CN107448022A - A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM - Google Patents
A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM Download PDFInfo
- Publication number
- CN107448022A CN107448022A CN201710755466.6A CN201710755466A CN107448022A CN 107448022 A CN107448022 A CN 107448022A CN 201710755466 A CN201710755466 A CN 201710755466A CN 107448022 A CN107448022 A CN 107448022A
- Authority
- CN
- China
- Prior art keywords
- concrete
- construction
- terrace
- numbered
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/10—Buildings forming part of cooling plants
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Abstract
The present invention relates to a kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM, the terrace constructed is divided into several casting area and is numbered;It is modeled using revit2015 design softwares;Then model is exported, imported in naviswork2015, assigned timing node to construction unit amount, make 4Dbim construction simulation animations;Mode is poured using subregion and carries out floor construction, first pours the region of odd-numbered, form removal when native strength grade reaches design strength more than 50% is coagulated when coagulation, then pours the region of even-numbered;Integral terrace structure is formed after the completion of all pouring.The present invention realizes the visualization and quantitative analysis of engineering construction using CAD, poured using subregion and avoid conventional the shortcomings that setting post-cast strip method, it can prevent concrete floor from producing crack, avoid Shi works Sew from influenceing heat preservation of refrigeration storage performance, and advantageously reduce additional process and shorten the duration.
Description
Technical field
The present invention relates to architecture construction technical field, more particularly to a kind of food for being modeled based on BIM, not setting post-cast strip
Freezer large area overlength method for constructing terrace.
Background technology
Food stuff refrigerated storage is the building for food product refrigeration and refrigeration, and it is the method by artificial cooling, makes Ku Neibao
Certain low temperature is held, therefore it is required that can guarantee that freezer has good heat-insulating property after construction.
Newly-laid concrete can shrink during scleroma, and built structure is heated to be expanded, and be cooled, shrink.Concrete
Scleroma is shunk most of by completion in first 1~2 month after construction, and effect of the temperature change to structure is then frequent.
When its deformation suffers restraints, temperature stress is just produced in inside configuration, will occur crack when serious in component, and crack
Generation be significant adverse to heat preservation of refrigeration storage.
Traditional prevents method caused by crack to set post-cast strip method.Post-cast strip is set in construction, is built in long
Build in thing, width is set every 30~40 meters as 700~1000 millimeters of seam, reinforcing bar is using overlap joint or straight-through plus curved way in seam.
After reserving post-cast strip, concrete can be with free shrink, so as to greatly reduce shrinkage stress in work progress.The tension of concrete
Intensity can largely be used for resisting temperature stress, improve the ability of structure resistance temperature change.
Although pouring post-cast strip concrete to preventing terrace cracking effective by design requirement, brought to construction many tired
It is difficult:It is that exterior sheathing and support can not remove in time first, causes template turnover slow;Next to that the raked joint of post-cast strip is more troublesome,
Increase extra process to construction, thus extend project progress.Also, for this special building of freezer, post-cast strip is set
It is unfavorable for ground insulating performance.
BIM (Building Information Modeling, abbreviation BIM) is with construction-engineering project
Based on every relevant information data, it is established that three-dimensional BUILDINGS MODELS, had by digital information analogue simulation building
Some real informations.It has information completeness, information relevance, consistency on messaging, visualization, harmony, simulation, optimization
Property and eight big feature of figure can be gone out.By the project participant such as construction unit, designing unit, unit in charge of construction, supervisor same
On platform, same building information model is shared.Beneficial to project visualization, become more meticulous construction.
The content of the invention
The invention provides a kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM, using computer aided manufacturing
Help design to realize the visualization and quantitative analysis of engineering construction, poured using subregion and avoid conventional the shortcomings that setting post-cast strip method, energy
Enough prevent concrete floor from producing crack, avoid Shi works Sew from influenceing heat preservation of refrigeration storage performance, and advantageously reduce additional process and contracting
Casual labourer's phase.
In order to achieve the above object, the present invention is realized using following technical scheme:
A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM, comprises the following steps:
First, model and determine arrangement and method for construction;
1) zoning;
According to construction demand, the terrace constructed is divided into several casting area and is numbered;
2) revit2015 design softwares are utilized, the terrace after template, subregion, reinforcing bar are modeled;Then it is model is defeated
Go out, import in naviswork2015, assign timing node to construction unit amount, 4Dbim construction simulation animations are made, by animation
Export into video format preservation;
3) mode is poured using subregion and carries out floor construction, first pour the region of odd-numbered, treat that coagulation coagulates native intensity etc.
Form removal when level reaches design strength more than 50%, then pour the region of even-numbered;Formed integrally after the completion of all pouring
Level ground structure;
2nd, work progress and requirement:
1) cleared up before construction;
It is before pouring that the debris in template, the oil removal on reinforcing bar is clean, and check the cement mortar bedding block of reinforcing bar, modeling
Whether backing strap block pads;Such as moisten template using that should be watered during plank sheathing, the cleaning mouth of post template is removing debris and product
It is re-closed after water;
2) concrete stirs;
A. various material usages are determined according to design mixture proportion, water content ratio of aggregate should often determine adjustment match ratio in time and use
Water;
B. loading sequence:Stone is first filled into mixer, cement is refilled, finally loads sand;When mixing additive, outside powdery
Agent is added to be previously charged into according to addition in inner wrapping, the used time adds simultaneously with thin coarse aggregate;Liquid additive presses usage amount and water
Load mixer stirring simultaneously;
C. mixing time:To make concrete stir, since whole mixs are fitted into mixing drum and play concrete
Untill discharging, the shortest time of concrete stirring is 90 seconds;
3) concrete transportation;
Must assure that concrete pump continuously works, and such as breaks down during pump concrete, idle hours more than 45 minutes or
There is segregation phenomenon in concrete, should be immediately with the concrete of residual in press water or other method flush pipe;
4) vibrate;
A. the drop height degree that freely inclines that concrete falls from discharging opening must not exceed 2 meters;
B. staged and layered is carried out continuously during casting concrete, and every layer pours height according to design feature, reinforcing bar density degree
Determine, generic hierarchical is highly 1.25 times of vibrator effect partial length, and maximum is no more than 50 centimetres;
C. pulled out slowly using fast insert during poker vibrator, slotting point is evenly distributed, and point-by-point mobile, order is carried out, and must not be lost
Leakage, accomplishes uniform jolt ramming;Mobile spacing is not more than 1.5 times of vibrating spear operating radius;Vibrate last layer when should insert lower floor
5cm, gap is connect with two interlayers of elimination;
D. casting concrete should be carried out continuously;, should be before front layer concrete initial set, by secondary layer concrete such as necessary interval
Pour and finish;
E. often observed during casting concrete template, reinforcing bar, reserving hole, built-in fitting and joint bar whether there is mobile, deformation or
Stopping state, pinpointing the problems should stop pouring immediately, and repair before the concrete coagulation poured intact;
5) conserve;
After concreting, covered and watered within 12h, concrete is kept for moisture state, curing period
No less than 7 round the clock.
Compared with prior art, the beneficial effects of the invention are as follows:
1) CAD is used, the visualization and quantitative analysis of engineering construction is realized, accomplishes the construction that becomes more meticulous;
2) subregion casting method is used, conventional the shortcomings that setting post-cast strip method construction is avoided, can prevent concrete floor from producing
Raw crack, avoids Shi works Sew from influenceing heat preservation of refrigeration storage performance;
3) technical process is simple and direct, advantageously reduces additional process and shortens the duration.
Brief description of the drawings
Fig. 1 is the terrace subregion schematic diagram of the present invention after BIM is modeled.
Fig. 2 is the floor construction figure of the present invention after BIM is modeled.
Embodiment
The embodiment of the present invention is described further below in conjunction with the accompanying drawings:
A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM of the present invention, comprises the following steps:
First, model and determine arrangement and method for construction;
1) zoning;
According to construction demand, the terrace constructed is divided into several casting area and is numbered;
2) revit2015 design softwares are utilized, the terrace after template, subregion, reinforcing bar are modeled;Then it is model is defeated
Go out (as shown in Figure 1), import in naviswork2015, assign timing node to construction unit amount, make 4Dbim construction simulations
Animation, animation output is preserved into video format;
3) as shown in Fig. 2 pouring mode using subregion carries out floor construction, the region of odd-numbered is first poured, treats coagulation
Form removal when native strength grade reaches design strength more than 50% is coagulated, then pours the region of even-numbered;After the completion of all pouring
Form integral terrace structure;
2nd, work progress and requirement:
1) cleared up before construction;
It is before pouring that the debris in template, the oil removal on reinforcing bar is clean, and check the cement mortar bedding block of reinforcing bar, modeling
Whether backing strap block pads;Such as moisten template using that should be watered during plank sheathing, the cleaning mouth of post template is removing debris and product
It is re-closed after water;
2) concrete stirs;
A. various material usages are determined according to design mixture proportion, water content ratio of aggregate should often determine adjustment match ratio in time and use
Water;
B. loading sequence:Stone is first filled into mixer, cement is refilled, finally loads sand;When mixing additive, outside powdery
Agent is added to be previously charged into according to addition in inner wrapping, the used time adds simultaneously with thin coarse aggregate;Liquid additive presses usage amount and water
Load mixer stirring simultaneously;
C. mixing time:To make concrete stir, since whole mixs are fitted into mixing drum and play concrete
Untill discharging, the shortest time of concrete stirring is 90 seconds;
3) concrete transportation;
Must assure that concrete pump continuously works, and such as breaks down during pump concrete, idle hours more than 45 minutes or
There is segregation phenomenon in concrete, should be immediately with the concrete of residual in press water or other method flush pipe;
4) vibrate;
A. the drop height degree that freely inclines that concrete falls from discharging opening must not exceed 2 meters;
B. staged and layered is carried out continuously during casting concrete, and every layer pours height according to design feature, reinforcing bar density degree
Determine, generic hierarchical is highly 1.25 times of vibrator effect partial length, and maximum is no more than 50 centimetres;
C. pulled out slowly using fast insert during poker vibrator, slotting point is evenly distributed, and point-by-point mobile, order is carried out, and must not be lost
Leakage, accomplishes uniform jolt ramming;Mobile spacing is not more than 1.5 times of vibrating spear operating radius;Vibrate last layer when should insert lower floor
5cm, gap is connect with two interlayers of elimination;
D. casting concrete should be carried out continuously;, should be before front layer concrete initial set, by secondary layer concrete such as necessary interval
Pour and finish;
E. often observed during casting concrete template, reinforcing bar, reserving hole, built-in fitting and joint bar whether there is mobile, deformation or
Stopping state, pinpointing the problems should stop pouring immediately, and repair before the concrete coagulation poured intact;
5) conserve;
After concreting, covered and watered within 12h, concrete is kept for moisture state, curing period
No less than 7 round the clock.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its
Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.
Claims (1)
1. a kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM, it is characterised in that comprise the following steps:
First, model and determine arrangement and method for construction;
1) zoning;
According to construction demand, the terrace constructed is divided into several casting area and is numbered;
2) revit2015 design softwares are utilized, the terrace after template, subregion, reinforcing bar are modeled;Then model is exported,
Import in naviswork2015, assign timing node to construction unit amount, make 4Dbim construction simulation animations, animation is exported
Preserved into video format;
3) mode is poured using subregion and carries out floor construction, first pour the region of odd-numbered, treat that coagulation coagulates native strength grade and reached
To form removal during design strength more than 50%, the region of even-numbered is then poured;Integral terrace knot is formed after the completion of all pouring
Structure;
2nd, work progress and requirement:
1) cleared up before construction;
It is before pouring that the debris in template, the oil removal on reinforcing bar is clean, and check the cement mortar bedding block of reinforcing bar, plastic mattress
Whether block pads;Such as moisten template using that should be watered during plank sheathing, the cleaning mouth of post template is after debris and ponding is removed
It is re-closed;
2) concrete stirs;
A. various material usages are determined according to design mixture proportion, water content ratio of aggregate should often determine adjustment match ratio water in time
Amount;
B. loading sequence:Stone is first filled into mixer, cement is refilled, finally loads sand;When mixing additive, powdered additive
It is previously charged into according to addition in inner wrapping, the used time adds simultaneously with thin coarse aggregate;Liquid additive presses usage amount and water simultaneously
Load mixer stirring;
C. mixing time:To make concrete stir, it is fitted into mixing drum discharging playing concrete since whole mixs
Untill, the shortest time of concrete stirring is 90 seconds;
3) concrete transportation;
It must assure that concrete pump continuously works, and such as breaks down during pump concrete, idle hours was more than 45 minutes or coagulation
There is segregation phenomenon in soil, should be immediately with the concrete of residual in press water or other method flush pipe;
4) vibrate;
A. the drop height degree that freely inclines that concrete falls from discharging opening must not exceed 2 meters;
B. staged and layered is carried out continuously during casting concrete, and every layer pours height and determined according to design feature, reinforcing bar density degree,
Generic hierarchical is highly 1.25 times of vibrator effect partial length, and maximum is no more than 50 centimetres;
C. pulled out slowly using fast insert during poker vibrator, slotting point is evenly distributed, and point-by-point mobile, order is carried out, and must not be omitted, be done
To uniform jolt ramming;Mobile spacing is not more than 1.5 times of vibrating spear operating radius;Vibrate last layer when should insert lower floor 5cm, to disappear
Gap is connect except two interlayers;
D. casting concrete should be carried out continuously;, should be before front layer concrete initial set, by sublevel concreting such as necessary interval
Finish;
E. often observe template, reinforcing bar, reserving hole, built-in fitting and joint bar whether there is mobile, deformation or blocked during casting concrete
Situation, pinpointing the problems should stop pouring immediately, and repair before the concrete coagulation poured intact;
5) conserve;
After concreting, covered and watered within 12h, concrete is kept moisture state, curing period is many
In 7 round the clock.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710755466.6A CN107448022A (en) | 2017-08-29 | 2017-08-29 | A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710755466.6A CN107448022A (en) | 2017-08-29 | 2017-08-29 | A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107448022A true CN107448022A (en) | 2017-12-08 |
Family
ID=60493331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710755466.6A Withdrawn CN107448022A (en) | 2017-08-29 | 2017-08-29 | A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107448022A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110488782A (en) * | 2019-08-26 | 2019-11-22 | 中电建路桥集团有限公司 | Cement concrete batching plant back court intelligent monitor system based on BIM platform |
CN112699452A (en) * | 2021-01-20 | 2021-04-23 | 南通四建集团有限公司 | Construction method for improving flatness of large-area terrace |
CN114411945A (en) * | 2021-12-31 | 2022-04-29 | 贵州建工集团第七建筑工程有限责任公司 | Bin jump construction method based on BIM technology |
CN115159919A (en) * | 2022-07-06 | 2022-10-11 | 山西省安装集团股份有限公司 | Fair-faced concrete and construction process thereof |
CN115217336A (en) * | 2022-08-04 | 2022-10-21 | 深圳市市政工程总公司 | Large-volume concrete pouring method |
CN115952589A (en) * | 2023-03-14 | 2023-04-11 | 中国建筑第二工程局有限公司 | Ring beam joint BIM auxiliary construction method capable of avoiding concrete pouring obstruction |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102691401A (en) * | 2012-06-15 | 2012-09-26 | 北京城建建设工程有限公司 | Construction method for large-area concrete weighbridge |
CN103046697A (en) * | 2013-01-23 | 2013-04-17 | 中国三冶集团有限公司第二建筑工程公司 | Construction method of 25-40-degree concrete pitched roofs |
CN103225406A (en) * | 2013-05-13 | 2013-07-31 | 中建五局第三建设有限公司 | Seamless construction method of multi-layer super large-area reinforced concrete ground |
CN103498555A (en) * | 2013-10-15 | 2014-01-08 | 中国建筑第二工程局有限公司 | Adjustable large-area floor steel channel formwork system and construction method thereof |
CN105064659A (en) * | 2015-07-07 | 2015-11-18 | 中国轻工建设工程有限公司 | High position stereo shelf warehouse super-flat terrace construction technology |
CN105587102A (en) * | 2016-03-01 | 2016-05-18 | 黑龙江泽林科技有限公司 | Construction method of wet-on-wet paving type high abrasion resistance terrace |
KR101721546B1 (en) * | 2016-05-26 | 2017-03-30 | 김대용 | Industry safety management system using rtls |
-
2017
- 2017-08-29 CN CN201710755466.6A patent/CN107448022A/en not_active Withdrawn
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102691401A (en) * | 2012-06-15 | 2012-09-26 | 北京城建建设工程有限公司 | Construction method for large-area concrete weighbridge |
CN103046697A (en) * | 2013-01-23 | 2013-04-17 | 中国三冶集团有限公司第二建筑工程公司 | Construction method of 25-40-degree concrete pitched roofs |
CN103225406A (en) * | 2013-05-13 | 2013-07-31 | 中建五局第三建设有限公司 | Seamless construction method of multi-layer super large-area reinforced concrete ground |
CN103498555A (en) * | 2013-10-15 | 2014-01-08 | 中国建筑第二工程局有限公司 | Adjustable large-area floor steel channel formwork system and construction method thereof |
CN105064659A (en) * | 2015-07-07 | 2015-11-18 | 中国轻工建设工程有限公司 | High position stereo shelf warehouse super-flat terrace construction technology |
CN105587102A (en) * | 2016-03-01 | 2016-05-18 | 黑龙江泽林科技有限公司 | Construction method of wet-on-wet paving type high abrasion resistance terrace |
KR101721546B1 (en) * | 2016-05-26 | 2017-03-30 | 김대용 | Industry safety management system using rtls |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110488782A (en) * | 2019-08-26 | 2019-11-22 | 中电建路桥集团有限公司 | Cement concrete batching plant back court intelligent monitor system based on BIM platform |
CN112699452A (en) * | 2021-01-20 | 2021-04-23 | 南通四建集团有限公司 | Construction method for improving flatness of large-area terrace |
CN114411945A (en) * | 2021-12-31 | 2022-04-29 | 贵州建工集团第七建筑工程有限责任公司 | Bin jump construction method based on BIM technology |
CN115159919A (en) * | 2022-07-06 | 2022-10-11 | 山西省安装集团股份有限公司 | Fair-faced concrete and construction process thereof |
CN115217336A (en) * | 2022-08-04 | 2022-10-21 | 深圳市市政工程总公司 | Large-volume concrete pouring method |
CN115217336B (en) * | 2022-08-04 | 2023-08-18 | 深圳市市政工程总公司 | Large-volume concrete pouring method |
CN115952589A (en) * | 2023-03-14 | 2023-04-11 | 中国建筑第二工程局有限公司 | Ring beam joint BIM auxiliary construction method capable of avoiding concrete pouring obstruction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107448022A (en) | A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM | |
CN103938864B (en) | Infilled wall Constructional Col-umn Construction engineering method | |
CN105839850B (en) | Precompressed construction method is poured into a mould after basement top-down method shaft | |
CN209482591U (en) | Prefabricated molds shell structure column construction structure | |
CN108297246A (en) | Prevent concrete block from generating fracture unit technique | |
CN104631677B (en) | Super thick concrete hollow terrace gradation construction technology | |
CN109306714A (en) | Jump the control distress in concrete construction method that storehouse method is combined with expansion reinforcing band | |
CN113668928B (en) | Method for controlling construction cracks of ultra-large-volume concrete water pool | |
CN102877486A (en) | Integral cast-in-situ construction method for cable ducts | |
CN102677898A (en) | Sequence construction method for large area reinforced concrete floors | |
CN104563282B (en) | Integral constructing method of house body structure and wall structure and house | |
CN104499498B (en) | A kind of construction method of mass concrete building | |
CN104652371A (en) | Overflow cemented rock-fill dam established based on old dam and construction method thereof | |
CN106316241A (en) | Self-compacting micro-expansion concrete and preparation method thereof | |
CN107558504A (en) | A kind of construction method for controlling concrete component cracking | |
CN107142902B (en) | High head and large flow tunneling boring damming method | |
CN106639321A (en) | Method and structure for controlling shrinkage cracks of ultra-long concrete structure | |
CN109133844A (en) | A kind of Rapid Patching Material for PCC Airfield and preparation process | |
US20120167516A1 (en) | method of forming protrusions on a masonry block | |
CN209243778U (en) | Expansion reinforcing band structure for the control distress in concrete construction in conjunction with jump storehouse method | |
CN108638322A (en) | Prefabricated post concreting method in a kind of assembled architecture | |
CN205894276U (en) | Prefabricated prefabricated concrete structure | |
CN104652280B (en) | Overlength, after water fish ridge wall one-time continuous moulding irrigation method and overlength fish ridge wall thereof | |
CN206457783U (en) | A kind of channel frost heaving resistant liner plate for including insulation material | |
CN114319875A (en) | Seamless construction process for super-large-area concrete ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20171208 |