room 101, No. 111 Xianxia Road, Jianshan New District, Haining City, Jiaxing City, Zhejiang Province

Patentee after: Zhejiang Lingxue Electronic Machinery Co.,Ltd.

Address before: 325005 No. 8 Building, Zhongqian District, Liuhongqiao Road, Ouhai District, Wenzhou City, Zhejiang Province

Patentee before: Lan Guangyuan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190517