CN107448042A - Without top cover steel feed bin top frame platform formwork, release method - Google Patents
Without top cover steel feed bin top frame platform formwork, release method Download PDFInfo
- Publication number
- CN107448042A CN107448042A CN201610366750.XA CN201610366750A CN107448042A CN 107448042 A CN107448042 A CN 107448042A CN 201610366750 A CN201610366750 A CN 201610366750A CN 107448042 A CN107448042 A CN 107448042A
- Authority
- CN
- China
- Prior art keywords
- feed bin
- steel feed
- channel
- top cover
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H7/00—Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
- E04H7/22—Containers for fluent solids, e.g. silos, bunkers; Supports therefor
- E04H7/24—Constructions, with or without perforated walls, depending on the use of specified materials
Abstract
One kind is without top cover steel feed bin top frame platform formwork, release method, installation sets temporary support without top cover steel feed bin, the scaffold formwork bracing system needed as concrete structure construction, and set up upper brace framework scaffold formwork bracing system in rear temporary support in place in steel feed bin, it is characterised in that comprise the following steps:A, it is used as backing material using some channel-section steels by calculating, some channel-section steel parallel intervals are welded in steel feed bin top, temporary support is set up on the support that some channel-section steels are barricaded as, b, it is welded before being temporarily supported above the Φ 8200mm direct tube sections lifting of steel feed bin top in the ground assembling stage, c, the demoulding without top cover steel feed bin top frame platform, the demoulding is completed.The present invention has that supporting apparatus is simple in construction, sets up conveniently, and scaffold formwork bracing system quality safety is reliable, framework platform formwork, is convenient in demoulding, the advantages of reducing engineering cost and fulfil the whole construction period ahead of schedule.
Description
Technical field
It is one kind without top cover steel feed bin top frame platform formwork, release method specifically the present invention relates to a kind of concrete frame and platform formwork, release method.
Background technology
More main proportioning room steel feed bin divides storehouse of returning mine, mixes ore storage bin, fuel ore storage bin, serpentine ore storage bin, 5 kinds of lime stone ore storage bin in South Platform modeling quiet steel works sintering first stage of the project in river, and totally 36, steel feed bin is by circular cylinder body, annular base, bearing, cone and top cover(Blending ore steel feed bin is without top cover)Composition.Bearing is arranged on+16.3m concrete platforms, and annular base is installed on bearing, and lower half and centrum portion are hung on below 16.3m concretes platform, flange in the bottom absolute altitude 3.5m.Feed bin top barrel diameter 8.2m, top cover absolute altitude+21.0m, feed bin top is+21.8m concrete platforms.Feed bin minimum weight 90t, maximum 130t, common about 3725t.
Steel feed bin is arranged in concrete frame structure in platform modeling quiet steel works sintering first stage of the project in river, and integral layout is compact, and steel feed bin physical dimension is big, steel feed bin top cover and top concrete platform only 100mm gaps.Proportioning room, which shares 20, has top cover feed bin and 16 without top cover feed bin.If constructed with conventionally following the prescribed order, top concrete frame and platform formwork difficulty, the situation for being stripped can not carry out afterwards of having constructed will result directly in.
Therefore it is known without top cover steel feed bin top frame platform formwork, the demoulding there are problems that above-mentioned a variety of inconvenience and.
The content of the invention
The purpose of the present invention, be to propose a kind of safe and reliable temporary support without top cover steel feed bin top frame platform formwork, release method.
To achieve the above object, technical solution of the invention is:
One kind is without top cover steel feed bin top frame platform formwork, release method, installation sets temporary support without top cover steel feed bin, the scaffold formwork bracing system needed as concrete structure construction, and set up upper brace framework scaffold formwork bracing system in rear temporary support in place in steel feed bin, it is characterised in that comprise the following steps:
A, it is used as backing material using some channel-section steels by calculating, some channel-section steel parallel intervals are welded in steel feed bin top, and temporary support is set up on the support that some channel-section steels are barricaded as, and temporary support is the scaffold formwork bracing system that concrete structure construction needs;The particular location of temporary support is at the downward 300mm of middle butt weld, and from 1700mm at the top of steel feed bin, apart from top, concrete platform beam space reaches 1100mm, it is sufficient to meets formwork and stripping operation;
B, it is welded before being temporarily supported above the Φ 8200mm direct tube sections lifting of steel feed bin top in the ground assembling stage;
C, the demoulding without top cover steel feed bin top frame platform
After the completion of+21.8m absolute altitudes concrete frame at the top of top cover steel feed bin and platform construction maintenance, it is stripped from the sealing-tape machine blanking hole of feed bin top+21.8m absolute altitude platforms into scaffold formwork bracing system, and cuts off interim channel steel support, completes the demoulding.
The present invention's can also be further achieved by the following technical measures without top cover steel feed bin top frame platform formwork, release method.
Foregoing method, wherein the channel-section steel specification is 20a channel-section steels.
Foregoing method, wherein at intervals of≤1500mm between the channel-section steel.
Foregoing method, wherein the channel-section steel surface to the height of soffit is 1700mm.
After adopting the above technical scheme, the present invention's has advantages below without top cover steel feed bin top frame platform formwork, release method:
1st, supporting apparatus is simple in construction, sets up conveniently;
2nd, scaffold formwork bracing system quality safety is reliable, framework platform formwork, is convenient in demoulding;
3rd, engineering cost is reduced, the whole construction period is fulfiled ahead of schedule on the premise of safety, quality is ensured.
Brief description of the drawings
Fig. 1 is the embodiment of the present invention without top cover steel feed bin formwork temporary support structure schematic diagram;
Fig. 2 is the A-A sectional views in Fig. 1.
In figure:1 steel feed bin, 2 channel-section steels, 3 apertures, 4 sealing-tape machine blanking holes, 5 cat ladders, 6 scaffold support systems, 7 concrete girders, 8 floors, 9 templates.
Embodiment
With reference to embodiments and its accompanying drawing illustrates further to the present invention.
Embodiment 1
The present invention without top cover steel feed bin top frame platform formwork, release method, installation sets temporary support without top cover steel feed bin, the scaffold formwork bracing system needed as concrete structure construction, and upper brace framework scaffold formwork bracing system is set up in rear temporary support in place in steel feed bin, comprise the following steps:
1. without top cover steel feed bin top frame platform formwork measure
Mix ore bunkers and belong to no top cover steel feed bin due to 16, after Φ 8200mm direct tube sections lifting in steel feed bin top is in place ,+21.8m absolute altitudes the concrete frame and during platform at the top of construction steel feed bin, platform template scaffold tube will be without support impetus.
Referring now to Fig. 1 and Fig. 2, Fig. 1 is the A-A sectional views in Fig. 1 without steel lid feed bin formwork temporary support structure schematic diagram, Fig. 2 is pushed up for the embodiment of the present invention.
Scaffold formwork bracing system is set up in order to facilitate the construction of top concrete frame structure, when installation is without top cover steel feed bin 1, can not only be merely to prevent lifting from deforming and carrying out temporary support, also it need to ensure there is the scaffold formwork bracing system facility needed for concrete structure construction while preventing feed bin from deforming.The present invention's is taken after steel feed bin is in place without top cover steel feed bin top frame platform formwork, release method, and upper brace framework scaffold formwork bracing system is set up in temporary support.
5 specifications are used as [20a channel-section steels 2 are used as backing material by calculating, at intervals of 1500mm between channel-section steel, channel-section steel is welded in the top of steel feed bin 1, and temporary support is set up on the support that 5 channel-section steels are barricaded as, and temporary support is the scaffold formwork bracing system that concrete structure construction needs.Temporary support particular location, prevent feed bin from deforming and welding operability when being assembled with reference to feed bin, be arranged at middle butt weld downwards about at 300mm, from about 1700mm at the top of steel feed bin, apart from top, concrete platform beam space reaches 1100mm, it is sufficient to meets formwork and stripping operation.The height of the surface of channel-section steel 2 to the bottom surface of floor 8 is 1700mm.
The ground assembling stage before being temporarily supported above the Φ 8200mm direct tube sections lifting of steel feed bin top is welded.
2. it is stripped measure without top cover feed bin top frame platform
It after the completion of+21.8m concrete frames at the top of top cover feed bin and platform construction maintenance, can be stripped from the sealing-tape machine blanking hole of+21.8m absolute altitude platforms at the top of feed bin into scaffold formwork bracing system, and cut off interim channel steel support, complete the demoulding.
The present invention has substantive distinguishing features and significant technological progress, being solved without top cover steel feed bin top frame platform formwork, release method using temporary support measure for the present invention directly results in top concrete frame and platform formwork difficulty, the problem for being stripped can not carry out afterwards of having constructed, the present invention's has that supporting apparatus is simple in construction, sets up conveniently without top cover steel feed bin top frame platform formwork, release method, and scaffold formwork bracing system quality safety is reliable, framework platform formwork, is convenient in demoulding.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes should also belong to scope of the invention, should be limited by each claim.
Claims (4)
1. one kind is without top cover steel feed bin top frame platform formwork, release method, installation sets temporary support without top cover steel feed bin, the scaffold formwork bracing system needed as concrete structure construction, and set up upper brace framework scaffold formwork bracing system in rear temporary support in place in steel feed bin, it is characterised in that comprise the following steps:
A, it is used as backing material using some channel-section steels by calculating, some channel-section steel parallel intervals are welded in steel feed bin top, and temporary support is set up on the support that some channel-section steels are barricaded as, and temporary support is the scaffold formwork bracing system that concrete structure construction needs;The particular location of temporary support is at the downward 300mm of middle butt weld, and from 1700mm at the top of steel feed bin, apart from top, concrete platform beam space reaches 1100mm, it is sufficient to meets formwork and stripping operation;
B, it is welded before being temporarily supported above the Φ 8200mm direct tube sections lifting of steel feed bin top in the ground assembling stage;
C, the demoulding without top cover steel feed bin top frame platform
After the completion of+21.8m absolute altitudes concrete frame at the top of top cover steel feed bin and platform construction maintenance, it is stripped from the sealing-tape machine blanking hole of steel feed bin top+21.8m absolute altitude platforms into scaffold formwork bracing system, and cuts off interim channel steel support, completes the demoulding.
2. as claimed in claim 1 without top cover steel feed bin top frame platform formwork, release method, it is characterised in that the channel-section steel specification is 20a channel-section steels.
3. as claimed in claim 1 without top cover steel feed bin top frame platform formwork, release method, it is characterised in that at intervals of≤1500mm between the channel-section steel.
4. as claimed in claim 1 without top cover steel feed bin top frame platform formwork, release method, it is characterised in that the height on the channel-section steel surface to soffit is 1700mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610366750.XA CN107448042A (en) | 2016-05-30 | 2016-05-30 | Without top cover steel feed bin top frame platform formwork, release method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610366750.XA CN107448042A (en) | 2016-05-30 | 2016-05-30 | Without top cover steel feed bin top frame platform formwork, release method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107448042A true CN107448042A (en) | 2017-12-08 |
Family
ID=60485359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610366750.XA Pending CN107448042A (en) | 2016-05-30 | 2016-05-30 | Without top cover steel feed bin top frame platform formwork, release method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107448042A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006076572A (en) * | 2004-09-07 | 2006-03-23 | Ogasawara Kogyosho:Kk | Internal reinforcement structure of top plate of cylindrical water tank or the like |
CN101586465A (en) * | 2009-06-24 | 2009-11-25 | 中煤建筑安装工程公司第六十九工程处 | A kind of construction method of large-diameter coal bunker flat-topping lid |
CN102454294A (en) * | 2010-10-18 | 2012-05-16 | 五冶集团上海有限公司 | Construction method of reinforced concrete and steel structure storage bin combined frame structure |
CN104912321A (en) * | 2015-04-02 | 2015-09-16 | 中国中材国际工程股份有限公司 | Steel truss formwork support structure for suspended structure and installing method of steel truss formwork support structure |
-
2016
- 2016-05-30 CN CN201610366750.XA patent/CN107448042A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006076572A (en) * | 2004-09-07 | 2006-03-23 | Ogasawara Kogyosho:Kk | Internal reinforcement structure of top plate of cylindrical water tank or the like |
CN101586465A (en) * | 2009-06-24 | 2009-11-25 | 中煤建筑安装工程公司第六十九工程处 | A kind of construction method of large-diameter coal bunker flat-topping lid |
CN102454294A (en) * | 2010-10-18 | 2012-05-16 | 五冶集团上海有限公司 | Construction method of reinforced concrete and steel structure storage bin combined frame structure |
CN104912321A (en) * | 2015-04-02 | 2015-09-16 | 中国中材国际工程股份有限公司 | Steel truss formwork support structure for suspended structure and installing method of steel truss formwork support structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108019076B (en) | Construction method of large-diameter reinforced concrete silo and device for conical shell construction | |
CN103790423B (en) | Large-sized concrete silo construction method | |
CN104018514A (en) | Inverted installation method of embedded foundation bolts of large tower-type equipment foundation | |
CN108868193B (en) | Construction method for reversely dismantling steel structure building | |
CN103882813B (en) | For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction | |
CN103306208A (en) | Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier | |
CN105239775B (en) | A kind of reinforcement installation penetration quality dynamic control method for silo slip form construction | |
CN107090975A (en) | A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation | |
CN103104091A (en) | Sliding mold whole lifting platform and construction method | |
CN101586465A (en) | A kind of construction method of large-diameter coal bunker flat-topping lid | |
CN104594655A (en) | Application method for dismantling temporary supports in brick-concrete structure wall | |
CN104153579A (en) | Pouring formwork structure for non-standard layer structure and construction method | |
CN105401580A (en) | Concrete pouring construction method for underground gallery | |
CN106032704A (en) | Construction method for using concrete columns to support structures on both sides of post-pouring strip | |
CN105781159B (en) | A kind of power plant main power house armored concrete coal hopper construction technology | |
CN105297957A (en) | Prefabricated filled wallboard and mounting method thereof | |
CN201915638U (en) | Hyperbolic steel funnel construction equipment | |
CN107587770A (en) | Disjunctor storehouse synchronization slding form operation method | |
CN210659200U (en) | High-rise building elevator shaft operation platform | |
CN107448042A (en) | Without top cover steel feed bin top frame platform formwork, release method | |
CN209523198U (en) | A kind of underpinning structure supporting lattice column | |
CN205296802U (en) | Well steel platform | |
CN204173804U (en) | A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure | |
CN111058619A (en) | Temporary support system for post-cast strip of reinforced concrete beam plate and application method | |
CN103950811B (en) | The people's Cargo Lift mounting structure and its installation method of complicated appearance building structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171208 |