CN107768035A - A kind of cage winch that can reclaim broken string automatically - Google Patents

A kind of cage winch that can reclaim broken string automatically Download PDF

Info

Publication number
CN107768035A
CN107768035A CN201710986241.1A CN201710986241A CN107768035A CN 107768035 A CN107768035 A CN 107768035A CN 201710986241 A CN201710986241 A CN 201710986241A CN 107768035 A CN107768035 A CN 107768035A
Authority
CN
China
Prior art keywords
broken string
alignment
twisted wire
tube
guiding tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710986241.1A
Other languages
Chinese (zh)
Other versions
CN107768035B (en
Inventor
刘德华
余曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI LONGSKY COMMUNICATION TECHNOLOGY Co Ltd
Original Assignee
HUBEI LONGSKY COMMUNICATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI LONGSKY COMMUNICATION TECHNOLOGY Co Ltd filed Critical HUBEI LONGSKY COMMUNICATION TECHNOLOGY Co Ltd
Priority to CN201710986241.1A priority Critical patent/CN107768035B/en
Publication of CN107768035A publication Critical patent/CN107768035A/en
Application granted granted Critical
Publication of CN107768035B publication Critical patent/CN107768035B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • H01B13/02Stranding-up
    • H01B13/0207Details; Auxiliary devices
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • H01B13/02Stranding-up

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Storage Of Web-Like Or Filamentary Materials (AREA)
  • Guides For Winding Or Rewinding, Or Guides For Filamentary Materials (AREA)

Abstract

The invention discloses a kind of cage winch that can reclaim broken string automatically, including cage, alignment of shafts pipe, pay off rack and strand body load-bearing plate, it is interval with some strand body load-bearing plates in the cage successively from front to back, some pay off racks are provided between two neighboring strand body load-bearing plate, some pay off racks are arranged successively from top to bottom between two strand body load-bearing plates, the alignment of shafts pipe passes through from some centre bores for twisting body load-bearing plate, a twisted wire guiding tube and a broken string recovery tube are welded with alignment of shafts pipe, the length of the twisted wire guiding tube and broken string recovery tube is all higher than the length of alignment of shafts pipe, two ends of described and twisted wire guiding tube and broken string recovery tube are stretched out out of the alignment of shafts pipe;Guide wheel is provided with the exit of alignment of shafts pipe, the broken string come out from broken string recovery tube is wound on guide wheel.The present invention realizes the automatic recovery of broken string monofilament, improves the operating efficiency of recovery broken string monofilament, reduces the labor intensity of worker.

Description

A kind of cage winch that can reclaim broken string automatically
Technical field
The present invention relates to the production technical field of OPGW twisted wire products, and in particular to a kind of cage that can reclaim broken string automatically twists Machine.
Background technology
Current most of company in OPGW twisted wire process of producing product, be frequently encountered in twisted wire product a monofilament because Many reasons such as material defect, line ball, parabola and situation about breaking, to avoid causing whole root long degree because monofilament breaks Twisted wire is scrapped, and now needs to divest broken monofilament from the part twisted wire twisted.At present, the mode of generally use is by cage Winch carries out reverse low speed and started, and a people, which holds broken monofilament the end of a thread, to back away, now broken monofilament gradually from Divested on twisted wire, another people treats that fracture of wire moves certain length to and cuts it.Two people are needed to lead to using aforesaid way recovery fracture of wire Power cooperation, the labor intensity of worker is big, and recovery speed is slow, and the monofilament after recovery can not be again due to being cut into small break Secondary utilization.
The content of the invention
In order to solve the above technical problems, the present invention provides a kind of cage winch that can reclaim broken string automatically, by main shaft A piece twisted wire guiding tube of welding and a broken string recovery tube, realize the automatic recovery of broken string in heart pipe.
To achieve these goals, the technical solution adopted in the present invention is:
A kind of cage winch that can reclaim broken string automatically, including cage, alignment of shafts pipe, pay off rack and strand body load-bearing plate, institute State and be interval with some strand body load-bearing plates in cage successively from front to back, some unwrapping wire are provided between two neighboring strand body load-bearing plate Frame, some pay off racks are twisted between body load-bearing plate at two and arranged successively from top to bottom, and the alignment of shafts pipe is from some institutes The centre bore for stating strand body load-bearing plate is passed through, and a twisted wire guiding tube and a broken string recovery tube are welded with alignment of shafts pipe, The length of the twisted wire guiding tube and broken string recovery tube is all higher than the length of alignment of shafts pipe, described and twisted wire guiding tube and broken string Two ends of recovery tube are stretched out out of the alignment of shafts pipe;Guide wheel is provided with the exit of alignment of shafts pipe, is reclaimed from broken string The broken string of pipe out is wound on guide wheel.
As the preferred of the present embodiment, the twisted wire guiding tube is arranged concentrically with alignment of shafts pipe, and twisted wire guiding tube 15~20mm is stretched out in rear and front end out of the alignment of shafts pipe.
As the preferred of the present embodiment, broken string recovery tube is arranged on the top of twisted wire guiding tube, and with twisted wire guiding tube simultaneously Row arrangement;15~20mm is stretched out in the rear and front end of broken string recovery tube out of the alignment of shafts pipe.
As the preferred of the present embodiment, the center of circle edge of the alignment of shafts pipe, twisted wire guiding tube and the recovery tube three that breaks On longitudinal direction on same straight line.
As the preferred of the present embodiment, the alignment of shafts pipe, twisted wire guiding tube, the caliber for the recovery tube that breaks are passed successively Hand over, and alignment of shafts pipe caliber is 2.5~3 times of twisted wire guiding tube caliber, twisted wire guiding tube caliber is broken string recovery tube caliber 1.8~2 times.
The present invention compared with prior art, has the advantages that:
1st, the present invention in alignment of shafts pipe by welding a twisted wire guiding tube and a broken string recovery tube, and twisted wire is from strand By and by the hauling machine and admission machine at equipment rear portion around a new drum in line guiding tube.The monofilament of broken string is from broken string Go out to twist by, monofilament in recovery tube and deflecting is carried out by guide wheel after body, be then recovered on the drum of pay off rack, using such a side Formula carries out broken string recovery and improves 20~30 times than original manual recovery mode efficiency, while a people can complete broken string recovery Work, also reduce the labor intensity of worker.
2nd, the broken string monofilament reclaimed using the present invention is all complete one section, and the monofilament of broken string is after rewinding machine is straightened Utilized again available for other twisted wires compared with short section length.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation for the cage winch that can reclaim broken string automatically of the present invention;
Fig. 2 is a kind of side view for the cage winch that can reclaim broken string automatically of the present invention.
Shown in figure:1st, body load-bearing plate is twisted, 2, pay off rack, 3, drum, 4, alignment of shafts pipe, 5, twisted wire, 6, broken string monofilament, 7th, twisted wire guiding tube, 8, broken string recovery tube, 9, guide wheel.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
As shown in Fig. 1 to 2, the embodiment of the present invention provides a kind of cage winch that can reclaim broken string automatically, including cage, main shaft Central tube 4, pay off rack 2 and strand body load-bearing plate 1, it is interval with some strand body load-bearing plates 1 successively from front to back in cage, it is adjacent Some pay off racks 2 are provided between two strand body load-bearing plates 1, drum 3 is installed on pay off rack 1, some pay off racks 2 twist bodies at two To be arranged successively from top to bottom between load-bearing plate 1, the alignment of shafts pipe 4 passes through from some centre bores for twisting body load-bearing plate 1, In the present embodiment, a twisted wire guiding tube 7 and a broken string recovery tube 8 are welded with alignment of shafts pipe 4.Twisted wire guiding tube 7 be used for guide twisted wire 5 in cage by, broken string recovery tube 8 be used for will broken string monofilament 6 separated with twisted wire 5, wherein, strand The length of line guiding tube 7 and broken string recovery tube 8 is all higher than the length of alignment of shafts pipe 4, and twisted wire guiding tube 7 and broken string recovery tube 8 two ends are stretched out out of alignment of shafts pipe 4, and in the alignment of shafts, 4 exit is provided with guide wheel 9, from broken string recovery tube 8 Broken string out is wound on guide wheel 9.
Referring to shown in Fig. 1 to 2, the twisted wire guiding tube 7 is arranged concentrically with alignment of shafts pipe 4, and before twisted wire guiding tube 7 15~20mm is stretched out at both ends out of alignment of shafts pipe 4 afterwards.Twisted wire guiding tube 7 is arranged concentrically and can use up with alignment of shafts pipe 4 Broken string monofilament 6 in amount control twisted wire 5 during stripping the stability of twisted wire guiding tube 7 and the stress of alignment of shafts pipe 4 and Uniformity, the rear and front end of twisted wire guiding tube 7 stretch out 15~20mm out of alignment of shafts pipe 4, can prevent the mistake in stripping Destruction is produced to two ends of alignment of shafts pipe 4 in journey.Further optimize the present embodiment, broken string recovery tube 8 is arranged on strand The top of line guiding tube 7, and with the laid out in parallel of twisted wire guiding tube 7.In this embodiment, broken string recovery tube 8 and twisted wire can be drawn Conduit 7 is welded together, and broken string recovery tube 8 is welded to the top of twisted wire guiding tube 7.Wherein, the rear and front end of broken string recovery tube 7 15~20mm (it is to be understood that twisted wire guiding tube 7 is identical with the length of broken string recovery tube 8) is stretched out out of alignment of shafts pipe 4. So, by twisted wire guiding tube 7 and broken string recovery tube be welded together about 8 can both ensure both in twisted wire stripping process by The uniformity of power, meanwhile, compared to be separately welded on broken string monofilament during stripping it is more easily peelable.Further, it is main Axis center pipe 4, twisted wire guiding tube 7 and break the three of recovery tube 8 the center of circle along the longitudinal direction on same straight line, meanwhile, Alignment of shafts pipe 4, twisted wire guiding tube 7, the caliber for the recovery tube 8 that breaks are submitted successively, and the caliber of alignment of shafts pipe 7 guides for twisted wire 2.5~3 times of the caliber of pipe 5, the caliber of twisted wire guiding tube 7 are 1.8~2 times of the broken string caliber of recovery tube 8.Due in alignment of shafts pipe 4th, twisted wire guiding tube 7, the number of share of stock of the twisted wire to break in the three of recovery tube 8 are different (certainly, only one in broken string recovery tube 8 Root breaks monofilament 6), caliber so is separately provided according to the thickness of twisted wire is different, both material can be saved simultaneously, is also prevented from Twisted wire carries out play in pipe.
The present invention operation principle be:
When OPGW twisted wires product in process of production, wherein when a monofilament breaks, by twisted wire 5 from twisted wire guiding tube Carried out in 7 by and now, will be peeled off by the hauling machine and admission machine at cage winch rear portion around a new drum on twisted wire 5 The broken string monofilament 6 gone out carries out recovery broken string monofilament 6 by the recovery tube 8 that breaks, and broken string monofilament 6 leads to after broken string recovery tube 8 comes out The deflecting of guide wheel 9 installed additional is crossed, is then recovered on the drum 3 on pay off rack 2, is turned round because broken string monofilament 6 exists after the stripping of twisted wire 5 The internal stress turned, the internal stress of broken string monofilament 6 of recovery can be caused larger, the mechanical performance such as broken string stretching resistance of monofilament 6 will decline, and lead to Cross this segment distance (in the present embodiment, about 4 meters or so of the length of twisted wire guiding tube 7 and broken string recovery tube 8) of broken string recovery tube 8 Recycling can discharge most of torsion in this segment distance, be recovered to and put in the deflecting by guide wheel 9 on drum 3 afterwards The internal stress of broken string monofilament 6 on the drum 3 of coil holder 2 is disappeared substantially, and other strands compared with short section length are can be used for after rewinding machine is straightened Line reuses, and carrying out broken string monofilament 6 using such a mode reclaims than 20~30 times original of manual recovery mode efficiency raising, A people can complete the recovery operation that breaks simultaneously, also reduce the labor intensity of worker.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God any modification, equivalent substitution and improvements made etc., should be included in the scope of the protection with principle.

Claims (5)

1. a kind of cage winch that can reclaim broken string automatically, including cage, alignment of shafts pipe, pay off rack and strand body load-bearing plate, described It is interval with some strand body load-bearing plates in cage successively from front to back, some unwrapping wire is provided between two neighboring strand body load-bearing plate Frame, some pay off racks are twisted between body load-bearing plate at two and arranged successively from top to bottom, and the alignment of shafts pipe is from some institutes The centre bore for stating strand body load-bearing plate passes through, it is characterised in that:A twisted wire guiding tube and one are welded with alignment of shafts pipe Break recovery tube, and the length of the twisted wire guiding tube and broken string recovery tube is all higher than the length of alignment of shafts pipe, described and twisted wire Two ends of guiding tube and broken string recovery tube are stretched out out of the alignment of shafts pipe;It is provided with and leads in the exit of alignment of shafts pipe Wheel, the broken string come out from broken string recovery tube are wound on guide wheel.
2. the cage winch according to claim 1 that broken string can be reclaimed automatically, it is characterised in that:In twisted wire guiding tube and main shaft Heart pipe is arranged concentrically, and 15~20mm is stretched out in the rear and front end of twisted wire guiding tube out of the alignment of shafts pipe.
3. the cage winch according to claim 2 that broken string can be reclaimed automatically, it is characterised in that:Broken string recovery tube is arranged on strand The top of line guiding tube, and with twisted wire guiding tube laid out in parallel;Stretched out of the alignment of shafts pipe rear and front end of broken string recovery tube Go out 15~20mm.
4. the cage winch according to claim 1 that broken string can be reclaimed automatically, it is characterised in that:The alignment of shafts pipe, twist Line guiding tube and broken string recovery tube three the center of circle along the longitudinal direction on same straight line.
5. the cage winch according to claim 1 that broken string can be reclaimed automatically, it is characterised in that:Alignment of shafts pipe, twisted wire draw Conduit, the caliber for the recovery tube that breaks successively decrease successively, and alignment of shafts pipe caliber is 2.5~3 times of twisted wire guiding tube caliber, twisted wire Guiding tube caliber is 1.8~2 times of broken string recovery tube caliber.
CN201710986241.1A 2017-10-20 2017-10-20 Cage winch capable of automatically recovering broken wire Active CN107768035B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710986241.1A CN107768035B (en) 2017-10-20 2017-10-20 Cage winch capable of automatically recovering broken wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710986241.1A CN107768035B (en) 2017-10-20 2017-10-20 Cage winch capable of automatically recovering broken wire

Publications (2)

Publication Number Publication Date
CN107768035A true CN107768035A (en) 2018-03-06
CN107768035B CN107768035B (en) 2024-06-21

Family

ID=61269913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710986241.1A Active CN107768035B (en) 2017-10-20 2017-10-20 Cage winch capable of automatically recovering broken wire

Country Status (1)

Country Link
CN (1) CN107768035B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111599537A (en) * 2020-06-08 2020-08-28 合肥神马科技集团有限公司 Cage-type wire twisting machine convenient to walk wires

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0330321U (en) * 1989-08-02 1991-03-26
CN1668804A (en) * 2002-07-17 2005-09-14 贝克特股份有限公司 Metal strand comprising interrupted filament
JP2006252978A (en) * 2005-03-11 2006-09-21 Tokyo Electric Power Co Inc:The Separation device and separation method of electric wires or the like
CN204390804U (en) * 2014-12-29 2015-06-10 上海广为电器工具有限公司 Strand winder circuit wire detecting device
CN205104300U (en) * 2015-11-05 2016-03-23 四川新星电缆股份有限公司 Double broken line protection device for tubular strander
CN207474153U (en) * 2017-10-20 2018-06-08 湖北长天通信科技有限公司 A kind of cage winch that can recycle broken string automatically

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0330321U (en) * 1989-08-02 1991-03-26
CN1668804A (en) * 2002-07-17 2005-09-14 贝克特股份有限公司 Metal strand comprising interrupted filament
JP2006252978A (en) * 2005-03-11 2006-09-21 Tokyo Electric Power Co Inc:The Separation device and separation method of electric wires or the like
CN204390804U (en) * 2014-12-29 2015-06-10 上海广为电器工具有限公司 Strand winder circuit wire detecting device
CN205104300U (en) * 2015-11-05 2016-03-23 四川新星电缆股份有限公司 Double broken line protection device for tubular strander
CN207474153U (en) * 2017-10-20 2018-06-08 湖北长天通信科技有限公司 A kind of cage winch that can recycle broken string automatically

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111599537A (en) * 2020-06-08 2020-08-28 合肥神马科技集团有限公司 Cage-type wire twisting machine convenient to walk wires

Also Published As

Publication number Publication date
CN107768035B (en) 2024-06-21

Similar Documents

Publication Publication Date Title
EP3140452B1 (en) Steel cord with reduced residual torsions
CN1239365C (en) Method for continuously unwinding thread
WO2015158103A1 (en) Steel wire rope for conveyor belt
CN104775314A (en) Integrated stranding closer and rope making method thereof
CN110373922B (en) Production equipment and production method of steel cord
CN210341482U (en) Stranding device for steel wire rope
CN107768035A (en) A kind of cage winch that can reclaim broken string automatically
CN207474153U (en) A kind of cage winch that can recycle broken string automatically
JP7535531B2 (en) Steel cord for rubber reinforcement
CN109343183B (en) Yarn binding machine die holder for yarn binding of cable core and yarn binding method of cable core
JPH08209567A (en) Metal cord, its production and composite material of the cord with rubber
CN207572142U (en) A kind of cable produces stranded wire apparatus
JP2012045580A (en) Method for manufacturing steel wire for reinforcement of rubber article, device for manufacturing the same, steel cord for reinforcement of the rubber article, and pneumatic tire
CN211368190U (en) Stranding device with core wire multilayer structure
CN207079412U (en) A kind of all-steel cord
JP5133729B2 (en) Spiral steel wire, steel cord for reinforcing rubber articles, tire, and method for manufacturing spiral steel wire
CN220753143U (en) Wire repair auxiliary device of cage winch and cage winch provided with wire repair auxiliary device
CN217104234U (en) Composite traction production line
JPH0319986A (en) Production of three-stranded steel cord
CN208444666U (en) A kind of buncher winding structure
CN202102768U (en) Anti-towing rubber jacketed flexible cable having flexible reinforced structure
JPH04266441A (en) Method and device for manufacturing steel cord
CN109399399B (en) Yarn guide device of textile machinery
CN203878402U (en) Tension synchronization regulation steel wire rope two-for-one twisting machine
CN118894406A (en) Wire paying-off and threading device for electroplated wire

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant