CN107448022A - A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM - Google Patents

A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM Download PDF

Info

Publication number
CN107448022A
CN107448022A CN201710755466.6A CN201710755466A CN107448022A CN 107448022 A CN107448022 A CN 107448022A CN 201710755466 A CN201710755466 A CN 201710755466A CN 107448022 A CN107448022 A CN 107448022A
Authority
CN
China
Prior art keywords
concrete
construction
terrace
numbered
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710755466.6A
Other languages
Chinese (zh)
Inventor
李冬
李云鹏
吴晓红
郭丰玮
胡雪芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN201710755466.6A priority Critical patent/CN107448022A/en
Publication of CN107448022A publication Critical patent/CN107448022A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/10Buildings forming part of cooling plants
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Abstract

The present invention relates to a kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM, the terrace constructed is divided into several casting area and is numbered;It is modeled using revit2015 design softwares;Then model is exported, imported in naviswork2015, assigned timing node to construction unit amount, make 4Dbim construction simulation animations;Mode is poured using subregion and carries out floor construction, first pours the region of odd-numbered, form removal when native strength grade reaches design strength more than 50% is coagulated when coagulation, then pours the region of even-numbered;Integral terrace structure is formed after the completion of all pouring.The present invention realizes the visualization and quantitative analysis of engineering construction using CAD, poured using subregion and avoid conventional the shortcomings that setting post-cast strip method, it can prevent concrete floor from producing crack, avoid Shi works Sew from influenceing heat preservation of refrigeration storage performance, and advantageously reduce additional process and shorten the duration.

Description

A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM
Technical field
The present invention relates to architecture construction technical field, more particularly to a kind of food for being modeled based on BIM, not setting post-cast strip Freezer large area overlength method for constructing terrace.
Background technology
Food stuff refrigerated storage is the building for food product refrigeration and refrigeration, and it is the method by artificial cooling, makes Ku Neibao Certain low temperature is held, therefore it is required that can guarantee that freezer has good heat-insulating property after construction.
Newly-laid concrete can shrink during scleroma, and built structure is heated to be expanded, and be cooled, shrink.Concrete Scleroma is shunk most of by completion in first 1~2 month after construction, and effect of the temperature change to structure is then frequent. When its deformation suffers restraints, temperature stress is just produced in inside configuration, will occur crack when serious in component, and crack Generation be significant adverse to heat preservation of refrigeration storage.
Traditional prevents method caused by crack to set post-cast strip method.Post-cast strip is set in construction, is built in long Build in thing, width is set every 30~40 meters as 700~1000 millimeters of seam, reinforcing bar is using overlap joint or straight-through plus curved way in seam. After reserving post-cast strip, concrete can be with free shrink, so as to greatly reduce shrinkage stress in work progress.The tension of concrete Intensity can largely be used for resisting temperature stress, improve the ability of structure resistance temperature change.
Although pouring post-cast strip concrete to preventing terrace cracking effective by design requirement, brought to construction many tired It is difficult:It is that exterior sheathing and support can not remove in time first, causes template turnover slow;Next to that the raked joint of post-cast strip is more troublesome, Increase extra process to construction, thus extend project progress.Also, for this special building of freezer, post-cast strip is set It is unfavorable for ground insulating performance.
BIM (Building Information Modeling, abbreviation BIM) is with construction-engineering project Based on every relevant information data, it is established that three-dimensional BUILDINGS MODELS, had by digital information analogue simulation building Some real informations.It has information completeness, information relevance, consistency on messaging, visualization, harmony, simulation, optimization Property and eight big feature of figure can be gone out.By the project participant such as construction unit, designing unit, unit in charge of construction, supervisor same On platform, same building information model is shared.Beneficial to project visualization, become more meticulous construction.
The content of the invention
The invention provides a kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM, using computer aided manufacturing Help design to realize the visualization and quantitative analysis of engineering construction, poured using subregion and avoid conventional the shortcomings that setting post-cast strip method, energy Enough prevent concrete floor from producing crack, avoid Shi works Sew from influenceing heat preservation of refrigeration storage performance, and advantageously reduce additional process and contracting Casual labourer's phase.
In order to achieve the above object, the present invention is realized using following technical scheme:
A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM, comprises the following steps:
First, model and determine arrangement and method for construction;
1) zoning;
According to construction demand, the terrace constructed is divided into several casting area and is numbered;
2) revit2015 design softwares are utilized, the terrace after template, subregion, reinforcing bar are modeled;Then it is model is defeated Go out, import in naviswork2015, assign timing node to construction unit amount, 4Dbim construction simulation animations are made, by animation Export into video format preservation;
3) mode is poured using subregion and carries out floor construction, first pour the region of odd-numbered, treat that coagulation coagulates native intensity etc. Form removal when level reaches design strength more than 50%, then pour the region of even-numbered;Formed integrally after the completion of all pouring Level ground structure;
2nd, work progress and requirement:
1) cleared up before construction;
It is before pouring that the debris in template, the oil removal on reinforcing bar is clean, and check the cement mortar bedding block of reinforcing bar, modeling Whether backing strap block pads;Such as moisten template using that should be watered during plank sheathing, the cleaning mouth of post template is removing debris and product It is re-closed after water;
2) concrete stirs;
A. various material usages are determined according to design mixture proportion, water content ratio of aggregate should often determine adjustment match ratio in time and use Water;
B. loading sequence:Stone is first filled into mixer, cement is refilled, finally loads sand;When mixing additive, outside powdery Agent is added to be previously charged into according to addition in inner wrapping, the used time adds simultaneously with thin coarse aggregate;Liquid additive presses usage amount and water Load mixer stirring simultaneously;
C. mixing time:To make concrete stir, since whole mixs are fitted into mixing drum and play concrete Untill discharging, the shortest time of concrete stirring is 90 seconds;
3) concrete transportation;
Must assure that concrete pump continuously works, and such as breaks down during pump concrete, idle hours more than 45 minutes or There is segregation phenomenon in concrete, should be immediately with the concrete of residual in press water or other method flush pipe;
4) vibrate;
A. the drop height degree that freely inclines that concrete falls from discharging opening must not exceed 2 meters;
B. staged and layered is carried out continuously during casting concrete, and every layer pours height according to design feature, reinforcing bar density degree Determine, generic hierarchical is highly 1.25 times of vibrator effect partial length, and maximum is no more than 50 centimetres;
C. pulled out slowly using fast insert during poker vibrator, slotting point is evenly distributed, and point-by-point mobile, order is carried out, and must not be lost Leakage, accomplishes uniform jolt ramming;Mobile spacing is not more than 1.5 times of vibrating spear operating radius;Vibrate last layer when should insert lower floor 5cm, gap is connect with two interlayers of elimination;
D. casting concrete should be carried out continuously;, should be before front layer concrete initial set, by secondary layer concrete such as necessary interval Pour and finish;
E. often observed during casting concrete template, reinforcing bar, reserving hole, built-in fitting and joint bar whether there is mobile, deformation or Stopping state, pinpointing the problems should stop pouring immediately, and repair before the concrete coagulation poured intact;
5) conserve;
After concreting, covered and watered within 12h, concrete is kept for moisture state, curing period No less than 7 round the clock.
Compared with prior art, the beneficial effects of the invention are as follows:
1) CAD is used, the visualization and quantitative analysis of engineering construction is realized, accomplishes the construction that becomes more meticulous;
2) subregion casting method is used, conventional the shortcomings that setting post-cast strip method construction is avoided, can prevent concrete floor from producing Raw crack, avoids Shi works Sew from influenceing heat preservation of refrigeration storage performance;
3) technical process is simple and direct, advantageously reduces additional process and shortens the duration.
Brief description of the drawings
Fig. 1 is the terrace subregion schematic diagram of the present invention after BIM is modeled.
Fig. 2 is the floor construction figure of the present invention after BIM is modeled.
Embodiment
The embodiment of the present invention is described further below in conjunction with the accompanying drawings:
A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM of the present invention, comprises the following steps:
First, model and determine arrangement and method for construction;
1) zoning;
According to construction demand, the terrace constructed is divided into several casting area and is numbered;
2) revit2015 design softwares are utilized, the terrace after template, subregion, reinforcing bar are modeled;Then it is model is defeated Go out (as shown in Figure 1), import in naviswork2015, assign timing node to construction unit amount, make 4Dbim construction simulations Animation, animation output is preserved into video format;
3) as shown in Fig. 2 pouring mode using subregion carries out floor construction, the region of odd-numbered is first poured, treats coagulation Form removal when native strength grade reaches design strength more than 50% is coagulated, then pours the region of even-numbered;After the completion of all pouring Form integral terrace structure;
2nd, work progress and requirement:
1) cleared up before construction;
It is before pouring that the debris in template, the oil removal on reinforcing bar is clean, and check the cement mortar bedding block of reinforcing bar, modeling Whether backing strap block pads;Such as moisten template using that should be watered during plank sheathing, the cleaning mouth of post template is removing debris and product It is re-closed after water;
2) concrete stirs;
A. various material usages are determined according to design mixture proportion, water content ratio of aggregate should often determine adjustment match ratio in time and use Water;
B. loading sequence:Stone is first filled into mixer, cement is refilled, finally loads sand;When mixing additive, outside powdery Agent is added to be previously charged into according to addition in inner wrapping, the used time adds simultaneously with thin coarse aggregate;Liquid additive presses usage amount and water Load mixer stirring simultaneously;
C. mixing time:To make concrete stir, since whole mixs are fitted into mixing drum and play concrete Untill discharging, the shortest time of concrete stirring is 90 seconds;
3) concrete transportation;
Must assure that concrete pump continuously works, and such as breaks down during pump concrete, idle hours more than 45 minutes or There is segregation phenomenon in concrete, should be immediately with the concrete of residual in press water or other method flush pipe;
4) vibrate;
A. the drop height degree that freely inclines that concrete falls from discharging opening must not exceed 2 meters;
B. staged and layered is carried out continuously during casting concrete, and every layer pours height according to design feature, reinforcing bar density degree Determine, generic hierarchical is highly 1.25 times of vibrator effect partial length, and maximum is no more than 50 centimetres;
C. pulled out slowly using fast insert during poker vibrator, slotting point is evenly distributed, and point-by-point mobile, order is carried out, and must not be lost Leakage, accomplishes uniform jolt ramming;Mobile spacing is not more than 1.5 times of vibrating spear operating radius;Vibrate last layer when should insert lower floor 5cm, gap is connect with two interlayers of elimination;
D. casting concrete should be carried out continuously;, should be before front layer concrete initial set, by secondary layer concrete such as necessary interval Pour and finish;
E. often observed during casting concrete template, reinforcing bar, reserving hole, built-in fitting and joint bar whether there is mobile, deformation or Stopping state, pinpointing the problems should stop pouring immediately, and repair before the concrete coagulation poured intact;
5) conserve;
After concreting, covered and watered within 12h, concrete is kept for moisture state, curing period No less than 7 round the clock.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (1)

1. a kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM, it is characterised in that comprise the following steps:
First, model and determine arrangement and method for construction;
1) zoning;
According to construction demand, the terrace constructed is divided into several casting area and is numbered;
2) revit2015 design softwares are utilized, the terrace after template, subregion, reinforcing bar are modeled;Then model is exported, Import in naviswork2015, assign timing node to construction unit amount, make 4Dbim construction simulation animations, animation is exported Preserved into video format;
3) mode is poured using subregion and carries out floor construction, first pour the region of odd-numbered, treat that coagulation coagulates native strength grade and reached To form removal during design strength more than 50%, the region of even-numbered is then poured;Integral terrace knot is formed after the completion of all pouring Structure;
2nd, work progress and requirement:
1) cleared up before construction;
It is before pouring that the debris in template, the oil removal on reinforcing bar is clean, and check the cement mortar bedding block of reinforcing bar, plastic mattress Whether block pads;Such as moisten template using that should be watered during plank sheathing, the cleaning mouth of post template is after debris and ponding is removed It is re-closed;
2) concrete stirs;
A. various material usages are determined according to design mixture proportion, water content ratio of aggregate should often determine adjustment match ratio water in time Amount;
B. loading sequence:Stone is first filled into mixer, cement is refilled, finally loads sand;When mixing additive, powdered additive It is previously charged into according to addition in inner wrapping, the used time adds simultaneously with thin coarse aggregate;Liquid additive presses usage amount and water simultaneously Load mixer stirring;
C. mixing time:To make concrete stir, it is fitted into mixing drum discharging playing concrete since whole mixs Untill, the shortest time of concrete stirring is 90 seconds;
3) concrete transportation;
It must assure that concrete pump continuously works, and such as breaks down during pump concrete, idle hours was more than 45 minutes or coagulation There is segregation phenomenon in soil, should be immediately with the concrete of residual in press water or other method flush pipe;
4) vibrate;
A. the drop height degree that freely inclines that concrete falls from discharging opening must not exceed 2 meters;
B. staged and layered is carried out continuously during casting concrete, and every layer pours height and determined according to design feature, reinforcing bar density degree, Generic hierarchical is highly 1.25 times of vibrator effect partial length, and maximum is no more than 50 centimetres;
C. pulled out slowly using fast insert during poker vibrator, slotting point is evenly distributed, and point-by-point mobile, order is carried out, and must not be omitted, be done To uniform jolt ramming;Mobile spacing is not more than 1.5 times of vibrating spear operating radius;Vibrate last layer when should insert lower floor 5cm, to disappear Gap is connect except two interlayers;
D. casting concrete should be carried out continuously;, should be before front layer concrete initial set, by sublevel concreting such as necessary interval Finish;
E. often observe template, reinforcing bar, reserving hole, built-in fitting and joint bar whether there is mobile, deformation or blocked during casting concrete Situation, pinpointing the problems should stop pouring immediately, and repair before the concrete coagulation poured intact;
5) conserve;
After concreting, covered and watered within 12h, concrete is kept moisture state, curing period is many In 7 round the clock.
CN201710755466.6A 2017-08-29 2017-08-29 A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM Withdrawn CN107448022A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710755466.6A CN107448022A (en) 2017-08-29 2017-08-29 A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710755466.6A CN107448022A (en) 2017-08-29 2017-08-29 A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM

Publications (1)

Publication Number Publication Date
CN107448022A true CN107448022A (en) 2017-12-08

Family

ID=60493331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710755466.6A Withdrawn CN107448022A (en) 2017-08-29 2017-08-29 A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM

Country Status (1)

Country Link
CN (1) CN107448022A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110488782A (en) * 2019-08-26 2019-11-22 中电建路桥集团有限公司 Cement concrete batching plant back court intelligent monitor system based on BIM platform
CN112699452A (en) * 2021-01-20 2021-04-23 南通四建集团有限公司 Construction method for improving flatness of large-area terrace
CN114411945A (en) * 2021-12-31 2022-04-29 贵州建工集团第七建筑工程有限责任公司 Bin jump construction method based on BIM technology
CN115159919A (en) * 2022-07-06 2022-10-11 山西省安装集团股份有限公司 Fair-faced concrete and construction process thereof
CN115217336A (en) * 2022-08-04 2022-10-21 深圳市市政工程总公司 Large-volume concrete pouring method
CN115952589A (en) * 2023-03-14 2023-04-11 中国建筑第二工程局有限公司 Ring beam joint BIM auxiliary construction method capable of avoiding concrete pouring obstruction

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691401A (en) * 2012-06-15 2012-09-26 北京城建建设工程有限公司 Construction method for large-area concrete weighbridge
CN103046697A (en) * 2013-01-23 2013-04-17 中国三冶集团有限公司第二建筑工程公司 Construction method of 25-40-degree concrete pitched roofs
CN103225406A (en) * 2013-05-13 2013-07-31 中建五局第三建设有限公司 Seamless construction method of multi-layer super large-area reinforced concrete ground
CN103498555A (en) * 2013-10-15 2014-01-08 中国建筑第二工程局有限公司 Adjustable large-area floor steel channel formwork system and construction method thereof
CN105064659A (en) * 2015-07-07 2015-11-18 中国轻工建设工程有限公司 High position stereo shelf warehouse super-flat terrace construction technology
CN105587102A (en) * 2016-03-01 2016-05-18 黑龙江泽林科技有限公司 Construction method of wet-on-wet paving type high abrasion resistance terrace
KR101721546B1 (en) * 2016-05-26 2017-03-30 김대용 Industry safety management system using rtls

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691401A (en) * 2012-06-15 2012-09-26 北京城建建设工程有限公司 Construction method for large-area concrete weighbridge
CN103046697A (en) * 2013-01-23 2013-04-17 中国三冶集团有限公司第二建筑工程公司 Construction method of 25-40-degree concrete pitched roofs
CN103225406A (en) * 2013-05-13 2013-07-31 中建五局第三建设有限公司 Seamless construction method of multi-layer super large-area reinforced concrete ground
CN103498555A (en) * 2013-10-15 2014-01-08 中国建筑第二工程局有限公司 Adjustable large-area floor steel channel formwork system and construction method thereof
CN105064659A (en) * 2015-07-07 2015-11-18 中国轻工建设工程有限公司 High position stereo shelf warehouse super-flat terrace construction technology
CN105587102A (en) * 2016-03-01 2016-05-18 黑龙江泽林科技有限公司 Construction method of wet-on-wet paving type high abrasion resistance terrace
KR101721546B1 (en) * 2016-05-26 2017-03-30 김대용 Industry safety management system using rtls

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110488782A (en) * 2019-08-26 2019-11-22 中电建路桥集团有限公司 Cement concrete batching plant back court intelligent monitor system based on BIM platform
CN112699452A (en) * 2021-01-20 2021-04-23 南通四建集团有限公司 Construction method for improving flatness of large-area terrace
CN114411945A (en) * 2021-12-31 2022-04-29 贵州建工集团第七建筑工程有限责任公司 Bin jump construction method based on BIM technology
CN115159919A (en) * 2022-07-06 2022-10-11 山西省安装集团股份有限公司 Fair-faced concrete and construction process thereof
CN115217336A (en) * 2022-08-04 2022-10-21 深圳市市政工程总公司 Large-volume concrete pouring method
CN115217336B (en) * 2022-08-04 2023-08-18 深圳市市政工程总公司 Large-volume concrete pouring method
CN115952589A (en) * 2023-03-14 2023-04-11 中国建筑第二工程局有限公司 Ring beam joint BIM auxiliary construction method capable of avoiding concrete pouring obstruction

Similar Documents

Publication Publication Date Title
CN107448022A (en) A kind of food stuff refrigerated storage large area overlength method for constructing terrace based on BIM
CN103938864B (en) Infilled wall Constructional Col-umn Construction engineering method
CN105839850B (en) Precompressed construction method is poured into a mould after basement top-down method shaft
CN209482591U (en) Prefabricated molds shell structure column construction structure
CN108297246A (en) Prevent concrete block from generating fracture unit technique
CN104631677B (en) Super thick concrete hollow terrace gradation construction technology
CN109306714A (en) Jump the control distress in concrete construction method that storehouse method is combined with expansion reinforcing band
CN113668928B (en) Method for controlling construction cracks of ultra-large-volume concrete water pool
CN102877486A (en) Integral cast-in-situ construction method for cable ducts
CN102677898A (en) Sequence construction method for large area reinforced concrete floors
CN104563282B (en) Integral constructing method of house body structure and wall structure and house
CN104499498B (en) A kind of construction method of mass concrete building
CN104652371A (en) Overflow cemented rock-fill dam established based on old dam and construction method thereof
CN106316241A (en) Self-compacting micro-expansion concrete and preparation method thereof
CN107558504A (en) A kind of construction method for controlling concrete component cracking
CN107142902B (en) High head and large flow tunneling boring damming method
CN106639321A (en) Method and structure for controlling shrinkage cracks of ultra-long concrete structure
CN109133844A (en) A kind of Rapid Patching Material for PCC Airfield and preparation process
US20120167516A1 (en) method of forming protrusions on a masonry block
CN209243778U (en) Expansion reinforcing band structure for the control distress in concrete construction in conjunction with jump storehouse method
CN108638322A (en) Prefabricated post concreting method in a kind of assembled architecture
CN205894276U (en) Prefabricated prefabricated concrete structure
CN104652280B (en) Overlength, after water fish ridge wall one-time continuous moulding irrigation method and overlength fish ridge wall thereof
CN206457783U (en) A kind of channel frost heaving resistant liner plate for including insulation material
CN114319875A (en) Seamless construction process for super-large-area concrete ground

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20171208