CN107779530A - The installation method of last furnace shell - Google Patents

The installation method of last furnace shell Download PDF

Info

Publication number
CN107779530A
CN107779530A CN201610726535.6A CN201610726535A CN107779530A CN 107779530 A CN107779530 A CN 107779530A CN 201610726535 A CN201610726535 A CN 201610726535A CN 107779530 A CN107779530 A CN 107779530A
Authority
CN
China
Prior art keywords
platform
furnace shell
furnace
crane
outrigger platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610726535.6A
Other languages
Chinese (zh)
Inventor
闵良建
陶海森
李鹏
刘卫健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201610726535.6A priority Critical patent/CN107779530A/en
Publication of CN107779530A publication Critical patent/CN107779530A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of installation method of last furnace shell, step 1:Offline assembled outrigger platform;Step 2:Assembled integral outrigger platform is arranged on to the outside of furnace body frame using crane, outrigger platform and furnace body frame are connected firmly;Step 3:Sliding rail is laid in outrigger platform both sides;Step 4:Offline assembling sliding trolley;Step 5:By the sliding trolley assembled with crane integral hoisting to outrigger platform after the completion of sliding rail laying;Step 6:When furnace shell is installed, furnace shell is hoisted to above sliding trolley using crane, sliding trolley is then slid onto by blast furnace installation site by winding plant and installed.The present invention is quick and convenient simple by crane integral installation.

Description

The installation method of last furnace shell
Technical field
The present invention relates to the installation method of a kind of installation method, specifically last furnace shell.
Background technology
Generally conventional blast furnace overhaul, in the case where retaining furnace body frame, furnace shell is all by furnace roof driving point when installing Block is installed, and not only efficiency is low, and the duration is also slow.
The content of the invention
It is contemplated that the defects of overcoming prior art, there is provided a kind of installation method of last furnace shell, it is overall by crane Installation, it is quick and convenient simple.
In order to solve the above-mentioned technical problem, the present invention is realized in:
A kind of installation method of last furnace shell, it is characterised in that it comprises the following steps:
Step 1:Offline assembled outrigger platform;
Step 2:Assembled integral outrigger platform is arranged on to the outside of furnace body frame using crane, by outrigger platform and stove Body framework is connected firmly;
Step 3:Sliding rail is laid in outrigger platform both sides;
Step 4:Offline assembling sliding trolley;
Step 5:By the sliding trolley assembled with crane integral hoisting to outrigger platform after the completion of sliding rail laying;
Step 6:When furnace shell is installed, furnace shell is hoisted to above sliding trolley using crane, then will be slid by winding plant Dolly slides onto blast furnace installation site and installed.
The installation method of described last furnace shell, it is characterised in that outrigger platform described in step 1 includes platform, tiltedly Support and sliding rail, the platform and furnace body frame outside are connected, and connect diagonal brace between platform and furnace body frame, on the platform The two side positions laying sliding rail in portion.
The beneficial effects of the invention are as follows:Because the installation of conventional blast furnace overhaul furnace shell piecemeal is typically divided by furnace roof driving Block is installed, and online installation accuracy control difficulty is big, and operating environment is poor, the quality control difficulty of furnace shell welding is larger, while online Installation takes substantial amounts of time, long construction period.Solve problem above by this set outrigger platform and sliding trolley device, can To realize that the whole circle of furnace shell is offline assembled, installed using outrigger platform sliding trolley in place, so as to realize Fast Installation.The device carries High efficiency of construction, efficiently solve furnace shell piecemeal installation effectiveness it is low problem, substantially reduce the construction period.
By the method, enable the online whole circle installation of furnace shell, it is ensured that the installation accuracy and quality of furnace shell, by frame Frame sets outrigger platform, then utilizes sliding trolley, it is possible to achieve the whole circle installation of furnace shell, can greatly improve furnace shell erector Phase, save the duration.
Brief description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of sliding trolley.
Embodiment
As shown in Figure 1:A kind of installation method of last furnace shell, it comprises the following steps:
Step 1:Offline assembled outrigger platform;The outrigger platform includes platform 1, diagonal brace 3 and sliding rail 2, the platform and stove The outside of body framework 4 is connected, and diagonal brace, the two side positions laying sliding rail of the platform upper are connected between platform and furnace body frame Road;
Step 2:Assembled integral outrigger platform is arranged on to the outside of furnace body frame using crane, by outrigger platform and stove Body framework is connected firmly;
Step 3:Sliding rail is laid in outrigger platform both sides;
Step 4:Offline assembling sliding trolley 5;As shown in Figure 2.
Step 5:By the sliding trolley assembled crane integral hoisting to outrigger platform after the completion of sliding rail laying On;
Step 6:When furnace shell is installed, furnace shell is hoisted to above sliding trolley using crane, then will be slid by winding plant Dolly slides onto blast furnace installation site and installed.
This method is constructed suitable for the overhaul of blast furnace routine, and can realize that furnace shell is whole by the device encloses the mesh installed online Mark, so as to improve operating efficiency, the construction period is saved, and furnace shell installation accuracy can be controlled, improve installation quality.
This method, which makes, to be used simply, can be integral in ground processing assembling, then passes through crane integral installation, quick square Just it is simple.

Claims (2)

1. a kind of installation method of last furnace shell, it is characterised in that it comprises the following steps:
Step 1:Offline assembled outrigger platform;
Step 2:Assembled integral outrigger platform is arranged on to the outside of furnace body frame using crane, by outrigger platform and stove Body framework is connected firmly;
Step 3:Sliding rail is laid in outrigger platform both sides;
Step 4:Offline assembling sliding trolley;
Step 5:By the sliding trolley assembled with crane integral hoisting to outrigger platform after the completion of sliding rail laying;
Step 6:When furnace shell is installed, furnace shell is hoisted to above sliding trolley using crane, then will be slid by winding plant Dolly slides onto blast furnace installation site and installed.
2. the installation method of last furnace shell according to claim 1, it is characterised in that the outrigger platform described in step 1 Including platform, diagonal brace and sliding rail, the platform connects oblique with being connected on the outside of furnace body frame, between platform and furnace body frame Support, the two side positions laying sliding rail of the platform upper.
CN201610726535.6A 2016-08-26 2016-08-26 The installation method of last furnace shell Pending CN107779530A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610726535.6A CN107779530A (en) 2016-08-26 2016-08-26 The installation method of last furnace shell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610726535.6A CN107779530A (en) 2016-08-26 2016-08-26 The installation method of last furnace shell

Publications (1)

Publication Number Publication Date
CN107779530A true CN107779530A (en) 2018-03-09

Family

ID=61438592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610726535.6A Pending CN107779530A (en) 2016-08-26 2016-08-26 The installation method of last furnace shell

Country Status (1)

Country Link
CN (1) CN107779530A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110592300A (en) * 2019-08-29 2019-12-20 上海宝冶冶金工程有限公司 Conveying system and method for blast furnace shell
CN110760634A (en) * 2019-09-25 2020-02-07 中国一冶集团有限公司 Blast furnace shell installation method
CN112723205A (en) * 2020-12-25 2021-04-30 上海二十冶建设有限公司 Blast furnace shell mounting device and using method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202139243U (en) * 2011-05-05 2012-02-08 天津二十冶建设有限公司 Furnace shell installing and translating device for overhauling blast furnace
CN203247279U (en) * 2013-05-07 2013-10-23 中国十七冶集团有限公司 Gliding platform for mounting furnace shell in major overhaul of blast furnace
CN203256286U (en) * 2013-03-25 2013-10-30 宝钢集团新疆八一钢铁有限公司 Blast furnace throat steel brick replacing apparatus
CN105177202A (en) * 2015-10-22 2015-12-23 安徽马钢工程技术集团有限公司 Iron-making blast furnace overhaul method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202139243U (en) * 2011-05-05 2012-02-08 天津二十冶建设有限公司 Furnace shell installing and translating device for overhauling blast furnace
CN203256286U (en) * 2013-03-25 2013-10-30 宝钢集团新疆八一钢铁有限公司 Blast furnace throat steel brick replacing apparatus
CN203247279U (en) * 2013-05-07 2013-10-23 中国十七冶集团有限公司 Gliding platform for mounting furnace shell in major overhaul of blast furnace
CN105177202A (en) * 2015-10-22 2015-12-23 安徽马钢工程技术集团有限公司 Iron-making blast furnace overhaul method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王贤军等: "中小型高炉大修施工技术", 《内蒙古水利》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110592300A (en) * 2019-08-29 2019-12-20 上海宝冶冶金工程有限公司 Conveying system and method for blast furnace shell
WO2021035974A1 (en) * 2019-08-29 2021-03-04 上海宝冶冶金工程有限公司 Transportation system and method for blast furnace shell
CN110760634A (en) * 2019-09-25 2020-02-07 中国一冶集团有限公司 Blast furnace shell installation method
CN112723205A (en) * 2020-12-25 2021-04-30 上海二十冶建设有限公司 Blast furnace shell mounting device and using method thereof

Similar Documents

Publication Publication Date Title
CN104060830B (en) Method for lifting and transporting large parts of underground nuclear power station
CN104563528B (en) The quick positioning apparatus of prefabrication prefabricated panel and method
CN101804501A (en) Ground assembling and welding integral installation and construction technology for vaporization-cooling chimney
CN107779530A (en) The installation method of last furnace shell
CN209211859U (en) A kind of nuclear power basin installation auxiliary device
CN103243932A (en) Structure for detaching inner climbing tower crane through roof crane and construction method thereof
CN103835511A (en) Integral lifting method for ultra-long light thin giant steel tube truss
CN103061514B (en) Long-span steel structure corridor construction method
CN104047229A (en) Method for prefabricating T-beam on girder
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN203733923U (en) Square shelter antenna lodging device
CN206109432U (en) Platform of encorbelmenting of blast furnace stove outer covering installation usefulness
CN108222526B (en) High-rise conjoined building tower lateral displacement control device and construction method
CN102877480B (en) Method for mounting annular truss
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN117167030A (en) Mechanical method communication channel construction method synchronously implemented with subway main line tunnel
CN106276603B (en) Lifting device and its application method for cooling tower Construction of Steel Structure
CN104018657A (en) Method for constructing high and large cornice through horizontal sliding platform
CN204530490U (en) A kind of hydraulic climbing mould construction frame
CN102733612B (en) Mounting method of electric hoist orbit
CN202658587U (en) Pressure steel pipe installation turntable in construction hole
CN206188264U (en) Guide device is installed fast to standard festival
CN202645112U (en) Mounting operation platform for 100m high-steel chimney
CN106012830B (en) A kind of Super Long Tunnel anchor utilizes the horizontal hole in the tunnel method that laterally transhipment reinforcing pull rod is constructed
CN208986492U (en) Phase conductor hoisting tool in shaft tower upgrading use

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180309

RJ01 Rejection of invention patent application after publication