CN107560510A - A kind of tunnel big cross section section constructing method and its face blast arrangement - Google Patents

A kind of tunnel big cross section section constructing method and its face blast arrangement Download PDF

Info

Publication number
CN107560510A
CN107560510A CN201710741660.9A CN201710741660A CN107560510A CN 107560510 A CN107560510 A CN 107560510A CN 201710741660 A CN201710741660 A CN 201710741660A CN 107560510 A CN107560510 A CN 107560510A
Authority
CN
China
Prior art keywords
section
fill
hole
explosives
hole depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710741660.9A
Other languages
Chinese (zh)
Inventor
谭潘成
杨新兴
张金锋
赵香萍
李晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201710741660.9A priority Critical patent/CN107560510A/en
Publication of CN107560510A publication Critical patent/CN107560510A/en
Pending legal-status Critical Current

Links

Abstract

The invention belongs to technical field of tunnel construction, arranged more particularly to a kind of tunnel big cross section section constructing method and its face blast, including excavation method and blasting method, the excavation method uses steel tube shed advance support, and tunnel cross-section is divided into the step step excavation of upper, middle and lower three, inverted arch is immediately following getting out of a predicament or an embarrassing situation, and closure is cyclic in time;The blasting method refers to:A, according to country rock feature reasonable selection periphery hole spacing and the minimum burden of periphery hole;B, the explosive payload of periphery hole is controlled, and makes dose along borehole total length reasonable layout;C, periphery hole uses small diameter medicine roll and low explosive, and realizes underground borehole blasting by primacord;D, detonated using millisecond detonator elementary errors order.By reasonably optimizing Parameters of Smooth Wall Blasting, tunnel Smooth Blasting Effects are greatly ensure that, the out break problem of blast working is effectively controlled, has given full play to country rock self-bearing capacity, country rock is ensure that and faces upward the stabilization on slope.

Description

A kind of tunnel big cross section section constructing method and its face blast arrangement
Technical field
The invention belongs to technical field of tunnel construction, and in particular to a kind of tunnel big cross section section constructing method and its section are quick-fried Rag is put.
Background technology
In recent years, with the rapid development of Chinese national economy, railway construction scale is also increasing, is needed in railway construction A large amount of Tunnel Engineering are built, tunnel is gradually to " more, long, big " development, i.e., quantity is more, length is big, big cross section.For drilling and blasting method tunnel For road, reasonably optimizing Tunnel Blasting construction technology is needed, to reach the purpose of fast and safe construction.
The content of the invention
The invention provides a kind of tunnel big cross section section constructing method and its face blast to arrange, can reach fast and safely The purpose of construction.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:
A kind of tunnel big cross section section constructing method, including excavation method and blasting method, the excavation method are surpassed using steel tube shed Preceding supporting, and tunnel cross-section is divided into the step step excavation of upper, middle and lower three, inverted arch is immediately following getting out of a predicament or an embarrassing situation, and closure is cyclic in time; The blasting method refers to:
A, according to country rock feature reasonable selection periphery hole spacing and the minimum burden of periphery hole;
B, the explosive payload of periphery hole is controlled, and makes dose along borehole total length reasonable layout;
C, periphery hole uses small diameter medicine roll and low explosive, and realizes underground borehole blasting by primacord;
D, detonated using millisecond detonator elementary errors order.
Preferably, periphery hole spacing presses formula in a(1)It is determined that:
(1)
In formula, E is periphery hole spacing,D b For borehole diameter.
Preferably, determine periphery hole bulkfactor according to periphery hole spacing E and minimum burden W ratio, take 0.5~ 1.0。
Preferably, powder charge collection is determined according to explosive specific charge amount q, periphery hole spacing E and tri- parameters of minimum burden W Moderate Q, can be by formula(2)Calculated:
(2).
A kind of face blast arrangement, including top bar arrangement, middle step arrangement, arrangement of getting out of a predicament or an embarrassing situation and inverted arch arrangement, it is described Top bar arrangement refers to:Top bar is 0.8m per cyclic advance, periphery hole A hole depth 1.0m, fills 1 section explosive, 0.2kg;Reliever B, C, D, E hole depth 1.0m, 2 section explosives, 0.4kg are filled;Reliever F, G hole depth 1.5m, fills 2 section explosives, 0.4kg;Reliever H hole depths 1.5m, fill 3 section explosives, 0.6kg;Reliever I hole depth 1.8m, fill 4 section explosives, 0.8kg;Reliever J hole depth 2.2m, fill 4 sections and fry Medicine, 0.8kg;Snubber K hole depth 2.4m, fill 5 section explosives, 1.0kg;Snubber L hole depth 2.4m, fill 5 section explosives, 1.0kg;Slotting Eye V hole depth 1.5m, fill 4 section explosives, 0.8kg.
The middle step arrangement refers to:Middle step is 1.6m per cyclic advance, periphery hole M hole depth 1.8m, fills 2 section explosives, 0.4kg;Reliever N hole depth 1.8m, fill 3 section explosives, 0.6kg;Snubber O hole depth 3m, fill 4 section explosives, 0.8kg;Snubber P holes Deep 3m, fill 3 section explosives, 0.6kg;Snubber Q hole depth 3m, fill 3 section explosives, 0.6kg;Snubber R hole depth 3m, fill 4 section explosives, 0.8kg。
The inverted arch arrangement refers to:Inverted arch reliever S hole depth 4m, fill 4 section explosives, 0.8kg;Reliever T hole depth 4m, fill 6 Save explosive, 1.2k;Periphery hole U hole depth 4m, fill 6 section explosives, 1.2kg.
The present invention compared with prior art, has an advantageous effect in that:
Constructed using " the step excavating load of three step seven ", integrating tunnel deformation monitoring control technology, both shortened inverted arch closing time, again Construction speed is greatly speeded up, has efficiently controlled deflection, tunnel deformation is controlled in 30-40mm;Pass through reasonably optimizing light Face blasting parameter, tunnel Smooth Blasting Effects are greatly ensure that, effectively control the out break problem of blast working, fully hair Country rock self-bearing capacity has been waved, country rock has been ensure that and faces upward the stabilization on slope.Construction experience has important to similar large cross-section tunnel Reference value.
Brief description of the drawings
Fig. 1 is excavation method cross section of the present invention process chart;
Fig. 2 is excavation method vertical section process chart of the present invention;
Fig. 3 is Tunnel Blasting arrangement schematic diagram of the present invention.
Embodiment
The technical scheme in the embodiment of the present invention is clearly and completely described below, it is clear that described embodiment Only part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, the common skill in this area The every other embodiment that art personnel are obtained under the premise of creative work is not made, belong to the model that the present invention protects Enclose.
As shown in Figure 1 and 2, excavated in construction using " footwork of three step seven ", i.e., first use steel tube shed(Advanced tubule)It is super Preceding supporting, and tunnel cross-section is divided into the step step excavation of upper, middle and lower three, inverted arch is immediately following getting out of a predicament or an embarrassing situation, and closure is cyclic in time. For tunnel span it is big the characteristics of, in order to prevent tunnel instability, landslide, cyclic advance is excavated in strict control of constructing, and is specially:On Step is controlled in 1 Pin steelframe spacing per cyclic advance(0.8m);In, get out of a predicament or an embarrassing situation by 1~2 Pin steelframes spacing control;Each step step Away from control in 3~5m;The same left and right working face of step staggers 2 Pin steelframes.
(1)Top bar is constructed
Under the protection of advance support, the 1. portion in Fig. 1 is excavated using photoface exploision, and carry out preliminary bracing in time.
(2)In, construction of getting out of a predicament or an embarrassing situation
For tunnel cross-section it is larger the characteristics of, often circulate in, left and right sides of getting out of a predicament or an embarrassing situation staggeredly excavated, i.e., this circulation excavation Fig. 1 In 3. 6. portion, 4. subsequent cycle excavates in Fig. 1 5. portion again.
(3)Inverted arch is constructed
Based on IV grade of country rock, inverted arch often circulates excavation length by 4 Pin steelframes in tunnel(3.2m)Control, after excavation using steelframe and Gunite concrete closes cyclization in time.Inverted arch preliminary bracing carries out 2 circulations(6.4m)Poured afterwards using inverted arch trestle is overall by several times Build inverted arch and fill concrete.
Tunnel Blasting uses photoface exploision technique, and air rock drill drilling, the detonation of plastic detonating tube elementary errors millisecond detonator should Explosion is configured using following steps.
A, according to country rock feature reasonable selection periphery hole spacing and the minimum burden of periphery hole;
B, the strictly explosive payload of control periphery hole, and make dose along borehole total length reasonable layout;
C, periphery hole preferably uses small diameter medicine roll and low explosive, and realizes underground borehole blasting by primacord;
D, detonated using millisecond detonator elementary errors order, should make to produce free face during perimeter blasting, blasting cap initiation of the periphery hole with section The time difference should be as small as possible.
In general, the major parameter for influenceing Tunnel Blasting effect is:Periphery hole spacingE, minimum burdenW, periphery hole BulkfactorE/W, the not coefficient of coupDAnd concentration of chargeqProve there was only these blasting parameters all optimal Deng, engineering practice In the range of when, Tunnel Blasting effect is only optimal.
(1)Periphery hole spacingE
Periphery hole spacing is one of important parameter of photoface exploision.Tunnel blasting excavation, periphery hole spacing can be determined by formula (1).
(1)
In formula,D b It is 35 ~ 40mm according to engineering analogy value for borehole diameter.
(2)Minimum burdenW
Minimum burdenWAs light fluctuation method, it is an other important parameter for photoface exploision.Minimum burden is with excavating Tunnel cross-section it is relevant, section is bigger, and its value can be with slightly larger.Minimum burden also influences tunnel after light surface layer excavates and enclosed The stability of rock, therefore tunnel excavation need to rationally determine minimum burden.
Meanwhile minimum burden is relevant with rock property and geological structure, according to engineering experience, the minimum of large cross-section tunnel BurdenW, hard rock can use 500~600 mm, and crumbly rock takes 800~900 mm.
(3)Periphery hole bulkfactorE/W
Periphery hole bulkfactor is periphery hole spacingEWith minimum burdenWRatio, be influence demolition effect an important factor for, Take 0.5~1.0.
(4)The not coefficient of coupD
The ratio of borehole diameter and cartridge size is referred to as the not coefficient of coup.WhenDWhen=1, represent that hole wall is in close contact with pack;WhenD >When 1, represent gap be present between hole wall and pack.Research shows:When borehole diameter is 32~45 mm, the not coefficient of coupD= 1.5~2.0[1]
(5)Concentration of chargeQ
Concentration of chargeQWith explosive specific charge amountq, periphery hole spacingEAnd minimum burden(Light fluctuation method)WThree parameters are closed System is close, can be by formula(2)Calculated:
(2)
In formula, explosive specific charge amountqDepending on many factors such as lithology, basal area, blasthole diameter and blast hole depths, according to Engineering It is 0.8~1.2 kg/m than value3
As shown in figure 3, tunnel cross-section explosion specifically arranges that design parameter is shown in Table 1.
(1)Top bar is 0.8m per cyclic advance, periphery hole A hole depth 1.0m, fills 1 section explosive, 0.2kg;Reliever B, C, D, E hole depths 1.0m, 2 section explosives, 0.4kg are filled;Reliever F, G hole depth 1.5m, fills 2 section explosives, 0.4kg;Reliever H hole depths 1.5m, fill 3 section explosives, 0.6kg;Reliever I hole depth 1.8m, fill 4 section explosives, 0.8kg;Reliever J hole depth 2.2m, fill 4 sections and fry Medicine, 0.8kg;Snubber K hole depth 2.4m, fill 5 section explosives, 1.0kg;Snubber L hole depth 2.4m, fill 5 section explosives, 1.0kg;Slotting Eye V hole depth 1.5m, fill 4 section explosives, 0.8kg.
(2)Middle step is 1.6m per cyclic advance, periphery hole M hole depth 1.8m, fills 2 section explosives, 0.4kg;Reliever N hole depths 1.8m, fill 3 section explosives, 0.6kg;Snubber O hole depth 3m, fill 4 section explosives, 0.8kg;Snubber P hole depth 3m, fill 3 section explosives, 0.6kg;Snubber Q hole depth 3m, fill 3 section explosives, 0.6kg;Snubber R hole depth 3m, fill 4 section explosives, 0.8kg.
(3)Explosion of getting out of a predicament or an embarrassing situation design is similar with middle step, and parameters are essentially identical.
(4)Inverted arch reliever S hole depth 4m, fill 4 section explosives, 0.8kg;Reliever T hole depth 4m, fill 6 section explosives, 1.2k;Week Side eye U hole depth 4m, fill 6 section explosives, 1.2kg.
The tunnel cross-section explosion design parameter of table 1
By reasonably optimizing Parameters of Smooth Wall Blasting, tunnel Smooth Blasting Effects are greatly ensure that, effectively control blast working Out break problem, its amount of backbreaking is down to 5%~8% by the 20%~25% of General Explosive.Tunnel cross-section after photoface exploision is smooth Smoother, rock mass stress redistribution phenomenon is reduced, and reduces chip off-falling, the possibility of landslide, effective guarantee safety for tunnel engineering.
Monitoring During The Access is indispensable content in constructing tunnel, and it not only monitors each construction stage country rock and supporting Dynamically, it is ensured that construction safety, or adjustment preliminary bracing design parameter, determine secondary lining and inverted arch applies the time, carries For the foundation of informationization designing.
Point layout, lay one group of monitoring measurement section in work progress in hole per 10m, lay 13 sections, tunnel altogether Road Vault settlement, perimeter convergence and point layout.
Tunnel vault sedimentation, perimeter convergence value are as shown in table 2.From the point of view of Monitoring Data test result, tunnel deformation is in 30- In 40mm, illustrate that country rock is in stable state, support system is effective, reliable.
Table 2 Tunnel week deformation/mm
Measuring point Vault Convergence(1-2) Convergence(3-4) Convergence(5-6)
DK16+480 36.88 40.03 42.62 -
DK16+490 32.49 33.38 36.85 -
DK16+500 30.78 26.85 35.21 -
DK16+510 32.81 36.48 31.83 -
DK16+520 33.21 36.8 32.51 40.14
DK16+530 36.73 36.79 38.8 37.42
DK16+540 38.59 39.13 38.46 -
DK16+550 33.28 34.42 - -
DK16+560 32.8 35.35 - -
DK16+570 37.91 30.84 - -
DK16+580 36.05 31.33 - -
DK16+590 38.32 38.98 - -
DK16+600 37.16 33.56 - -
Constructed using " the step excavating load of three step seven ", shorten inverted arch closing time, greatly speed up construction speed, efficiently control Deflection, while save construction cost.
By reasonably optimizing Parameters of Smooth Wall Blasting, tunnel Smooth Blasting Effects are greatly ensure that, effectively control explosion The out break problem of construction.
From the point of view of field monitoring result, for tunnel deformation in 30-40mm, country rock is in stable state, support system effectively, Reliably.
Only presently preferred embodiments of the present invention is explained in detail above, but the present invention is not limited to above-described embodiment, In those of ordinary skill in the art's possessed knowledge, it can also be made on the premise of present inventive concept is not departed from each Kind change, various change should be included in the scope of the protection.

Claims (7)

  1. A kind of 1. tunnel big cross section section constructing method, it is characterised in that:Including excavation method and blasting method, the excavation method It is divided into the step step excavation of upper, middle and lower three using steel tube shed advance support, and by tunnel cross-section, inverted arch is closelyed follow and got out of a predicament or an embarrassing situation, and When closure cyclization;The blasting method refers to:
    A, according to country rock feature reasonable selection periphery hole spacing and the minimum burden of periphery hole;
    B, the explosive payload of periphery hole is controlled, and makes dose along borehole total length reasonable layout;
    C, periphery hole uses small diameter medicine roll and low explosive, and realizes underground borehole blasting by primacord;
    D, detonated using millisecond detonator elementary errors order.
  2. A kind of 2. tunnel big cross section section constructing method according to claim 1, it is characterised in that:In a between periphery hole Away from by formula(1)It is determined that:
    (1)
    In formula, E is periphery hole spacing,D b For borehole diameter.
  3. A kind of 3. tunnel big cross section section constructing method according to claim 1, it is characterised in that:According to periphery hole spacing E Periphery hole bulkfactor is determined with minimum burden W ratio, takes 0.5~1.0.
  4. A kind of 4. tunnel big cross section section constructing method according to claim 1, it is characterised in that:According to explosive specific charge amount q, Tri- parameters of periphery hole spacing E and minimum burden W determine concentration of charge Q, can be by formula(2)Calculated:
    (2).
  5. A kind of 5. face blast arrangement that method uses according to claim 1, it is characterised in that:Arranged including top bar, Middle step arrangement, arrangement of getting out of a predicament or an embarrassing situation and inverted arch arrangement, the top bar arrangement refer to:Top bar is 0.8m per cyclic advance, week Side eye(A)Hole depth 1.0m, fill 1 section explosive, 0.2kg;Reliever(B)、(C)、(D)、(E)Hole depth 1.0m, 2 section explosives are filled, 0.4kg;Reliever(F)、(G)Hole depth 1.5m, fill 2 section explosives, 0.4kg;Reliever(H)Hole depth 1.5m, 3 section explosives are filled, 0.6kg;Reliever(I)Hole depth 1.8m, fill 4 section explosives, 0.8kg;Reliever(J)Hole depth 2.2m, fill 4 section explosives, 0.8kg;Draw Slotted eyes(K)Hole depth 2.4m, fill 5 section explosives, 1.0kg;Snubber(L)Hole depth 2.4m, fill 5 section explosives, 1.0kg;Snubber(V)Hole Deep 1.5m, fill 4 section explosives, 0.8kg.
  6. 6. face blast arrangement according to claim 5, it is characterised in that the middle step arrangement refers to:Middle step is every Cyclic advance is 1.6m, periphery hole(M)Hole depth 1.8m, fill 2 section explosives, 0.4kg;Reliever(N)Hole depth 1.8m, 3 section explosives are filled, 0.6kg;Snubber(O)Hole depth 3m, fill 4 section explosives, 0.8kg;Snubber(P)Hole depth 3m, fill 3 section explosives, 0.6kg;Snubber (Q)Hole depth 3m, fill 3 section explosives, 0.6kg;Snubber(R)Hole depth 3m, fill 4 section explosives, 0.8kg.
  7. 7. face blast arrangement according to claim 5, it is characterised in that the inverted arch arrangement refers to:Inverted arch reliever (S)Hole depth 4m, fill 4 section explosives, 0.8kg;Reliever(T)Hole depth 4m, fill 6 section explosives, 1.2k;Periphery hole(U)Hole depth 4m, fills 6 Save explosive, 1.2kg.
CN201710741660.9A 2017-08-25 2017-08-25 A kind of tunnel big cross section section constructing method and its face blast arrangement Pending CN107560510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710741660.9A CN107560510A (en) 2017-08-25 2017-08-25 A kind of tunnel big cross section section constructing method and its face blast arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710741660.9A CN107560510A (en) 2017-08-25 2017-08-25 A kind of tunnel big cross section section constructing method and its face blast arrangement

Publications (1)

Publication Number Publication Date
CN107560510A true CN107560510A (en) 2018-01-09

Family

ID=60977056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710741660.9A Pending CN107560510A (en) 2017-08-25 2017-08-25 A kind of tunnel big cross section section constructing method and its face blast arrangement

Country Status (1)

Country Link
CN (1) CN107560510A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110006300A (en) * 2019-04-26 2019-07-12 中建三局第三建设工程有限责任公司 A kind of method of soft rock, high inclination-angle tunnel anchorage digital primer Blasting Excavation
CN111380428A (en) * 2020-04-24 2020-07-07 中铁五局集团有限公司 Medium pilot tunnel advanced blasting construction method based on small-spacing cavern group three-tunnel separation section
CN111912307A (en) * 2020-07-23 2020-11-10 中交上海航道局有限公司 Blasting excavation method of V-level surrounding rock large-section granite tunnel
CN115077315A (en) * 2022-06-17 2022-09-20 山东多邦汇德信息技术有限公司 Tunnel blast hole distribution scheme acquisition method based on rock drilling rack structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105131A (en) * 2007-08-17 2008-01-16 中铁十二局集团有限公司 Tunnel dredging method suitable for railway large section IV, V class rock tunnel
CN101864963A (en) * 2010-05-26 2010-10-20 中铁二十三局集团第三工程有限公司 Large-section loess tunnel construction method
CN101906974A (en) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 Supporting structure of extra-large cross-section loess tunnel and construction method thereof
CN102562075A (en) * 2012-03-09 2012-07-11 中交第二公路工程局有限公司 Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN104963689A (en) * 2015-07-07 2015-10-07 中铁十九局集团第二工程有限公司 Three-step seven-procedure excavation method for tunnel
CN106194195A (en) * 2016-07-22 2016-12-07 中铁建大桥工程局集团第五工程有限公司 Collapsible Loess District large cross-section tunnel three step is without remaining core soil in advance construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105131A (en) * 2007-08-17 2008-01-16 中铁十二局集团有限公司 Tunnel dredging method suitable for railway large section IV, V class rock tunnel
CN101864963A (en) * 2010-05-26 2010-10-20 中铁二十三局集团第三工程有限公司 Large-section loess tunnel construction method
CN101906974A (en) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 Supporting structure of extra-large cross-section loess tunnel and construction method thereof
CN102562075A (en) * 2012-03-09 2012-07-11 中交第二公路工程局有限公司 Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN104963689A (en) * 2015-07-07 2015-10-07 中铁十九局集团第二工程有限公司 Three-step seven-procedure excavation method for tunnel
CN106194195A (en) * 2016-07-22 2016-12-07 中铁建大桥工程局集团第五工程有限公司 Collapsible Loess District large cross-section tunnel three step is without remaining core soil in advance construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
蔡伟: "《爆破作业人员简明读本》", 30 June 2014 *
陈庆凯等: "《爆破安全》", 31 December 2012 *
韦爱勇主编: "《控制爆破技术》", 31 August 2009 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110006300A (en) * 2019-04-26 2019-07-12 中建三局第三建设工程有限责任公司 A kind of method of soft rock, high inclination-angle tunnel anchorage digital primer Blasting Excavation
CN110006300B (en) * 2019-04-26 2021-09-14 中建三局第三建设工程有限责任公司 Blasting excavation method for soft rock and large-inclination-angle tunnel anchor digital detonator
CN111380428A (en) * 2020-04-24 2020-07-07 中铁五局集团有限公司 Medium pilot tunnel advanced blasting construction method based on small-spacing cavern group three-tunnel separation section
CN111912307A (en) * 2020-07-23 2020-11-10 中交上海航道局有限公司 Blasting excavation method of V-level surrounding rock large-section granite tunnel
CN111912307B (en) * 2020-07-23 2022-09-09 中交上海航道局有限公司 Blasting excavation method for V-level surrounding rock large-section granite tunnel
CN115077315A (en) * 2022-06-17 2022-09-20 山东多邦汇德信息技术有限公司 Tunnel blast hole distribution scheme acquisition method based on rock drilling rack structure

Similar Documents

Publication Publication Date Title
CN108007285B (en) A kind of efficient Cut Blasting method of stone head deep hole sublevel segmentation
CN107560510A (en) A kind of tunnel big cross section section constructing method and its face blast arrangement
CN105781560B (en) A kind of construction method of the remote base tunnel look-ahead explosion in super low coverage superimposing thread tunnel
CN107764144A (en) A kind of tunnel Millisecond Controlled Blasting method
CN106247877B (en) A kind of hypervelocity symmetrically forces kerve method without cutting hole deviation line
CN103123247A (en) Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
CN111059970B (en) Multistage ultra-deep hole ballast-throwing vibration-control self-stabilizing blasting method for upper step of hard rock in tunnel
CN102809330B (en) Large collapse rock blasting method under precise control of digital electronic detonators
CN109252868A (en) Hard-soft heterogeneous ground shield-tunneling construction boulder and basement rock protrusion processing method
CN107060773B (en) A kind of underground chamber drilling and blasting method damping excavation method of static(al) explosion presplitting shock insulation
CN106767205A (en) The micro- Comprehensive Control blasting method of shaking of bustling urban district subway running tunnel
CN105466292A (en) Medium-length hole blasting technology used in semi-coal-rock roadway
CN105466290A (en) Cutting excavation blasting method
CN110260735A (en) A kind of diamond shape major diameter emptying aperture burn cut structure and lane construction technique
CN114166082B (en) Tunnel advanced drilling hole combination accurate control blasting structure and construction process
CN105865281A (en) Method for transverse open excavation controlled blasting construction adjacent to power station and booster station
CN106545344B (en) A kind of Karst area tunnel wall-hanging country rock face blast excavation method
Liu et al. A safe mining approach for deep outburst coal seam groups with hard‐thick sandstone roof: Stepwise risk control based on gas diversion and extraction
CN107024155A (en) A kind of underground chamber smooth blasting method of controlling profile surface evenness
CN104930937B (en) Circular divided blasting tunnel construction method capable of effectively controlling blasting vibration velocity
CN113188391A (en) Blasting method for soft rock roadway tunneling
CN112504041A (en) Method for reducing tunnel blasting excavation vibration speed in urban sensitive environment
KR101318362B1 (en) Blasting method for tunnel
CN105823388A (en) Blasting network structure used for slight dynamite
CN207197379U (en) A kind of tunnel surrounding blasting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180109