CN107633080A - A kind of user task processing method and processing device - Google Patents
A kind of user task processing method and processing device Download PDFInfo
- Publication number
- CN107633080A CN107633080A CN201710874736.5A CN201710874736A CN107633080A CN 107633080 A CN107633080 A CN 107633080A CN 201710874736 A CN201710874736 A CN 201710874736A CN 107633080 A CN107633080 A CN 107633080A
- Authority
- CN
- China
- Prior art keywords
- task
- task object
- user
- processing method
- incidence relation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
This application provides a kind of user task processing method and electronic equipment, method to include:Receive the input data of user;Based on input data, task object set is obtained, task object set comprises at least a task object, and task object includes at least one task element;Element property of the task based access control object on same task element, the incidence relation established between task object.The user task processing method and electronic equipment that the application provides cause, when task object or task element change, incidence relation between task based access control object would know that impacted task object, it is modulated so as to task object further impacted to this, therefore, improve the reliability of task management, better user experience.
Description
Technical field
The application is related to technical field of software development, more particularly to a kind of user task processing method and electronic equipment.
Background technology
With the development of science and technology, artificial intelligence AI (ArtificialIntelligence) development is also more and more fast
Speed, and virtual personal assistant turns into one of Main way of current AI technologies development, it can pass through voice and word and user
Interact, help user to complete some tasks in life or work, such as meeting schedule, information inquiry, service reservation and day
Journey prompting etc..
But in the intelligent management of user task to there is some user task or the variation of its task element in AI at present
When, other tasks can't carry out automatic Modulation, cause the management reliability to user task relatively low, so as to influence making for user
With experience.
The content of the invention
The invention provides a kind of user task processing method and electronic equipment, to solve in the prior art to user
When task is managed, when being changed if there is some user task or its task element, other tasks can't be carried out certainly
Dynamic modulation, causes the management reliability to user task relatively low, the problem of so as to influence the usage experience of user, its technical scheme
It is as follows:
A kind of user task processing method, including:
Receive the input data of user;
Based on the input data, task object set is obtained, the task object set comprises at least a task pair
As, and the task object includes at least one task element;
Element property based on the task object on same task element, the association established between the task object
Relation.
Wherein, the task element comprises at least:Time element, position element, character element.
Wherein, the incidence relation comprises at least:On the dependence of task element, and/or, on element property
Ordering relation.
The user task processing method also includes:
Based on the incidence relation between the task object, the directed acyclic graph between the task object is generated;
The directed acyclic graph is exported.
The user task processing method also includes:
The first instruction is received, described first instructs for carrying out the first operation to first task object;
Based on the incidence relation between the task object, second task associated with the first task object is obtained
Object;
First operation is performed to the first task object, and detects whether second task object needs user
Handled.
Wherein, whether detection second task object needs user to be handled, including:
Judge that second task object whether there is after the first task object is performed first operation
Element conflict, if it is, the output first information, the first information is used to prompt user to change the second task object.
The user task processing method also includes:
The current scene attribute of user is monitored, the scene attribute comprises at least:Current ambient conditions, current location shape
State;
Based on the scene attribute and the incidence relation, the 3rd task object in the task object set is carried out
Task operating.
Wherein, based on the scene attribute and the incidence relation, to the 3rd task pair in the task object set
As carrying out task operating, including:
Based on the scene attribute and the incidence relation, judge whether there is the 3rd task pair in the task object set
As element conflict be present, if it is, the second information of output, second information is used to prompt user to carry out the 3rd task object
Change.
Wherein, based on the scene attribute and the incidence relation, to the 3rd task pair in the task object set
As carrying out task operating, including:
Based on the scene attribute and the incidence relation, the 3rd task object in the task object set is determined,
And task status change, the element property of the task element of the 3rd task object and institute are carried out to the 3rd task object
Stating scene attribute is associated.
A kind of electronic equipment, including:Memory and processor;
The memory, for storing data caused by application program and application program operation;
The processor, for performing the application program, to realize following functions:Receive the input data of user;Base
In the input data, task object set is obtained, the task object set comprises at least a task object, and described
Business object includes at least one task element;Element property based on the task object on same task element, establish institute
State the incidence relation between task object.
Above-mentioned technical proposal has the advantages that:
User task processing method provided by the invention and electronic equipment, task can be got based on the data input of user
Object set, and can element property of the task based access control object on same task element, the association established between task object
Relation, this causes, when task object or task element variation, the incidence relation between task based access control object would know that impacted
Task object, be modulated so as to task object further impacted to this, this improves task management can
By property, better user experience.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis
The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a schematic flow sheet of user task processing method provided in an embodiment of the present invention;
Fig. 2 is another schematic flow sheet of user task processing method provided in an embodiment of the present invention;
Fig. 3 is the schematic diagram of directed acyclic graph provided in an embodiment of the present invention;
Incidence relations of the Fig. 4 between task based access control object provided in an embodiment of the present invention, obtain and first task object
The schematic diagram of the specific implementation of the second associated task object;
Fig. 5 is another schematic flow sheet of user task processing method provided in an embodiment of the present invention;
Fig. 6 is the structural representation of electronic equipment provided in an embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
The embodiments of the invention provide a kind of user task processing method, referring to Fig. 1, showing that the flow of this method is shown
It is intended to, can includes:
Step S101:Receive the input data of user.
Wherein, the input data of user can be task requests data, and it can be text data, or voice number
According to.
Step S102:Based on input data, task object set is obtained.
Wherein, task object set includes at least one task object, and task object includes at least one task element,
Task element can at least include time element, position element, character element.
Step S103:Element property of the task based access control object on same task element, the pass established between task object
Connection relation.
Wherein, the incidence relation between task object can at least include the dependence on task element, and/or,
Ordering relation on element property.
User task processing method provided in an embodiment of the present invention, task object can be got based on the data input of user
Set, and can element property of the task based access control object on same task element, the incidence relation established between task object,
This causes, when task object or task element variation, the incidence relation between task based access control object would know that impacted appoint
Business object, is modulated, this improves the reliable of task management so as to task object further impacted to this
Property, better user experience.
Referring to Fig. 2, another schematic flow sheet of user task processing method provided in an embodiment of the present invention is shown, can
With including:
Step S201:Receive the input data of user.
Wherein, the input data of user can be task requests data, and it can be text data, or voice number
According to.
Step S202:Based on input data, task object set is obtained.
Wherein, task object set comprises at least a task object, and task object includes at least one task element,
Task element can at least include time element, position element, character element.
Step S203:Element property of the task based access control object on same task element, the pass established between task object
Connection relation.
Assuming that multiple tasks object is respectively provided with time element and position element, then it is based on
Wherein, the incidence relation between task object can at least include the dependence on task element, and/or,
Ordering relation on element property.
It is exemplary, there is the task task1 to be:Go to the airport by bus, the time:9:00-10:00, place:Company-capital
Airport, also a task task3 are:Multiply flight CA10021 to Shanghai, time:11:00-13:00, place:The Capital Airport-
Pudong airport, it can be seen that task task1 and task task3 from the time element and task element of task and dependence pass be present
System, task task3 execution depend on task task1.In addition, time element and position from task task1 and task task3
Element, which can be seen that task task1 and task task3, has certain ordering relation, and task task1 will come task task3
Before.
Method provided in an embodiment of the present invention can also include:Incidence relation between task based access control object, generate task
Directed acyclic graph (Directed Acyclic Graph, DAG) between object, and directed acyclic graph is exported.Refer to figure
3, the schematic diagram of a directed acyclic graph is shown, directed acyclic graph characterizes the incidence relation between task object, i.e., by having
It can intuitively find out the incidence relation between task object to acyclic figure.
Step S204:Receive the first instruction.
Wherein, first instruct for carrying out the first operation to first task object.
Specifically, the first operation can be the operation of query task object, or, to add the operation of task object, or
Person, to delete the operation of task object, or, to change the operation of task object.
Step S205:Incidence relation between task based access control object, obtain second times associated with first task object
Business object.
In a kind of possible implementation, inverted index, inverted index source can be established to all task objects of user
Need to search record according to the value of attribute in practical application, each single item in this concordance list all include a property value and
The address of each record with the property value.As shown in figure 4, the property value of index can include scene attribute (such as time, position
Put, personage etc.), task definition, dependence, task status etc..
When receiving the first instruction, the first instruction is parsed, the mission bit stream of first task object can be obtained,
After the mission bit stream for obtaining the first object, can the mission bit stream based on first task object, pass through the property value of foregoing index
Retrieved, can get task object by retrieval records, and by the task identification of first task object, may have access to oriented
Acyclic figure, so as to which second task object associated with first task object can be obtained by directed acyclic graph.In addition, in this reality
Apply in example, the life cycle state information of first task object can also be got by the task identification of first task object, its
In, life cycle state information is used for the implementation status for characterizing task object, and life cycle state information can include performing
(running), lack condition (pending), etc. pending (waiting, primary condition are ready), perform completion (finish).
Step S206:The first operation is performed to first task object, and detects whether the second task object needs user to enter
Row processing.
It should be noted that when being operated to first task object, such as when deletion, change first task object,
The incidence relation that may result between task object changes, and accordingly, directed acyclic graph can also change, now,
The task object for needing the change based on first task object to adjust needs is adjusted, while updates directed acyclic graph.
In the present embodiment, whether the second task object of detection needs user to be handled, including:Judge the second task pair
As whether there is element conflict after being performed the first operation in first task object, if it is, the output first information, the first letter
Cease for prompting user to change the second task object.
Exemplified by operation by the first operation for modification task object:Assuming that first task object is 9:00-10:00 performs thing
Part A, the second task object are 10:30~11:00 performs event B, if being 9 by first task object modification:40~10:40 hold
Act feelings A, then it will conflict in time with the second task object, now, exportable prompt message, to prompt user to the
Two task objects are modified, for example, the modification time B execution time, that is, change the time in the second task object, make its with
Time in amended first task object does not conflict.
User task processing method provided in an embodiment of the present invention, task object can be got based on the data input of user
Set, and can element property of the task based access control object on same task element, the incidence relation established between task object,
This causes, when task object or task element variation, the incidence relation between task based access control object would know that impacted appoint
Business object, and impacted task object is adjusted, this improves the reliability of task management, better user experience.
Referring to Fig. 5, another schematic flow sheet of user task processing method provided in an embodiment of the present invention is shown, can
With including:
Step S501:Receive the input data of user.
Wherein, the input data of user can be task requests data, and it can be text data, or voice number
According to.
Step S502:Based on input data, task object set is obtained.
Wherein, task object set comprises at least a task object, and task object includes at least one task element,
Task element can at least include time element, position element, character element.
Step S503:Element property of the task based access control object on same task element, the pass established between task object
Connection relation.
Wherein, the incidence relation between task object can at least include the dependence on task element, and/or,
Ordering relation on element property.
Step S504:Monitor the current scene attribute of user.
Wherein, scene attribute comprises at least current ambient conditions, current position state.
Step S505:Based on scene attribute and incidence relation, the 3rd task object in task object set is appointed
Business operation.
In a kind of possible implementation, based on scene attribute and incidence relation, to the 3rd in task object set
Task object carries out task operating, can include:Based on scene attribute and incidence relation, the 3rd in task object set is determined
Task object, and to the 3rd task object carry out task status change, the element property of the task element of the 3rd task object with
Scene attribute is associated.
Specifically, can all task objects of user be established with inverted index, the property value of index can include scene category
Property (such as time, position, personage), task definition, dependence, task status etc..In the present embodiment, the current feelings of user are monitored
Scape attribute, when the current scene attribute of user changes, retrieved with the scene attribute of change, obtain impacted appoint
The list of business object, the incidence relation being then based between task object, is determined from the list of impacted task object
The 3rd task object of element conflict be present, actively the 3rd task object that element conflict be present is changed.Need to illustrate
If can not be changed to the 3rd task object that element conflict be present, prompt message is exported, prompts user to depositing
Changed in the 3rd task object of element conflict.
In a kind of possible implementation, based on scene attribute and incidence relation, to the 3rd in task object set
Task object carries out task operating, can include:Based on scene attribute and incidence relation, judge whether have in task object set
There is element conflict in the 3rd task object, if it is, the second information of output, the second information is used to prompt user to the 3rd task pair
As being changed.
Specifically, establishing inverted index to all task objects of user, the property value of index can include scene attribute
(such as time, position, personage), task definition, dependence, task status etc..In the present embodiment, the current scene of user is monitored
Attribute, when the current scene attribute of user changes, retrieved with the scene attribute of change, obtain impacted task
The list of object, the incidence relation being then based between task object, determine to deposit from the list of impacted task object
In the 3rd task object of element conflict, prompt message is then exported, the finger for prompting user to change the 3rd task object
Show information.
User task processing method provided in an embodiment of the present invention, task object can be got based on the data input of user
Set, element property of the task based access control object on same task element, the incidence relation established between task object, can also be supervised
The current scene attribute of user is surveyed, the incidence relation between scene attribute and task object based on user determines impacted appoint
Business object, so as to be adjusted to impacted task object.User task processing method provided in an embodiment of the present invention can base
Incidence relation between scene attribute and task object detects possible task conflict in real time, and actively eliminate task conflict or
Person prompts user to eliminate task conflict, and user task processing method provided in an embodiment of the present invention improves the reliable of task management
Property, better user experience.
The embodiment of the present invention additionally provides a kind of electronic equipment, referring to Fig. 6, showing that the structure of the electronic equipment 60 is shown
It is intended to, can includes:Memory 601 and processor 602.Wherein:
Memory 601, for storing data caused by application program and application program operation.
Processor 602, for performing application program, to realize following functions:
Receive the input data of user;Based on the input data, task object set, the task object set are obtained
Including at least a task object, and the task object includes at least one task element;Based on the task object in phase
With the element property in task element, the incidence relation established between the task object.
Wherein, task element comprises at least:Time element, position element, character element.
Wherein, the incidence relation between task object comprises at least:On the dependence of task element, and/or, on
The ordering relation of element property.
User task processing method provided in an embodiment of the present invention, task object can be got based on the data input of user
Set, and can element property of the task based access control object on same task element, the incidence relation established between task object,
This causes, when task object or task element variation, the incidence relation between task based access control object would know that impacted appoint
Business object, is modulated, this improves the reliable of task management so as to task object further impacted to this
Property, better user experience.
In one embodiment, electronic equipment can also include:Output equipment.
Processor, it is additionally operable to be based on incidence relation, generates the directed acyclic graph (Directed between task object
Acyclic Graph, DAG), and the DAG is exported by the output equipment.
In one embodiment, processor 602, it is additionally operable to receive the first instruction, described first instructs for first task
Object carries out the first operation;Based on the incidence relation, second task object associated with the first task object is obtained;
First operation is performed to the first task object, and detects whether second task object is needed at user
Reason.
In one embodiment, processor 602 is when whether detection second task object needs user to be handled, tool
Body is used for:
Judge that second task object whether there is after the first task object is performed first operation
Element conflict, if it is, the output first information, the first information is used to prompt user to change the second task object.
In one embodiment, processor 602, it is additionally operable to monitor the current scene attribute of user, the scene attribute is at least
Including:Current ambient conditions, current position state;Based on the scene attribute and the incidence relation, to the task object
The 3rd task object in set carries out task operating.
In one embodiment, processor 602 is based on the scene attribute and the incidence relation, to the task object collection
When the 3rd task object in conjunction carries out task operating, it is specifically used for:
Based on the scene attribute and the incidence relation, judge whether there is the 3rd task pair in the task object set
As element conflict be present, if it is, the second information of output, second information is used to prompt user to carry out the 3rd task object
Change.
In one embodiment, processor 602 is based on the scene attribute and the incidence relation, to the task object collection
When the 3rd task object in conjunction carries out task operating, it is specifically used for:
Based on the scene attribute and the incidence relation, the 3rd task object in the task object set is determined,
And task status change, the element property of the task element of the 3rd task object and institute are carried out to the 3rd task object
Stating scene attribute is associated.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be and other
The difference of embodiment, between each embodiment identical similar portion mutually referring to.
In several embodiments provided herein, it should be understood that disclosed method, apparatus and equipment, can be with
Realize by another way.For example, device embodiment described above is only schematical, for example, the unit
Division, only a kind of division of logic function, can there is other dividing mode, such as multiple units or component when actually realizing
Another system can be combined or be desirably integrated into, or some features can be ignored, or do not perform.It is another, it is shown or
The mutual coupling discussed or direct-coupling or communication connection can be by some communication interfaces, between device or unit
Coupling or communication connection are connect, can be electrical, mechanical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit
The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs
's.In addition, each functional unit in each embodiment of the present invention can be integrated in it is in a processing unit or each
Unit is individually physically present, can also two or more units it is integrated in a unit.
If the function is realized in the form of SFU software functional unit and is used as independent production marketing or in use, can be with
It is stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words
The part to be contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, including some instructions are causing a computer equipment (can be
People's computer, server, or network equipment etc.) perform all or part of step of each embodiment methods described of the present invention.
And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention.
A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention
The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one
The most wide scope caused.
Claims (10)
- A kind of 1. user task processing method, it is characterised in that including:Receive the input data of user;Based on the input data, task object set is obtained, the task object set comprises at least a task object, and The task object includes at least one task element;Element property based on the task object on same task element, the association established between the task object are closed System.
- 2. user task processing method according to claim 1, it is characterised in that the task element comprises at least:When Between element, position element, character element.
- 3. user task processing method according to claim 1, it is characterised in that the incidence relation comprises at least:Close In the dependence of task element, and/or, the ordering relation on element property.
- 4. user task processing method according to claim 1, it is characterised in that also include:Based on the incidence relation between the task object, the directed acyclic graph between the task object is generated;The directed acyclic graph is exported.
- 5. user task processing method according to claim 1, it is characterised in that also include:The first instruction is received, described first instructs for carrying out the first operation to first task object;Based on the incidence relation between the task object, second task pair associated with the first task object is obtained As;First operation is performed to the first task object, and detects whether second task object needs user to carry out Processing.
- 6. user task processing method according to claim 5, it is characterised in that detection second task object Whether user is needed to be handled, including:Judge that second task object whether there is element after the first task object is performed first operation Conflict, if it is, the output first information, the first information is used to prompt user to change the second task object.
- 7. user task processing method according to claim 1, it is characterised in that also include:The current scene attribute of user is monitored, the scene attribute comprises at least:Current ambient conditions, current position state;Based on the scene attribute and the incidence relation, task is carried out to the 3rd task object in the task object set Operation.
- 8. user task processing method according to claim 7, it is characterised in that based on the scene attribute and the pass Connection relation, task operating is carried out to the 3rd task object in the task object set, including:Based on the scene attribute and the incidence relation, judge whether there is the 3rd task object to deposit in the task object set In element conflict, if it is, the second information of output, second information is used to prompt user to become the 3rd task object More.
- 9. user task processing method according to claim 7, it is characterised in that based on the scene attribute and the pass Connection relation, task operating is carried out to the 3rd task object in the task object set, including:Based on the scene attribute and the incidence relation, the 3rd task object in the task object set is determined, and it is right 3rd task object carries out task status change, element property and the feelings of the task element of the 3rd task object Scape attribute is associated.
- 10. a kind of electronic equipment, it is characterised in that including:Memory and processor;The memory, for storing data caused by application program and application program operation;The processor, for performing the application program, to realize following functions:Receive the input data of user;Based on the input data, task object set is obtained, the task object set is at least Including a task object, and the task object includes at least one task element;Based on the task object at identical The element property being engaged on element, the incidence relation established between the task object.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710874736.5A CN107633080B (en) | 2017-09-25 | 2017-09-25 | User task processing method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710874736.5A CN107633080B (en) | 2017-09-25 | 2017-09-25 | User task processing method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107633080A true CN107633080A (en) | 2018-01-26 |
CN107633080B CN107633080B (en) | 2020-06-23 |
Family
ID=61103379
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710874736.5A Active CN107633080B (en) | 2017-09-25 | 2017-09-25 | User task processing method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107633080B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110362394A (en) * | 2019-07-22 | 2019-10-22 | 北京明略软件系统有限公司 | Task processing method and device, storage medium, electronic device |
CN110705953A (en) * | 2019-08-19 | 2020-01-17 | 湖南正宇软件技术开发有限公司 | Data acquisition method and system |
TWI821033B (en) * | 2022-10-26 | 2023-11-01 | 大陸商鼎捷軟件股份有限公司 | Related data automatic processing system and method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060059496A1 (en) * | 2000-11-22 | 2006-03-16 | Microsoft Corporation | Methods and systems for structuring asynchronous processes |
US20060136918A1 (en) * | 2004-12-22 | 2006-06-22 | Microsoft Corporation | Decomposition of tasks into extensible and customizable business activities |
CN101673297A (en) * | 2009-09-24 | 2010-03-17 | 宇龙计算机通信科技(深圳)有限公司 | Method for setting and prompting schedule information, system and mobile terminal therefor |
CN102508716A (en) * | 2011-09-29 | 2012-06-20 | 用友软件股份有限公司 | Task control device and task control method |
CN103401998A (en) * | 2013-07-16 | 2013-11-20 | 广东欧珀移动通信有限公司 | Realization method of correlation alarm clock on mobile equipment |
CN105183819A (en) * | 2015-08-27 | 2015-12-23 | 安一恒通(北京)科技有限公司 | Methods and apparatus for providing alert message and generating alert setting item |
CN105302410A (en) * | 2014-07-30 | 2016-02-03 | 国家电网公司 | To-do event reminding method and apparatus |
-
2017
- 2017-09-25 CN CN201710874736.5A patent/CN107633080B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060059496A1 (en) * | 2000-11-22 | 2006-03-16 | Microsoft Corporation | Methods and systems for structuring asynchronous processes |
US20060136918A1 (en) * | 2004-12-22 | 2006-06-22 | Microsoft Corporation | Decomposition of tasks into extensible and customizable business activities |
CN101673297A (en) * | 2009-09-24 | 2010-03-17 | 宇龙计算机通信科技(深圳)有限公司 | Method for setting and prompting schedule information, system and mobile terminal therefor |
CN102508716A (en) * | 2011-09-29 | 2012-06-20 | 用友软件股份有限公司 | Task control device and task control method |
CN103401998A (en) * | 2013-07-16 | 2013-11-20 | 广东欧珀移动通信有限公司 | Realization method of correlation alarm clock on mobile equipment |
CN105302410A (en) * | 2014-07-30 | 2016-02-03 | 国家电网公司 | To-do event reminding method and apparatus |
CN105183819A (en) * | 2015-08-27 | 2015-12-23 | 安一恒通(北京)科技有限公司 | Methods and apparatus for providing alert message and generating alert setting item |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110362394A (en) * | 2019-07-22 | 2019-10-22 | 北京明略软件系统有限公司 | Task processing method and device, storage medium, electronic device |
CN110362394B (en) * | 2019-07-22 | 2022-04-26 | 北京明略软件系统有限公司 | Task processing method and device, storage medium and electronic device |
CN110705953A (en) * | 2019-08-19 | 2020-01-17 | 湖南正宇软件技术开发有限公司 | Data acquisition method and system |
TWI821033B (en) * | 2022-10-26 | 2023-11-01 | 大陸商鼎捷軟件股份有限公司 | Related data automatic processing system and method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN107633080B (en) | 2020-06-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7201730B2 (en) | Intention recommendation method, device, equipment and storage medium | |
US11301136B2 (en) | Capacity forecasting based on capacity policies and transactions | |
CN104813292A (en) | Scaling computing clusters in a distributed computing system | |
CN105897805A (en) | Method and device for cross-layer scheduling of resources of data center with multi-layer architecture | |
CN104254846B (en) | For the navigation based on content of electronic equipment | |
CN104145257A (en) | Semantic cache cloud services for connected devices | |
CN110083455A (en) | Figure computation processing method, device, medium and electronic equipment | |
US10956470B2 (en) | Facet-based query refinement based on multiple query interpretations | |
CN103294556B (en) | Method and system for host computer system access control | |
CN108289034B (en) | A kind of fault discovery method and apparatus | |
CN103530168B (en) | Multi-satellite remote sensing data processing system and method based on virtualization technology | |
CN108196876A (en) | PHP business collocation methods and central server based on file | |
CN107633080A (en) | A kind of user task processing method and processing device | |
CN113157947A (en) | Knowledge graph construction method, tool, device and server | |
CN106462933A (en) | Using content structure to socially connect users | |
US10109214B2 (en) | Cognitive bias determination and modeling | |
CN105630419A (en) | Partition view sending method of resource pools and management node | |
US11061739B2 (en) | Dynamic infrastructure management and processing | |
Baier et al. | Energy-utility analysis of probabilistic systems with exogenous coordination | |
CN111797422A (en) | Data privacy protection query method and device, storage medium and electronic equipment | |
CN109741141A (en) | Configure the method and industry pattern running environment configurator of industry pattern running environment | |
US20220207384A1 (en) | Extracting Facts from Unstructured Text | |
US11366964B2 (en) | Visualization of the entities and relations in a document | |
JP2023538941A (en) | Intelligent backup and restore of containerized environments | |
US20210034987A1 (en) | Auxiliary handling of metadata and annotations for a question answering system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |