Prior art keywords
piping lane
area
lane section
pipe line
line area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711049892.4A
Other languages
Chinese (zh)
Inventor
胡峻
石斌
彭国辉
蒋振军
刘光铸
王新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinmao Technology Development Co Ltd
Original Assignee
Jiangsu Jinmao Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jinmao Technology Development Co Ltd filed Critical Jiangsu Jinmao Technology Development Co Ltd
Priority to CN201711049892.4A priority Critical patent/CN107604945A/en
Publication of CN107604945A publication Critical patent/CN107604945A/en
Pending legal-status Critical Current

Links

Landscapes

  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of strong prefabricated piping lane of anti-pressure ability, including piping lane section, the piping lane section is rectangular parallelepiped structure, the piping lane section rear and front end is provided with corresponding projection and groove, rainwater area is divided into by dividing plate inside piping lane section, pipe line area, contraminated zone, the rainwater area is disposed in parallel in piping lane section bottom with contraminated zone, pipe line area is arranged at the top of piping lane section, it is dome-shaped above the pipe line area, at least three discharge pipe fixed mounts are provided with inside pipe line area, the pipe fixing bracket outer end is provided with baffle plate, overcoat is provided with the outside of the piping lane section, the overcoat is reinforced concrete structure, steel strand rope connecting hole is provided with overcoat, the present invention uses circle arched structure, pressure can be born, structural stability is strong, protect pipeline, service life is grown.

Description

A kind of strong prefabricated piping lane of anti-pressure ability
Technical field
The invention belongs to building element technical field, and in particular to a kind of strong prefabricated piping lane of anti-pressure ability.
Background technology
Prefabricated piping lane is to be used to concentrate the public tunnel for laying the municipal pipelines such as water, electricity, gas, communication in Urban Underground, existing Some underground pipe galleries are the square structure of both-side opening, are connected with each other during laying and form, but are actually using now Because piping lane is arranged on underground in journey, very big pressure is undertaken at the top of piping lane, easy cracking damage, has a strong impact on service life, And easily there is security incident, and the problems such as follow-up repairing is difficult, difficult in maintenance occur, need to improve.
The content of the invention
To solve the above problems, the invention discloses a kind of strong prefabricated piping lane of anti-pressure ability, circle arched structure, Neng Goucheng It is stressed, structural stability is strong, protects pipeline, service life length.
To reach above-mentioned purpose, technical scheme is as follows:
A kind of strong prefabricated piping lane of anti-pressure ability, it is characterised in that:Including piping lane section, the piping lane section is rectangular parallelepiped structure, institute State piping lane section rear and front end and be provided with corresponding projection and groove, rainwater area, pipe line area, sewage are divided into by dividing plate inside piping lane section Area, the rainwater area are disposed in parallel in piping lane section bottom with contraminated zone, and pipe line area is arranged at the top of piping lane section, on the pipe line area Side is dome-shaped, is provided with least three discharge pipe fixed mounts inside pipe line area, the pipe fixing bracket outer end is provided with baffle plate, the pipe Overcoat is provided with the outside of corridor section, the overcoat is reinforced concrete structure, and steel strand rope connecting hole is provided with overcoat.
As a modification of the present invention, the section of the projection and groove is isosceles trapezoid.
As a modification of the present invention, the rainwater area, contraminated zone inwall are provided with water-repellent paint.
As a modification of the present invention, illuminating lamp is provided with above the pipe line area.
As a modification of the present invention, the pipe fixing bracket is provided with label.
As a modification of the present invention, the pipe fixing bracket is bolted with baffle plate.
The beneficial effects of the invention are as follows:
A kind of strong prefabricated piping lane of anti-pressure ability of the present invention, circle arched structure, can bear pressure, structural stability By force, pipeline, service life length are protected.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Reference numerals list:
1st, piping lane section, 2, groove, 3, dividing plate, 4, rainwater area, 5, pipe line area, 6, contraminated zone, 7, pipe fixing bracket, 8, baffle plate, 9, Overcoat, 10, steel strand rope connecting hole, 11, water-repellent paint, 12, illuminating lamp, 13, label, 14, bolt.
Embodiment
With reference to the accompanying drawings and detailed description, the present invention is furture elucidated, it should be understood that following embodiments are only For illustrating the present invention rather than limitation the scope of the present invention.It should be noted that the word " preceding " used below in description, " rear ", "left", "right", "up" and "down" refer to the direction in accompanying drawing, and word " interior " and " outer " refer respectively to direction or remote From the direction of particular elements geometric center.
As illustrated, the prefabricated piping lane that a kind of anti-pressure ability of the present invention is strong, including piping lane section 1, the piping lane section 1 For rectangular parallelepiped structure, the rear and front end of piping lane section 1 is provided with corresponding groove 2 and projection(Overleaf, it is not drawn into), piping lane section 1 Inside is divided by dividing plate 3 is disposed in parallel in piping lane section 1 for rainwater area 4, pipe line area 5, contraminated zone 6, the rainwater area 4 with contraminated zone 6 Bottom, pipe line area 5 are arranged at the top of piping lane section, and the top of pipe line area 5 is dome-shaped, and the inside of pipe line area 5 is provided with least three rows Pipe fixing bracket 7, the outer end of pipe fixing bracket 7 are provided with baffle plate 8, and the outside of piping lane section 1 is provided with overcoat 9, the protection Layer 9 is reinforced concrete structure, and steel strand rope connecting hole 10 is provided with overcoat 9.
A kind of strong prefabricated piping lane of anti-pressure ability of the present invention, circle arched structure, outside are provided with overcoat 9, internal Increase reinforcing bar, bigger pressure can be born, intensity is high, and structural stability is strong, protects pipeline, service life length, the rainwater Area 4, contraminated zone 6 can realize the dirty separation of rain, and rainwater area 4, the inwall of contraminated zone 6 are provided with water-repellent paint 11, waterproof and dampproof, pipe line area 5 inside can arrange different pipelines, and capacity is big, practical.
The section of projection and groove of the present invention is isosceles trapezoid, and splicing is convenient and swift, improves installation effectiveness.
The top of pipe line area 5 of the present invention is provided with illuminating lamp 12, convenient operation.
Pipe fixing bracket 7 of the present invention is provided with label 13, indicates the title effect of different pipelines, is easy to check and ties up Repair.
Pipe fixing bracket 7 of the present invention is connected with baffle plate 8 by bolt 14, and pipeline holds up baffle plate after putting well upwards, Ensure that pipeline is not fallen off, reduce rate of breakdown, improve security.
Technological means disclosed in the present invention program is not limited only to the technological means disclosed in above-mentioned embodiment, in addition to Formed technical scheme is combined by above technical characteristic.

Claims (6)

  1. A kind of 1. strong prefabricated piping lane of anti-pressure ability, it is characterised in that:Including piping lane section, the piping lane section is rectangular parallelepiped structure, The piping lane section rear and front end is provided with corresponding projection and groove, is divided into rainwater area, pipe line area, sewage by dividing plate inside piping lane section Area, the rainwater area are disposed in parallel in piping lane section bottom with contraminated zone, and pipe line area is arranged at the top of piping lane section, on the pipe line area Side is dome-shaped, is provided with least three discharge pipe fixed mounts inside pipe line area, the pipe fixing bracket outer end is provided with baffle plate, the pipe Overcoat is provided with the outside of corridor section, the overcoat is reinforced concrete structure, and steel strand rope connecting hole is provided with overcoat.
  2. A kind of 2. strong prefabricated piping lane of anti-pressure ability according to claim 1, it is characterised in that:The projection and groove Section is isosceles trapezoid.
  3. A kind of 3. strong prefabricated piping lane of anti-pressure ability according to claim 1, it is characterised in that:The rainwater area, sewage Area's inwall is provided with water-repellent paint.
  4. A kind of 4. strong prefabricated piping lane of anti-pressure ability according to claim 1, it is characterised in that:Set above the pipe line area There is illuminating lamp.
  5. A kind of 5. strong prefabricated piping lane of anti-pressure ability according to claim 1, it is characterised in that:On the pipe fixing bracket Provided with label.
  6. A kind of 6. strong prefabricated piping lane of anti-pressure ability according to claim 1, it is characterised in that:The pipe fixing bracket with Baffle plate is bolted.
CN201711049892.4A 2017-10-31 2017-10-31 A kind of strong prefabricated piping lane of anti-pressure ability Pending CN107604945A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711049892.4A CN107604945A (en) 2017-10-31 2017-10-31 A kind of strong prefabricated piping lane of anti-pressure ability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711049892.4A CN107604945A (en) 2017-10-31 2017-10-31 A kind of strong prefabricated piping lane of anti-pressure ability

Publications (1)

Publication Number Publication Date
CN107604945A true CN107604945A (en) 2018-01-19

Family

ID=61085379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711049892.4A Pending CN107604945A (en) 2017-10-31 2017-10-31 A kind of strong prefabricated piping lane of anti-pressure ability

Country Status (1)

Country Link
CN (1) CN107604945A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2661777Y (en) * 2003-12-19 2004-12-08 南京鸿宇市政设施投资管理有限责任公司 Municipal underground pipeline lane
KR100706161B1 (en) * 2006-10-13 2007-04-13 주식회사 삼안 Combined sewer pipe installation structure
KR100938853B1 (en) * 2009-01-30 2010-01-26 배석동 Precast panel with holes and connective structure and contructing method using thereof
CN204608830U (en) * 2014-12-30 2015-09-02 青岛厚科信息工程有限公司 Novel underground pipe gallery
CN205062838U (en) * 2015-09-22 2016-03-02 赵洪志 Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN205839797U (en) * 2016-07-19 2016-12-28 上海宝冶集团有限公司 There is the underground pipe gallery of water storage function
CN206052769U (en) * 2016-09-29 2017-03-29 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery with drainage function
CN206289655U (en) * 2016-11-25 2017-06-30 沈阳建筑大学 A kind of underground pipe gallery with retaining and preliminary filtering function
CN206289663U (en) * 2016-10-10 2017-06-30 张青富 A kind of body and pipe gallery
CN107237352A (en) * 2017-07-12 2017-10-10 江苏金贸科技发展有限公司 A kind of band protects the prefabricated piping lane of cable cover
CN107269940A (en) * 2017-07-12 2017-10-20 江苏金贸科技发展有限公司 A kind of many Pipe racks of assembled waterproof
CN207597425U (en) * 2017-10-31 2018-07-10 江苏金贸科技发展有限公司 A kind of strong prefabricated piping lane of anti-pressure ability

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2661777Y (en) * 2003-12-19 2004-12-08 南京鸿宇市政设施投资管理有限责任公司 Municipal underground pipeline lane
KR100706161B1 (en) * 2006-10-13 2007-04-13 주식회사 삼안 Combined sewer pipe installation structure
KR100938853B1 (en) * 2009-01-30 2010-01-26 배석동 Precast panel with holes and connective structure and contructing method using thereof
CN204608830U (en) * 2014-12-30 2015-09-02 青岛厚科信息工程有限公司 Novel underground pipe gallery
CN205062838U (en) * 2015-09-22 2016-03-02 赵洪志 Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN205839797U (en) * 2016-07-19 2016-12-28 上海宝冶集团有限公司 There is the underground pipe gallery of water storage function
CN206052769U (en) * 2016-09-29 2017-03-29 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery with drainage function
CN206289663U (en) * 2016-10-10 2017-06-30 张青富 A kind of body and pipe gallery
CN206289655U (en) * 2016-11-25 2017-06-30 沈阳建筑大学 A kind of underground pipe gallery with retaining and preliminary filtering function
CN107237352A (en) * 2017-07-12 2017-10-10 江苏金贸科技发展有限公司 A kind of band protects the prefabricated piping lane of cable cover
CN107269940A (en) * 2017-07-12 2017-10-20 江苏金贸科技发展有限公司 A kind of many Pipe racks of assembled waterproof
CN207597425U (en) * 2017-10-31 2018-07-10 江苏金贸科技发展有限公司 A kind of strong prefabricated piping lane of anti-pressure ability

Similar Documents

Publication Publication Date Title
CN108999118A (en) A kind of anti-collision guard rail for highways
CN204151825U (en) Super-section prestressing force Urban Underground pipe gallery
CN107604945A (en) A kind of strong prefabricated piping lane of anti-pressure ability
CN207597425U (en) A kind of strong prefabricated piping lane of anti-pressure ability
CN106958260A (en) A kind of pipe gallery
CN201196299Y (en) Prefabricated concrete pipe gallery
CN205557579U (en) Well controllable formula underground pipe gallery in storehouse is assembled to adding to prestressing force
CN201196300Y (en) Prefabricated cylindrical reinforcing steel frame concrete pipe gallery
CN203977337U (en) Fixed central strip pier
CN207062995U (en) Hoisting port
KR200385180Y1 (en) Fireplug lay under the ground
CN201835294U (en) Rubber water-stop for underground building settlement joint
CN201196308Y (en) Precast pre-stress concrete pipe gallery with edge rounding
CN107653907A (en) A kind of multifunctional fabricated underground pipe gallery
CN218759943U (en) Flexible protective net device for preventing rock falling from top of tunnel
CN202124917U (en) Anti-theft drainage channel used for highway and urban road
CN208668299U (en) Tubine structure under a kind of culvert top plate
CN201196306Y (en) Precast pre-stress steel cylinder concrete pipe gallery
CN217781624U (en) Highway engineering curb maintenance drainage structures
CN201196303Y (en) Precast pre-stress concrete pipe gallery
CN203594093U (en) Falling-proof concrete grid structure
CN218061792U (en) Inspection shaft safety device
CN203270763U (en) Municipal administration path rainwater inspection well
CN201196307Y (en) Precast pre-stress reinforced steel cylinder concrete pipe gallery
CN112727499B (en) Protection device for underground pipeline in rectangular pipe jacking construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180119

RJ01 Rejection of invention patent application after publication