CN107604813B - Municipal Bridge guardrail and its construction method - Google Patents

Municipal Bridge guardrail and its construction method Download PDF

Info

Publication number
CN107604813B
CN107604813B CN201710647780.2A CN201710647780A CN107604813B CN 107604813 B CN107604813 B CN 107604813B CN 201710647780 A CN201710647780 A CN 201710647780A CN 107604813 B CN107604813 B CN 107604813B
Authority
CN
China
Prior art keywords
plug connector
catch basin
lower module
perforation
bottom base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710647780.2A
Other languages
Chinese (zh)
Other versions
CN107604813A (en
Inventor
潘祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Hua Long Construction Co Ltd
Original Assignee
Wenzhou Hua Long Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Hua Long Construction Co Ltd filed Critical Wenzhou Hua Long Construction Co Ltd
Priority to CN201710647780.2A priority Critical patent/CN107604813B/en
Publication of CN107604813A publication Critical patent/CN107604813A/en
Application granted granted Critical
Publication of CN107604813B publication Critical patent/CN107604813B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of municipal Bridge guardrail and its construction methods, it is advantageous that drainage performance is good while having preferable bonding strength.A kind of municipal administration Bridge guardrail, top base including bottom base and above bottom base, the top base is equipped with guard assembly, the top base and bottom base junction are equipped with dredge outlet, the top base is equipped with the plug connector moved in the vertical direction, the position of face plug connector is equipped with jack on the bottom base, further includes the control assembly for controlling plug connector and moving up and down.In jack when road surface does not have rainwater on plug connector insertion bottom base, plug connector can also play the role of reinforcing support, so that guardrail has preferable bonding strength.Plug connector is controlled by control assembly when rain on road surface to open up, and rainwater is spilt out by dredge outlet, increases the drainability of bridge floor.

Description

Municipal Bridge guardrail and its construction method
Technical field
The present invention relates to a kind of municipal bridge, in particular to a kind of municipal Bridge guardrail and its construction method.
Background technique
Many cities can build bridge to preferably keep the traffic moving, and bridge can be also built on river, but by There is no guardrail will danger close on bridge floor in people's walking.Rainwater is excessive when raining will cause bridge floor ponding, general guardrail Rainwater barrier can not be discharged, can thus accumulate rainwater will cause traffic jam, and since rainwater can be with very much Soil, since the accumulation of soil can also block, so to dredge in time, but dredge outlet is excessive, will affect the stability of railing.
Authorization Notice No. is that the utility model patent of CN206127885U discloses a kind of municipal Bridge guardrail.This is practical new Type controls the opening and closing of dredge outlet by automatically controlled mode, makes guardrail connection with higher strong by closing dredge outlet usually Degree.
Summary of the invention
One of purpose of the invention is to provide a kind of municipal Bridge guardrail, it is advantageous that having preferable bonding strength While drainage performance it is good.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of municipal Bridge guardrail, packet Bottom base and the top base above bottom base are included, the top base is equipped with guard assembly, the top base and bottom base Junction is equipped with dredge outlet, and the top base is equipped with the plug connector moved in the vertical direction, and face is inserted on the bottom base The position of fitting is equipped with jack, further includes the control assembly for controlling plug connector and moving up and down.
By using above-mentioned technical proposal, in jack when road surface does not have rainwater on plug connector insertion bottom base, Plug connector can also play the role of reinforcing support, so that guardrail has preferable bonding strength.On road surface when rain Plug connector is controlled by control assembly to open up, and rainwater is spilt out by dredge outlet, increases the draining energy of bridge floor Power.
The present invention is further arranged to: the bottom base is equipped with catch basin, and the control assembly includes being located at catch basin In the rotating bar that is fixedly connected with floating ball of floating ball and one end, the bottom base is equipped with and the middle part of rotating bar is rotatablely connected Bracket, the other end of the rotating bar is equipped with drawstring, and the guard assembly is equipped with fixed pulley, and the drawstring bypasses fixed pulley It is fixedly connected later with plug connector.
By using above-mentioned technical proposal, pass through the sink-float of floating ball in catch basin as dynamic after catch basin is opened on bottom base Power element to drive plug connector to move up and down by rotating bar, drawstring, fixed pulley cooperation transmitting power.Catch basin is small under simultaneously The effect of caching can also be played when rain.
The present invention is further arranged to: the rotating bar is connected close to rotating bar with drawstring with the rotating joint of bracket One end.
By using above-mentioned technical proposal, the tie point of rotating bar and bracket is positioned close to one end of drawstring, so that Rotating bar and bracket play the role of laborsaving lever so that floating ball in water by lesser buoyancy when can float.
The present invention is further arranged to: the side of the catch basin is equipped with permeable hole.
By using above-mentioned technical proposal, permeable hole is set to be to dislike the water in catch basin to be in the state being slowly discharged. So that water level when not raining in catch basin can decline, so that plug connector reinserts in jack.And in order to not influence The diameter of integral strength, permeable hole is smaller and quantity also can be less, will not influence catch basin water storage, equally can not be as draining Main means.
The present invention is further arranged to: the port of the catch basin is equipped with placing groove, is equipped with cover board, institute in the placing groove Cover board is stated equipped with filtration hole.
By using above-mentioned technical proposal, placing groove is set to install cover board in the top of catch basin, opens filter on the cover board Water hole avoids impurity from entering in catch basin, and permeable hole is caused to be blocked.
The present invention is further arranged to: the filter basket being detachably connected is equipped in the catch basin.
By using above-mentioned technical proposal, filter basket is set further to filter lesser impurity, permeable hole is avoided to be blocked Plug, at the same filter basket can take apart it is easy to clean.
The present invention is further arranged to: the cover board is equipped with the column spinner being rotatablely connected with cover board, the column spinner Lower end is protruded into catch basin, and the lower end of the column spinner is equipped with the rotation long slab being fixedly connected with column spinner, the catch basin The arc locked groove that can be caught in rotation long slab is equipped on the inner wall of two sides.
By using above-mentioned technical proposal, rotation long slab rotation can be operated by rotating column spinner, pass through rotation long slab rotation It is caught in arc locked groove to fix cover board, cover board is avoided to deviate from from placing groove.It simultaneously again can be with when needing to open cover board Rotation long slab is screwed out.
The present invention is further arranged to: the upper surface of the column spinner and the upper surface of cover board are concordant, the column spinner Upper surface is equipped with rectangular operating groove.
By using above-mentioned technical proposal, operating groove is set to facilitate with drive rotation in straight screwdriver insertion operation slot Long slab rotation.
The present invention is further arranged to: the middle part of the arc locked groove be equipped with vertically with the jam plate of reservoir sidewall.
By using above-mentioned technical proposal, jam plate is set to facilitate rotation to know whether when rotating long slab and have been rotated by In place.
It is a further object to provide a kind of construction methods of above-mentioned municipal Bridge guardrail.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of applying for municipal Bridge guardrail Work method, comprising:
Step a, Prefabricated block;
Prefabricated first lower module: the upper surface of the first lower module is provided with the catch basin of side perforation, on the side wall of catch basin It is provided with the first locked groove;The lower end of first lower module is provided with the first perforation of multiple and reinforcing bar cooperation;
Prefabricated second lower module: the side of the second lower module is provided with the second locked groove;The lower end of second lower module is provided with multiple With the second perforation of reinforcing bar cooperation, the second perforation runs through the second lower module;
Prefabricated top base module: the lower end surface of top base module be provided with second perforation contraposition third perforate, it is prefabricated on The upper end of pedestal is connected with horizontal bar and vertical column;
Step b, is spliced to form guardrail;
After spreading adhesive on reserved steel bar on bridge floor, part reserved steel bar is passed through into the first perforation, by first Lower module is fixed on bridge floor;The second perforation that remaining reserved steel bar passes through the second lower module third is penetrated later later to wear Kong Zhong, so that the second lower module and top base module are also all fixed, and the position of the position of the second lower module and the first lower module Set alignment;
Step c installs plug connector and control assembly.
By using above-mentioned technical proposal, the municipal administration Bridge guardrail rapid construction is formed by above-mentioned construction method.
In conclusion the invention has the benefit that
1, reinforce support in jack when not raining on plug connector insertion bottom base, opened Sometimes When It Rains, so that rain Water can be spilt out by dredge outlet, increase the drainability of bridge floor;
2, cover board is caught in arc locked groove fixed by rotation long slab rotation, and cover board is avoided to deviate from from placing groove.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment one;
Fig. 2 is the enlarged drawing in Fig. 1 at A;
Fig. 3 is the structural schematic diagram of the first lower module in embodiment one;
Fig. 4 is the structural schematic diagram of the second lower module in embodiment one;
Fig. 5 is the structural schematic diagram of upper die holder in embodiment one.
Appended drawing reference: 1, bottom base;2, top base;3, column is indulged;4, horizontal bar;5, dredge outlet;6, jack;7, plug connector;8, Catch basin;9, floating ball;10, bracket;11, rotating bar;12, drawstring;13, fixed pulley;14, permeable hole;15, placing groove;16, it covers Plate;17, filtration hole;18, filter basket;19, column spinner;20, operating groove;21, long slab is rotated;22, arc locked groove;23, jam plate; 24, the first lower module;25, the first locked groove;26, the first perforation;27, the second lower module;28, the second locked groove;29, the second perforation; 30, third is perforated.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.
Embodiment one: as shown in Figure 1, a kind of municipal administration Bridge guardrail, including bottom base 1 and upper above bottom base 1 Pedestal 2, the top of top base 2 are equipped with the vertical column 3 that more are fixedly connected with top base 2 to play the effect of protection pedestrian, indulge The upper end on column 3 is fixedly connected with a horizontal bar 4.The upper surface of bottom base 1 is concordant with bridge floor, and top base 2 connects with bottom base 1 The place of connecing is provided with multiple for hydrophobic dredge outlet 5.The rainwater of bridge floor can be transferred out by dredge outlet 5, avoid bridge floor shape At ponding.
As shown in Figure 1, the position for corresponding to dredge outlet 5 on bottom base 1 is provided with jack 6, being connected on top base 2 can be vertical The plug connector 7 just moved upwards, and the control assembly that control plug connector 7 moves up and down.Pass through control in a large amount of ponding of bridge floor Component processed control plug connector 7 moves upwards extractions, no longer stops dredge outlet 5 after plug connector 7 is extracted, dredge outlet 5 it is hydrophobic Ability rises, and the ponding of bridge floor is smoothly discharged;After bridge floor water level decreasing, plug connector 7 is controlled by control assembly It moves downward in insertion jack 6, so that the bonding strength between top base 2 and bottom base 1 is more preferable, is not easy to be destroyed.
As shown in Figure 1, the position on bottom base 1 positioned at each 7 the same side of plug connector is provided with catch basin 8, put in catch basin 8 It is equipped with floating ball 9.Position on bottom base 1 positioned at 8 side of catch basin is equipped with bracket 10, and middle part and bracket are equipped on bracket 10 The rotating bars 11 of 10 rotation connections, the farther away one end of 11 distance bracket of rotating bar 10 is fixedly connected with floating ball 9, rotating bar 11 it is another One end is fixedly connected with drawstring 12, and drawstring 12 is fixedly connected after bypassing the fixed pulley 13 being mounted on horizontal bar 4 with plug connector 7. When road surface forms ponding, the water level in catch basin 8 rises, and at this moment the position of floating ball 9, which rises, drives rotating bar 11 to rotate, rotation Bar 11 and 12 connecting pin of drawstring, which are rotated down, changes force direction drive plug connector 7 rising later by fixed pulley 13.And it should Rotating bar 11 belongs to laborsaving lever, so that more convenient when pulling plug connector 7.
As depicted in figs. 1 and 2, the position on bottom base 1 positioned at 8 side of catch basin is provided with permeable hole 14, permeable hole 14 Diameter is smaller to emit the water in catch basin 8 slowly, simultaneously because the diameter of permeable hole 14 is smaller, therefore The integral strength of bottom base 1 will not be had an impact.The position of 8 port of catch basin is provided with placing groove 15, places in placing groove 15 There is cover board 16, filtration hole 17 is provided on cover board 16 to filter rainwater, avoids large-scale sundries from entering and block permeable hole in catch basin 8 14.Filtration hole 17 is long lumbar hole, and rotating bar 11 rotates after passing through filtration hole 17 along the length direction of filtration hole 17, so that lid Plate 16 will not hinder rotating bar 11 to rotate.Position in catch basin 8 positioned at 9 lower section of floating ball is equipped with filter basket 18, passes through filtering Basket 18 further filters the small-sized sundries carried secretly in rainwater in catch basin 8.
As depicted in figs. 1 and 2, it needs to take out filter basket 18 when accumulating more sundries in filter basket 18 and clean, by It needs to open cover board 16 when cleaning, and needs for cover board 16 to be fastened on when not needing and opening cover board 16 and put It sets in slot 15.Therefore column spinner 19 is rotatably connected on cover board 16, the upper surface of column spinner 19 and the upper surface of cover board 16 are flat Together and it is provided with rectangular operating groove 20, the lower end of column spinner 19 is protruded into catch basin 8, and is fixedly connected in 19 lower end of column spinner There is rotation long slab 21.The arc locked groove 22 that can be caught in rotation long slab 21 is provided on the two sides inner wall of catch basin 8, arc locked groove 22 Middle part forms the jam plate 23 perpendicular to 8 inner wall of catch basin.The lid of cover board 16 is closed in placing groove 15 when fixed cover board 16, Then by straight screwdriver insertion operation slot 20, rotation straight screwdriver drives column spinner 19 and rotation long slab 21 to rotate, will The rotation rotation of long slab 21 is caught in arc locked groove 22, until rotation long slab 21 and jam plate 23 abut.Need to take out the cleaning of cover board 16 When filter basket 18, by column spinner 19 and rotation long slab 21 rotate backward so that rotate long slab 21 disengaging arc locked groove 22, this When can insert a finger into permeable hole 14 and take out cover board 16.
A kind of embodiment two: construction method of municipal administration Bridge guardrail, comprising:
Step a, Prefabricated block;
Prefabricated first lower module 24: as shown in figure 3, the upper surface of the first lower module 24 is provided with the catch basin 8 of side perforation, The first locked groove 25 is provided on the side wall of catch basin 8.The lower end of first lower module 24 is provided with the first perforation of multiple and reinforcing bar cooperation 26。
Open the second locked groove 28 in the side of prefabricated second lower module, 27: the second lower module 27.It opens the lower end of second lower module 27 There is the second perforation 29 of multiple and reinforcing bar cooperation, the second perforation 29 runs through the second lower module 27.
Prefabricated 2 module of top base: the lower end surface of 2 module of top base is provided with the third perforation 30 with 29 contraposition of the second perforation, The upper end of prefabricated top base 2 is connected with horizontal bar 4 and vertical column 3.
Step b, is spliced to form guardrail;
After spreading adhesive on reserved steel bar on bridge floor, part reserved steel bar is passed through into the first perforation 26, by the One lower module 24 is fixed on bridge floor.The second perforation 29 that remaining reserved steel bar passes through the second lower module 27 is worn later later Enter in third perforation 30 so that the second lower module 27 and 2 module of top base are also all fixed, and the position of the second lower module 27 and The aligned in position of first lower module 24.
Step c installs plug connector 7 and control assembly;
After plug connector 7 is passed through 2 module of top base, with the rotating bar 11 being fixedly connected with floating ball 9 from filtration hole 17 Cover board 16 is covered on placing groove 15 across later, later that rotating bar 11 and bracket 10 is hinged, one end and rotating bar The connecting rope of 11 connections is fixedly connected with the upper end of plug connector 7 later around fixed pulley 13.

Claims (9)

1. a kind of municipal administration Bridge guardrail, including bottom base (1) and the top base (2) being located above bottom base (1), the top base (2) be equipped with guard assembly, it is characterized in that: the top base (2) and bottom base (1) junction be equipped with dredge outlet (5), it is described on Pedestal (2) is equipped with the plug connector (7) moved in the vertical direction, and the position of face plug connector (7) is set on the bottom base (1) There are jack (6), further includes the control assembly for controlling plug connector (7) and moving up and down;The bottom base (1) is equipped with catch basin (8), The control assembly includes the floating ball (9) being located in catch basin (8) and the rotating bar that one end is fixedly connected with floating ball (9) (11), the bottom base (1) is equipped with the bracket (10) being rotatablely connected with the middle part of rotating bar (11), the rotating bar (11) The other end be equipped with drawstring (12), the guard assembly be equipped with fixed pulley (13), the drawstring (12) around fixed pulley (13) it It is fixedly connected afterwards with plug connector (7);Closed dredge outlet (5), the plug connector (7) when plug connector (7) insertion dredge outlet (5) No longer closed dredge outlet (5) after being extracted from dredge outlet (5).
2. municipal administration Bridge guardrail according to claim 1, it is characterized in that: the rotation of the rotating bar (11) and bracket (10) Tie point is close to one end that rotating bar (11) and drawstring (12) connect.
3. municipal administration Bridge guardrail according to claim 1, it is characterized in that: the side of the catch basin (8) is equipped with permeable hole (14)。
4. municipal administration Bridge guardrail according to claim 3, it is characterized in that: the port of the catch basin (8) is equipped with placing groove (15), cover board (16) are equipped in the placing groove (15), the cover board (16) is equipped with filtration hole (17).
5. municipal administration Bridge guardrail according to claim 4, is detachably connected it is characterized in that: being equipped in the catch basin (8) Filter basket (18).
6. municipal administration Bridge guardrail according to claim 5, turns it is characterized in that: the cover board (16) is equipped with cover board (16) The column spinner (19) of dynamic connection, the lower end of the column spinner (19) are protruded into catch basin (8), and the lower end of the column spinner (19) is set There is the rotation long slab (21) being fixedly connected with column spinner (19), rotation can be caught in by being equipped on the two sides inner wall of the catch basin (8) Turn the arc locked groove (22) of long slab (21).
7. municipal administration Bridge guardrail according to claim 6, it is characterized in that: the upper surface of the column spinner (19) and cover board (16) upper surface is concordant, and the upper surface of the column spinner (19) is equipped with rectangular operating groove (20).
8. municipal administration Bridge guardrail according to claim 7, it is characterized in that: the middle part of the arc locked groove (22) is equipped with vertically With the jam plate (23) of catch basin (8) inner wall.
9. a kind of construction method of municipal Bridge guardrail described in claim 1, comprising:
Step a, Prefabricated block;
Prefabricated first lower module (24): the upper surface of the first lower module (24) is provided with the catch basin (8) of side perforation, catch basin (8) the first locked groove (25) are provided on side wall;The lower end of first lower module (24) is provided with the first perforation of multiple and reinforcing bar cooperation (26);
Prefabricated second lower module (27): the side of the second lower module (27) is provided with the second locked groove (28);Second lower module (27) Lower end is provided with the second perforation (29) of multiple and reinforcing bar cooperation, and the second perforation (29) runs through the second lower module (27);
Prefabricated top base (2) module: the lower end surface of top base (2) module is provided with perforates with the third of the second perforation (29) contraposition (30), the upper end of prefabricated top base (2) is connected with horizontal bar (4) and vertical column (3);
Step b, is spliced to form guardrail;
After spreading adhesive on reserved steel bar on bridge floor, part reserved steel bar is passed through into the first perforation (26), by first Lower module (24) is fixed on bridge floor;Later by remaining reserved steel bar pass through the second lower module (27) second perforation (29) it After penetrate third perforation (30) in so that the second lower module (27) and top base (2) module are also all fixed, and the second lower module (27) aligned in position of position and the first lower module (24);
Step c installs plug connector (7) and control assembly.
CN201710647780.2A 2017-08-01 2017-08-01 Municipal Bridge guardrail and its construction method Active CN107604813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710647780.2A CN107604813B (en) 2017-08-01 2017-08-01 Municipal Bridge guardrail and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710647780.2A CN107604813B (en) 2017-08-01 2017-08-01 Municipal Bridge guardrail and its construction method

Publications (2)

Publication Number Publication Date
CN107604813A CN107604813A (en) 2018-01-19
CN107604813B true CN107604813B (en) 2019-02-05

Family

ID=61064001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710647780.2A Active CN107604813B (en) 2017-08-01 2017-08-01 Municipal Bridge guardrail and its construction method

Country Status (1)

Country Link
CN (1) CN107604813B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972518B (en) * 2019-03-06 2020-07-10 安徽省公路桥梁工程有限公司 Construction method of hanging plate type guardrail base
CN110761177B (en) * 2019-12-19 2021-02-05 丁华丽 Comprehensive water utilization system for bridge
CN111576287B (en) * 2020-05-26 2021-12-07 济宁市兖州区亚威通泰公用设施有限公司 Highway green guardrail of planting based on rainwater is from clearing up

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100493687B1 (en) * 2005-02-22 2005-06-07 (주)삼원종합건축사사무소 Balcony sash of a railing one body type for construction
KR100887020B1 (en) * 2007-07-11 2009-03-04 이영갑 Roof waterproof system and constructing method thereof
CN103225261A (en) * 2013-05-02 2013-07-31 厦门市市政工程设计院有限公司 Bridge drainage structure
CN203569537U (en) * 2013-11-05 2014-04-30 周艳梅 Novel lever type automatic diversion sluice
CN104831663B (en) * 2015-03-25 2016-08-31 包宇青 Rainwater recycling municipal administration Bridge guardrail cleans device and using method thereof
CN204690591U (en) * 2015-06-03 2015-10-07 魏崇亮 A kind of bridge drainage system
CN205653702U (en) * 2016-04-06 2016-10-19 山东英克莱集团有限公司 Public road bridge guardrail for roof beam
CN205875546U (en) * 2016-08-03 2017-01-11 黄勇 Novel building roof rainwater drainage overflow mouth device

Also Published As

Publication number Publication date
CN107604813A (en) 2018-01-19

Similar Documents

Publication Publication Date Title
CN107604813B (en) Municipal Bridge guardrail and its construction method
CN105332416B (en) A kind of automatic turnover roof drain pollutant interception
KR100611047B1 (en) the cover for rainer
CN102127929B (en) Rainwater well grid cleaning device
CN109267772B (en) Ecological landscape corridor for intelligent three-dimensional rainwater recycling and workflow thereof
CN108222212B (en) Underground rainwater centralized drainage structure for united villa
CN203977546U (en) Gardens dewatering installation
CN109440907B (en) Anti-blocking sewer cover plate
CN107524219A (en) Town road intelligent drainage system
CN106758799B (en) System for reclaiming rainwater and its construction method for sponge urban interchange
CN207727378U (en) A kind of sponge city pavement
CN110184969A (en) A kind of highway guard rail
CN211690650U (en) Prevent blockking up escape canal
CN203977557U (en) A kind of block-resistant type park port flap
CN208430536U (en) A kind of municipal administration automatic adjustment drain well lid
CN213572148U (en) Rainwater collection device is used in gardens
CN207063119U (en) A kind of ball float bar gate type automatic control cuts dirty inspection shaft
CN207619762U (en) A kind of sponge urban pavement
CN213772925U (en) Ponding structure is prevented to bridge
CN109853322A (en) Sponge city sectional polyurethane eco-landscape road
CN212561842U (en) Automatic open-close rain grate device in rainy day
CN106489009B (en) Environmentally friendly unpowered flow regulator
CN110080346B (en) Garden slope water storage filtering fence device and water storage system
CN209082657U (en) A kind of energy-saving drainage system of afforestation
CN207959735U (en) A kind of Green Roof for rainwater recycle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant