CN107779530A - The installation method of last furnace shell - Google Patents
The installation method of last furnace shell Download PDFInfo
- Publication number
- CN107779530A CN107779530A CN201610726535.6A CN201610726535A CN107779530A CN 107779530 A CN107779530 A CN 107779530A CN 201610726535 A CN201610726535 A CN 201610726535A CN 107779530 A CN107779530 A CN 107779530A
- Authority
- CN
- China
- Prior art keywords
- platform
- furnace shell
- furnace
- crane
- outrigger platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 28
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000004804 winding Methods 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B5/00—Making pig-iron in the blast furnace
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of installation method of last furnace shell, step 1:Offline assembled outrigger platform;Step 2:Assembled integral outrigger platform is arranged on to the outside of furnace body frame using crane, outrigger platform and furnace body frame are connected firmly;Step 3:Sliding rail is laid in outrigger platform both sides;Step 4:Offline assembling sliding trolley;Step 5:By the sliding trolley assembled with crane integral hoisting to outrigger platform after the completion of sliding rail laying;Step 6:When furnace shell is installed, furnace shell is hoisted to above sliding trolley using crane, sliding trolley is then slid onto by blast furnace installation site by winding plant and installed.The present invention is quick and convenient simple by crane integral installation.
Description
Technical field
The present invention relates to the installation method of a kind of installation method, specifically last furnace shell.
Background technology
Generally conventional blast furnace overhaul, in the case where retaining furnace body frame, furnace shell is all by furnace roof driving point when installing
Block is installed, and not only efficiency is low, and the duration is also slow.
The content of the invention
It is contemplated that the defects of overcoming prior art, there is provided a kind of installation method of last furnace shell, it is overall by crane
Installation, it is quick and convenient simple.
In order to solve the above-mentioned technical problem, the present invention is realized in:
A kind of installation method of last furnace shell, it is characterised in that it comprises the following steps:
Step 1:Offline assembled outrigger platform;
Step 2:Assembled integral outrigger platform is arranged on to the outside of furnace body frame using crane, by outrigger platform and stove
Body framework is connected firmly;
Step 3:Sliding rail is laid in outrigger platform both sides;
Step 4:Offline assembling sliding trolley;
Step 5:By the sliding trolley assembled with crane integral hoisting to outrigger platform after the completion of sliding rail laying;
Step 6:When furnace shell is installed, furnace shell is hoisted to above sliding trolley using crane, then will be slid by winding plant
Dolly slides onto blast furnace installation site and installed.
The installation method of described last furnace shell, it is characterised in that outrigger platform described in step 1 includes platform, tiltedly
Support and sliding rail, the platform and furnace body frame outside are connected, and connect diagonal brace between platform and furnace body frame, on the platform
The two side positions laying sliding rail in portion.
The beneficial effects of the invention are as follows:Because the installation of conventional blast furnace overhaul furnace shell piecemeal is typically divided by furnace roof driving
Block is installed, and online installation accuracy control difficulty is big, and operating environment is poor, the quality control difficulty of furnace shell welding is larger, while online
Installation takes substantial amounts of time, long construction period.Solve problem above by this set outrigger platform and sliding trolley device, can
To realize that the whole circle of furnace shell is offline assembled, installed using outrigger platform sliding trolley in place, so as to realize Fast Installation.The device carries
High efficiency of construction, efficiently solve furnace shell piecemeal installation effectiveness it is low problem, substantially reduce the construction period.
By the method, enable the online whole circle installation of furnace shell, it is ensured that the installation accuracy and quality of furnace shell, by frame
Frame sets outrigger platform, then utilizes sliding trolley, it is possible to achieve the whole circle installation of furnace shell, can greatly improve furnace shell erector
Phase, save the duration.
Brief description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of sliding trolley.
Embodiment
As shown in Figure 1:A kind of installation method of last furnace shell, it comprises the following steps:
Step 1:Offline assembled outrigger platform;The outrigger platform includes platform 1, diagonal brace 3 and sliding rail 2, the platform and stove
The outside of body framework 4 is connected, and diagonal brace, the two side positions laying sliding rail of the platform upper are connected between platform and furnace body frame
Road;
Step 2:Assembled integral outrigger platform is arranged on to the outside of furnace body frame using crane, by outrigger platform and stove
Body framework is connected firmly;
Step 3:Sliding rail is laid in outrigger platform both sides;
Step 4:Offline assembling sliding trolley 5;As shown in Figure 2.
Step 5:By the sliding trolley assembled crane integral hoisting to outrigger platform after the completion of sliding rail laying
On;
Step 6:When furnace shell is installed, furnace shell is hoisted to above sliding trolley using crane, then will be slid by winding plant
Dolly slides onto blast furnace installation site and installed.
This method is constructed suitable for the overhaul of blast furnace routine, and can realize that furnace shell is whole by the device encloses the mesh installed online
Mark, so as to improve operating efficiency, the construction period is saved, and furnace shell installation accuracy can be controlled, improve installation quality.
This method, which makes, to be used simply, can be integral in ground processing assembling, then passes through crane integral installation, quick square
Just it is simple.
Claims (2)
1. a kind of installation method of last furnace shell, it is characterised in that it comprises the following steps:
Step 1:Offline assembled outrigger platform;
Step 2:Assembled integral outrigger platform is arranged on to the outside of furnace body frame using crane, by outrigger platform and stove
Body framework is connected firmly;
Step 3:Sliding rail is laid in outrigger platform both sides;
Step 4:Offline assembling sliding trolley;
Step 5:By the sliding trolley assembled with crane integral hoisting to outrigger platform after the completion of sliding rail laying;
Step 6:When furnace shell is installed, furnace shell is hoisted to above sliding trolley using crane, then will be slid by winding plant
Dolly slides onto blast furnace installation site and installed.
2. the installation method of last furnace shell according to claim 1, it is characterised in that the outrigger platform described in step 1
Including platform, diagonal brace and sliding rail, the platform connects oblique with being connected on the outside of furnace body frame, between platform and furnace body frame
Support, the two side positions laying sliding rail of the platform upper.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610726535.6A CN107779530A (en) | 2016-08-26 | 2016-08-26 | The installation method of last furnace shell |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610726535.6A CN107779530A (en) | 2016-08-26 | 2016-08-26 | The installation method of last furnace shell |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107779530A true CN107779530A (en) | 2018-03-09 |
Family
ID=61438592
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610726535.6A Pending CN107779530A (en) | 2016-08-26 | 2016-08-26 | The installation method of last furnace shell |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107779530A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110592300A (en) * | 2019-08-29 | 2019-12-20 | 上海宝冶冶金工程有限公司 | Conveying system and method for blast furnace shell |
| CN110760634A (en) * | 2019-09-25 | 2020-02-07 | 中国一冶集团有限公司 | Blast furnace shell installation method |
| CN112723205A (en) * | 2020-12-25 | 2021-04-30 | 上海二十冶建设有限公司 | Blast furnace shell mounting device and using method thereof |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202139243U (en) * | 2011-05-05 | 2012-02-08 | 天津二十冶建设有限公司 | Furnace shell installing and translating device for overhauling blast furnace |
| CN203247279U (en) * | 2013-05-07 | 2013-10-23 | 中国十七冶集团有限公司 | Gliding platform for mounting furnace shell in major overhaul of blast furnace |
| CN203256286U (en) * | 2013-03-25 | 2013-10-30 | 宝钢集团新疆八一钢铁有限公司 | Blast furnace throat steel brick replacing apparatus |
| CN105177202A (en) * | 2015-10-22 | 2015-12-23 | 安徽马钢工程技术集团有限公司 | Iron-making blast furnace overhaul method |
-
2016
- 2016-08-26 CN CN201610726535.6A patent/CN107779530A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202139243U (en) * | 2011-05-05 | 2012-02-08 | 天津二十冶建设有限公司 | Furnace shell installing and translating device for overhauling blast furnace |
| CN203256286U (en) * | 2013-03-25 | 2013-10-30 | 宝钢集团新疆八一钢铁有限公司 | Blast furnace throat steel brick replacing apparatus |
| CN203247279U (en) * | 2013-05-07 | 2013-10-23 | 中国十七冶集团有限公司 | Gliding platform for mounting furnace shell in major overhaul of blast furnace |
| CN105177202A (en) * | 2015-10-22 | 2015-12-23 | 安徽马钢工程技术集团有限公司 | Iron-making blast furnace overhaul method |
Non-Patent Citations (1)
| Title |
|---|
| 王贤军等: "中小型高炉大修施工技术", 《内蒙古水利》 * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110592300A (en) * | 2019-08-29 | 2019-12-20 | 上海宝冶冶金工程有限公司 | Conveying system and method for blast furnace shell |
| WO2021035974A1 (en) * | 2019-08-29 | 2021-03-04 | 上海宝冶冶金工程有限公司 | Transportation system and method for blast furnace shell |
| CN110760634A (en) * | 2019-09-25 | 2020-02-07 | 中国一冶集团有限公司 | Blast furnace shell installation method |
| CN112723205A (en) * | 2020-12-25 | 2021-04-30 | 上海二十冶建设有限公司 | Blast furnace shell mounting device and using method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104060830B (en) | Method for lifting and transporting large parts of underground nuclear power station | |
| CN104563528B (en) | The quick positioning apparatus of prefabrication prefabricated panel and method | |
| CN101804501A (en) | Ground assembling and welding integral installation and construction technology for vaporization-cooling chimney | |
| CN107779530A (en) | The installation method of last furnace shell | |
| CN209211859U (en) | A kind of nuclear power basin installation auxiliary device | |
| CN103243932A (en) | Structure for detaching inner climbing tower crane through roof crane and construction method thereof | |
| CN103835511A (en) | Integral lifting method for ultra-long light thin giant steel tube truss | |
| CN103061514B (en) | Long-span steel structure corridor construction method | |
| CN104047229A (en) | Method for prefabricating T-beam on girder | |
| CN106544959B (en) | The construction method of king-tower lifting segment and bridge main tower saddle containing saddle | |
| CN203733923U (en) | Square shelter antenna lodging device | |
| CN206109432U (en) | Platform of encorbelmenting of blast furnace stove outer covering installation usefulness | |
| CN108222526B (en) | High-rise conjoined building tower lateral displacement control device and construction method | |
| CN102877480B (en) | Method for mounting annular truss | |
| CN102383613B (en) | Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device | |
| CN117167030A (en) | Mechanical method communication channel construction method synchronously implemented with subway main line tunnel | |
| CN106276603B (en) | Lifting device and its application method for cooling tower Construction of Steel Structure | |
| CN104018657A (en) | Method for constructing high and large cornice through horizontal sliding platform | |
| CN204530490U (en) | A kind of hydraulic climbing mould construction frame | |
| CN102733612B (en) | Mounting method of electric hoist orbit | |
| CN202658587U (en) | Pressure steel pipe installation turntable in construction hole | |
| CN206188264U (en) | Guide device is installed fast to standard festival | |
| CN202645112U (en) | Mounting operation platform for 100m high-steel chimney | |
| CN106012830B (en) | A kind of Super Long Tunnel anchor utilizes the horizontal hole in the tunnel method that laterally transhipment reinforcing pull rod is constructed | |
| CN208986492U (en) | Phase conductor hoisting tool in shaft tower upgrading use |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180309 |
|
| RJ01 | Rejection of invention patent application after publication |