CN107539689A - The method omitted when preventing the rubbish on construction ground from shifting - Google Patents

The method omitted when preventing the rubbish on construction ground from shifting Download PDF

Info

Publication number
CN107539689A
CN107539689A CN201710916463.6A CN201710916463A CN107539689A CN 107539689 A CN107539689 A CN 107539689A CN 201710916463 A CN201710916463 A CN 201710916463A CN 107539689 A CN107539689 A CN 107539689A
Authority
CN
China
Prior art keywords
rubbish
dustbin
compartment
limit flitch
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710916463.6A
Other languages
Chinese (zh)
Inventor
蒋丽萍
Original Assignee
蒋丽萍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 蒋丽萍 filed Critical 蒋丽萍
Priority to CN201710916463.6A priority Critical patent/CN107539689A/en
Publication of CN107539689A publication Critical patent/CN107539689A/en
Withdrawn legal-status Critical Current

Links

Abstract

The invention discloses the method omitted when preventing the rubbish on construction ground from shifting, comprise the following steps:Step A:Make the delivery end docking of the afterbody and dustbin in transfer car(buggy) compartment;Step B:Support member is moved to the lower section of dustbin and compartment interface, start telescoping mechanism, the upper surface both ends of limit flitch is contacted respectively with the bottom of dustbin and the bottom in compartment, the one end in rotating cylinder and rubbish chamber interior wall closely face is circumscribed;Step C:By executing garbage from the dustbin push-in compartment of compressed garbage;Step D:The upper surface for limiting flitch is cleaned out.So by using the present invention; avoid when promoting executing garbage; gap of the rubbish chip between compartment and dustbin on executing garbage drops to ground; and avoid wind and blown away; worker only need to be after completing compartment and loading executing garbage; chip on limit flitch is cleared up, operating efficiency is improved, protects environmental sanitation.

Description

The method omitted when preventing the rubbish on construction ground from shifting
Technical field
The present invention relates to building field, and in particular to the method omitted when preventing the rubbish on construction ground from shifting.
Background technology
As people's living standard improves constantly, the requirement to environmental condition also increasingly improves, the rubbish of town and country traditional sense Rubbish station can not meet requirement of the people to the new ideas such as efficient, environmentally friendly, low energy, therefore the popularization gesture of compressed garbage station It must go.Compacting refuse transfer station is small with its floor space, good concealment, the advantages such as space structure is reasonable, leads rubbish The development of terminal industry.The popularization and utilization of garbage transfer station, have both beautified environment, have prevented secondary pollution again, reduced The growth of mosquitos and flies, vehicle-mounted efficiency is improved, alleviates labor strength, substantially reduces operating cost.
The rubbish being collected into transports to refuse transfer station by special garbage truck.Cram packer is fully sealed.Rubbish First step processing is carried out after being transported to transfer station.Classified first by classifier, be divided into organic matter and inorganic matter, and It is available and not available.Processing is also compressed for the rubbish of large volume.Afterwards, these rubbish are classified fortune Walk.
The rubbish transported from transfer station, some are transported to sanitary filling field, and rubbish is inserted in ready hole and is capped Cover and be compacted, bring it about biology, physics, chemical change, decomposing organic matter, reach minimizing and innoxious purpose. Special pipeline and impervious barrier are covered with these holes, for collecting gas caused by rubbish fermentation and percolate.Gas is by combustion Burning processing, a percolate part, into reclaimed water, for clean rubbish vehicle and dust from land surface, are also partly oozed by purified treatment Filtrate reaches national standard reference after filtering and emitted again, and environment will not be polluted.Also be transported to heap Fertile factory, after compost treatment, house refuse becomes health, tasteless humus, has been used as the fertilizer of plant.Also one Divide to be sent in incinerator and burned, make combustible component in rubbish fully oxidized, caused heat is used to generate electricity and heat. China builds up, is building and just having 140 in the refuse-burning plant of declaration at present.One ton of rubbish can generate electricity 300 degree, and waste heat can also For heat supply.
When carrying out building in some more remote ground places and building, builder has thousands of, its daily life collection In in the board house built temporarily.And if rubbish caused by workpeople's life is transported not in time, can be made troubles to worker;And Directly house refuse is transported, then can increase the quantity of required cram packer.Therefore often establish one by construction site and face When garbage compression station, transported again after the house refuse of builder is focused on, compressed.
The life rubbish of builder is transported in station to pour into after collecting by manpower dolly or light-duty discharging vehicle is placed on melt pit Dustbin in, after loose rubbish fills dustbin, with compressor compacting turn into bulk.When the rubbish of compacting is loaded with dustbin Afterwards, dustbin is lifted to certain altitude, is docked with transfer car(buggy) compartment, the rubbish by pusher by executing garbage from compressed garbage Case is pushed into compartment.Due to that can have gap between compartment and dustbin even at a distance of more than ten centimetres, executing garbage moves from dustbin During moving to compartment, understand gap of some rubbish chip between compartment and dustbin and drop to ground, add Worker's clearance time, and when blowing, can also drop chip and blow, it is not easy to collect chip, cleared of debris.
The content of the invention
Present invention aims at the method the omitted when rubbish that prevents construction ground shifts is provided, solve due to compartment and There can be gap between dustbin even at a distance of more than ten centimetres, executing garbage has during compartment is moved to from dustbin Gap of a part of rubbish chip between compartment and dustbin drops to ground, when adding worker's clearance time, and blowing, Chip can also be dropped to blow, the problem of being not easy to collect chip, cleared of debris.
The present invention is achieved through the following technical solutions:
The method omitted when preventing the rubbish on construction ground from shifting, comprises the following steps:
Step A is docked:By the dustbin equipped with compressed garbage from raked floor, restart transfer car(buggy), make transfer car(buggy) compartment Afterbody and dustbin delivery end docking;
Step B connections:Scroll wheel, so that support member is moved to the lower section of dustbin and compartment interface, start flexible Mechanism, make the overhanging length of side of telescoping mechanism, until limit flitch upper surface both ends respectively with the bottom of dustbin and the bottom in compartment Contact, the one end in rotating cylinder and rubbish chamber interior wall closely face are circumscribed;
Step C is shifted:By executing garbage from the dustbin push-in compartment of compressed garbage;
Step D is cleared up:The upper surface for limiting flitch is cleaned out.
The roller, support member, telescoping mechanism and limit flitch are sequentially connected, and the limit flitch is described parallel to horizontal plane The flexible track of telescoping mechanism drives limit flitch close or passes through branch away from support member, telescoping mechanism perpendicular to limit flitch Support member is fixed on the top of roller;
One end away from telescoping mechanism is provided with fixing axle and the rotating cylinder being set in fixing axle on limit flitch, solid The both ends of dead axle are provided with contiguous block, and the contiguous block is respectively positioned on limit flitch connection, and the rotating cylinder can be around the axis of fixing axle Rotate.
After the rubbish of compacting is loaded with dustbin, lifting dustbin docks, then to certain altitude with transfer car(buggy) compartment Scroll wheel, so that support member is moved to the lower section of dustbin and compartment interface, then start telescoping mechanism, make telescoping mechanism It is overhanging elongated, until the upper surface both ends of limit flitch contact with the bottom of dustbin and the bottom in compartment respectively, rotating cylinder and rubbish Chamber interior wall is circumscribed close to the one end on ground, and executing garbage then is pushed into compartment from the dustbin of compressed garbage by pusher; So by using the present invention, avoid when promoting executing garbage, the rubbish chip on executing garbage is between compartment and dustbin Gap drops to ground, and avoids wind and blown away, and worker only need to will be located at limit flitch after completing compartment and loading executing garbage On chip cleaning, improve operating efficiency, protect environmental sanitation;Meanwhile executing garbage is sliding into car from dustbin In railway carriage or compartment really during, because the one end in rotating cylinder and rubbish chamber interior wall closely face is circumscribed, the ground of executing garbage always with rolling Cylinder contact, while roller is unanimously played a supporting role to executing garbage, the feelings for avoiding dustbin from toppling over due to crank to compartment Condition occurs, and protects the connecting portion of dustbin, improves the service life of dustbin, reduce its repair rate.
Further, it is hinged at the both ends of the upper surface of the limit flitch and is provided with grip block, the be hinged axis Parallel to the axis of roller, torsion spring, the torsion spring are provided between opposite and the upper surface of limit flitch each other in grip block Axis each parallel to be hinged axis, and the linking arm of one end is connected with grip block, the linking arm of the torsion spring other end with Flitch connection is limited, and when torsion spring be in ortho states, the distance away from hinge axes one end is less than grip block close to being hinged on grip block The distance of axis one end.
In order to further increase in executing garbage is promoted, the stability of flitch is limited, grip block and torsion spring are set;First will support Part is moved to the exit of dustbin, then drives transfer car(buggy) again, transfer car(buggy) compartment is docked with the outlet of dustbin, and simultaneously Grip block is pulled open, makes remote hinge axes one end on grip block remote, until transfer car(buggy) compartment docks with the outlet of dustbin, so After unclamp grip block, grip block is close to each other in the presence of torsion spring, until grip block face relative to each other with transfer car(buggy) car The side wall in railway carriage or compartment and the side wall contact of dustbin.
Further, it is provided with elastic caoutchouc to one end away from hinge axes on opposite each other in the grip block Layer.
In the presence of torsion spring, grip block is clamped in corresponding side wall, in order to avoid this side wall is because of the clamping of grip block The excessive generation indenture of power, therefore elastic rubber layer is set, with the surface quality of protective side wall, moreover it is possible to avoid the lacquer painting of side wall from being scraped Flower.
Further, the support member is steel plate, and support member is parallel with limit flitch.
Further, several atmospheric pressure poles are provided between support member and limit flitch, the axis of the atmospheric pressure pole is flat Row is in the flexible track of telescoping mechanism, and one end of atmospheric pressure pole is connected with support member, and the other end of atmospheric pressure pole is connected with limit flitch. The setting of atmospheric pressure pole adds the stationarity of limit flitch movement, the connecting portion between protection limit flitch and telescoping mechanism.
Further, the telescoping mechanism can use pneumatic cylinder, hydraulic cylinder, connection linkage.In the present invention, telescopic machine Structure is preferably hydraulic cylinder, and its cylinder bottom is connected with support member, and its piston-rod end is connected with limit flitch.
The present invention compared with prior art, has the following advantages and advantages:
1st, the method omitted when the present invention prevents the rubbish on construction ground from shifting, the rubbish of compacting are loaded with dustbin Afterwards, dustbin is lifted to certain altitude, is docked with transfer car(buggy) compartment, then scroll wheel, so that support member is moved to dustbin With the lower section of compartment interface, then start telescoping mechanism, make telescoping mechanism overhanging elongated, until the upper surface both ends of limit flitch Contacted respectively with the bottom of dustbin and the bottom in compartment, the one end in rotating cylinder and rubbish chamber interior wall closely face is circumscribed, Ran Houtong Cross pusher and executing garbage is pushed into compartment from the dustbin of compressed garbage;So by using the present invention, avoid promoting rubbish During rubbish block, gap of the rubbish chip between compartment and dustbin on executing garbage drops to ground, and avoids wind and blown Walk, worker need to only clear up the chip on limit flitch after completing compartment and loading executing garbage, improve work effect Rate, protect environmental sanitation;
2nd, the method omitted when the present invention prevents the rubbish on construction ground from shifting, executing garbage are sliding into car from dustbin In railway carriage or compartment really during, because the one end in rotating cylinder and rubbish chamber interior wall closely face is circumscribed, the ground of executing garbage always with rolling Cylinder contact, while roller is unanimously played a supporting role to executing garbage, the feelings for avoiding dustbin from toppling over due to crank to compartment Condition occurs, and protects the connecting portion of dustbin, improves the service life of dustbin, reduce its repair rate;
3rd, the method omitted when the present invention prevents the rubbish on construction ground from shifting, rubbish is being promoted in order to further increase In block, the stability of flitch is limited, grip block and torsion spring are set;Support member is first moved to the exit of dustbin, then driven again Dynamic transfer car(buggy), makes transfer car(buggy) compartment be docked with the outlet of dustbin, and pulls open grip block simultaneously, makes on grip block away from jointed shaft Line one end is remote, until transfer car(buggy) compartment docks with the outlet of dustbin, then unclamps grip block, effect of the grip block in torsion spring Under it is close to each other, until the face relative to each other of grip block contacts with the side wall in transfer car(buggy) compartment and the side wall of dustbin.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, forms one of the application Point, do not form the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the side view of the present invention;
Fig. 3 is the structural representation when present invention uses;
Fig. 4 is present invention position in use.
Mark and corresponding parts title in accompanying drawing:
1- rollers, 2- support members, 3- telescoping mechanisms, 4- limit flitch, 5- fixing axles, 6- rotating cylinders, 7- contiguous blocks, 8- clampings Plate, 9- torsion springs, 10- atmospheric pressure poles, 11- transfer car(buggy)s compartment, 12- dustbins, 13- executing garbages.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment and accompanying drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make For limitation of the invention.
Embodiment 1
As Figure 1-Figure 4, the method omitted when the present invention prevents the rubbish on construction ground from shifting, including following step Suddenly:
Step A is docked:By the dustbin 12 equipped with compressed garbage from raked floor, restart transfer car(buggy), make transfer car(buggy) car The delivery end docking of the afterbody and dustbin 12 in railway carriage or compartment 11;
Step B connections:Scroll wheel 1, so that support member 2 is moved to the lower section of dustbin 12 and the interface of compartment 11, open Dynamic telescoping mechanism 3, makes the 3 overhanging length of side of telescoping mechanism, until the upper surface both ends of limit flitch 4 respectively with the bottom of dustbin 12 and The bottom contact in compartment 11, the one end in rotating cylinder and rubbish chamber interior wall closely face are circumscribed;
Step C is shifted:Executing garbage is pushed into compartment 11 from the dustbin 12 of compressed garbage;
Step D is cleared up:The upper surface for limiting flitch 4 is cleaned out.
The roller 1, support member 2, telescoping mechanism 3 and limit flitch 4 are sequentially connected, the limit flitch 4 parallel to horizontal plane, The flexible track of the telescoping mechanism 3 perpendicular to limit flitch 4, and drive limit flitch 4 close to or away from support member 2, telescopic machine Structure 3 is fixed on the top of roller 1 by support member 2;
The rotating cylinder that one end away from telescoping mechanism 3 is provided with fixing axle 5 and is set in fixing axle 5 on limit flitch 4 6, contiguous block 7 is provided with the both ends of fixing axle 5, the contiguous block 7 is respectively positioned on limit flitch 4 and connected, and the rotating cylinder 6 can be around solid The axis of dead axle 5 rotates.
After the rubbish of compacting is loaded with dustbin, lifting dustbin docks, then to certain altitude with transfer car(buggy) compartment Scroll wheel 1, so that support member 2 is moved to the lower section of dustbin and compartment interface, then starts telescoping mechanism 3, make to stretch Mechanism 3 is overhanging elongated, until the upper surface both ends of limit flitch 4 contact with the bottom of dustbin and the bottom in compartment respectively, rotating cylinder 6 It is circumscribed with the one end in rubbish chamber interior wall closely face, then executing garbage is pushed into from the dustbin of compressed garbage by pusher Compartment;So by using the present invention, avoid when promoting executing garbage, the rubbish chip on executing garbage from compartment and dustbin it Between gap drop to ground, and avoid wind and blown away, worker only need to will be located at limit after completing compartment and loading executing garbage Chip cleaning on flitch 4, improves operating efficiency, protects environmental sanitation;Meanwhile executing garbage slides from dustbin Into compartment really during, because the one end in rotating cylinder 6 and rubbish chamber interior wall closely face is circumscribed, the ground of executing garbage is always Contacted with roller 6, while roller 6 is unanimously played a supporting role to executing garbage, avoid dustbin because crank inclines to compartment Situation occurs, and protects the connecting portion of dustbin, improves the service life of dustbin, reduce its repair rate.
Further, it is hinged at the both ends of the upper surface of the limit flitch 4 and is provided with grip block 8, the be hinged axle Line is provided with torsion spring 9, institute between opposite and the upper surface of limit flitch 4 each other parallel to the axis of roller 1 in grip block 8 The axis of torsion spring 9 is stated each parallel to be hinged axis, and the linking arm of the one end of torsion spring 9 is connected with grip block 8, the other end of torsion spring 9 Linking arm be connected with limit flitch 4, and the distance away from hinge axes one end is less than when torsion spring 9 be in ortho states, on grip block 8 presss from both sides Hold distance of the plate 8 close to hinge axes one end.
In order to further increase in executing garbage is promoted, the stability of flitch 4 is limited, grip block 8 and torsion spring 9 are set;First will Support member 2 is moved to the exit of dustbin, then drives transfer car(buggy) again, transfer car(buggy) compartment is docked with the outlet of dustbin, And pull open grip block 8 simultaneously, make it is remote away from hinge axes one end on grip block 8, until transfer car(buggy) compartment and dustbin go out Mouth docking, then unclamps grip block 8, and grip block 8 is close to each other in the presence of torsion spring 9, until the face relative to each other of grip block 8 Contacted with the side wall in transfer car(buggy) compartment and the side wall of dustbin.
Further, it is provided with elastic caoutchouc to one end away from hinge axes on opposite each other in the grip block 8 Layer.
In the presence of torsion spring 6, grip block 5 is clamped in corresponding side wall, in order to avoid this side wall is because of the folder of grip block 5 The excessive generation indenture of clamp force, therefore elastic rubber layer is set, with the surface quality of protective side wall, moreover it is possible to avoid the lacquer painting quilt of side wall Scratch.
Further, the support member 2 is steel plate, and support member 2 is parallel with limit flitch 4.
Further, several atmospheric pressure poles 10, the axle of the atmospheric pressure pole 10 are provided between support member 2 and limit flitch 4 Line is each parallel to the flexible track of telescoping mechanism 3, and one end of atmospheric pressure pole 10 is connected with support member 2, the other end of atmospheric pressure pole 10 It is connected with limit flitch 4.The setting of atmospheric pressure pole 10 adds the stationarity that limit flitch 4 moves, protection limit flitch 4 and telescoping mechanism 3 Between connecting portion.
Further, the telescoping mechanism 3 can use pneumatic cylinder, hydraulic cylinder, connection linkage.In the present invention, stretch Mechanism 3 is preferably hydraulic cylinder, and its cylinder bottom is connected with support member 2, and its piston-rod end is connected with limit flitch 4.
Above-described embodiment, the purpose of the present invention, technical scheme and beneficial effect are carried out further Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc., all should include Within protection scope of the present invention.

Claims (7)

1. the method omitted when preventing the rubbish on construction ground from shifting, it is characterised in that:Comprise the following steps:
Step A is docked:By the dustbin (12) equipped with compressed garbage from raked floor, restart transfer car(buggy), make transfer car(buggy) compartment (11) the delivery end docking of afterbody and dustbin (12);
Step B connections:Scroll wheel (1), so that support member (2) is moved under dustbin (12) and compartment (11) interface Side, start telescoping mechanism (3), make telescoping mechanism (3) overhanging length of side, until limit flitch (4) upper surface both ends respectively with rubbish The bottom of case (12) and the bottom of compartment (11) contact, the one end in rotating cylinder and rubbish chamber interior wall closely face are circumscribed;
Step C is shifted:By executing garbage from dustbin (12) push-in compartment (11) of compressed garbage;
Step D is cleared up:The upper surface for limiting flitch (4) is cleaned out.
2. the method that the rubbish according to claim 1 for preventing construction ground is omitted when shifting, it is characterised in that:It is described Roller (1), support member (2), telescoping mechanism (3) and limit flitch (4) are sequentially connected, and the limit flitch (4) is parallel to horizontal plane, institute The flexible track of telescoping mechanism (3) is stated perpendicular to limit flitch (4), and drives limit flitch (4) close to or away from support member (2), Telescoping mechanism (3) is fixed on the top of roller (1) by support member (2);
One end away from telescoping mechanism (3) is provided with fixing axle (5) and is set in fixing axle (5) on limit flitch (4) Rotating cylinder (6), contiguous block (7) being provided with the both ends of fixing axle (5), the contiguous block (7) is respectively positioned on limit flitch (4) connection, The rotating cylinder (6) can rotate around the axis of fixing axle (5).
3. the method that the rubbish according to claim 2 for preventing construction ground is omitted when shifting, it is characterised in that:Institute State the upper surface of limit flitch (4) both ends it is be hinged be provided with grip block (8), the be hinged diameter parallel is in roller (1) Axis, torsion spring (9), the torsion spring (9) are provided between opposite and the upper surface of limit flitch (4) each other in grip block (8) Axis each parallel to be hinged axis, and the linking arm of torsion spring (9) one end is connected with grip block (8), torsion spring (9) other end Linking arm be connected with limit flitch (4), and when torsion spring (9) is in ortho states, the distance of remote hinge axes one end is small on grip block (8) Distance in grip block (8) close to hinge axes one end.
4. the method that the rubbish according to claim 3 for preventing construction ground is omitted when shifting, it is characterised in that:Institute State grip block (8) and be provided with elastic rubber layer to one end away from hinge axes on opposite each other.
5. the method that the rubbish according to claim 2 for preventing construction ground is omitted when shifting, it is characterised in that:It is described Support member (2) is steel plate, and support member (2) is parallel with limit flitch (4).
6. the method that the rubbish according to claim 5 for preventing construction ground is omitted when shifting, it is characterised in that:Propping up Several atmospheric pressure poles (10) are provided between support member (2) and limit flitch (4), the axis of the atmospheric pressure pole (10) is each parallel to flexible The flexible track of mechanism (3), and one end of atmospheric pressure pole (10) is connected with support member (2), the other end and the limit of atmospheric pressure pole (10) are expected Plate (4) connects.
7. the method that the rubbish according to claim 6 for preventing construction ground is omitted when shifting, it is characterised in that:It is described Telescoping mechanism (3) is hydraulic cylinder, and its cylinder bottom is connected with support member (2), and its piston-rod end is connected with limit flitch (4).
CN201710916463.6A 2017-09-30 2017-09-30 The method omitted when preventing the rubbish on construction ground from shifting Withdrawn CN107539689A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710916463.6A CN107539689A (en) 2017-09-30 2017-09-30 The method omitted when preventing the rubbish on construction ground from shifting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710916463.6A CN107539689A (en) 2017-09-30 2017-09-30 The method omitted when preventing the rubbish on construction ground from shifting

Publications (1)

Publication Number Publication Date
CN107539689A true CN107539689A (en) 2018-01-05

Family

ID=60965051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710916463.6A Withdrawn CN107539689A (en) 2017-09-30 2017-09-30 The method omitted when preventing the rubbish on construction ground from shifting

Country Status (1)

Country Link
CN (1) CN107539689A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111605934A (en) * 2020-06-09 2020-09-01 马鞍山市安顺劳务有限公司 Method for improving garbage transfer efficiency of building construction site
CN111702515A (en) * 2020-05-16 2020-09-25 范宪鸽 Fastening device is used in processing of abnormal shape aluminum alloy accessory

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111702515A (en) * 2020-05-16 2020-09-25 范宪鸽 Fastening device is used in processing of abnormal shape aluminum alloy accessory
CN111605934A (en) * 2020-06-09 2020-09-01 马鞍山市安顺劳务有限公司 Method for improving garbage transfer efficiency of building construction site

Similar Documents

Publication Publication Date Title
CN201694590U (en) Tipping bucket feeding and pre-pressing type refuse storage transfer device
CN107539689A (en) The method omitted when preventing the rubbish on construction ground from shifting
CN2897904Y (en) Refuse compressor with forward-loading and backward-tipping
CN110451141B (en) Garbage moving device in buried type bin, negative-pressure type garbage collecting and transporting system and method
CN203439607U (en) Folding belt conveyor
CN107572166A (en) The bindiny mechanism omitted during rubbish entrucking with preventing construction
CN107572169A (en) With the improving construction method of rubbish transfer efficiency
CN107572168A (en) Use support component to construction
CN102424225B (en) Garbage compressor
CN201424263Y (en) Multi-station migration intelligent garbage briquetting device
CN205475022U (en) Subway tunnel rubbish cleaning device
CN204110714U (en) Rubbish moves transhipment station
CN206088028U (en) Indoor perpendicular compression station
CN205467497U (en) Fixed platform formula removes perpendicular rubbish compression station
CN204872377U (en) Prevent sealed garbage truck that rubbish dropped
CN206230917U (en) A kind of buried horizontal compression station
CN205114234U (en) Perpendicular compression rubbish transfer equipment
CN201415835Y (en) Pressure relief material discharge and storage device
CN207142032U (en) A kind of compression type garbage truck
CN214652206U (en) Dust collecting device of packaging car loader
CN210259806U (en) Multifunctional garbage truck
CN202729068U (en) Environment-friendly trash compressing transfer machine
CN213415114U (en) Garbage transferring system
CN202706179U (en) A multifunctional sewage suction vehicle
CN211716569U (en) Garbage feeding device of garbage incinerator by pyrolysis gasification process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180105

WW01 Invention patent application withdrawn after publication