CN107587778A - A kind of assembling operation method of tower section - Google Patents

A kind of assembling operation method of tower section Download PDF

Info

Publication number
CN107587778A
CN107587778A CN201710771517.4A CN201710771517A CN107587778A CN 107587778 A CN107587778 A CN 107587778A CN 201710771517 A CN201710771517 A CN 201710771517A CN 107587778 A CN107587778 A CN 107587778A
Authority
CN
China
Prior art keywords
tower section
pole
guide rail
tower
operation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710771517.4A
Other languages
Chinese (zh)
Other versions
CN107587778B (en
Inventor
杨瑞景
李勇辉
黄黔林
徐惠江
李定强
肖青松
吴飞
陈利波
邓忠军
王斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201710771517.4A priority Critical patent/CN107587778B/en
Publication of CN107587778A publication Critical patent/CN107587778A/en
Application granted granted Critical
Publication of CN107587778B publication Critical patent/CN107587778B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of assembling operation method of tower section of the present invention, comprises the following steps:Step a:First tower section is stood on ground, is provided with guide rail in tower section along its length;Step b:The pole being engaged with the guide rail is installed on the guide rail;Step c:By the pole along the upward lifting of the guide rail, make the pole lower end more than the height of the first tower section 1/3rd;Step d:The pole is fixed on the guide rail;Step e:Rope one end around the pole top and is fixed on the second tower section top, exerted a force in the rope other end, second tower section is lifted to above first tower section;Step f:Second tower section is fixedly installed in first tower section;Step g:Repeat step c to step f, multiple tower sections can be assembled successively;Step h:The pole is slid downwards along the guide rail, finally pulled down the pole from the guide rail;This method is easy to assembly, and floor space is small during assembling, and packaging efficiency is high.

Description

A kind of assembling operation method of tower section
Technical field
The present invention relates to assembling tower field, and in particular to a kind of assembling operation method of tower section.
Background technology
In recent years, natural calamity is taken place frequently, and extreme influence is caused to power grid security.These natural calamities easily cause circuit and fallen The accidents such as tower, broken string, once causing down tower, particularly basis damage, rushed to repair by former design standard time-consuming longer.Emergent repairing tower is set Meter be for transmission line of electricity due to icing, storm, yielding of foundation, external force are destroyed or other accident and the shaft tower that is destroyed is interim Instead of, can quick-recovery power transmission soon, then the shaft tower destroyed is recovered or changed.
The emergent repairing tower of prior art is to be formed by connecting by multiple tower sections by flange.Typically on the ground by multiple tower sections Assemble, form complete emergent repairing tower, then emergent repairing tower is erected.But the narrow area such as many mountain areas, valley, field, There is no vacant lot to be used to assemble emergent repairing tower, the assembling difficulty of emergent repairing tower certainly will be added, very big obstruction is caused to repairing work.
In addition, many high voltage transmission line towers, the high tower of other functions assemble also by tower section, above mentioned problem is equally existed.
Therefore, how to designing a kind of assembling operation method of new tower section, it is this area skill it is overcome above mentioned problem An art personnel problem urgently to be resolved hurrily
The content of the invention
It is easy to assembly it is an object of the invention to provide a kind of assembling operation method of tower section, and floor space during assembling Small, packaging efficiency is high.
To achieve the above objectives, the technical solution adopted by the present invention is:
A kind of assembling operation method of tower section, comprises the following steps:
Step a:First tower section is stood on ground, is provided with guide rail in tower section along its length;
Step b:The pole being engaged with the guide rail is installed on the guide rail;
Step c:By the pole along the upward lifting of the guide rail, make the pole lower end more than the first tower section three/ One height;
Step d:The pole is fixed on the guide rail;
Step e:Rope one end around the pole top and is fixed on the second tower section top, applied in the rope other end Power, second tower section is lifted to above first tower section;
Step f:Second tower section is fixedly installed in first tower section;
Step g:Repeat step c to step f, multiple tower sections can be assembled successively;
Step h:The pole is slid downwards along the guide rail, finally pulled down the pole from the guide rail.
Further, the pole in the step c and step h carries out upward lifting by lowering or hoisting gear and slid downwards.
Further, the pole bottom is positioned on the lowering or hoisting gear.
Further, the pole top is provided with fixed pulley, and the rope bypasses from fixed pulley.
Compared with prior art, the advantage of the invention is that:
The assembling operation method of the tower section of the present invention, can be assembled under the area of very little, and packaging efficiency is high, It is easy to assembly, it can use manpower and material resources sparingly;In addition, the use of lowering or hoisting gear can replace manually up lifting pole, further carry High efficiency, reduce manpower consumption;Moreover, guide rail is arranged in tower section all the time, needing further to increase, or carry out that it is installed His part, or when repaired, operating personnel can take lowering or hoisting gear, along guide rail rise and fall, can improve work Make efficiency, other advantages, target and the feature for reducing the resource consumption present invention to a certain extent will in the following description It is illustrated, and to a certain extent, based on will be aobvious and easy to those skilled in the art to investigating hereafter See, or can be instructed from the practice of the present invention.The target and other advantages of the present invention can be said by following Bright book and claims are realized and obtained.
Brief description of the drawings
In order that the object, technical solutions and advantages of the present invention are clearer, the present invention is made below in conjunction with accompanying drawing into The detailed description of one step, wherein:
Fig. 1-Fig. 3 is the assembling operation method assembling flow path figure of the tower section of the present invention;
Fig. 4 and Fig. 5 is the structural representation when assembling operation method of the tower section of the present invention is installed using lowering or hoisting gear;
Fig. 6 is the zoomed-in view at A in Fig. 4;
Fig. 7 to Figure 15 is lifting device structure schematic diagram.
Embodiment
Hereinafter with reference to accompanying drawing, the preferred embodiments of the present invention are described in detail.It should be appreciated that preferred embodiment Only for the explanation present invention, the protection domain being not intended to be limiting of the invention.
As Figure 1-3, a kind of assembling operation method of tower section, comprises the following steps:
Step a:First tower section 100 is stood on ground, is provided with guide rail in tower section along its length;
Step b:The pole being engaged with guide rail is installed on guide rail;
Step c:By pole along the upward lifting of guide rail, make pole lower end more than the height of the first tower section 1/3rd;
Step d:Pole is fixed on guide rail;
Step e:Rope one end around pole top and is fixed on the second tower section top, exerted a force in the rope other end, Second tower section is lifted to above first tower section;
Step f:Second tower section is fixedly installed in first tower section;
Step g:Repeat step c to step f, multiple tower sections can be assembled successively;
Step h:Pole is slid downwards along guide rail, finally pulled down pole from guide rail.
Pole top is provided with fixed pulley, and rope bypasses from fixed pulley.
As shown in Figs. 4-6, the pole 300 in the step c and step h of the present embodiment is carried out upwards by lowering or hoisting gear 400 Lifting and downwards landing;Lowering or hoisting gear 400 can freely rise or fall on guide rail 200, and can stop fixing at an arbitrary position. As a kind of most preferably selection, lowering or hoisting gear 400 is located at the lower section of pole 300, and it is upward that lowering or hoisting gear 400 can head on pole 300 Lifting, pole 300 can be slid downwards with lowering or hoisting gear 400, and pole 300 is positioned on lowering or hoisting gear 400, can be with lifting Device 400 is fixed in the optional position of guide rail 200.
Wherein, the lowering or hoisting gear of the present embodiment can select the structure as shown in Fig. 7 to 15, and it includes mounting bracket 2, carrier 3rd, Power Component 4, lifting assembly 5 and anti-fall component 6, mounting bracket 2 are movably set on guide rail 200, carrier 3, Power Component 4, Lifting assembly 5 and anti-fall component 6 may be contained within mounting bracket 2, and Power Component 4 drives lifting assembly 5 to operate, and lifting assembly 5 is made For guide rail 200, mounting bracket 2 is driven along guide rail activity.Power Component 4 includes motor 41, reduction box 42 and manual turntable 43, its Middle manual turntable 43 can in the case of cold control device operation.
Anti-fall component 6 includes tumbler 61, encoder 62, controller 63 and clutch part 64, and tumbler 61 is rotatablely connected In on mounting bracket 2, when movable on guide rail 200, tumbler 61 acts on guide rail and rotated mounting bracket 2, and encoder 62 will turn The turn signal of moving part 61 changes into pulse signal, and is conveyed to controller 63, and controller 63 is preset with action signal value, rotates When the slewing rate of part 61 is more than action signal value, controller 63 will control clutch part 64 to act, and act on clutch part 64 In guide rail 200, realize that mounting bracket 2 is stopped action, wherein encoder 62 is two, and two work simultaneously, and one of damage is another One also can normal work, be a kind of setting of dual fail-safe.Further specifically, clutch part 64 includes electromagnet 641, magnetic Body 642, brake sliding block 643 and pulling spring 644, electromagnet 641 are fixed on mounting bracket 2 and are electrically connected with controller 63, Magnetic absorbing mass 642 is fixed on brake sliding block 643 and can attracted each other with electromagnet 641, and brake sliding block 643 is slideably positioned in peace Shelve on 2, pull spring 644 to be arranged between brake sliding block 643 and mounting bracket 2;Lowering or hoisting gear with electromagnetism anti-drop function During normal operation, electromagnet 641 is powered, and magnetic absorbing mass 642 makes brake sliding block 643 close by the sucking action with electromagnet 641 Electromagnet 641, the sliding block 643 that now brakes do not contact with guide rail 200, pull spring 644 to be in extended state;When tumbler 61 When slewing rate is more than action signal value, controller 63 controls electromagnet 641 to power off, and electromagnet 641 loses and magnetic absorbing mass 642 Attraction, the rapid desufflation of spring 644 is pulled, pull the brake quick sliding of sliding block 643, until contacting guide rail 200, in brake sliding block 643 and guide rail 200 interact under, mounting bracket 2 is stopped action.Oblique chute 21 is provided with mounting bracket 2, brake sliding block 643 is slided Dynamic to be arranged in oblique chute 21, brake sliding block 643 can be parallel with guide rail 200 all the time with the contact surface that guide rail 200 contacts, and brake is slided When block 643 is moved to the other end from the one end of oblique chute 21, brake sliding block 643 moves closer to or away from guide rail 200.The He of controller 63 Power Component 4 is electrically connected with, and when the slewing rate of tumbler 61 is more than action signal value, controller 63 will control Power Component 4 Shut down.
Gear grooved 11, the gear structure that lifting assembly 5 is and gear grooved 11 coordinates, lifting assembly 5 are provided with guide rail 200 Including master gear 51 and pinion 52, master gear 51 and pinion 52 are fixedly installed with one heart, the contact of master gear 51 and guide rail 200 Face is above pinion 52.Pinion 52 is two, and is arranged at the both sides of master gear 51, and master gear 51 uses plastic material system Into pinion 52 is made of metal material.Master gear 51 and pinion 52 pass through power transmission shaft 53, fixing bolt 54 and nut seat 55 are fixed with one heart;Big axis hole 511 is offered at the center of master gear 51, the big the week side of boss of axis hole 511 offers outer half to be connected Circular hole 512, the center of circle of outer semicircle orifice 512 are located on the sideline of big axis hole 511;Small axis hole 521 is offered at the center of pinion 52, The small outside of axis hole 521 offers disconnected circular hole 522, and the distance of circular hole 522 to the small center of circle of axis hole 521 is equal to big axis hole 511 Radius;Power transmission shaft 53 is provided with the big shaft part 531 isometrical with big axis hole 511, and the small shaft part isometrical with small axis hole 521 532, the big the week side of boss of shaft part 531 offers interior semicircle orifice 533, and the center of circle of interior semicircle orifice 533 is located on the sideline of big shaft part 531, main Gear 51 is installed on big shaft part 531, and pinion 52 is installed on small shaft part 532;Fixing bolt 54 can be each passed through outer semicircle Hole 512, interior semicircle orifice 533 and circular hole 522, progress is circumferentially fixed, and nut seat 55 can be fixed on the both ends of fixing bolt 54 and carry out axle To fixation.
In addition, the lower section of carrier 3 is provided with battery 31, battery 31 provides the electricity that Power Component 4 and anti-fall component 6 work Amount;The top of carrier 3 is provided with pedal-controlled component 32, and pedal-controlled component 32 includes foot-operated positive and negative switch 321, footbrake 322 and foot throttle 323, for controlling the rotation direction of Power Component 4 respectively, accelerating to rotate and underdrive.On mounting bracket 2 Junction box 7 is additionally provided with, electrical equipment is provided with junction box 7, for connecting, controlling and protecting battery 31, Power Component 4th, anti-fall component 6 and pedal-controlled component 32.
In addition, the upper end of mounting bracket 2 of this lowering or hoisting gear 400 is also provided with handle 22, it is provided with handle 22 manually Manipulation component 23, manual manipulation component 23 includes positive and negative switch 231, hand-operated brake 232 and hand throttle 233 manually, for dividing Not Kong Zhi Power Component 4 rotation direction, accelerate rotate and underdrive.Other something in common are not repeated to describe.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent substitution, and without departing from the objective and scope of the technical program, it all should cover in the present invention Right among.

Claims (4)

1. a kind of assembling operation method of tower section, it is characterised in that:Comprise the following steps:
Step a:First tower section is stood on ground, is provided with guide rail in tower section along its length;
Step b:The pole being engaged with the guide rail is installed on the guide rail;
Step c:By the pole along the upward lifting of the guide rail, make the pole lower end more than the first tower section 1/3rd Highly;
Step d:The pole is fixed on the guide rail;
Step e:Rope one end around the pole top and is fixed on the second tower section top, exerted a force in the rope other end, Second tower section is lifted to above first tower section;
Step f:Second tower section is fixedly installed in first tower section;
Step g:Repeat step c to step f, multiple tower sections can be assembled successively;
Step h:The pole is slid downwards along the guide rail, finally pulled down the pole from the guide rail.
A kind of 2. assembling operation method of tower section according to claim 1, it is characterised in that:In the step c and step h Pole by lowering or hoisting gear carry out upward lifting and downwards slide.
A kind of 3. assembling operation method of tower section according to claim 2, it is characterised in that:The pole bottom is positioned over On the lowering or hoisting gear.
A kind of 4. assembling operation method of tower section according to claim 2, it is characterised in that:The pole top is provided with Fixed pulley, the rope bypass from fixed pulley.
CN201710771517.4A 2017-08-31 2017-08-31 A kind of assembling operation method of tower section Active CN107587778B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710771517.4A CN107587778B (en) 2017-08-31 2017-08-31 A kind of assembling operation method of tower section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710771517.4A CN107587778B (en) 2017-08-31 2017-08-31 A kind of assembling operation method of tower section

Publications (2)

Publication Number Publication Date
CN107587778A true CN107587778A (en) 2018-01-16
CN107587778B CN107587778B (en) 2019-07-12

Family

ID=61050779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710771517.4A Active CN107587778B (en) 2017-08-31 2017-08-31 A kind of assembling operation method of tower section

Country Status (1)

Country Link
CN (1) CN107587778B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083486A (en) * 2018-08-30 2018-12-25 长兴创智科技有限公司 A kind of more piece cement electric pole automatic assembling mounting device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296346A (en) * 1995-04-26 1996-11-12 Toei Kensetsu Kogyo:Kk Pole for main column built at fixed place at early stage and main column building method at fixed place at early stage
WO2002046552A1 (en) * 2000-12-05 2002-06-13 Allan P Henderson Tilt-up and telescopic support tower for large structures
CN1814967A (en) * 2005-02-05 2006-08-09 瓦尔蒙特工业股份有限公司 Method and apparatus for erecting wind-energy tower
CN101845912A (en) * 2010-06-23 2010-09-29 天津市银宇建筑结构工程技术有限公司 Segmental-body assembly type emergency communication tower
US20130318890A1 (en) * 2009-06-26 2013-12-05 International Drilling Equipment Company Llc Drilling rig assembly method and apparatus
CN103669978A (en) * 2013-12-24 2014-03-26 国家电网公司 Multifunctional hoop device for assembling embracing rods
CN203794500U (en) * 2014-02-24 2014-08-27 扬州国电通用电力机具制造有限公司 Tower hoisting device
CN107091008A (en) * 2017-06-05 2017-08-25 国家电网公司 A kind of adhesion type is from lifting pole

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296346A (en) * 1995-04-26 1996-11-12 Toei Kensetsu Kogyo:Kk Pole for main column built at fixed place at early stage and main column building method at fixed place at early stage
WO2002046552A1 (en) * 2000-12-05 2002-06-13 Allan P Henderson Tilt-up and telescopic support tower for large structures
CN1814967A (en) * 2005-02-05 2006-08-09 瓦尔蒙特工业股份有限公司 Method and apparatus for erecting wind-energy tower
US20130318890A1 (en) * 2009-06-26 2013-12-05 International Drilling Equipment Company Llc Drilling rig assembly method and apparatus
CN101845912A (en) * 2010-06-23 2010-09-29 天津市银宇建筑结构工程技术有限公司 Segmental-body assembly type emergency communication tower
CN103669978A (en) * 2013-12-24 2014-03-26 国家电网公司 Multifunctional hoop device for assembling embracing rods
CN203794500U (en) * 2014-02-24 2014-08-27 扬州国电通用电力机具制造有限公司 Tower hoisting device
CN107091008A (en) * 2017-06-05 2017-08-25 国家电网公司 A kind of adhesion type is from lifting pole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083486A (en) * 2018-08-30 2018-12-25 长兴创智科技有限公司 A kind of more piece cement electric pole automatic assembling mounting device

Also Published As

Publication number Publication date
CN107587778B (en) 2019-07-12

Similar Documents

Publication Publication Date Title
CN105442933B (en) Power network electric pole erecting tools car and its construction method
DE102006034299A1 (en) Wind turbine is fitted with lift which moves up outside of tower, lift motor, etc. being mounted at rear of gondola
EP2727875A1 (en) Lift with maintenance opening in cabin floor
CN107587778A (en) A kind of assembling operation method of tower section
CN202449775U (en) Driving device for lifting of oil addable lamp
CN105775971B (en) The safety lifting device of track structure
CN104495563A (en) Flexible safety gear linkage mechanism for home elevator
CN208916761U (en) A kind of articulated arm lift
JP2016540706A (en) Elevator automatic rescue device
CN204152182U (en) A kind of tongue piece formula falling proof device
KR101264738B1 (en) Manually moving work car for monorail
CN206172872U (en) Construction material lifting device
CN110395639B (en) Civil engineering construction is with safe type elevating gear
CN105217540B (en) A kind of installation method of climbing elevator erecting device and elevator
CN107658785A (en) The pillar insulator quick replacement device of leading screw driving
CN206624536U (en) A kind of lowering or hoisting gear with electromagnetism anti-drop function
CN113474278A (en) Overhead traveling crane assembly
CN108313889B (en) Hoisting device is assisted to super high-rise creeping formwork
KR100717352B1 (en) Transformer moving along the telegraph pole
CN209650573U (en) A kind of mechanical balance counterweight lifting ground well falling proof device
DE19754034A1 (en) Lift brake with manual release
DE102021124753A1 (en) METHOD OF STOPPING MOTOR OPERATION OF AN ELECTRIC WINDOW CURTAIN
CN206395644U (en) Screw elevator
CN208120503U (en) Intelligent easy broken rod goes up and down navigational lighting aid Tower System
CN205477351U (en) First pulley locking device of internally piloting auto -lock ladder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant