The content of the invention
The present invention provides a kind of wall surface mortar and prints more ejecting devices and its printing integrated machine people of building wall mortar, solution
Certainly manually metope pulp shooting machine strikes off the big labor intensity that brings, low construction efficiency the problem of.
To solve above-mentioned purpose, the technical solution adopted by the present invention is:
Wall surface mortar prints more ejecting devices, including mortar expects pipe, the front of mortar expects pipe are provided with spout, and nozzle is provided with valve,
Spout is additionally provided with the high-pressure air pipe for accessing high-pressure air source, the side wall of high-pressure air pipe sets the gas for going deep into mortar expects pipe towards metope
Spout, gas spout are directed at the spout;Mortar tube end side is provided with piston, and piston edge mortar in mortar expects pipe promotes
Under slide in and out, spring is provided between piston and mortar tube end piston is applied into pressure towards mortar expects pipe, piston ridge sets
There is the unlatching that spout valve stretch rod connects the valve and control valve, the mortar expects pipe opposite side is provided with detachable end.
The edge of the piston is provided with guide bar, and the edge of mortar expects pipe protrudes guide way, pilot hole is provided with guide way,
Guide bar sets spring after passing through guide hole, and the end of guide bar sets termination and blocks spring, and piston is relative another provided with guide bar
Side is provided with spout valve stretch rod, and spout valve stretch rod is passed through on another guide way that mortar tube end edge protrudes after guide hole
It is connected with spout valve, spout valve stretch rod is additionally provided with the spring shelves body on the inside of guide way, is provided between spring shelves body and guide way
Spring.
The valve includes valve plate, valve plate is hinged in marginal position and nozzle, valve plate are provided with poke rod, poke rod at rear portion
Valve is pulled to open to side, poke rod is connected on spout valve stretch rod.
The end cap includes lid and the internal diameter gone out to mortar rostrum, internal diameter outer peripheral face and mortar tube end inward flange
If the screw thread worked in coordination, end cap outer ledge is provided with rotating disk.
The printing integrated machine people of building wall mortar of more ejecting devices, including moveable bottom are printed provided with wall surface mortar
Disk, set vertical body frame on chassis, the crane provided with mortar scraping device be arranged on body frame and can along body frame oscilaltion,
The top of mortar scraping device is provided with described mortar printing equipment wall surface mortar and prints more ejecting devices, in addition to sparge pipe,
Sparge pipe is arranged on the top that wall surface mortar prints more ejecting devices, sparge pipe rear portion connection water tank, and water tank is arranged on crane
Front end.
The top of the body frame is provided with extension spacing device;The downside on the chassis is provided with lifting locating wheel, the master
The bottom of frame is provided with telescopic bottom positioning head, and the top of the body frame is provided with flexibly positioned head.
The mortar scraping device includes strike-off stick and mends stock tank, hangs the front end that flat board is arranged on crane, described to mend slurry
Groove is arranged on the top of strike-off stick, mends in stock tank and is provided with helical axis, the surface of helical axis sets helical blade, mends and is set on the right side of stock tank
The motor of helical axis is driven, the rear portion of the strike-off stick is provided with electromagnetic shaker.
The body frame is two parallel vertical framves, and vertical frame lower side sets angle modulation axle, built-in angle modulation is provided with the inside of chassis
The vertically arranged of axle heightens groove, and the bottom of vertical frame sets two groups of extension springs of anterior side arrangement, and the extension spring other end is fixed on bottom
On disk, extension spring pulls vertical frame to realize that vertical frame is fixed, and the vertical frame is divided into top body frame and bottom body frame, fold plane position
If articulated elements is connected, top body frame and bottom body frame set drawstring at fold plane, and top body frame, bottom master are fixed in drawstring top
The straight line pull rope mechanism for pulling drawstring is set up, bottom body frame top surface sets prominent sheave, and the vertical frame of vertical state is led
Rope sheave is embedded into the body frame of top, and the chassis includes four groups of movable pulleys of corner and the liftable lifting positioning of bottom sides
Wheel, lifting locating wheel include anterior two-wheel wheel group and the steering wheel group at rear portion, and the steering wheel group is provided with spring after tuning
Steering wheel group is driven to former mode, the lifting locating wheel lifting is realized using straight line driving mechanism driving;One side direction
Two coaxial movable pulleys are provided with drive mechanism, and two movable pulleys of another side direction are the universal wheel in lockable direction.
The flexibly positioned head indent is arranged at the top of main frame, and flexibly positioned head is built-in with stage clip;The bottom positioning head
Body frame bottom is built in, bottom positioning head stretches out body frame bottom faces and contacted with ground, and bottom positioning head is built-in with linear telescopic machine
Structure.
The advantage of the invention is that:Job search position is realized using spacing device in equipment, automatic metope of filling lacks material
Position, it is automatic to collect additional size and focus on, automatic lifting, automatic press polish, after completing working face, can manually or automatically it remove
From and shift to next working face, work as face wall until carrying out and all work, that is, stop and send to complete work prompting.Whole process is reduced
Manual labor.Have manually operated construction function concurrently.Lift chassis, you transport or replacing building site when, be moved easily.
The machine is applicable residential building, and the spraying of office building interior wall strikes off matt, once reaches examination effect.It is applicable brick and mixes wall,
Cement wall, lightweight brick wall, brick cavity wall, unburned brick wall, etc. are adapted to the metope of spraying.Cement mortar is applicable, foam mortar, stone
Powder mortar, it is best to scrape the grey following effects of thickness 3.5m.
Brief description of the drawings
The wall surface mortar that Fig. 1 is the present invention prints more ejecting device cut away views,
Fig. 2 is the cut away view of the spout of the present invention,
Fig. 3 is the front view of the present invention,
Fig. 4 is the lateral plan of the present invention.
Fig. 5 is the structure chart of the body frame of the present invention,
Fig. 6 is the mortar scraping device top view of the present invention,
Fig. 7 is the mortar scraping device cutaway view Amplified image of the present invention,
Fig. 8 is the sparge pipe structure chart of the present invention,
Reference:
1st, mortar expects pipe, 2, spout, 3, high-pressure air pipe, 4, gas spout, 5, the end cap 9 of 6 valve of piston, 7 spout valve stretch rod 8, bottom
Disk, 10, body frame, 11, crane, 12, mortar scraping device, 13, extension spacing device, 14, lifting locating wheel, 15, bottom it is fixed
Potential head, 16, flexibly positioned head, the water tank of 17 sparge pipe 18, the spring shelves body of 101 guide bar, 102 guide way, 103 spring, 104 termination 105
The rotating disk of 106 valve plate, 107 poke rod, 108 lid 109.
201st, movable pulley, 202, two-wheel wheel group, 203, steering wheel group, 301, vertical frame, 302, top body frame, 303, bottom
Body frame, 304, articulated elements, 305, straight line pull rope mechanism, 306, sheave, 307, drawstring, 401, strike-off stick, 402, mend stock tank,
403rd, helical axis, 404, helical blade, 701, stage clip, 702, linear telescopic mechanism.
Embodiment
The present invention is that a kind of wall surface mortar prints more ejecting devices, including mortar expects pipe 1, the front of mortar expects pipe 1 are provided with
Spout 2, is provided with valve 6 at spout 2, and spout 2 is additionally provided with the high-pressure air pipe 3 of access high-pressure air source towards metope, high-pressure air pipe 3
Side wall sets the gas spout 4 for going deep into mortar expects pipe 1, and gas spout 4 is directed at the spout 2;The end side of mortar expects pipe 1, which is provided with, lives
Plug 5, piston 5 slide in and out along in mortar expects pipe 1 under mortar promotion, and spring is provided between piston 5 and the end of mortar expects pipe 1 will be living
Plug 5 applies pressure towards mortar expects pipe 1, and the edge of piston 5 is provided with spout valve stretch rod 7 and connects opening for the valve 6 and control valve 6
Open, the opposite side of mortar expects pipe 1 is provided with detachable end 8.For spout towards metope, the side wall of high-pressure air pipe, which is set, gos deep into mortar
The gas spout of expects pipe, gas spout is close to the spout.Mortar expects pipe accesses mortar pump, and high-pressure air pipe is passed through compressed air.
The edge of the piston 5 is provided with guide bar, and the edge of mortar expects pipe 1 protrudes guide way, guiding is provided with guide way
Hole, guide bar set spring after passing through guide hole, and the end of guide bar sets termination and blocks spring, and piston 5 is provided with guide bar relatively
Opposite side is provided with spout valve stretch rod 7, and spout valve stretch rod 7 is passed through on another guide way that the end edge of mortar expects pipe 1 protrudes
It is connected after guide hole with spout valve 76, spout valve stretch rod 7 is additionally provided with the spring shelves body on the inside of guide way, and spring shelves body is with leading
To being provided with spring between body.
The valve 6 include valve plate, valve plate marginal position it is be hinged with spout 2 at, valve plate is provided with poke rod at rear portion, stirs
Bar pulls valve 6 to open to side, and poke rod is connected on spout valve stretch rod 7.The end cap 8 includes lid and to mortar expects pipe
1 internal diameter protruded, internal diameter outer peripheral face and the end inward flange of mortar expects pipe 1 set the screw thread worked in coordination, and end cap outer ledge is provided with
Rotating disk.
The printing integrated machine people of building wall mortar, it is described including moveable chassis, vertical body frame is set on chassis, if
The crane for having mortar scraping device is arranged on body frame and can be along body frame oscilaltion, and sparge pipe is arranged on mortar scraping device
Top.
The top of the body frame is provided with extension spacing device;The downside on the chassis is provided with lifting locating wheel, the master
The bottom of frame is provided with telescopic bottom positioning head, and the top of the body frame is provided with flexibly positioned head.
Mortar scraping device includes strike-off stick and mends stock tank, hangs the front end that flat board is arranged on crane, and the benefit stock tank is set
Put on the top of strike-off stick, mend in stock tank and be provided with helical axis, the surface of helical axis sets helical blade, mends and driving is set on the right side of stock tank
The motor of helical axis, the rear portion of the strike-off stick are provided with vibration motor.Strike-off stick top flare, vibrations pressurization encryption, to metope
The secondary extrusion outside spraying is caused, improves the compactness of wall surface mortar.
Mending has mortar material in stock tank, scarce material problem occurs in wall surface mortar, mends sand in the helical blade rotation in stock tank
Slurry is supplemented to metope, and metope is lacked slurry position filling-in automatically.Wall surface mortar is excessive, hangs strike-off stick and handles additional size collection,
Unnecessary mortar will not be scattered, and unnecessary mortar after mending stock tank collection by focusing on.After construction, the metope of smooth, reach
Check and accept effect.
The body frame is two parallel vertical framves 301, and vertical frame lower side sets angle modulation axle, built-in adjust is provided with the inside of chassis
The vertically arranged of angle axle heightens groove, and the bottom of vertical frame sets two groups of extension springs of anterior side arrangement, and the extension spring other end is fixed on
On chassis, extension spring pulls vertical frame to realize that vertical frame is fixed.
Vertical frame is divided into top body frame and bottom body frame by fold plane, and the front portion of fold plane sets articulated elements and is connected, top master
Frame and bottom body frame set drawstring at fold plane, and top body frame is fixed on drawstring top, and bottom body frame sets the pulling for pulling drawstring
Mechanism, bottom body frame top surface set prominent sheave, and the sheave of the vertical frame of vertical state is embedded into the body frame of top.Should
Foldable structure solves height problem when changing building site or changing room and hide room lintel, according to need of work, big support
Not manually, automatic landing, automatic to rise, required integral hardness and upright standard when not influenceing to support work greatly.
Chassis includes four groups of movable pulleys of corner and the liftable lifting locating wheel of bottom sides, and simple operations can allow
Scrape wall telephone chassis and raise more than ten centimeters, solve the problems, such as the limitation of site road, when mobile, road out-of-flatness can also be light
Pine changes building site.Lifting locating wheel includes anterior two-wheel wheel group and the steering wheel group at rear portion, and the steering wheel group is provided with spring
Steering wheel group is driven to former direction, the lifting locating wheel after tuning lifting is realized using straight line driving mechanism driving.Bottom
Disk automatically moves function, equipment is possessed maximized automation and ensures.The progress of single working procedure and the implementation of end
And cooperation, the adjustment of steering wheel group are close to caused angular transition reset issues when working face.Movable pulley, solves replacing
The mobile problem in building site,
The spacing device that protracts is a spacing axle for being provided with circular ring plate, and spacing axle both ends are arranged on extension distance rod, spacing of protracting
Rod rear end is be hinged to drive extension distance rod level to the fortune between vertical with the top of body frame, setting drive mechanism between distance rod and body frame
It is dynamic.Need to carry out Distance positioning to mortar surface in construction, improve operating efficiency, work is more smooth.Spacing axle and annulus and wall
Face contacts, and contact point is designed to annulus slideably, when avoiding contact, adhesion mortar, and solve contact point and construction
Mortar barrier problem between point.
Flexibly positioned head indent is arranged at the top of main frame, and flexibly positioned head is built-in with stage clip;Built in the bottom positioning head
In body frame bottom, bottom positioning head stretches out body frame bottom faces and contacted with ground, and bottom positioning head is built-in with straight-line motion mechanism.Bottom
Portion's positioning head solves the problem of ground is uneven or top fixing point is uneven, fixed unstable, will not be fixed at work because of body frame
Shakiness, equipment movement is produced, causes working face out-of-flatness.
Straight-line motion mechanism is hydraulic cylinder, linear electric motors or turbine and worm transmission mechanism, the external part of straight-line motion mechanism
Prominent body frame bottom contacts with ground.
Crane includes support body and lift drive system, and support body sets lifting wheel group with the guiding contact surface on body frame, lifts
Component is taken turns as each one group of each two groups of anterior side and left and right side, spring adjustment lifting wheel group is set between lifting wheel group and body frame
Contact between body frame;The drive system includes motor-driven gear and the rack being arranged on body frame medial surface,
Wheel and rack is engaged, and the motor is arranged in support body.Crane can ensure strike-off stick plate up to summit, downwards most
The arrival lower dead center of the day of one's doom, will not leave working face.
The built-in spring of lifting wheel group part is as buffer gear, and lift assembly can not with the big support of lifting when solving lifting
The problem of fitting like a glove, steadily balanced when reaching assembly lifting, ensure that the finish and stability of scraper plate and metope.
The work process of the present invention:
1. movement, the present apparatus is moved to close to wall locations to be onstructed, the coaxial wheels group of the movable pulley of chassis corner location
Autonomous is realized by drive system, another two groups of universal wheels realize the present apparatus and whole as direction adjusting mechanism on the move
The turning of body Slicking apparatus.
2. chassis is risen, the flexible end motion of the straight line driving mechanism in chassis, the work of drive train crane simultaneously will
Lifting wheel group falls and contacted with ground, until train crane jacks on chassis to height is required, straight line driving mechanism is locked, real
The fixation of existing train crane and the fixation of chassis height.
3. the adjustment of aliging between chassis and metope, the motor driven two-wheel wheel group 3 of two-wheel wheel group 3 is worked, and chassis is realized
The adjustment of front and back position between metope, foremost position of the two-wheel wheel group on depression angle exceeds carrier frame, in front and rear shifting
In dynamic, two-wheel wheel group 3 contacts with metope.The possibility of metope is contacted when having different due to the two-wheeled of two-wheel wheel group 3, in two-wheel wheel
After side wheel contact metope in group 3, motor continuous firing, steering wheel group can be by into the two-wheel wheel group 3 not in contact with metope
A side wheel direction rotate, can should now be swung forwards centered on the wheel for contacting metope not in contact with the wheel of metope, up to connecing
Metope is contacted, at this moment, the deflecting force that steering wheel is subject to disappears, and the torsion spring on steering wheel drives steering wheel to recover former direction.
4. folding the rise of body frame, the external part of the straight line driving mechanism first in the middle part of body frame, which is retracted, drives drawstring, drawstring
Upper shelf is pulled to rotate up, upper shelf is rotated to certain angle, and drawstring leaves two directive wheels, the external part of straight line driving mechanism
Retraction original position, upper shelf connect completely with lower cage, and thimble is by upper shelf compression and back.Due to drawstring and straight line driving mechanism
Extension spring is provided between external part, after upper shelf return, the external part continued extension extension spring of straight line driving mechanism, extension spring is in stretching
State is accepted, prevents body frame from rocking middle and upper part frame run-off the straight.
5th, the extension of top positioning is fixed, and annulus contacts with metope on spacing axle, and contact point is designed to annulus slideably,
When avoiding contact, adhesion mortar, annulus is multiple, the linear contact lay of multiple spot composition is formed in being contacted in metope, it is ensured that body frame
Between it is horizontal equidistant with metope.It can solve the problem that mortar obstructs problem between contact point and construction point using annulus.
6th, the positioning up and down of body frame, after the printing integrated machine people of building wall mortar reaches specified location, positioned under body frame
Lower locating rod under the drive of linear telescopic structure under stretch contact ground, linear telescopic structure persistently stretches out, and lower locating rod will be main
Frame is jacked up, and the expansion link of the upper positioning at the top of main frame contacts its top of building, and the spring at simultaneous retractable bar is compressed, to stretching
Contracting bar applies the pretightning force to top of building.Treat that the lower locating rod of linear telescopic structure driving reaches to fix with ground, straight line
Support force of the stage clip at stretching structure rear portion by linear telescopic structure to body frame, body frame now are same upper positioning and lower positioning
Under Shi Zuoyong, upper end and lower fixed positioning are realized.Equipment is integrally realized and is supportted under upper top while enters to be about to body frame to be fixed on metope
Front, the speed of the fixed form is fast, be adapted to efficient construction progress;The mode intensity of positioning is big, prevents positioning from failing.
7th, above mortar prints, and crane drives mortar printing equipment oscilaltion campaign, mortar on Slicking apparatus body frame
Mortar is full of in expects pipe, is passed through gases at high pressure in high-pressure air pipe, and gases at high pressure spray into mortar expects pipe at gas spout and from sand
The nozzle of slurry pipe sprays, and gases at high pressure drive mortar to spray simultaneously during spraying, and spout is towards metope, and mortar is in high pressure
Metope is sprayed onto under the drive of gas, mortar is fixed on metope, realizes the spraying covering of wall surface mortar.
The mortar spout is provided with valve, and mortar tube end is provided with piston, and mortar enters mortar expects pipe, by mortar
Pipe fills mortar completely, extrudes the piston of mortar tube end, and piston opens spout shutoff valve simultaneously, continues to fill up mortar
Material, piston are opened the valve in air inlet pipe by bar linkage structure, start to whitewash, spout sprays mortar under the drive of gases at high pressure
Material.
8th, benefit slurry step is struck off, crane drives present apparatus oscilaltion campaign on Slicking apparatus body frame, calendar plate contact
The screed of metope, by screed surfacing into smooth surface.When wall surface mortar thickness is blocked up, calendar plate tip position will be blocked up
Mortar wipe off, unnecessary mortar enter mortar pin groove in.It is accumulated in after calendar plate scrapes unnecessary mortar from metope in mortar pin groove,
During minor spiral axle 8 rotates, mortar is pushed through opposite side by helical blade from side, respectively goes out mortar position in mortar pin groove during being somebody's turn to do
In sustained height.For the position of mortar thickness deficiency, the mortar in overflow status can cover calendar plate and add to the position
Put.When mortar excessive height, due to mortar poor fluidity itself, the mortar spent, spiral shell can not be supplemented faster in mortar pin groove
Flight now just can be by supplementing the mortar spent during mortar is pushed into opposite side from side in spin axis.
When mortar is excessive in mortar pin groove, now helical axis is rotated, and mortar is pushed to discharging opening side side by side by helical blade
Go out, mortar control is in overflow status in husky well slot.Helical axis rotates, and can control mortar in mortar pin groove in flowing shape
State, avoid mortar in mortar pin groove from being deposited in side, cause just produce the work.Sparge pipe is sprayed water before matt metope, is kept away
Exempt to influence matt after metope is dry.
Scraper plate and benefit sizing device, metope is lacked slurry position filling-in automatically, collection is handled additional size automatically, and unnecessary mortar is not
It in disorder can be scattered, after construction, the metope of smooth, reach examination effect.
Rear pinch roller at the top of mortar pin groove is in mortar pin groove top, when the mortar pin groove of the present apparatus is moved at the top of metope, after
Pinch roller receives pushing for top metope, and rear pinch roller will push torque and be conducted to mortar pin groove, and the atmospheric pressure pole of mortar pin groove bottom is compressed,
For mortar pin groove around with the rotation of the hinge of calendar plate junction and to lower swing, the downside of mortar pin groove contradicts the upper end of spacing swing arm,
Spacing swing arm upper end is to lower swing, and hinge rotation of the spacing swing arm lower end around middle part is upward, and rear torque arm is also swung up.The mortar
During the groove bottom, extreme higher position is less than the top edge of calendar plate, and calendar plate reaches metope in being run on continuing to think
Top, realize that the mortar that top is not left no room strikes off.
Torque arm is also swung up that calendar plate bottom can be driven backward afterwards, and wall surface mortar is left in calendar plate bottom, on calendar plate
Wall surface mortar is close in portion, and the present apparatus moves downward, calendar plate in downward direction moved to wall surface mortar calendering applications.