CN107630715A - A kind of constructing tunnel dust falling device - Google Patents
A kind of constructing tunnel dust falling device Download PDFInfo
- Publication number
- CN107630715A CN107630715A CN201710780039.3A CN201710780039A CN107630715A CN 107630715 A CN107630715 A CN 107630715A CN 201710780039 A CN201710780039 A CN 201710780039A CN 107630715 A CN107630715 A CN 107630715A
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- water
- constructing tunnel
- dust falling
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Nozzles (AREA)
Abstract
The present invention relates to a kind of dust falling device, more particularly to a kind of constructing tunnel dust falling device.The technical problem to be solved in the present invention is to provide the constructing tunnel dust falling device that a kind of cost is low, time saving and energy saving, dust-laying effect is good, labor intensity is small.In order to solve the above-mentioned technical problem, the invention provides such a constructing tunnel dust falling device, bottom plate etc. is included;Bottom base plate is symmetrical to be connected with montant by bolted connection, montant bottom is provided with wheel, bottom plate top left side is provided with water injector, and bottom plate top right side is provided with and moves up and down device, and the sprinkler part of water injector is connected with moving up and down the moving parts of device.The present invention can carry out depositing dust work to job site spray water, be moved up and down by shower nozzle by starting pump working, can carry out large area watering work, reach the effect that cost is low, time saving and energy saving, dust-laying effect is good, labor intensity is small.
Description
Technical field
The present invention relates to a kind of dust falling device, more particularly to a kind of constructing tunnel dust falling device.
Background technology
Constructing tunnel, it is the abbreviation of new Austrian method for tunnel construction, it is that Austrian scholar applies in long campaigns tunnel
A kind of rational construction method of proposition from the viewpoint of rock mechanics, it is using spray anchor technology, monitoring parameter in work practice
Survey etc. and with a system that rock mechanics theory is formed and a kind of new engineering construction method for being formed.
Tunnel building site generally causes and stirred up a cloud of dust in work progress, and the pollution to environment is very serious.Use at present
Sprinkler, so need to expend higher cost, water consumption is also big;Artificial watering wastes time and energy, dust-laying effect is poor, work
Intensity is big, therefore needs the constructing tunnel depositing dust for researching and developing that a kind of cost is low, time saving and energy saving, dust-laying effect is good, labor intensity is small badly
Equipment.
The content of the invention
(1) technical problems to be solved
The present invention uses sprinkler at present in order to overcome, and so needs to expend higher cost, water consumption is also big;People
Work watering is wasted time and energy, the shortcomings that dust-laying effect is poor, labor intensity is big, the technical problem to be solved in the present invention is to provide one kind into
The constructing tunnel dust falling device that this is low, time saving and energy saving, dust-laying effect is good, labor intensity is small.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a constructing tunnel dust falling device, bottom is included
Plate, montant, wheel, water injector and device is moved up and down, bottom base plate is symmetrical to be connected with by bolted connection
Montant, montant bottom are provided with wheel, and bottom plate top left side is provided with water injector, and bottom plate top right side is provided with and moves up and down dress
Put, the sprinkler part of water injector is connected with moving up and down the moving parts of device.
Preferably, water injector includes water tank, water inlet pipe, water pump, outlet pipe and shower nozzle, and spiral shell is passed on left at the top of bottom plate
Tether the mode connect and water tank be installed, water tank inner bottom part is provided with water pump, is connected with water inlet pipe on the left of tank top, water inlet pipe with
Connected in water tank, outlet pipe is connected with water pump, for water outlet pipe end on the right side of tank top, water outlet pipe end is provided with spray
Head, shower nozzle are connected with moving up and down the moving parts of device.
Preferably, move up and down device and include slide rail, Electric Motor Wheel, driven pulley, sliding block, bracing wire and cross bar, bottom plate top
Right side is vertically-mounted by bolted connection slide rail, and slide rail top is provided with Electric Motor Wheel, and slide rail bottom is provided with driven
Wheel, bracing wire is slidably provided with slide rail, be connected with bracing wire between Electric Motor Wheel and driven pulley, the end of pulling top with sliding block respectively
Portion connects with bottom, and sliding block right flank is connected with cross bar by bolted connection, and shower nozzle is arranged on cross bar right-hand member.
Preferably, rotating device is also included, rotating device includes rack, bearing block and gear, and sliding block right flank leads to
Cross bolted mode and bearing block is installed, cross bar left end is located in the bearing in bearing block, passes through key connection in the middle part of cross bar
Mode be connected with gear, right end vertical is welded with rack at the top of bottom plate, and rack be located on rear side of gear, and wheel and rack engages.
Preferably, fixing device is also included, bottom plate top is symmetrical to be provided with fixing device, and fixing device includes spiral shell
Bar, knob, fixed plate and clutch shaft bearing, the left and right sides is provided with screwed hole at the top of bottom plate, is provided with screw rod in screwed hole, screw rod and
Screwed hole is coordinated by screw thread, and screw tip is welded with knob, and screw rod lower horizontal is provided with fixed plate, and fixed plate crown center leads to
Cross bolted mode and clutch shaft bearing is installed, screw rod bottom is located in clutch shaft bearing, and screw rod passes through interference with clutch shaft bearing
Mode is connected.
Preferably, also include sleeve and spring, bottom base plate is symmetrical be bolted mode is connected with set
Cylinder, sleeve is in being vertically arranged, and montant is located in sleeve, and montant is slidably matched with sleeve, between montant top and sleeve inner top
It is connected with spring.
Preferably, pole and handle are also included, bottom plate top left is provided with pole, and pole is in be vertically arranged, pole bottom
By bolted connection with being connected at the top of bottom plate, pole is located on the left of water tank at end, is connected at the top of pole left surface by bolt
The mode horizontal connection connect has handle.
Preferably, in addition to rubber sleeve, rubber sleeve is arranged with handle, rubber sleeve is fully wrapped around by handle, rubber sleeve
Thickness is at least 0.5cm.
Preferably, rubber slab is also included, the bottom of fixed plate is provided with rubber slab, and rubber slab is in horizontally disposed, rubber slab
The mode being connected by screw is connected with fixed plate.
Operation principle:In use, easily the present invention can be pushed at constructing tunnel by wheel.Sprayed water by starting
Device, water injector can carry out depositing dust work to construction site spray water.At the same time, start and move up and down device, up and down
Mobile device drives the sprinkler part of water injector to move up and down, and so as to carry out large area water spray work, dust-laying effect is good, work
Efficiency high.When need not use of the invention, close water injector and move up and down device.
Because water injector includes water tank, water inlet pipe, water pump, outlet pipe and shower nozzle, bolt is passed on left at the top of bottom plate
The mode of connection is provided with water tank, and water tank inner bottom part is provided with water pump, water inlet pipe, water inlet pipe and water are connected with the left of tank top
Being connected in case, outlet pipe is connected with water pump, for water outlet pipe end on the right side of tank top, water outlet pipe end is provided with shower nozzle,
Shower nozzle is connected with moving up and down the moving parts of device, so operating personnel add in right amount first by water inlet pipe into water tank
Clear water, then start pump working, water pump sprays the water in water tank by outlet pipe from shower nozzle, and the water of ejection is to constructing tunnel
Scene carries out depositing dust work.When need not use of the invention, switch off the pump.
Because moving up and down device includes slide rail, Electric Motor Wheel, driven pulley, sliding block, bracing wire and cross bar, bottom plate top right side
Vertically-mounted by bolted connection to have slide rail, slide rail top is provided with Electric Motor Wheel, and slide rail bottom is provided with driven pulley, sliding
Bracing wire is slidably provided with rail, is connected with bracing wire between Electric Motor Wheel and driven pulley, end of pulling respectively with the top of sliding block and
Bottom connects, and sliding block right flank is connected with cross bar by bolted connection, and shower nozzle is arranged on cross bar right-hand member, so starting electricity
Driving wheel positive and negative alternate rotates, and Electric Motor Wheel pulls sliding block to move up and down by bracing wire, and sliding block, which moves up and down, drives cross bar to move up and down,
Shower nozzle moves up and down therewith carries out large area water spray work.When need not use of the invention, Electric Motor Wheel is closed.
Because also including rotating device, rotating device includes rack, bearing block and gear, and sliding block right flank passes through spiral shell
Tether the mode connect and bearing block is installed, cross bar left end is located in the bearing in bearing block, passes through the side of key connection in the middle part of cross bar
Formula is connected with gear, and right end vertical is welded with rack at the top of bottom plate, and rack is located on rear side of gear, wheel and rack engagement, so
Band moving gear moves up and down during cross bar moves up and down, because wheel and rack engages, so positive and negative alternate turns gear simultaneously
It is dynamic, and then drive cross bar positive and negative alternate to rotate.I.e. cross bar is moved up and down while positive and negative alternate rotates, so as to drive shower nozzle one
Rotated while moving up and down one side positive and negative alternate, into make it that the water that shower nozzle sprays is more uniform.Further improve depositing dust
Effect.
It is symmetrical at the top of bottom plate to be provided with fixing device because also including fixing device, fixing device include screw rod,
Knob, fixed plate and clutch shaft bearing, the bottom plate top left and right sides are provided with screwed hole, screw rod, screw rod and spiral shell are provided with screwed hole
Pit is coordinated by screw thread, and screw tip is welded with knob, and screw rod lower horizontal is provided with fixed plate, and fixed plate crown center passes through
Bolted mode is provided with clutch shaft bearing, and screw rod bottom is located in clutch shaft bearing, and screw rod passes through interference side with clutch shaft bearing
Formula is connected, so when needing to fix the present invention, operating personnel turn screw rod clockwise by knob, and then drive and fix
Plate is moved down, and in the presence of clutch shaft bearing, fixed plate will not be rotated clockwise and rotated with screw rod.When fixed plate and ground
It is in close contact, continues to turn screw rod, when wheel departs from ground, stopping turns screw rod, and now the present invention is fixed.It need not consolidate
When fixed of the invention, operating personnel turn screw rod counterclockwise by knob, and then drive fixed plate to move up, when wheel again with
After the contact of ground, stopping turns screw rod.
Because also including sleeve and spring, bottom base plate is symmetrical be bolted mode is connected with sleeve,
In being vertically arranged, montant is located in sleeve sleeve, and montant is slidably matched with sleeve, is connected between montant top and sleeve inner top
There is spring, so during the mobile present invention, under the action of the spring, montant can slide up and down in sleeve, so as to
Play cushioning effect so that the present invention is not easy to jolt, and extends the service life of the present invention.
Because also including pole and handle, bottom plate top left is provided with pole, and in being vertically arranged, pole bottom leads to pole
Bolted mode is crossed with being connected at the top of bottom plate, pole is located on the left of water tank, is bolted at the top of pole left surface
Mode horizontal connection has handle, so operating personnel hold handle, handle coordinates with wheel, can more easily move the present invention
Position.
Because also including rubber sleeve, rubber sleeve is arranged with handle, rubber sleeve is fully wrapped around by handle, rubber sleeve thickness
At least 0.5cm, so operating personnel contact when holding handle with rubber sleeve, rubber sleeve soft texture so that operating personnel feel
Feel more comfortable.
Because also including rubber slab, the bottom of fixed plate is provided with rubber slab, and in being horizontally disposed with, rubber slab passes through rubber slab
The mode of mode connects for screw is connected with fixed plate, so the present invention, by after fixation, rubber slab contacts with ground, rubber slab coefficient of friction
Greatly so that the present invention is fixed to be consolidated very much.
(3) beneficial effect
The present invention can carry out depositing dust work, by shower nozzle by starting pump working to job site spray water
Lower movement, large area watering work can be carried out, wheel coordinates with handle, while can easily move the position of the present invention, reaches
Cost is low, time saving and energy saving, dust-laying effect is good, labor intensity is small effect.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the first enlarged diagram of fixing device of the present invention.
Fig. 5 is the 4th kind of main structure diagram of the present invention.
Fig. 6 is the 5th kind of main structure diagram of the present invention.
Fig. 7 is second of enlarged diagram of fixing device of the present invention.
Mark in accompanying drawing for:1- bottom plates, 2- montants, 3- wheels, 4- water injectors, 5- move up and down device, 41- water
Case, 42- water inlet pipes, 43- water pumps, 44- outlet pipes, 45- shower nozzles, 51- slide rails, 52- Electric Motor Wheels, 53- driven pulleys, 54- sliding blocks,
55- bracing wires, 56- cross bars, 6- rotating devices, 61- racks, 62- bearing blocks, 63- gears, 7- fixing devices, 71- screwed holes, 72-
Screw rod, 73- knobs, 74- fixed plates, 75- clutch shaft bearings, 8- sleeves, 9- springs, 10- poles, 11- handles, 12- rubber sleeves,
76- rubber slabs.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of constructing tunnel dust falling device, as shown in figs. 1-7, include bottom plate 1, montant 2, wheel 3, water injector 4
With move up and down device 5, the bottom of bottom plate 1 is symmetrical to be connected with montant 2, the installation of the bottom of montant 2 by bolted connection
There is wheel 3, the top left side of bottom plate 1 is provided with water injector 4, and the top right side of bottom plate 1 is provided with and moves up and down device 5, water injector 4
Sprinkler part is connected with moving up and down the moving parts of device 5.
Embodiment 2
A kind of constructing tunnel dust falling device, as shown in figs. 1-7, include bottom plate 1, montant 2, wheel 3, water injector 4
With move up and down device 5, the bottom of bottom plate 1 is symmetrical to be connected with montant 2, the installation of the bottom of montant 2 by bolted connection
There is wheel 3, the top left side of bottom plate 1 is provided with water injector 4, and the top right side of bottom plate 1 is provided with and moves up and down device 5, water injector 4
Sprinkler part is connected with moving up and down the moving parts of device 5.
Water injector 4 includes water tank 41, water inlet pipe 42, water pump 43, outlet pipe 44 and shower nozzle 45, the top left side of bottom plate 1
Water tank 41 is installed by bolted connection, the inner bottom part of water tank 41 is provided with water pump 43, and the top left side of water tank 41 is connected with
Water inlet pipe 42, water inlet pipe 42 are connected with outlet pipe 44, water tank 41 is run through in the end of outlet pipe 44 with being connected in water tank 41 on water pump 43
Top right side, the end of outlet pipe 44 are provided with shower nozzle 45, and shower nozzle 45 is connected with moving up and down the moving parts of device 5.
Embodiment 3
A kind of constructing tunnel dust falling device, as shown in figs. 1-7, include bottom plate 1, montant 2, wheel 3, water injector 4
With move up and down device 5, the bottom of bottom plate 1 is symmetrical to be connected with montant 2, the installation of the bottom of montant 2 by bolted connection
There is wheel 3, the top left side of bottom plate 1 is provided with water injector 4, and the top right side of bottom plate 1 is provided with and moves up and down device 5, water injector 4
Sprinkler part is connected with moving up and down the moving parts of device 5.
Water injector 4 includes water tank 41, water inlet pipe 42, water pump 43, outlet pipe 44 and shower nozzle 45, the top left side of bottom plate 1
Water tank 41 is installed by bolted connection, the inner bottom part of water tank 41 is provided with water pump 43, and the top left side of water tank 41 is connected with
Water inlet pipe 42, water inlet pipe 42 are connected with outlet pipe 44, water tank 41 is run through in the end of outlet pipe 44 with being connected in water tank 41 on water pump 43
Top right side, the end of outlet pipe 44 are provided with shower nozzle 45, and shower nozzle 45 is connected with moving up and down the moving parts of device 5.
Move up and down device 5 and include slide rail 51, Electric Motor Wheel 52, driven pulley 53, sliding block 54, bracing wire 55 and cross bar 56, bottom
The top right side of plate 1 is vertically-mounted by bolted connection slide rail 51, and the top of slide rail 51 is provided with Electric Motor Wheel 52, slide rail 51
Bottom is provided with driven pulley 53, is slidably provided with bracing wire 55 on slide rail 51, drawing is connected between Electric Motor Wheel 52 and driven pulley 53
Line 55, top and bottom of the end of bracing wire 55 respectively with sliding block 54 are connected, and the right flank of sliding block 54 connects by bolted connection
Cross bar 56 is connected to, shower nozzle 45 is arranged on the right-hand member of cross bar 56.
Embodiment 4
A kind of constructing tunnel dust falling device, as shown in figs. 1-7, include bottom plate 1, montant 2, wheel 3, water injector 4
With move up and down device 5, the bottom of bottom plate 1 is symmetrical to be connected with montant 2, the installation of the bottom of montant 2 by bolted connection
There is wheel 3, the top left side of bottom plate 1 is provided with water injector 4, and the top right side of bottom plate 1 is provided with and moves up and down device 5, water injector 4
Sprinkler part is connected with moving up and down the moving parts of device 5.
Water injector 4 includes water tank 41, water inlet pipe 42, water pump 43, outlet pipe 44 and shower nozzle 45, the top left side of bottom plate 1
Water tank 41 is installed by bolted connection, the inner bottom part of water tank 41 is provided with water pump 43, and the top left side of water tank 41 is connected with
Water inlet pipe 42, water inlet pipe 42 are connected with outlet pipe 44, water tank 41 is run through in the end of outlet pipe 44 with being connected in water tank 41 on water pump 43
Top right side, the end of outlet pipe 44 are provided with shower nozzle 45, and shower nozzle 45 is connected with moving up and down the moving parts of device 5.
Move up and down device 5 and include slide rail 51, Electric Motor Wheel 52, driven pulley 53, sliding block 54, bracing wire 55 and cross bar 56, bottom
The top right side of plate 1 is vertically-mounted by bolted connection slide rail 51, and the top of slide rail 51 is provided with Electric Motor Wheel 52, slide rail 51
Bottom is provided with driven pulley 53, is slidably provided with bracing wire 55 on slide rail 51, drawing is connected between Electric Motor Wheel 52 and driven pulley 53
Line 55, top and bottom of the end of bracing wire 55 respectively with sliding block 54 are connected, and the right flank of sliding block 54 connects by bolted connection
Cross bar 56 is connected to, shower nozzle 45 is arranged on the right-hand member of cross bar 56.
Also include rotating device 6, rotating device 6 includes rack 61, bearing block 62 and gear 63, the right flank of sliding block 54
Bearing block 62 is installed by bolted connection, the left end of cross bar 56 is located in the bearing in bearing block 62, the middle part of cross bar 56
Gear 63 is connected with by way of key connection, the top right end vertical of bottom plate 1 is welded with rack 61, after rack 61 is located at gear 63
Side, gear 63 engage with rack 61.
Also include fixing device 7, the top of bottom plate 1 left and right is arranged with fixing device 7, and fixing device 7 includes screw rod
72nd, knob 73, fixed plate 74 and clutch shaft bearing 75, the top of bottom plate 1 left and right sides are provided with screwed hole 71, are provided with screwed hole 71
Screw rod 72, screw rod 72 are coordinated with screwed hole 71 by screw thread, and the top of screw rod 72 is welded with knob 73, and the lower horizontal of screw rod 72 is provided with
Fixed plate 74, the crown center of fixed plate 74 are provided with clutch shaft bearing 75 by bolted connection, and the bottom of screw rod 72 is positioned at the
In one bearing 75, screw rod 72 is connected with clutch shaft bearing 75 by interference mode.
Also include sleeve 8 and spring 9, the bottom of bottom plate 1 is symmetrical be bolted mode is connected with sleeve 8,
Sleeve 8 is in being vertically arranged, and montant 2 is located in sleeve 8, and montant 2 is slidably matched with sleeve 8, the top of montant 2 and the inner top of sleeve 8
Between be connected with spring 9.
Also include pole 10 and handle 11, the top left of bottom plate 1 is provided with pole 10, and pole 10 is in be vertically arranged, pole
10 bottoms are connected with the top of bottom plate 1 by bolted connection, and pole 10 is located at the left side of water tank 41, the left surface of pole 10 top
Horizontal connection has handle 11 by bolted connection.
Also include rubber sleeve 12, be arranged rubber sleeve 12 on handle 11, rubber sleeve 12 is fully wrapped around by handle 11, rubber
Cover 12 thickness and be at least 0.5cm.
Also include rubber slab 76, the bottom of fixed plate 74 is provided with rubber slab 76, and rubber slab 76 is in horizontally disposed, rubber slab
76 modes being connected by screw are connected with fixed plate 74.
Operation principle:In use, easily the present invention can be pushed at constructing tunnel by wheel 3.Sprayed by starting
Water installations 4, water injector 4 can carry out depositing dust work to construction site spray water.At the same time, start and move up and down device 5,
Moving up and down device 5 drives the sprinkler part of water injector 4 to move up and down, so as to carry out large area water spray work, dust-laying effect
Good, operating efficiency is high.When need not use of the invention, close water injector 4 and move up and down device 5.
Because water injector 4 includes water tank 41, water inlet pipe 42, water pump 43, outlet pipe 44 and shower nozzle 45, the top of bottom plate 1
Pass on left bolted mode and water tank 41 is installed, the inner bottom part of water tank 41 is provided with water pump 43, and the top left side of water tank 41 connects
Water inlet pipe 42 is connected to, water inlet pipe 42 is connected with outlet pipe 44, water is run through in the end of outlet pipe 44 with being connected in water tank 41 on water pump 43
The top right side of case 41, the end of outlet pipe 44 are provided with shower nozzle 45, and shower nozzle 45 is connected with moving up and down the moving parts of device 5, institute
Appropriate clear water is added into water tank 41 by water inlet pipe 42 first with operating personnel, then starts water pump 43 and works, water pump 43
Water in water tank 41 is sprayed by outlet pipe 44 from shower nozzle 45, the water of ejection carries out depositing dust work to tunnel construction site.No
When needing to use the present invention, 43 are switched off the pump.
Because moving up and down device 5 includes slide rail 51, Electric Motor Wheel 52, driven pulley 53, sliding block 54, bracing wire 55 and cross bar
56, the top right side of bottom plate 1 is vertically-mounted by bolted connection slide rail 51, and the top of slide rail 51 is provided with Electric Motor Wheel 52,
The bottom of slide rail 51 is provided with driven pulley 53, is slidably provided with bracing wire 55 on slide rail 51, connects between Electric Motor Wheel 52 and driven pulley 53
Bracing wire 55 is connected to, top and bottom of the end of bracing wire 55 respectively with sliding block 54 are connected, and the right flank of sliding block 54 is bolted
Mode is connected with cross bar 56, and shower nozzle 45 is arranged on the right-hand member of cross bar 56, is rotated so starting the positive and negative alternate of Electric Motor Wheel 52, Electric Motor Wheel 52
Sliding block 54 is pulled to move up and down by bracing wire 55, sliding block 54, which moves up and down, drives cross bar 56 to move up and down, and shower nozzle 45 is upper and lower therewith
It is mobile to carry out large area water spray work.When need not use of the invention, Electric Motor Wheel 52 is closed.
Because also including rotating device 6, rotating device 6 includes rack 61, bearing block 62 and gear 63, and sliding block 54 is right
Side is provided with bearing block 62 by bolted connection, and the left end of cross bar 56 is located in the bearing in bearing block 62, cross bar 56
Middle part is connected with gear 63 by way of key connection, and the top right end vertical of bottom plate 1 is welded with rack 61, and rack 61 is located at gear
63 rear sides, gear 63 engage with rack 61, so band moving gear 63 moves up and down during cross bar 56 moves up and down, because of gear
63 engage with rack 61, so positive and negative alternate rotates gear 63 simultaneously, and then drive the positive and negative alternate of cross bar 56 to rotate.That is cross bar 56
Move up and down while positive and negative alternate rotates, so as to drive shower nozzle 45 to move up and down while positive and negative alternate rotation, enters
So that the water that shower nozzle 45 sprays is more uniform.Further improve dust-laying effect.
Because also including fixing device 7, the top of bottom plate 1 left and right is arranged with fixing device 7, and fixing device 7 includes
Screw rod 72, knob 73, fixed plate 74 and clutch shaft bearing 75, the top of bottom plate 1 left and right sides are provided with screwed hole 71, in screwed hole 71
Provided with screw rod 72, screw rod 72 is coordinated with screwed hole 71 by screw thread, and the top of screw rod 72 is welded with knob 73, the lower horizontal of screw rod 72
Provided with fixed plate 74, the crown center of fixed plate 74 is provided with clutch shaft bearing 75, the bottom position of screw rod 72 by bolted connection
In in clutch shaft bearing 75, screw rod 72 is connected with clutch shaft bearing 75 by interference mode, so when needing to fix the present invention,
Operating personnel turn screw rod 72 clockwise by knob 73, and then drive fixed plate 74 to move down, in the work of clutch shaft bearing 75
Under, fixed plate 74 will not be rotated clockwise and rotated with screw rod 72.When fixed plate 74 and ground close contact, continue to turn spiral shell
Bar 72, when wheel 3 departs from ground, stopping turns screw rod 72, and now the present invention is fixed.When need not fix the present invention, behaviour
Make personnel and screw rod 72 is turned by knob 73 counterclockwise, and then drive fixed plate 74 to move up, when wheel 3 connects with ground again
After touch, stop turning screw rod 72.
Because also including sleeve 8 and spring 9, the bottom of bottom plate 1 is symmetrical be bolted mode is connected with set
Cylinder 8, sleeve 8 is in being vertically arranged, and montant 2 is located in sleeve 8, and montant 2 is slidably matched with sleeve 8, in the top of montant 2 and sleeve 8
Spring 9 is connected between top, so during the mobile present invention, in the presence of spring 9, montant 2 can be in sleeve 8
Inside slide up and down, so as to play cushioning effect so that the present invention is not easy to jolt, and extends the service life of the present invention.
Because also including pole 10 and handle 11, the top left of bottom plate 1 is provided with pole 10, and pole 10 is in be vertically arranged,
The bottom of pole 10 is connected with the top of bottom plate 1 by bolted connection, and pole 10 is located at the left side of water tank 41, the left surface of pole 10
Horizontal connection has handle 11 by bolted connection at top, so operating personnel hold handle 11, handle 11 is matched somebody with somebody with wheel 3
Close, can more easily move the position of the present invention.
Because also including rubber sleeve 12, rubber sleeve 12 is arranged on handle 11, rubber sleeve 12 is fully wrapped around by handle 11,
The thickness of rubber sleeve 12 is at least 0.5cm, so operating personnel contact when holding handle 11 with rubber sleeve 12, the quality of rubber sleeve 12 is soft
It is soft so that operating personnel feel more comfortable.
Because also including rubber slab 76, the bottom of fixed plate 74 is provided with rubber slab 76, and rubber slab 76 is in horizontally disposed, rubber
The mode that offset plate 76 is connected by screw is connected with fixed plate 74, so the present invention, by after fixation, rubber slab 76 contacts with ground,
The coefficient of friction of rubber slab 76 is big so that the present invention is fixed to be consolidated very much.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (9)
1. a kind of constructing tunnel dust falling device, it is characterised in that include bottom plate (1), montant (2), wheel (3), water spray dress
Put (4) and move up and down device (5), bottom plate (1) bottom is symmetrical to be connected with montant (2) by bolted connection, erects
Bar (2) bottom is provided with wheel (3), and bottom plate (1) top left side is provided with water injector (4), and bottom plate (1) top right side is provided with up and down
Mobile device (5), the sprinkler part of water injector (4) are connected with moving up and down the moving parts of device (5).
2. a kind of constructing tunnel dust falling device according to claim 1, it is characterised in that water injector (4) includes
Water tank (41), water inlet pipe (42), water pump (43), outlet pipe (44) and shower nozzle (45), bottom plate (1) top left side are bolted
Mode water tank (41) is installed, water tank (41) inner bottom part is provided with water pump (43), and water tank (41) top left side is connected with into water
Manage (42), water inlet pipe (42) is connected with outlet pipe (44), outlet pipe (44) end is passed through with being connected in water tank (41) on water pump (43)
Water tank (41) top right side is worn, outlet pipe (44) end is provided with shower nozzle (45), shower nozzle (45) and the shifting for moving up and down device (5)
Dynamic component connects.
3. a kind of constructing tunnel dust falling device according to claim 2, it is characterised in that move up and down device (5) bag
Slide rail (51), Electric Motor Wheel (52), driven pulley (53), sliding block (54), bracing wire (55) and cross bar (56), bottom plate (1) top right are included
Side is vertically-mounted by bolted connection slide rail (51), and slide rail (51) top is provided with Electric Motor Wheel (52), slide rail (51)
Bottom is provided with driven pulley (53), is slidably provided with bracing wire (55) on slide rail (51), Electric Motor Wheel (52) and driven pulley (53) it
Between be connected with bracing wire (55), top and bottom of bracing wire (55) end respectively with sliding block (54) are connected, and sliding block (54) right flank leads to
Cross bolted mode and be connected with cross bar (56), shower nozzle (45) is arranged on cross bar (56) right-hand member.
4. a kind of constructing tunnel dust falling device according to claim 3, it is characterised in that also include rotating device
(6), rotating device (6) includes rack (61), bearing block (62) and gear (63), and sliding block (54) right flank is bolted
Mode bearing block (62) is installed, cross bar (56) left end is located in the bearing in bearing block (62), passes through in the middle part of cross bar (56)
The mode of key connection is connected with gear (63), and right end vertical is welded with rack (61) at the top of bottom plate (1), and rack (61) is located at gear
(63) rear side, gear (63) engage with rack (61).
5. a kind of constructing tunnel dust falling device according to claim 4, it is characterised in that also include fixing device
(7), left and right is arranged with fixing device (7) at the top of bottom plate (1), and fixing device (7) includes screw rod (72), knob (73), consolidated
Fixed board (74) and clutch shaft bearing (75), bottom plate (1) the top left and right sides are provided with screwed hole (71), spiral shell are provided with screwed hole (71)
Bar (72), screw rod (72) are coordinated with screwed hole (71) by screw thread, and screw rod (72) top is welded with knob (73), under screw rod (72)
Fang Shuiping is provided with fixed plate (74), and fixed plate (74) crown center is provided with clutch shaft bearing (75) by bolted connection,
Screw rod (72) bottom is located in clutch shaft bearing (75), and screw rod (72) is connected with clutch shaft bearing (75) by interference mode.
A kind of 6. constructing tunnel dust falling device according to claim 5, it is characterised in that also include sleeve (8) and
Spring (9), bottom plate (1) bottom is symmetrical be bolted mode is connected with sleeve (8), sleeve (8) in being vertically arranged,
Montant (2) is located in sleeve (8), and montant (2) is slidably matched with sleeve (8), between montant (2) top and sleeve (8) inner top
It is connected with spring (9).
A kind of 7. constructing tunnel dust falling device according to claim 6, it is characterised in that also include pole (10) and
Handle (11), bottom plate (1) top left are provided with pole (10), and for pole (10) in being vertically arranged, pole (10) bottom passes through bolt
With being connected at the top of bottom plate (1), pole (10) is located on the left of water tank (41) mode of connection, passes through spiral shell at the top of pole (10) left surface
Tethering the mode horizontal connection connect has handle (11).
8. a kind of constructing tunnel dust falling device according to claim 7, it is characterised in that also including rubber sleeve
(12) rubber sleeve (12), is arranged on handle (11), rubber sleeve (12) is fully wrapped around by handle (11), and rubber sleeve (12) thickness is extremely
It is 0.5cm less.
9. a kind of constructing tunnel dust falling device according to claim 8, it is characterised in that also include rubber slab
(76), the bottom of fixed plate (74) is provided with rubber slab (76), and in being horizontally disposed with, rubber slab (76) is connected rubber slab (76) by screw
The mode connect is connected with fixed plate (74).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710780039.3A CN107630715A (en) | 2017-09-01 | 2017-09-01 | A kind of constructing tunnel dust falling device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710780039.3A CN107630715A (en) | 2017-09-01 | 2017-09-01 | A kind of constructing tunnel dust falling device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107630715A true CN107630715A (en) | 2018-01-26 |
Family
ID=61100351
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710780039.3A Pending CN107630715A (en) | 2017-09-01 | 2017-09-01 | A kind of constructing tunnel dust falling device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107630715A (en) |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108300417A (en) * | 2018-01-31 | 2018-07-20 | 庄玉琼 | A kind of constructing tunnel dust-proofing agent draft machine |
| CN108361058A (en) * | 2018-02-07 | 2018-08-03 | 曾福宁 | A kind of constructing tunnel watering and lowering dust equipment |
| CN108379973A (en) * | 2018-03-12 | 2018-08-10 | 赣州牛研科技有限公司 | Use depositing dust machine to a kind of construction of hydro project |
| CN108532524A (en) * | 2018-03-21 | 2018-09-14 | 南昌华学科技有限公司 | A kind of road construction water sprayer |
| CN108722705A (en) * | 2018-05-29 | 2018-11-02 | 张罗悦 | A kind of movable tunnel construction atomizing de-dusting apparatus |
| CN108952792A (en) * | 2018-07-09 | 2018-12-07 | 朱绍雄 | A kind of energy-saving watering and lowering dust equipment of constructing tunnel |
| CN109653786A (en) * | 2019-03-05 | 2019-04-19 | 华北理工大学 | A kind of pit mining dust suppression equipment |
| CN110195569A (en) * | 2019-05-06 | 2019-09-03 | 黄天楚 | A kind of oil exploitation rotary drilling equipment |
| CN110237623A (en) * | 2019-06-24 | 2019-09-17 | 陈莹 | A kind of construction environmental protection device for reducing dust |
| CN111963977A (en) * | 2020-07-29 | 2020-11-20 | 湖南一肯照明有限公司 | Wisdom street lamp with dust fall function |
| CN112282831A (en) * | 2020-11-28 | 2021-01-29 | 湖南煤矿机械有限公司 | Spraying dust-settling device of electric traction coal mining machine |
| CN115554792A (en) * | 2022-05-23 | 2023-01-03 | 陈益锋 | Dust suppressing vehicle for bridge and tunnel construction |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001219422A (en) * | 2000-02-10 | 2001-08-14 | Nakayama Tekko Kk | Waste compactly treating concrete cutting machine |
| CN106833712A (en) * | 2017-03-21 | 2017-06-13 | 郭钦 | A kind of oil high efficiente callback device |
| CN106862126A (en) * | 2017-02-14 | 2017-06-20 | 刘荣春 | A kind of municipal road billboard wiping device |
| CN107029371A (en) * | 2017-04-25 | 2017-08-11 | 刘燕 | A kind of lane residential building fire-extinguishing truck |
| CN107049200A (en) * | 2017-05-09 | 2017-08-18 | 李长财 | A kind of shoes processing vamp high-efficiency cleaning device |
| CN107059747A (en) * | 2017-06-21 | 2017-08-18 | 惠安普科优利网络科技有限公司 | A kind of quick dust falling device of construction |
-
2017
- 2017-09-01 CN CN201710780039.3A patent/CN107630715A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001219422A (en) * | 2000-02-10 | 2001-08-14 | Nakayama Tekko Kk | Waste compactly treating concrete cutting machine |
| CN106862126A (en) * | 2017-02-14 | 2017-06-20 | 刘荣春 | A kind of municipal road billboard wiping device |
| CN106833712A (en) * | 2017-03-21 | 2017-06-13 | 郭钦 | A kind of oil high efficiente callback device |
| CN107029371A (en) * | 2017-04-25 | 2017-08-11 | 刘燕 | A kind of lane residential building fire-extinguishing truck |
| CN107049200A (en) * | 2017-05-09 | 2017-08-18 | 李长财 | A kind of shoes processing vamp high-efficiency cleaning device |
| CN107059747A (en) * | 2017-06-21 | 2017-08-18 | 惠安普科优利网络科技有限公司 | A kind of quick dust falling device of construction |
Non-Patent Citations (2)
| Title |
|---|
| 朱成璞: "《卫生杀虫药械应用指南》", 30 November 1988, 上海交通大学出版社 * |
| 莫海军: "《机械设计基础:少学时》", 31 August 2014, 华南理工大学出版社 * |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108300417A (en) * | 2018-01-31 | 2018-07-20 | 庄玉琼 | A kind of constructing tunnel dust-proofing agent draft machine |
| CN108361058A (en) * | 2018-02-07 | 2018-08-03 | 曾福宁 | A kind of constructing tunnel watering and lowering dust equipment |
| CN108379973A (en) * | 2018-03-12 | 2018-08-10 | 赣州牛研科技有限公司 | Use depositing dust machine to a kind of construction of hydro project |
| CN108532524A (en) * | 2018-03-21 | 2018-09-14 | 南昌华学科技有限公司 | A kind of road construction water sprayer |
| CN108722705A (en) * | 2018-05-29 | 2018-11-02 | 张罗悦 | A kind of movable tunnel construction atomizing de-dusting apparatus |
| CN108952792A (en) * | 2018-07-09 | 2018-12-07 | 朱绍雄 | A kind of energy-saving watering and lowering dust equipment of constructing tunnel |
| CN109653786A (en) * | 2019-03-05 | 2019-04-19 | 华北理工大学 | A kind of pit mining dust suppression equipment |
| CN110195569A (en) * | 2019-05-06 | 2019-09-03 | 黄天楚 | A kind of oil exploitation rotary drilling equipment |
| CN110237623A (en) * | 2019-06-24 | 2019-09-17 | 陈莹 | A kind of construction environmental protection device for reducing dust |
| CN111963977A (en) * | 2020-07-29 | 2020-11-20 | 湖南一肯照明有限公司 | Wisdom street lamp with dust fall function |
| CN112282831A (en) * | 2020-11-28 | 2021-01-29 | 湖南煤矿机械有限公司 | Spraying dust-settling device of electric traction coal mining machine |
| CN115554792A (en) * | 2022-05-23 | 2023-01-03 | 陈益锋 | Dust suppressing vehicle for bridge and tunnel construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107630715A (en) | A kind of constructing tunnel dust falling device | |
| CN206233219U (en) | A kind of construction site ground multi-stag roller-compactor | |
| CN206503129U (en) | A kind of construction site quick roller-compactor in ground | |
| CN107059747A (en) | A kind of quick dust falling device of construction | |
| CN107503682A (en) | A kind of monitor installation perforating device | |
| CN107127171A (en) | A kind of traffic bridge roadblock device for high-efficiency cleaning | |
| CN106272927A (en) | Concrete prefabricated beam automatic spray health-preservation device | |
| CN107252787A (en) | A kind of efficient cleaning equipment of building implement | |
| CN108057298A (en) | A kind of construction environmental protection device | |
| CN205636607U (en) | Bridge is with water spray heat sink | |
| CN107100080A (en) | Sprinkler is used after a kind of bridge is good | |
| CN205477360U (en) | Quick digging device in ground for building | |
| CN106859516A (en) | A kind of family removes grease and uses high pressure washer | |
| CN217028781U (en) | Anchor rod drilling machine for digging and improving high slope | |
| CN107376550A (en) | Movable spraying system and its spraying method | |
| CN109277218A (en) | A kind of mine ionic liquid inhibitor spraying device and spraying method | |
| CN115749154A (en) | Green building roof | |
| CN206752327U (en) | Sprinkler is used after a kind of bridge is good | |
| CN212663039U (en) | Portable dust device that sprays of building site | |
| CN220226459U (en) | Construction guardrail | |
| CN207071557U (en) | A kind of traffic bridge roadblock device for high-efficiency cleaning | |
| CN211537041U (en) | Building engineering construction is with portable dust device | |
| CN207295596U (en) | A kind of quick dust falling device of construction | |
| CN214460348U (en) | Powder spraying pile machine with portable dust suppression system | |
| CN210841002U (en) | Spraying structure for building garden green belt |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180126 |