CN107676111A - A kind of method for protecting support for the prefabricated steel bracket of well lane engineering - Google Patents

A kind of method for protecting support for the prefabricated steel bracket of well lane engineering Download PDF

Info

Publication number
CN107676111A
CN107676111A CN201710990299.3A CN201710990299A CN107676111A CN 107676111 A CN107676111 A CN 107676111A CN 201710990299 A CN201710990299 A CN 201710990299A CN 107676111 A CN107676111 A CN 107676111A
Authority
CN
China
Prior art keywords
steel
type
lane engineering
protecting support
well lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710990299.3A
Other languages
Chinese (zh)
Inventor
王刚
钟勇
林尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Kunyu Mining Co Ltd
Original Assignee
Luoyang Kunyu Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Kunyu Mining Co Ltd filed Critical Luoyang Kunyu Mining Co Ltd
Priority to CN201710990299.3A priority Critical patent/CN107676111A/en
Publication of CN107676111A publication Critical patent/CN107676111A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches

Abstract

A kind of method for protecting support for the prefabricated steel bracket of well lane engineering, the present invention replaces original π shaped steel supportings with n-type steel, the supporting of n-type steel can be such that the stress of country rock is preferably assigned on bow member, add supporting effect, steel support material is saved simultaneously and carries on the back the mine timber of side, security is also greatly added simultaneously, and the present invention has the characteristics that easy to operate, suitable large-scale promotion and application.

Description

A kind of method for protecting support for the prefabricated steel bracket of well lane engineering
Technical field
The present invention relates to a kind of method for protecting support, and in particular to a kind of method for protecting support for the prefabricated steel bracket of well lane engineering.
Background technology
Known, with the continuous progress of science and technology, deep-well mining technology is progressively comprehensively developed and applied, but is had Non-ferrous metal deep-well mining technology is also in primary developing stage, many deficiencies also be present, should be constantly to it in the development in future Optimize.During practice of construction, with being continuously increased for mining depth, increasing, the fortune of steel supporting is pressed to underground With also gradually increase, in order to solve the above-mentioned technical problem, existing method is to use π shaped steel supportings, the support pattern of the structure Not only cost is high, and security is poor, therefore how to provide a kind of rational method for protecting support just into those skilled in the art's Long-term technology demand.
The content of the invention
Insufficient present in background technology to overcome, the invention provides a kind of branch for the prefabricated steel bracket of well lane engineering Maintaining method, the present invention can be such that the stress of country rock is preferably assigned on bow member, add supporting effect, while save steel branch Protective material and the mine timber for carrying on the back side, while also increase security etc..
To realize goal of the invention as described above, the present invention uses technical scheme as described below:
A kind of method for protecting support for the prefabricated steel bracket of well lane engineering, specifically comprise the following steps:
The first step, multiple n-type vaults being adapted with tunnel specification, each two n-type are set in roadway tunnel head clearance first The spacing of vault is configured according to the steadiness of roadway roadway surrounding rock;
Second step, take the next step, set the canopy leg extended downwardly to form support respectively in the two ends of each n-type vault, in canopy leg Lower end set base angle backing plate, the base angle backing plate be arranged on design floor level below solid rock on;
3rd step, is taken the next step, and more round logs are set between each vault and tunnel inwall, and top side requires that the tight back of the body of the back of the body is real, round log Arched girder must be crossed, it is impossible to leakage top phenomenon occur, sky is tamped when pushing up using round log or the type turntable of well, is fallen to prevent float stone or rubble Fall;
4th step, takes the next step, and at least two connecting rods is respectively equipped between the canopy leg of every two adjacent stent, in the outside of support Bar-mat reinforcement is set between the inwall of tunnel, then sets waste residue to fill between bar-mat reinforcement and tunnel inwall.
The method for protecting support for the prefabricated steel bracket of well lane engineering, the spacing of the two n-types vault is 0.5~2m.
The method for protecting support for the prefabricated steel bracket of well lane engineering, the n-type vault are n-type I-steel or n-type channel-section steel.
The method for protecting support for the prefabricated steel bracket of well lane engineering, the model 9# I-steel of the I-steel.
The method for protecting support for the prefabricated steel bracket of well lane engineering, the model 12# channel-section steel steel of the channel-section steel.
The method for protecting support for the prefabricated steel bracket of well lane engineering, the length, width and height of the base angle backing plate be respectively 150mm, 100mm and 50mm.
The method for protecting support for the prefabricated steel bracket of well lane engineering, the connecting rod are steel pipe, steel pipe it is a diameter of 40mm。
The method for protecting support for the prefabricated steel bracket of well lane engineering, a diameter of 100mm of the round log, length are 2000mm。
Using technical scheme as described above, the present invention has superiority as described below:
The present invention replaces original π shaped steel supportings with n-type steel, and the supporting of n-type steel can make the stress of country rock preferably be assigned to arch On frame, supporting effect is added, while saves steel support material and carries on the back the mine timber of side, while also greatly adds safety Property, the present invention has the characteristics that easy to operate, suitable large-scale promotion and application.
Embodiment
The present invention can be explained in more detail by the following examples, the invention is not limited in the following examples;
A kind of method for protecting support for the prefabricated steel bracket of well lane engineering of the present invention, specifically comprises the following steps:
The first step, multiple n-type vaults being adapted with tunnel specification, each two n-type are set in roadway tunnel head clearance first The spacing of vault is configured according to the steadiness of roadway roadway surrounding rock, when it is implemented, the spacing of two n-type vaults be 0.5~ 2m;The n-type vault is n-type I-steel or n-type channel-section steel, the model 9# I-steel of the I-steel, the model of the channel-section steel For 12# channel-section steel steel;
Second step, take the next step, set the canopy leg extended downwardly to form support respectively in the two ends of each n-type vault, in canopy leg Lower end set base angle backing plate, the base angle backing plate be arranged on design floor level below solid rock on, base angle backing plate Length, width and height are respectively 150mm, 100mm and 50mm;
3rd step, is taken the next step, and more round logs are set between each vault and tunnel inwall, and top side requires that the tight back of the body of the back of the body is real, round log Arched girder must be crossed, it is impossible to leakage top phenomenon occur, sky is tamped when pushing up using round log or the type turntable of well, is fallen to prevent float stone or rubble Fall;A diameter of 100mm of the round log, length 2000mm;
4th step, takes the next step, and at least two connecting rods is respectively equipped between the canopy leg of every two adjacent stent, in the outside of support Bar-mat reinforcement is set between the inwall of tunnel, then sets waste residue to fill between bar-mat reinforcement and tunnel inwall, the connection Bar is round steel, a diameter of 40mm of round steel.
The present invention in the specific implementation, according to the steadiness of roadway surrounding rock, the spacing of reasonable Arrangement n-type vault, general feelings Spacing is 1.5m under condition;When country rock is relatively broken, it should be advisable in 1.0m or so;
Further, canopy leg bottom must install base angle backing plate and base angle backing plate must design below floor level 200mm heavily fortified point On hard rock, if because roadway floor rock is soft, solid rock is had not yet to see after deep-cutting 200mm, need to continue to deep-cut solid rock Untill;
Further, vault need to be evenly arranged round log, and push up side and require that the tight back of the body of the back of the body is real, and round log must cross arched girder, be forbidden leakage top occur Phenomenon;Sky must be tamped when pushing up using round log or " type of well " turntable, is fallen to prevent float stone or rubble;
Finally, support two is helped to require to be welded using bar-mat reinforcement and round steel, and uniform welding 2 or 3 are answered between every two framves canopy leg A diameter of 6.5mm round steel, straight line is unified into before and after guarantee;During welded steel fabric, net and net between lap of splice 100mm~ 200mm, the outer no longer back of the body of net sets mine timber, but uses waste residue to fill.
Part not in the detailed description of the invention is prior art.
The embodiment selected herein for the open purpose of the present invention, is presently considered to be suitable, still, Ying Liao Solution, it is contemplated that all changes and improvement including all embodiments belonged in this design and invention scope.

Claims (8)

1. a kind of method for protecting support for the prefabricated steel bracket of well lane engineering, it is characterized in that:Specifically comprise the following steps:
The first step, multiple n-type vaults being adapted with tunnel specification, each two n-type are set in roadway tunnel head clearance first The spacing of vault is configured according to the steadiness of roadway roadway surrounding rock;
Second step, take the next step, set the canopy leg extended downwardly to form support respectively in the two ends of each n-type vault, in canopy leg Lower end set base angle backing plate, the base angle backing plate be arranged on design floor level below solid rock on;
3rd step, is taken the next step, and more round logs are set between each vault and tunnel inwall, and top side requires that the tight back of the body of the back of the body is real, round log Arched girder must be crossed, it is impossible to leakage top phenomenon occur, sky is tamped when pushing up using round log or the type turntable of well, is fallen to prevent float stone or rubble Fall;
4th step, takes the next step, and at least two connecting rods is respectively equipped between the canopy leg of every two adjacent stent, in the outside of support Bar-mat reinforcement is set between the inwall of tunnel, then sets waste residue to fill between bar-mat reinforcement and tunnel inwall.
2. it is used for the method for protecting support of the prefabricated steel bracket of well lane engineering according to claim 1, it is characterized in that:The two n-types arch The spacing on top is 0.5~2m.
3. it is used for the method for protecting support of the prefabricated steel bracket of well lane engineering according to claim 1, it is characterized in that:The n-type vault For n-type I-steel or n-type channel-section steel.
4. it is used for the method for protecting support of the prefabricated steel bracket of well lane engineering according to claim 3, it is characterized in that:The I-steel Model 9# I-steel.
5. it is used for the method for protecting support of the prefabricated steel bracket of well lane engineering according to claim 3, it is characterized in that:The type of the channel-section steel Number it is 12# channel-section steel steel.
6. it is used for the method for protecting support of the prefabricated steel bracket of well lane engineering according to claim 1, it is characterized in that:The base angle backing plate Length, width and height be respectively 150mm, 100mm and 50mm.
7. it is used for the method for protecting support of the prefabricated steel bracket of well lane engineering according to claim 1, it is characterized in that:The connecting rod is Steel pipe, a diameter of 40mm of steel pipe.
8. it is used for the method for protecting support of the prefabricated steel bracket of well lane engineering according to claim 1, it is characterized in that:The round log it is straight Footpath is 100mm, length 2000mm.
CN201710990299.3A 2017-10-23 2017-10-23 A kind of method for protecting support for the prefabricated steel bracket of well lane engineering Pending CN107676111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710990299.3A CN107676111A (en) 2017-10-23 2017-10-23 A kind of method for protecting support for the prefabricated steel bracket of well lane engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710990299.3A CN107676111A (en) 2017-10-23 2017-10-23 A kind of method for protecting support for the prefabricated steel bracket of well lane engineering

Publications (1)

Publication Number Publication Date
CN107676111A true CN107676111A (en) 2018-02-09

Family

ID=61142066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710990299.3A Pending CN107676111A (en) 2017-10-23 2017-10-23 A kind of method for protecting support for the prefabricated steel bracket of well lane engineering

Country Status (1)

Country Link
CN (1) CN107676111A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110051968A (en) * 2009-11-11 2011-05-18 주식회사 포스코 Tunnel structure using steel frames
CN202544879U (en) * 2012-02-23 2012-11-21 山东盛大矿业股份有限公司 High-strength roadway support device
CN102979534A (en) * 2012-12-11 2013-03-20 安徽恒源煤电股份有限公司 TU shed support process
CN202882939U (en) * 2012-09-25 2013-04-17 山东大学 Deep soft rock roadway three-dimensional prestress wire backfilling support retaining and protecting system
CN203022777U (en) * 2013-01-17 2013-06-26 贵州盘江精煤股份有限公司 Shed erection support at underground fork or tunnel opening
CN103470279A (en) * 2013-09-15 2013-12-25 湘潭大学 U-shaped steel bracket capable of actively controlling deformation of surrounding rocks
CN104832187A (en) * 2015-04-03 2015-08-12 山东大学 High-stress soft rock roadway supporting system with metal mesh backplane and construction method
WO2015179883A2 (en) * 2014-05-08 2015-11-26 Elbroc Mining Products (Pty) Ltd Support arrangement
CN106677797A (en) * 2017-03-13 2017-05-17 安徽理工大学 U-shaped steel composite support structure for deep dynamic pressure soft rock roadway and construction method of U-shaped steel composite support structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110051968A (en) * 2009-11-11 2011-05-18 주식회사 포스코 Tunnel structure using steel frames
CN202544879U (en) * 2012-02-23 2012-11-21 山东盛大矿业股份有限公司 High-strength roadway support device
CN202882939U (en) * 2012-09-25 2013-04-17 山东大学 Deep soft rock roadway three-dimensional prestress wire backfilling support retaining and protecting system
CN102979534A (en) * 2012-12-11 2013-03-20 安徽恒源煤电股份有限公司 TU shed support process
CN203022777U (en) * 2013-01-17 2013-06-26 贵州盘江精煤股份有限公司 Shed erection support at underground fork or tunnel opening
CN103470279A (en) * 2013-09-15 2013-12-25 湘潭大学 U-shaped steel bracket capable of actively controlling deformation of surrounding rocks
WO2015179883A2 (en) * 2014-05-08 2015-11-26 Elbroc Mining Products (Pty) Ltd Support arrangement
CN104832187A (en) * 2015-04-03 2015-08-12 山东大学 High-stress soft rock roadway supporting system with metal mesh backplane and construction method
CN106677797A (en) * 2017-03-13 2017-05-17 安徽理工大学 U-shaped steel composite support structure for deep dynamic pressure soft rock roadway and construction method of U-shaped steel composite support structure

Similar Documents

Publication Publication Date Title
CN100577986C (en) Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN102839675B (en) Method of long-span pre-stress fish belly sill for foundation pit support
CN207406349U (en) Tunnel Base reinforcing construction
CN104047614B (en) A kind of strong expansion argillization soft-rock tunnel displacement supporting method
CN104061001B (en) Gob side entry retaining exploitation support process method
CN102720498B (en) Gob-side entry retaining mining process for coal face
CN104389628B (en) Landslide location tunnel reinforcement device and reinforced construction method
CN102305091B (en) Support structure for hard rock large-section tunnel construction, and construction method for support structure
CN103821167A (en) Construction method for subway station body
CN208267862U (en) A kind of bracing means at tunnel road surface crack
CN105569726A (en) Gob-side entry retaining method for GFRP (Glass Fiber Reinforced Polymer) tube concrete pier stud and gangue concrete wall
CN206707726U (en) A kind of gob side entry retaining roadside support system
CN204941565U (en) A kind of novel tunnel inverted arch structure
CN109083660B (en) Soft rock roadway or tunnel bottom heave treatment supporting structure and method based on reinforced concrete bottom beam
CN105114099B (en) A kind of weak consolidated formation laneway support method and support system
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN210599028U (en) Primary support supporting structure of super-large-span underground engineering in hard rock area
CN110735654A (en) arch center for supporting underground tunnel and roadway engineering and rapid supporting method thereof
CN107676111A (en) A kind of method for protecting support for the prefabricated steel bracket of well lane engineering
CN103603682A (en) Roof supporting method applicable to cutting, drifting and cemented filling mining
CN109779652A (en) A kind of expansion of coal-mine soft-rock tailentry is repaired and method for protecting support
CN202755368U (en) Long span pre-stressing force fish-belly beam used for retaining and protecting foundation pit
CN205532652U (en) Rock cross -cut coal uncovering 's enhancement supporting construction under complex geological condition
CN212656835U (en) Broken type stope supporting construction of ore rock
CN106761849A (en) Supporting construction is served as a contrast at the beginning of a kind of high density formation tunnel based on lock foot pad plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209

RJ01 Rejection of invention patent application after publication