- CN107649815A CN107649815A CN201711058094.8A CN201711058094A CN107649815A CN 107649815 A CN107649815 A CN 107649815A CN 201711058094 A CN201711058094 A CN 201711058094A CN 107649815 A CN107649815 A CN 107649815A
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- out against
- block
- doorframe
- limited block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003466 welding Methods 0.000 title claims abstract description 44
- 238000000034 method Methods 0.000 title claims abstract description 19
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 9
- PCTMTFRHKVHKIS-BMFZQQSSSA-N (1s,3r,4e,6e,8e,10e,12e,14e,16e,18s,19r,20r,21s,25r,27r,30r,31r,33s,35r,37s,38r)-3-[(2r,3s,4s,5s,6r)-4-amino-3,5-dihydroxy-6-methyloxan-2-yl]oxy-19,25,27,30,31,33,35,37-octahydroxy-18,20,21-trimethyl-23-oxo-22,39-dioxabicyclo[33.3.1]nonatriaconta-4,6,8,10 Chemical compound C1C=C2C[C@@H](OS(O)(=O)=O)CC[C@]2(C)[C@@H]2[C@@H]1[C@@H]1CC[C@H]([C@H](C)CCCC(C)C)[C@@]1(C)CC2.O[C@H]1[C@@H](N)[C@H](O)[C@@H](C)O[C@H]1O[C@H]1/C=C/C=C/C=C/C=C/C=C/C=C/C=C/[C@H](C)[C@@H](O)[C@@H](C)[C@H](C)OC(=O)C[C@H](O)C[C@H](O)CC[C@@H](O)[C@H](O)C[C@H](O)C[C@](O)(C[C@H](O)[C@H]2C(O)=O)O[C@H]2C1 PCTMTFRHKVHKIS-BMFZQQSSSA-N 0.000 claims description 7
- 230000007704 transition Effects 0.000 claims description 5
- 238000009826 distribution Methods 0.000 claims description 3
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims 6
- 210000003127 knee Anatomy 0.000 claims 1
- 230000002459 sustained effect Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 17
- 229910000838 Al alloy Inorganic materials 0.000 abstract description 7
- 229910000975 Carbon steel Inorganic materials 0.000 abstract description 2
- 239000010962 carbon steel Substances 0.000 abstract description 2
- 238000012797 qualification Methods 0.000 abstract 1
- 238000003825 pressing Methods 0.000 description 15
- 125000006850 spacer group Chemical group 0.000 description 10
- 238000009434 installation Methods 0.000 description 5
- 230000002787 reinforcement Effects 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
- B23K37/04—Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
- B23K37/0443—Jigs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K2101/00—Articles made by soldering, welding or cutting
- B23K2101/24—Frameworks
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Joining Of Corner Units Of Frames Or Wings (AREA)
- Securing Of Glass Panes Or The Like (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
Description
技术领域technical field
本发明属于碳钢焊接领域,具体涉及一种右侧前门框组对焊接工装及其安调方法。The invention belongs to the field of carbon steel welding, and in particular relates to a right front door frame pair welding tool and an installation method thereof.
背景技术Background technique
铝合金集装箱体因具有材质轻、耐腐蚀等优良特性,在工业中的应用已越来越普遍,需求量也越来越大。为进一步缩短铝合金集装箱体的生产周期,提高产品质量,需要对其的每一个生产工序进行精益及优化。铝合金集装箱体右侧板总成中的右侧前门框总成的组对焊接的优化则是其中重要的一环。Due to the excellent properties of light weight and corrosion resistance, the aluminum alloy container body has become more and more popular in industry, and its demand is also increasing. In order to further shorten the production cycle of the aluminum alloy container body and improve product quality, it is necessary to lean and optimize each production process. The optimization of pair welding of the right front door frame assembly in the right side panel assembly of the aluminum alloy container body is an important part.
目前右侧前门框总成组对焊接作业完全由生产工人手工组对,依靠卷尺手工测量来确定组对尺寸,该方法使组对尺寸不稳定,易产生不合格品,且手工组对速度较慢,生产效率较低。并且在右侧前门框总成焊接过程中无工装夹具固定,导致焊后易产生焊接变形,焊后调型耗费较多的时间。At present, the butt welding operation of the front door frame assembly on the right side is completely assembled manually by the production workers, and the size of the pair is determined by manual measurement with a tape measure. Slow and low production efficiency. In addition, there is no tooling fixture during the welding process of the right front door frame assembly, which leads to welding deformation after welding, and it takes a lot of time to adjust the shape after welding.
因此,有必要研究出一种右侧前门框组对焊接工装及其安调方法,保证右侧前门框生产过程中的内宽、内高与对角线尺寸,控制焊接过程中的焊接变形,以降低右侧前门框组对时的尺寸偏差,得到尺寸合格且稳定的产品,缩短右侧前门框单件生产工时,进而提高铝合金集装箱体的生产效率。Therefore, it is necessary to develop a welding tool for the right front door frame assembly and its installation and adjustment method to ensure the inner width, inner height and diagonal dimensions during the production process of the right front door frame, and to control the welding deformation during the welding process. In order to reduce the dimensional deviation when the right front door frame is aligned, obtain qualified and stable products, shorten the single-piece production man-hours of the right front door frame, and improve the production efficiency of the aluminum alloy container body.
发明内容Contents of the invention
有鉴于此,本发明的目的在于提供一种右侧前门框组对焊接工装及其安调方法,以解决上述问题。In view of this, the purpose of the present invention is to provide a right front door frame assembly butt welding tool and its installation and adjustment method to solve the above problems.
为达到上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
一种右侧前门框组对焊接工装,包括螺纹顶紧夹具、限位块、下压快速夹、垫块、加强板垫片、限位块、顶紧快速夹、立柱、横梁;所述立柱有八根且垂直固定于地面,所述横梁有abcd四根,每根横梁与两根立柱垂直连接,且四根横梁首尾相连围成型面与右侧前门框的ABCD四边相对应的结构;所述螺纹顶紧夹具有六副,分设在abc三根横梁上各两副;所述下压快速夹有十二副,分设在四根横梁上各三副;所述顶紧快速夹有三副,均设在d横梁上;所述加强板垫片有四副,分设在四根横梁首尾相连的交角处;所述限位块垂直设置在d横梁的一端;每副螺纹顶紧夹具与一副设置在横梁上的限位块配套使用,每副下压快速夹及顶紧快速夹分别与一副设置在横梁上的垫块配套使用。A butt welding tool for the right front door frame, including a threaded clamping fixture, a limit block, a press-down quick clip, a cushion block, a reinforcement plate gasket, a limit block, a fastening clamp, a column, and a beam; the column There are eight beams and they are fixed vertically on the ground. There are four beams abcd, each beam is vertically connected to two columns, and the four beams are connected end to end to form a structure corresponding to the four sides of ABCD of the right front door frame; There are six sets of threaded top clamps, two sets on each of the three beams of abc; twelve sets of quick pressing clamps, three sets on each of the four beams; three sets of fast clamps on top, They are all arranged on the beam d; there are four pairs of reinforcing plate gaskets, which are respectively arranged at the intersection corners where the four beams are connected end to end; the limit block is vertically arranged at one end of the beam d; The limit blocks arranged on the crossbeam are matched with each other, and each pair of pressing down quick clamps and top tightening quick clamps are matched with a pair of pads arranged on the crossbeam respectively.
优选的,所述螺纹顶紧夹具包括螺杆和螺孔垫块;所述螺杆一端设有旋转把手,另一端开设有外螺纹;所述螺孔垫块设置在横梁上,且沿垂直横梁长度方向开设有与所述外螺纹匹配的内螺纹孔。Preferably, the threaded tightening fixture includes a screw and a screw hole pad; one end of the screw is provided with a rotating handle, and the other end is provided with an external thread; the screw hole pad is arranged on the beam, and along the length direction of the vertical beam An internal thread hole matched with the external thread is provided.
优选的,所述限位块包括T型块和L型块;所述T型块下部连接设置在横梁上,上部与L型块的一面贴合,两者贴合面上均开设有匹配的腰型孔,并通过紧固件彼此连接;所述L型块的另一面垂直于螺杆运动方向设置。Preferably, the limit block includes a T-shaped block and an L-shaped block; the lower part of the T-shaped block is connected and arranged on the beam, and the upper part is attached to one side of the L-shaped block. Waist-shaped holes are connected to each other by fasteners; the other side of the L-shaped block is arranged perpendicular to the direction of movement of the screw.
优选的,所述下压快速夹包括基座I、下压把手和压杆;所述基座I通过一过渡块连接设置在横梁上,所述下压把手和压杆分别铰接在基座I上,且两者中部通过一直杆相互铰接;所述下压把手可带动压杆沿垂直垫块上表面方向运动。Preferably, the press-down quick clamp includes a base 1, a press-down handle and a depression bar; and the middle parts of the two are hinged to each other through a straight bar; the pressing handle can drive the pressing bar to move along the direction vertical to the upper surface of the block.
优选的,所述顶紧快速夹包括基座II、顶紧把手和顶紧杆;所述基座II通过一过渡块连接设置在横梁上,所述顶紧把手铰接在基座II上,所述顶紧杆端部通过一弯杆与顶紧把手中部铰接,所述顶紧把手可带动顶紧杆沿垂直垫块侧表面方向运动。Preferably, the tightening quick clamp includes a base II, a tightening handle and a tightening rod; the base II is connected and arranged on the beam through a transition block, and the tightening handle is hinged on the base II, so The end of the tightening rod is hinged to the middle of the tightening handle through a bent rod, and the tightening handle can drive the tightening rod to move along the direction perpendicular to the side surface of the cushion block.
优选的,所述垫块为凸型结构,且与横梁通过紧固件连接。Preferably, the spacer is a convex structure, and is connected with the beam through a fastener.
优选的,所述限位块为L型结构,且与横梁通过紧固件连接。Preferably, the limiting block has an L-shaped structure, and is connected with the crossbeam by fasteners.
优选的,所述加强板垫片为两边互相垂直的直边,一边为弧形边的三边形片状结构。Preferably, the reinforcement plate gasket is a triangular sheet structure with two straight sides perpendicular to each other and one side with an arc-shaped side.
一种上述的右侧前门框组对焊接工装的安调方法:A method for installing and adjusting the above-mentioned right front door frame assembly butt welding tool:
(1)将八根立柱根据右侧前门框尺寸分布固定在地面;(1) Fix the eight uprights on the ground according to the size distribution of the right front door frame;
(2)将abcd四根横梁首尾相连围成型面与右侧前门框的ABCD四边相对应的结构,并将每根横梁垂直固定在立柱上;(2) Connect the four beams abcd end to end to enclose the structure corresponding to the four sides ABCD of the front door frame on the right side, and fix each beam vertically on the column;
(3)对立柱和横梁进行水平面的初步调平;(3) Preliminary leveling of the horizontal plane of the columns and beams;
(4)将垫块通过紧固件分别连接在每根横梁的两端及中间位置的上表面各一个;(4) Connect the pads to the two ends of each beam and the upper surface of the middle position respectively through fasteners;
(5)对垫块进行水平面的调平,且使所有垫块上表面在同一高度;(5) Level the horizontal plane of the pads, and make the upper surfaces of all pads at the same height;
(6)将限位块通过紧固件分别连接在abc三根横梁的两端的内表面各一个;(6) The limit blocks are respectively connected to the inner surfaces of the two ends of the three beams of abc through fasteners;
(7)对限位块根据右侧前门框的内宽与内高尺寸进行垂直方向上的调节,使在同一横梁上的限位块在同一直线,不在同一横梁上的限位块相互平行或垂直;(7) Adjust the limit block in the vertical direction according to the inner width and inner height of the right front door frame, so that the limit blocks on the same beam are on the same line, and the limit blocks not on the same beam are parallel to each other or vertical;
(8)将螺纹顶紧夹具、下压快速夹和顶紧快速夹分别固定在其各自对应的限位块或垫块位置,并检查各结构是否能灵活运动;(8) Fix the threaded clamping clamp, the pressing down quick clamp and the clamping clamp on their corresponding limit blocks or spacers respectively, and check whether each structure can move flexibly;
(9)将四个加强板垫片通过紧固件分别连接在四根横梁首尾相连的交角处;(9) Connect the four reinforcement plate gaskets to the corners where the four beams are connected end to end through fasteners;
(10)将一个限位块通过紧固件连接在d横梁一端的上表面。(10) Connect a limit block to the upper surface of one end of the d beam through a fastener.
优选的,步骤(1)中立柱与地面通过膨胀螺钉连接固定。Preferably, in step (1), the upright column is connected and fixed to the ground through expansion screws.
本发明的有益效果在于:The beneficial effects of the present invention are:
1、本发明的组对焊接工装,可使右侧前门框在焊接前得以有效固定,右侧前门框在生产过程中的内宽、内高与对角线尺寸可有效的被控制,焊接过程中的焊接变形可得到缩小,右侧前门框组对时的尺寸偏差得以降低,得到的产品尺寸合格且稳定。1. The butt welding tooling of the present invention can effectively fix the right front door frame before welding, and the inner width, inner height and diagonal size of the right front door frame can be effectively controlled during the production process, and the welding process The welding deformation in the process can be reduced, and the dimensional deviation when the right front door frame is assembled can be reduced, and the obtained product is qualified and stable in size.
2、本发明采用的顶紧快速夹和下压快速夹,可使组对过程更为高效快捷,缩短了右侧前门框单件生产工时,进而提高铝合金集装箱体的生产效率。2. The top-tightening quick clips and down-pressing quick clips adopted in the present invention can make the assembly process more efficient and quick, shorten the production man-hours of a single piece of the right front door frame, and further improve the production efficiency of the aluminum alloy container body.
3、本发明的组对焊接工装安调方法,可使焊接工装的构件间连接更紧实,位置匹配度更好,整体水平及垂直精度更高。3. The installation and adjustment method of paired welding equipment of the present invention can make the connection between the components of the welding equipment more compact, the position matching degree is better, and the overall horizontal and vertical precision is higher.
附图说明Description of drawings
为了使本发明的目的、技术方案和有益效果更加清楚,本发明提供如下附图进行说明:In order to make the purpose, technical scheme and beneficial effect of the present invention clearer, the present invention provides the following drawings for illustration:
图1为本发明未装件结构示意图;Fig. 1 is the schematic diagram of the structure of the unloaded part of the present invention;
图2为本发明装了右侧前门框后结构示意图;Fig. 2 is the structure schematic diagram behind the right side front door frame of the present invention;
图3为M区域局部放大图;Figure 3 is a partial enlarged view of the M area;
图4为N区域局部放大图。Figure 4 is a partial enlarged view of the N area.
附图中标记如下:螺纹顶紧夹具1、螺杆11、螺孔垫块12、限位块2、T型块21、L型块22、下压快速夹3、基座I31、下压把手32、压杆33、垫块4、加强板垫片5、限位块6、顶紧快速夹7、基座II71、顶紧把手72、顶紧杆73、立柱8、横梁9。The marks in the accompanying drawings are as follows: thread clamping fixture 1, screw rod 11, screw hole pad 12, limit block 2, T-shaped block 21, L-shaped block 22, pressing down quick clamp 3, base I31, pressing down handle 32 , Depression bar 33, spacer 4, reinforcing plate spacer 5, limit block 6, top tight quick clip 7, base II71, top tight handle 72, top tight bar 73, column 8, crossbeam 9.
具体实施方式Detailed ways
下面将结合附图,对本发明的优选实施例进行详细的描述。The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
如图1~2,一种右侧前门框组对焊接工装,包括螺纹顶紧夹具1、限位块2、下压快速夹3、垫块4、加强板垫片5、限位块6、顶紧快速夹7、立柱8、横梁9;所述立柱8有八根且垂直固定于地面,所述横梁9有abcd四根,每根横梁9与两根立柱8垂直连接,且四根横梁首尾相连围成型面与右侧前门框的ABCD四边相对应的结构;所述螺纹顶紧夹具1有六副,分设在abc三根横梁上各两副;所述下压快速夹3有十二副,分设在四根横梁上各三副;所述顶紧快速夹7有三副,均设在d横梁上;所述加强板垫片5有四副,分设在四根横梁首尾相连的交角处;所述限位块6垂直设置在d横梁的一端;每副螺纹顶紧夹具1与一副设置在横梁上的限位块2配套使用,每副下压快速夹3及顶紧快速夹7分别与一副设置在横梁上的垫块4配套使用。图2中右侧前门框的ABCD四边分别为右侧前门框右门框、上门框、左门框、下门框,其分别对应图1中abcd四根横梁9。As shown in Figures 1 and 2, a butt welding tool for the front door frame on the right side includes a threaded clamping clamp 1, a limit block 2, a quick pressing clamp 3, a spacer 4, a reinforcement plate gasket 5, a limit block 6, Tighten fast clamp 7, column 8, beam 9; said column 8 has eight and vertically fixed on the ground, said beam 9 has four abcd, each beam 9 is vertically connected with two columns 8, and four beams The end-to-end structure corresponding to the four sides of ABCD of the front door frame on the right side surrounds the forming surface; there are six pairs of the threaded top clamps 1, and two pairs are respectively arranged on the three beams of abc; the press-down quick clamps 3 have twelve There are three pairs of sets on each of the four beams; there are three sets of the top fast clamps 7, all of which are set on the d beam; there are four sets of the reinforcing plate gaskets 5, which are respectively set at the corners where the four beams are connected end to end. ; The limit block 6 is vertically arranged at one end of the d crossbeam; each pair of threaded clamps 1 is used in conjunction with a pair of limit blocks 2 arranged on the crossbeam, and each pair of press-down quick clamps 3 and top-tightened quick clamps 7 They are respectively used in conjunction with a pair of pads 4 arranged on the beam. The ABCD four sides of the right front door frame in Fig. 2 are respectively the right door frame, the upper door frame, the left door frame and the lower door frame of the right front door frame, which correspond to the four beams 9 of abcd in Fig. 1 respectively.
如图3,进一步的,本实施例采用的螺纹顶紧夹具1包括螺杆11和螺孔垫块12;所述螺杆11一端设有旋转把手,另一端开设有外螺纹;所述螺孔垫块12设置在横梁上,且沿垂直横梁长度方向开设有与所述外螺纹匹配的内螺纹孔。As shown in Figure 3, further, the threaded clamping fixture 1 adopted in this embodiment includes a screw rod 11 and a screw hole pad 12; one end of the screw rod 11 is provided with a rotating handle, and the other end is provided with an external thread; the screw hole pad 12 is arranged on the beam, and an internal thread hole matched with the external thread is opened along the length direction vertical to the beam.
进一步的,本实施例采用的限位块2包括T型块21和L型块22;所述T型块21下部连接设置在横梁9上,上部与L型块22的一面贴合,两者贴合面上均开设有匹配的腰型孔,并通过紧固件彼此连接;所述L型块22的另一面垂直于螺杆11运动方向设置。Further, the limiting block 2 used in this embodiment includes a T-shaped block 21 and an L-shaped block 22; the lower part of the T-shaped block 21 is connected to the beam 9, and the upper part is attached to one side of the L-shaped block 22. Matching waist-shaped holes are opened on the bonding surfaces, and are connected to each other by fasteners; the other surface of the L-shaped block 22 is arranged perpendicular to the moving direction of the screw rod 11 .
进一步的,本实施例采用的下压快速夹3包括基座I31、下压把手32和压杆33;所述基座I31通过一过渡块连接设置在横梁9上,所述下压把手32和压杆33分别铰接在基座I31上,且两者中部通过一直杆相互铰接;所述下压把手32可带动压杆33沿垂直垫块4上表面方向运动。Further, the press-down quick clamp 3 adopted in this embodiment includes a base I31, a press-down handle 32 and a press bar 33; the base I31 is connected and arranged on the crossbeam 9 through a transition block, and the press-down handle 32 and The pressing rods 33 are respectively hinged on the base I31, and the middle parts of the two are hinged to each other through a straight rod;
如图4,进一步的,本实施例采用的顶紧快速夹7包括基座II71、顶紧把手72和顶紧杆73;所述基座II71通过一过渡块连接设置在横梁9上,所述顶紧把手72铰接在基座II71上,所述顶紧杆73端部通过一弯杆与顶紧把手72中部铰接,所述顶紧把手72可带动顶紧杆73沿垂直垫块4侧表面方向运动。As shown in Fig. 4, further, the tightening quick clip 7 adopted in this embodiment includes a base II71, a tightening handle 72 and a tightening rod 73; the base II71 is connected and arranged on the beam 9 through a transition block, and the The tightening handle 72 is hinged on the base II71, the end of the tightening rod 73 is hinged with the middle part of the tightening handle 72 through a bent rod, and the tightening handle 72 can drive the tightening rod 73 along the side surface of the vertical pad 4 direction movement.
进一步的,本实施例采用的垫块4为凸型结构,且与横梁9通过紧固件连接。Further, the spacer 4 used in this embodiment has a convex structure, and is connected with the beam 9 through fasteners.
进一步的,本实施例采用的限位块6为L型结构,且与横梁9通过紧固件连接。Further, the limiting block 6 adopted in this embodiment has an L-shaped structure, and is connected with the beam 9 through a fastener.
进一步的,本实施例采用的加强板垫片5为两边互相垂直的直边,一边为弧形边的三边形片状结构。Further, the reinforcement plate gasket 5 adopted in this embodiment is a triangular sheet structure with two straight sides perpendicular to each other and one side with an arc-shaped side.
一种上述右侧前门框组对焊接工装的安调方法:A method for installing and adjusting the above-mentioned right front door frame assembly butt welding tool:
(1)将八根立柱8根据右侧前门框尺寸分布固定在地面;(1) Fix the eight uprights 8 on the ground according to the size distribution of the front door frame on the right side;
(2)将abcd四根横梁9首尾相连围成型面与右侧前门框的ABCD四边相对应的结构,并将每根横梁垂直固定在立柱8上;(2) connect the four crossbeams 9 of abcd end to end to form a structure corresponding to the four sides of ABCD of the front door frame on the right side, and fix each crossbeam vertically on the column 8;
(3)对立柱8和横梁9进行水平面的初步调平;(3) Carry out preliminary leveling of the horizontal plane to the column 8 and the crossbeam 9;
(4)将垫块4通过紧固件分别连接在每根横梁9的两端及中间位置的上表面各一个;(4) The pads 4 are respectively connected to the two ends of each beam 9 and the upper surface of the middle position by fasteners;
(5)对垫块4进行水平面的调平,且使所有垫块4上表面在同一高度;(5) Carry out leveling of the horizontal plane to the spacer 4, and make the upper surfaces of all spacers 4 at the same height;
(6)将限位块2通过紧固件分别连接在abc三根横梁的两端的内表面各一个;(6) The limit block 2 is respectively connected to the inner surfaces of the two ends of the three beams of abc through fasteners;
(7)对限位块2根据右侧前门框的内宽与内高尺寸进行垂直方向上的调节,使在同一横梁上的限位块在同一直线,不在同一横梁上的限位块相互平行或垂直;(7) Adjust the limit block 2 in the vertical direction according to the inner width and inner height of the right front door frame, so that the limit blocks on the same beam are on the same line, and the limit blocks not on the same beam are parallel to each other or vertically;
(8)将螺纹顶紧夹具1、下压快速夹3和顶紧快速夹7分别固定在其各自对应的限位块2或垫块4位置,并检查各结构是否能灵活运动;(8) Fix the threaded clamping clamp 1, the pressing down quick clamp 3 and the clamping clamp 7 respectively at their corresponding position of the limit block 2 or pad 4, and check whether each structure can move flexibly;
(9)将四个加强板垫片5通过紧固件分别连接在四根横梁首尾相连的交角处;(9) Connect the four reinforcing plate gaskets 5 to the corners where the four beams are connected end-to-end through fasteners;
(10)将一个限位块6通过紧固件连接在d横梁一端的上表面。(10) A limit block 6 is connected to the upper surface of one end of the d beam through a fastener.
进一步的,步骤(1)中立柱8与地面通过膨胀螺钉连接固定。Further, in step (1), the column 8 is connected and fixed to the ground through expansion screws.
按照上述步骤将右侧前门框组对焊接工装安装调试,可使焊接工装的构件间连接更紧实,位置匹配度更好,整体水平及垂直精度更高。According to the above steps, the right front door frame assembly is installed and debugged on the welding tool, which can make the connection between the components of the welding tool more compact, the position matching degree is better, and the overall horizontal and vertical accuracy is higher.
安调完成后,使用时,将右侧前门框工件放置于其对应的横梁9上,此时限位块限制右侧前门框的内宽、内高与对角线等关键尺寸,随后旋转螺纹顶紧夹具1的螺杆11,将工件ABC三边顶紧至限位块2的L型块22,限定水平方向的位置;按下下压快速夹3的下压把手32,使压杆33将工件压紧至垫块4的上表面,限定垂直方向的位置;向外拉动顶紧快速7的顶紧把手72,使顶紧杆73将工件的D边顶紧至垫块4的外侧表面,进一步矫正水平方向的位置。After the installation and adjustment are completed, when in use, place the workpiece of the right front door frame on its corresponding beam 9. At this time, the limit block limits the key dimensions such as the inner width, inner height and diagonal of the right front door frame, and then rotate the threaded top Tighten the screw rod 11 of the fixture 1, tighten the three sides of the workpiece ABC to the L-shaped block 22 of the limit block 2, and limit the position in the horizontal direction; press down the pressing handle 32 of the pressing quick clamp 3, so that the pressing rod 33 will hold the workpiece Compress to the upper surface of spacer 4, limit the position of vertical direction; Pull out the tightening handle 72 of tightening fast 7, make tightening rod 73 tighten the D limit of workpiece to the outer surface of spacer 4, further Correct the horizontal position.
至此,右侧前门框在组对焊接工装上被有效固定,右侧前门框在生产过程中的内宽、内高与对角线尺寸,焊接过程中的焊接变形可得到缩小和控制,右侧前门框组对时的尺寸偏差得以降低,得到尺寸合格且稳定的产品。同时顶紧快速夹7和下压快速夹3的存在,使组对过程更为高效快捷,缩短了右侧前门框单件生产工时,进而提高铝合金集装箱体的生产效率。So far, the right front door frame is effectively fixed on the assembly welding tool, the inner width, inner height and diagonal size of the right front door frame during the production process, and the welding deformation during the welding process can be reduced and controlled. The dimensional deviation during the assembly of the front door frame can be reduced, and a product with qualified and stable dimensions can be obtained. At the same time, the existence of the fast clamp 7 for top tightening and the quick clamp 3 for pressing down makes the assembly process more efficient and quicker, shortens the single-piece production man-hour of the right front door frame, and improves the production efficiency of the aluminum alloy container body.
最后说明的是,以上优选实施例仅用以说明本发明的技术方案而非限制,尽管通过上述优选实施例已经对本发明进行了详细的描述,但本领域技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离本发明权利要求书所限定的范围。Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that it can be described in terms of form and Various changes may be made in the details without departing from the scope of the invention defined by the claims.
Claims (10)
- A kind of 1. doorframe welding frock before right side, it is characterised in that:Fixture, limited block are held out against including screw thread, are pushed quickly Folder, cushion block, reinforcing plate pad, limited block, hold out against quick clip, column, crossbeam;The column has eight and is perpendicularly fixed at ground Face, the crossbeam have an abcd tetra-, every crossbeam and two root posts vertical connection, and four crossbeams join end to end enclose forming surface with The corresponding structure in the sides of ABCD tetra- of doorframe before right side;The screw thread, which holds out against fixture, six pairs, sets up separately each on tri- crossbeams of abc Two is secondary;Described push quickly accompanies ten second mates, sets up each three pair on four crossbeams separately;Described hold out against quickly accompanies three pairs, is all provided with On d crossbeams;The reinforcing plate pad has fourth officer, sets up separately at four end to end angles of cut of crossbeam;The limited block is vertical It is arranged on one end of d crossbeams;The limited block that fixture is arranged on a pair on crossbeam is held out against per deputy thread to support the use, and is pushed per pair Quick clip and hold out against the cushion block that quick clip is arranged on crossbeam with a pair respectively and support the use.
- 2. doorframe welding frock before right side according to claim 1, it is characterised in that:The screw thread holds out against fixture bag Include screw rod and screw cushion block;Described screw rod one end is provided with rotating handles, and the other end offers external screw thread;The screw cushion block is set On crossbeam, and the internal thread hole matched with the external screw thread is offered along vertical crossbeams length direction.
- 3. doorframe welding frock before right side according to claim 2, it is characterised in that:The limited block includes T-shaped Block and L-type block;The T-shaped piece of bottom connection is arranged on crossbeam, and top is bonded with the one side of L-type block, on both binding faces The waist-shaped hole of matching is offered, and is connected to each other by fastener;The another side of the L-type block is set perpendicular to screw motion direction Put.
- 4. doorframe welding frock before right side according to claim 1, it is characterised in that:The quick clip that pushes includes Pedestal I, push handle and depression bar;The pedestal I is arranged on crossbeam by transition block connection, described to push handle and depression bar It is respectively hinged on pedestal I, and both middle parts are hinged by a straight-bar;The handle that pushes can drive depression bar along vertical pad Move in block upper surface direction.
- 5. doorframe welding frock before right side according to claim 1, it is characterised in that:The quick clip that holds out against includes Pedestal II, hold out against handle and top-fastening rod;The pedestal II is arranged on crossbeam by transition block connection, described to hold out against handle hinge It is connected on pedestal II, the boom end that holds out against is be hinged in the middle part of handle with holding out against by a knee, and the handle that holds out against can drive top Tight bar moves along vertical cushion block side face directions.
- 6. doorframe welding frock before right side according to claim 1, it is characterised in that:The cushion block is convex knot Structure, and be connected with crossbeam by fastener.
- 7. doorframe welding frock before right side according to claim 1, it is characterised in that:The limited block is L-type knot Structure, and be connected with crossbeam by fastener.
- 8. doorframe welding frock before right side according to claim 1, it is characterised in that:The reinforcing plate pad is two The mutually perpendicular straight flange in side, while the triangle laminated structure for arc-shaped side.
- 9. the peace of doorframe welding frock adjusts method before a kind of any described right side of claim 1~8, it is characterised in that:(1) eight root posts are fixed on ground according to doorframe Size Distribution before right side;(2) tetra- crossbeams of abcd are joined end to end and encloses the forming surface structure corresponding with the sides of ABCD tetra- of doorframe before right side, and will Every beam vertical is fixed on column;(3) column and crossbeam carry out the preliminary leveling of horizontal plane;(4) cushion block is connected to the both ends of every crossbeam and each one of the upper surface in centre position by fastener;(5) leveling of horizontal plane is carried out to cushion block, and makes all cushion block upper surfaces in sustained height;(6) limited block is connected to each one of the inner surface at the both ends of tri- crossbeams of abc by fastener;(7) carry out the regulation in vertical direction with interior high size according to the inner width of doorframe before right side to limited block, make in same horizontal stroke Limited block on beam is in same straight line, and the limited block on same crossbeam is not parallel to each other or vertically;(8) screw thread held out against into fixture, push quick clip and holds out against quick clip and be separately fixed at its each self-corresponding limited block or pad Block position, and check whether each structure can flexible motion;(9) four reinforcing plate pads are connected at four end to end angles of cut of crossbeam by fastener;(10) limited block is connected to the upper surface of d crossbeams one end by fastener.
- 10. the peace of doorframe welding frock adjusts method before right side according to claim 9, it is characterised in that:Step (1) Central post is connected with ground by swell fixture.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711058094.8A CN107649815A (en) | 2017-11-01 | 2017-11-01 | Doorframe welding frock and its peace tune method before a kind of right side |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711058094.8A CN107649815A (en) | 2017-11-01 | 2017-11-01 | Doorframe welding frock and its peace tune method before a kind of right side |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107649815A true CN107649815A (en) | 2018-02-02 |
Family
ID=61096548
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201711058094.8A Pending CN107649815A (en) | 2017-11-01 | 2017-11-01 | Doorframe welding frock and its peace tune method before a kind of right side |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107649815A (en) |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108356464A (en) * | 2018-02-26 | 2018-08-03 | 劲旅环境科技有限公司 | A kind of rear door frame group mounted welder assembly |
| CN108544167A (en) * | 2018-05-31 | 2018-09-18 | 广东国华人防科技有限公司 | A kind of welding fixture, system and the welding method of people's air defense gas-particulate filter |
| CN109014732A (en) * | 2018-09-06 | 2018-12-18 | 浙江天马停车设备有限公司 | Rear cross beam welding mould |
| CN110125590A (en) * | 2019-05-06 | 2019-08-16 | 中国船舶重工集团公司第七二五研究所 | A kind of oceanographic buoy angle section frame tool for assembling |
| CN111421277A (en) * | 2020-04-24 | 2020-07-17 | 广东精泰人防工程有限公司 | Assembly assembly tool platform for one-way linear welding production line of civil air defense steel structure door leaf |
| CN112658566A (en) * | 2020-12-15 | 2021-04-16 | 中车唐山机车车辆有限公司 | Clamping device for end wall plate welding |
| CN113878279A (en) * | 2020-07-01 | 2022-01-04 | 机科发展科技股份有限公司 | Auxiliary welding positioning device for end wall plate of rail train |
| CN113953755A (en) * | 2021-12-01 | 2022-01-21 | 河北京车轨道交通车辆装备有限公司 | Vehicle body end wall synthesis tool and process |
| KR102419816B1 (en) * | 2022-05-06 | 2022-07-12 | 김대진 | Jig for welding golf cart frame |
| CN115890099A (en) * | 2022-09-28 | 2023-04-04 | 江苏四达重工有限公司 | A welding tool for sheet metal parts |
| CN116135431A (en) * | 2021-11-18 | 2023-05-19 | 包头北方创业有限责任公司 | Container box assembly system |
| CN120985186A (en) * | 2025-09-05 | 2025-11-21 | 安徽明瑞智能科技股份有限公司 | A shell welding system based on DC charging pile production |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202726385U (en) * | 2012-08-22 | 2013-02-13 | 陕西通力专用汽车有限责任公司 | Auxiliary frame welding fixture for dumper |
| CN103111782A (en) * | 2012-10-26 | 2013-05-22 | 北京星航机电设备厂 | Welding tool used for cabin in multilayer abnormal shape structure |
| CN104475997A (en) * | 2014-11-17 | 2015-04-01 | 长春轨道客车股份有限公司 | Modular manufacturing method for aluminum structure of third-dimensional curved surface cab of motor train unit |
| CN204504617U (en) * | 2015-03-28 | 2015-07-29 | 苏州肯美锐钣金有限公司 | A kind of welding tool setup |
| CN205271248U (en) * | 2015-11-19 | 2016-06-01 | 海克力斯(上海)自动化设备有限公司 | Truck chassis tail lamp scaffold weldment frock |
| CN106736204A (en) * | 2017-03-23 | 2017-05-31 | 中车洛阳机车有限公司 | A kind of quick group pair and welding tooling for engineering truck truck side sill |
| CN207479923U (en) * | 2017-11-01 | 2018-06-12 | 辽宁忠旺特种车辆制造有限公司 | Doorframe welding tooling before a kind of right side |
-
2017
- 2017-11-01 CN CN201711058094.8A patent/CN107649815A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202726385U (en) * | 2012-08-22 | 2013-02-13 | 陕西通力专用汽车有限责任公司 | Auxiliary frame welding fixture for dumper |
| CN103111782A (en) * | 2012-10-26 | 2013-05-22 | 北京星航机电设备厂 | Welding tool used for cabin in multilayer abnormal shape structure |
| CN104475997A (en) * | 2014-11-17 | 2015-04-01 | 长春轨道客车股份有限公司 | Modular manufacturing method for aluminum structure of third-dimensional curved surface cab of motor train unit |
| CN204504617U (en) * | 2015-03-28 | 2015-07-29 | 苏州肯美锐钣金有限公司 | A kind of welding tool setup |
| CN205271248U (en) * | 2015-11-19 | 2016-06-01 | 海克力斯(上海)自动化设备有限公司 | Truck chassis tail lamp scaffold weldment frock |
| CN106736204A (en) * | 2017-03-23 | 2017-05-31 | 中车洛阳机车有限公司 | A kind of quick group pair and welding tooling for engineering truck truck side sill |
| CN207479923U (en) * | 2017-11-01 | 2018-06-12 | 辽宁忠旺特种车辆制造有限公司 | Doorframe welding tooling before a kind of right side |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108356464A (en) * | 2018-02-26 | 2018-08-03 | 劲旅环境科技有限公司 | A kind of rear door frame group mounted welder assembly |
| CN108544167A (en) * | 2018-05-31 | 2018-09-18 | 广东国华人防科技有限公司 | A kind of welding fixture, system and the welding method of people's air defense gas-particulate filter |
| CN109014732A (en) * | 2018-09-06 | 2018-12-18 | 浙江天马停车设备有限公司 | Rear cross beam welding mould |
| CN110125590A (en) * | 2019-05-06 | 2019-08-16 | 中国船舶重工集团公司第七二五研究所 | A kind of oceanographic buoy angle section frame tool for assembling |
| CN111421277A (en) * | 2020-04-24 | 2020-07-17 | 广东精泰人防工程有限公司 | Assembly assembly tool platform for one-way linear welding production line of civil air defense steel structure door leaf |
| CN113878279A (en) * | 2020-07-01 | 2022-01-04 | 机科发展科技股份有限公司 | Auxiliary welding positioning device for end wall plate of rail train |
| CN112658566A (en) * | 2020-12-15 | 2021-04-16 | 中车唐山机车车辆有限公司 | Clamping device for end wall plate welding |
| CN116135431A (en) * | 2021-11-18 | 2023-05-19 | 包头北方创业有限责任公司 | Container box assembly system |
| CN113953755A (en) * | 2021-12-01 | 2022-01-21 | 河北京车轨道交通车辆装备有限公司 | Vehicle body end wall synthesis tool and process |
| KR102419816B1 (en) * | 2022-05-06 | 2022-07-12 | 김대진 | Jig for welding golf cart frame |
| CN115890099A (en) * | 2022-09-28 | 2023-04-04 | 江苏四达重工有限公司 | A welding tool for sheet metal parts |
| CN120985186A (en) * | 2025-09-05 | 2025-11-21 | 安徽明瑞智能科技股份有限公司 | A shell welding system based on DC charging pile production |
| CN120985186B (en) * | 2025-09-05 | 2026-02-24 | 安徽明瑞智能科技股份有限公司 | Shell welding system based on direct-current charging pile production |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107649815A (en) | Doorframe welding frock and its peace tune method before a kind of right side | |
| CN104259674B (en) | Anti-deformation device and method before the weldering of reduction T connector Welding Angular Deformation | |
| CN104117771A (en) | Device and method capable of reducing butt welding line angular deformation | |
| CN111545907B (en) | Flexible multi-point adsorption device and method for double-laser-beam bilateral synchronous welding of T-shaped wallboard structure | |
| CN218612569U (en) | Right angle correction device for door frame group frame | |
| CN206642957U (en) | A kind of double glazing automates polygon adhesive supplier | |
| CN207087238U (en) | Automobile skeleton clamping and positioning device | |
| CN206883105U (en) | A kind of I-steel positioning welding frock | |
| CN103551469B (en) | A kind of with the laser prestress forming jig loaded and resilience is measured | |
| CN207479923U (en) | Doorframe welding tooling before a kind of right side | |
| CN209886577U (en) | Forging press for large-diameter elbow pipe fitting for petrochemical industry | |
| CN209532547U (en) | A kind of CNG gas cylinder general frame tailor-welding tool | |
| CN108971857A (en) | A kind of accessory welding fixture for welding bench | |
| CN111016032B (en) | Molding device for stringer part pressure loss experimental part and application thereof | |
| CN204321477U (en) | Vertical R6 cabinet welding anti-deformation fixture | |
| CN207788891U (en) | A kind of quickly splicing doorframe workbench | |
| CN209190127U (en) | A kind of welding tooling controlling reversible deformation | |
| CN217647828U (en) | Accurate device of taking one's place of big cross-section steel box girder side web | |
| CN211761086U (en) | Panel equipment presss from both sides tight machine | |
| CN112108536B (en) | Double-beam post-welding shape righting method for large thin-wall aluminum alloy T-shaped wall plate structure | |
| CN209792977U (en) | Welding tool for container rear door frame upright post | |
| CN209754412U (en) | Support frame is used in processing of aluminium frame | |
| CN208913426U (en) | Door frame welding device of civil air defense equipment | |
| CN116837999B (en) | Adjustable tire frame for unit panel curtain wall production and production method | |
| CN219479709U (en) | Adjustable door and window rack |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180202 |