CN107761542A - 一种拱斜拉组合体系桥梁及其施工方法 - Google Patents
一种拱斜拉组合体系桥梁及其施工方法 Download PDFInfo
- Publication number
- CN107761542A CN107761542A CN201711120227.XA CN201711120227A CN107761542A CN 107761542 A CN107761542 A CN 107761542A CN 201711120227 A CN201711120227 A CN 201711120227A CN 107761542 A CN107761542 A CN 107761542A
- Authority
- CN
- China
- Prior art keywords
- arch
- bridge
- bridge floor
- arch rib
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D12/00—Bridges characterised by a combination of structures not covered as a whole by a single one of groups E01D2/00 - E01D11/00
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
- E01D21/105—Balanced cantilevered erection
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711120227.XA CN107761542B (zh) | 2017-11-14 | 2017-11-14 | 一种拱斜拉组合体系桥梁及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711120227.XA CN107761542B (zh) | 2017-11-14 | 2017-11-14 | 一种拱斜拉组合体系桥梁及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107761542A true CN107761542A (zh) | 2018-03-06 |
CN107761542B CN107761542B (zh) | 2019-09-27 |
Family
ID=61272855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711120227.XA Expired - Fee Related CN107761542B (zh) | 2017-11-14 | 2017-11-14 | 一种拱斜拉组合体系桥梁及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107761542B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108978499A (zh) * | 2018-06-12 | 2018-12-11 | 中铁大桥勘测设计院集团有限公司 | 一种斜拉悬索协作体系桥梁架设方法 |
CN109024234A (zh) * | 2018-09-10 | 2018-12-18 | 华东交通大学 | 一种单螺旋拱与悬索组合桥梁结构体系 |
CN109505264A (zh) * | 2018-12-07 | 2019-03-22 | 中铁局集团厦门建设工程有限公司 | 一种中承式钢管拱吊杆的安装方法 |
CN111254979A (zh) * | 2020-01-20 | 2020-06-09 | 中交第三航务工程局有限公司 | 一种水下斜拉式悬浮隧道的拉索锚锭系统 |
CN112711891A (zh) * | 2021-03-26 | 2021-04-27 | 上海建工集团股份有限公司 | 空间缆索悬挂结构施工控制方法 |
CN113430909A (zh) * | 2020-08-18 | 2021-09-24 | 中交第一公路勘察设计研究院有限公司 | 拱形排架悬吊桥梁结构 |
CN114922103A (zh) * | 2022-05-23 | 2022-08-19 | 广西壮族自治区桂东公路发展中心 | 基于高墩受弯失效的连拱桥快速拆除方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1030111A (zh) * | 1987-06-20 | 1989-01-04 | 湖南省公路管理局 | 拱索桥 |
CN200996127Y (zh) * | 2006-08-17 | 2007-12-26 | 铁道第四勘察设计院 | 斜拉拱组合桥 |
WO2010092562A1 (en) * | 2009-02-09 | 2010-08-19 | Bahat Ben Ibrahim S | Erection method by simple tower instrument devices of building upper bridge construction |
CN104562913A (zh) * | 2014-12-31 | 2015-04-29 | 西安市政设计研究院有限公司 | 一种飘带形独塔斜拉-刚构组合桥及其施工工艺 |
CN204325895U (zh) * | 2014-11-19 | 2015-05-13 | 江西同济工程设计有限公司 | 一种组合体系桥梁 |
RU2578401C1 (ru) * | 2014-12-29 | 2016-03-27 | Виктор Петрович Новокрещенов | Вантовый мост |
CN106758752A (zh) * | 2016-12-21 | 2017-05-31 | 北京建筑大学 | 斜塔斜拉异形拱桥及其施工方法 |
CN107059594A (zh) * | 2017-05-31 | 2017-08-18 | 同济大学 | 一种斜拉‑下承式吊杆拱协作体系桥梁 |
CN107100064A (zh) * | 2017-05-31 | 2017-08-29 | 同济大学 | 一种蝴蝶式斜拉桥体系 |
-
2017
- 2017-11-14 CN CN201711120227.XA patent/CN107761542B/zh not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1030111A (zh) * | 1987-06-20 | 1989-01-04 | 湖南省公路管理局 | 拱索桥 |
CN200996127Y (zh) * | 2006-08-17 | 2007-12-26 | 铁道第四勘察设计院 | 斜拉拱组合桥 |
WO2010092562A1 (en) * | 2009-02-09 | 2010-08-19 | Bahat Ben Ibrahim S | Erection method by simple tower instrument devices of building upper bridge construction |
CN204325895U (zh) * | 2014-11-19 | 2015-05-13 | 江西同济工程设计有限公司 | 一种组合体系桥梁 |
RU2578401C1 (ru) * | 2014-12-29 | 2016-03-27 | Виктор Петрович Новокрещенов | Вантовый мост |
CN104562913A (zh) * | 2014-12-31 | 2015-04-29 | 西安市政设计研究院有限公司 | 一种飘带形独塔斜拉-刚构组合桥及其施工工艺 |
CN106758752A (zh) * | 2016-12-21 | 2017-05-31 | 北京建筑大学 | 斜塔斜拉异形拱桥及其施工方法 |
CN107059594A (zh) * | 2017-05-31 | 2017-08-18 | 同济大学 | 一种斜拉‑下承式吊杆拱协作体系桥梁 |
CN107100064A (zh) * | 2017-05-31 | 2017-08-29 | 同济大学 | 一种蝴蝶式斜拉桥体系 |
Non-Patent Citations (1)
Title |
---|
吴太广等: "无背索斜拉拱桥桥型方案设计", 《城市道桥与防洪》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108978499A (zh) * | 2018-06-12 | 2018-12-11 | 中铁大桥勘测设计院集团有限公司 | 一种斜拉悬索协作体系桥梁架设方法 |
CN109024234A (zh) * | 2018-09-10 | 2018-12-18 | 华东交通大学 | 一种单螺旋拱与悬索组合桥梁结构体系 |
CN109024234B (zh) * | 2018-09-10 | 2020-06-30 | 华东交通大学 | 一种单螺旋拱与悬索组合桥梁结构体系 |
CN109505264A (zh) * | 2018-12-07 | 2019-03-22 | 中铁局集团厦门建设工程有限公司 | 一种中承式钢管拱吊杆的安装方法 |
CN111254979A (zh) * | 2020-01-20 | 2020-06-09 | 中交第三航务工程局有限公司 | 一种水下斜拉式悬浮隧道的拉索锚锭系统 |
CN111254979B (zh) * | 2020-01-20 | 2021-05-07 | 中交第三航务工程局有限公司 | 一种水下斜拉式悬浮隧道的拉索锚锭系统 |
CN113430909A (zh) * | 2020-08-18 | 2021-09-24 | 中交第一公路勘察设计研究院有限公司 | 拱形排架悬吊桥梁结构 |
CN112711891A (zh) * | 2021-03-26 | 2021-04-27 | 上海建工集团股份有限公司 | 空间缆索悬挂结构施工控制方法 |
CN114922103A (zh) * | 2022-05-23 | 2022-08-19 | 广西壮族自治区桂东公路发展中心 | 基于高墩受弯失效的连拱桥快速拆除方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107761542B (zh) | 2019-09-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107761542B (zh) | 一种拱斜拉组合体系桥梁及其施工方法 | |
CN109235285B (zh) | 一种大跨度铁路钢筋混凝土拱桥悬臂浇筑系统及施工方法 | |
CN108374319B (zh) | 一种下承式系杆拱桥结构单元及拱桥结构及其施工方法 | |
CN104404869A (zh) | 桩柱式混凝土空心桩桥墩结构 | |
CN111335142A (zh) | 自锚式斜拉系杆拱桥 | |
CN211815489U (zh) | 一种带有自锚悬索体系的超大跨径飞燕式钢管混凝土拱桥 | |
CN108978471B (zh) | 一种增大斜拉桥异形索塔刚度的支撑装置及其安装方法 | |
CN204282199U (zh) | 桩柱式混凝土空心桩桥墩结构 | |
CN103290784B (zh) | 拱梁结合桥吊装施工方法 | |
CN100519943C (zh) | 独塔无背索斜拉桥 | |
CN102535327B (zh) | 下承式预应力钢桁-砼组合连续刚构桥及施工方法 | |
CN106012872B (zh) | 连续刚构桥的无背索斜拉加固体系及施工方法 | |
CN105568870A (zh) | 用于跨线桥施工的三角挂篮法悬浇装置及其施工方法 | |
CN112982139A (zh) | 一种宽幅大跨混合梁矮塔斜拉桥体系及其施工方法 | |
CN113882238A (zh) | 大跨度上承式索辅梁拱组合刚构桥及其施工方法 | |
CN106638265A (zh) | 一种钢混梁刚构拱桥 | |
CN208472543U (zh) | 钢管混凝土拱桥 | |
CN104562944B (zh) | 大跨径叠合梁斜拉桥边钢箱临时锚固体系 | |
CN103469735A (zh) | 曲线超高型空心柱板式桥墩墩顶实心段模板的安装方法 | |
CN206376178U (zh) | 一种钢混梁刚构拱桥 | |
CN205242278U (zh) | 用于跨线桥施工的三角挂篮法悬浇装置 | |
CN110295548A (zh) | 在先拱后梁的桥梁施工工艺下维持力学平衡的临时装置 | |
CN209816632U (zh) | 一种用于空间异形拱桥的拱脚结构 | |
CN113430908A (zh) | 一种背索式部分双层悬带拱桥及其施工方法 | |
CN215164738U (zh) | 一种系杆拱式快拼支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20180306 Assignee: Center for technology transfer Jiangsu University of Science and Technology Assignor: JIANGSU University OF SCIENCE AND TECHNOLOGY Contract record no.: X2021980006173 Denomination of invention: An arch cable-stayed composite system bridge and its construction method Granted publication date: 20190927 License type: Common License Record date: 20210714 |
|
EC01 | Cancellation of recordation of patent licensing contract | ||
EC01 | Cancellation of recordation of patent licensing contract |
Assignee: Center for technology transfer Jiangsu University of Science and Technology Assignor: JIANGSU University OF SCIENCE AND TECHNOLOGY Contract record no.: X2021980006173 Date of cancellation: 20210826 |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190927 |