CN107634529A - A kind of charging pile, which is avoided the peak hour, adjusts ginseng control system and method - Google Patents

A kind of charging pile, which is avoided the peak hour, adjusts ginseng control system and method Download PDF

Info

Publication number
CN107634529A
CN107634529A CN201710969417.2A CN201710969417A CN107634529A CN 107634529 A CN107634529 A CN 107634529A CN 201710969417 A CN201710969417 A CN 201710969417A CN 107634529 A CN107634529 A CN 107634529A
Authority
CN
China
Prior art keywords
module
power
charging pile
peak hour
ginseng
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710969417.2A
Other languages
Chinese (zh)
Inventor
於砚福
董晓岚
陶静
赵传伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710969417.2A priority Critical patent/CN107634529A/en
Publication of CN107634529A publication Critical patent/CN107634529A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages

Abstract

Being avoided the peak hour the present invention relates to a kind of charging pile adjusts ginseng control system and method, its technical characterstic to be:Including:Single-chip microcomputer, communication module, memory module, display module, NFC module for reading and writing, fault alarm module, watchdog circuit, output control module, charging inlet module, intelligent electric meter, inversion module, battery pack and power module.The tune ginseng power consumption parameter of avoiding the peak hour that the present invention is issued using communication module reception power system, the average power consumption of daily 24 hours loads is predicted by Bidirectional intelligent table historical data, in different electricity consumption peak interval of time, ginseng power consumption parameter is adjusted according to avoiding the peak hour, the rationally powering mode and the reverse grid generation of batteries residual electric energy of control charging pile, it is achieved thereby that the spatial load forecasting of avoiding the peak hour of power network peak load shifting, reaches purpose that is energy-saving and reducing charging pile running cost.

Description

A kind of charging pile, which is avoided the peak hour, adjusts ginseng control system and method
Technical field
The invention belongs to intelligent grid applied technical field, more particularly to a kind of charging pile to avoid the peak hour and adjust ginseng control system and side Method.
Background technology
With the development of intelligent grid, the energy-saving efficiency of power consumer electrical equipment how is improved, research, which meets power network, to be needed Side management requirement is asked, the intelligent power equipment for the control that can avoid the peak hour is necessary.Electric Cars in China charging infrastructure promotes Alliance's issue investigation display:By in September, 2016, more than 100,000, instream factor only has the public charging pile quantity in China 10%.Operation enterprise could not realize profit substantially.
Currently known various charging pile working methods are single, there is no one kind to receive power system and avoid the peak hour to adjust and join electricity consumption ginseng Number, ginseng control is adjusted for realizing that charging pile is avoided the peak hour, so as to reach the system on power network peak load shifting mesh ground.
Technical term involved in the present invention is explained below:
Dsm:Under the support of government regulation and policy, effective excitation and guiding measure and suitable are taken Function mode, pass through genco, grid company, ESCO, social intermediary, product vendor, electric power use Family etc. is pulled together jointly, is improved terminal power consumption efficiency and is changed power mode, electricity is reduced while meeting equally with Electricity Functional Consumption and electricity needs, reach and economize on resources and environmental protection, realize that social benefit is best, each side is benefited, the least cost energy The carried out management activity of service.
Peak load shifting:A part of peak load is moved to low-valley interval, it is poor so as to reduce the peak load of operation of power networks, it is real The purpose for saving the energy is showed.
Tune of avoiding the peak hour is joined:According to power system power information, by adjusting intelligent power spatial load forecasting parameter, point, peak are reduced Section power consumption, improve the control mode of paddy section power consumption.
The content of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide one kind can solve the problem that currently known various chargings Stake working method is single, and utilization rate is low to cause deficit of operation, and the technical problem of power system dsm can not be met Charging pile, which is avoided the peak hour, adjusts ginseng control system and method.
The present invention solves its technical problem and takes following technical scheme to realize:
A kind of charging pile, which is avoided the peak hour, adjusts ginseng control system, including:Single-chip microcomputer, communication module, memory module, display module, NFC Module for reading and writing, fault alarm module, watchdog circuit, output control module, charging inlet module, intelligent electric meter, inversion module, Battery pack and power module;
The one-chip computer module respectively with communication module, memory module, display module, NFC module for reading and writing, fault alarm mould Block is connected with watchdog circuit, the output end of the single-chip microcomputer also by output control module respectively with charging inlet module, intelligence Energy ammeter, inversion module, battery pack are connected, and the tune ginseng control management of avoiding the peak hour of charging pile is realized for writing complete program;
The communication module is connected with one-chip computer module, passes through intelligent electric meter using power line carrier data communication mode The tune ginseng power information of avoiding the peak hour that power system issues is received, and sends charging pile use information;
The display module is connected with one-chip computer module, and function is carried out using LCDs and LED Light-Emitting Diodes Instruction;
The NFC module for reading and writing is connected with one-chip computer module, has NFC function chip for using charging pile user Mobile communication equipment or IC card information be written and read, complete the accounting management that uses of charging pile;
The fault alarm module is connected with one-chip computer module, and the sound and light alarm module is by light emitting diode, loudspeaker Formed with drive circuit, for realizing sound and light alarm during the system failure;
The watchdog circuit is connected with one-chip computer module, is disturbed for anti-locking system and program is lost or is come into Endless loop, cause system in case of system halt;
The input of the output control module is connected with one-chip computer module, is driven by two road JX03 bidirectional relays Integrated circuit control magnetic latching relay closes, is disconnected, realizes that avoiding the peak hour for charging pile adjusts ginseng control and function to show.
The input of the charging inlet module is connected with output control module, and charging pile is used using paid-type electric energy meter Family provides accounting management;
The input of the intelligent electric meter is connected with output control module, can forward and reverse electric energy using Bidirectional intelligent ammeter Metering;
The input of the inversion module is connected with output control module, battery pack direct current energy can be converted into alternating current Energy;
The input of the battery pack is connected with output control module, for power storage and conversion;
The output end of the power module is connected with one-chip computer module and is its power supply, and the power module is steady using three ends Briquetting voltage stabilizing, two level voltage stabilizing is carried out using Low Drift Temperature voltage-regulator diode.
Moreover, the intelligent electric meter uses Bidirectional intelligent ammeter, for completing electricity consumption and transmission of electricity bidirectional measuring.
A kind of charging pile, which is avoided the peak hour, adjusts the control method of ginseng control system, comprises the following steps:
Step 301:System initialization, self-test;
Step 302:There is failure and turn 303 in System self-test, otherwise turn 304;
Step 303:Alarm, system bypass;
Step 304:Read power information and Bidirectional intelligent ammeter historical data that power system issues;
Step 305:Call charging pile to avoid the peak hour and adjust ginseng policy calculation subprogram;
Step 306:Charging pile has user to ask to use, and calls NFC read-write subprograms to complete accounting management;
Step 307:Judgement is the electricity consumption crest segment time to turn 308, otherwise turns 310;
Step 308:Call output control subprogram, power load by it is battery-powered, according to control strategy dump energy It is reverse defeated power supply network electric energy to power network reverse power supply P=(Pc-Py) × K, P, the current electric energy of Pc battery packs, Py should for charging pile The electro-load forecast electric energy of electricity consumption period, K are energy-storage system nargin;
Step 309:Judge that the electricity consumption crest segment time terminates to turn 310, otherwise turn 308;
Step 310:Judgement is to turn 311 with the level section time, otherwise turns 313;
Step 311:Output control subprogram is called, next electricity consumption period is crest segment, and power load is powered by power network, battery Group charging, next electricity consumption period are paddy section, and power load turns power network power supply after exhausting battery electric quantity;
Step 312:The judgement level section time terminates to turn 313, otherwise turns 311;
Step 313:Judgement is the electricity consumption paddy section time to turn 314, otherwise turns 316;
Step 314:Output control subprogram is called, power load is powered by power network, battery pack charging;
Step 315:Judge that the electricity consumption paddy section time terminates to turn 316, otherwise turn 314;
Step 316:Watchdog zero clearing;
Step 317:Clock is at 24 points and turns 301, otherwise turns 306.
The advantages and positive effects of the present invention are:
Charging pile provided by the invention, which is avoided the peak hour, adjusts ginseng control system, is avoided the peak hour using what communication module reception power system issued Ginseng power consumption parameter is adjusted, the average power consumption of daily 24 hours loads is predicted by Bidirectional intelligent table historical data, at different electricity consumption peaks The paddy period, ginseng power consumption parameter is adjusted according to avoiding the peak hour, rationally controls the powering mode and the reverse power network of batteries residual electric energy of charging pile Generate electricity, it is achieved thereby that the spatial load forecasting of avoiding the peak hour of power network peak load shifting, reaches energy-saving and reduce charging pile running cost Purpose.
Brief description of the drawings
Fig. 1 be the present invention charging pile avoid the peak hour tune ginseng control system architecture schematic diagram;
In figure:0th, single-chip microcomputer;1st, communication module;2nd, memory module;3rd, display module;4th, NFC module for reading and writing;5th, failure report Alert module;6th, watchdog circuit;7th, output control module;8th, charging inlet module;9 intelligent electric meters,;10th, inversion module;11、 Battery pack;12nd, power module;
Fig. 2 is the output control circuit figure of the present invention;
In figure:201st, magnetic latching relay 1;202nd, intelligent electric meter;203rd, magnetic latching relay 2;204th, isolating transformer; 205th, wave filter;206th, rectifier;207th, isolating diode;208th, battery pack;209th, inverter;210th, isolating transformer; 211st, static switch;212nd, wave filter;213rd, charging inlet module;
Fig. 3 be the present invention charging pile avoid the peak hour tune ginseng control system main program flow chart;
Fig. 4 is the tune ginseng computational methods flow chart of avoiding the peak hour of the present invention.
Embodiment
The embodiment of the present invention is described in further detail below in conjunction with accompanying drawing:
A kind of charging pile, which is avoided the peak hour, adjusts ginseng control system, as shown in figure 1, including:Single-chip microcomputer 0, communication module 1, memory module 2nd, display module 3, NFC module for reading and writing 4, fault alarm module 5, watchdog circuit 6, output control module 7, charging inlet module 8th, intelligent electric meter 9, inversion module 10, battery pack 11 and power module 12;
The one-chip computer module 0 respectively with communication module 1, memory module 2, display module 3, NFC module for reading and writing 4, failure Alarm module 5 is connected with watchdog circuit 6, the output end of the single-chip microcomputer also by output control module 7 respectively with charging Mouth mold block 8, intelligent electric meter 9, inversion module 10, battery pack 11 are connected, and the mistake of charging pile is realized for writing complete program Adjust ginseng control management in peak;
The communication module 1 is connected with one-chip computer module 0, and power train is received by intelligent electric meter using power line carrier The tune of avoiding the peak hour issued of uniting joins power information, and sends charging pile use information;
In the present embodiment, the communication module 1 builds charging pile and intelligent electric meter 9 using the communication of power carrier data Vertical bidirectional data communication, realizes remote monitoring of the power system to charging pile.
The display module 3 is connected with one-chip computer module 0, and work(is carried out using LCDs and LED Light-Emitting Diodes Can instruction;
The NFC module for reading and writing 4 is connected with one-chip computer module 0, has NFC function core for using charging pile user The mobile communication equipment or IC card information of piece are written and read, and complete the accounting management that charging pile uses;
In the present embodiment, system makes charging pile user that the movement for possessing NFC function can be used by NFC module for reading and writing 4 Equipment and IC-card carry out accounting management.
The fault alarm module 5 is connected with one-chip computer module 0, the sound and light alarm module 5 by light emitting diode, raise one's voice Device and drive circuit composition, for realizing sound and light alarm during the system failure;
The watchdog circuit 6 is connected with one-chip computer module 0, is disturbed for anti-locking system and program is lost or is walked Enter endless loop, cause system in case of system halt;
The input of the output control module 7 is connected with one-chip computer module 0, is driven by two road JX03 bidirectional relays Dynamic integrated circuit control magnetic latching relay closes, is disconnected, realizes that avoiding the peak hour for charging pile adjusts ginseng control and function to show.
The input of the charging inlet module 8 is connected with output control module 7, using paid-type electric energy meter to charging pile User provides accounting management;
The input of the intelligent electric meter 9 is connected with output control module 7, can forward and reverse electricity using Bidirectional intelligent ammeter Can metering;
The input of the inversion module 10 is connected with output control module 7, can be changed battery pack direct current energy and be struck a bargain Flow electric energy;
In the present embodiment, the inversion module 10 can make battery pack electric energy in the power network electricity consumption crest segment time, according to electric power System is avoided the peak hour parameter request, adjusts electricity using at the peak time amount and to power network reverse power supply.
The input of the battery pack 11 is connected with output control module 7, for power storage and conversion;
The output end of the power module 12 is connected with one-chip computer module and is its power supply, and the power module uses three ends Regulator block voltage stabilizing, two level voltage stabilizing is carried out using Low Drift Temperature voltage-regulator diode.
As shown in Fig. 2 the output control circuit figure of the embodiment of the present invention.Power network is kept by the magnetic of intelligent electric meter 202 and 203 Relay 2, carried out after isolated variable is sent to the noise jamming that electromagnetic interface filter 205 filters out mains terminal by isolating transformer 204, It is sent on rectifier 206, the input of inverter 209 is sent to after exchange is become into direct current, under main control circuit driving, inverter DC direct currents are become voltage, frequency stabilization, glitch-free pure sine wave by 209 is output to static state by isolating transformer 210 Switch 211, after quality power is sent into output electromagnetic interface filter 212 by static switch 211, sent after filtering out interference by electromagnetic interface filter To charging inlet module end, the power supply of high-quality is provided for charging pile user;The energy of battery pack 208 is sent to isolating diode simultaneously 207 positive poles, because the voltage that current rectifying and wave filtering circuit 206 exports is higher than this voltage, so two isolation pole pipes 207 are in cut-off shape State, battery are in charging stand-by state.
When charging pile system controls the shut-off of 203 magnetic latching relays 2, the voltage that rectifier 206 exports is less than battery pack 208 voltages sent, isolating diode 207 turn on, and the energy of battery pack 208 is sent to the input of inverter 209, in main control electricity Under the driving of road, the DC direct currents that battery pack 208 is sent to are become voltage, frequency stabilization, glitch-free pure sine by inverter 209 Ripple is output to static switch 211 by isolating transformer 210, and quality power is sent into output electromagnetic interface filter by static switch 211 After 212, charging inlet module end is sent to after filtering out interference by electromagnetic interface filter, the power supply of high-quality is provided for charging pile user.
When charging pile system controls the shut-off of 203 magnetic latching relays 2, while during 201 magnetic latching relays 1 closure, remain The remaining electric energy of battery pack 208 passes through isolating diode 207, inverter 209, isolating transformer 210, static switch 211, wave filter 212nd, 201 magnetic latching relays 1, intelligent electric meter 202 are to power network reverse power supply.
During output control circuit failure, output control circuit works in bypass mode;Civil power is directly sent to static switch 211 On, it is sent to charging inlet module after output electromagnetic interface filter 212 filters out interference after being sent out by static switch 211.For user load Electric energy is provided.Bypass condition is all will be operate in when machine overload, excess temperature or fault of converter.
As shown in figure 3, the charging pile of the embodiment of the present invention, which is avoided the peak hour, adjusts the main program flow of ginseng control system.Charging pile is every Day 24 hours different electricity consumption periods, its powering mode tune ginseng that can be avoided the peak hour according to power system require the power supply of selection power network or electricity Pond group power supply;And batteries residual electric energy can be avoided the peak hour according to power system adjusts ginseng to require reverse grid generation, reduces charging Stake operation cost, improve the ability of power network peak load shifting;
The charging pile is avoided the peak hour, and tune ginseng control system allomeric function considers and handles reason subprogram by main program, tune of avoiding the peak hour, NVC reads and writes Subprogram, communication subprogram, output control subprogram, which coordinate, to be realized;
Tune of avoiding the peak hour considers and handles reason subprogram, and main program is sent out by reading Bidirectional intelligent ammeter, power supply energy historical data, is calculated Year, the moon, Zhou Pingjun are sent out, for energy value corresponding to daily 24 hours;And the peak interval of time issued according to power system and electricity consumption ginseng Numeral system is avoided the peak hour surely adjusts ginseng strategy;NVC read-writes subprogram is written and read by NVC module for reading and writing to user profile, if meeting makes With condition, then the paid-type electric energy meter that expense is inputted to charging inlet module provides charge power supply, charging pile to charging pile user After the completion of use, remaining cost is written back to mobile device or IC-card with NFC function, closes paid-type electric energy meter to charging pile The charge power supply that user provides completes accounting management;When communication subprogram receives the peak valley that power system issues by communication module Section and parameter of using electricity in off-peak hours, and charging pile electricity consumption situation is uploaded into power system;Output control subprogram adjusts ginseng plan by avoiding the peak hour Slightly, in the different working method of point, cutting edge of a knife or a sword, paddy, flat electricity consumption slot setup, use electricity in off-peak hours control function and the system of charging pile are realized Fault alarm module function and function are shown;Its charging pile, which is avoided the peak hour, adjusts the control method of ginseng control system to comprise the following steps:
Step 301:System initialization, self-test;
Step 302:There is failure and turn 303 in System self-test, otherwise turn 304;
Step 303:Alarm, system bypass;
Step 304:Read power information and Bidirectional intelligent ammeter historical data that power system issues;
Step 305:Call charging pile to avoid the peak hour and adjust ginseng policy calculation subprogram;
Step 306:Charging pile has user to ask to use, and calls NFC read-write subprograms to complete accounting management;
Step 307:Judgement is the electricity consumption crest segment time to turn 308, otherwise turns 310;
Step 308:Call output control subprogram, power load by it is battery-powered, according to control strategy dump energy It is reverse defeated power supply network electric energy to power network reverse power supply P=(Pc-Py) × K, P, the current electric energy of Pc battery packs, Py should for charging pile The electro-load forecast electric energy of electricity consumption period, K are energy-storage system nargin;
Step 309:Judge that the electricity consumption crest segment time terminates to turn 310, otherwise turn 308;
Step 310:Judgement is to turn 311 with the level section time, otherwise turns 313;
Step 311:Output control subprogram is called, next electricity consumption period is crest segment, and power load is powered by power network, battery Group charging, next electricity consumption period are paddy section, and power load turns power network power supply after exhausting battery electric quantity;
Step 312:The judgement level section time terminates to turn 313, otherwise turns 311;
Step 313:Judgement is the electricity consumption paddy section time to turn 314, otherwise turns 316;
Step 314:Output control subprogram is called, power load is powered by power network, battery pack charging;
Step 315:Judge that the electricity consumption paddy section time terminates to turn 316, otherwise turn 314;
Step 316:Watchdog zero clearing;
Step 317:Clock is at 24 points and turns 301, otherwise turns 306;
Be as shown in Figure 4 system charging pile avoid the peak hour tune ginseng computational methods flow chart.System is by reading Bidirectional intelligent electricity Table is sent out, power supply energy historical data calculates corresponding to daily 24 hours year, the moon, Zhou Pingjun are sent out, for energy value;And according to power train The peak interval of time and power consumption parameter that system issues formulate tune ginseng strategy of avoiding the peak hour;According to the day part power load and power train predicted System is avoided the peak hour requirement, is calculated to power network reverse power supply data;Tune of avoiding the peak hour is issued according to power system and joins the period to power network reverse power supply; Its step is:
Step 1, the historical data by intelligent electric meter acquisition charging pile electricity consumption and generating;
Step 2, by communication module obtain power system peak valley usually section and avoid the peak hour adjust parameter evidence;
Step 3, the year, the moon, Zhou Pingjun power consumptions for corresponding to the period for daily 24 hours are calculated according to equation below:
Step 4, the year for calculating daily 24 hours corresponding periods, the moon, Zhou Pingjun generated energy:
Step 5, according to week on days 4:3:3 proportion weighted calculates 24 hours days average power consumption of day part:At 24 hours day It is corresponding that corresponding period average power consumption=correspondence period average annual use of electricity × 0.4+ corresponds to period monthly average power consumption × 0.3+ Period Zhou Pingjun power consumption × 0.3;
Step 6,24 hours days average generated energy of day part is calculated according to the proportion weighted in week on days 4,3,3;
24 hours days corresponding period, average generated energy=correspondence period average annual energy output × 0.4+ corresponded to period monthly average Generated energy × 0.3+ corresponds to period Zhou Pingjun generated energy × 0.3;
Step 7, the battery pack Margin coefficient K that electricity consumption crest segment is set;
Step 8, avoiding the peak hour the tune ginseng data setting reverse power generation period according to power system;
Step 9, using the weighted average power consumption of 24 hours charging pile days day part, generated energy as Prediction Parameters, to filling Electric stake carries out tune ginseng control of avoiding the peak hour.
The charging pile of the present invention, which avoids the peak hour to adjust, joins the peak that control system and method enable charging pile to be issued according to power system Paddy period and avoid the peak hour tune ginseng power consumption parameter and intelligent electric meter historical data, set powering mode in the different electricity consumption periods, realize The tune ginseng control mode of avoiding the peak hour of charging pile, reduces charging pile running cost.So that power system dsm extends To user terminal, meet the purpose of power network peak load shifting, promote the load and energy management under intelligent grid environment.
It is emphasized that embodiment of the present invention is illustrative, rather than it is limited, therefore present invention bag Include and be not limited to embodiment described in embodiment, it is every by those skilled in the art's technique according to the invention scheme The other embodiment drawn, also belongs to the scope of protection of the invention.

Claims (3)

  1. The tune ginseng control system 1. a kind of charging pile is avoided the peak hour, it is characterised in that:Including:It is single-chip microcomputer, communication module, memory module, aobvious Show module, NFC module for reading and writing, fault alarm module, watchdog circuit, output control module, charging inlet module, intelligence electricity Table, inversion module, battery pack and power module;
    The one-chip computer module respectively with communication module, memory module, display module, NFC module for reading and writing, fault alarm module and Watchdog circuit is connected, and the output end of the single-chip microcomputer is also electric with charging inlet module, intelligence respectively by output control module Table, inversion module, battery pack are connected, and the tune ginseng control management of avoiding the peak hour of charging pile is realized for writing complete program;
    The communication module is connected with one-chip computer module, is received using power line carrier data communication mode by intelligent electric meter Tune ginseng power information that what power system issued avoid the peak hour, and send charging pile use information;
    The display module is connected with one-chip computer module, and function instruction is carried out using LCDs and LED Light-Emitting Diodes;
    The NFC module for reading and writing is connected with one-chip computer module, for using the shifting with NFC function chip to charging pile user Dynamic communication equipment or IC card information are written and read, and complete the accounting management that charging pile uses;
    The fault alarm module is connected with one-chip computer module, and the sound and light alarm module is by light emitting diode, loudspeaker and drive Dynamic circuit composition, for realizing sound and light alarm during the system failure;
    The watchdog circuit is connected with one-chip computer module, is disturbed for anti-locking system and program is lost or is come into and extremely follow Ring, cause system in case of system halt;
    The input of the output control module is connected with one-chip computer module, integrated by two road JX03 bidirectional relays drivings Circuit control magnetic latching relay closes, is disconnected, realizes that avoiding the peak hour for charging pile adjusts ginseng control and function to show.
    The input of the charging inlet module is connected with output control module, and charging pile user is carried using paid-type electric energy meter For accounting management;
    The input of the intelligent electric meter is connected with output control module, can forward and reverse electric energy meter using Bidirectional intelligent ammeter Amount;
    The input of the inversion module is connected with output control module, battery pack direct current energy can be converted into AC energy;
    The input of the battery pack is connected with output control module, for power storage and conversion;
    The output end of the power module is connected with one-chip computer module and is its power supply, and the power module uses three-terminal regulator block Voltage stabilizing, two level voltage stabilizing is carried out using Low Drift Temperature voltage-regulator diode.
  2. The tune ginseng control system 2. a kind of charging pile according to claim 1 is avoided the peak hour, it is characterised in that:The intelligent electric meter is adopted With Bidirectional intelligent ammeter, for completing electricity consumption and transmission of electricity bidirectional measuring.
  3. 3. any charging pile according to claim 1 or 2, which is avoided the peak hour, adjusts the control method of ginseng control system, its feature exists In:A kind of charging pile, which is avoided the peak hour, adjusts the control method of ginseng control system, comprises the following steps:
    Step 301:System initialization, self-test;
    Step 302:There is failure and turn 303 in System self-test, otherwise turn 304;
    Step 303:Alarm, system bypass;
    Step 304:Read power information and Bidirectional intelligent ammeter historical data that power system issues;
    Step 305:Call charging pile to avoid the peak hour and adjust ginseng policy calculation subprogram;
    Step 306:Charging pile has user to ask to use, and calls NFC read-write subprograms to complete accounting management;
    Step 307:Judgement is the electricity consumption crest segment time to turn 308, otherwise turns 310;
    Step 308:Call output control subprogram, power load from it is battery-powered, according to control strategy dump energy to electricity Net reverse power supply P=(Pc-Py) × K, P is reverse defeated power supply network electric energy, and the current electric energy of Pc battery packs, Py is the charging pile electricity consumption The electro-load forecast electric energy of period, K are energy-storage system nargin;
    Step 309:Judge that the electricity consumption crest segment time terminates to turn 310, otherwise turn 308;
    Step 310:Judgement is to turn 311 with the level section time, otherwise turns 313;
    Step 311:Output control subprogram is called, next electricity consumption period is crest segment, and power load is powered by power network, and battery pack is filled Electricity, next electricity consumption period are paddy section, and power load turns power network power supply after exhausting battery electric quantity;
    Step 312:The judgement level section time terminates to turn 313, otherwise turns 311;
    Step 313:Judgement is the electricity consumption paddy section time to turn 314, otherwise turns 316;
    Step 314:Output control subprogram is called, power load is powered by power network, battery pack charging;
    Step 315:Judge that the electricity consumption paddy section time terminates to turn 316, otherwise turn 314;
    Step 316:Watchdog zero clearing;
    Step 317:Clock is at 24 points and turns 301, otherwise turns 306.
CN201710969417.2A 2017-10-18 2017-10-18 A kind of charging pile, which is avoided the peak hour, adjusts ginseng control system and method Pending CN107634529A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710969417.2A CN107634529A (en) 2017-10-18 2017-10-18 A kind of charging pile, which is avoided the peak hour, adjusts ginseng control system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710969417.2A CN107634529A (en) 2017-10-18 2017-10-18 A kind of charging pile, which is avoided the peak hour, adjusts ginseng control system and method

Publications (1)

Publication Number Publication Date
CN107634529A true CN107634529A (en) 2018-01-26

Family

ID=61103417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710969417.2A Pending CN107634529A (en) 2017-10-18 2017-10-18 A kind of charging pile, which is avoided the peak hour, adjusts ginseng control system and method

Country Status (1)

Country Link
CN (1) CN107634529A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111009901A (en) * 2019-12-24 2020-04-14 福建百城新能源科技有限公司 Off-peak power utilization optimized scheduling system based on storage and charging system
CN111089397A (en) * 2019-12-11 2020-05-01 於晓明 Multi-point passive temperature detection control system and method for air conditioner
WO2020192304A1 (en) * 2019-03-25 2020-10-01 菲尼克斯亚太电气(南京)有限公司 Timing relay supporting nfc transmission of working parameter and corresponding system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077907A (en) * 2014-07-10 2014-10-01 国家电网公司 Device and method for forwarding electricity consumption information parameters of electric energy meter
CN104124692A (en) * 2014-08-19 2014-10-29 国家电网公司 System and method for controlling off-peak parameter adjustment of electric heating
CN105004061A (en) * 2015-07-20 2015-10-28 国网天津市电力公司 Electric water heater peak shifting parameter adjusting control system and load management method thereof
CN205725086U (en) * 2016-06-28 2016-11-23 汕头市高博电子科技有限公司 Charging pile management system
CN206135439U (en) * 2016-07-27 2017-04-26 国网新疆电力公司电力科学研究院 Fill electric pile based on temporal characteristic

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077907A (en) * 2014-07-10 2014-10-01 国家电网公司 Device and method for forwarding electricity consumption information parameters of electric energy meter
CN104124692A (en) * 2014-08-19 2014-10-29 国家电网公司 System and method for controlling off-peak parameter adjustment of electric heating
CN105004061A (en) * 2015-07-20 2015-10-28 国网天津市电力公司 Electric water heater peak shifting parameter adjusting control system and load management method thereof
CN205725086U (en) * 2016-06-28 2016-11-23 汕头市高博电子科技有限公司 Charging pile management system
CN206135439U (en) * 2016-07-27 2017-04-26 国网新疆电力公司电力科学研究院 Fill electric pile based on temporal characteristic

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020192304A1 (en) * 2019-03-25 2020-10-01 菲尼克斯亚太电气(南京)有限公司 Timing relay supporting nfc transmission of working parameter and corresponding system
CN111089397A (en) * 2019-12-11 2020-05-01 於晓明 Multi-point passive temperature detection control system and method for air conditioner
CN111009901A (en) * 2019-12-24 2020-04-14 福建百城新能源科技有限公司 Off-peak power utilization optimized scheduling system based on storage and charging system
CN111009901B (en) * 2019-12-24 2021-09-03 福建百城新能源科技有限公司 Off-peak power utilization optimized scheduling system based on storage and charging system

Similar Documents

Publication Publication Date Title
CN102832624B (en) Networked dispatching system for charging piles of electric automobile with power distribution network
CN102148534B (en) Power grid system and management method thereof
CN105576809A (en) Bidirectional charging pile system based on wind-solar-diesel-storage energy microgrid
CN102931672A (en) Power distribution type energy storage device and control system thereof
CN107634529A (en) A kind of charging pile, which is avoided the peak hour, adjusts ginseng control system and method
CN106364355A (en) Wireless and alternating current combined charging system and method thereof for electric vehicle
CN103532206B (en) A kind of charging pile
CN104102178A (en) Intelligent household microgrid system based on technology of internet of things
CN102593949B (en) User side peak-shaving power storage and supply system
CN105356517A (en) Dynamic distribution router and method for household energy and power generation planning method for household energy
CN201681440U (en) Electric automobile charge pile controller
CN105490372A (en) Solar alternating current charging pile capable of automatically switching power supplies
CN106230007A (en) A kind of micro-capacitance sensor energy storage Optimization Scheduling
CN205091372U (en) Multiloop independently measures electric energy meter
CN103078360A (en) Standard cluster power supply system of electronic automobile
CN206117281U (en) Solar energy power supply apparatus
CN206004322U (en) A kind of TRT is filled based on the intelligence of bus-stop
CN107579586A (en) A kind of ship power distribution control system based on intelligent controller
CN203101501U (en) Step-tariff-based intelligent electric meter system
CN102122410A (en) Method and device for remotely recharging prepaid smart electricity meter indoors
CN202167879U (en) Intelligent charging and monitoring integration device for electric automobile
CN202693675U (en) Power circuit for intelligent electric meter and three-phase intelligent electric meter with power circuit
CN201682282U (en) Alternating current charging post
CN202009256U (en) Integrated charger
CN206370704U (en) With reference to PLC intelligent charging spot

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180126

RJ01 Rejection of invention patent application after publication