CN107571382A - Glazing streamline and glazing method - Google Patents

Glazing streamline and glazing method Download PDF

Info

Publication number
CN107571382A
CN107571382A CN201710954274.8A CN201710954274A CN107571382A CN 107571382 A CN107571382 A CN 107571382A CN 201710954274 A CN201710954274 A CN 201710954274A CN 107571382 A CN107571382 A CN 107571382A
Authority
CN
China
Prior art keywords
bottle
glaze
station
interior
glazing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710954274.8A
Other languages
Chinese (zh)
Other versions
CN107571382B (en
Inventor
肖书明
周文军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hejiang Huayi Ceramic Products Co.,Ltd.
Original Assignee
Hejiang Huayi Ceramic Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hejiang Huayi Ceramic Products Co Ltd filed Critical Hejiang Huayi Ceramic Products Co Ltd
Priority to CN201710954274.8A priority Critical patent/CN107571382B/en
Publication of CN107571382A publication Critical patent/CN107571382A/en
Application granted granted Critical
Publication of CN107571382B publication Critical patent/CN107571382B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Specific Conveyance Elements (AREA)

Abstract

The present invention relates to glazing construction applications, it is intended to solves that existing glazing structure floor space is big, operating efficiency is low, the ropy problem of glazing, there is provided glazing streamline and glazing method.Upper bottle point, air blowing dedusting station, bottle station, upper interior glaze station on first are sequentially distributed along the current direction of glazing streamline, wipe bottleneck station, first lower bottle of station, bottle station, infiltration station, upper outer glaze station, second lower bottle of station, lower bottle point on second.Glazing streamline includes air blowing dust removal machine, belt conveyor, interior glaze system, transition delivery platform, outer glaze system, differential wash bottle bottom machine in upper bottle localization machine, bottle.Outer glaze system and interior glaze system are respectively utilized to complete main upper interior glaze and upper outer glaze operation using being circular layout.The beneficial effects of the invention are as follows can expeditiously complete the operation such as upper interior glaze, upper outer glaze, conveniently realize that the beneficial effect of extensive Production line is compact-sized, floor space is small, operating efficiency is high, glazing quality is high.

Description

Glazing streamline and glazing method
Technical field
The present invention relates to glazing construction applications, in particular to a kind of glazing streamline and glazing method.
Background technology
Glazing structure is that the structure of glazing is carried out to the surfaces externally and internally of workpiece (such as bottle blank).Glazing of the prior art Structure has that structure floor space is big, and operating efficiency is low, the ropy problem of glazing.
The content of the invention
The present invention is intended to provide a kind of glazing streamline, to solve, glazing structure floor space of the prior art is big, grasps Make that efficiency is low, the ropy problem of glazing.
Another object of the present invention is to provide a kind of glazing method for possessing above-mentioned glazing streamline.
What embodiments of the invention were realized in:
The embodiment of the present invention provides a kind of glazing method, and it is implemented based on glazing streamline;Glazing streamline includes being used for To the interior glaze system of interior glaze on bottle part, and the outer glaze system to outer glaze on bottle part;
Interior glaze system includes interior glaze turntable and some circumferential interior glaze of interior glaze turntable that are connected to embrace tong;Interior glaze rotation Bottle station on first, upper interior glaze station, first lower bottle of station are corresponding in turn to outside the circumference of platform;Each interior glaze embraces tong and carries bottle Part under the driving of interior glaze turntable successively by bottle station on first, on interior glaze station, first lower bottle of station, with to bottle part according to It is secondary to carry out bottle operation on first, upper interior glaze operation, first time bottle operation;After the completion of first time bottle operation, interior glaze embraces tong again Return to bottle station on first and be ready for next operation circulation;
Bottle behaviour is taken as the interior glaze armful tong crawl of bottle station on corresponding first positioned at bottle station on first on first Bottle part;Glaze operation is to embrace folder to the interior glaze for moving to upper interior glaze station by being arranged at the interior glaze glazing machine of upper interior glaze station in upper The inner surface glazing of bottle part entrained by hand;First time bottle operation embraces tong to will move to the interior glaze of corresponding first lower bottle of station Entrained bottle part is lowered into first lower bottle of station;
Outer glaze system includes outer glaze turntable and some circumferential outer glaze of outer glaze turntable that are connected to embrace tong;Outer glaze rotation Bottle station on second, upper outer glaze station, second lower bottle of station are corresponding in turn to outside the circumference of platform;Each outer glaze embraces tong and carries bottle Part under the driving of outer glaze turntable successively by bottle station on second, on outer glaze station, second lower bottle of station, with to bottle part according to It is secondary to carry out bottle operation on second, upper outer glaze operation, second time bottle operation;After the completion of second time bottle operation, outer glaze embraces tong again Return to bottle station on second and be ready for next operation circulation;
Bottle behaviour is taken as the outer glaze armful tong crawl of bottle station on corresponding second positioned at bottle station on second on second Bottle part;Bottle part positioned at bottle station on second is to be had been subjected to from what first lower bottle of station conveyed in interior glaze system after interior glaze Bottle part;Above outer glaze operation is to embrace outer glaze on by way of tong drives bottle part in leaching glaze in soaking glaze groove outer glaze;Second time bottle behaviour The bottle part embraced as the outer glaze that will move to corresponding second lower bottle of station entrained by tong is lowered into second lower bottle of station.
In one embodiment of the invention:
Bottle part is delivered to bottle station on first by the way that belt conveyor is defeated from upper bottle point, and bottle part is in upper bottle point and first Air blowing dust removal operation is carried out between upper bottle station;Air blowing dust removal operation is to be blown from air blowing dust removal machine into bottle part inner chamber to blow out Dust in bottle part.
In one embodiment of the invention:
Glazing method once carries out glazing to the bottle part group being made up of multiple bottles of parts simultaneously;
The transfer passage of belt conveyor is accommodates the single channel of a bottle part, and belt conveyor is be arranged in order one Bottle part group is conveying unit;
Interior glaze, which embraces the outer glaze armful tong of tong and institute, has multiple clamping positions, realizes that once processing is defeated by belt conveyor simultaneously The bottle part group brought.
In one embodiment of the invention:
The bottle part for being lowered into first lower bottle of station is delivered to bottle station on second by transition delivery platform;
The quantity of the transfer passage of transition delivery platform is equal to the quantity for the bottle part that bottle part group is included.
In one embodiment of the invention:
Be lowered into the bottle part of second lower bottle of station by differential wash bottle bottom machine wipe it is offline after bottom of bottle operation;
Differential wash bottle bottom machine includes the first differential belt and the second differential belt, the first differential belt and the second differential belt It is adjacent to be arranged side by side, and can be with different transmission speed transfer bottle parts;
Transfer to a bottom part for the bottle part of differential wash bottle bottom machine is pressed on the first differential belt, another part is pressed on Second differential belt, the first differential belt and the second differential is set to transmit at different rates, the very fast person of the transmission in both is to bottle Part pressing part thereon carries out wiping bottom of bottle operation, stick at during by upper outer glaze bottom of bottle glaze water wipe under, complete to wipe bottom of bottle behaviour Make.
In one embodiment of the invention:
After upper interior glaze operation, also have before first time bottle operation and wipe bottleneck operation;
Wipe bottleneck operation and stick at the unnecessary interior glaze at bottle neck after upper interior glaze operation to clean;
Interior glaze system shares four interior glaze and embraces tong, and four interior glaze embrace circumferential four that tong is respectively arranged at interior glaze turntable Side, and it is 90 ° to be spaced central angle each other;
It is additionally provided with upper between glaze station and first lower bottle of station and wipes bottleneck station, interior glaze is embraced tong carrying bottle part and carried out Follow-up first time bottle operation is carried out again after wiping bottleneck station and completing to wipe bottleneck operation after interior glaze operation.
In one embodiment of the invention:
On second after bottle operation, on be provided with infiltration before the operation of outer glaze and operate;
Infiltration operation is to embrace tong using outer glaze to drive bottle part to be immersed in the water, and moistens the outer surface of bottle part;
Outer glaze system shares four outer glaze and embraces tong, and four outer glaze embrace circumferential four that tong is respectively arranged at outer glaze turntable Side, and it is 90 ° to be spaced central angle each other.
In one embodiment of the invention:
Upper outer glaze operation includes following action:
Bottle part is immersed in glaze groove downwards, bottle part proposes to soak upwards glaze groove, makes bottle part with its axis and vertical direction be in set The state at fixed inclination angle is around its axis rotation so that unnecessary outer glaze drippage.
The present invention also provides a kind of glazing streamline for completing foregoing any glazing method.Glazing streamline comprises at least For completing the interior glaze system of interior glaze on bottle part and the outer glaze system for completing outer glaze on bottle part;First time bottle of interior glaze system Station flowing water connects bottle station on the second of outer glaze system.
The present invention also provides a kind of glazing streamline.Upper bottle point is sequentially distributed along the current direction of glazing streamline, is blown Gas dedusting station, bottle station, upper interior glaze station on first, wipe bottleneck station, first lower bottle of station, bottle station, infiltration on second Station, upper outer glaze station, second lower bottle of station, lower bottle point.Glazing streamline include upper bottle localization machine, air blowing dust removal machine in bottle, Belt conveyor, interior glaze operating desk, outer glaze operating desk, transition delivery platform, differential wash bottle bottom machine.Upper bottle localization machine is arranged at Bottle point, for positioning upper bottle.Air blowing dust removal machine is arranged at air blowing dedusting station in bottle, for the inner chamber of the bottle part to come to conveying Blow, to blow out the dust impurity in it.Belt conveyor passes sequentially through bottle point, air blowing dedusting station, bottle station on first, For transfer bottle part to corresponding station.Bottle station, upper interior glaze station, wiping bottleneck station, first lower bottle of station are in ring on first Shape is distributed in the periphery of interior glaze operating desk.Glaze station is provided with the interior glaze glazing constructions being used for bottle part Nei Shinei glaze in upper.Wipe bottle Mouth station is provided with the wiping bottleneck machine of the unnecessary glaze in the bottleneck periphery for being used for cleaning the bottle part after interior glaze on upper interior glaze station.Interior glaze Operating desk includes interior glaze turntable and four interior glaze for being connected to the interior side of glaze turntable four embrace tong.Each interior glaze embraces tong It is configured under the drive of interior glaze turntable, realizes that bottle station captures bottle part, in upper interior glaze station from first successively Glaze glazing constructions are completed to bottle part Nei Shinei glaze, are wiping the bottleneck station cooperation wiping bottleneck machine completion unnecessary glaze of bottle part bottleneck in cooperation Erasing and bottle part is put down in first lower bottle of station.Transition delivery platform is connected to bottle on first lower bottle of station and second Between station, for the bottle part put down in first lower bottle of station to be transferred into bottle station on second.Bottle station, infiltration work on second Position, upper outer glaze station, second lower bottle of station are distributed in the periphery of outer glaze operating desk in a ring.Infiltrate station and be provided with the leaching for accommodating water Tank.Upper outer glaze station is provided with the leaching glaze groove for accommodating glaze water.Outer glaze operating desk includes outer glaze turntable and four are connected to The outer glaze of the outer side of glaze turntable four embraces tong.Each outer glaze is embraced tong and is configured under the drive of outer glaze turntable, according to Secondary realization bottle station from second captures bottle part, drives bottle part to be soaked in soaking pit to infiltrate the appearance of bottle part in infiltration station Face, in upper outer glazer's bit strip bottle part is moved in glaze groove soak by soaking outer glaze in glaze realization and putting down bottle part in second time bottle Station.Differential wash bottle bottom machine is connected between second lower bottle of station and lower bottle point, for that will put down in the bottle of second lower bottle of station Part, which is transmitted to lower bottle point, waits bottle part offline.And differential wash bottle bottom machine can also carry out scouring bottom of bottle to the bottle part that it is transmitted, To wipe the glaze for sticking at bottom of bottle.
Glazing method and glazing streamline in the present embodiment have it is easy to operate, and in can expeditiously completing Glaze, upper outer glaze etc. operate, and conveniently realize the beneficial effect of extensive Production line;Glazing streamline also volume in this present embodiment There is rational in infrastructure compact, the small beneficial effect of floor space outside.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below by embodiment it is required use it is attached Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore be not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the structural representation of the glazing streamline in the embodiment of the present invention;
Fig. 2 is Fig. 1 top view;
Fig. 3 is the structural representation of the interior glaze operating desk in the embodiment of the present invention;
Fig. 4 is the structural representation of the outer glaze operating desk in the embodiment of the present invention;
Fig. 5 is a kind of structural representation of embodiment of the interior glaze armful tong in the present embodiment;
Fig. 6 is Fig. 5 A direction views;
Fig. 7 is the structural representation of the bottle part in the present embodiment;
Fig. 8 is a kind of structural representation of embodiment of the interior glaze glazing constructions in the present embodiment;
Fig. 9 is Fig. 8 top view;
Figure 10 is the topology view for going out part at glaze in the present embodiment;
Figure 11 is the schematic diagram of the interior glaze glazing constructions use state in the present embodiment;
Figure 12 is the structural representation of the wiping bottleneck machine in the embodiment of the present invention;
Figure 13 is Figure 12 top view;
Figure 14 is zoomed-in view at the R in Figure 12;
Figure 15 is Figure 14 top view.
Icon:L01- glazing streamlines;Glaze operating desk in 010-;The outer glaze operating desks of 020-;Glaze embraces tong in 100-;200- Interior glaze turntable;The upper bottle localization machines of 300-;Air blowing dust removal machine in 400- bottles;500- soaking pits;600- soaks glaze groove;The outer glaze of 700- Embrace tong;The outer glaze turntables of 800-;Glaze system in B001-;The outer glaze systems of D001-;T1- belt conveyers;T2- transition conveying is flat Platform;T3- differential wash bottles bottom machine;T31- the first differential belts;T32- the second differential belts;10- frames;11- chassis;12- sides Plate;20- clamping devices;20a- clamps actuator;20b- clamping parts;21- Bottle neck grippers;The clamping strips of 21a- first;21b- first Auxiliary section;22- bottles tripe presss from both sides;The clamping strips of 22a- second;The auxiliary sections of 22b- second;23- connectors;2a- telescopic ends;30- rotations are driven Dynamic device;C1- bar-shaped troughs;K1- mounting holes;Q1- activity spaces;R001- wipes bottleneck machine;The outer surface of r01- bottlenecks;R02- water outlets Mouthful;R03- groove bottoms;R10- drive mechanisms;R11- rotary actuators;R20- scrub heads;R21- cleans groove;R22- drives; R22- otch;R23- driving belts;R24- tensioning wheels;R25- driving grooves;R26- centers rotary column;R30- scouring pads;R40- supplies water System;R50- supports mounting bracket;R51- support rails;R52- support frames;R60- catchments slotware;Glaze glazing knot in S001- Structure;S01- step surfaces;S02- lower surfaces;Glaze access slot in s10-;S11- support bars;S12- elongated slots;S13- support frames;S20- is supplied Glaze system;S21- divides glaze transverse tube;S211- boss;S22- enters glaze supervisor;S23- enters glaze branch pipe;S24- supplies glaze pond;S30- coordinates Mouth;S301- ports;S40- goes out glaze pipe;The upper pipeline sections of s41-;S42- lower tube sections;S43- cushions;S44- coordinates pipeline section;S50- is returned Position part;W0- bottle parts;W1- bottle part necks;W2- bottle part tripes portion;Y1- pivot centers.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be configured to arrange and design with a variety of.
Therefore, below the detailed description of the embodiments of the invention to providing in the accompanying drawings be not intended to limit it is claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.It is common based on the embodiment in the present invention, this area The every other embodiment that technical staff is obtained under the premise of creative work is not made, belong to the model that the present invention protects Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent accompanying drawing in individual accompanying drawing.
If occurring term " first ", " second " etc. in description of the invention to be only used for distinguishing description, and it is not intended that referring to Show or imply relative importance.
Embodiment
Fig. 1, Fig. 2 are referred to, the present embodiment provides a kind of glazing method, and it is implemented based on glazing streamline L01.
Glazing streamline L01 in the present embodiment includes being used for the interior glaze system B001 to interior glaze on bottle part W0, and to bottle The outer glaze system D001 of outer glaze on part W0.
Please refer to Fig. 3, interior glaze system B001 includes by interior glaze turntable 200 and some is connected to interior glaze turntable 200 circumferential interior glaze embrace the interior glaze operating desk 010 that tong 100 is formed;Is corresponding in turn to outside the circumference of interior glaze turntable 200 Bottle station, upper interior glaze station, first lower bottle of station on one;Each interior glaze embraces tong 100 and carries bottle part W0 in interior glaze turntable 200 Driving under successively by bottle station, upper interior glaze station, first lower bottle of station on first, to be carried out successively on first to bottle part W0 Bottle operation, upper interior glaze operation, first time bottle operation;After the completion of first time bottle operation, interior glaze is embraced tong 100 and turned again on first Bottle station is ready for next operation circulation;
Bottle behaviour is taken as the interior glaze armful crawl of tong 100 of bottle station on corresponding first positioned at bottle station on first on first Bottle part W0;Glaze operation is by being arranged at the interior glaze glazing machine of upper interior glaze station to moving to the interior glaze of upper interior glaze station in upper Embrace the inner surface glazing of the bottle part W0 entrained by tong 100;First time bottle operation is that will move to corresponding first lower bottle of station The bottle part W0 that interior glaze embraces entrained by tong 100 is lowered into first lower bottle of station.
Coordinate referring to Fig. 4, outer glaze system D001 includes by outer glaze turntable 800 and some is connected to outer glaze turntable 800 Circumferential outer glaze embraces the outer glaze operating desk 020 that tong 700 is formed.It is corresponding in turn to outside the circumference of outer glaze turntable 800 on second Bottle station, upper outer glaze station, second lower bottle of station;Each outer glaze embraces tong 700 and carries drives of the bottle part W0 in outer glaze turntable 800 Pass through bottle station, upper outer glaze station, second lower bottle of station on second under dynamic successively, grasped with carrying out bottle on second successively to bottle part W0 Make, upper outer glaze operates, second time bottle operation;After the completion of second time bottle operation, outer glaze embraces tong 700 and turns again to bottle work on second Position is ready for next operation circulation;
Bottle behaviour is taken as the outer glaze armful crawl of tong 700 of bottle station on corresponding second positioned at bottle station on second on second Bottle part W0;The bottle part W0 of bottle station is to have been subjected to interior glaze system B001 from what first lower bottle of station conveyed on second Bottle part W0 in upper after glaze;Upper outer glaze operation is to soak the side of glaze in glaze groove 600 is soaked by the outer glaze armful drive of tong 700 bottle part W0 Outer glaze in formula;Second time bottle operation is that will move to the bottle part W0 entrained by the outer glaze armful tong 700 of corresponding second lower bottle of station It is lowered into second lower bottle of station.
In one embodiment of the invention, alternatively, the also settable belt conveyer T1 of glazing streamline L01.Bottle part W0 is delivered to bottle station on first, and bottle part W0 bottle stations on upper bottle point and first by belt conveyer T1 from upper bottle point Between carry out air blowing dust removal operation;Air blowing dust removal operation is to be blown from air blowing dust removal machine 400 in bottle into bottle part W0 inner chambers to blow Dust in bottle outlet part W0.Air blowing dust removal operation is completed from air blowing dust removal machine 400 in the bottle that can be blown into bottle.In other realities Apply in example, such as when dust is few in itself in bottle part W0, air blowing dust removal machine 400 in air blowing dedusting station and bottle can be not provided with.
In one embodiment of the invention, to improve operating efficiency, optionally, glazing method is once simultaneously to by multiple The bottle part W0 groups that bottle part W0 is formed carry out glazing.Belt conveyer T1 transfer passage is the single channel for accommodating a bottle part W0, Belt conveyer T1 is using a bottle part W0 group being arranged in order to convey unit.Interior glaze embraces tong 100 and outer glaze embraces tong 700 With multiple clamping positions, the bottle part W0 group that processing simultaneously is come by belt conveyer T1 conveyings is realized once.The present embodiment It is one group of five bottle part W0 situation shown in accompanying drawing.
In one embodiment of the invention, it is glaze system B001 in realization and outer glaze system D001 linking, this implementation Glazing streamline L01 in example is additionally provided with transition delivery platform T2.The bottle part W0 for being lowered into first lower bottle of station is defeated by transition Platform T2 is sent to be delivered to bottle station on second;The quantity of transition delivery platform T2 transfer passage is equal to what bottle part W0 groups were included Bottle part W0 quantity.Easily know, in other embodiments, can also be not provided with transition delivery platform T2, and pass through other structures Or method realizes transmission of the bottle part W0 on first lower bottle of station and second between bottle station.
In one embodiment of the invention, the glazing streamline L01 in the present embodiment is additionally provided with differential wash bottle bottom machine T3. Be lowered into the bottle part W0 of second lower bottle of station by differential wash bottle bottom machine T3 wipe it is offline after bottom of bottle operation.Differential wash bottle bottom machine It is adjacent that T3 includes the first differential belt T31 and the second differential belt T32, the first differential belt T31 and the second differential belt T32 It is arranged side by side, and can be with different transmission speed transfer bottle part W0;Transfer to differential wash bottle bottom machine T3 bottle part W0 bottom A part is pressed on the first differential belt T31, another part is pressed on the second differential belt T32, make the first differential belt T31 and Second differential transmits at different rates, and the very fast person of transmission in both carries out wiping bottom of bottle to the bottle part W0 parts pressed thereon Operation, stick at during by upper outer glaze bottom of bottle glaze water wipe under, complete to wipe bottom of bottle operation.In use, can be first poor by making successively Fast belt T31 and the second differential realize the wiping bottom of bottle operation to two parts bottom of bottle respectively in a manner of fast speed transmits, poor Fast wash bottle bottom machine T3 end may be configured as lower bottle point, offline for bottle part W0.
In one embodiment of the invention, alternatively, there is wiping after upper interior glaze operation, before first time bottle operation Bottleneck operates;Wipe bottleneck operation and stick at the unnecessary interior glaze at bottle neck after upper interior glaze operation to clean.It is corresponding, interior glaze system System B001 shares four interior glaze and embraces tong 100, and four interior glaze embrace circumferential four that tong 100 is respectively arranged at interior glaze turntable 200 Side, and it is 90 ° to be spaced central angle each other;It is additionally provided with upper between glaze station and first lower bottle of station and wipes bottleneck station, it is interior Glaze embrace tong 100 carry bottle part W0 carry out after the operation of interior glaze carrying out again after wiping bottleneck station and completing to wipe bottleneck operation it is follow-up First time bottle operation.
In one embodiment of the invention, alternatively, on second after bottle operation, on be provided with before the operation of outer glaze and soak Profit operation;Infiltration operation is to embrace tong 700 using outer glaze to drive bottle part W0 to be immersed in the water, and moistens bottle part W0 outer surface;Outside Glaze system D001 shares four outer glaze and embraces tong 700, and four outer glaze embrace the week that tong 700 is respectively arranged at outer glaze turntable 800 To four sides, and it is 90 ° to be spaced central angle each other.Upper outer glaze can improve glazing quality, outer glaze after first passing through immersion wetting Evenly.
In one embodiment of the invention, alternatively, upper outer glaze operation includes following action:Bottle part W0 immerses downwards Soak in glaze groove 600, bottle part W0 is proposed to soak glaze groove 600 upwards, made bottle part W0 with its axis and vertical direction in the inclination angle of setting State is around its axis rotation so that unnecessary outer glaze drippage.After upper outer glaze, the method for glaze is dripped by Sloped rotating can enter one Step makes outer glaze be uniformly distributed and remove unnecessary outer glaze, further improves the quality of upper outer glaze.
The present invention also provides a kind of glazing streamline L01 for completing foregoing any glazing method.Glazing streamline L01 is extremely It is few to include being used to complete the interior glaze system B001 of the glaze and outer glaze system D001 for completing outer glaze on bottle part W0 on bottle part W0; Interior glaze system B001 first lower bottle of station flowing water connects bottle station on the second of outer glaze system D001.
To sum up, the glazing method in the present embodiment has easy to operate, and can expeditiously complete interior glaze, upper outer Glaze etc. operates, and conveniently realizes the beneficial effect of extensive Production line.
The embodiments possible of glazing streamline L01 in review paper the present embodiment below.
Refer to Fig. 1, Fig. 2, along glazing streamline L01 current direction be sequentially distributed upper bottle point, air blowing dedusting station, Bottle station on first, upper interior glaze station, wipe bottleneck station, first lower bottle of station, bottle station, infiltration station, upper outer glaze on second Station, second lower bottle of station, lower bottle point.
Glazing streamline L01 includes air blowing dust removal machine 400, belt conveyer T1, interior glaze behaviour in upper bottle localization machine 300, bottle Make platform 010, outer glaze operating desk 020, transition delivery platform T2, differential wash bottle bottom machine T3.Upper bottle localization machine 300 is arranged at bottle Point, for positioning upper bottle.Air blowing dust removal machine 400 is arranged at air blowing dedusting station in bottle, for the bottle part W0's that comes to conveying Inner chamber is blown, to blow out the dust impurity in it.
Belt conveyer T1 passes sequentially through bottle point, air blowing dedusting station, bottle station on first, for transfer bottle part W0 extremely Corresponding station.Bottle station, upper interior glaze station, wiping bottleneck station, first lower bottle of station are distributed in interior glaze behaviour in a ring on first Make the periphery of platform 010.Glaze station is provided with the interior glaze glazing constructions S001 being used for bottle part W0 Nei Shinei glaze in upper.Wipe bottleneck station Wiping bottleneck machine R001 provided with the unnecessary glaze in the bottleneck periphery for cleaning the bottle part W0 after interior glaze on upper interior glaze station.
Please refer to Fig. 3, interior glaze operating desk 010 includes interior glaze turntable 200 and four are connected to interior glaze rotation The interior glaze of the side of platform 200 4 embraces tong 100.The relatively interior glaze turntable 200 of tong 100 is embraced for glaze in realization vertically moving up and down, Interior glaze embraces the vertical track that tong 100 is slidably connected on the side of interior glaze turntable 200.
Each interior glaze is embraced tong 100 and is configured under the drive of interior glaze turntable 200, realizes successively from first Bottle station crawl bottle part W0, glaze glazing constructions S001 is completed to bottle part W0 Nei Shinei glaze, is being wiped bottle within upper interior glaze station coordinates Mouth station coordinates the erasing for wiping the bottleneck machine R001 completion unnecessary glaze of bottle part W0 bottlenecks and puts down bottle part W0 in first lower bottle of work Position.
Transition delivery platform T2 is connected on first lower bottle of station and second between bottle station, for that will put down under first The bottle part W0 of bottle station transfers to bottle station on second.
Bottle station, infiltration station, upper outer glaze station, second lower bottle of station are distributed in outer glaze operating desk in a ring on second 020 periphery.Infiltrate station and be provided with the soaking pit 500 for accommodating water.Upper outer glaze station is provided with the leaching glaze groove 600 for accommodating glaze water.
Coordinate referring to Fig. 4, outer glaze operating desk 020 includes outer glaze turntable 800 and four are connected to outer glaze turntable The outer glaze of 800 4 sides embraces tong 700.Vertically moved up and down to realize that outer glaze embraces the relatively outer glaze turntable 800 of tong 700, outside Glaze embraces the vertical track that tong 700 is slidably connected on the side of outer glaze turntable 800.
Each outer glaze is embraced tong 700 and is configured under the drive of outer glaze turntable 800, realizes successively from second Bottle station crawl bottle part W0, in infiltration station drive bottle part W0 to be soaked in soaking pit 500 with infiltrate a bottle part W0 outer surface, Upper outer glazer's bit strip moves bottle part W0 in glaze groove 600 is soaked by soaking in glaze realization outer glaze and putting down bottle part W0 under second Bottle station.
Differential wash bottle bottom machine T3 is connected between second lower bottle of station and lower bottle point, for that will put down in second lower bottle of station Bottle part W0 transmit to lower bottle point and wait bottle part W0 offline.And differential wash bottle bottom machine T3 can also be to bottle part W0 that it is transmitted Scouring bottom of bottle is carried out, to wipe the glaze for sticking at bottom of bottle.
To realize the various actions in interior glaze system B001, the interior glaze in the present embodiment embrace tong 100 can be set to it is a variety of Form.Fig. 5-Fig. 6 is shown in which a kind of embodiment.Refer to Fig. 5-Fig. 6, the interior glaze in the present embodiment is embraced tong 100 and wrapped Including rack 10, clamping device 20, rotating driver 30.
Wherein, clamping device 20 include two it is spaced and rotate coaxially be matched with frame 10 clamping actuator 20a, It is configured to be connected between two clamping actuator 20a and can be clamped under two drives for clamping actuator 20a or loose The clamping part 20b opened.Clamping part 20b includes being used to clamp bottle part neck W1 Bottle neck gripper 21 and for clamping bottle part tripe portion W2's Bottle tripe folder 22.Two relative sides of the first clamping strip 21a of composition Bottle neck gripper 21 are provided with corresponding with bottle part neck W1 shapes The first auxiliary section 21b.Two relative sides of the second clamping strip 22a for forming bottle tripe folder 22 are provided with and bottle part neck W1 shapes Second auxiliary section 22b corresponding to shape.The drive connection clamping device 20 of rotating driver 30 simultaneously is configured to drive clamping machine Structure 20 is overturn.Optionally, it is the gripper cylinder that both sides set the telescopic end 2a that can be stretched respectively to clamp actuator 20a.Second Clamping strip 22a both ends correspond to the telescopic end 2a for being fixed on corresponding both sides respectively.Alternatively, rotating driver 30 can also use Rotary cylinder, in a manner of using identical driving power with clamping actuator 20a, i.e., use pneumatic actuation.Certainly, at other Can also the modes such as electronic, hydraulic-driven be used to set in embodiment.
Interior glaze in the present embodiment, which embraces tong 100, can realize following action:Under clamping actuator 20a driving, bottle Neck clip 21 and bottle tripe folder 22 clamp bottle part neck W1 and bottle part tripe portion W2 respectively, under the driving of rotating driver 30, drive folder Structure and the upset of clamped bottle part W0 degree of realization are held, makes bottleneck vertically downward, to complete to spray the standard of the actions such as interior glaze function It is standby.In actual use, the major function of bottleneck vertically downward is to pour out the impurity residued in bottle, avoids influenceing in upper Glaze.
In the present embodiment, a bottle part W0 is clamped simultaneously by Bottle neck gripper 21 and bottle tripe folder 22, enables to bottle part W0 clampings tight, Uniform force, bottle part W0 are not easy to be caught broken bottle part W0 everywhere, and the relative position of bottle part W0 and clamping device 20 is stable, is advantageous to bottle Part W0 precise positioning, it is convenient that bottle part W0 is carried out to apply the operation such as interior glaze.
In an embodiment of the present embodiment, each interior glaze armful tong 100 is equipped with multiple for clamping bottle part W0 Clamping position, with realize once clamp and operate multiple bottles of part W0.Its implementation can be that the first auxiliary section 21b has multiple (five as shown in Fig. 5, Fig. 6), multiple first auxiliary section 21b are arranged at intervals along the first clamping strip 21a, and positioned at two folders Hold between actuator 20a.Second auxiliary section 22b has multiple, and multiple second auxiliary section 22b are arranged at intervals along the second clamping strip 22a, And between two clamping actuator 20a.By said structure, can be achieved once to clamp multiple bottles of part W0, it is possible to increase more Operating efficiency again.Alternatively, the first clamping strip 21a is long strip shape structure, and its medial surface is provided with arc notch.First Auxiliary section 21b is sector structure, and it protrudes side and is connected at arc notch, and its concave side is used to coordinate clamping bottle part neck Portion W1.Alternatively, the first auxiliary section 21b concave side is the circular arc of diameter of the diameter more than bottle part neck W1, and two relative The first auxiliary section 21b realize from sandwich bottle part neck W1 that there is the advantages of clamping is firm jointly.Similarly, the second folder It is long strip shape structure to hold bar 22a, and its medial surface is provided with arc notch.Second auxiliary section 22b is sector structure, and its is convex Go out side to be connected at arc notch, its concave side is used to coordinate clamping bottle part tripe portion W2.Alternatively, the second auxiliary section 22b Concave side for diameter of the diameter more than bottle part neck W1 circular arc, two the second relative auxiliary section 22b realize jointly from Sandwich bottle part tripe portion W2, there is the advantages of clamping is firm.
In other embodiments, according to being actually needed, bottle part W0, once two bottle part W0, one one at a time be may be configured as The forms such as secondary multiple bottles of part W0.Accordingly, the first clamping strip 21a, the second clamping strip 22a length dimension shape, first coordinate Portion 21b, the second auxiliary section 22b quantity etc. can also carry out accommodation.
It is soft that rubber, flexible plastic etc. can be selected in the material of the first auxiliary section 21b, the second auxiliary section 22b in the present embodiment Property material, with further avoid being caught broken bottle part W0 and increase clamping friction power, avoid releasing.
Continuing with referring to Fig. 5, Fig. 6, in the present embodiment, alternatively, frame 10 includes chassis 11 and two intervals are connected to The side plate 12 at the both ends of chassis 11.Two clamping actuator 20a are correspondingly rotatably assorted in two side plates 12.Two side plates 12 and chassis The 11 common activity space Q1 for limiting U-shaped, clamping device 20 is located in activity space Q1, and is limited in activity space Q1 and moves Make.Frame 10 in the present embodiment limits the activity space Q1 of U-shaped, and clamping device 20 is located in activity space Q1, and is defined Acted in activity space Q1, clamp structure can be avoided in action (such as when being overturn under the driving of rotating driver 30) When with other structures occur mechanical interference cause mechanical breakdown or occur security incident.In other embodiments of the invention, with It can realize that the installation grade of clamping device 20 is purport well, frame 10 may also be arranged to other suitable structures, such as can be with The opening for being arranged to five face closures is box-packed etc..In addition, the also settable convenient installation when needed of chassis 11 in the present embodiment connects Meet the mounting hole K1 of other structures.
Referring again to Fig. 5, Fig. 6, in an embodiment of the present embodiment, Bottle neck gripper 21 and bottle tripe folder 22 are positioned at folder Hold actuator 20a pivot center Y1 both sides.Alternatively, Bottle neck gripper 21, bottle tripe folder 22 relatively rotate axis Y1 position energy Enough so that after the clamping bottle part of clamping device 20 W0, whole clamping device 20 and clamped bottle part W0 relatively rotate the used of axis Y1 Property square be exactly zero, to control when clamping device 20 drives bottle part W0 upset, feedback efficiency is high, energy consumption is minimum.
Bottle neck gripper 21 and bottle tripe folder 22 in the present embodiment is driven by clamping actuator 20a to realize clamping or pine Open.Bottle neck gripper 21 and bottle tripe folder 22 can be directly connected to clamp actuator 20a respectively, and directly in clamping actuator 20a driving Lower synchronous clamping is unclamped.Certainly, in the present embodiment, the set-up mode used is clamping actuator 20a is fixedly connected with a bottle tripe Folder 22 simultaneously is used to drive bottle tripe folder 22 to clamp or unclamp.Bottle neck gripper 21 is fixed on bottle tripe folder 22 by connector 23, and can be with Bottle tripe presss from both sides 22 synchronous clampings or release.That is, Bottle neck gripper 21 is indirectly connected with clamping actuator 20a.Taken in the present embodiment One of the reason for set-up mode is that bottle part tripe portion W2 sizes are larger, bottle part neck W1 sizes are smaller, and this causes in wide upward bottle 21 closer centre position of neck clip, and bottle tripe folder is 22 more in the outer part, though while be directly connected to clamp actuator 20a and can realize, It is the problems such as structure design there may be outward appearance, stress.To make the stable drive between Bottle neck gripper 21 and bottle tripe folder 22, positioned at same Fixed between the first clamping strip 21a and the second clamping strip 22a of side by two connectors 23 along its length separately Connection.Alternatively, the one end of connector 23 is fixedly connected with corresponding first clamping strip 21a, and the other end is provided with along bar-shaped trough C1, the The length that two clamping strip 22a are configured to be connected in bar-shaped trough C1 is to optional position, to adjust itself and corresponding first Spacing between clamping strip 21a.During the various sizes of bottle part W0 of corresponding clamping, it may be necessary to pass through and adjust the first clamping strip 21a And second relative position between clamping strip 22a realizes normal clamping;Or reach foregoing by adjusting relative position It is zero to offset rotary inertia.
To sum up above description, the interior glaze in the present embodiment, which is embraced tong 100 and can realized, firm equably clamps bottle part W0 simultaneously Drive bottle part W0 do the action set, have bottle part W0 everywhere uniform force, be not easy to be caught broken, the phase of bottle part W0 and clamping device 20 It is stable to position, be advantageous to a bottle part W0 precise positioning, and conveniently to bottle part W0 apply the beneficial effect of the operations such as interior glaze.
Finally, it is necessary to illustrate, the interior glaze in the embodiment of the present invention embraces the workpiece that tong 100 can be additionally used in other shapes Clamping, may now need to Bottle neck gripper 21 and bottle tripe folder 22 structure carry out adaptability design.
Embracing tong 100 using the interior glaze in the present embodiment, the bottle station from first picks up multiple bottles of parts W0, Ran Houzhuan successively Upper interior glaze operation is carried out to upper interior glaze station.
By supplying glaze and glazing into bottle part W0, its structure can be set to more interior glaze glazing constructions S001 in the present embodiment Kind form.Fig. 8 is a kind of structural representation of embodiment of the interior glaze glazing constructions S001 in the present embodiment;Fig. 9 is Fig. 8 Top view (a kind of glazing object bottle part W0 that this interior glaze glazing constructions S001 is additionally illustrated in Fig. 8, Fig. 9);Figure 10 is this reality Apply the topology view for going out part at glaze in example.It refer to Fig. 8, Fig. 9, Figure 10, the interior glaze glazing constructions S001 bags in the present embodiment Include for glaze system s20, coordinate mouth s30, return member s50.For glaze system s20 be provided with it is some it is upwardly opening go out glaze pipe s40, supply Glaze system s20 can go out glaze from the outlet for going out glaze pipe s40.Coordinate mouth s30 that there is insertion its upper and lower end face s02 port s301. The outlet for going out glaze pipe s40 corresponds to port s301 from below.Mouth s30 is coordinated to flexibly support in return member s50 upper ends, and can be Overcome return member s50 returning place force to move downwardly to the lower end sealing for the port s301 for making cooperation mouth s30 in the presence of external force to connect Pass-out glaze pipe s40 outlet, the glaze that exports out for using glaze pipe s40 can only be from port s301 upper end pass-out.
Figure 11 is the schematic diagram of the interior glaze glazing constructions S001 use states in the present embodiment.Coordinate referring to Figure 10, Figure 11, Interior glaze glazing constructions S001 in the present embodiment is in use, first by bottle part W0 (or other wait to apply interior glaze workpiece) so that Open Side Down Inversion state under press-fit mouth s30, make cooperation mouth s30 port s301 upper ends connect bottleneck.Bottle part W0 and cooperation mouth s30 Overcome return member s50 returning place force to continue to move downward, cooperation mouth s30 port s301 lower end sealing is connected out glaze pipe S40 outlet.Then make to go out glaze from the outlet for going out glaze pipe s40 for glaze system s20, glaze water is entered in bottle part W0 by bottleneck Chamber, and a bottle part W0 inner surface is attached to, realize glazing.After glazing, a bottle part W0 is taken away, coordinate mouth s30 in return member s50 Returning place force in the presence of return and go out glaze pipe s40 disengagement, unnecessary glaze water from port s301 lower ends flow out.In the present embodiment, It is in inverted state that tong 100 can be embraced by interior glaze and drives bottle part W0, and then whole interior glaze is embraced tong 100 and driven under bottle part W0 Press-fit mouth s30.After the completion of applying interior glaze, then tong 100 is embraced by interior glaze and drives bottle part W0 to go upward to original position.
Interior glaze glazing constructions S001 in the present embodiment has simple in construction, can conveniently realize glazing;And only need Coordinate the device that bottle part W0 can be driven to move up and down with inversion state that the interior glaze of applying of automation can be achieved to operate.
In one embodiment of the invention, it is up-small and down-big step pipe to go out glaze pipe s40, and pipeline section s41 is with thereon There is step surface s01 between pipeline section s42.During pressing, step surface s01 sealings are pressed on pipeline section on the lower surface s02 for coordinating mouth s30 S41 section is less than end section under port s301, and can enter in the port s301 for coordinating mouth s30.In the present embodiment, preferably , upper pipeline section s41 external diameter is less than bottle part W0 opening diameter, and when pushing, upper pipeline section s41 can be directly inserted into a bottle part In W0 opening, glaze is preferably supplied to realize.
In the present embodiment, for make bottle part W0 and coordinate mouth s30, coordinate mouth s30 and go out between glaze pipe s40 to press when, contact Face can seal well, avoid imprecision contact from causing glaze water to spill, the cooperation mouth s30 in the present embodiment is using rubber, soft Property plastic cement elastomeric material form.Alternatively, be additionally provided with cushion s43 in lower tube section s42 outer end, with preferably with coordinate mouth S30 sealing pressings, and buffering pressure force, avoid breaking.In addition, port s301 upper end is up big and down small bellmouth knot Structure.So, port s301 can preferably coordinate the different bottle part W0 in the certain section of bottleneck size, while improving use range Improve the compactness of cooperation.
Return member s50 in the present embodiment can be arranged to diversified forms, such as return member s50 to be sheathed on out glaze pipe Spring outside s40, returning place force are the elastic force of spring.To coordinate spring, go out glaze pipe s40 bottoms and set sectional dimension larger Coordinate pipeline section s44.
In the present embodiment, also include interior glaze access slot s10 referring again to Fig. 8, Fig. 9, interior glaze glazing constructions S001, go out glaze Pipe s40 outlet is located in interior glaze access slot s10, is connect with enabling the glaze water unnecessary after glazing into bottle part W0 to be collected into interior glaze Groove s10.Glaze water after collection can be directly by recycling for glaze system s20;Or utilized again after the processing such as filtering.
In one embodiment of the invention, include being responsible for s22 into glaze for glaze system s20, divide glaze transverse tube s21.Divide glaze horizontal Pipe s21 is fixedly installed in interior glaze access slot s10, and if its connection do glaze pipe s40.In the present embodiment, set five altogether and go out glaze Pipe s40, upper interior glaze is carried out to five bottle part W0 simultaneously to realize.Five go out glaze pipe s40 and are respectively perpendicular to be connected to a point glaze transverse tube s21 On.Referring to Figure 10, it is each go out glaze pipe s40 outside the lower end of the spring as return member s50 that is arranged be supported in and be arranged on a point glaze On boss s211 on transverse tube s21, the other end is supported in the lower end for coordinating mouth s30.Enter glaze supervisor's s22 connections and divide glaze transverse tube S21, and supply glaze to glaze pipe s40 is gone out by dividing glaze transverse tube s21.Optionally, enter glaze supervisor s22 one end connections and supply glaze pond s24, it is another End by it is multiple enter glaze branch pipe s23 be respectively separated to connect and divide glaze transverse tube s21 length to diverse location, with reduce it is each go out glaze pipe S40 goes out the asynchronous degree of glaze, reduce the stand-by period and it is corresponding go out glaze amount.Interior glaze access slot s10 in the present embodiment can connect confession Glaze pond s24 or after being filtered by filtration connection supply glaze pond s24, to realize glaze water reuse.Specific set-up mode can be with For interior glaze access slot s10 bottom wall is arranged into the pyramidal structure that section reduces downwards, is provided with its taper smallest end by switch valve The outlet pipe of control, outlet pipe connection supply glaze pond s24.
In one embodiment of the invention, interior glaze access slot s10 is ring sector structure, interior glaze access slot s10 radial outer wall Two spaced support bar s11 are connected between inner radial wall, divide glaze transverse tube s21 both ends be connected respectively in Two support bar s11.Support bar s11 be provided with along perpendicular to divide glaze transverse tube s21 grow to elongated slot s12, divide glaze transverse tube s21 positions can It is connected at elongated slot s12 with adjusting.Interior glaze access slot s10 in the present embodiment is supported in ground by the support frame s13 with roller Face.
Interior glaze glazing constructions S001 in the present embodiment has simple in construction, can conveniently realize interior glaze, and easily The beneficial effect of the automation of glaze in realization.Interior glaze glazing constructions S001 in other the present embodiment is subtracted by structure design It is small it is multiple go out glaze pipe s40 go out the asynchronous rate of glaze, reduce and once go out the glaze time and go out glaze amount and unnecessary glaze water is collected and again The structure utilized so that the interior glaze glazing constructions S001 in the present embodiment is also equipped with the high beneficial effect of glaze water use efficiency.
In practical operation, it is unnecessary to exist in the presence of the bottle mouth position of the bottle part W0 after interior glaze on upper interior glaze station Glaze situation, now can be by being set between upper interior glaze station and first lower bottle of station referring again to Fig. 1, Fig. 2, Fig. 3 Bottleneck station is wiped to solve.Wipe bottleneck station be provided be configured in upper interior glaze station by applying in interior glaze structure applied Bottle part W0 after glaze wipe the wiping bottleneck machine R001 of the unnecessary interior glaze of bottle mouth position.Wiping bottleneck machine R001 can be arranged to possess energy The form of the wiping sponge enough rotated.
Figure 12-Figure 15 shows a kind of embodiment for wiping bottleneck machine R001.Wherein, Figure 12 is the wiping bottle in the present embodiment Mouth machine R001 structural representation;Figure 13 is Figure 12 top view;Figure 14 be Figure 12 in R at zoomed-in view, Figure 15 Figure 14 Top view (the cooperation position relation with bottle part W0 is additionally illustrated in figure).
Please refer to Figure 12-Figure 15, the wiping bottleneck machine R001 in the present embodiment is configured to driving including some The scrub head r20 rotated under motivation structure r10 driving.The scrub head r20 of setting quantity can be according to once needing to be handled Bottle part W0 quantity.Such as the situation for five bottle part W0 of single treatment shown in figure, five scrub heads of corresponding setting r20.Scrub head r20 has upwardly opening scouring groove r21, cleans in groove r21 and is connected with least one wiping being disposed radially Developed a film r30, and scouring pad r30 can be rotated with scrub head r20 to realize that scouring acts.Wipe bottleneck machine R001 and be also equipped with connection scouring Groove r21 and the water system r40 that scouring water is wiped for being supplied into scouring groove r21.
Wiping bottleneck machine R001 in the embodiment of the present invention is wiped in use, making bottle part W0 be inserted with downward opening inversion state In hair washing r20 scouring groove r21, and the scouring pad r30 on scrub head r20 is set to fit in bottleneck outer peripheral face;In drive mechanism Under r10 driving, each scrub head r20 drives scouring pad r30 rotations that it is unnecessary to wipe out bottleneck outer surface to realize that scouring acts Glaze water.Meanwhile water system r40 supplies water to cleaning in groove r21, realizes that moistening scouring pad r30 and timely cleaning and wiping are got off The effect of glaze, it is ensured that this wiping bottleneck machine R001 sustainabilities carry out scouring operation.
Wiping bottleneck machine R001 in the present embodiment provided with the scrub head r20 for cleaning groove r21 by coordinating scouring pad r30 to pass through The mode of rotation realizes the wiping bottleneck operation to bottle part W0, has and cleans the good beneficial effect of efficiency high, effect.Also, simultaneously Water supply constantly can moisten and clean scrub head r20, realize that the efficient of sustainability, high quality clean operation.
Please referring primarily to Figure 14, Figure 15, in one embodiment of the invention, if the side enclosure wall for cleaning groove r21 offers Dry otch r22, scouring pad r30 radial outer end are fixedly installed at corresponding otch r22, scouring pad r30 radial inner end edge Bottle part W0 to be cleaned bottleneck outer surface can be contacted by extending radially inwardly to.Alternatively, scouring pad r30 can not also be set It is set to radially, and is arranged to along tangential, i.e., not by cleaning groove r21 center, bottle part W0 outer peripheral faces and wiping is so set Stickiness between r30 of developing a film is preferable, it is possible to increase scrub effect.Scouring pad r30 can by flexible water-absorption material texture into, such as by Flexibility wipes sponge and formed.Alternatively, otch r22 and corresponding scouring pad r30 is four, and along clean groove r21 circumference It is uniformly distributed.Four scouring pad r30 can realize that once rotation realization more and fill wiping effect, further improve scrub effect.
Referring again to Figure 12, Figure 13, in one embodiment of the invention, drive mechanism r10 includes rotary actuator R11, some drive r22.Rotary actuator r11 output end is directly or indirectly connected by driving belt r23, with band Dynamic each drive r22 rotations.And each drive r22 rotation axial direction is vertically.Each scrub head r20 is to keep its wiping State opening up washing trough r21 is correspondingly fixedly connected on each drive r22 top, and can be with corresponding drive R22 vertically axial-rotations.Five scrub head r20 of corresponding foregoing setting situation, drive r22 are also five.Each scouring Head r20 can be fixedly connected on corresponding drive r22 by forms such as spot welding.For convenience of transmission, drive r22 excircle is set Have twice axially spaced-apart is used to coordinate driving belt r23 driving groove r25, and one in twice driving groove r25 is used to coordinate The driving belt r23 of input power, another road are used for the driving belt r23 for coordinating output power.Certainly, it is outside for not needing The drive r22 of output power is transmitted, it can only set one of driving groove r25, also can equally set twice, simply wherein together Do not actually use.To avoid being driven belt sag, drive mechanism r10 also includes some for being tensioned between each drive r22 Driving belt r23 tensioning wheel r24.It should be noted that being shown to be clear, part driving belt r23 hides and not shown in Figure 13 Go out.
In one embodiment of the invention, wiping bottleneck machine R001 also includes support mounting bracket r50, support mounting bracket r50 Including support frame r52, support frame r52 length is to being overlapped with support rail r51 between both ends.Scrub head r20 share it is multiple, And it is rotatably assorted spaced reciprocally in support rail r51 in a row.Support frame r52 and support rail r51 can use shaped steel Form.In addition, each tensioning wheel r24 is also pivotally mounted on support rail r51.
In one embodiment of the invention, scrub head r20 is rotatably assorted horizontal in support by hollow center rotary column r26 Bar r51, scrub head r20 offer the exhalant canal of its scouring groove r21 of some connections and center rotary column r26 mesopores, and water outlet is led to The delivery port r02 in road is arranged at the groove bottom r03 for cleaning groove r21.Mesopore of the water system r40 water supply from center rotary column r26 It is passed through, enters and cleaned in groove r21 from the delivery port r02 pass-outs on the groove bottom r03 for cleaning groove r21.
In one embodiment of the invention, to avoid water for cleaning from flowing out, wiping bottleneck machine R001 also includes the slotware that catchments R60, the slotware r60 that catchments are positioned at cleaning under groove r21, for collecting from the water for cleaning groove r21 spillings.Alternatively, catchment slotware R60 supports are connected in support frame r52, and notch is upward.Water after cleaning directly can overflow inflow from scouring groove r21 and catchment In slotware r60.Also it can be set in the present embodiment for filter etc. processing Posterior circle for clear to the water in the slotware r60 that catchments The structure (not shown) washed.
Wiping bottleneck machine R001 in the present embodiment, which has to wipe to sustainability, realizes that efficient, high quality cleans bottleneck Beneficial effect.
Bottle part W0 can be embraced tong 100 by interior glaze and be carried to wiping bottleneck station, and drive bottle part W0 descending with inversion state Cleaned to making bottleneck enter in scouring groove r21;After the completion of again by interior glaze embrace tong 100 take up.
In embodiments of the present invention, alternatively, the quantity of interior glaze armful tong 100, which is equal to, is laid in outside interior glaze turntable 200 The quantity of the station in week.Such as only set under bottle station on first, upper interior glaze station, first for the interior periphery of glaze turntable 200 In the case of these three stations of bottle station, three interior glaze can be correspondingly arranged and embrace tong 100;Set for the interior periphery of glaze turntable 200 In the case of having bottle station on first, upper interior glaze station, wiping bottleneck station, first lower bottle of station this four station, it can correspond to and set Put four interior glaze and embrace tong 100.What is so set is intended so that at any time, each interior glaze embraces tong 100 can A corresponding station, bottle part W0 is driven to carry out corresponding operate in the station;Equally, at any time, each station has One interior glaze is embraced tong 100 and existed, and so can utilize to saturation room and time, maximizes and improves operation operating efficiency.Certainly, For other considerations (such as cost, sequential are set), interior glaze may be arranged to and embrace tong 100 less than station quantity or interior glaze armful folder The unnecessary station quantity of hand 100.
Referring to Fig. 2, present embodiment illustrates the periphery of interior glaze turntable 200 to be provided with bottle station on first, upper interior glaze Station, the situation for wiping bottleneck station, first lower bottle of station.Now alternatively, bottle station, upper interior glaze station on first, wipe bottleneck Station, first lower bottle of station with end to end annular spread formal distribution in the periphery of interior glaze turntable 200, it is and each adjacent Central angle between station is 90 °.And be correspondingly arranged on four interior glaze and embrace tong 100, four interior glaze are embraced between tong 100 Central angle also be 90 °.
In summary describe, the glazing streamline L01 in the embodiment of the present invention is rational in infrastructure compact, and floor space is small, behaviour Facilitate, and can expeditiously complete the operation such as interior glaze, upper outer glaze, conveniently realize extensive Production line.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

  1. A kind of 1. glazing method, it is characterised in that:
    The glazing method is implemented based on glazing streamline;
    The glazing streamline includes being used for the interior glaze system to interior glaze on bottle part, and the outer glaze system to outer glaze on bottle part;
    The interior glaze system includes interior glaze turntable and some circumferential interior glaze of the interior glaze turntable that are connected to embrace tong;It is described Bottle station on first, upper interior glaze station, first lower bottle of station are corresponding in turn to outside the circumference of interior glaze turntable;Each interior glaze Embrace tong carry bottle part under the driving of the interior glaze turntable successively by bottle station on first, under interior glaze station, first Bottle station, to carry out bottle operation on first, upper interior glaze operation, first time bottle operation successively to bottle part;First time bottle operation is completed Afterwards, the interior glaze armful tong turns again to bottle station on described first and is ready for next operation circulation;
    Bottle behaviour is taken as the interior glaze of bottle station on corresponding described first and embraces tong crawl positioned at described the on described first The bottle part of bottle station on one;The upper interior glaze operation is by being arranged at the interior glaze glazing machine of the upper interior glaze station to moving to The interior glaze of the upper interior glaze station embraces the inner surface glazing of the bottle part entrained by tong;First time bottle operation is will fortune Move the bottle part embraced to the interior glaze of corresponding first lower bottle of station entrained by tong and be lowered into first lower bottle of station;
    The outer glaze system includes outer glaze turntable and some circumferential outer glaze of the outer glaze turntable that are connected to embrace tong;It is described Bottle station on second, upper outer glaze station, second lower bottle of station are corresponding in turn to outside the circumference of outer glaze turntable;Each outer glaze Embrace tong carry bottle part under the driving of the outer glaze turntable successively by bottle station on second, under outer glaze station, second Bottle station, to carry out bottle operation on second, upper outer glaze operation, second time bottle operation successively to bottle part;Second time bottle operation is completed Afterwards, the outer glaze armful tong turns again to bottle station on described second and is ready for next operation circulation;
    Bottle behaviour is taken as the outer glaze of bottle station on corresponding described second and embraces tong crawl positioned at described the on described second The bottle part of bottle station on two;The bottle part of bottle station is to be conveyed from first lower bottle of station on described second Cross the bottle part after interior glaze in the interior glaze system;The upper outer glaze operation is to embrace tong by the outer glaze to drive bottle part in leaching glaze Outer glaze in the mode of glaze is soaked in groove;Second time bottle operation embraces folder to will move to the outer glaze of corresponding second lower bottle of station Bottle part entrained by hand is lowered into second lower bottle of station.
  2. 2. glazing method according to claim 1, it is characterised in that:
    Bottle part is delivered to bottle station on described first by the way that belt conveyor is defeated from upper bottle point, and bottle part on described bottle point and Air blowing dust removal operation is carried out on described first between bottle station;The air blowing dust removal operation is from air blowing dust removal machine to bottle part inner chamber Dust of the middle air blowing to blow out in bottle part.
  3. 3. glazing method according to claim 2, it is characterised in that:
    The glazing method once carries out glazing to the bottle part group being made up of multiple bottles of parts simultaneously;
    The transfer passage of the belt conveyor is accommodates the single channel of a bottle part, and the belt conveyor is to be arranged in order One bottle part group is conveying unit;
    The interior glaze embraces tong and the outer glaze embraces tong and has multiple clamping positions, realizes that once processing is defeated by the belt simultaneously Send the machine bottle part group that conveying comes.
  4. 4. glazing method according to claim 3, it is characterised in that:
    The bottle part for being lowered into first lower bottle of station is delivered to bottle station on described second by transition delivery platform;
    The quantity of the transfer passage of the transition delivery platform is equal to the quantity for the bottle part that the bottle part group is included.
  5. 5. glazing method according to claim 1, it is characterised in that:
    Be lowered into the bottle part of second lower bottle of station by differential wash bottle bottom machine wipe it is offline after bottom of bottle operation;
    The differential wash bottle bottom machine includes the first differential belt and the second differential belt, the first differential belt and described second Differential belt is adjacent to be arranged side by side, and can be with different transmission speed transfer bottle parts;
    Transfer to a bottom part for the bottle part of the differential wash bottle bottom machine and be pressed on the first differential belt, another part pressure Together in the second differential belt, the first differential belt and second differential is set to transmit at different rates, Liang Zhezhong The part that is pressed thereon to bottle part of the very fast person of transmission carry out wiping bottom of bottle operation, the glaze water that bottom of bottle is sticked at during by upper outer glaze is wiped Under, complete the wiping bottom of bottle operation.
  6. 6. glazing method according to claim 1, it is characterised in that:
    Also have described after interior glaze operation, before first time bottle operation and wipe bottleneck operation;
    The wiping bottleneck operation sticks at the unnecessary interior glaze at bottle neck to clean after upper interior glaze operation;
    The interior glaze system shares four interior glaze and embraces tong, and four interior glaze embrace tong and are respectively arranged at the interior glaze rotation Circumferential four sides of turntable, and it is 90 ° to be spaced central angle each other;
    It is additionally provided between the upper interior glaze station and first lower bottle of station and wipes bottleneck station, the interior glaze embraces tong and carries bottle Part carries out completing described wipe in the wiping bottleneck station after the upper interior glaze operation carrying out follow-up described the after bottleneck operation again Once bottle operates.
  7. 7. glazing method according to claim 1, it is characterised in that:
    On described second after bottle operation, it is described on be provided with infiltration before the operation of outer glaze and operate;
    The infiltration operation is to embrace tong using the outer glaze to drive bottle part to be immersed in the water, and moistens the outer surface of bottle part;
    The outer glaze system shares four outer glaze and embraces tong, and four outer glaze embrace tong and are respectively arranged at the outer glaze rotation Circumferential four sides of turntable, and it is 90 ° to be spaced central angle each other.
  8. 8. glazing method according to claim 1, it is characterised in that:
    The upper outer glaze operation includes following action:
    Bottle part is immersed in glaze groove downwards, bottle part proposes to soak glaze groove upwards, makes bottle part with its axis and vertical direction in setting The state at inclination angle is around its axis rotation so that unnecessary outer glaze drippage.
  9. A kind of 9. glazing streamline for completing the glazing method described in claim any one of 1-8, it is characterised in that:
    The glazing streamline, which comprises at least, is used to completing on bottle part the interior glaze system of interior glaze and outer on bottle part for completing The outer glaze system of glaze;First lower bottle of station flowing water of the interior glaze system connects bottle on the second of the outer glaze system Station.
  10. A kind of 10. glazing streamline, it is characterised in that:
    Along the current direction of the glazing streamline be sequentially distributed upper bottle point, air blowing dedusting station, bottle station on first, it is upper in Glaze station, wipe bottleneck station, first lower bottle of station, bottle station on second, infiltration station, upper outer glaze station, second lower bottle of station, Lower bottle point;
    The glazing streamline includes air blowing dust removal machine, belt conveyor, interior glaze operating desk, outer glaze behaviour in upper bottle localization machine, bottle Make platform, transition delivery platform, differential wash bottle bottom machine;
    The upper bottle localization machine is arranged at the upper bottle point, for positioning upper bottle;Air blowing dust removal machine is arranged at described in the bottle Air blowing dedusting station, the inner chamber of the bottle part for coming to conveying is blown, to blow out the dust impurity in it;The Belt Conveying Machine passes sequentially through the upper bottle point, the air blowing dedusting station, bottle station on described first, for transfer bottle part to corresponding work Position;
    Bottle station, the upper interior glaze station, the wiping bottleneck station, first lower bottle of station are distributed in a ring on described first In the periphery of the interior glaze operating desk;The upper interior glaze station is provided with the interior glaze glazing constructions being used for bottle part Nei Shinei glaze;Institute State and wipe the wiping that bottleneck station is provided with the unnecessary glaze in the bottleneck periphery for being used for cleaning the bottle part after interior glaze on the upper interior glaze station Bottleneck machine;
    The interior glaze operating desk includes interior glaze turntable and four interior glaze for being connected to the interior side of glaze turntable four embrace folder Hand;Each interior glaze is embraced tong and is configured under the drive of the interior glaze turntable, realizes successively from described first Upper bottle station crawl bottle part, interior glaze station coordinates the interior glaze glazing constructions to complete to bottle part Nei Shinei glaze, in institute described State and wipe the bottleneck station cooperation erasing for wiping the bottleneck machine completion unnecessary glaze of bottle part bottleneck and put down bottle part in described first Lower bottle station;
    The transition delivery platform is connected on first lower bottle of station and described second between bottle station, for will put down in The bottle part of first lower bottle of station transfers to bottle station on described second;
    Bottle station, the infiltration station, the upper outer glaze station, second lower bottle of station are distributed in a ring on described second The periphery of the outer glaze operating desk;The infiltration station is provided with the soaking pit for accommodating water;The upper outer glaze station, which is provided with, accommodates glaze The leaching glaze groove of water;
    The outer glaze operating desk includes outer glaze turntable and four outer glaze for being connected to the outer side of glaze turntable four embrace folder Hand;Each outer glaze is embraced tong and is configured under the drive of the outer glaze turntable, realizes successively from described second Upper bottle station crawl bottle part, in the infiltration station drive bottle part to be soaked in the soaking pit with infiltrate the outer surface of bottle part, Outer glazer's bit strip moves bottle part and realizes outer glaze by soaking glaze in the leaching glaze groove and put down bottle part in second described Lower bottle station;
    The differential wash bottle bottom machine is connected between second lower bottle of station and the lower bottle point, for that will put down in described The bottle part of two lower bottles of stations, which is transmitted to the lower bottle point, waits bottle part offline;And the differential wash bottle bottom machine can also pass to it Defeated bottle part carries out scouring bottom of bottle, to wipe the glaze for sticking at bottom of bottle.
CN201710954274.8A 2017-10-13 2017-10-13 Glazing assembly line and glazing method Active CN107571382B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710954274.8A CN107571382B (en) 2017-10-13 2017-10-13 Glazing assembly line and glazing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710954274.8A CN107571382B (en) 2017-10-13 2017-10-13 Glazing assembly line and glazing method

Publications (2)

Publication Number Publication Date
CN107571382A true CN107571382A (en) 2018-01-12
CN107571382B CN107571382B (en) 2019-04-05

Family

ID=61036815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710954274.8A Active CN107571382B (en) 2017-10-13 2017-10-13 Glazing assembly line and glazing method

Country Status (1)

Country Link
CN (1) CN107571382B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107696250A (en) * 2017-10-13 2018-02-16 合江县华艺陶瓷制品有限公司 Interior glaze system
CN110843098A (en) * 2019-11-29 2020-02-28 湖南三创智能科技有限公司 Full-automatic glaze dipping production line for ceramic wine bottles
CN112936531A (en) * 2021-01-04 2021-06-11 刘宇 Rotary porcelain cup glazing equipment
CN114833157A (en) * 2021-02-01 2022-08-02 安徽海思达机器人有限公司 Wine bottle clamping mechanism and wine bottle outer surface cleaning device applying same
CN115781893A (en) * 2023-01-31 2023-03-14 福建省科越智能机械有限公司 Adaptive multi-station internal and external glazing mechanism
CN116238034A (en) * 2023-03-01 2023-06-09 保靖县金锋陶瓷有限责任公司 Ceramic wine bottle rapid forming equipment and application method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030161958A1 (en) * 2002-02-25 2003-08-28 Zitkus Wayne J. Process for glazing a chinaware article and an article produced thereby
CN101190544A (en) * 2006-11-30 2008-06-04 王佳耀 Color porcelain windowing processing technique
CN106588126A (en) * 2016-12-09 2017-04-26 孙智敏 Novel ceramic preparation and decoration process
CN106830683A (en) * 2017-03-17 2017-06-13 无锡康伟工程陶瓷有限公司 The effective ceramic glazing technology of vacuum switch

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030161958A1 (en) * 2002-02-25 2003-08-28 Zitkus Wayne J. Process for glazing a chinaware article and an article produced thereby
CN101190544A (en) * 2006-11-30 2008-06-04 王佳耀 Color porcelain windowing processing technique
CN106588126A (en) * 2016-12-09 2017-04-26 孙智敏 Novel ceramic preparation and decoration process
CN106830683A (en) * 2017-03-17 2017-06-13 无锡康伟工程陶瓷有限公司 The effective ceramic glazing technology of vacuum switch

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107696250A (en) * 2017-10-13 2018-02-16 合江县华艺陶瓷制品有限公司 Interior glaze system
CN107696250B (en) * 2017-10-13 2023-02-24 合江县华艺陶瓷制品有限公司 Inner glaze system
CN110843098A (en) * 2019-11-29 2020-02-28 湖南三创智能科技有限公司 Full-automatic glaze dipping production line for ceramic wine bottles
CN112936531A (en) * 2021-01-04 2021-06-11 刘宇 Rotary porcelain cup glazing equipment
CN114833157A (en) * 2021-02-01 2022-08-02 安徽海思达机器人有限公司 Wine bottle clamping mechanism and wine bottle outer surface cleaning device applying same
CN114833157B (en) * 2021-02-01 2023-06-30 安徽海思达机器人有限公司 Winebottle clamping mechanism and outer surface cleaning device for same
CN115781893A (en) * 2023-01-31 2023-03-14 福建省科越智能机械有限公司 Adaptive multi-station internal and external glazing mechanism
CN116238034A (en) * 2023-03-01 2023-06-09 保靖县金锋陶瓷有限责任公司 Ceramic wine bottle rapid forming equipment and application method thereof
CN116238034B (en) * 2023-03-01 2023-09-12 保靖县金锋陶瓷有限责任公司 Ceramic wine bottle rapid forming equipment and application method thereof

Also Published As

Publication number Publication date
CN107571382B (en) 2019-04-05

Similar Documents

Publication Publication Date Title
CN107571382A (en) Glazing streamline and glazing method
CN107696250A (en) Interior glaze system
CN101474628B (en) Full automatic machine for washing bottle mouth of wide neck container
CN206701891U (en) A kind of automatic bottle washing machine with guide thimble conversion equipment
CN202570702U (en) Bottle washing machine for culture bottles
CN201135988Y (en) Automatic wide neck container bottle mouth rinsing machine
CN207535041U (en) Interior glaze system
CN206123405U (en) Photo holder frame raw material plates throws optical equipment
CN102962238A (en) Production line capable of intelligently and fully automatically loading and unloading bottles and washing interiors and exteriors of bottles by brushes
CN101372011B (en) Bottle-clamping mechanism of wide neck container full automatic rotary type bottle-washing machine
CN110843098A (en) Full-automatic glaze dipping production line for ceramic wine bottles
CN213591330U (en) Bottle brushing device for beverage production line
CN206747207U (en) A kind of ozonization automatic bottle washing machine with guide thimble conversion equipment
CN206925118U (en) Full-automatic bottle washing machine
CN201239730Y (en) Continuous full-automatic box type fine cleaning machine and continuous full-automatic bottle washing machine
CN107671991A (en) Upper outer glaze method and upper outer glaze streamline
CN209303401U (en) A kind of anion bottle washing apparatus
CN204381032U (en) Former water storage tube cleaning device
CN114833157B (en) Winebottle clamping mechanism and outer surface cleaning device for same
CN106391615A (en) On-line bottle sleeve cleaning device of bottle washer
CN206701874U (en) A kind of washout equipment of automatic bottle washing machine
CN210411835U (en) Vertical cleaning device for special-shaped bottles
CN208944781U (en) A kind of vial cleaning device
CN212683088U (en) Packing box transferring manipulator for packing box assembling machine
CN203265187U (en) Bottle-washing machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 2128, Section 3, Chancheng Avenue, Lingang Street, Hejiang County, Luzhou City, Sichuan Province (Lingang Industrial Park)

Patentee after: Hejiang Huayi Ceramic Products Co.,Ltd.

Country or region after: China

Address before: 646000 Lingang Industrial Park, Hejiang County, Luzhou City, Sichuan Province (Caofang Village, Hejiang Town)

Patentee before: HEJIANG HUAYI CERAMIC PRODUCT CO.,LTD.

Country or region before: China

CP03 Change of name, title or address