CN107688081A - A kind of sewage detection system - Google Patents

A kind of sewage detection system Download PDF

Info

Publication number
CN107688081A
CN107688081A CN201710952622.8A CN201710952622A CN107688081A CN 107688081 A CN107688081 A CN 107688081A CN 201710952622 A CN201710952622 A CN 201710952622A CN 107688081 A CN107688081 A CN 107688081A
Authority
CN
China
Prior art keywords
cavity volume
hole
baffle
intercommunication
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710952622.8A
Other languages
Chinese (zh)
Inventor
袁兴芳
Original Assignee
袁兴芳
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 袁兴芳 filed Critical 袁兴芳
Priority to CN201710952622.8A priority Critical patent/CN107688081A/en
Publication of CN107688081A publication Critical patent/CN107688081A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/18Water

Abstract

The invention discloses a kind of sewage detection system,Including the foul water tank being fixedly mounted on body,The dispatch pipe being connected with sewage detection case and the delivery pipe being connected with cleaning equipment,Placement chamber is provided with ground,Lay bottom righthand side in chamber and deflecting plate is steerably provided with by steering spindle,Deflecting plate left end is provided with the first through-hole,Lay chamber lower end and be installed with separating device,Separating device includes the first sleeve,The first cavity volume is provided with first sleeve,First baffle is installed with first cavity volume,First cavity volume is separated into cavity volume and first time cavity volume on first by first baffle,First sliding block can be smoothly installed up and down in first time cavity volume,First upper end of slide block face midpoint is installed with the first fore-set,First fore-set upper end penetrates first baffle and the first sleeve and probeed into and lays in chamber,Left and right is correspondingly arranged on the second through-hole of cavity volume and first time cavity volume in intercommunication first in first baffle.

Description

A kind of sewage detection system
Technical field
The present invention relates to sewage detection field, specifically a kind of sewage detection system.
Background technology
It is general in some sewage treatment plants to be all provided with sewage disposal system, and be dirty for the regular sampling Detection of sewage Important step in water harnessing, but existing sewage detection equipment Setting pattern is excessively simple, it is impossible to sewage to be detected Storage is made a distinction, while easily mixes washing water with sewage to be detected when being scrubbed to foul water tank, therefore, greatly reduces dirt The original concentration of water, increase difficulty to detection, while be also directly result in the raising of testing cost.
The content of the invention
For the deficiency of above-mentioned technology, the present invention proposes a kind of sewage detection system.
A kind of sewage detection system of the present invention, including the foul water tank and sewage detection case that are fixedly mounted on body connect The dispatch pipe connect and the delivery pipe being connected with cleaning equipment, are provided with placement chamber in ground, bottom right in the placement chamber End is steerably provided with deflecting plate by steering spindle, and the deflecting plate left end is provided with the first through-hole, described to lay under chamber End is installed with separating device, and the separating device includes the first sleeve, the first cavity volume, institute are provided with first sleeve State and first baffle is installed with the first cavity volume, first cavity volume is separated into cavity volume and on first by the first baffle Cavity volume once, the first sliding block, the first upper end of slide block face midpoint can be smoothly installed up and down in first time cavity volume The first fore-set is installed with, the first fore-set upper end penetrates the first baffle and the first sleeve and probes into the placement chamber In, left and right is correspondingly arranged on the second through-hole of cavity volume and first time cavity volume on first described in intercommunication, institute in the first baffle State in the first sliding block left and right and be correspondingly arranged on and coordinate with second through-hole and the 3rd through-hole of intercommunication up and down, described first Baffle plate lower end is fixedly installed the first pad being engaged with the 3rd through-hole, and first upper end of slide block is fixedly installed The second pad being engaged with second through-hole, cavity volume intercommunication in the delivery pipe and described first, the dispatch pipe with First time cavity volume intercommunication, the foul water tank lower end is fixedly mounted free pipe thoroughly, keyholed back plate valve is provided with the empty pipe thoroughly, described Foul water tank its right end face is respectively equipped with the first push button and the second push button being electrically connected with the keyholed back plate valve, and first push button is used To control the keyholed back plate valve to open, second push button to control the keyholed back plate valve to close, wear downwards by the empty pipe lower end thoroughly Saturating first through-hole and with cavity volume intercommunication on described first, be provided with cleaning apparatus, the cleaning apparatus upper end in body It is provided with and is input into pipe, described be input into pipe is provided with folding valve, and the cleaning apparatus lower end is provided with and the foul water tank intercommunication Clean pipe, be also equipped with button on body, the button is additionally provided with carrying to drive the folding valve to open in ground Device, the bogey is driving the deflecting plate to pivot.
Further technical scheme, the first fore-set upper end is steerably provided with to be engaged with the deflecting plate bottom surface The first spin.
Further technical scheme, the first projection, first time appearance are installed with first time cavity volume bottom wall Also it is installed with the first elastic component connect being connected with first sliding block on the wall of bottom of chamber, first elastic component is to by institute State the upward top pressure of the first sliding block so that first pad and second pad respectively with the 3rd through-hole and described Second through-hole is engaged.
Further technical scheme, the bogey include being arranged on chute that in ground and oral area is upward and smooth Loading plate in the chute, the second bullet connect being connected with the loading plate is installed with the chute bottom wall Property part, second elastic component is the upward top pressure of the loading plate, loading plate lower surface midpoint to be fixedly installed Second fore-set, the second fore-set lower end probe into the placement chamber and are installed with and be engaged with the deflecting plate upper surface The second spin.
Further technical scheme, the cleaning apparatus include second sleeve and be arranged in the second sleeve the Two cavity volumes, second baffle are provided with second cavity volume, second cavity volume is separated on second by the second baffle to be held Chamber and second time cavity volume, the second baffle lower end are fixedly installed the 3rd pad, the second baffle and the 3rd pad Piece midpoint is provided with the 4th through-hole of cavity volume and second time cavity volume on second described in intercommunication, in the second sleeve upper end The 6th through-hole is provided with putting, the second sliding block is smoothly installed in second time cavity volume, left and right is correspondingly set in the sliding block The 5th through-hole of upper and lower intercommunication is equipped with, is fixedly installed the second projection on the second cavity volume bottom wall, on second sliding block End is installed with the 3rd elastic component that is fixedly connected with the second baffle, and the 3rd elastic component is described second to be slided The downward top pressure of block and second sliding block is offseted with second projection, the second sleeve upper end is provided with cross-drilled hole, described Cross-drilled hole left end is provided with the vertical core that chamber is laid described in intercommunication, and the cross-drilled hole left and right ends are separately installed with left coiling wheel and right coiling Wheel, the deflecting plate left end are installed with steel wire rope, and the steel wire rope is around the left coiling wheel and right coiling wheel and one by one Penetrate the 6th through-hole and the 5th through-hole and be fixedly connected with second sliding block.
Further technical scheme, is provided with placed hole on described first on the right side of cavity volume roof, smooth in the placed hole The linking arm being fixedly connected with first fore-set is installed, the linking arm right-hand member is provided with the resistance coordinated with the delivery pipe Seben.
The beneficial effects of the invention are as follows:
During operation, standing stands on the loading plate and controls first push button to open the keyholed back plate valve simultaneously, At the same time, the loading plate can slide downward, during the loading plate slide downward, the spin can deflecting plate described in pushing tow, The deflecting plate can be pivoted downwards, and the downward top pressure of the first fore-set, first fore-set can be driven institute by the deflecting plate State the first sliding block slide downward so that first pad and second pad respectively with the 3rd through-hole and described Second through-hole, which departs from, to be coordinated, therefore by cavity volume on described first and the dispatch pipe intercommunication, and the choke plate is by the conveying Pipe is blocked, and sewage is flowed on described first in cavity volume from the foul water tank by the empty pipe thoroughly, on described first Cavity volume and the dispatch pipe intercommunication, therefore sewage can be flowed into sewage detection case from the dispatch pipe;
When being pivoted downwards due to the deflecting plate, second sliding block can be lifted up by the steel wire rope and make described Three pads block the 5th through-hole, thus after operation terminates, press the button and open the folding valve, it is described to be input into Water in pipe is first trapped on described second in cavity volume, after the loading plate is operated off, in the work of second elastic component Under, the loading plate protrudes from ground by upward top pressure, in the presence of the 3rd elastic component, the second sliding block quilt Downward top pressure and offseted with second projection, thus, cavity volume and second time cavity volume intercommunication on described second, Gu Shui can be from described Clean pipe is flowed into the foul water tank and is rinsed, due in the presence of first elastic component, the first sliding block quilt Upward top pressure so that first pad and second pad respectively with the 3rd through-hole and second through-hole It is engaged, and the choke plate opens wide the delivery pipe, therefore the water after rinsing can be flowed into purification from the delivery pipe and set In standby, after flushing, second push button is controlled to close the keyholed back plate valve, so as to which the empty pipe thoroughly is blocked again, The foul water tank can refilling use;
Apparatus of the present invention are simple in construction, easy to use, can be achieved to contraminated zone to be detected point storage, and the water rinsed after foul water tank It can automatically flow into cleaning equipment, will not be mixed with sewage, therefore the original concentration of sewage to be checked can be kept, you can it is difficult to reduce detection Degree can also reduce testing cost.
Brief description of the drawings
, below will be to embodiment or prior art in order to illustrate more clearly of inventive embodiments or technical scheme of the prior art The required accompanying drawing used is briefly described in description, it should be apparent that, drawings in the following description are only one invented A little embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these Accompanying drawing obtains other accompanying drawings.
Fig. 1 is a kind of structural representation of sewage detection system of the present invention;
Fig. 2 is the structure enlargement diagram of cleaning apparatus in Fig. 1;
Fig. 3 is the structure enlargement diagram of separating device in Fig. 1;
Fig. 4 is the right view of foul water tank in Fig. 1.
Embodiment
All features disclosed in this specification, or disclosed all methods or during the step of, except mutually exclusive spy Beyond sign and/or step, it can combine in any way.
This specification(Including any accessory claim, summary and accompanying drawing)Disclosed in any feature, except non-specifically chatting State, can alternative features equivalent by other or with similar purpose replaced.I.e., unless specifically stated otherwise, each feature It is an example in a series of equivalent or similar characteristics.
As shown in Figures 1 to 4, a kind of sewage detection system of apparatus of the present invention, including the dirt being fixedly mounted on body Water tank 10, the dispatch pipe 17 being connected with sewage detection case and the delivery pipe 16 being connected with cleaning equipment, set in ground Have and lay chamber 19, bottom righthand side is steerably provided with deflecting plate 190, the deflecting plate by steering spindle in the placement chamber 19 190 left ends are provided with the first through-hole 191, and placement chamber 19 lower end is installed with separating device, the separating device bag The first sleeve 18 is included, the first cavity volume is provided with first sleeve 18, first baffle is installed with first cavity volume 48, first cavity volume is separated into cavity volume 40 and first time cavity volume 44 on first, first time appearance by the first baffle 48 First sliding block 42 can be smoothly installed up and down, the upper surface midpoint of the first sliding block 42 is installed with the first top in chamber 44 Post 180, the upper end of the first fore-set 180 penetrate the sleeve 18 of first baffle 48 and first and probeed into the placement chamber 19, Left and right is correspondingly arranged on the second through-hole of cavity volume 40 and first time cavity volume 44 on first described in intercommunication in the first baffle 48 480, in first sliding block 42 left and right be correspondingly arranged on coordinate with second through-hole 480 and intercommunication up and down it is the 3rd penetrating Hole 46, the lower end of first baffle 48 are fixedly installed the first pad 47 being engaged with the 3rd through-hole 46, and described The upper end of one sliding block 42 is fixedly installed the second pad 41 being engaged with second through-hole 480, the delivery pipe 16 and institute The intercommunication of cavity volume 40 on first, the dispatch pipe 17 and the intercommunication of first time cavity volume 44 are stated, peace is fixed in the lower end of foul water tank 10 Equipped with empty pipe 11 thoroughly, keyholed back plate valve 110 is provided with the empty pipe 11 thoroughly, its right end face of foul water tank 10 is respectively equipped with and the control The first push button 101 and the second push button 102 that pipe valve 110 is electrically connected with, first push button 101 is controlling the keyholed back plate valve 110 open, and to control the keyholed back plate valve 110 to close, the empty lower end of pipe 11 thoroughly penetrates downwards described second push button 102 First through-hole 191 and with the intercommunication of cavity volume 40 on described first, cleaning apparatus, the cleaning apparatus upper end peace are provided with body Equipped with pipe 26 is input into, described be input into pipe 26 is provided with folding valve 24, and the cleaning apparatus lower end is provided with and the foul water tank The clean pipe 22 of 10 intercommunications, button 25 is also equipped with body, the button 25 is to drive the folding valve 24 to open, ground In be additionally provided with bogey, the bogey is driving the deflecting plate 190 to pivot.
Valuably or exemplarily, wherein, the upper end of the first fore-set 180 is steerably provided with and the deflecting plate The first spin 181 that 190 bottom surfaces are engaged.
Valuably or exemplarily, wherein, the first projection 45 is installed with the bottom wall of first time cavity volume 44, it is described Also it is installed with the first elastic component 43 connect being connected with first sliding block 42 on first time bottom wall of cavity volume 44, described first Elastic component 43 is to by the 42 upward top pressure of the first sliding block, so that first pad 47 and second pad 41 are distinguished It is engaged with the 3rd through-hole 46 and second through-hole 480.
Valuably or exemplarily, wherein, the bogey includes being arranged on the chute 14 that in ground and oral area is upward And the loading plate 13 in the chute 14 is smoothly arranged on, it is installed with and the loading plate 13 on the bottom wall of chute 14 The second elastic component 15 connect of connection, second elastic component 15 is to by the 13 upward top pressure of loading plate, the loading plate 13 lower surface midpoints are fixedly installed the second fore-set 12, and the lower end of the second fore-set 12 probes into the placement chamber 19 and fixed The second spin 121 being engaged with the upper surface of deflecting plate 190 is installed.
Valuably or exemplarily, wherein, the cleaning apparatus includes second sleeve 27 and is arranged on described second set The second cavity volume in cylinder 27, is provided with second baffle 35 in second cavity volume, and the second baffle 35 is by second cavity volume Cavity volume 36 and second time cavity volume 31 on second are separated into, the lower end of second baffle 35 is fixedly installed the 3rd pad 34, described Second baffle 35 and the midpoint of the 3rd pad 34 are provided with cavity volume 36 and second time cavity volume 31 on second described in intercommunication The 4th through-hole 28, the upper end midpoint of second sleeve 27 is provided with the 6th through-hole 270, in second time cavity volume 31 Smooth to be provided with the second sliding block 33, left and right is correspondingly arranged on the 5th through-hole 30 of upper and lower intercommunication in the sliding block 33, and described the The second projection 32 is fixedly installed on the bottom wall of two cavity volume 31, the upper end of the second sliding block 33 is installed with and the second baffle 35 the 3rd elastic components 29 being fixedly connected, the 3rd elastic component 29 are described the 33 downward top pressure of the second sliding block to be made Second sliding block 33 offsets with second projection 32, and the upper end of second sleeve 27 is provided with cross-drilled hole 38, the left end of cross-drilled hole 38 The vertical core 20 that chamber 19 is laid described in intercommunication is provided with, the left and right ends of cross-drilled hole 38 are separately installed with left coiling wheel 39 and right coiling Wheel 37, the left end of deflecting plate 190 are installed with steel wire rope 21, and the steel wire rope 21 is around the left coiling wheel 39 and right disk It is fixedly connected around taking turns 37 and penetrating the 6th through-hole 270 and the 5th through-hole 28 one by one with second sliding block 33.
Valuably or exemplarily, wherein, placed hole 50, the placement are provided with the right side of the roof of cavity volume 40 on described first The linking arm 51 being fixedly connected with first fore-set 180 is smoothly installed in hole 50, the right-hand member of linking arm 51 be provided with The choke plate 52 that the delivery pipe 16 coordinates.
Apparatus of the present invention are in original state, in the presence of the 3rd elastic component 29, second sliding block 33 by Lower top pressure and offseted with second projection 32, the deflecting plate 190 is pivoted up so that the steel wire rope 21 is tensioned, In the presence of first elastic component 43, first sliding block 42 is by upward top pressure, so that first pad 47 and described Second pad 41 is engaged with the 3rd through-hole 46 and second through-hole 480 respectively, and can make first spin 181 offset with the lower surface of deflecting plate 190, and the choke plate 52 does not block the delivery pipe 16, in the described second elasticity In the presence of part 15, the loading plate 13 is projected on ground by upward top pressure;The keyholed back plate valve 110 is closed and incited somebody to action The empty pipe 11 thoroughly blocks.
During operation, standing stands on the loading plate 13 and controls first push button 101 simultaneously by the control Pipe valve 110 is opened, at the same time, the loading plate 13 can slide downward, during 13 slide downward of loading plate, the spin 121 deflecting plate 190, the deflecting plate 190 can pivot downwards described in pushing tow, and the deflecting plate 190 can be by first fore-set 180 downward top pressures, first fore-set 180 can drive the slide downward of the first sliding block 42, so that first pad 47 Depart from respectively with the 3rd through-hole 46 and second through-hole 480 with second pad 41 and coordinate, therefore by described the Cavity volume 40 and the intercommunication of dispatch pipe 17 on one, and the choke plate 52 blocks the delivery pipe 16, sewage is from the sewage It is flowed into case 10 by the empty pipe thoroughly on described first in cavity volume 40, due to cavity volume 40 and the dispatch pipe on described first 17 intercommunications, therefore sewage can be flowed into sewage detection case from the dispatch pipe 17;When being pivoted downwards due to the deflecting plate 190, Second sliding block 33 can be lifted up by the steel wire rope 21 and make the 3rd pad 34 by the 5th through-hole 30 closure, therefore after operation terminates, press the button 25 and open the folding valve 24, the water being input into pipe 26 is first detained It is described to hold in the presence of second elastic component 15 after people leaves loading plate 13 on described second in cavity volume 36 Support plate 13 protrudes from ground by upward top pressure, and in the presence of the 3rd elastic component 29, second sliding block 33 is downward Top pressure and offseted with second projection 32, thus, cavity volume 36 and second time intercommunication of cavity volume 31 on described second, Gu Shui can be from institutes State clean pipe 22 and be flowed into the foul water tank 10 and be rinsed, due in the presence of first elastic component 43, described One sliding block 42 by upward top pressure so that first pad 47 and second pad 41 respectively with the 3rd through-hole 46 It is engaged with second through-hole 480, and the choke plate 52 opens wide the delivery pipe 16, therefore the water after rinsing can be from institute State and be flowed into delivery pipe 16 in cleaning equipment, after flushing, control second push button 102 to close the keyholed back plate valve 110 Close, so as to which the empty pipe 11 thoroughly is blocked again, the foul water tank 10 can refilling use;
The beneficial effects of the invention are as follows:During operation, standing stands on the loading plate and controls first electricity simultaneously Button opens the keyholed back plate valve, at the same time, the loading plate can slide downward, during the loading plate slide downward, the rolling Deflecting plate described in club's pushing tow, the deflecting plate can pivot downwards, and the deflecting plate can be by the downward top pressure of the first fore-set, institute The first sliding block slide downward can be driven by stating the first fore-set so that first pad and second pad respectively with institute State the 3rd through-hole and second through-hole and depart from and coordinate, therefore by cavity volume on described first and the dispatch pipe intercommunication, and institute State choke plate to block the delivery pipe, sewage is flowed into cavity volume on described first from the foul water tank by the empty pipe thoroughly In, due to cavity volume on described first and the dispatch pipe intercommunication, therefore sewage can be flowed into sewage detection case from the dispatch pipe;
When being pivoted downwards due to the deflecting plate, second sliding block can be lifted up by the steel wire rope and make described Three pads block the 5th through-hole, thus after operation terminates, press the button and open the folding valve, it is described to be input into Water in pipe is first trapped on described second in cavity volume, after the loading plate is operated off, in the work of second elastic component Under, the loading plate protrudes from ground by upward top pressure, in the presence of the 3rd elastic component, the second sliding block quilt Downward top pressure and offseted with second projection, thus, cavity volume and second time cavity volume intercommunication on described second, Gu Shui can be from described Clean pipe is flowed into the foul water tank and is rinsed, due in the presence of first elastic component, the first sliding block quilt Upward top pressure so that first pad and second pad respectively with the 3rd through-hole and second through-hole It is engaged, and the choke plate opens wide the delivery pipe, therefore the water after rinsing can be flowed into purification from the delivery pipe and set In standby, after flushing, second push button is controlled to close the keyholed back plate valve, so as to which the empty pipe thoroughly is blocked again, The foul water tank can refilling use;
Apparatus of the present invention are simple in construction, easy to use, can be achieved to contraminated zone to be detected point storage, and the water rinsed after foul water tank It can automatically flow into cleaning equipment, will not be mixed with sewage, therefore the original concentration of sewage to be checked can be kept, you can it is difficult to reduce detection Degree can also reduce testing cost.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry For personnel it should be appreciated that the present invention is not limited to the above embodiments, that described in above-described embodiment and specification is the present invention Principle, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these change and Improvement is both fallen within claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (6)

1. a kind of sewage detection system, including the foul water tank being fixedly mounted on body, the dispatch that is connected with sewage detection case Pipe and the delivery pipe being connected with cleaning equipment, it is characterised in that:Placement chamber is provided with ground, it is described to lay bottom right in chamber End is steerably provided with deflecting plate by steering spindle, and the deflecting plate left end is provided with the first through-hole, described to lay under chamber End is installed with separating device, and the separating device includes the first sleeve, the first cavity volume, institute are provided with first sleeve State and first baffle is installed with the first cavity volume, first cavity volume is separated into cavity volume and on first by the first baffle Cavity volume once, the first sliding block, the first upper end of slide block face midpoint can be smoothly installed up and down in first time cavity volume The first fore-set is installed with, the first fore-set upper end penetrates the first baffle and the first sleeve and probes into the placement chamber In, left and right is correspondingly arranged on the second through-hole of cavity volume and first time cavity volume on first described in intercommunication, institute in the first baffle State in the first sliding block left and right and be correspondingly arranged on and coordinate with second through-hole and the 3rd through-hole of intercommunication up and down, described first Baffle plate lower end is fixedly installed the first pad being engaged with the 3rd through-hole, and first upper end of slide block is fixedly installed The second pad being engaged with second through-hole, cavity volume intercommunication in the delivery pipe and described first, the dispatch pipe with First time cavity volume intercommunication, the foul water tank lower end is fixedly mounted free pipe thoroughly, keyholed back plate valve is provided with the empty pipe thoroughly, described Foul water tank its right end face is respectively equipped with the first push button and the second push button being electrically connected with the keyholed back plate valve, the empty pipe lower end thoroughly Penetrate downwards first through-hole and with cavity volume intercommunication on described first, cleaning apparatus, the clean dress are provided with body Put upper end and be provided with and be input into pipe, described be input into pipe is provided with folding valve, and the cleaning apparatus lower end is provided with and the sewage The clean of case intercommunication is managed, and is also equipped with button on body, bogey is additionally provided with ground.
A kind of 2. sewage detection system according to claim 1, it is characterised in that:The first fore-set upper end is steerably The first spin being engaged with the deflecting plate bottom surface is installed.
A kind of 3. sewage detection system according to claim 1, it is characterised in that:It is fixed on first time cavity volume bottom wall First projection is installed, the first bullet connect being connected with first sliding block is also installed with first time cavity volume bottom wall Property part.
A kind of 4. sewage detection system according to claim 1, it is characterised in that:The bogey includes being arranged on ground In face and chute that oral area is upward and the loading plate that is smoothly arranged in the chute, it is installed with the chute bottom wall The second elastic component connect being connected with the loading plate, loading plate lower surface midpoint are fixedly installed the second fore-set, institute The second fore-set lower end is stated to probe into the placement chamber and be installed with the second spin being engaged with the deflecting plate upper surface.
A kind of 5. sewage detection system according to claim 1, it is characterised in that:The cleaning apparatus includes second sleeve And the second cavity volume in the second sleeve is arranged on, second baffle, the second baffle are provided with second cavity volume Second cavity volume is separated into cavity volume and second time cavity volume on second, the second baffle lower end is fixedly installed the 3rd pad Piece, the second baffle and the 3rd pad midpoint are provided with cavity volume on second described in intercommunication and second time cavity volume 4th through-hole, second sleeve upper end midpoint are provided with the 6th through-hole, are smoothly provided with second time cavity volume Second sliding block, left and right is correspondingly arranged on the 5th through-hole of upper and lower intercommunication in the sliding block, fixed on the second cavity volume bottom wall The second projection is provided with, second upper end of slide block is installed with the 3rd elastic component being fixedly connected with the second baffle, The second sleeve upper end is provided with cross-drilled hole, and the cross-drilled hole left end is provided with the vertical core that chamber is laid described in intercommunication, and the cross-drilled hole is left Right both ends are separately installed with left coiling wheel and right coiling is taken turns, and the deflecting plate left end is installed with steel wire rope, the steel wire rope Taken turns around the left coiling wheel and right coiling and penetrate the 6th through-hole and the 5th through-hole one by one and slided with described second Block is fixedly connected.
A kind of 6. sewage detection system according to claim 1, it is characterised in that:Set on described first on the right side of cavity volume roof Placed hole is equipped with, the linking arm being fixedly connected with first fore-set is smoothly installed in the placed hole, the linking arm is right End is provided with the choke plate coordinated with the delivery pipe.
CN201710952622.8A 2017-10-13 2017-10-13 A kind of sewage detection system Withdrawn CN107688081A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710952622.8A CN107688081A (en) 2017-10-13 2017-10-13 A kind of sewage detection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710952622.8A CN107688081A (en) 2017-10-13 2017-10-13 A kind of sewage detection system

Publications (1)

Publication Number Publication Date
CN107688081A true CN107688081A (en) 2018-02-13

Family

ID=61154328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710952622.8A Withdrawn CN107688081A (en) 2017-10-13 2017-10-13 A kind of sewage detection system

Country Status (1)

Country Link
CN (1) CN107688081A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108481167A (en) * 2018-05-29 2018-09-04 泉州菲林鞋业有限公司 A kind of intelligence polissoir
CN108571023A (en) * 2018-05-29 2018-09-25 高维维 A kind of digital control type dredging plant
CN108568742A (en) * 2018-05-29 2018-09-25 泉州菲林鞋业有限公司 A kind of intelligent polissoir
CN108571024A (en) * 2018-05-29 2018-09-25 高维维 A kind of dredging plant
CN108655508A (en) * 2018-05-29 2018-10-16 泉州市广进源智能设备有限公司 A kind of pipe machining equipment
CN108655918A (en) * 2018-05-29 2018-10-16 泉州菲林鞋业有限公司 A kind of intellectual polissoir
CN108661101A (en) * 2018-05-29 2018-10-16 高维维 A kind of numerical control dredging plant
CN108677657A (en) * 2018-05-29 2018-10-19 广州太牛科技有限公司 A kind of road construction equipment
CN108687408A (en) * 2018-05-29 2018-10-23 泉州市广进源智能设备有限公司 A kind of pipe machining equipment of modernization
CN108817972A (en) * 2018-05-29 2018-11-16 广州吉和电子商务有限公司 A kind of relay parts equipment
CN110539030A (en) * 2018-05-29 2019-12-06 泉州市广进源智能设备有限公司 Modernized pipeline machining equipment

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2580252Y (en) * 2002-10-30 2003-10-15 罗振亮 Foot control city water switch device
CN2586033Y (en) * 2002-11-28 2003-11-12 王春林 Foot controlled water tap
CN2597792Y (en) * 2003-01-02 2004-01-07 卢丹 Automatic water return valve
CN201100476Y (en) * 2007-09-24 2008-08-13 马爱芬 Medical intercrossed injection prevention tap water switch device
CN201748024U (en) * 2010-07-20 2011-02-16 青岛捷能汽轮机集团股份有限公司 Low-pressure adjusting valve connecting rod for steam extractor set
CN201787128U (en) * 2009-12-16 2011-04-06 南车长江车辆有限公司 Fluid reversing valve
CN102506196A (en) * 2011-10-24 2012-06-20 浙江盾安禾田金属有限公司 Self-operated three-way valve
CN202768304U (en) * 2012-10-11 2013-03-06 张为民 Running water machine
CN203670889U (en) * 2013-08-12 2014-06-25 江苏苏能环保科技有限公司 Quick disconnect type water-sealed valve
CN105865845A (en) * 2016-06-08 2016-08-17 太平洋水处理工程有限公司 Water treatment online sampling analysis system
CN105929124A (en) * 2016-06-12 2016-09-07 深圳市清时捷科技有限公司 On-line water quality analysis instrument and water quality analysis method thereof

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2580252Y (en) * 2002-10-30 2003-10-15 罗振亮 Foot control city water switch device
CN2586033Y (en) * 2002-11-28 2003-11-12 王春林 Foot controlled water tap
CN2597792Y (en) * 2003-01-02 2004-01-07 卢丹 Automatic water return valve
CN201100476Y (en) * 2007-09-24 2008-08-13 马爱芬 Medical intercrossed injection prevention tap water switch device
CN201787128U (en) * 2009-12-16 2011-04-06 南车长江车辆有限公司 Fluid reversing valve
CN201748024U (en) * 2010-07-20 2011-02-16 青岛捷能汽轮机集团股份有限公司 Low-pressure adjusting valve connecting rod for steam extractor set
CN102506196A (en) * 2011-10-24 2012-06-20 浙江盾安禾田金属有限公司 Self-operated three-way valve
CN202768304U (en) * 2012-10-11 2013-03-06 张为民 Running water machine
CN203670889U (en) * 2013-08-12 2014-06-25 江苏苏能环保科技有限公司 Quick disconnect type water-sealed valve
CN105865845A (en) * 2016-06-08 2016-08-17 太平洋水处理工程有限公司 Water treatment online sampling analysis system
CN105929124A (en) * 2016-06-12 2016-09-07 深圳市清时捷科技有限公司 On-line water quality analysis instrument and water quality analysis method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
符林芳: "《液压与气压传动技术》", 31 July 2016 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108481167A (en) * 2018-05-29 2018-09-04 泉州菲林鞋业有限公司 A kind of intelligence polissoir
CN108571023A (en) * 2018-05-29 2018-09-25 高维维 A kind of digital control type dredging plant
CN108568742A (en) * 2018-05-29 2018-09-25 泉州菲林鞋业有限公司 A kind of intelligent polissoir
CN108571024A (en) * 2018-05-29 2018-09-25 高维维 A kind of dredging plant
CN108655508A (en) * 2018-05-29 2018-10-16 泉州市广进源智能设备有限公司 A kind of pipe machining equipment
CN108655918A (en) * 2018-05-29 2018-10-16 泉州菲林鞋业有限公司 A kind of intellectual polissoir
CN108661101A (en) * 2018-05-29 2018-10-16 高维维 A kind of numerical control dredging plant
CN108677657A (en) * 2018-05-29 2018-10-19 广州太牛科技有限公司 A kind of road construction equipment
CN108687408A (en) * 2018-05-29 2018-10-23 泉州市广进源智能设备有限公司 A kind of pipe machining equipment of modernization
CN108817972A (en) * 2018-05-29 2018-11-16 广州吉和电子商务有限公司 A kind of relay parts equipment
CN110539030A (en) * 2018-05-29 2019-12-06 泉州市广进源智能设备有限公司 Modernized pipeline machining equipment

Similar Documents

Publication Publication Date Title
DE202017000981U1 (en) vacuum cleaner
CN205868941U (en) Rotatory stirring formula SMD magnetic core belt cleaning device
CN108452506B (en) Table tennis serving device for physical education
CN207244454U (en) Superelevation tower main cable saddle Lift-on/Lift-off System
CN105195484B (en) A kind of automatic barrel-cleaning machine
CN107957355A (en) A kind of detection collecting device that different depth water quality is carried out to water conservancy cistern
CN106275921A (en) A kind of with automatically clearing up and the water tank of display function
CN108842572A (en) A kind of construction cement flooring installation apparatus
CN107060442A (en) A kind of multi-storied garage vehicle location means for correcting
CN207001919U (en) The cable laying rotating disk being moved easily
CN109051067A (en) Traditional Chinese medicine decocting system circulation feeding device
CN206503338U (en) A kind of intelligent building refuse induction system
CN104941165A (en) Auxiliary device for basket-shooting training
CN106269615A (en) Possesses the cleaning manipulator of cleaning workpiece spacing location
CN108709768A (en) A kind of trade effluent distributing sampling device
CN108607832A (en) A kind of washing device for parts for fire-fighting equipment production
CN105559525A (en) Automatic cooker
CN104338723B (en) A kind of full-automatic bucket for drinking water production line cleans device
CN106473664A (en) Scrubbing brush and its vacuum cleaner
CN208981306U (en) A kind of building foundation detection device
CN206853038U (en) Car is cleaned in a kind of physical education basketball transport with water
CN208454346U (en) The composite construction of lifting block component storage and conversion equipment, lifting thermomechanical components and major-minor lifting block component
CN110073995A (en) A kind of intelligent pet cage
CN107907384A (en) A kind of urine examination device
CN106068953A (en) A kind of corn threshing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180213

WW01 Invention patent application withdrawn after publication