- CN107542423A CN107542423A CN201610467308.6A CN201610467308A CN107542423A CN 107542423 A CN107542423 A CN 107542423A CN 201610467308 A CN201610467308 A CN 201610467308A CN 107542423 A CN107542423 A CN 107542423A
- Authority
- CN
- China
- Prior art keywords
- expansion
- casing
- horizontal well
- water
- expansion casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本发明涉及一种筛管完井水平井膨胀套管堵水方法,首先,确定水平井出水水体3位置;接着,通过送入钻具8下入膨胀套管串,在确定水体3位置注入化学堵剂4;然后,将膨胀套管5膨胀,实现对化学堵剂机械支撑;所述膨胀套管串包括膨胀套管5、膨胀锥6和膨胀启动器7。本发明采用膨胀套管对化学堵剂进行机械支撑,可避免常规化学堵水方法,堵剂在短时间内被压回井筒造成堵水失败的缺陷,同时利用膨胀套管作为机械支撑井筒损失内径较小,工艺简单且可分段实施,可广泛用于筛管完井水平井堵水等领域。
The present invention relates to a water plugging method of screen pipe completion horizontal well expansion casing. Firstly, determine the position 3 of the outlet water body of the horizontal well; Blocking agent 4; then, expand the expansion sleeve 5 to achieve mechanical support for the chemical blocking agent; the expansion sleeve string includes the expansion sleeve 5, the expansion cone 6 and the expansion starter 7. The invention adopts the expansion casing to mechanically support the chemical plugging agent, which can avoid the defect of the conventional chemical water plugging method that the plugging agent is pressed back into the wellbore in a short time to cause water plugging failure, and at the same time, the expansion casing is used as the mechanical support to lose the inner diameter of the wellbore Small in size, simple in process and can be implemented in stages, it can be widely used in fields such as screen completion, horizontal well water plugging and the like.
Description
技术领域technical field
本发明涉及石油天然气行业中的钻井完井技术领域,为筛管完井水平井堵水提供一种作业方法。The invention relates to the technical field of drilling and completion in the petroleum and natural gas industry, and provides an operation method for water plugging of screen tube completion and horizontal wells.
背景技术Background technique
水平井增加了产层的泄油面积,可在低生产压差下开发油藏,已成为加快产能建设、提高采油效率、增加可采储量的重要技术手段。广泛应用于中高渗、稠油、低渗透油藏。但是受成本及技术因素的影响,国内外水平井主要采用管外无封隔器的割缝衬管完井方式。 国内该类完井方式占70%, 国外则达到90%。水平井出水主要有底水锥进、裂缝突进2种方式,受制于水平井的特殊井身结构,水平井见水后如不采取措施,含水将持续上升,严重制约其整体开发效果。Horizontal wells increase the drainage area of production layers, and can develop reservoirs under low production pressure differentials. They have become an important technical means to speed up production capacity construction, improve oil recovery efficiency, and increase recoverable reserves. Widely used in medium and high permeability, heavy oil and low permeability reservoirs. However, affected by cost and technical factors, horizontal wells at home and abroad mainly adopt the slotted liner completion method without packers outside the pipe. This kind of completion method accounts for 70% in China and 90% in foreign countries. There are two main methods of water output from horizontal wells: bottom water coning and fracture intrusion. Due to the special well structure of horizontal wells, if no measures are taken after water breakthrough in horizontal wells, the water cut will continue to rise, seriously restricting its overall development effect.
现有的筛管完井水平井堵水方法主要有两种:堵剂笼统注入法和环空封隔定位注入法。这两种方法都有其局限性,堵剂笼统注入法:化学堵剂会在压差的作用下很快被压回井筒。环空分隔定位注入法:施工工艺复杂,堵水后内径损失大。专利CN201420691031提供一种水平井堵水封隔器,由上接头、胶筒、中心管、锁紧部分、卡瓦、液压坐封部分组成,在上接头与胶筒之间的中心管的外管壁上安装有扶正装置,扶正装置包括至少三组扶正体。该封隔器坐封时通过扶正装置和卡瓦的作用使其定位与套管中心、胶筒沿圆周均匀释放,实现了在水平井段长期有效坐封,坐封时胶筒能够沿圆周均匀释放,以实现水平井找水、堵水,但是存在施工难度大,稳定性和可靠性差的问题。总体来说目前对于筛管完井水平井出水,国内外都没有行之有效的方法。There are two main water plugging methods for horizontal well completion with screen tube completion: general plugging agent injection method and annulus isolation positioning injection method. These two methods have their limitations. The general plugging agent injection method: the chemical plugging agent will be quickly pressed back into the wellbore under the action of pressure difference. Annulus separation positioning injection method: the construction process is complicated, and the inner diameter loss is large after water blocking. Patent CN201420691031 provides a horizontal well water plugging packer, which is composed of an upper joint, a rubber tube, a central pipe, a locking part, slips, and a hydraulic setting part, and the outer tube of the central pipe between the upper joint and the rubber tube A centralizing device is installed on the wall, and the centralizing device includes at least three groups of centralizing bodies. When setting the packer, through the function of the centralizing device and the slips, it is positioned with the center of the casing and the rubber tube is evenly released along the circumference, realizing long-term effective setting in the horizontal well section, and the rubber tube can be evenly distributed along the circumference during setting. release to realize water finding and water blocking in horizontal wells, but there are problems of difficult construction, poor stability and reliability. Generally speaking, at present, there is no effective method at home and abroad for the water production of screen completion horizontal wells.
发明内容Contents of the invention
本发明的目的是针对目前的筛管完井水平井出水的问题,提供一种技术方法更加可靠、作业价格更低、简单高效的筛管完井水平井膨胀套管堵水方法。The purpose of the present invention is to provide a more reliable technical method, lower operating price, simple and efficient water plugging method for screen tube completion horizontal well expansion casing for the current problem of screen tube completion horizontal well water output.
本发明是这样实现的:The present invention is achieved like this:
一种筛管完井水平井膨胀套管堵水方法,首先,确定水平井出水水体3位置;接着,通过送入钻具8下入膨胀套管串,在确定水体3位置注入化学堵剂4;然后,将膨胀套管5膨胀,实现对化学堵剂机械支撑;所述膨胀套管串包括膨胀套管5、膨胀锥6和膨胀启动器7。A water plugging method for screen completion horizontal well expansion casing, firstly, determine the position of the water body 3 of the horizontal well; then, by sending the drilling tool 8 into the expansion casing string, inject the chemical plugging agent 4 at the position of the determined water body 3 Then, expand the expansion sleeve 5 to achieve mechanical support for the chemical blocking agent; the expansion sleeve string includes the expansion sleeve 5, the expansion cone 6 and the expansion starter 7.
上述方案还包括:The above program also includes:
化学堵剂4是根据水体3位置在膨胀套管5串下入过程中分段挤注进地层的。The chemical plugging agent 4 is squeezed and injected into the formation in sections according to the position of the water body 3 during the running of the expansion casing 5 strings.
在膨胀套管5入井前,膨胀套管 5串前后各预先硫化一段密封胶筒9,或者在膨胀套管5入井前,预先在膨胀套管5外壁上下各套上一段密封胶筒9。Before the expansion casing 5 goes into the well, a section of the sealing rubber tube 9 is pre-vulcanized before and after the expansion casing 5 strings, or before the expansion casing 5 goes into the well, a section of the sealing rubber tube 9 is respectively set on the upper and lower walls of the expansion casing 5 in advance.
膨胀套管5在设计位置膨胀为塑性变形,使膨胀套管成为化学堵剂的永久支撑,保证化学堵剂不被压差压回井筒,从而保证堵水长期有效。The expansion sleeve 5 is plastically deformed at the design position, making the expansion sleeve a permanent support for the chemical plugging agent, ensuring that the chemical plugging agent will not be pushed back into the wellbore by the pressure difference, thereby ensuring long-term effectiveness of water plugging.
本发明的优点在于:The advantages of the present invention are:
(1)膨胀套管可以给化学堵剂提供一个较长时间的机械支撑,使化学堵剂持续发挥作用,大大提高水平井寿命。(1) The expansion casing can provide a long-term mechanical support for the chemical plugging agent, so that the chemical plugging agent can continue to function and greatly improve the service life of the horizontal well.
(2)相比较其它堵水方法内径损失最小。(2) Compared with other water blocking methods, the inner diameter loss is the smallest.
(3)可以针对不同出水层位进行分段封堵。(3) Segmented plugging can be carried out for different water outlet levels.
(4)相对来说具有更简单的工艺,更低廉的费用。(4) Relatively speaking, it has simpler process and lower cost.
附图说明Description of drawings
图1 本发明方法中发现并确定出水位置示意图;Figure 1 is a schematic diagram of finding and determining the water outlet position in the method of the present invention;
图2 本发明方法中下入膨胀套管串并挤注化学堵剂示意图;Fig. 2 is a schematic diagram of lowering expansion casing strings and squeezing chemical plugging agent in the method of the present invention;
图3本发明方法中 膨胀套管实施膨胀完成堵水作业示意图。Fig. 3 is a schematic diagram of the expansion of the expansion casing to complete the water shutoff operation in the method of the present invention.
图中:1.完井套管,2.筛管,3.水体,4.化学堵剂,5.膨胀套管,6.膨胀锥,7.膨胀启动器,8.送入钻具,9.密封胶筒。In the figure: 1. Completion casing, 2. Screen pipe, 3. Water body, 4. Chemical plugging agent, 5. Expansion casing, 6. Expansion cone, 7. Expansion starter, 8. Sending into drilling tool, 9 .Sealing rubber cartridge.
具体实施方式detailed description
现结合说明书附图,对本发明作进一步的描述。Now in conjunction with the accompanying drawings of the description, the present invention will be further described.
如图1~3所示,一种筛管完井水平井膨胀套管堵水方法,是由发现水平井出水并确定出水点3,然后下入膨胀套管串组合并在出水点注入化学堵剂4,继续下入膨胀套管5至预定位置对膨胀套管5实施膨胀,使膨胀套管5成为化学堵剂4的永久支撑作业步骤组成。As shown in Figures 1 to 3, a water plugging method for screen tube completion horizontal well expansion casing is to discover the water outlet of the horizontal well and determine the water outlet point 3, then run the expansion casing string combination and inject chemical plugging at the water outlet point. agent 4, continue to run down the expansion sleeve 5 to a predetermined position to expand the expansion sleeve 5, and make the expansion sleeve 5 a permanent support operation of the chemical blocking agent 4.
如图1所示,针对采用完井套管1和筛管2完井的水平井生产过程中出水,首先应确定为点状出水或底水锥进,经过测试确定水体3位置。As shown in Fig. 1, for the water discharge in the production process of a horizontal well completed with completion casing 1 and screen 2, it should first be determined as point water discharge or bottom water coning, and the position of water body 3 should be determined after testing.
如图2所示,按照设计要求下入膨胀套管串,膨胀套管串包括膨胀锥6、膨胀启动器7、膨胀套管5,膨胀套管串上下两端硫化有密封胶筒9。As shown in Figure 2, according to the design requirements, the expansion casing string is lowered. The expansion casing string includes the expansion cone 6, the expansion starter 7, and the expansion casing 5. The upper and lower ends of the expansion casing string are vulcanized with sealant rubber cylinders 9.
下入过程中可针对水体3的位置在不同位置通过送入钻具8对地层分段挤注化学堵剂4,完成化学堵剂4挤注后,将膨胀套管5串下至设计位置。During the run-in process, the chemical plugging agent 4 can be injected into the stratum by sending the drilling tool 8 at different positions according to the position of the water body 3. After the injection of the chemical plugging agent 4 is completed, the expansion casing 5 strings are lowered to the designed position.
如图3所示,待膨胀套管串下到设计位置后,通过送入钻具8泵入工作液进行膨胀套管5膨胀作业,直至完成全部膨胀套管5膨胀,为化学堵剂4提供可靠的机械支撑,并恢复井筒通道。As shown in Fig. 3, after the expansion casing string is lowered to the designed position, the expansion operation of the expansion casing 5 is carried out by feeding the drilling tool 8 and pumping the working fluid until all the expansion casing 5 is expanded, providing chemical plugging agent 4 Reliable mechanical support and restoration of wellbore access.
本发明采用采用边下入膨胀套管串边挤注化学堵剂4的作业方式,可选择性分段挤注化学堵剂4,同时膨胀套管5膨胀后可为化学堵剂4提供可靠的机械支撑,避免化学堵剂4在短期被压回井筒造成堵水失效,大大提高筛管完井水平井堵水可靠性,可广泛用于筛管完井水平井堵水等领域。The present invention adopts the operation method of squeezing the chemical plugging agent 4 while running in the expansion casing in series, and can selectively squeeze the chemical plugging agent 4 in sections, and at the same time, the expansion casing 5 can provide reliable protection for the chemical plugging agent 4 after expansion. Mechanical support prevents the chemical plugging agent 4 from being pressed back into the wellbore in a short period of time to cause water plugging failure, which greatly improves the reliability of water plugging in horizontal well completions with screens, and can be widely used in fields such as water plugging in horizontal wells with screen completions.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610467308.6A CN107542423A (en) | 2016-06-24 | 2016-06-24 | A kind of sieve tube completion horizontal well expansion sleeve pipe shutoff method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610467308.6A CN107542423A (en) | 2016-06-24 | 2016-06-24 | A kind of sieve tube completion horizontal well expansion sleeve pipe shutoff method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107542423A true CN107542423A (en) | 2018-01-05 |
Family
ID=60960557
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610467308.6A Pending CN107542423A (en) | 2016-06-24 | 2016-06-24 | A kind of sieve tube completion horizontal well expansion sleeve pipe shutoff method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107542423A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108547591A (en) * | 2018-02-13 | 2018-09-18 | 中国石油天然气股份有限公司 | A water plugging method for screen completion heavy oil horizontal wells |
| CN110410030A (en) * | 2019-06-14 | 2019-11-05 | 中国石油天然气股份有限公司 | A composite material application repair pipe string and method |
| CN113356788A (en) * | 2020-03-06 | 2021-09-07 | 中国石油化工股份有限公司 | Visual simulation device and method for artificial partition plate of radial well structure |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20020007949A1 (en) * | 2000-07-18 | 2002-01-24 | Tolman Randy C. | Method for treating multiple wellbore intervals |
| CN200985761Y (en) * | 2006-12-25 | 2007-12-05 | 长庆石油勘探局 | Expansion casing tube start-up cavity device |
| CN102619493A (en) * | 2012-03-28 | 2012-08-01 | 中国石油天然气股份有限公司 | Profile control and water shutoff method for heavy oil horizontal well with screen completion and its combined device |
| CN102876304A (en) * | 2012-09-18 | 2013-01-16 | 中国石油化工股份有限公司 | A kind of horizontal well bottom water plugging agent system and bottom water plugging process |
| WO2013028383A2 (en) * | 2011-08-23 | 2013-02-28 | Schlumberger Canada Limited | Chemical injection system |
| CN103089193A (en) * | 2011-10-31 | 2013-05-08 | 中国石油化工股份有限公司 | Tail pipe completion method by plugging expandable casing on top of screen pipe |
| CN103089182A (en) * | 2011-10-31 | 2013-05-08 | 中国石油化工股份有限公司 | Well completion method for tail pipe combining expansion sleeve pipe and expansion sieve pipe |
| CN103775015A (en) * | 2012-10-18 | 2014-05-07 | 中国石油化工股份有限公司 | Downhole expansion tool for sleeve and method for using downhole expansion tool for sleeve to expand sleeve |
| CN203808945U (en) * | 2014-04-18 | 2014-09-03 | 中国海洋石油总公司 | Water plugging and controlling technical tubular column for open hole screen pipe completion horizontal well root |
| CN205172513U (en) * | 2015-10-12 | 2016-04-20 | 中石化石油工程技术服务有限公司 | Bridging plug device based on expandable casing |
-
2016
- 2016-06-24 CN CN201610467308.6A patent/CN107542423A/en active Pending
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20020007949A1 (en) * | 2000-07-18 | 2002-01-24 | Tolman Randy C. | Method for treating multiple wellbore intervals |
| CN200985761Y (en) * | 2006-12-25 | 2007-12-05 | 长庆石油勘探局 | Expansion casing tube start-up cavity device |
| WO2013028383A2 (en) * | 2011-08-23 | 2013-02-28 | Schlumberger Canada Limited | Chemical injection system |
| CN103089193A (en) * | 2011-10-31 | 2013-05-08 | 中国石油化工股份有限公司 | Tail pipe completion method by plugging expandable casing on top of screen pipe |
| CN103089182A (en) * | 2011-10-31 | 2013-05-08 | 中国石油化工股份有限公司 | Well completion method for tail pipe combining expansion sleeve pipe and expansion sieve pipe |
| CN102619493A (en) * | 2012-03-28 | 2012-08-01 | 中国石油天然气股份有限公司 | Profile control and water shutoff method for heavy oil horizontal well with screen completion and its combined device |
| CN102876304A (en) * | 2012-09-18 | 2013-01-16 | 中国石油化工股份有限公司 | A kind of horizontal well bottom water plugging agent system and bottom water plugging process |
| CN103775015A (en) * | 2012-10-18 | 2014-05-07 | 中国石油化工股份有限公司 | Downhole expansion tool for sleeve and method for using downhole expansion tool for sleeve to expand sleeve |
| CN203808945U (en) * | 2014-04-18 | 2014-09-03 | 中国海洋石油总公司 | Water plugging and controlling technical tubular column for open hole screen pipe completion horizontal well root |
| CN205172513U (en) * | 2015-10-12 | 2016-04-20 | 中石化石油工程技术服务有限公司 | Bridging plug device based on expandable casing |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108547591A (en) * | 2018-02-13 | 2018-09-18 | 中国石油天然气股份有限公司 | A water plugging method for screen completion heavy oil horizontal wells |
| CN110410030A (en) * | 2019-06-14 | 2019-11-05 | 中国石油天然气股份有限公司 | A composite material application repair pipe string and method |
| CN110410030B (en) * | 2019-06-14 | 2021-04-30 | 中国石油天然气股份有限公司 | A kind of composite material application repair pipe string and method |
| CN113356788A (en) * | 2020-03-06 | 2021-09-07 | 中国石油化工股份有限公司 | Visual simulation device and method for artificial partition plate of radial well structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104314546B (en) | Staged Fracturing Completion String and Staged Fracturing Technology in Horizontal Well Casing | |
| CN104563955B (en) | Steel pipe hydraulic expansion type external casing packer | |
| CN107605452A (en) | A horizontal well refracturing method | |
| CN201705276U (en) | Well completion and flow string of horizontal well | |
| CN111425148B (en) | Casing pipe column applying toe end sliding sleeve to full-diameter sliding sleeve and application method thereof | |
| CN104563954B (en) | Steel pipe recovers expansion type external pipe packer | |
| CN105822253A (en) | Casing sliding sleeve and hydraulic bridge plug combined completion string and rapid fracturing method | |
| CN110295879A (en) | A kind of staged fracturing horizontal well in segments period note adopts dual string | |
| CN204532234U (en) | Combined completion string of casing sliding sleeve and hydraulic bridge plug | |
| CN107060682A (en) | A kind of high pressure self-locking packer and its set method | |
| CN207093070U (en) | Casing variable well leak detection string | |
| CN107542423A (en) | A kind of sieve tube completion horizontal well expansion sleeve pipe shutoff method | |
| CN105822252B (en) | Cementing String Combination and Cementing Method | |
| RU2732167C1 (en) | Method of repairing casing string in non-cemented part (embodiments) | |
| CN202531133U (en) | Two-end water plugging process pipe string for oil well sealing middle layer | |
| CN102619493A (en) | Profile control and water shutoff method for heavy oil horizontal well with screen completion and its combined device | |
| US9765591B2 (en) | Swellable elastomer plug and abandonment swellable plugs | |
| CN109681138B (en) | Method for lifting and discharging halogen pipes | |
| CN204252929U (en) | Oil Production Water Plugging String | |
| CN203939477U (en) | An integrated pipe string for oil testing and well completion operations | |
| US20180252068A1 (en) | Packing Element Having a Bonded Petal Anti-Extrusion Device | |
| CN105840167A (en) | Sectional Completion String | |
| CN120465875A (en) | A large-diameter composite metal pipe external packer for horizontal wellbore reconstruction | |
| CN107724995A (en) | A kind of mechanical-set half dissolving bridging device and its fracturing process | |
| CN106761514A (en) | Self-expanding rubber subsidy device and subsidy method for casing damaged well |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |