CN107708836B - Haze absorption and purification vehicle - Google Patents

Haze absorption and purification vehicle Download PDF

Info

Publication number
CN107708836B
CN107708836B CN201680030734.1A CN201680030734A CN107708836B CN 107708836 B CN107708836 B CN 107708836B CN 201680030734 A CN201680030734 A CN 201680030734A CN 107708836 B CN107708836 B CN 107708836B
Authority
CN
China
Prior art keywords
frame
fixedly connected
pipeline
fixing frame
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201680030734.1A
Other languages
Chinese (zh)
Other versions
CN107708836A (en
Inventor
徐帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jianda Transportation Engineering Co ltd
Original Assignee
Jiangsu Jianda Transportation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jianda Transportation Engineering Co ltd filed Critical Jiangsu Jianda Transportation Engineering Co ltd
Publication of CN107708836A publication Critical patent/CN107708836A/en
Application granted granted Critical
Publication of CN107708836B publication Critical patent/CN107708836B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

A haze absorption and purification vehicle comprises a bottom plate (1), an air inlet device (2), a first filtering device (3), a spraying device (4), a cleaning device (5), a pushing device (6), an exhaust device (7) and a fixing device (8), wherein a first roller (11) is arranged on the bottom plate (1), the air inlet device (2) comprises an air inlet pipe (21), a first fan (22), a first pipeline (23), a first filter screen (24), a second filter screen (25), a first support (26), a second support (27), a third support (28) and a first sponge block (29), the first filtering device (3) comprises a first purification frame (31), a second pipeline (32), a third filter screen (33), a first supporting rod (34), a fourth filter screen (35), an adhesion frame (36), an adhesion block (37), a first cross rod (38), a third pipeline (39) and a second supporting rod (30), the spraying device (4) comprises a spraying frame (41), a first stop block (42), a first stop ring (43), a first triangular block (44), a water outlet pipe (45), a fourth pipeline (46), a fourth support (47), a water inlet pipe (48) and a first water tank (49), and the cleaning device (5) comprises a cleaning frame (51), a third supporting rod (52), a fourth supporting rod (53), a second sponge block (54), a first rotating shaft (55) and a first motor (56). This haze absorbs and purifies car can effectual filtration haze, can prevent that the dust from piling up on the filter screen, improves filtration efficiency.

Description

Haze absorption and purification vehicle
Technical Field
The invention relates to the technical field of haze purification, in particular to a haze absorption and purification vehicle.
Background
The haze is a serious air pollution phenomenon, which affects the health of people all the time, and recently, the haze phenomenon generally exists from north China to Jiangzhe and Sichuan basins, and especially in winter, the air drying is very easy to generate the haze phenomenon, so the haze phenomenon is also an important time period for air quality reduction in winter.
Haze poses a great threat to the health of people, and institutions such as the public health institute of Beijing university release research on the evaluation of health hazard and economic loss of hazardous breath P2.5, which points out that PM2.5 pollution is fatal to the public, and therefore, the prevention and control of PM2.5 is already reluctant.
Therefore, there is a need to provide a new technical solution to overcome the above-mentioned drawbacks.
Disclosure of Invention
The invention aims to provide a haze absorption and purification vehicle which can effectively solve the technical problems.
In order to achieve the purpose of the invention, the following technical scheme is adopted:
the utility model provides a haze absorbs and purifies car, the haze absorbs and purifies the car includes the bottom plate, is located air inlet unit of bottom plate top, be located first filter equipment of air inlet unit below, be located spray set of first filter equipment below, be located belt cleaning device of spray set below, be located the thrust unit of belt cleaning device top, be located the exhaust apparatus of thrust unit top and be located the left fixing device of exhaust apparatus.
Compared with the prior art, the invention has the following beneficial effects: the haze absorption and purification vehicle is simple in structure and convenient to use, can effectively absorb haze and filter the haze, is high in filtering efficiency, can prevent filtered dust from being accumulated on the filter screen, improves the filtering efficiency, ensures the filtering effect, has an automatic cleaning function, reduces the labor intensity, saves the labor cost, reduces the time cost, is convenient to move, and increases the convenience.
Drawings
FIG. 1 is a schematic structural view of the haze absorption and purification vehicle of the present invention.
Detailed Description
As shown in fig. 1, the haze absorption and purification vehicle of the present invention includes a bottom plate 1, an air intake device 2 located above the bottom plate 1, a first filtering device 3 located below the air intake device 2, a spraying device 4 located below the first filtering device 3, a cleaning device 5 located below the spraying device 4, a pushing device 6 located above the cleaning device 5, an exhaust device 7 located above the pushing device 6, and a fixing device 8 located on the left side of the exhaust device 7.
As shown in fig. 1, the bottom plate 1 is a cuboid, the bottom plate 1 is horizontally placed, the bottom plate 1 is provided with a first roller 11 located below the bottom plate 1, the first roller 11 is a cylinder and is horizontally placed, and the first roller 11 can drive the bottom plate 1 to move.
As shown in fig. 1, the air intake device 2 includes an air intake pipe 21, a first fan 22 disposed on the air intake pipe 21, a first pipeline 23 located below the air intake pipe 21, a first filter screen 24 accommodated in the first pipeline 23, a second filter screen 25 located below the first filter screen 24, a first support 26 located below the air intake pipe 21, a second support 27 located below the first support 26, a third support 28 located on the right side of the second support 27, and a first sponge block 29 located below the second filter screen 25. The air inlet pipe 21 is bent, and the lower end of the air inlet pipe 21 is fixedly connected with the upper end of the first pipeline 23, so that the inside of the air inlet pipe 21 is communicated with the inside of the first pipeline 23. The first fan 22 is disposed on the air inlet pipe 21, and is configured to suck outside air into the air inlet pipe 21. The first duct 22 is vertical. The first filter 24 is inclined, and the side surface of the first filter 24 is fixedly connected to the inner surface of the first pipe 23, so that impurities in the air can be filtered, and the filtered impurities can be concentrated on one side of the first filter 24. Second filter screen 25 is equipped with two and is located the left and right sides respectively, second filter screen 25 is crooked form, and the second filter screen 25 top that is located the left and right sides leans on together, the side of second filter screen 25 with the internal surface fixed connection of first pipeline 23 to can filter impurity, and can concentrate impurity between the second filter screen 25, second filter screen 25 has elasticity, and when the sedimentary impurity is more between the second filter screen 25, second filter screen 25 can warp for impurity removes downwards, prevents to influence purifying effect. The first support 26 is L-shaped, one end of the first support 26 is fixedly connected with the air inlet pipe 21, and one end of the first support 26 is fixedly connected with the side surface of the first pipeline 23. The second bracket 27 is L-shaped, one end of the second bracket 27 is fixedly connected with the first bracket 26, and the other end of the second bracket 27 is fixedly connected with the third bracket 28. The third supports 28 are two and are respectively located on the left side and the right side of the first pipeline 23, each third support 28 is L-shaped, one end of each third support 28 is fixedly connected with the side face of the first pipeline 23, and the other end of each third support 28 is vertical. The lower surface of the first sponge block 29 is curved, and the side surface of the first sponge block 29 is fixedly connected with the inner surface of the first pipeline 23.
As shown in fig. 1, the first filter device 3 includes a first cleaning frame 31, a second duct 32 located below the first cleaning frame 31, a third filter 33 located below the second duct 32, a first support bar 34 located below the third filter 33, fourth filter 35 located on left and right sides of the first support bar 34, an adhesion frame 36 located below the first cleaning frame 31, an adhesion block 37 located inside the adhesion frame 36, a first cross bar 38 disposed on the adhesion frame 36, a third duct 39 located below the adhesion frame 36, and second support bars 30 located on left and right sides of the third duct 39. The first purification frame 31 is hollow and hemispherical, the upper surface of the first purification frame 31 is curved, the first purification frame 31 is provided with a first through hole 311 located on the upper surface and a second through hole 312 located on the lower surface, the first through hole 311 and the second through hole 312 are cylindrical and communicated with the inside of the first purification frame 31, the lower end of the first pipeline 23 is aligned with the first through hole 311 and fixedly connected with the upper surface of the first purification frame 31, so that the inside of the first pipeline 23 is communicated with the inside of the first purification frame 31, the lower surface of the first sponge block 29 is fixedly connected with the upper surface of the first purification frame 31 and blocks the first through hole 311, and the lower end of the third support 28 is fixedly connected with the first purification frame 31. The second pipe 32 is vertical, the second pipe 32 is accommodated in the first purification frame 31, and the upper end of the second pipe 32 is aligned with the first through hole 311 and is fixedly connected with the inner surface of the first purification frame 31, so that the inside of the second pipe 32 is communicated with the inside of the first pipe 23. The third filter screen 33 is hollow and hemispherical, the upper surface of the third filter screen 33 is fixedly connected with the inner surface of the first purification frame 31, and the lower end of the second pipeline 32 is fixedly connected with the inner surface of the third filter screen 33, so that air can be filtered. The first support rod 34 is vertical, the first support rod 34 is vertically disposed, the lower end of the first support rod 34 is fixedly connected with the inner surface of the first purification frame 31, and the upper end of the first support rod 34 is fixedly connected with the lower surface of the third filter screen 33, so as to support the third filter screen 33. Fourth filter screen 35 is equipped with two and is located the left and right sides respectively, fourth filter screen 35 is hollow hemispherical, fourth filter screen 35 is located the top of second through-hole 312, the lower surface of fourth filter screen 35 with the internal surface fixed connection of first purification frame 31 makes the follow the gas of second through-hole 312 combustion gas need pass through the filtration of fourth filter screen 35. The adhesion frame 36 is hollow, the upper end of the adhesion frame 36 is vertical, the lower end of the adhesion frame 36 is V-shaped, the upper end of the adhesion frame 36 is aligned with the second through hole 312 and is fixedly connected with the lower surface of the first purification frame 31, so that the inside of the adhesion frame 36 is communicated with the inside of the first purification frame 31, the lower surface of the adhesion frame 36 is provided with a third through hole 361, and the third through hole 361 is cylindrical and is communicated with the inside of the adhesion frame 36. The adhesion blocks 37 are two and are respectively located on the left side and the right side, the adhesion blocks 37 are contained in the adhesion frame 36, the cross section of the adhesion blocks 37 is of a diamond shape, and the surfaces of the adhesion blocks 37 are provided with adhesive layers for adsorbing impurities in the air. The first cross bar 38 is horizontal, and two ends of the first cross bar 38 are fixedly connected with the adhesion frame 36. The third pipeline 39 is vertical, the upper end of the third pipeline 39 is aligned with the third through hole 361 and is fixedly connected with the lower surface of the adhesion frame 36, so that the inside of the third pipeline 39 is communicated with the inside of the adhesion frame 36, the third pipeline 39 is provided with a first valve 391, and the first valve 391 is used for controlling the flow of gas in the third pipeline 39. The second support rods 30 are arranged at the left side and the right side of the third pipeline 39, the second support rods 30 are vertical, and the upper ends of the second support rods 30 are fixedly connected with the adhesion frame 36.
As shown in fig. 1, the spraying device 4 includes a spraying frame 41, a first stopper 42 located in the spraying frame 41, a first stopper ring 43 located above the first stopper 42, a first triangular block 44 located below the first stopper 42, a water outlet pipe 45 located below the spraying frame 41, a fourth pipe 46 located on the left side of the spraying frame 41, a fourth bracket 47 located below the spraying frame 41, a water inlet pipe 48 located on the right side of the spraying frame 41, and a first water tank 49 located below the water inlet pipe 48. The cross section of the spraying frame 41 is in a hollow isosceles trapezoid shape, the spraying frame 41 is provided with a fourth through hole 411 on the upper surface, a fifth through hole 412 on the right surface, a sixth through hole 413 on the lower surface and a seventh through hole 414 on the left surface, the fourth through hole 411, the fifth through hole 412, the sixth through hole 413 and the seventh through hole 414 are communicated with the inside of the spraying frame 41, the lower end of the third pipeline 39 is aligned with the fourth through hole 411 and fixedly connected with the upper surface of the spraying frame 41, so that the inside of the third pipeline 39 is communicated with the inside of the spraying frame 41, and the lower end of the second support rod 30 is fixedly connected with the upper surface of the spraying frame 40. The first block 42 is horizontal, the cross section of the first block 42 is isosceles trapezoid, the side surface of the first stopper 42 is fixedly connected with the inner surface of the shower frame 41, the first stopper 42 is positioned above the seventh through hole 414, the first stopper 42 is provided with an eighth through hole 421 and a first channel 422 located at the right side of the eighth through hole 421, the eighth through hole 421 is inclined, the eighth through hole 421 penetrates the upper and lower surfaces of the first stopper 42, the first channel 422 is L-shaped, the right end of the first channel 422 is communicated with the right surface of the first stopper 42, the upper end of the first channel 422 is communicated with the upper surface of the first stopper 42, and the right end of the first channel 422 is aligned with the fifth through hole 412 and is fixedly connected with the inner surface of the shower frame 41, so that the first channel 422 is communicated with the fifth through hole 412. The first baffle ring 43 is hollow and hemispherical, the lower surface of the first baffle ring 43 is fixedly connected with the upper surface of the first baffle block 42, the first baffle ring 43 is positioned above the first channel 422, and a plurality of ninth through holes 431 penetrating through the inner surface and the outer surface of the first baffle ring 43 are formed in the first baffle ring 43. The cross section of the first triangular block 44 is triangular, the lower surface and the left surface of the first triangular block 44 are fixedly connected with the inner surface of the spraying frame 41, and the upper surface of the first triangular block 44 is inclined, so that water and air are concentrated to the right side. The water outlet pipe 45 is vertical, the upper end of the water outlet pipe 45 is aligned with the sixth through hole 413 and is fixedly connected with the lower surface of the spraying frame 41, so that the inside of the water outlet pipe 45 is communicated with the inside of the spraying frame 41, the water outlet pipe 45 is provided with a second valve 451, and the second valve 451 is used for controlling the flow rate of water in the water outlet pipe 45. The fourth pipeline 46 is in a shape of Chinese character 'ao', the upper end of the fourth pipeline 46 is aligned to the seventh through hole 414 and is fixedly connected with the left surface of the spray frame 41, so that the inside of the fourth pipeline 46 is communicated with the inside of the spray frame 41, the fourth pipeline 46 is provided with a third valve 461, and the third valve 461 is used for controlling the flow of gas in the fourth pipeline 46. The fourth bracket 47 is L-shaped, one end of the fourth bracket 47 is fixedly connected with the lower surface of the shower frame 41, and the other end of the fourth bracket 47 is horizontal. The water inlet pipe 48 is L-shaped, one end of the water inlet pipe 48 is aligned with the fifth through hole 412 and is fixedly connected with the right surface of the spray frame 41, so that the inside of the water inlet pipe 48 is communicated with the inside of the first channel 422, the other end of the water inlet pipe 48 is vertical and extends into the first water tank 49, and the water inlet pipe 48 is provided with a first water pump 481 for sucking water in the first water tank 49 into the water inlet pipe 48. The first water tank 49 is a hollow cuboid, the cross section of the first water tank 49 is concave, the first water tank 49 is located under the water inlet pipe 48, the first water tank 49 is provided with a fifth support 491 located on the left side of the first water tank 49 and a sixth support located on the left side of the fifth support 491, the fifth support 491 is L-shaped, one end of the fifth support 491 is fixedly connected with the left surface of the first water tank 49, the other end of the fifth support 491 is vertical, the sixth support is Z-shaped, one end of the sixth support is fixedly connected with the right surface of the spray frame 41, and the other end of the sixth support is fixedly connected with the fifth support 491 so as to be used for fixing the first water tank 49.
As shown in fig. 1, the cleaning device 5 includes a cleaning frame 51, a third support rod 52 located below the cleaning frame 51, a fourth support rod 53 located on the right side of the third support rod 52, a second sponge block 54 located in the cleaning frame 51, a first rotating shaft 55 located on the right side of the second sponge block 54, a first motor 56 located on the right side of the first rotating shaft 55, a first air cylinder 57 located below the first motor 56, and a first pushing rod 58 located on the left side of the first air cylinder 57. Wash frame 51 level and place, the left end of washing frame 51 is hollow round platform form, the right-hand member of washing frame 51 is hollow cylinder, be equipped with the first round hole 511 that is located the left end and be located the second round hole 512 of upper surface on the washing frame 51, first round hole 511 with the inside of washing frame 51 communicates with each other, the lower extreme of fourth pipeline 46 is aimed at first round hole 511 and with wash the left fixed surface of frame 51 and be connected, make the inside of fourth pipeline 46 with the inside of washing frame 51 communicates with each other. The third support rod 52 is vertical, the lower end of the third support rod 52 is fixedly connected with the upper surface of the bottom plate 1, and the upper end of the third support rod 52 is fixedly connected with the fourth pipeline 46, so that the fourth pipeline 46 is supported. Fourth bracing piece 53 is equipped with two and is located the left and right sides respectively, fourth bracing piece 53 is vertical form, the lower extreme of fourth bracing piece 53 with the last fixed surface of bottom plate 1 is connected, the upper end of fourth bracing piece 53 with wash frame 51 fixed connection, thereby it is right to wash frame 51 plays the supporting role. The second sponge block 54 is contained in the cleaning frame 51, the left end of the second sponge block 54 is in a round table shape, the right end of the second sponge block 54 is a cylinder, the side face of the second sponge block 54 is in sliding connection with the inner surface of the cleaning frame 51, so that the second sponge block 54 can not only filter air entering the cleaning frame 51, but also enable the second sponge block 54 to rotate, and impurities on the inner surface of the cleaning frame 51 are cleaned. First pivot 55 is the cylinder, first pivot 55 level is placed, the left end of first pivot 55 with the right surface fixed connection of second sponge piece 54, first pivot 55 run through wash the frame 51 the right surface and with wash frame 51 sliding connection, the right-hand member of first pivot 55 with first motor 56 is connected, makes first motor 56 drives first pivot 55 is rotatory. The first motor 56 is provided with a fifth support rod 561 positioned below, a first moving plate 562 positioned below the fifth support rod 561, and a first vertical rod 563 positioned below the first moving plate 562, the fifth support rod 561 is vertical, the upper end of the fifth support rod 561 is fixedly connected with the lower surface of the first motor 56, and the lower end of the fifth support rod 561 is fixedly connected with the upper surface of the first moving plate 562. The first moving plate 562 is horizontal, and the upper surface of the first moving plate 562 is slidably connected to the lower surface of the cleaning frame 51, so that the first moving plate 562 can move left and right. First montant 563 is vertical form, the upper end of first montant 563 with the lower surface fixed connection of first movable plate 562, the lower extreme of first montant 563 with the upper surface sliding connection of bottom plate 1. The first cylinder 57 is located below the first moving plate 562, the first cylinder 57 is provided with a second cross bar 572 located on the right side and a first fixing frame 571 located on the right side of the second cross bar 571, the lower surface of the first cylinder 57 is fixedly connected with the upper surface of the bottom plate 1, the first fixing frame 571 is L-shaped, one end of the first fixing frame 571 is fixedly connected with the upper surface of the bottom plate 1, the other end of the first fixing frame 571 is horizontal, and the lower surface of the first moving plate 562 is slidably connected with the upper surface of the first fixing frame 571, so that the first moving plate 562 can stably move left and right. The second cross bar 572 is horizontal, the right end of the second cross bar 572 is fixedly connected with the first fixing frame 571, and the left end of the second cross bar 572 is fixedly connected with the right surface of the first cylinder 57. First catch bar 58 is the cuboid, first catch bar 58 level is placed, the right-hand member of first catch bar 58 with first cylinder 57 is connected, makes first cylinder 57 drive first catch bar 58 controls, the left end of first catch bar 58 with the right fixed surface of first montant 563 is connected, makes first montant 563 remove about can, and then makes first motor 56 removes about, makes second sponge piece 54 removes about can, and drives second sponge piece 54 is rotatory, and then can wash impurity on the inside surface of cleaning frame 51.
As shown in fig. 1, the pushing device 6 includes a fifth pipe 61, a second fixing frame 62 located below the fifth pipe 61, a third fixing frame 63 located on the right side of the second fixing frame 62, a fourth fixing frame 64 located below the third fixing frame 63, a fifth fixing frame 65 located on the right side of the third fixing frame 63, a sixth supporting rod 66 located on the right side of the fifth fixing frame 65, a pushing block 67 located on the right side of the sixth supporting rod 66, and a third cross bar 68 disposed on the fifth fixing frame 65. The fifth pipeline 61 is zigzag-shaped, and the lower end of the fifth pipeline 61 is aligned with the second circular hole 512 and is fixedly connected with the upper surface of the cleaning frame 51, so that the interior of the fifth pipeline 61 is communicated with the interior of the cleaning frame 51. The second fixing frame 62 is L-shaped, one end of the second fixing frame 62 is fixedly connected to the fifth pipeline 61, and the other end of the second fixing frame 62 is fixedly connected to the right surface of the cleaning frame 51, so that the fifth pipeline 61 is supported. The third fixing frame 63 is L-shaped, one end of the third fixing frame 63 is fixedly connected with the fifth pipeline 61, and the other end of the third fixing frame 63 is fixedly connected with the upper surface of the fourth fixing frame 64. The fourth fixing frame 64 is in a shape of a Chinese character 'ao', one end of the fourth fixing frame 64 is fixedly connected with the upper surface of the bottom plate 1, the other end of the fourth fixing frame 64 is fixedly connected with the upper surface of the first fixing frame 571, a fourth cross bar 641 is arranged on the fourth fixing frame 64, the fourth cross bar 641 is horizontally arranged, and two ends of the fourth cross bar 641 are fixedly connected with the fourth fixing frame 64. The utility model discloses a support structure, including fifth mount 65, fifth mount 63, fifth horizontal pole 651, fifth mount 65 is the L type, the one end of fifth mount 65 with the right surface fixed connection of third mount 63, the other end of fifth mount 65 is vertical form, be equipped with fifth horizontal pole 651 on the fifth mount 65, fifth horizontal pole 651 is horizontal form, the left end of fifth horizontal pole 651 with fifth mount 65 fixed connection, the right-hand member of fifth horizontal pole 651 with the left surface fixed connection of sixth bracing piece 66. Sixth bracing piece 66 is the cuboid, the vertical placement of sixth bracing piece 66, the lower extreme of sixth bracing piece 66 with the last fixed surface of bottom plate 1 is connected, be equipped with the sixth horizontal pole 661 that is located the right side on the sixth bracing piece 66, sixth horizontal pole 661 is the level form, the left end of sixth horizontal pole 661 with the right fixed surface of sixth bracing piece 66 is connected, the right-hand member of sixth horizontal pole 661 with the left fixed surface who promotes piece 67 is connected. The pushing block 67 is a cuboid, the pushing block 67 is vertically placed, and a user can hold the pushing block conveniently. The third cross bar 68 is horizontal, the right end of the third cross bar 68 is fixedly connected with the fifth fixing frame 65, and the left end of the third cross bar 68 is fixedly connected with the fifth pipeline 61.
As shown in fig. 1, the exhaust apparatus 7 includes a gas collecting frame 71, a first baffle 72 located above the gas collecting frame 71, a third sponge block 73 located below the first baffle 72, a sixth fixing frame 74 located below the gas collecting frame 71, a gas outlet frame 75 located above the first baffle 72, a sixth pipeline 76 located above the gas outlet frame 75, a gas outlet pipe 77 located above the sixth pipeline 76, a seventh fixing frame 78 located below the gas outlet pipe 77, and an eighth fixing frame 79 located on the left side of the gas outlet pipe 77. The gas collecting frame 71 is hollow and hemispherical, a third round hole 711 on the lower surface is arranged on the gas collecting frame 71, the third round hole 711 is communicated with the inside of the gas collecting frame 71, and the upper end of the fifth pipeline 61 is aligned with the third round hole 711 and is fixedly connected with the lower surface of the gas collecting frame 71, so that the inside of the fifth pipeline 61 is communicated with the inside of the gas collecting frame 71. The first baffle 72 is a cuboid, the first baffle 72 is horizontally arranged, the upper surface of the gas collection frame 71 is fixedly connected with the lower surface of the first baffle 72, so that the gas collection frame 71 and the first baffle 72 form a sealed space, the first baffle 72 is provided with a plurality of fourth round holes 721 penetrating through the upper surface and the lower surface of the first baffle 72, and the fourth round holes 721 are cylindrical. The third sponge block 73 is horizontal, the upper surface of the third sponge block 73 is fixedly connected with the lower surface of the first baffle 72, and the side surface of the third sponge block 73 is fixedly connected with the inner surface of the air collection frame 71, so that air entering the air collection frame 71 can enter the fourth circular hole 721 only by being filtered by the third picture block 73. The sixth fixing frame 74 is L-shaped, one end of the sixth fixing frame 74 is fixedly connected to the side surface of the fifth pipeline 61, the other end of the sixth fixing frame 74 is vertical, a first inclined rod 741 is arranged on the sixth fixing frame 74, the first inclined rod 741 is inclined, the lower end of the first inclined rod 741 is fixedly connected to the sixth fixing frame 74, and the upper end of the first inclined rod 741 is fixedly connected to the air collecting frame 71. The air outlet frame 75 is a hollow cylinder, the air outlet frame 75 is vertically arranged, the lower surface of the air outlet frame 75 is fixedly connected with the upper surface of the first baffle plate 72, the air outlet frame 75 is positioned above the fourth round hole 721, a fifth round hole 751 positioned on the upper surface and a concentration block 752 positioned in the air outlet frame 75 are arranged on the air outlet frame 75, the fifth round hole 751 is cylindrical, the fifth round hole 751 is communicated with the inside of the air outlet frame 75, the concentration block 752 is annular, the upper surface and the side surface of the concentration block 752 are fixedly connected with the inner surface of the air outlet frame 75, the lower surface of the concentration block 752 is fixedly connected with the upper surface of the first baffle plate 72, and the inner surface of the concentration block 752 is curved, so that air is conveniently concentrated together. The sixth pipeline 76 is vertical, the lower end of the sixth pipeline 76 is aligned with the fifth circular hole 751 and is fixedly connected with the upper surface of the gas outlet frame 75, so that the inside of the sixth pipeline 76 is communicated with the inside of the gas outlet frame 75, the sixth pipeline 76 is provided with a fourth valve 761, and the fourth valve 761 is used for controlling the flow rate of gas in the sixth pipeline 76. The outlet pipe 77 is curved, the lower extreme of outlet pipe 77 with the upper surface fixed connection of sixth pipeline 76 makes the inside of outlet pipe 77 with the inside of sixth pipeline 76 communicates with each other, be equipped with a plurality of sixth round hole 771 and be located on the outlet pipe 77 the second down tube 772 of below, sixth round hole 771 be equipped with a plurality of and evenly distributed on the outlet pipe 77, sixth round hole 771 with the inside of outlet pipe 77 communicates with each other, the second down tube 772 is the slope form, the lower extreme of second down tube 772 with go out the upper surface fixed connection of gas frame 75, the upper end of second down tube 772 with outlet pipe 77 fixed connection, thereby to outlet pipe 77 plays the supporting role. The seventh fixing frame 78 is L-shaped, one end of the seventh fixing frame 78 is fixedly connected to the right surface of the air outlet frame 75, and the other end of the seventh fixing frame 78 is fixedly connected to the air outlet pipe 77. The eighth fixing frame 79 is L-shaped, one end of the eighth fixing frame 79 is fixedly connected to the air outlet frame 75, and the other end of the eighth fixing frame 79 is fixedly connected to the air outlet pipe 77.
As shown in fig. 1, the fixing device 8 includes a ninth fixing frame 81, a tenth fixing frame 82 located below the ninth fixing frame 81, a first fixing rod 83 located below the tenth fixing frame 82, and a second fixing rod 84 located below the first fixing rod 83. The ninth fixing frame 81 is L-shaped, one end of the ninth fixing frame 81 is fixedly connected to the right surface of the third bracket 28, and the other end of the ninth fixing frame 81 is vertical and is fixedly connected to the tenth fixing frame 82. The tenth fixing frame 82 is L-shaped, one end of the tenth fixing frame 82 is fixedly connected to the first purifying frame 31, and the other end of the tenth fixing frame 82 is fixedly connected to the upper surface of the eighth fixing frame 79. The first fixing rod 83 is horizontal, the left end of the first fixing rod 83 is fixedly connected to the right surface of the adhesive frame 36, and the right end of the first fixing rod 83 is fixedly connected to the left surface of the eighth fixing frame 79. The second fixing rod 84 is horizontal, the right end of the second fixing rod 84 is fixedly connected with the left surface of the air outlet frame 75, and the left end of the second fixing rod 84 is fixedly connected with the right surface of the second supporting rod 30, so that the air outlet device 7 is fixed.
As shown in fig. 1, when the haze absorption and purification vehicle of the present invention is used, the first fan 22 is first started, so that the outside air is sucked into the air inlet duct 21, then enters the first pipeline 23, and after being filtered by the first filter screen 24, the particles with larger volume are collected to the left side, so that the cleaning is convenient, the filtering can be smoothly carried out, then enters the lower part after being filtered by the first filter screen 24, then is filtered by the second filter screen 25, because the second filter screen 25 is bent and oppositely arranged, the second filter screen 25 can perform double filtration on the air, and when the dust accumulated above the second filter 25 is large, the second filter 25 is elastically deformed, the dust above the second filter screen 25 enters the lower part, and the second filter screen 25 is prevented from being blocked, so that the filtering effect of the second filter screen 25 is prevented from being influenced. Then enter into in the second pipeline 32 after the filtration of first picture piece 29 again, after the filtration of second filter screen 33, enter into first purification frame 31 in, then enter into adhesion frame 36 after the filtration of fourth filter screen 35 in, because fourth filter screen 35 is hemispherical for the dust can not deposit on fourth filter screen 35, and increased the area of contact with the air, improved filtration efficiency. Because the adhesion block 37 is provided with the adhesion layer, the impurities in the air entering the adhesion frame 36 are partially adsorbed, the impurities in the air are reduced, then the air enters the third pipeline 39, the first valve 391 is opened, the gas enters the spray frame 41, then the first water pump 481 is started, the water in the first water tank 49 enters the water inlet pipe 48, then enters the first channel 422, is sprayed out from the upper part of the first block 42, enters the first baffle ring 43, and is sprayed out from the ninth through hole 431, because the first baffle ring 43 is positioned below the fourth through hole 411, the gas entering the spray frame 41 from the fourth through hole 411 can be purified and filtered, then enters the lower part of the first block 42 through the eighth through hole 421, then the water is concentrated to the right side through the first triangular block 44, enters the water outlet pipe 45, the second valve 451 is opened, the water is drained. Then, the gas enters the cleaning frame 51 through the fourth pipeline 46, then enters the fifth pipeline 61 after being filtered by the second sponge block 54, then the first motor 56 can be started, so that the first rotating shaft 55 rotates, the second sponge block 54 rotates, the inner surface of the cleaning frame 51 is scrubbed, dust is prevented from being concentrated in the cleaning frame 51, the purifying effect of the second sponge block 54 can be better, meanwhile, the first cylinder 57 can be started, the first push rod 58 moves left and right, the first vertical rod 563 moves left and right, the first moving plate 562 moves left and right, the first motor 56 is driven to move left and right, the second sponge block 54 moves left and right, and the inner surface of the cleaning frame 51 can be comprehensively cleaned. Then the air entering the fifth pipeline 61 enters the air collecting frame 71, then enters the air outlet frame 75 after being filtered by the third sponge block 73, then enters the sixth pipeline 76, and finally is discharged through the sixth round hole 771 on the air outlet pipe 77, so that the efficiency of discharging the air is improved. So far, the haze absorption and purification vehicle has the advantages that the use process is described.

Claims (10)

1. The utility model provides a haze absorbs and purifies car which characterized in that: the haze absorption and purification vehicle comprises a bottom plate, an air inlet device positioned above the bottom plate, a first filtering device positioned below the air inlet device, a spraying device positioned below the first filtering device, a cleaning device positioned below the spraying device, a pushing device positioned above the cleaning device, an exhaust device positioned above the pushing device and a fixing device positioned on the left side of the exhaust device, wherein a first roller positioned below the bottom plate is arranged on the bottom plate, the air inlet device comprises an air inlet pipe, a first fan arranged on the air inlet pipe, a first pipeline positioned below the air inlet pipe, a first filter screen accommodated in the first pipeline, a second filter screen positioned below the first filter screen, a first support positioned below the air inlet pipe, a second support positioned below the first support, a third support positioned on the right side of the second support and a first sponge block positioned below the second filter screen, the first filtering device comprises a first purifying frame, a second pipeline, a third filter screen, a first supporting rod, a fourth filter screen, an adhesion frame, an adhesion block, a first transverse rod, a third pipeline and a second supporting rod, wherein the second pipeline is positioned below the first purifying frame, the third filter screen is positioned below the second pipeline, the fourth filter screen is positioned on the left side and the right side of the first supporting rod, the adhesion frame is positioned below the first purifying frame, the adhesion block is positioned in the adhesion frame, the first transverse rod is arranged on the adhesion frame, the third pipeline is positioned below the adhesion frame, the second supporting rod is positioned on the left side and the right side of the third pipeline, the spraying device comprises a spraying frame, a first stop block positioned in the spraying frame, a first stop ring positioned above the first stop block, a first triangular block positioned below the first stop block, a water outlet positioned below the spraying frame, a fourth pipeline positioned on the left side of the spraying frame, a fourth support positioned below the spraying frame, The cleaning device comprises a cleaning frame, a third supporting rod, a fourth supporting rod, a second sponge block, a first rotating shaft, a first motor, a first air cylinder, a first pushing rod, a fifth pipeline, a second fixing frame, a third fixing frame, a fourth fixing frame, a sixth supporting rod, a first supporting rod, a second water tank, a second fixing frame, a third fixing frame, a fourth fixing frame, a fifth fixing frame, a sixth supporting rod, a second water tank, a second fixing frame, a third fixing frame, a fourth fixing frame, a fifth fixing frame, a sixth supporting rod, a second water tank, a third fixing frame, a fourth fixing frame, a third fixing frame, a fourth fixing frame, a second, The air exhaust device comprises an air collecting frame, a first baffle positioned above the air collecting frame, a third sponge block positioned below the first baffle, a sixth fixing frame positioned below the air collecting frame, an air outlet frame positioned above the first baffle, a sixth pipeline positioned above the air outlet frame, an air outlet pipe positioned above the sixth pipeline, a seventh fixing frame positioned below the air outlet pipe, and an eighth fixing frame positioned on the left side of the air outlet pipe, the fixing device comprises a ninth fixing frame, a tenth fixing frame positioned below the ninth fixing frame, a first fixing rod positioned below the tenth fixing frame, and a second fixing rod positioned below the first fixing rod, the second filter screen is in a bent shape, and the second filter screens positioned on the left side and the right side are mutually abutted, the side of the second filter screen is fixedly connected with the inner surface of the first pipeline, and the second filter screen is elastic.
2. The haze absorption and purification vehicle according to claim 1, wherein: the bottom plate is the cuboid, the bottom plate level is placed, first gyro wheel is cylinder and level and places.
3. The haze absorption and purification vehicle according to claim 2, wherein: the air inlet pipe is bent, the lower end of the air inlet pipe is fixedly connected with the upper end of the first pipeline, the first pipeline is vertical, the first filter screen is inclined, the side surface of the first filter screen is fixedly connected with the inner surface of the first pipeline, the second filter screen is provided with two filter screens which are respectively positioned at the left side and the right side, the first support is L-shaped, one end of the first support is fixedly connected with the air inlet pipe, one end of the first support is fixedly connected with the side surface of the first pipeline, the second support is L-shaped, one end of the second support is fixedly connected with the first support, the other end of the second support is fixedly connected with the third support, the third support is provided with two filter screens which are respectively positioned at the left side and the right side of the first pipeline, the third support is L-shaped, one end of the third support is fixedly connected with the side surface of the first pipeline, the other end of the third support is vertical, the lower surface of the first sponge block is bent, and the side surface of the first sponge block is fixedly connected with the inner surface of the first pipeline.
4. The haze absorption and purification vehicle according to claim 3, wherein: the first purifying frame is hollow hemispherical, the upper surface of the first purifying frame is in a bent shape, the first purifying frame is provided with a first through hole positioned on the upper surface and a second through hole positioned on the lower surface, the first through hole and the second through hole are communicated with the inside of the first purifying frame, the lower end of the first pipeline is aligned with the first through hole and is fixedly connected with the upper surface of the first purifying frame, the lower surface of the first sponge block is fixedly connected with the upper surface of the first purifying frame and blocks the first through hole, the lower end of the third support is fixedly connected with the first purifying frame, the second pipeline is in a vertical shape, the second pipeline is contained in the first purifying frame, the upper end of the second pipeline is aligned with the first through hole and is fixedly connected with the inner surface of the first purifying frame, and the third filter screen is hollow hemispherical, the upper surface of the third filter screen is fixedly connected with the inner surface of the first purification frame, the lower end of the second pipeline is fixedly connected with the inner surface of the third filter screen, the first support rods are vertically arranged, the lower ends of the first support rods are fixedly connected with the inner surface of the first purification frame, the upper ends of the first support rods are fixedly connected with the lower surface of the third filter screen, the fourth filter screen is provided with two hollow hemispherical filter screens which are respectively positioned at the left side and the right side, the fourth filter screen is positioned above the second through hole, the lower surface of the fourth filter screen is fixedly connected with the inner surface of the first purification frame, the adhesion frame is hollow, the upper end of the adhesion frame is vertically arranged, the lower end of the adhesion frame is V-shaped, the upper end of the adhesion frame is aligned with the second through hole and is fixedly connected with the lower surface of the first purification frame, the lower surface of gluing the frame is equipped with the third through-hole, it is equipped with two and is located the left and right sides respectively to glue the piece, glue the piece accept in glue in the frame, glue the transversal rhombus of personally submitting of piece, glue the piece on being equipped with the viscose layer on the surface, first horizontal pole is the level form, the both ends of first horizontal pole with adhesion frame fixed connection, the third pipeline is vertical form, aim at the upper end of third pipeline the third through-hole and with the lower fixed surface of gluing the frame is connected, be equipped with first valve on the third pipeline, the second bracing piece is equipped with two and is located respectively the left and right sides of third pipeline, the second bracing piece is vertical form, the upper end of second bracing piece with adhesion frame fixed connection.
5. The haze absorption and purification vehicle according to claim 4, wherein: the cross section of the spraying frame is in a hollow isosceles trapezoid shape, the spraying frame is provided with a fourth through hole positioned on the upper surface of the spraying frame, a fifth through hole positioned on the right surface of the spraying frame, a sixth through hole positioned on the lower surface of the spraying frame and a seventh through hole positioned on the left surface of the spraying frame, the fourth through hole, the fifth through hole, the sixth through hole and the seventh through hole are communicated with the inside of the spraying frame, the lower end of a third pipeline is aligned with the fourth through hole and fixedly connected with the upper surface of the spraying frame, the lower end of a second supporting rod is fixedly connected with the upper surface of the spraying frame, the first stop block is in a horizontal shape, the cross section of the first stop block is in an isosceles trapezoid shape, the side surface of the first stop block is fixedly connected with the inner surface of the spraying frame, the first stop block is provided with an eighth through hole and a first channel positioned on the right side of the eighth through hole, and the eighth through hole, the first channel is L-shaped, the right end of the first channel is communicated with the right surface of the first stop block, the upper end of the first channel is communicated with the upper surface of the first stop block, the right end of the first channel is aligned to the fifth through hole, the first stop ring is hollow and hemispherical, the lower surface of the first stop ring is fixedly connected with the upper surface of the first stop block, the first stop ring is positioned above the first channel, a plurality of ninth through holes penetrating through the inner surface and the outer surface of the first stop ring are arranged on the first stop ring, the cross section of the first triangular block is triangular, the lower surface and the left surface of the first triangular block are fixedly connected with the inner surface of the spraying frame, the water outlet pipe is vertical, the upper end of the water outlet pipe is aligned to the sixth through hole and is fixedly connected with the lower surface of the spraying frame, the water outlet pipe is provided with a second valve, and the fourth pipeline is concave, the upper end of the fourth pipeline is aligned with the seventh through hole and is fixedly connected with the left surface of the spraying frame, a third valve is arranged on the fourth pipeline, the fourth support is of an L shape, one end of the fourth support is fixedly connected with the lower surface of the spraying frame, the other end of the fourth support is of a horizontal shape, the water inlet pipe is of an L shape, one end of the water inlet pipe is aligned with the fifth through hole and is fixedly connected with the right surface of the spraying frame, the other end of the water inlet pipe is of a vertical shape and extends into the first water tank, a first water pump is arranged on the water inlet pipe, the first water tank is a hollow cuboid, the cross section of the first water tank is in a concave shape, the first water tank is positioned under the water inlet pipe, a fifth support positioned on the left side of the first water tank and a sixth support positioned on the left side of the fifth support are arranged on the first water tank, the fifth support is L-shaped, one end of the fifth support is fixedly connected with the left surface of the first water tank, the other end of the fifth support is vertical, the sixth support is Z-shaped, one end of the sixth support is fixedly connected with the right surface of the spraying frame, and the other end of the sixth support is fixedly connected with the fifth support.
6. The haze absorption and purification vehicle according to claim 5, wherein: the cleaning frame is horizontally arranged, the left end of the cleaning frame is in a hollow round platform shape, the right end of the cleaning frame is in a hollow cylinder shape, a first round hole at the left end and a second round hole at the upper surface are arranged on the cleaning frame, the first round hole is communicated with the interior of the cleaning frame, the lower end of a fourth pipeline is aligned with the first round hole and is fixedly connected with the left surface of the cleaning frame, a third supporting rod is in a vertical shape, the lower end of the third supporting rod is fixedly connected with the upper surface of the bottom plate, the upper end of the third supporting rod is fixedly connected with the fourth pipeline, the fourth supporting rod is provided with two parts and is respectively arranged at the left side and the right side, the fourth supporting rod is in a vertical shape, the lower end of the fourth supporting rod is fixedly connected with the upper surface of the bottom plate, and the upper end of the fourth supporting rod is fixedly connected with the cleaning frame, the second sponge block is contained in the cleaning frame, the left end of the second sponge block is in a round platform shape, the right end of the second sponge block is in a cylinder shape, the side face of the second sponge block is in sliding connection with the inner surface of the cleaning frame, the first rotating shaft is in a cylinder shape, the first rotating shaft is horizontally placed, the left end of the first rotating shaft is fixedly connected with the right surface of the second sponge block, the first rotating shaft penetrates through the right surface of the cleaning frame and is in sliding connection with the cleaning frame, the right end of the first rotating shaft is connected with the first motor, a fifth supporting rod located below the first motor, a first movable plate located below the fifth supporting rod and a first vertical rod located below the first movable plate are arranged on the first motor, the fifth supporting rod is in a vertical shape, and the upper end of the fifth supporting rod is fixedly connected with the lower surface of the first motor, the lower end of the fifth supporting rod is fixedly connected with the upper surface of the first moving plate, the first moving plate is in a horizontal shape, the upper surface of the first moving plate is slidably connected with the lower surface of the cleaning frame, the first vertical rod is in a vertical shape, the upper end of the first vertical rod is fixedly connected with the lower surface of the first moving plate, the lower end of the first vertical rod is slidably connected with the upper surface of the bottom plate, the first cylinder is provided with a second horizontal rod positioned on the right side and a first fixing frame positioned on the right side of the second horizontal rod, the lower surface of the first cylinder is fixedly connected with the upper surface of the bottom plate, the first fixing frame is in an L shape, one end of the first fixing frame is fixedly connected with the upper surface of the bottom plate, the other end of the first fixing frame is in a horizontal shape, and the lower surface of the first moving plate is slidably connected with the upper surface of the first fixing frame, the second horizontal pole is the level form, the right-hand member of second horizontal pole with first mount fixed connection, the left end of second horizontal pole with the right fixed surface of first cylinder is connected, first catch bar is the cuboid, first catch bar level is placed, the right-hand member of first catch bar with first cylinder is connected, the left end of first catch bar with the right fixed surface of first montant is connected.
7. The haze absorption and purification vehicle according to claim 6, wherein: the fifth pipeline is Z-shaped, the lower end of the fifth pipeline is aligned to the second round hole and is fixedly connected with the upper surface of the cleaning frame, the second fixing frame is L-shaped, one end of the second fixing frame is fixedly connected with the fifth pipeline, the other end of the second fixing frame is fixedly connected with the right surface of the cleaning frame, the third fixing frame is L-shaped, one end of the third fixing frame is fixedly connected with the fifth pipeline, the other end of the third fixing frame is fixedly connected with the upper surface of the fourth fixing frame, the fourth fixing frame is concave-shaped, one end of the fourth fixing frame is fixedly connected with the upper surface of the bottom plate, the other end of the fourth fixing frame is fixedly connected with the upper surface of the first fixing frame, a fourth cross rod is arranged on the fourth fixing frame and is horizontally arranged, and two ends of the fourth cross rod are fixedly connected with the fourth fixing frame, the fifth fixing frame is L-shaped, one end of the fifth fixing frame is fixedly connected with the right surface of the third fixing frame, the other end of the fifth fixing frame is vertical, a fifth cross rod is arranged on the fifth fixing frame and is horizontal, the left end of the fifth cross rod is fixedly connected with the fifth fixing frame, the right end of the fifth cross rod is fixedly connected with the left surface of the sixth supporting rod, the sixth supporting rod is cuboid, the sixth supporting rod is vertically arranged, the lower end of the sixth supporting rod is fixedly connected with the upper surface of the bottom plate, a sixth cross rod positioned on the right side is arranged on the sixth supporting rod and is horizontal, the left end of the sixth cross rod is fixedly connected with the right surface of the sixth supporting rod, and the right end of the sixth cross rod is fixedly connected with the left surface of the pushing block, the promotion piece is the cuboid, promote the vertical placing of piece, the third horizontal pole is the level form, the right-hand member of third horizontal pole with fifth mount fixed connection, the left end of third horizontal pole with fifth pipeline fixed connection.
8. The haze absorption and purification vehicle according to claim 7, wherein: the gas collecting frame is in a hollow hemispherical shape, a third round hole positioned on the lower surface is arranged on the gas collecting frame, the third round hole is communicated with the inside of the gas collecting frame, the upper end of a fifth pipeline is aligned with the third round hole and is fixedly connected with the lower surface of the gas collecting frame, the first baffle is in a cuboid shape, the first baffle is horizontally placed, the upper surface of the gas collecting frame is fixedly connected with the lower surface of the first baffle, a plurality of fourth round holes penetrating through the upper surface and the lower surface of the first baffle are arranged on the first baffle, the third sponge block is in a horizontal shape, the upper surface of the third sponge block is fixedly connected with the lower surface of the first baffle, the side surface of the third sponge block is fixedly connected with the inner surface of the gas collecting frame, the sixth fixing frame is in an L shape, one end of the sixth fixing frame is fixedly connected with the side surface of the fifth pipeline, and the other end of the sixth fixing frame is in a vertical shape, the gas outlet frame is provided with a fifth round hole positioned on the upper surface and a concentration block positioned in the gas outlet frame, the fifth round hole is communicated with the inside of the gas outlet frame, the concentration block is annular, the upper surface and the side surface of the concentration block are fixedly connected with the inner surface of the gas outlet frame, the lower surface of the concentration block is fixedly connected with the upper surface of the first baffle plate, the inner surface of the concentration block is curved, the sixth pipeline is vertical, the lower end of the sixth pipeline is aligned to the fifth round hole and fixedly connected with the upper surface of the gas outlet frame, a fourth valve is arranged on the sixth pipeline, the gas outlet pipe is bent, the lower end of the gas outlet pipe is fixedly connected with the upper surface of the sixth pipeline, a plurality of sixth round holes and second inclined rods located below the gas outlet pipe are arranged on the gas outlet pipe, the sixth round holes are communicated with the inside of the gas outlet pipe, the second inclined rods are inclined, the lower ends of the second inclined rods are fixedly connected with the upper surface of the gas outlet frame, the upper ends of the second inclined rods are fixedly connected with the gas outlet pipe, the seventh fixing frame is L-shaped, one end of the seventh fixing frame is fixedly connected with the right surface of the gas outlet frame, and the other end of the seventh fixing frame is fixedly connected with the gas outlet pipe, the eighth fixing frame is L-shaped, one end of the eighth fixing frame is fixedly connected with the air outlet frame, and the other end of the eighth fixing frame is fixedly connected with the air outlet pipe.
9. The haze absorption and purification vehicle according to claim 8, wherein: the ninth mount is the L type, the one end of ninth mount with the right fixed surface of third support is connected, the other end of ninth mount be vertical form and with tenth mount fixed connection, the tenth mount is the L type, the one end of tenth mount with first purification frame fixed connection, the other end of tenth mount with the last fixed surface of eighth mount is connected, first dead lever is the level form, the left end of first dead lever with the right fixed surface who glues the frame is connected, the right-hand member of first dead lever with the left fixed surface of eighth mount is connected.
10. The haze absorption and purification vehicle according to claim 9, wherein: the second fixed rod is horizontal, the right end of the second fixed rod is fixedly connected with the left surface of the air outlet frame, and the left end of the second fixed rod is fixedly connected with the right surface of the second supporting rod.
CN201680030734.1A 2016-03-12 2016-03-12 Haze absorption and purification vehicle Expired - Fee Related CN107708836B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2016/076197 WO2017156665A1 (en) 2016-03-12 2016-03-12 Smog absorption and purification vehicle

Publications (2)

Publication Number Publication Date
CN107708836A CN107708836A (en) 2018-02-16
CN107708836B true CN107708836B (en) 2021-05-28

Family

ID=59850182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201680030734.1A Expired - Fee Related CN107708836B (en) 2016-03-12 2016-03-12 Haze absorption and purification vehicle

Country Status (2)

Country Link
CN (1) CN107708836B (en)
WO (1) WO2017156665A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109603362A (en) * 2019-02-22 2019-04-12 湖南科技学院 An air haze removal device based on the principle of water adsorption

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104841232A (en) * 2015-05-23 2015-08-19 王杨 Air purifier with cleaning function
CN105107004A (en) * 2015-09-24 2015-12-02 陈卡丹 Air filtering and sterilizing system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5908494A (en) * 1996-02-02 1999-06-01 Earth First Air Systems, Inc. Liquid spray air purification apparatus
CN201329230Y (en) * 2008-11-19 2009-10-21 聚光科技(杭州)有限公司 Novel filtering device
CN201534054U (en) * 2009-04-02 2010-07-28 贺文锋 Box-type industrial waste gas treater
CN104773105B (en) * 2015-03-24 2017-03-01 大连金州华兴机械加工厂 Haze recovery vehicle
CN104941366B (en) * 2015-06-05 2016-08-24 李爱辉 A kind of air purifier with dust collection function
CN104958976B (en) * 2015-06-05 2016-09-14 成都恒力达科技有限公司 A kind of waste gas purification apparatus

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104841232A (en) * 2015-05-23 2015-08-19 王杨 Air purifier with cleaning function
CN105107004A (en) * 2015-09-24 2015-12-02 陈卡丹 Air filtering and sterilizing system

Also Published As

Publication number Publication date
WO2017156665A1 (en) 2017-09-21
CN107708836A (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN105642063B (en) A vehicle-mounted haze elimination device
CN112403160A (en) Environment-friendly flue gas dust collector
CN107708836B (en) Haze absorption and purification vehicle
CN116637457A (en) Dust removal system and dust removal method for atmospheric pollution treatment
CN208020518U (en) A kind of stone cutting device
CN107708837A (en) A kind of haze purification device that may be mounted on motor vehicle
CN220696257U (en) Filtering dust remover
CN219978250U (en) Low-energy-consumption volatile organic compound on-line monitoring system for environment detection
CN108014580A (en) A kind of Multi-Layer and Multi-Cavity body segmented deduster
CN215506196U (en) Waste gas treatment system of printing ink workshop
CN214437191U (en) Environment-friendly membrane group ware that sewage treatment used
CN211274044U (en) High-efficiency industrial smoke energy-saving purification device
CN222111297U (en) A water film dust collector
CN209392950U (en) A kind of adsorbing powder dust purification device of commercial wood processing workshop
CN114931830A (en) Purification device for glass raw material processing and use method thereof
CN219333469U (en) Multistage filtration equipment
CN221287314U (en) Environment-friendly dust remover with multiple filtering structures
CN113797684A (en) Mining plant dust removal purifier for environmental protection equipment
CN106237735B (en) A kind of air-purification filter device that can remove haze
CN214763690U (en) Energy-concerving and environment-protective sewage treatment plant
CN218011856U (en) Raise dust processing apparatus
CN222694344U (en) A dust collector with multi-layer filtration
CN222804805U (en) A filtering device for sewage treatment
CN221333251U (en) Efficient automatic waste gas removing device for paint production
CN220376928U (en) Novel non-woven fabrics washs fast device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210425

Address after: 213300 Nine Blocks, 56 Xingcheng East Road, Bieqiao Town, Liyang City, Changzhou City, Jiangsu Province

Applicant after: Jiangsu Jianda Transportation Engineering Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Luohu District No. 4068 Jiefang Road Mingshi court B2002

Applicant before: Xu Fan

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210528