CN107473090A - A kind of overhead traveling crane - Google Patents
A kind of overhead traveling crane Download PDFInfo
- Publication number
- CN107473090A CN107473090A CN201710772692.5A CN201710772692A CN107473090A CN 107473090 A CN107473090 A CN 107473090A CN 201710772692 A CN201710772692 A CN 201710772692A CN 107473090 A CN107473090 A CN 107473090A
- Authority
- CN
- China
- Prior art keywords
- suspension hook
- overhead traveling
- traveling crane
- connecting bar
- swing connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C11/00—Trolleys or crabs, e.g. operating above runways
- B66C11/02—Trolleys or crabs, e.g. operating above runways with operating gear or operator's cabin suspended, or laterally offset, from runway or track
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
- B66C1/34—Crane hooks
Abstract
The invention discloses a kind of overhead traveling crane, including overhead traveling crane body, the lifting component on overhead traveling crane body that can be moved in the horizontal direction, lifting by crane component includes being used to sling the first suspension hook of the positive plate at electrolytic cell both ends, the second suspension hook for slinging the positive plate among electrolytic cell, the swing connecting bar moved with vertical direction in the horizontal direction for the first suspension hook of drive and the second suspension hook, the motor for driving swing connecting bar to move with vertical direction in the horizontal direction, and the first suspension hook is removably connected in swing connecting bar.The overhead traveling crane of the present invention, by the way that the first suspension hook is removably attachable in swing connecting bar, when needing to sling the positive plate at both ends, the first suspension hook is connected in swing connecting bar, the first suspension hook and the second suspension hook are synchronized with the movement together;When the positive plate at both ends need not be sling, the first suspension hook and swing connecting bar are separated, the motion of only the second suspension hook.Simple in construction, easy to operate, cost is relatively low.
Description
Technical field
The present invention relates to a kind of overhead traveling crane.
Background technology
In cupric electrolysis production, in each electrolytic cell, positive plate and minus plate are all to be spaced arrangement, and each electrolysis
Groove both ends are all positive plates, and the service life of both ends positive plate is twice of grading electrode plate.When producing copper, sun is lifted by crane
Pole anode scrap, but the lifting cycle of the positive plate at electrolytic cell both ends with middle different, this require both ends suspension hook and in
Between suspension hook to be separately controlled.Original design is driven using motor, and the suspension hook at both ends is driven using single motor, lifted by crane
When, overhead traveling crane operative employee will operate two steps, could all sling anode anode scrap.In operation, sometimes because of the motor anglec of rotation
Degree is inadequate, causes suspension hook not rest on and correctly hooks up position, causes grab, hits hook phenomenon, influence to produce;Meanwhile because using
Environment has certain corrosivity, and anode ear thickness etc. influences, and electrical fault rate is high, fragile, and motor is import electricity
Machine, difficulty is reprocessed, it is costly.
The content of the invention
It is an object of the invention to provide a kind of overhead traveling crane, the suspension hook at the overhead traveling crane both ends is not required to separate electrical motor control, simple in construction,
Easy to operate, cost is low.
To reach above-mentioned purpose, the technical solution adopted by the present invention is:
A kind of overhead traveling crane, the anode plate and cathode plate in electrolytic cell, the positive plate and described the moon are lifted by crane in being produced for cupric electrolysis
The positive plate is arranged at polar plate interval arranged, the cell body both ends of each electrolytic cell, and the overhead traveling crane includes can be along water
The lifting for being used to lift by crane the positive plate and the minus plate square to mobile overhead traveling crane body, on the overhead traveling crane body
Component, the lifting component include the first suspension hook of the positive plate for slinging the electrolytic cell both ends, for slinging
Second suspension hook of the positive plate among the electrolytic cell, for driving second suspension hook in the horizontal direction and vertical direction
The swing connecting bar of motion, the motor for driving the swing connecting bar to be moved in the horizontal direction with vertical direction;
First suspension hook is removably connected in the swing connecting bar, when first suspension hook is connected with the swing connecting bar
When, the swing connecting bar drives first suspension hook to be synchronized with the movement with second suspension hook;When first suspension hook and the pendulum
During dynamic connecting rod separation, the swing connecting bar only drives second suspension hook to move.
Preferably, first suspension hook, which is provided with, is used for the connecting portion that is connected with the swing connecting bar, on the connecting portion
Provided with the first connecting hole, the swing connecting bar is provided with the second connecting hole, and first connecting hole and second connecting hole lead to
Connection component is crossed to be connected.
It is further preferred that the connection component is latch.
Preferably, first suspension hook has four, is respectively arranged on four ends of the overhead traveling crane body.
Preferably, second suspension hook has multiple, and multiple second suspension hooks are located between first suspension hook, and described the
One suspension hook and second suspension hook are spaced setting.
Due to the utilization of above-mentioned technical proposal, the present invention has following advantages compared with prior art:The overhead traveling crane of the present invention,
By the way that the first suspension hook is removably attachable in swing connecting bar, when needing to sling the positive plate at both ends, the first suspension hook is connected
It is connected in swing connecting bar, the first suspension hook and the second suspension hook are synchronized with the movement together;When the positive plate at both ends need not be sling, by
One suspension hook and swing connecting bar separate, the motion of only the second suspension hook.Simple in construction, easy to operate, cost is relatively low.
Brief description of the drawings
Accompanying drawing 1 is the structural representation of the present invention.
Wherein:1st, overhead traveling crane body;2nd, the first suspension hook;3rd, the second suspension hook;4th, swing connecting bar;5th, motor;6th, connecting portion;
7th, the first connecting hole;8th, the second connecting hole;9th, connection component.
Embodiment
The technical solution of the present invention will be further described below with reference to the accompanying drawings.
It is shown in Figure 1, a kind of overhead traveling crane, the anode plate and cathode plate in electrolytic cell, sun are lifted by crane in being produced for cupric electrolysis
Pole plate and minus plate are spaced arrangement, and the equal arrangement of anode plate in cell body both ends of each electrolytic cell, overhead traveling crane includes can be along level side
The lifting component for being used to lift by crane anode plate and cathode plate to mobile overhead traveling crane body 1, on overhead traveling crane body 1, lifts by crane component
The first suspension hook 2 including the positive plate for slinging electrolytic cell both ends, for sling the positive plate among electrolytic cell second
Suspension hook 3, for drive the second suspension hook 3 in the horizontal direction with vertical direction motion swing connecting bar 4, for driving swing connecting bar 4
The motor 5 moved in the horizontal direction with vertical direction;
First suspension hook 2 is removably connected in swing connecting bar 4, when the first suspension hook 2 is connected with swing connecting bar 4, swing connecting bar 4
The first suspension hook 2 is driven to be synchronized with the movement with the second suspension hook 3;When the first suspension hook 2 separates with swing connecting bar 4, swing connecting bar 4 only drives
Second suspension hook 3 moves.
First suspension hook 2 is provided with the connecting portion 6 for being used for being connected with swing connecting bar 4, and connecting portion 6 is provided with the first connecting hole 7,
Swing connecting bar 4 is provided with the second connecting hole 8, and the first connecting hole 7 is connected with the second connecting hole 8 by connection component 9.
In the present embodiment, connection component 9 is latch.When cupric electrolysis produces, when both ends positive plate cycle and centre sun
The pole plate cycle unanimously needs to lift by crane the positive plate at both ends and middle positive plate simultaneously when, by the first connecting hole 7 and the second connection
Hole 8 is linked together by latch, realizes synchronous interaction;When both ends positive plate cycle and inconsistent need of grading electrode plate cycle
When lifting by crane middle positive plate, latch need to only be extracted, now the first suspension hook 2 just separates with swing connecting bar 4, swing connecting bar 4
The second suspension hook 3 among driving moves.
In the present embodiment, the first suspension hook 2 has four, is respectively arranged on four ends of overhead traveling crane body 1.According to production practices
Situation, the anode anode scrap at any end is lifted by crane, is just connected the connecting portion 6 at this end with swing connecting bar 4 with latch, realized synchronous.
Second suspension hook 3 have it is multiple, multiple second suspension hooks 3 be located at the first suspension hook 2 between, the first suspension hook 2 and the second suspension hook 3 are spaced and set
Put.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow person skilled in the art
Scholar can understand present disclosure and be carried out, and it is not intended to limit the scope of the present invention, all according to the present invention
The equivalent change or modification that Spirit Essence is made, it should all cover within the scope of the present invention.
Claims (5)
1. a kind of overhead traveling crane, the anode plate and cathode plate in electrolytic cell are lifted by crane in being produced for cupric electrolysis, the positive plate and described
Minus plate is spaced arrangement, and the positive plate is arranged at the cell body both ends of each electrolytic cell, and the overhead traveling crane includes can edge
The overhead traveling crane body of horizontal direction movement(1), located at the overhead traveling crane body(1)On be used for lift by crane the positive plate and the negative electrode
The lifting component of plate, it is characterised in that:The lifting component includes being used for the positive plate for slinging the electrolytic cell both ends
The first suspension hook(2), the second suspension hook for slinging the positive plate among the electrolytic cell(3), for driving described
Two suspension hooks(3)The swing connecting bar moved in the horizontal direction with vertical direction(4), for driving the swing connecting bar(4)Along level
Direction and the motor of vertical direction motion(5);
First suspension hook(2)Removably it is connected to the swing connecting bar(4)On, when first suspension hook(2)With the pendulum
Dynamic connecting rod(4)During connection, the swing connecting bar(4)Drive first suspension hook(2)With second suspension hook(3)It is synchronized with the movement;
When first suspension hook(2)With the swing connecting bar(4)During separation, the swing connecting bar(4)Only drive second suspension hook(3)
Motion.
A kind of 2. overhead traveling crane according to claim 1, it is characterised in that:First suspension hook(2)Be provided be used for it is described
Swing connecting bar(4)The connecting portion of connection(6), the connecting portion(6)It is provided with the first connecting hole(7), the swing connecting bar(4)On
Provided with the second connecting hole(8), first connecting hole(7)With second connecting hole(8)Pass through connection component(9)It is connected.
A kind of 3. overhead traveling crane according to claim 2, it is characterised in that:The connection component(9)For latch.
A kind of 4. overhead traveling crane according to claim 1, it is characterised in that:First suspension hook(2)There are four, be respectively arranged on institute
State overhead traveling crane body(1)Four ends.
A kind of 5. overhead traveling crane according to claim 1, it is characterised in that:Second suspension hook(3)Have it is multiple, multiple described
Two suspension hooks(3)Located at first suspension hook(2)Between, first suspension hook(2)With second suspension hook(3)It is spaced and sets
Put.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710772692.5A CN107473090B (en) | 2017-08-31 | 2017-08-31 | A kind of overhead traveling crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710772692.5A CN107473090B (en) | 2017-08-31 | 2017-08-31 | A kind of overhead traveling crane |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107473090A true CN107473090A (en) | 2017-12-15 |
CN107473090B CN107473090B (en) | 2019-09-20 |
Family
ID=60604271
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710772692.5A Active CN107473090B (en) | 2017-08-31 | 2017-08-31 | A kind of overhead traveling crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107473090B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881199A (en) * | 2019-04-10 | 2019-06-14 | 深圳市铿东科技有限公司 | A kind of regenerating alkaline etching liquid and its copper recovery system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006027043A1 (en) * | 2006-06-08 | 2007-12-20 | Sgl Carbon Ag | Installation assembly for electrodes, used in electric steel production, has a threaded sleeve with sufficient movement through the cover plate to bond the electrode and nipple together with a safety lock |
CN204038857U (en) * | 2014-08-07 | 2014-12-24 | 长春轨道客车股份有限公司 | Low-floor light rail vehicle body Universal hanger |
CN107089588A (en) * | 2017-06-15 | 2017-08-25 | 中国有色(沈阳)冶金机械有限公司 | A kind of special hanger structure of cupric electrolysis overhead traveling crane |
CN207078923U (en) * | 2017-08-31 | 2018-03-09 | 张家港联合铜业有限公司 | A kind of overhead traveling crane |
-
2017
- 2017-08-31 CN CN201710772692.5A patent/CN107473090B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006027043A1 (en) * | 2006-06-08 | 2007-12-20 | Sgl Carbon Ag | Installation assembly for electrodes, used in electric steel production, has a threaded sleeve with sufficient movement through the cover plate to bond the electrode and nipple together with a safety lock |
CN204038857U (en) * | 2014-08-07 | 2014-12-24 | 长春轨道客车股份有限公司 | Low-floor light rail vehicle body Universal hanger |
CN107089588A (en) * | 2017-06-15 | 2017-08-25 | 中国有色(沈阳)冶金机械有限公司 | A kind of special hanger structure of cupric electrolysis overhead traveling crane |
CN207078923U (en) * | 2017-08-31 | 2018-03-09 | 张家港联合铜业有限公司 | A kind of overhead traveling crane |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881199A (en) * | 2019-04-10 | 2019-06-14 | 深圳市铿东科技有限公司 | A kind of regenerating alkaline etching liquid and its copper recovery system |
Also Published As
Publication number | Publication date |
---|---|
CN107473090B (en) | 2019-09-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204355909U (en) | A kind of energy-conserving elevator | |
CN201670648U (en) | Template suspension appliance | |
CN207078923U (en) | A kind of overhead traveling crane | |
CN201206174Y (en) | Insulation rotary electrolysis cathode/anode spreader | |
CN201809473U (en) | Movable substrate clamping mechanism for electroplating of substrates | |
CN107473090A (en) | A kind of overhead traveling crane | |
CN2801740Y (en) | Electrolytic copper crane sling | |
CN202607136U (en) | Tooling structure for processing T-section bar | |
CN201169492Y (en) | Anode clamp for electrolyzing multifunctional crane | |
CN105506677A (en) | Stripping device used for stripping electrolytic deposition zinc skin on negative plate | |
CN106744272B (en) | A kind of Multifunctional electrolysis copper suspender | |
CN204517119U (en) | A kind of automatic assembling of attaching plug | |
CN203593524U (en) | Traveling crane hanger for metal manganese anode plate discharging | |
CN102491163A (en) | Process for assembling engine room cover of wind driven generator and special hanging beam | |
CN202924577U (en) | Special hanger frame for small lid of electric furnace | |
CN202337633U (en) | Lifting appliance for furnace door | |
CN205688042U (en) | A kind of device removing solid-fish squamous negative electrode electrodeposition thing | |
CN216551585U (en) | Portable bridge link plate installation device | |
CN205346670U (en) | Driving of cathode bar lateral shifting single armed line | |
CN216549232U (en) | Prefabricated component lifting appliance for prefabricated building | |
CN213925055U (en) | Damping glider for mounting cathode carbon block during overhaul of electrolytic cell | |
CN212550010U (en) | Device capable of automatically separating spring gasket | |
CN204415031U (en) | A kind of device of translation electrolytic bath | |
CN203741440U (en) | Spongy copper peeling device | |
CN219314402U (en) | Electrolytic tank polar plate overturning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |