CN107649884A - A kind of air duct production system and method for wind curtain machine - Google Patents

A kind of air duct production system and method for wind curtain machine Download PDF

Info

Publication number
CN107649884A
CN107649884A CN201711057383.6A CN201711057383A CN107649884A CN 107649884 A CN107649884 A CN 107649884A CN 201711057383 A CN201711057383 A CN 201711057383A CN 107649884 A CN107649884 A CN 107649884A
Authority
CN
China
Prior art keywords
air duct
connecting plate
plant
fan blade
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711057383.6A
Other languages
Chinese (zh)
Other versions
CN107649884B (en
Inventor
黄益仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711057383.6A priority Critical patent/CN107649884B/en
Publication of CN107649884A publication Critical patent/CN107649884A/en
Application granted granted Critical
Publication of CN107649884B publication Critical patent/CN107649884B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/06Metal-working plant comprising a number of associated machines or apparatus

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Duct Arrangements (AREA)
  • Laser Beam Processing (AREA)

Abstract

The present invention relates to a kind of air duct production system for wind curtain machine, fan blade processing unit (plant), connecting plate processing unit (plant) and the combination unit being connected including conveyer and successively with conveyer, the fan blade processing unit (plant) includes slitting mechanism and roller press mechanism, the connecting plate processing unit (plant) includes cutting mechanism and grooving mechanism, and the combination unit includes roller riveter structure, detection means and bracing means.The metal air duct that the technique productions go out can effectively strengthen its service life, when in use because its structural strength is far above the plastics air duct of prior art, can adapt to the electrical equipment drive of more strength, be supported with providing more powerful wind-force.And the rotating shaft and bearing because of air duct both ends are to be detachably connected, make it more convenient and economical in maintenance.

Description

A kind of air duct production system and method for wind curtain machine
Technical field
The present invention relates to field of machining, more particularly to a kind of air duct production system and method for wind curtain machine.
Background technology
Air curtain is also known as air curtain, wind curtain machine, air lock, English name:air curtain、air door.Product extensively should On the gateway of the environment such as factory, shop, dining room, pharmacy, freezer, hotel, hospital, airport, station and all are equipped with sky The place of device is adjusted, using special pot motor, drives the operating of tubular, centrifugal or axial-flow type wind wheel to produce powerful together Airflow barrier, effectively maintain the air ambient of indoor and outdoor, can effectively keep indoor air clean, prevent air couple Stream, air conditioning energy consumption is reduced, prevents the intrusion of dust, insect and pernicious gas, there is provided a comfortable job, shopping, leisure ring Border.Mainly coordinate the one kind of air conditioner as environmental protection and energy saving machinery, as long as installation wind curtain machine, it is possible to by dealing crowd's body surface Hot gas break up, mitigate the burden of air-conditioning.Give people the clear sensation of knowledge one simultaneously.
The core texture air duct inside air curtain machine is the plastics wind using the technique productions of injection molding in the prior art Cylinder, its service life is shorter, fragile, now contemplates and develops a kind of air duct of metal material, for solve metal air duct assembling, There is no the problem of corollary equipment during pressing process, the present invention proposes a kind of a full set of production system and operation side for metal air duct Method.
The content of the invention
To achieve the above object, the present invention adopts the following technical scheme that:A kind of air duct production system for wind curtain machine, bag Fan blade processing unit (plant), connecting plate processing unit (plant) and the combination unit for including conveyer and being connected successively with conveyer, the wind Leaf processing unit (plant) includes slitting mechanism and roller press mechanism, and the connecting plate processing unit (plant) includes cutting mechanism and grooving mechanism, institute Stating combination unit includes roller riveter structure, detection means and bracing means.
The present invention operation principle be:The invention provides a kind of a full set of production system for producing wind curtain machine special-purpose metal air duct System, including for transmitting the conveyer of labor and materials, workpiece, conveyer can be selected belt conveyer, roller bearing conveyer or One or more in mechanical arm shifting apparatus are applied in combination.Conveyer adds fan blade according to the operating procedure order of the system Frock is put, connecting plate processing unit (plant), combination unit are attached.Fan blade processing unit (plant) includes the banding machine for cutting aluminium, uses By straight aluminum strip roll-in it is that section is arc in the blank material that strip is cut out according to product demand, then by roll squeezer Fan blade finished product, its length is cut further in accordance with product demand, complete fan blade processing.Connecting plate processing unit (plant) is used for according to product demand The disk of specification is cut, and disk is processed further out by central channel, positioning hole and deep-slotted chip breaker by grooving mechanism.Wherein Central channel is used to coordinate rotating shaft and fixed plate to install and use with positioning hole.Deep-slotted chip breaker is used to intert fan blade, and fan blade is fixed.Combination Device includes roller riveter structure, detection means and bracing means, and the air duct that roller riveter structure is used to complete preassembling carries out roll-in, roller Splenium position is the edge of circular connecting plate, it is pressed deep-slotted chip breaker and fan blade, the combination between both enhancings after deforming by roll-in Power.Detection means is used to detect dynamic equilibrium state of the air duct in rotary course, if situations such as deflecting, rocking. The position for detecting to deflect, rock adds balancing patch and rotates detection again, reaches requirement for dynamic balance after repeatedly debugging. Bracing means is a glue applying mechanism, each junction of air duct is closed with seccotine sol, when increase adhesion prevents from rotating at a high speed Come off, also increase the durability degree of air duct.
Further, the grooving mechanism includes frame, main shaft, slide rail and index dial, the index dial be rotatably connected in In frame, the slide rail is arranged above index dial and is fixedly connected with frame, and the main shaft is slidably connected to slide rail, the slide rail Slideway be arc.
Grooving mechanism adopts the drilling and cutting machine construction of standard model, and its horizontal slide rail is created with reference to needs of production Property improve so that the deep-slotted chip breaker camber line dug needed for the camber line of horizontal slide rail and product be in projection relation, is eliminated when slotting The school position process descended each time before knife, more it is avoided that defect ware produces caused by the error of school position or error.This design is producing Operating procedure is greatly simplified in process, improves production efficiency and quality.
Further, the detection means is dynamic balance detecting device, the dynamic balance detecting device include the second frame, The clamping part being installed in second frame, the drive division of the clamping part side is arranged at, is horizontally placed on the clamping The laser portion of portion side.
Detection means uses dynamic balance detecting device, its principle be by by air duct both ends spindle housing on clamping part, Rotation is driven by drive division, laser irradiation is carried out with laser portion alignment air duct one side, when air duct rotates, on air duct wall When being mapped with laser, illustrate that the position is offset, need to be adjusted by adding balancing patch.
Further, it is additionally provided with numerical control module in second frame, the numerical control module is respectively with drive division and swashing Light portion communicates to connect.
A kind of air duct production technology for wind curtain machine, comprise the following steps:
S1:Slitting, tabular aluminium is divided into aluminum strip by slitting mechanism;
S2:Roll-in, aluminum strip is sent into from roller press mechanism one end, it is arc to form cross section by the multi-level roll-in of roller press mechanism The fan blade of shape;
S3:Cut, the fan blade of roll-in is cut according to processing dimension, and reserved 1~2cm surpluses;
S4:Connecting plate is processed, aluminium sheet is cut into by connecting plate processing unit (plant) it is discoid, and by grooving mechanism successively Central channel is opened up at disc centre, positioning hole is drilled with around central channel, opens up deep-slotted chip breaker along disk circumference;
S5:End plate assembles, and is fitted together at the connecting plate central channel of machine-shaping into fixed plate, and is passed through and fixed by screw Plate is tightened in positioning hole and fixes fixed plate and connecting plate, and fixed plate is provided centrally with rotating shaft, and roller end is arranged with bearing;
S6:Air duct assembles, and fan blade is connected to one by one in the deep-slotted chip breaker on connecting plate, forms cylindrical-shaped structure;
S7:Roller riveting, the air duct being completed in step S6 is transferred load into roller riveter structure, by roller riveter structure to connecting edges of boards The fan blade locked and fixed that the roll-in of edge will be connected in deep-slotted chip breaker;
S8:Detection, the air duct that the riveting of step S7 central rolls is completed is transferred load into dynamic balance detecting device, by rotating through at a high speed Laser is irradiated to the location detection of air duct and goes out unbalance point in journey, and adds balancing patch to adjust air duct dynamic balancing;
S9:Reinforce, by each connection spot gluing connection of the qualified products for passing through dynamic balancing detection in S8 steps.
Beneficial effects of the present invention are:The metal air duct that the technique productions go out can effectively strengthen its service life, make Used time is far above the plastics air duct of prior art due to its structural strength, the electrical equipment drive of more strength can be adapted to, to carry Supported for more powerful wind-force.And the rotating shaft and bearing because of air duct both ends are to be detachably connected, make its maintenance when more It is convenient and economical.
Brief description of the drawings
The invention will be further described for accompanying drawing, but the embodiment in accompanying drawing does not form any limitation of the invention.
Fig. 1 is a kind of air duct production system schematic diagram for wind curtain machine that one embodiment of the invention provides.
Embodiment
As shown in fig. 1, a kind of air duct production system for wind curtain machine that one embodiment of the invention provides, including transmission The device and fan blade processing unit (plant) being connected successively with conveyer, connecting plate processing unit (plant) and combination unit, the fan blade processing Device includes slitting mechanism and roller press mechanism, and the connecting plate processing unit (plant) includes cutting mechanism and grooving mechanism, the combination Device includes roller riveter structure, detection means and bracing means.
The present invention operation principle be:The invention provides a kind of a full set of production system for producing wind curtain machine special-purpose metal air duct System, including for transmitting the conveyer of labor and materials, workpiece, conveyer can be selected belt conveyer, roller bearing conveyer or One or more in mechanical arm shifting apparatus are applied in combination.Conveyer adds fan blade according to the operating procedure order of the system Frock is put, connecting plate processing unit (plant), combination unit are attached.Fan blade processing unit (plant) includes the banding machine for cutting aluminium, uses By straight aluminum strip roll-in it is that section is arc in the blank material that strip is cut out according to product demand, then by roll squeezer Fan blade finished product, its length is cut further in accordance with product demand, complete fan blade processing.Connecting plate processing unit (plant) is used for according to product demand The disk of specification is cut, and disk is processed further out by central channel, positioning hole and deep-slotted chip breaker by grooving mechanism.Wherein Central channel is used to coordinate rotating shaft and fixed plate to install and use with positioning hole.Deep-slotted chip breaker is used to intert fan blade, and fan blade is fixed.Combination Device includes roller riveter structure, detection means and bracing means, and the air duct that roller riveter structure is used to complete preassembling carries out roll-in, roller Splenium position is the edge of circular connecting plate, it is pressed deep-slotted chip breaker and fan blade, the combination between both enhancings after deforming by roll-in Power.Detection means is used to detect dynamic equilibrium state of the air duct in rotary course, if situations such as deflecting, rocking. The position for detecting to deflect, rock adds balancing patch and rotates detection again, reaches requirement for dynamic balance after repeatedly debugging. Bracing means is a glue applying mechanism, each junction of air duct is closed with seccotine sol, when increase adhesion prevents from rotating at a high speed Come off, also increase the durability degree of air duct.
Further, the grooving mechanism includes frame, main shaft, slide rail and index dial, the index dial be rotatably connected in In frame, the slide rail is arranged above index dial and is fixedly connected with frame, and the main shaft is slidably connected to slide rail, the slide rail Slideway be arc.
Grooving mechanism adopts the drilling and cutting machine construction of standard model, and its horizontal slide rail is created with reference to needs of production Property improve so that the deep-slotted chip breaker camber line dug needed for the camber line of horizontal slide rail and product be in projection relation, is eliminated when slotting The school position process descended each time before knife, more it is avoided that defect ware produces caused by the error of school position or error.This design is producing Operating procedure is greatly simplified in process, improves production efficiency and quality.
Further, the detection means is dynamic balance detecting device, the dynamic balance detecting device include the second frame, The clamping part being installed in second frame, the drive division of the clamping part side is arranged at, is horizontally placed on the clamping The laser portion of portion side.
Detection means uses dynamic balance detecting device, its principle be by by air duct both ends spindle housing on clamping part, Rotation is driven by drive division, laser irradiation is carried out with laser portion alignment air duct one side, when air duct rotates, on air duct wall When being mapped with laser, illustrate that the position is offset, need to be adjusted by adding balancing patch.
Further, it is additionally provided with numerical control module in second frame, the numerical control module is respectively with drive division and swashing Light portion communicates to connect.
A kind of air duct production technology for wind curtain machine, comprise the following steps:
S1:Slitting, tabular aluminium is divided into aluminum strip by slitting mechanism;
S2:Roll-in, aluminum strip is sent into from roller press mechanism one end, it is arc to form cross section by the multi-level roll-in of roller press mechanism The fan blade of shape;
S3:Cut, the fan blade of roll-in is cut according to processing dimension, and reserved 1~2cm surpluses;
S4:Connecting plate is processed, aluminium sheet is cut into by connecting plate processing unit (plant) it is discoid, and by grooving mechanism successively Central channel is opened up at disc centre, positioning hole is drilled with around central channel, opens up deep-slotted chip breaker along disk circumference;
S5:End plate assembles, and is fitted together at the connecting plate central channel of machine-shaping into fixed plate, and is passed through and fixed by screw Plate is tightened in positioning hole and fixes fixed plate and connecting plate, and fixed plate is provided centrally with rotating shaft, and roller end is arranged with bearing;
S6:Air duct assembles, and fan blade is connected to one by one in the deep-slotted chip breaker on connecting plate, forms cylindrical-shaped structure;
S7:Roller riveting, the air duct being completed in step S6 is transferred load into roller riveter structure, by roller riveter structure to connecting edges of boards The fan blade locked and fixed that the roll-in of edge will be connected in deep-slotted chip breaker;
S8:Detection, the air duct that the riveting of step S7 central rolls is completed is transferred load into dynamic balance detecting device, by rotating through at a high speed Laser is irradiated to the location detection of air duct and goes out unbalance point in journey, and adds balancing patch to adjust air duct dynamic balancing;
S9:Reinforce, by each connection spot gluing connection of the qualified products for passing through dynamic balancing detection in S8 steps.
Beneficial effects of the present invention are:The metal air duct that the technique productions go out can effectively strengthen its service life, make Used time is far above the plastics air duct of prior art due to its structural strength, the electrical equipment drive of more strength can be adapted to, to carry Supported for more powerful wind-force.And the rotating shaft and bearing because of air duct both ends are to be detachably connected, make its maintenance when more It is convenient and economical.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (5)

  1. A kind of 1. air duct production system for wind curtain machine, it is characterised in that:Connect including conveyer and successively with conveyer Fan blade processing unit (plant), connecting plate processing unit (plant) and the combination unit connect, the fan blade processing unit (plant) include slitting mechanism and roll-in Mechanism, the connecting plate processing unit (plant) include cutting mechanism and grooving mechanism, and the combination unit includes roller riveter structure, detection dress Put and bracing means.
  2. 2. it is used for the air duct production system of wind curtain machine according to claim 1, it is characterised in that:The grooving mechanism includes machine Frame, main shaft, slide rail and index dial, the index dial are rotatably connected in frame, the slide rail is arranged above index dial and machine Frame is fixedly connected, and the main shaft is slidably connected to slide rail, and the slideway of the slide rail is arc.
  3. 3. it is used for the air duct production system of wind curtain machine according to claim 1, it is characterised in that:The detection means is dynamic flat Weigh detection means, and the dynamic balance detecting device includes the second frame, the clamping part being installed in second frame, is arranged at The drive division of the clamping part side, it is horizontally placed on the laser portion of the clamping part side.
  4. 4. it is used for the air duct production system of wind curtain machine according to claim 1, it is characterised in that:Also set in second frame Numerical control module is equipped with, the numerical control module communicates to connect with drive division and laser portion respectively.
  5. 5. a kind of air duct production technology for wind curtain machine, including the air duct production system for wind curtain machine of claim 1 or 2 System, it is characterised in that comprise the following steps:
    S1:Slitting, tabular aluminium is divided into aluminum strip by slitting mechanism;
    S2:Roll-in, aluminum strip is sent into from roller press mechanism one end, and cross section is formed as arc by the multi-level roll-in of roller press mechanism Fan blade;
    S3:Cut, the fan blade of roll-in is cut according to processing dimension, and reserved 1~2cm surpluses;
    S4:Connecting plate is processed, aluminium sheet is cut into by connecting plate processing unit (plant) it is discoid, and by grooving mechanism successively in circle Central channel is opened up at disk center, positioning hole is drilled with around central channel, opens up deep-slotted chip breaker along disk circumference;
    S5:End plate assembles, and is fitted together at the connecting plate central channel of machine-shaping into fixed plate, and is revolved by screw through fixed plate Tightly fixed plate and connecting plate are fixed in positioning hole, fixed plate is provided centrally with rotating shaft, and roller end is arranged with bearing;
    S6:Air duct assembles, and fan blade is connected to one by one in the deep-slotted chip breaker on connecting plate, forms cylindrical-shaped structure;
    S7:Roller riveting, the air duct being completed in step S6 is transferred load into roller riveter structure, by roller riveter structure to connecting plate edge The fan blade locked and fixed that roll-in will be connected in deep-slotted chip breaker;
    S8:Detection, the air duct that the riveting of step S7 central rolls is completed is transferred load into dynamic balance detecting device, by high-speed rotation The location detection that laser is irradiated to air duct goes out unbalance point, and adds balancing patch to adjust air duct dynamic balancing;
    S9:Reinforce, by each connection spot gluing connection of the qualified products for passing through dynamic balancing detection in S8 steps.
CN201711057383.6A 2017-11-01 2017-11-01 A kind of air duct production system and method for wind curtain machine Active CN107649884B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711057383.6A CN107649884B (en) 2017-11-01 2017-11-01 A kind of air duct production system and method for wind curtain machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711057383.6A CN107649884B (en) 2017-11-01 2017-11-01 A kind of air duct production system and method for wind curtain machine

Publications (2)

Publication Number Publication Date
CN107649884A true CN107649884A (en) 2018-02-02
CN107649884B CN107649884B (en) 2019-09-24

Family

ID=61096909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711057383.6A Active CN107649884B (en) 2017-11-01 2017-11-01 A kind of air duct production system and method for wind curtain machine

Country Status (1)

Country Link
CN (1) CN107649884B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000274769A (en) * 1999-03-26 2000-10-06 Mitsubishi Electric Corp Air-conditioning fan
JP3697551B2 (en) * 2000-09-12 2005-09-21 株式会社日藤工業 Air curtain device
CN1884359A (en) * 2005-06-24 2006-12-27 钱业军 Method for making plastic seam-free air-duct
CN103639287A (en) * 2013-12-10 2014-03-19 大连交通大学 Air duct producing device
CN203533873U (en) * 2013-09-11 2014-04-09 艾美特电器(深圳)有限公司 Air blower structure of warm air blower
CN204612066U (en) * 2015-03-31 2015-09-02 福建省雾精灵环境科技有限公司 A kind of gas station air curtain

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000274769A (en) * 1999-03-26 2000-10-06 Mitsubishi Electric Corp Air-conditioning fan
JP3697551B2 (en) * 2000-09-12 2005-09-21 株式会社日藤工業 Air curtain device
CN1884359A (en) * 2005-06-24 2006-12-27 钱业军 Method for making plastic seam-free air-duct
CN203533873U (en) * 2013-09-11 2014-04-09 艾美特电器(深圳)有限公司 Air blower structure of warm air blower
CN103639287A (en) * 2013-12-10 2014-03-19 大连交通大学 Air duct producing device
CN204612066U (en) * 2015-03-31 2015-09-02 福建省雾精灵环境科技有限公司 A kind of gas station air curtain

Also Published As

Publication number Publication date
CN107649884B (en) 2019-09-24

Similar Documents

Publication Publication Date Title
CN105383186B (en) Laser marking machine with rotary marking function for processing water pump identifications
CN203937867U (en) A kind of accuracy controlling device of adjusting for wing wallboard attitude
CN205467815U (en) Spout and inhale formula pad pasting device
CN205531917U (en) Mutual multi -functional intelligent window of networked control formula
CN107649884A (en) A kind of air duct production system and method for wind curtain machine
CN208020728U (en) A kind of film covering device of PE plastic films production
CN104308889B (en) A kind of pad pasting cutting machine
CN206141067U (en) Optical cement laminating equipment
CN206798806U (en) Automatic transport pastes adhesive tape machine
CN206282938U (en) Pole piece wrap-up
CN205838094U (en) Paper accurate conveyer device continuously
CN205311019U (en) Pressure equipment of sealing of multilayer sheet is put
CN205415260U (en) Burnishing machine with dual polishing function
CN110304295B (en) Beverage bottle film covering mechanism using atmospheric pressure to cover film
CN215749759U (en) Wood board edge bonding machine
CN110844214A (en) POF thermal contraction film packaging adjustable limiting area preheating cutting mechanism
CN205522688U (en) It cuts membrane device to revolve sword
CN208644093U (en) A kind of single pendulum direct-drive type is sleeping to add A yaw
CN209815338U (en) Synchronous quick separating and cutting device for fireproof gummed paper
CN208263647U (en) One kind is novel to seal coating machine
CN209227261U (en) Air softening finishing machine air door reversing arrangement
CN207432772U (en) A kind of full-automatic backlight source module laminator
CN207139945U (en) A kind of Novel cutter of corrugated board
CN212888524U (en) Super air knife
CN219727604U (en) Duplex position dust removal structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant