- CN107727941A CN107727941A CN201710771348.4A CN201710771348A CN107727941A CN 107727941 A CN107727941 A CN 107727941A CN 201710771348 A CN201710771348 A CN 201710771348A CN 107727941 A CN107727941 A CN 107727941A
- Authority
- CN
- China
- Prior art keywords
- monitoring
- task
- measuring point
- information
- power frequency
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/08—Measuring electromagnetic field characteristics
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D21/00—Measuring or testing not otherwise provided for
- G01D21/02—Measuring two or more variables by means not covered by a single other subclass
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/12—Measuring electrostatic fields or voltage-potential
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R33/00—Arrangements or instruments for measuring magnetic variables
- G01R33/02—Measuring direction or magnitude of magnetic fields or magnetic flux
Abstract
The present invention relates to a kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management method and system, this method suitable for being performed mobile terminal device, including:Identify and connect power frequency electromagnetic field monitoring terminal, establish and communicate with power frequency electromagnetic field monitoring terminal;Pending monitoring task is formulated according to on-the-spot test job requirement and is shown;After reaching tasks carrying place, acquisition tasks perform audio and/or image information, the acquisition time information and positional information in place, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, stored after being calibrated to Monitoring Data;Monitoring information is inquired about, the Monitoring Data after the information of collection and calibration is formed into report export according to template.Movable type, intelligent collection, storage and the application of environmentally sensitive areas electromagnetic environment information are realized, so as to reduce work on the spot amount, error rate is reduced, simplifies measurement process, initial data support is provided for follow-up project of transmitting and converting electricity addressing, path planning.
Description
Technical field
The invention belongs to the technical field of AC input transformation engineering electromagnetic environment monitor, more particularly, to a kind of environment sensitive
Region mobile electromagnetic environment information monitoring management method and system.
Background technology
Generally, project of transmitting and converting electricity is to be reported as foundation with engineering feasibility study, is carried out from environmental protection angle
Engineering selected routes, addressing and type selecting work.Substation site selection and line route selection are the rule for having multivariable and multiple constraint
The problem of drawing is, it is necessary to consider various qualitative and quantitative factors.Interaction between all kinds of factors, influence each other, cause addressing
Optimization process is increasingly complex.In numerous influence factors, overriding concern be electromagnetic environment influence, the purpose is to single to building
The electromagnetic environment that position is intended around selective calling location or line corridor is monitored, and existing influence or potential interference are carried out analysis and said
It is bright, assess site or whether circuit electromagnetic environment meets related request.
But at present lack residential area, health care, culture and education, scientific research, Administrative area, nature reserve area at different levels,
The original electromagnetic environmental impact value of the environmentally sensitive areas such as scenic spot, drinking water source protection zone, can not be project of transmitting and converting electricity
Addressing, path planning provide basic data.Electromagnetic Environmental Data Acquisition work is carried out in the environmental impact assessment stage mostly, because of the defeated change of complexity
Electrical engineering environment and make work on the spot relatively complicated, at present measuring instrument can not automatic record data, easily malfunction and expend
It is again a huge and repeated high job that time and manpower are more, later data is analyzed.It is sensitive for further specification environment
Region electromagnetic environment information gathering work, formulates the management system for forming a set of suitable AC input transformation engineering electromagnetic environment monitor
System, preferably environmentally sensitive area information progress Whole Course Management, which is supported, seems very necessary.
In summary, for how to realize environmentally sensitive areas in current electromagnetic environment data acquisition present situation
The movable type of electromagnetic environment information, intelligent collection, storage, management and application, and how to reduce work on the spot amount, reduce out
Error rate, simplify the problem of measurement process, still lack effective solution.
The content of the invention
For the deficiencies in the prior art, the invention provides a kind of environmentally sensitive areas mobile electromagnetic environment letter
Cease monitoring management method and system, it is intended to by intelligent portable mobile terminal advantage, for current project of transmitting and converting electricity electromagnetism ring
Border data acquisition present situation, the environmentally sensitive areas mobile electromagnetic environment information monitoring management method based on mobile terminal is proposed,
The environmentally sensitive areas mobile electromagnetic environment information monitoring management system based on mobile terminal is established, realizes project of transmitting and converting electricity electricity
Collection, storage, management and the application of magnetic environment Back ground Information, so as to reduce work on the spot amount, reduce error rate, simplification measured
Journey, initial data support is provided for follow-up project of transmitting and converting electricity addressing, path planning.
The first object of the present invention is to provide a kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management method.
To achieve these goals, the present invention is using a kind of following technical scheme:
A kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management method, suitable for mobile terminal device
Perform, the electromagnetic environment information monitoring management method includes:
Identify and connect power frequency electromagnetic field monitoring terminal, establish and communicate with power frequency electromagnetic field monitoring terminal;
Pending monitoring task is formulated according to on-the-spot test job requirement and is shown;
After reaching tasks carrying place, acquisition tasks perform place audio and/or image information, acquisition time information and
Positional information, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, after being calibrated to Monitoring Data
Storage;
Monitoring information is inquired about, the Monitoring Data after the information of collection and calibration is formed into report export according to template.
As further preferred scheme, between mobile terminal and the power frequency electromagnetic field monitoring terminal through but not limited to
Bluetooth equipment is identified and connected, and in the bluetooth communications range of power frequency electromagnetic field monitoring terminal, mobile terminal is identified and connected
Connect bluetooth equipment corresponding to the power frequency electromagnetic field monitoring terminal so that mobile terminal passes through indigo plant with power frequency electromagnetic field monitoring terminal
Tooth signal carries out data transmission.
As further preferred scheme, before mobile terminal identifies and connects power frequency electromagnetic field monitoring terminal, the electricity
Magnetic environment information monitoring management method also includes:
User carries out checking login according to existing logon account, if new user, is then logged in after registering logon account;
New user's registration logon account, logon account include user name and password.
As further preferred scheme, the specific step that pending monitoring task is formulated according to on-the-spot test job requirement
Suddenly it is:
Task is formulated:Task formulation is carried out according to on-the-spot test job requirement, selects adding, having task for new task
Modification or the deletion of existing task;
Measuring point is formulated:On the basis of task formulation, the specific survey under the existing task of new task or modification to addition
Point is configured.
As further preferred scheme, during the task is formulated,
Task type is selected according to on-the-spot test job requirement in the addition of new task, task parameters information is improved, enters
The addition of row new task;
Task type, task parameters information are modified in the modification of existing task;
Whole task is deleted in the deletion of existing task;
The task parameters information includes engineering name, formulates people, formulates time, client.
As further preferred scheme, task type specifically includes spot measurement task and laterally surveyed in the task of formulation
Amount task;
The spot measurement task is:To the audio of each detailed measuring point in task, the individually each measuring point in detail of collection
And/or image information;And the Monitoring Data of each measuring point in detail of power frequency electromagnetic field monitoring terminal collection is obtained, carry out independent
Description;
The cross measure task is:To one group of measuring point that is mutually related in task, gather whole group measuring point audio and/or
Image information;And the Monitoring Data of each measuring point in detail of power frequency electromagnetic field monitoring terminal collection is obtained, carry out whole group measuring point
Overall description;Wherein, each mutual relation of measuring point in detail is shown by measuring spacing in whole group measuring point.
As further preferred scheme, the measuring point is formulated and made after spot measurement task and/or cross measure task
It is fixed, measuring point formulation is carried out according to on-the-spot test job requirement, selects the modification added, have measuring point of new measuring point or existing measuring point
Deletion;
Single measuring point is added according to on-the-spot test job requirement successively in the addition of new measuring point or batch imports whole group and surveyed
Point;
Measuring point type, measuring point parameter information are modified in the modification of existing measuring point;
Specific measuring point is deleted in the deletion of existing measuring point;
Described the step of adding single measuring point successively is:Measuring point type is selected, measuring point parameter information is improved, carries out new measuring point
Addition;
The batch imports whole group measuring point and led by importing the batch of the progress whole group measuring point of the Excel document under specified path
Enter;
The measuring point type includes circuit, power transformation tiny node;The measuring point parameter information includes test object, title, area
Section, administrative region, measurement place, measuring instrument and testing time.
As further preferred scheme, the Monitoring Data is calibrated specially:Using the electric field in X, Y, Z-direction
Intensity and magnetic induction intensity totally six calibration parameters, it is respectively used to the Monitoring Data and standard of the collection of power frequency electromagnetic field monitoring terminal
Value contrast is calibrated, the Monitoring Data after being calibrated.
The second object of the present invention is to provide a kind of computer-readable recording medium.
To achieve these goals, the present invention is using a kind of following technical scheme:
A kind of computer-readable recording medium, wherein being stored with a plurality of instruction, the instruction is suitable to by mobile terminal device
Processor load and perform following processing:
Identify and connect power frequency electromagnetic field monitoring terminal, establish and communicate with power frequency electromagnetic field monitoring terminal;
Pending monitoring task is formulated according to on-the-spot test job requirement and is shown;
After reaching tasks carrying place, acquisition tasks perform place audio and/or image information, acquisition time information and
Positional information, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, after being calibrated to Monitoring Data
Storage;
Monitoring information is inquired about, the Monitoring Data after the information of collection and calibration is formed into report export according to template.
The third object of the present invention is to provide a kind of mobile terminal.
To achieve these goals, the present invention is using a kind of following technical scheme:
A kind of mobile terminal, it is characterised in that:Including processor and computer-readable recording medium, processor is used to realize
Each instruction;Computer-readable recording medium is used to store a plurality of instruction, and the instruction is suitable to be loaded by processor and performed following
Processing:
Identify and connect power frequency electromagnetic field monitoring terminal, establish and communicate with power frequency electromagnetic field monitoring terminal;
Pending monitoring task is formulated according to on-the-spot test job requirement and is shown;
After reaching tasks carrying place, acquisition tasks perform place audio and/or image information, acquisition time information and
Positional information, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, after being calibrated to Monitoring Data
Storage;
Monitoring information is inquired about, the Monitoring Data after the information of collection and calibration is formed into report export according to template.
The fourth object of the present invention is to provide a kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management system.
To achieve these goals, the present invention is using a kind of following technical scheme:
A kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management system, including:
Mobile terminal, for formulating and showing pending monitoring task, connected with the identification of power frequency electromagnetic field monitoring terminal, acquisition
The Monitoring Data of power frequency electromagnetic field monitoring terminal collection, audio frequency and video dynamic acquisitions, the calibration storage of Monitoring Data, monitoring information
Inquiry and report export;
Power frequency electromagnetic field monitoring terminal, being connected for being identified with mobile terminal, acquisition tasks perform the Monitoring Data in place,
And the Monitoring Data of collection is sent to mobile terminal.
As further preferred scheme, the power frequency electromagnetic field monitoring terminal includes the information monitoring mould being sequentially connected
Block, data processing module and data transmission module;
As further preferred scheme, described information monitoring modular includes power frequency electric field monitoring modular, power frequency magnetic field is supervised
Survey module, audible noise monitoring modular, temperature-humidity monitoring module and air pressure monitoring modular;
The power frequency electric field monitoring modular is used for the collection of power frequency electric field;
The power frequency magnetic field monitoring modular is used for the collection of power frequency magnetic field;
The audible noise monitoring modular is used for the collection of audible noise;
The temperature-humidity monitoring module is used for the collection of temperature and humidity;
The Pressure monitoring module is used for the collection of air pressure;
The power frequency electric field monitoring modular, the power frequency magnetic field monitoring modular and the audible noise monitoring modular respectively with
Modulate circuit is connected, and the power frequency electric field, power frequency magnetic field, audible noise of collection are carried out into signal condition, the modulate circuit respectively
It is connected with AD conversion module, the AD conversion module is connected with data processing module;
The temperature-humidity monitoring module and the Pressure monitoring module are connected with data processing module respectively;
As further preferred scheme, the data processing module includes microprocessor, and the microprocessor passes through
Serial ports sends the data after processing to data transmission module.
The data transmission module is used but is not limited to bluetooth module, and the data of collection are passed through into Bluetooth signal transmission to shifting
Dynamic terminal.
As further preferred scheme, the electromagnetic environment information monitoring management system can also include:Server, it is described
Server is connected with database and remote terminal respectively;
Server, for receive mobile terminal collection audio frequency and video multidate information and calibration after Monitoring Data;
Database, for the mobile terminal for storing monitoring task, storage obtains;
Remote terminal, for remotely carrying out checking login by logon account, remotely formulate and show pending monitoring task,
Obtain the audio frequency and video multidate information of mobile terminal collection, obtain the inquiry of Monitoring Data, monitoring information after mobile terminal is calibrated
And report export.
Beneficial effects of the present invention:
1st, mobile electromagnetic environment information monitoring management system in environmental sensitive area of the present invention, with blue tooth wireless communication
Mode and Mobile portable terminal are carrier, by the connection with power frequency electromagnetic field monitoring terminal, realize environmentally sensitive areas electromagnetism
The automatic data collection of ambient parameter and storage, solve that traditional measurement instrument needs hand-kept data and wired mode of connection is cumbersome asks
Topic;
2nd, it is whole to be based on Mobile portable for environmental sensitive area mobile electromagnetic environment information monitoring management method of the present invention
Realize the functions such as the management of environmentally sensitive areas measurement task, the analysis of test data and processing, report export in end;
3rd, mobile electromagnetic environment information monitoring management system in environmental sensitive area of the present invention passes through environmentally sensitive
Region electromagnetic environment in-site measurement service integration analysis, establishes the unified, collecting method of specification and system, realizes to environment
Standard, process and the normalization of sensitizing range electromagnetic environment information gathering work.
Brief description of the drawings
Fig. 1 is flow chart of the method for the present invention;
Fig. 2 is the overall system architecture structural representation of the present invention;
Fig. 3 is the data acquisition session flow chart of the present invention;
Fig. 4 is the surface chart of mobile terminal first of the present invention;
Fig. 5 is the mobile terminal second contact surface figure of the present invention;
Fig. 6 is the surface chart of mobile terminal the 3rd of the present invention;
Fig. 7 is the surface chart of mobile terminal the 4th of the present invention;
Fig. 8 is the surface chart of mobile terminal the 5th of the present invention.
Embodiment:
The invention will be further described with embodiment below in conjunction with the accompanying drawings:
It is noted that described further below is all exemplary, it is intended to provides further instruction to the application.It is unless another
Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field
The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root
According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative
It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag
Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
Embodiment 1:
For the deficiencies in the prior art, the invention provides a kind of environmentally sensitive areas mobile electromagnetic environment letter
Cease monitoring management method and system, it is intended to by intelligent portable mobile terminal advantage, for current project of transmitting and converting electricity electromagnetism ring
Border data acquisition present situation, the environmentally sensitive areas mobile electromagnetic environment information monitoring management method based on mobile terminal is proposed,
The environmentally sensitive areas mobile electromagnetic environment information monitoring management system based on mobile terminal is established, realizes project of transmitting and converting electricity electricity
Collection, storage, management and the application of magnetic environment Back ground Information, so as to reduce work on the spot amount, reduce error rate, simplification measured
Journey, initial data support is provided for follow-up project of transmitting and converting electricity addressing, path planning.
The present invention a kind of exemplary embodiments be:
As shown in figure 1,
A kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management method, suitable for mobile terminal device
Perform, the electromagnetic environment information monitoring management method includes:
Identify and connect power frequency electromagnetic field monitoring terminal, establish and communicate with power frequency electromagnetic field monitoring terminal;
Pending monitoring task is formulated according to on-the-spot test job requirement and is shown;
After reaching tasks carrying place, acquisition tasks perform place audio and/or image information, acquisition time information and
Positional information, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, after being calibrated to Monitoring Data
Storage;
Monitoring information is inquired about, the Monitoring Data after the information of collection and calibration is formed into report export according to template.
In the present embodiment, through but not limited to bluetooth equipment between mobile terminal and the power frequency electromagnetic field monitoring terminal
It is identified and connects, in the bluetooth communications range of power frequency electromagnetic field monitoring terminal, mobile terminal identifies and connects the work
Bluetooth equipment corresponding to frequency electromagnetic field monitoring terminal so that mobile terminal is entered with power frequency electromagnetic field monitoring terminal by Bluetooth signal
Row data transfer.
The mobile terminal realizes the automatic identification to power frequency electromagnetic field monitoring terminal.
In the present embodiment, data acquisition session flow chart as shown in Figure 3:
The existing logon account of user is obtained, carries out checking login, if new user, then the registration for obtaining new user logs in
Logged in after account;New user's registration logon account, logon account include user name and password.
After checking, formulate pending monitoring task according to on-the-spot test job requirement and show pending monitoring task;
After reaching tasks carrying place, acquisition tasks perform place audio and/or image information, acquisition time information and
Positional information, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, after being calibrated to Monitoring Data
Storage.
In the present embodiment, it is described that concretely comprising the following steps for pending monitoring task is formulated according to on-the-spot test job requirement:
Task is formulated:Task formulation is carried out according to on-the-spot test job requirement, selects adding, having task for new task
Modification or the deletion of existing task;
Measuring point is formulated:On the basis of task formulation, the specific survey under the existing task of new task or modification to addition
Point is configured.
In the present embodiment, during the task is formulated,
Task type is selected according to on-the-spot test job requirement in the addition of new task, task parameters information is improved, enters
The addition of row new task;
Task type, task parameters information are modified in the modification of existing task;
Whole task is deleted in the deletion of existing task;
The task parameters information includes engineering name, formulates people, formulates time, client.
In the present embodiment, task type specifically includes spot measurement task and cross measure task in the task of formulation;
The spot measurement task is:To the audio of each detailed measuring point in task, the individually each measuring point in detail of collection
And/or image information;And the Monitoring Data of each measuring point in detail of power frequency electromagnetic field monitoring terminal collection is obtained, carry out independent
Description;
The cross measure task is:To one group of measuring point that is mutually related in task, gather whole group measuring point audio and/or
Image information;And the Monitoring Data of each measuring point in detail of power frequency electromagnetic field monitoring terminal collection is obtained, carry out whole group measuring point
Overall description;Wherein, each mutual relation of measuring point in detail is shown by measuring spacing in whole group measuring point.
In the present embodiment, the measuring point is formulated and formulated after spot measurement task and/or cross measure task, according to existing
Field test job requires to carry out measuring point formulation, selects the modification added, have measuring point of new measuring point or have the deletion of measuring point;
Single measuring point is added according to on-the-spot test job requirement successively in the addition of new measuring point or batch imports whole group and surveyed
Point;
Measuring point type, measuring point parameter information are modified in the modification of existing measuring point;
Specific measuring point is deleted in the deletion of existing measuring point;
Described the step of adding single measuring point successively is:Measuring point type is selected, measuring point parameter information is improved, carries out new measuring point
Addition;
The batch imports whole group measuring point and led by importing the batch of the progress whole group measuring point of the Excel document under specified path
Enter;
The measuring point type includes circuit, power transformation tiny node;The measuring point parameter information includes test object, title, area
Section, administrative region, measurement place, measuring instrument and testing time.
In the present embodiment, the Monitoring Data is calibrated specially:Using the electric-field intensity and magnetic in X, Y, Z-direction
Induction totally six calibration parameters, be respectively used to the Monitoring Data of power frequency electromagnetic field monitoring terminal collection and standard value contrast into
Row calibration, the Monitoring Data after being calibrated.
Embodiment 2:
The present invention a kind of exemplary embodiments be:
A kind of computer-readable recording medium, wherein being stored with a plurality of instruction, the instruction is suitable to by mobile terminal device
Processor load and perform following processing:
Identify and connect power frequency electromagnetic field monitoring terminal, establish and communicate with power frequency electromagnetic field monitoring terminal;
Pending monitoring task is formulated according to on-the-spot test job requirement and is shown;
After reaching tasks carrying place, acquisition tasks perform place audio and/or image information, acquisition time information and
Positional information, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, after being calibrated to Monitoring Data
Storage;
Monitoring information is inquired about, the Monitoring Data after the information of collection and calibration is formed into report export according to template.
Embodiment 3:
The present invention a kind of exemplary embodiments be:
A kind of mobile terminal, it is characterised in that:Including processor and computer-readable recording medium, processor is used to realize
Each instruction;Computer-readable recording medium is used to store a plurality of instruction, and the instruction is suitable to be loaded by processor and performed following
Processing:
Identify and connect power frequency electromagnetic field monitoring terminal, establish and communicate with power frequency electromagnetic field monitoring terminal;
Pending monitoring task is formulated according to on-the-spot test job requirement and is shown;
After reaching tasks carrying place, acquisition tasks perform place audio and/or image information, acquisition time information and
Positional information, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, after being calibrated to Monitoring Data
Storage;
Monitoring information is inquired about, the Monitoring Data after the information of collection and calibration is formed into report export according to template.
Embodiment 4:
As shown in Fig. 2
The present invention a kind of exemplary embodiments be:
A kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management system, including:
Mobile terminal, for formulating and showing pending monitoring task, connected with the identification of power frequency electromagnetic field monitoring terminal, acquisition
The Monitoring Data of power frequency electromagnetic field monitoring terminal collection, audio frequency and video dynamic acquisitions, the calibration storage of Monitoring Data, monitoring information
Inquiry and report export;
Power frequency electromagnetic field monitoring terminal, being connected for being identified with mobile terminal, acquisition tasks perform the Monitoring Data in place,
And the Monitoring Data of collection is sent to mobile terminal;
In the present embodiment, mobile terminal is established by bluetooth equipment with power frequency electromagnetic field monitoring terminal and is in communication with each other.
In the present embodiment, background information management system, operation circle of background information management system are loaded in mobile terminal
Face as Figure 4-8, including:Pending tasks module, for the checking of environmentally sensitive region in-site measurement task, perform, manage
Reason, the measurement collection of bag task measuring point data, the writing function such as take pictures;Data calibration module, for realizing the electromagnetic field of measurement
Data calibration function, ensure gathered data accurately and reliably, including electric-field intensity in X, Y, Z-direction and magnetic induction intensity totally six
Individual parametric calibration;Information inquiry module, for being inquired about various task status informations and Monitoring Data, it is various support text
The download of part, video and code etc. is checked;Data export function, for carrying out excel export to executed measuring point gathered data.
Described Pending tasks module can formulate measurement task according to on-the-spot test job requirement, there is provided spot measurement and horizontal stroke
Selected to two kinds of measurement patterns of measurement for user according to on-site actual situations.Spot measurement is i.e. independent to each measuring point in detail
It is described and takes pictures;Cross measure is then one group to be mutually related to carry out overall description and take pictures, and cross measure is each
Show mutual relation by measuring spacing between measuring point, for realizing the intelligent collection of context sensitive information.
Pending tasks module includes task and formulated and measuring point formulation.
The addition, modification, deletion action of task can be completed in the page.Selected first in left side task type tree list area
Correct task type is selected, main interface will show task all under the task type with tabular form, and displaying information includes:
Engineering name, formulate people, formulate time, client etc.." addition " button is clicked in prompt operation area, system just automatically creates
One new task, user clicks on " preservation " after the parameter information of task is filled in the Task Details area of right side, just complete
Into the establishment of new task, with regard to the task record newly created can be seen in task list.Select a certain bar note in task list
Record, then click on " modification " button and mission bit stream can be modified in details area, must click on and " protect after having changed
Deposit " button.A certain bar record is equally selected to click on " deletion " button with regard to task deletion action can be completed in task list.
Measuring point formulation is that the specific measuring point under on the basis of task is formulated to task is configured.Formulate and operate with task
It is similar." circuit " or " transformer station " node under task node, then reselection " addition ", detailed are chosen in tree list
The thin information area fills the relevant parameter information of measuring point, clicks on " preservation ", then the base for the measuring point formulated is shown in data display area
This information;" batch imports " also may be selected when adding measuring point, select the Excel document under specified path, click on " it is determined that " i.e.
Batch can be completed to import.
Described data calibration module includes X, Y, the electric-field intensity in Z-direction and magnetic induction intensity totally six parameter schools
Standard, contrasted for power frequency electromagnetic field monitoring terminal gathered data and standard value.
Described information inquiry module can be directed to task status (in having completed, performing, being not carried out) and carry out filtering screening, reality
, can dynamic tracing measurement task implementation status now to standard criterion and the management function of measurement report.
Job enquiry module provides the function of being inquired about by task status, and query interface has three-decker:Task is looked into
Inquiry-measuring point inquiry-measuring point details displaying.
Job enquiry interface selects different conditions in left side tree list area, then can be checked in main interface show area
Task essential information under the state, a certain bar task record is selected to check the detail parameters letter of task in details area
Breath.System also provides the function that task screening is carried out according to screening conditions, and querying condition has task to formulate time, test-types
Deng.
In " measuring point number " column of every mission bit stream, measuring point list displaying interface can be entered with clickthrough, is looked into
See the relevant information of measuring point.
The function that measuring point is inquired about according to line name is provided at measuring point list displaying interface, all of measuring point information survey in detail
The information of point can be linked into measuring point details displaying interface by clicking on the detailed column of measuring point number one of measuring point information, check
Detailed data.
Detailed measuring point information page illustrates the measurement data of the detailed measuring point, including electric-field intensity, magnetic field intensity, gas
Temperature, atmospheric pressure, measuring point describe picture etc., and amplification can be clicked on after picture by, which uploading, checks picture, each single-point under cross measure
It is not required to picture description.
Described data export function can export each environmentally sensitive areas measurement data according to the template of standard.
In the present embodiment, the power frequency electromagnetic field monitoring terminal includes being sequentially connected information monitoring module, at data
Manage module and data transmission module;Information monitoring module realizes that the data of environmentally sensitive region power frequency electric field and power frequency magnetic field are adopted
Collect, bluetooth communication module is integrated in data transmission module, realizes blue tooth communication function, bluetooth communication module is by data at data
Manage and be interchangeable between the serial ports of module and bluetooth, play a part of changing into wireless data by wired.
In the present embodiment, described information monitoring modular include power frequency electric field monitoring modular, power frequency magnetic field monitoring modular, can
Listen noise module, temperature-humidity monitoring module and air pressure monitoring modular;
The power frequency electric field monitoring modular is used for the collection of power frequency electric field;
The power frequency magnetic field monitoring modular is used for the collection of power frequency magnetic field;
The audible noise monitoring modular is used for the collection of audible noise;
The temperature-humidity monitoring module is used for the collection of temperature and humidity;
The Pressure monitoring module is used for the collection of air pressure;
Wherein temperature, humidity, air pressure acquisition are data signals, power frequency electric field, power frequency magnetic field and audible noise collection
It is analog signal, the digital quantity signal collected is sent in the microprocessor of data processing module, the analog signal collected
Modulate circuit will be sent to and carry out signal condition, upper AD is sampled in transmission microprocessor after conditioning.Microprocessor passes through
Serial ports sends data to bluetooth module transmission portable terminal device.
Thus the power frequency electric field monitoring modular of the present embodiment, the power frequency magnetic field monitoring modular and the audible noise
Monitoring modular is connected with modulate circuit respectively, and the power frequency electric field, power frequency magnetic field, audible noise of collection are carried out into signal tune respectively
Reason, the modulate circuit are connected with AD conversion module, and the AD conversion module is connected with data processing module;
The temperature-humidity monitoring module and the Pressure monitoring module are connected with data processing module respectively;
In the present embodiment, the data processing module includes microprocessor, and the microprocessor will be located by serial ports
Data after reason are sent to data transmission module.
The data transmission module is used but is not limited to bluetooth module, and the data of collection are passed through into Bluetooth signal transmission to shifting
Dynamic terminal.
In the present embodiment, power frequency electromagnetic field monitoring terminal fusion temperature, humidity, air pressure, power frequency electric field, power frequency magnetic field and
Six parameters of audible noise, realize multi-parameter synchronous real-time measurement, the drawbacks of avoiding carrying a variety of measuring apparatus;
The electromagnetic environment information monitoring management system can also include:Server, the server respectively with database and
Remote terminal connects;
Server, for receive mobile terminal collection audio frequency and video multidate information and calibration after Monitoring Data;
Database, for the mobile terminal for storing monitoring task, storage obtains;
Remote terminal, for remotely carrying out checking login by logon account, remotely formulate and show pending monitoring task,
Obtain the audio frequency and video multidate information of mobile terminal collection, obtain the inquiry of Monitoring Data, monitoring information after mobile terminal is calibrated
And report export.
Beneficial effects of the present invention:
1st, mobile electromagnetic environment information monitoring management system in environmental sensitive area of the present invention, with blue tooth wireless communication
Mode and Mobile portable terminal are carrier, by the connection with power frequency electromagnetic field monitoring terminal, realize environmentally sensitive areas electromagnetism
The automatic data collection of ambient parameter and storage, solve that traditional measurement instrument needs hand-kept data and wired mode of connection is cumbersome asks
Topic;
2nd, it is whole to be based on Mobile portable for environmental sensitive area mobile electromagnetic environment information monitoring management method of the present invention
Realize the functions such as the management of environmentally sensitive areas measurement task, the analysis of test data and processing, report export in end;
3rd, mobile electromagnetic environment information monitoring management system in environmental sensitive area of the present invention passes through environmentally sensitive
Region electromagnetic environment in-site measurement service integration analysis, establishes the unified, collecting method of specification and system, realizes to environment
Standard, process and the normalization of sensitizing range electromagnetic environment information gathering work.
The preferred embodiment of the application is the foregoing is only, is not limited to the application, for the skill of this area
For art personnel, the application can have various modifications and variations.It is all within spirit herein and principle, made any repair
Change, equivalent substitution, improvement etc., should be included within the protection domain of the application.
Claims (10)
- A kind of 1. environmentally sensitive areas mobile electromagnetic environment information monitoring management method, suitable for being held mobile terminal device OK, it is characterised in that the electromagnetic environment information monitoring management method includes:Identify and connect power frequency electromagnetic field monitoring terminal, establish and communicate with power frequency electromagnetic field monitoring terminal;Pending monitoring task is formulated according to on-the-spot test job requirement and is shown;After reaching tasks carrying place, acquisition tasks perform the audio and/or image information in place, acquisition time information and position Information, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, deposited after being calibrated to Monitoring Data Storage;Monitoring information is inquired about, the Monitoring Data after the information of collection and calibration is formed into report export according to template.
- 2. a kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management method as claimed in claim 1, its feature It is, is identified and connects by bluetooth equipment between mobile terminal and the power frequency electromagnetic field monitoring terminal, in power frequency electric In the bluetooth communications range of magnetic field monitoring terminal, mobile terminal is identified and connected blue corresponding to the power frequency electromagnetic field monitoring terminal Tooth equipment so that mobile terminal is carried out data transmission with power frequency electromagnetic field monitoring terminal by Bluetooth signal.
- 3. a kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management method as claimed in claim 1, its feature It is, before mobile terminal identifies and connects power frequency electromagnetic field monitoring terminal, the electromagnetic environment information monitoring management method is also Including:User carries out checking login according to existing logon account, if new user, is then logged in after registering logon account;New user's registration logon account, logon account include user name and password.
- 4. a kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management method as claimed in claim 1, its feature It is, it is described that concretely comprising the following steps for pending monitoring task is formulated according to on-the-spot test job requirement:Task is formulated:Task formulation is carried out according to on-the-spot test job requirement, selects the modification added, have task of new task Or the deletion of existing task;Measuring point is formulated:On the basis of task formulation, the specific measuring point under the existing task of new task or modification to addition enters Row is set;During the task is formulated,Task type is selected according to on-the-spot test job requirement in the addition of new task, improves task parameters information, is carried out new The addition of task;Task type, task parameters information are modified in the modification of existing task;Whole task is deleted in the deletion of existing task;The task parameters information includes engineering name, formulates people, formulates time, client.
- 5. a kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management method as claimed in claim 4, its feature It is, task type specifically includes spot measurement task and cross measure task in the task of formulation;The spot measurement task is:To each detailed measuring point in task, individually each audio of measuring point in detail of collection and/or Image information;And the Monitoring Data of each measuring point in detail of power frequency electromagnetic field monitoring terminal collection is obtained, individually described;The cross measure task is:To one group of measuring point that is mutually related in task, the audio and/or image of collection whole group measuring point Information;And the Monitoring Data of each measuring point in detail of power frequency electromagnetic field monitoring terminal collection is obtained, carry out the total of whole group measuring point Body describes;Wherein, each mutual relation of measuring point in detail is shown by measuring spacing in whole group measuring point.
- 6. a kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management method as claimed in claim 5, its feature It is, the measuring point is formulated and formulated after spot measurement task and/or cross measure task, is entered according to on-the-spot test job requirement Row measuring point is formulated, and selects the modification added, have measuring point of new measuring point or the deletion of existing measuring point;Single measuring point is added according to on-the-spot test job requirement successively in the addition of new measuring point or batch imports whole group measuring point;Measuring point type, measuring point parameter information are modified in the modification of existing measuring point;Specific measuring point is deleted in the deletion of existing measuring point;Described the step of adding single measuring point successively is:Measuring point type is selected, measuring point parameter information is improved, carries out adding for new measuring point Add;The batch imports the batch importing that whole group measuring point carries out whole group measuring point by importing the Excel document under specified path;The measuring point type includes circuit, power transformation tiny node;The measuring point parameter information includes test object, title, section, OK Administrative division domain, measurement place, measuring instrument and testing time.
- 7. a kind of environmentally sensitive areas mobile electromagnetic environment information monitoring management method as claimed in claim 1, its feature It is, the Monitoring Data is calibrated specially:Using the electric-field intensity in X, Y, Z-direction and magnetic induction intensity totally six schools Quasi- parameter, the Monitoring Data and standard value contrast for being respectively used to the collection of power frequency electromagnetic field monitoring terminal are calibrated, calibrated Monitoring Data afterwards.
- 8. a kind of computer-readable recording medium, wherein being stored with a plurality of instruction, it is characterised in that the instruction is suitable to by moving The processor of terminal device loads and performs following processing:Identify and connect power frequency electromagnetic field monitoring terminal, establish and communicate with power frequency electromagnetic field monitoring terminal;Pending monitoring task is formulated according to on-the-spot test job requirement and is shown;After reaching tasks carrying place, acquisition tasks perform the audio and/or image information in place, acquisition time information and position Information, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, deposited after being calibrated to Monitoring Data Storage;Monitoring information is inquired about, the Monitoring Data after the information of collection and calibration is formed into report export according to template.
- 9. a kind of mobile terminal, including processor and computer-readable recording medium, processor is used to realize each instruction;Computer Readable storage medium storing program for executing is used to store a plurality of instruction, it is characterised in that the instruction is suitable to be loaded by processor and performed following Reason:Identify and connect power frequency electromagnetic field monitoring terminal, establish and communicate with power frequency electromagnetic field monitoring terminal;Pending monitoring task is formulated according to on-the-spot test job requirement and is shown;After reaching tasks carrying place, acquisition tasks perform the audio and/or image information in place, acquisition time information and position Information, and store;And the Monitoring Data of power frequency electromagnetic field monitoring terminal collection is obtained, deposited after being calibrated to Monitoring Data Storage;Monitoring information is inquired about, the Monitoring Data after the information of collection and calibration is formed into report export according to template.
- A kind of 10. environmentally sensitive areas mobile electromagnetic environment information monitoring management system, it is characterised in that including:Mobile terminal, for formulating and showing pending monitoring task, connected with the identification of power frequency electromagnetic field monitoring terminal, acquisition power frequency Calibration storage, the inquiry of monitoring information of the Monitoring Data, audio frequency and video dynamic acquisition, Monitoring Data of the collection of electromagnetic field monitoring terminal And report export;Power frequency electromagnetic field monitoring terminal, being connected for being identified with mobile terminal, acquisition tasks perform the Monitoring Data in place, and The Monitoring Data of collection is sent to mobile terminal;The power frequency electromagnetic field monitoring terminal includes the information monitoring mould being sequentially connected Block, data processing module and data transmission module;Described information monitoring modular includes power frequency electric field monitoring modular, power frequency magnetic field monitoring modular, audible noise monitoring modular, temperature Humidity monitoring module and air pressure monitoring modular;The power frequency electric field monitoring modular is used for the collection of power frequency electric field;The power frequency magnetic Field monitoring modular is used for the collection of power frequency magnetic field;The audible noise monitoring modular is used for the collection of audible noise;It is described warm and humid Spend the collection that monitoring modular is used for temperature and humidity;The Pressure monitoring module is used for the collection of air pressure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710771348.4A CN107727941B (en) | 2017-08-31 | 2017-08-31 | Environment sensitive area mobile electromagnetic environment information monitoring and management method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710771348.4A CN107727941B (en) | 2017-08-31 | 2017-08-31 | Environment sensitive area mobile electromagnetic environment information monitoring and management method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107727941A true CN107727941A (en) | 2018-02-23 |
CN107727941B CN107727941B (en) | 2020-08-14 |
Family
ID=61204790
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710771348.4A Active CN107727941B (en) | 2017-08-31 | 2017-08-31 | Environment sensitive area mobile electromagnetic environment information monitoring and management method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107727941B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108647699A (en) * | 2018-03-22 | 2018-10-12 | 平安信托有限责任公司 | task image processing method, device, equipment and storage medium |
CN109190103A (en) * | 2018-10-29 | 2019-01-11 | 航天信息股份有限公司 | A kind of collecting terminal |
CN112184945A (en) * | 2020-10-09 | 2021-01-05 | 英业达(重庆)有限公司 | Mobile terminal inspection management method and system |
CN112229446A (en) * | 2020-10-12 | 2021-01-15 | 云南电网有限责任公司电力科学研究院 | Monitoring and warning system for power frequency electromagnetic field and noise of transformer substation |
CN112836923A (en) * | 2020-12-09 | 2021-05-25 | 广州市极越电子有限公司 | Electromagnetic environmental assessment management method and system |
CN112880732A (en) * | 2019-11-29 | 2021-06-01 | 国网山东省电力公司电力科学研究院 | Power grid occupational harmful factor monitoring system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103996142A (en) * | 2013-02-16 | 2014-08-20 | 上海思创电器设备有限公司 | Electrical test measurement and control management method based on portable terminal |
CN104700226A (en) * | 2015-03-20 | 2015-06-10 | 国家电网公司 | Equipment and device for monitoring environmental protection measures in transmission and transformation project construction process |
CN104794561A (en) * | 2015-03-25 | 2015-07-22 | 朱海涛 | Project management control system utilizing mobile terminal and using method thereof |
CN105139292A (en) * | 2015-09-21 | 2015-12-09 | 国网山东省电力公司电力科学研究院 | Power transmission and transformation engineering construction stage environment supervision inspection system and method |
CN106840258A (en) * | 2017-01-23 | 2017-06-13 | 国网山东省电力公司电力科学研究院 | The full state electromagnetic environment monitoring system of wide area and method based on multi-parameter synergic monitoring |
-
2017
- 2017-08-31 CN CN201710771348.4A patent/CN107727941B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103996142A (en) * | 2013-02-16 | 2014-08-20 | 上海思创电器设备有限公司 | Electrical test measurement and control management method based on portable terminal |
CN104700226A (en) * | 2015-03-20 | 2015-06-10 | 国家电网公司 | Equipment and device for monitoring environmental protection measures in transmission and transformation project construction process |
CN104794561A (en) * | 2015-03-25 | 2015-07-22 | 朱海涛 | Project management control system utilizing mobile terminal and using method thereof |
CN105139292A (en) * | 2015-09-21 | 2015-12-09 | 国网山东省电力公司电力科学研究院 | Power transmission and transformation engineering construction stage environment supervision inspection system and method |
CN106840258A (en) * | 2017-01-23 | 2017-06-13 | 国网山东省电力公司电力科学研究院 | The full state electromagnetic environment monitoring system of wide area and method based on multi-parameter synergic monitoring |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108647699A (en) * | 2018-03-22 | 2018-10-12 | 平安信托有限责任公司 | task image processing method, device, equipment and storage medium |
CN109190103A (en) * | 2018-10-29 | 2019-01-11 | 航天信息股份有限公司 | A kind of collecting terminal |
CN112880732A (en) * | 2019-11-29 | 2021-06-01 | 国网山东省电力公司电力科学研究院 | Power grid occupational harmful factor monitoring system |
CN112184945A (en) * | 2020-10-09 | 2021-01-05 | 英业达(重庆)有限公司 | Mobile terminal inspection management method and system |
CN112229446A (en) * | 2020-10-12 | 2021-01-15 | 云南电网有限责任公司电力科学研究院 | Monitoring and warning system for power frequency electromagnetic field and noise of transformer substation |
CN112836923A (en) * | 2020-12-09 | 2021-05-25 | 广州市极越电子有限公司 | Electromagnetic environmental assessment management method and system |
Also Published As
Publication number | Publication date |
---|---|
CN107727941B (en) | 2020-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107727941A (en) | Environmentally sensitive areas mobile electromagnetic environment information monitoring management method and system | |
CN114841625B (en) | National forest resource continuous checking cloud platform and sample plot monitoring method | |
CN107515953A (en) | One kind welding overall process quality tracing and analysis system | |
CN106940839B (en) | Power transmission and transformation project quality data management and control system and method | |
CN101788551B (en) | Expressway slide slope disease automatic monitoring system | |
CN104580311A (en) | Internet of Things system for monitoring and controlling indoor environment or in-vehicle environment and monitoring and controlling method of Internet of Things system | |
CN108964280A (en) | A kind of automation of transformation substations equipment remote detecting system and method | |
CN102708518A (en) | Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology | |
CN107748959A (en) | A kind of construction management information service system | |
CN112202242A (en) | Tower comprehensive monitoring and intelligent early warning platform and early warning method | |
CN114817616B (en) | Forest accumulation amount continuous monitoring method, system and execution method thereof | |
CN106779421A (en) | A kind of electric energy meter collection operation management system based on GPS location | |
CN106908667A (en) | Electromagnetic environment mobile monitoring method and system | |
CN109784840A (en) | A kind of construction survey automatic data collection processing method being associated with engineering structure task | |
CN110023986A (en) | On-demand service provides system and on-demand service providing method | |
CN106933712A (en) | Networking remote test system and method based on B/S frameworks | |
CN106850316A (en) | A kind of optical fiber into end graphically managing method and system | |
CN111781884B (en) | Energy monitoring system | |
CN107677777A (en) | A kind of air heavy air pollution process intelligent analysis system | |
CN107203166A (en) | A kind of intelligence sensor actual training device | |
CN106990724A (en) | Environmental monitoring cloud service platform and method of environmental monitoring | |
CN207473653U (en) | The evaluation system of substation's O&M performance | |
CN207690160U (en) | Based on electric line mapping system | |
CN108182644A (en) | Building energy consumption measurement monitoring system | |
CN107563671A (en) | A kind of enterprise's test and appraisal planning service system based on internet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |