Full ground crawler-type multifunctional crane Download PDFInfo
- Publication number
- CN107572429A CN107572429A CN201711046120.5A CN201711046120A CN107572429A CN 107572429 A CN107572429 A CN 107572429A CN 201711046120 A CN201711046120 A CN 201711046120A CN 107572429 A CN107572429 A CN 107572429A
- Authority
- CN
- China
- Prior art keywords
- lifting
- slide rail
- crawler
- chassis
- clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 94
- 229910052742 iron Inorganic materials 0.000 claims abstract description 47
- 230000007246 mechanism Effects 0.000 claims abstract description 41
- 230000005540 biological transmission Effects 0.000 claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 210000000078 claw Anatomy 0.000 abstract description 21
- 238000009434 installation Methods 0.000 abstract description 8
- 238000010276 construction Methods 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 description 5
- 239000000725 suspension Substances 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
全地面履带式多功能吊车,属于吊车领域。包括履带底盘和设置于履带底盘的起重机械臂、机械臂操作室、铁塔起吊机构、铁塔起吊操作室、升降台、旋转升降底盘,铁塔起吊机构包括铁塔吊臂组;铁塔吊臂组包括多个起吊组,起吊组包括驱动吊臂、起吊滑轨、起吊爪和连杆机构;升降台的顶部设置有台板,台板设置有圆形槽,旋转升降底盘转动嵌设于圆形槽,铁塔吊臂组设置于旋转升降底盘。架设架空输电线路以及配电设施的施工时,全地面履带式多功能吊车采用履带式行走,可以适合全地形,起重机械臂能够用于物件的吊装,铁塔起吊机构能够将安装好后的架空输电线路铁塔的吊装到指定位置,提高架空输电线路的安装速度,减轻劳动强度。
An all-terrain crawler multifunctional crane belongs to the field of cranes. Including the crawler chassis and the lifting mechanical arm set on the crawler chassis, the manipulator operating room, the tower lifting mechanism, the tower lifting operating room, the lifting platform, the rotary lifting chassis, the tower lifting mechanism includes the tower boom group; the tower boom group includes multiple A lifting group, the lifting group includes a driving arm, a lifting slide rail, a lifting claw and a connecting rod mechanism; the top of the lifting platform is provided with a platen, and the platen is provided with a circular groove, and the rotating lifting chassis is embedded in the circular groove. The iron tower boom group is arranged on the rotating lifting chassis. When erecting overhead transmission lines and construction of power distribution facilities, the all-terrain crawler-type multifunctional crane adopts crawler type walking, which can be suitable for all terrains. The lifting mechanical arm can be used for hoisting objects, and the iron tower lifting mechanism can lift the installed overhead The transmission line tower is hoisted to the designated position, the installation speed of the overhead transmission line is improved, and the labor intensity is reduced.
Description
技术领域technical field
本发明涉及吊车领域,具体而言,涉及全地面履带式多功能吊车。The invention relates to the field of cranes, in particular to an all-terrain crawler-type multifunctional crane.
背景技术Background technique
目前,架设架空输电线路,以及配电设施的施工时,需要吊装、发电,器材运输等设备,还需要输电、配电等设施的施工应急抢险工作。At present, when erecting overhead transmission lines and construction of power distribution facilities, equipment such as hoisting, power generation, and equipment transportation are required, and emergency rescue work for construction of power transmission and distribution facilities is also required.
发明内容Contents of the invention
本发明的目的在于提供全地面履带式多功能吊车,以提高架空输电线路的安装速度,减轻劳动强度。The object of the present invention is to provide an all-terrain crawler-type multifunctional crane, so as to increase the installation speed of overhead power transmission lines and reduce labor intensity.
本发明是这样实现的:The present invention is achieved like this:
全地面履带式多功能吊车,全地面履带式多功能吊车包括履带底盘和设置于履带底盘的起重机械臂、机械臂操作室、铁塔起吊机构、铁塔起吊操作室、升降台、旋转升降底盘,铁塔起吊机构包括铁塔吊臂组;All-terrain crawler-type multi-function crane, all-terrain crawler-type multi-function crane includes a crawler chassis and a lifting robot arm set on the crawler chassis, a robot arm operating room, a tower lifting mechanism, a tower lifting operating room, a lifting platform, and a rotating lifting chassis, The tower lifting mechanism includes the tower boom group;
铁塔吊臂组包括多个起吊组,起吊组包括驱动吊臂、起吊滑轨、起吊爪和连杆机构;驱动吊臂的一端活动设置于履带底盘,驱动吊臂的另一端设置起吊滑轨,起吊爪滑动设置于起吊滑轨,连杆机构连动起吊爪沿着起吊滑轨来回往复移动;The tower boom group includes a plurality of lifting groups, and the lifting group includes a driving boom, a lifting slide rail, a lifting claw and a linkage mechanism; one end of the driving boom is movable on the crawler chassis, and the other end of the driving boom is provided with a lifting slide rail. The lifting claw is slidably arranged on the lifting slide rail, and the linkage mechanism links the lifting claw to move back and forth along the lifting slide rail;
升降台的顶部设置有台板,台板设置有圆形槽,旋转升降底盘转动嵌设于圆形槽,铁塔吊臂组设置于旋转升降底盘;圆形槽的边缘沿周向方向间隔设置有多个靠近旋转升降底盘的一侧开放设置的第一限位槽,每个第一限位槽的远离旋转升降底盘的一侧铰接有限位块;旋转升降底盘的边缘沿周向方向间隔设置有多个第二限位槽,每个第二限位槽能够转动至与一个第一限位槽对应,限位块能够卡接于第一限位槽和第二限位槽之间。The top of the lifting platform is provided with a platen, the platen is provided with a circular groove, the rotating lifting chassis is embedded in the circular groove, and the iron tower boom group is set in the rotating lifting chassis; the edge of the circular groove is arranged at intervals along the circumferential direction. A plurality of first limiting slots open on one side close to the rotating lifting chassis, each first limiting groove is hinged with a limiting block on the side away from the rotating lifting chassis; the edge of the rotating lifting chassis is arranged at intervals along the circumferential direction A plurality of second limiting slots, each second limiting slot can be rotated to correspond to one first limiting slot, and the limiting block can be clamped between the first limiting slot and the second limiting slot.
机械臂操作室控制起重机械臂起吊重物。铁塔起吊操作室控制铁塔起吊机构将在专用的工作场地施工安装好后的输电线路铁塔吊装到指定位置,提高了架空输电线路的安装速度,减轻劳动强度。The manipulator operating room controls the lifting manipulator to lift heavy objects. The tower hoisting operation room controls the tower hoisting mechanism to hoist the transmission line tower to the designated position after construction and installation in a dedicated work site, which improves the installation speed of overhead transmission lines and reduces labor intensity.
驱动吊臂驱动起吊滑轨移动至铁塔附近,利用起吊爪扣住铁塔,连杆机构驱动起吊爪上下移动,带动铁塔上下移动,实现架空输电线路铁塔的转运。Drive the boom to drive the lifting slide rail to move to the vicinity of the iron tower, use the lifting claw to buckle the iron tower, and the linkage mechanism drives the lifting claw to move up and down, driving the iron tower to move up and down, and realize the transfer of the overhead transmission line iron tower.
升降台能够进一步抬高被起吊爪扣住的铁塔的高度,起到辅助升降的目的。旋转升降底盘能够带动铁塔吊臂移动至不同的位置,方便起吊不同位置的铁塔。The lifting table can further raise the height of the iron tower held by the lifting claws to assist in lifting. The rotating lifting chassis can drive the tower boom to move to different positions, which is convenient for lifting towers in different positions.
实际操作时,旋转旋转升降底盘,旋转升降底盘带动铁塔吊臂组转动至指定位置,起到该位置的铁塔。利用起吊爪扣住位于该处的铁塔,然后利用连杆机构带动起吊爪沿着起吊滑轨向上移动,带动铁塔移动,从而将安装好后的铁塔移动至指定位置。In actual operation, the rotating lifting chassis is rotated, and the rotating lifting chassis drives the tower boom group to rotate to the designated position, and lifts the tower at that position. Use the lifting claws to buckle the iron tower located there, and then use the link mechanism to drive the lifting claws to move upward along the lifting slide rail, and drive the iron tower to move, so as to move the installed iron tower to the designated position.
可选地,起吊爪包括起吊滑块和设置于起吊滑块的起吊夹持臂,起吊滑块滑动设置于起吊滑轨;起吊夹持臂包括两个设置于起吊滑块且能够相互靠近和远离的夹持部,夹持部为“U”形件,两个夹持部的开口相对设置。Optionally, the lifting claw includes a lifting slider and a lifting clamping arm arranged on the lifting slider, and the lifting slider is slidably arranged on the lifting slide rail; The clamping part is a "U"-shaped piece, and the openings of the two clamping parts are arranged opposite to each other.
可选地,起吊滑块设置有驱动杆,驱动杆的两端分别设置有正螺纹段和反螺纹段,一个夹持部与正螺纹段螺纹连接,另一个夹持部与反螺纹段螺纹连接。Optionally, the lifting slider is provided with a drive rod, and the two ends of the drive rod are respectively provided with a positive thread segment and a reverse thread segment, one clamping part is threaded with the positive thread segment, and the other clamping part is threaded with the reverse thread segment .
可选地,起吊滑块设置有导向滑道,导向滑道的两端分别设置有伸缩液压杆,两个伸缩液压杆相对设置,两个夹持部并排滑动嵌设于导向滑道,每个伸缩液压杆的驱动端与一个夹持部连接。Optionally, the lifting slider is provided with a guide slideway, and telescopic hydraulic rods are respectively provided at both ends of the guide slideway. The driving end of the telescopic hydraulic rod is connected with a clamping part.
可选地,起吊夹持臂设置多个,多个起吊夹持臂间隔滑动设置于起吊滑块。Optionally, multiple lifting clamping arms are provided, and the multiple lifting clamping arms are slidably arranged on the lifting slider at intervals.
可选地,起吊滑轨的宽度方向并排设置有多根沿其长度方向设置的驱动螺杆,每根驱动螺杆的轴心线平行于起吊滑轨的限定方向;起吊滑轨的两侧分别设置有限位轨道,每个起吊滑块的两侧分别设置有能够滑动嵌设于限位轨道的限位块,每个起吊滑块还设置有驱动件,驱动件与驱动螺杆螺纹连接。Optionally, a plurality of drive screws arranged side by side along the length direction of the lifting slide rail are arranged side by side, and the axis line of each drive screw rod is parallel to the limited direction of the lifting slide rail; the two sides of the lifting slide rail are respectively provided with limited The two sides of each lifting slider are respectively provided with limiting blocks capable of slidingly embedded in the limiting track, and each lifting slider is also provided with a driving part, which is threadedly connected with the driving screw.
可选地,起吊组设置三个,其中两个起吊组相对设置且分别为夹持吊组,剩余的一个起吊组为平衡吊组且位于两个夹持吊组的一侧;两个夹持吊组的起吊滑轨和平衡吊组的起吊滑轨形成一个“U”形夹持空间。Optionally, there are three hoisting groups, two of which are opposite to each other and are clamping hoisting groups, and the remaining hoisting group is a balance hoisting group and is located on one side of the two clamping hoisting groups; The lifting slide rail of the lifting group and the lifting slide rail of the balancing hanging group form a "U"-shaped clamping space.
可选地,驱动吊臂的设置于履带底盘的一端与履带底盘之间设置有驱动液压杆;驱动吊臂的设置起吊滑轨的一端设置有角度驱动机构,起吊滑轨设置于角度驱动机构;角度驱动机构驱动起吊滑轨平行于被夹持的输电线路铁塔对应的侧面。Optionally, a driving hydraulic rod is provided between one end of the driving boom arranged on the crawler chassis and the crawler chassis; an angle driving mechanism is arranged at one end of the driving boom provided on the lifting slide rail, and the lifting slide rail is arranged on the angle driving mechanism; The angle drive mechanism drives the lifting slide rail parallel to the corresponding side of the clamped transmission line iron tower.
可选地,角度驱动机构包括角度驱动轴和设置于角度驱动轴的安装件,角度驱动轴转动设置于驱动吊臂的端部,安装件固定于角度驱动轴,起吊滑轨设置于安装件。Optionally, the angle drive mechanism includes an angle drive shaft and a mount arranged on the angle drive shaft, the angle drive shaft is rotatably disposed on the end of the driving boom, the mount is fixed on the angle drive shaft, and the lifting slide rail is disposed on the mount.
可选地,履带底盘还设置有置物架和工具箱。Optionally, the crawler chassis is also provided with a shelf and a toolbox.
本发明的有益效果:架设架空输电线路以及配电设施的施工时,全地面履带式多功能吊车采用履带式行走,可以适合全地形,起重机械臂能够用于物件的吊装,铁塔起吊机构能够将安装好后的架空输电线路铁塔的吊装到指定位置,提高架空输电线路的安装速度,减轻劳动强度。Beneficial effects of the present invention: when erecting overhead power transmission lines and construction of power distribution facilities, the all-terrain crawler-type multifunctional crane adopts crawler-type walking, which can be suitable for all-terrain, the lifting mechanical arm can be used for hoisting of objects, and the iron tower lifting mechanism can Hoist the iron tower of the installed overhead transmission line to the designated position, improve the installation speed of the overhead transmission line, and reduce labor intensity.
附图说明Description of drawings
为了更清楚地说明本发明实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本发明的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention, and thus It should be regarded as a limitation on the scope, and those skilled in the art can also obtain other related drawings based on these drawings without creative work.
图1为本发明实施例提供的全地面履带式多功能吊车的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the all-terrain crawler type multifunctional crane that the embodiment of the present invention provides;
图2为本发明实施例提供的旋转升降盘和台板的装配结构示意图;Fig. 2 is a schematic diagram of the assembly structure of the rotary lifting disc and the table provided by the embodiment of the present invention;
图3为本发明实施例提供夹持吊组的第一视角的结构示意图;Fig. 3 is a structural schematic view of the first viewing angle of the clamping suspension set provided by the embodiment of the present invention;
图4为本发明实施例提供的起吊爪的第二种结构的结构示意图;Fig. 4 is a structural schematic diagram of the second structure of the lifting claw provided by the embodiment of the present invention;
图5为本发明实施例提供夹持吊组的第二视角的结构示意图;Fig. 5 is a structural schematic diagram of a second viewing angle of the clamping suspension set provided by the embodiment of the present invention;
图6为本发明实施例提供平衡吊组的第一视角的结构示意图;Fig. 6 is a structural schematic view of the first viewing angle of the balance hanging group provided by the embodiment of the present invention;
图7为本发明实施例提供平衡吊组的第二视角的结构示意图。Fig. 7 is a structural schematic diagram of a second viewing angle of the balance hanging set provided by the embodiment of the present invention.
图标:100-履带底盘;200-起重机械臂;300-机械臂操作室;410-铁塔吊臂组;411-起吊组;412-夹持吊组;413-平衡吊组;420-驱动吊臂;421-驱动液压杆;430-起吊滑轨;431-驱动螺杆;440-起吊爪;441-起吊滑块;442-起吊夹持臂;443-夹持部;450-驱动杆;451-正螺纹段;452-反螺纹段;460-导向滑道;461-伸缩液压杆;470-连杆机构;480-角度驱动机构;481-角度驱动轴;482-安装件;500-铁塔起吊操作室;600-升降台;601-台板;602-圆形槽;603-第一限位槽;604-限位块;610-旋转升降底盘;611-第二限位槽;700-置物架;800-工具箱。Icons: 100-crawler chassis; 200-lifting mechanical arm; 300-operating room of mechanical arm; 410-pylon arm group; 411-lifting group; 412-clamping crane group; 413-balance crane group; 420-drive crane Arm; 421-driving hydraulic rod; 430-lifting slide rail; 431-driving screw; 440-lifting claw; 441-lifting slider; 442-lifting clamping arm; Positive thread section; 452-reverse thread section; 460-guide slide; 461-telescopic hydraulic rod; 470-link mechanism; 480-angle drive mechanism; 481-angle drive shaft; 482-mounting parts; Room; 600-lift platform; 601-platform; 602-circular groove; 603-first limit groove; 604-limit block; 610-rotary lifting chassis; 611-second limit groove; 700-shelf ;800 - Toolbox.
具体实施方式detailed description
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本发明实施例的组件可以以各种不同的配置来布置和设计。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations.
因此,以下对在附图中提供的本发明的实施例的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。Accordingly, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.
在本发明的描述中,需要说明的是,术语“第一”、“第二”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the terms "first", "second" and so on are only used for distinguishing descriptions, and should not be understood as indicating or implying relative importance.
在本发明的描述中,还需要说明的是,除非另有明确的规定和限定,术语“设置”、“连接”应做广义理解,例如,“连接”可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should also be noted that, unless otherwise specified and limited, the terms "setting" and "connection" should be understood in a broad sense. For example, "connection" can be a fixed connection or a detachable connection. Connected, or integrally connected; it may be mechanically connected or electrically connected; it may be directly connected or indirectly connected through an intermediary, and it may be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.
实施例1,参照图1至图7。Embodiment 1, with reference to Fig. 1 to Fig. 7.
如图1所示,本实施例提供的全地面履带式多功能吊车,全地面履带式多功能吊车包括履带底盘100和设置于履带底盘100的起重机械臂200、机械臂操作室300、铁塔起吊机构、铁塔起吊操作室500、升降台600、旋转升降底盘610,铁塔起吊机构包括铁塔吊臂组410;As shown in Figure 1, the all-terrain crawler multifunctional crane provided in this embodiment includes a crawler chassis 100 and a lifting robot arm 200 arranged on the crawler chassis 100, a mechanical arm operating room 300, and an iron tower. Lifting mechanism, tower lifting operation room 500, lifting platform 600, rotating lifting chassis 610, and the tower lifting mechanism includes tower boom group 410;
铁塔吊臂组410包括多个起吊组411,起吊组411包括驱动吊臂420、起吊滑轨430、起吊爪440和连杆机构470;驱动吊臂420的一端活动设置于履带底盘100,驱动吊臂420的另一端设置起吊滑轨430,起吊爪440滑动设置于起吊滑轨430,连杆机构470连动起吊爪440沿着起吊滑轨430来回往复移动;The iron tower boom group 410 includes a plurality of lifting groups 411, and the lifting group 411 includes a driving boom 420, a lifting slide rail 430, a lifting claw 440 and a link mechanism 470; one end of the driving boom 420 is movably arranged on the crawler chassis 100, and the driving crane The other end of the arm 420 is provided with a lifting slide rail 430, the lifting claw 440 is slidably arranged on the lifting slide rail 430, and the linkage mechanism 470 links the lifting claw 440 to move back and forth along the lifting slide rail 430;
本发明的一个实施例,如图1所示,履带底盘100还设置有置物架700和工具箱800。In an embodiment of the present invention, as shown in FIG. 1 , the crawler chassis 100 is further provided with a storage rack 700 and a tool box 800 .
履带底盘100设置的置物架700能够用于装载安装架空输电线路用的机构,工具箱800能够用于装载安装架空输电线路用的各种安装和检修工具。完成各种机构的运输。履带底盘100上还可以根据实际需求设置不同的装置,比如各种发电机构,焊接结构等。The rack 700 provided on the crawler chassis 100 can be used for loading mechanisms for installing overhead power transmission lines, and the tool box 800 can be used for loading various installation and maintenance tools for installing overhead power transmission lines. Complete the transportation of various institutions. Different devices can also be provided on the crawler chassis 100 according to actual needs, such as various power generating mechanisms, welding structures and the like.
本发明的一个实施例,如图1所示,起吊组411设置三个,其中两个起吊组411相对设置且分别为夹持吊组412,如图6和图7所示,剩余的一个起吊组411为平衡吊组413且位于两个夹持吊组412的一侧;两个夹持吊组412的起吊滑轨430和平衡吊组413的起吊滑轨430形成一个“U”形夹持空间。In one embodiment of the present invention, as shown in Figure 1, three hoisting groups 411 are provided, wherein two hoisting groups 411 are arranged oppositely and are respectively clamping hoisting groups 412, as shown in Figures 6 and 7, the remaining one hoisting Group 411 is the balanced hanging group 413 and is located on one side of the two clamping hanging groups 412; the lifting slide rails 430 of the two clamping hanging groups 412 and the lifting slide rails 430 of the balancing hanging group 413 form a "U"-shaped clamping space.
起吊组411设置三个,两个夹持吊组412位于铁塔的两侧,平衡吊组413位于铁塔的靠近履带底盘100的一侧,将铁塔限制在“U”形夹持空间内,然后利用起到夹持臂夹住铁塔,完成起吊。起吊组411设置三个,能够保证起吊的稳定性,以及保证必要的起吊强度。There are three lifting groups 411, two clamping groups 412 are located on both sides of the iron tower, and the balance hanging group 413 is located on the side of the iron tower close to the crawler chassis 100, so that the iron tower is limited in the "U"-shaped clamping space, and then use Lift the clamping arm to clamp the iron tower to complete the lifting. There are three hoisting groups 411, which can ensure the stability of hoisting and the necessary hoisting strength.
如图2所示,升降台600的顶部设置有台板601,台板601设置有圆形槽602,旋转升降底盘610转动嵌设于圆形槽602,铁塔吊臂组410设置于旋转升降底盘610;圆形槽602的边缘沿周向方向间隔设置有多个靠近旋转升降底盘610的一侧开放设置的第一限位槽603,每个第一限位槽603的远离旋转升降底盘610的一侧铰接有限位块604;旋转升降底盘610的边缘沿周向方向间隔设置有多个第二限位槽611,每个第二限位槽611能够转动至与一个第一限位槽603对应,限位块604能够卡接于第一限位槽603和第二限位槽611之间。As shown in Figure 2, the top of the lifting table 600 is provided with a platform 601, the platform 601 is provided with a circular groove 602, the rotating lifting chassis 610 is rotatably embedded in the circular groove 602, and the iron tower boom group 410 is arranged on the rotating lifting chassis 610; the edge of the circular groove 602 is provided with a plurality of first limiting grooves 603 open to one side close to the rotating lifting chassis 610 at intervals along the circumferential direction, and each first limiting groove 603 is far away from the rotating lifting chassis 610 A limiting block 604 is hinged on one side; a plurality of second limiting grooves 611 are arranged at intervals along the circumferential direction on the edge of the rotating lifting chassis 610, and each second limiting groove 611 can be rotated to correspond to a first limiting groove 603 , the limiting block 604 can be clamped between the first limiting groove 603 and the second limiting groove 611 .
机械臂操作室300控制起重机械臂200起吊重物。铁塔起吊操作室500控制铁塔起吊机构将在专用的工作场地施工安装好后的输电线路铁塔吊装到指定位置,提高了架空输电线路的安装速度,减轻劳动强度。The manipulator operating room 300 controls the lifting manipulator 200 to lift heavy objects. The tower hoisting operation room 500 controls the tower hoisting mechanism to hoist the transmission line tower to the designated position after construction and installation in a dedicated work site, which improves the installation speed of overhead transmission lines and reduces labor intensity.
驱动吊臂420驱动起吊滑轨430移动至铁塔附近,利用起吊爪440扣住铁塔,连杆机构470驱动起吊爪440上下移动,带动铁塔上下移动,实现架空输电线路铁塔的转运。Drive the boom 420 to drive the lifting slide rail 430 to move to the vicinity of the iron tower, use the lifting claw 440 to buckle the iron tower, and the linkage mechanism 470 drives the lifting claw 440 to move up and down, driving the iron tower to move up and down, and realize the transfer of the overhead transmission line iron tower.
升降台600能够进一步抬高被起吊爪440扣住的铁塔的高度,起到辅助升降的目的。旋转升降底盘610能够带动铁塔吊臂移动至不同的位置,方便起吊不同位置的铁塔。The lifting platform 600 can further raise the height of the iron tower held by the lifting claw 440 to assist in lifting. The rotating lifting chassis 610 can drive the iron tower boom to move to different positions, so as to facilitate the lifting of iron towers at different positions.
实际操作时,旋转旋转升降底盘610,旋转升降底盘610带动铁塔吊臂组410转动至指定位置,起到该位置的铁塔。利用起吊爪440扣住位于该处的铁塔,然后利用连杆机构470带动起吊爪440沿着起吊滑轨430向上移动,带动铁塔移动,从而将安装好后的铁塔移动至指定位置。During actual operation, the rotating lifting chassis 610 is rotated, and the rotating lifting chassis 610 drives the iron tower boom group 410 to rotate to a designated position, so as to lift the iron tower at this position. Use the lifting claw 440 to buckle the iron tower located there, and then use the link mechanism 470 to drive the lifting claw 440 to move upward along the lifting slide rail 430 to drive the iron tower to move, thereby moving the installed iron tower to a designated position.
本发明的一个实施例,如图3所示,起吊爪440包括起吊滑块441和设置于起吊滑块441的起吊夹持臂442,起吊滑块441滑动设置于起吊滑轨430;起吊夹持臂442包括两个设置于起吊滑块441且能够相互靠近和远离的夹持部443,夹持部443为“U”形件,两个夹持部443的开口相对设置。In one embodiment of the present invention, as shown in Figure 3, the lifting claw 440 includes a lifting slider 441 and a lifting clamping arm 442 arranged on the lifting slider 441, and the lifting slider 441 is slidably arranged on the lifting slide rail 430; The arm 442 includes two clamping parts 443 arranged on the lifting slider 441 and capable of approaching and moving away from each other. The clamping parts 443 are "U" shaped pieces, and the openings of the two clamping parts 443 are oppositely arranged.
两个夹持部443相互靠近夹住铁塔的部件,两个夹持部443相互远离松开铁塔的部件。连杆机构470带动起吊滑块441沿着起吊滑轨430向上移动,起吊滑块441带动起到夹持臂向上移动,带动铁塔移动。The two clamping parts 443 are close to each other to clamp the part of the iron tower, and the two clamping parts 443 are far away from each other to loosen the part of the iron tower. The link mechanism 470 drives the lifting slider 441 to move upwards along the lifting slide rail 430, and the lifting slider 441 drives the clamping arm to move upwards, thereby driving the iron tower to move.
夹持部443采用“U”形件能够更加牢固稳固地夹持住铁塔。The clamping part 443 adopts a "U" shape to clamp the iron tower more firmly and stably.
本发明的一个实施例,如图3所示,起吊滑块441设置有驱动杆450,驱动杆450的两端分别设置有正螺纹段451和反螺纹段452,一个夹持部443与正螺纹段451螺纹连接,另一个夹持部443与反螺纹段452螺纹连接。In one embodiment of the present invention, as shown in Figure 3, the lifting slider 441 is provided with a driving rod 450, and the two ends of the driving rod 450 are respectively provided with a positive thread section 451 and a reverse thread section 452, and a clamping part 443 is connected to the positive thread The section 451 is threaded, and the other clamping portion 443 is threaded with the reverse threaded section 452 .
驱动杆450正反转的过程中,驱动两个夹持部443相互远离和相互靠近。两个夹持部443能够同步移动,实现更加稳固地夹持住铁塔。During the process of forward and reverse rotation of the driving rod 450 , the two clamping parts 443 are driven to move away from each other and to approach each other. The two clamping parts 443 can move synchronously to achieve a more stable clamping of the iron tower.
本发明的一个实施例,如图4所示,起吊滑块441设置有导向滑道460,导向滑道460的两端分别设置有伸缩液压杆461,两个伸缩液压杆461相对设置,两个夹持部443并排滑动嵌设于导向滑道460,每个伸缩液压杆461的驱动端与一个夹持部443连接。In one embodiment of the present invention, as shown in Figure 4, the lifting slider 441 is provided with a guide slideway 460, and the two ends of the guide slideway 460 are respectively provided with telescopic hydraulic rods 461, and the two telescopic hydraulic rods 461 are arranged oppositely. The clamping parts 443 are slidably embedded in the guide slideway 460 side by side, and the driving end of each telescopic hydraulic rod 461 is connected with one clamping part 443 .
通过伸缩液压杆461驱动两个夹持部443相互靠近和远离,液压杆能够保证两个夹持部443的夹紧力,能够更加牢固稳固地夹持住铁塔。The telescopic hydraulic rod 461 drives the two clamping parts 443 to approach and move away from each other, the hydraulic rod can ensure the clamping force of the two clamping parts 443, and can clamp the iron tower more firmly.
本发明的一个实施例,如图5所示,起吊夹持臂442设置多个,多个起吊夹持臂442间隔滑动设置于起吊滑块441。In one embodiment of the present invention, as shown in FIG. 5 , multiple lifting clamping arms 442 are provided, and the multiple lifting clamping arms 442 are slidably arranged on the lifting slider 441 at intervals.
铁塔由很多根钢件搭建而成,设置多个起吊夹持臂442,每个起吊夹持臂442能够夹持住铁塔的其中一个部位的钢件,夹持住多个钢件,一方面提高夹持刚度和稳固度,另一方面,能够降低起吊夹持臂442的刚度要求,降低材料要求。The iron tower is built by many steel parts, and a plurality of lifting clamping arms 442 are set, and each lifting clamping arm 442 can clamp the steel parts of one of the parts of the iron tower, and clamp multiple steel parts, on the one hand improve Clamping stiffness and stability, on the other hand, can reduce the rigidity requirements for lifting the clamping arm 442 and reduce material requirements.
本发明的一个实施例,如图3所示,起吊滑轨430的宽度方向并排设置有多根沿其长度方向设置的驱动螺杆431,每根驱动螺杆431的轴心线平行于起吊滑轨430的限定方向;起吊滑轨430的两侧分别设置有限位轨道,每个起吊滑块441的两侧分别设置有能够滑动嵌设于限位轨道的限位块604,每个起吊滑块441还设置有驱动件,驱动件与驱动螺杆431螺纹连接。In one embodiment of the present invention, as shown in FIG. 3 , the width direction of the lifting slide rail 430 is arranged side by side with a plurality of driving screws 431 arranged along its length direction, and the axis line of each driving screw rod 431 is parallel to the lifting slide rail 430 limited direction; the two sides of the lifting slide rail 430 are respectively provided with limit rails, and the two sides of each lifting slider 441 are respectively provided with a limit block 604 that can be slidably embedded in the limit track, and each lifting slider 441 also A driving part is provided, and the driving part is threadedly connected with the driving screw rod 431 .
每根驱动螺杆431驱动一个起吊滑块441能够沿着起吊滑轨430的限定方向移动。由于铁塔相邻两个部位之间的钢件的距离呈不规则分布,因此,多个起吊夹持臂442之间的间距应该能够调节。本实施例中,利用驱动螺杆431的转动驱动起吊滑块441沿着限位轨道滑动。驱动不同的驱动螺杆431转动,能够带动不同的起吊滑块441移动至不同的位置以对铁塔进行夹持。Each driving screw 431 drives a lifting slider 441 to move along a defined direction of the lifting slide rail 430 . Since the distance between the steel parts between two adjacent parts of the iron tower is irregularly distributed, the distance between the multiple lifting clamping arms 442 should be adjustable. In this embodiment, the rotation of the driving screw 431 is used to drive the lifting slider 441 to slide along the limiting track. Driving different driving screw rods 431 to rotate can drive different lifting sliders 441 to move to different positions to clamp the iron tower.
本发明的一个实施例,如图5所示,驱动吊臂420的设置于履带底盘100的一端与履带底盘100之间设置有驱动液压杆421;驱动吊臂420的设置起吊滑轨430的一端设置有角度驱动机构480,起吊滑轨430设置于角度驱动机构480;角度驱动机构480驱动起吊滑轨430平行于被夹持的输电线路铁塔对应的侧面。In one embodiment of the present invention, as shown in FIG. 5 , a driving hydraulic rod 421 is arranged between one end of the driving boom 420 disposed on the crawler chassis 100 and the crawler chassis 100 ; An angle driving mechanism 480 is provided, and the lifting slide rail 430 is arranged on the angle driving mechanism 480; the angle driving mechanism 480 drives the lifting slide rail 430 to be parallel to the corresponding side of the clamped transmission line iron tower.
驱动液压杆421伸缩实现驱动吊臂420与履带底盘100之间的角度调节,通过调节驱动吊臂420与履带底盘100之间的角度实现驱动吊臂420远离履带底盘100一端的高度调节。The driving hydraulic rod 421 stretches to realize the angle adjustment between the driving boom 420 and the crawler chassis 100 , and the height adjustment of the driving boom 420 away from the crawler chassis 100 is realized by adjusting the angle between the driving boom 420 and the crawler chassis 100 .
由于铁塔的四个侧面不是竖向设置的,一般倾斜设置,整体从下到上,横街面积逐渐减小。“角度驱动机构480驱动起吊滑轨430平行于被夹持的输电线路铁塔对应的侧面”,比如,角度驱动机构480驱动两个夹持吊组412的起吊滑轨430在驱动吊臂420一侧的范围内作远离和靠近驱动吊臂420的摆动,角度驱动机构480驱动平衡吊组413的起吊滑轨430沿驱动吊臂420的延伸方向摆动实现角度调节。Since the four sides of the iron tower are not vertically arranged, they are generally arranged obliquely, and the area of the horizontal street gradually decreases from bottom to top as a whole. "The angle driving mechanism 480 drives the lifting slide rail 430 to be parallel to the side corresponding to the clamped transmission line iron tower", for example, the angle driving mechanism 480 drives the lifting slide rail 430 of the two clamping suspension groups 412 on the side of the driving boom 420 Swing away from and close to the driving boom 420 within the range, the angle driving mechanism 480 drives the lifting slide rail 430 of the balance hanging group 413 to swing along the extension direction of the driving boom 420 to realize angle adjustment.
本发明的一个实施例,如图5所示,角度驱动机构480包括角度驱动轴481和设置于角度驱动轴481的安装件482,角度驱动轴481转动设置于驱动吊臂420的端部,安装件482固定于角度驱动轴481,起吊滑轨430设置于安装件482。In one embodiment of the present invention, as shown in Figure 5, the angle drive mechanism 480 includes an angle drive shaft 481 and a mounting part 482 arranged on the angle drive shaft 481, and the angle drive shaft 481 is rotatably arranged on the end of the drive boom 420, installed The component 482 is fixed on the angle drive shaft 481 , and the lifting slide rail 430 is arranged on the mounting component 482 .
角度驱动轴481转动指定角度带动安装件482转动指定角度,设置于安装件482的起吊滑轨430转动相同的角度。驱动角度驱动轴481转动的结构可以采用电力,液压或者气压。The angle driving shaft 481 rotates a specified angle to drive the mounting part 482 to rotate a specified angle, and the lifting slide rail 430 disposed on the mounting part 482 rotates the same angle. The structure for driving the angular drive shaft 481 to rotate can adopt electric power, hydraulic pressure or air pressure.
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711046120.5A CN107572429B (en) | 2017-10-31 | 2017-10-31 | Full ground crawler-type multifunctional crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711046120.5A CN107572429B (en) | 2017-10-31 | 2017-10-31 | Full ground crawler-type multifunctional crane |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107572429A true CN107572429A (en) | 2018-01-12 |
CN107572429B CN107572429B (en) | 2019-03-01 |
Family
ID=61040701
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711046120.5A Expired - Fee Related CN107572429B (en) | 2017-10-31 | 2017-10-31 | Full ground crawler-type multifunctional crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107572429B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113860191A (en) * | 2021-10-27 | 2021-12-31 | 沈阳鑫博立恩石油钻探设备制造有限公司 | Drilling tool hanging row operation machine |
CN114321587A (en) * | 2021-12-15 | 2022-04-12 | 北京华商陆海科技有限公司 | Stabilizing device and stabilizing method for tower type equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0658066A (en) * | 1992-08-03 | 1994-03-01 | Kato Works Co Ltd | Self-propelled punch |
CN201176373Y (en) * | 2007-12-21 | 2009-01-07 | 王树声 | Hoisting device for pylon |
CN103738861A (en) * | 2013-12-19 | 2014-04-23 | 国家电网公司 | Integral hoisting method for A type column of steel pipe of ultra-high voltage transformer station |
CN205687503U (en) * | 2016-06-22 | 2016-11-16 | 吴吉成 | Tracked vehicle maintenance lifting platform |
CN106429887A (en) * | 2016-09-05 | 2017-02-22 | 中国电力科学研究院 | Remotely controllable mobile crane for erection of power transmission line pylon in mountainous region |
-
2017
- 2017-10-31 CN CN201711046120.5A patent/CN107572429B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0658066A (en) * | 1992-08-03 | 1994-03-01 | Kato Works Co Ltd | Self-propelled punch |
CN201176373Y (en) * | 2007-12-21 | 2009-01-07 | 王树声 | Hoisting device for pylon |
CN103738861A (en) * | 2013-12-19 | 2014-04-23 | 国家电网公司 | Integral hoisting method for A type column of steel pipe of ultra-high voltage transformer station |
CN205687503U (en) * | 2016-06-22 | 2016-11-16 | 吴吉成 | Tracked vehicle maintenance lifting platform |
CN106429887A (en) * | 2016-09-05 | 2017-02-22 | 中国电力科学研究院 | Remotely controllable mobile crane for erection of power transmission line pylon in mountainous region |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113860191A (en) * | 2021-10-27 | 2021-12-31 | 沈阳鑫博立恩石油钻探设备制造有限公司 | Drilling tool hanging row operation machine |
CN114321587A (en) * | 2021-12-15 | 2022-04-12 | 北京华商陆海科技有限公司 | Stabilizing device and stabilizing method for tower type equipment |
Also Published As
Publication number | Publication date |
---|---|
CN107572429B (en) | 2019-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205916923U (en) | Maintain frock in fan tower section of thick bamboo | |
CN108706333B (en) | Tunnel steel arch installing manipulator and manipulator working platform | |
CN102606092A (en) | Hanging type adaptive automatic drill pipe string discharge device | |
CN103711437A (en) | Hoisting derrick specially for coiled tubing equipment | |
CN111071362B (en) | Climbing robot and system for overhead line pole tower | |
CN103410458A (en) | Vertical discharge pipe system | |
CN103030074A (en) | Hinge points-variable combined type multi-functional crawler crane | |
CN105583827A (en) | Conical robot | |
CN104690710A (en) | Electro-hydraulic combination driven movable mechanical arm | |
CN204588531U (en) | A kind of knuckle hangs | |
CN207608237U (en) | Crawler-type multifunctional work car | |
CN204754953U (en) | Railway tunnel stock platform truck and drilling device thereof | |
CN209383292U (en) | A tower crane | |
CN107572429A (en) | Full ground crawler-type multifunctional crane | |
CN206680133U (en) | A kind of fine adjustment type balcony lift | |
CN109138897A (en) | Well head centralising device and with its well workover equip | |
CN208531649U (en) | Tunnel steel arch frame installation manipulator and robot work platform | |
CN109571407B (en) | Tunnel operation car and snatch manipulator thereof | |
CN209277844U (en) | Well head centralising device and with its well workover equip | |
CN205222520U (en) | Scalable with rotatory cantilever crane of crossbeam | |
CN203488119U (en) | Iron stand | |
CN203488122U (en) | Vertically pipe-arranging system | |
CN204224145U (en) | Crawler type frog leg hoisting crane | |
CN104139387A (en) | Automatic drill rod discharge mechanical hand suitable for core drill | |
CN207418151U (en) | A kind of multifunctional building crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190301 Termination date: 20191031 |