CN107447730A - Pumping plant blocks water the construction of trash rack, application method - Google Patents

Pumping plant blocks water the construction of trash rack, application method Download PDF

Info

Publication number
CN107447730A
CN107447730A CN201710780001.6A CN201710780001A CN107447730A CN 107447730 A CN107447730 A CN 107447730A CN 201710780001 A CN201710780001 A CN 201710780001A CN 107447730 A CN107447730 A CN 107447730A
Authority
CN
China
Prior art keywords
brake lining
side door
trash rack
water
switching mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710780001.6A
Other languages
Chinese (zh)
Inventor
张朝峰
张朝利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Huicheng Zhizao Industrial Design Co Ltd
Original Assignee
Suzhou Huicheng Zhizao Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Huicheng Zhizao Industrial Design Co Ltd filed Critical Suzhou Huicheng Zhizao Industrial Design Co Ltd
Priority to CN201710780001.6A priority Critical patent/CN107447730A/en
Publication of CN107447730A publication Critical patent/CN107447730A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/08Details, e.g. gates, screens
    • E02B5/085Arresting devices for waterborne materials, e.g. gratings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/08Details, e.g. gates, screens
    • E02B5/082Closures

Abstract

Blocked water the construction of trash rack, application method the present invention relates to a kind of pumping plant, including upper beam, the bottom girder being arranged on pump chamber Dun Qiang, the brake lining trash rack being arranged between upper beam, bottom girder, described multiple brake linings are disposed longitudinally between upper beam, bottom girder with brake lining axle, each brake lining is connected with the brake lining switching mechanism being arranged on Dun Qiang, turn clockwise brake lining switching mechanism, brake lining is rotated by 90 ° opening water flowing, trash rack stops that debris passes through, rotate counterclockwise brake lining switching mechanism, brake lining be inwardly rotated by 90 ° closure formed gate stop current pass through.Soil can be saved using the present invention, save construction costs, can stop that debris enters when drawing water, can be blocked water as gate during maintenance.

Description

Pumping plant blocks water the construction of trash rack, application method
Technical field
The application is related to the intakes of pumping station trash rack device in hydraulic engineering field, more particularly to a kind of pumping plant blocks water and blocks dirt The construction of grid, application method.
Background technology
In existing small and medium-sized pumping station, water inlet is designed with greatly trash rack, can so stop that weeds debris enters water pump Impeller, reduce the generation of failure.But water pump accessory and its dynamical system still often break down in long-term operation, especially It is that underwater maintenance is more inconvenient, therefore requires to set bulkhead gate in the associated specifications such as hydraulic engineering, is easy to repair;But Original design it is inconvenient for operation, using effect is also undesirable, the design to it is original design be optimized, be changed to brake lining rotation Formula blocks water trash rack, instead of intrinsic trash rack and gate.
The content of the invention
In order to solve the above problems, the present invention is as follows using technical scheme:
A kind of pumping plant blocks water trash rack, including upper beam, the bottom girder being arranged on pump chamber Dun Qiang, be arranged at upper beam, bottom girder it Between brake lining, trash rack, it is characterised in that described brake lining sets integral with trash rack right-angled intersection, and is set in infall There is brake lining axle, multiple brake lining trash racks are disposed longitudinally between upper beam, bottom girder with brake lining axle, and each brake lining trash rack is with being arranged on pier Brake lining switching mechanism connection on wall, turn clockwise brake lining switching mechanism, and horizontal brake lining rotates to be longitudinally opened water flowing, and The trash rack of longitudinal direction rotates to be transverse barriers debris by the way that rotate counterclockwise brake lining switching mechanism, brake lining rotates to be horizontal closure Form gate and stop that current pass through.
Further preferred scheme, described brake lining are rectangle chip strip, and brake lining both sides are longitudinally set at width 1/3 There is trash rack, brake lining is set integrally with trash rack right-angled intersection, and is provided with brake lining axle, brake lining axle both ends protrusion lock in infall Piece certain length is simultaneously provided with bearing, and bearing is arranged at corresponding upper beam, in the bearing block on bottom girder, and on the brake lining axle of upper end Provided with gear, each gear is connected to form interlinked mechanism by chain with the brake lining switching mechanism being located on Dun Qiang.
Further preferred scheme, the lower end of described brake lining and two sides are provided with rubber strip, brake lining lower end rubber strip with Bottom girder close-fitting is bonded, and the rubber strip of the side of brake lining two is fitted on the rubber strip of adjacent brake lining side when closing, and can be sealed Block water, prevent leakage.
Further preferred scheme, the brake lining are arranged between upper beam, bottom girder from left to right, one brake lining side of rightmost Rubber strip form complete gate in the grid step that fits on Dun Qiang when closing, have and stop brake lining and the purpose that blocks water.
Further preferred scheme, described either side Dun Qiang, which is provided with side door, can make brake lining opening and closing light, avoid water Press through big opening brake lining difficulty or cause to deform.
Further preferred scheme, described side door are provided with the side door switching mechanism on side door lift arm connection top, side Door lift arm is provided with retainer ring, and track is provided with the outside of side door, rubber blanket, pre- preventing water leakage are provided with track.
Block water the construction method of trash rack the invention also discloses above-mentioned pumping plant, including following technique and step:
1) brake lining is made first, brake lining is rectangular slat steel plate welding production, steel plate thickness 2-4mm, the long 150- of brake lining 300cm, wide 30-50cm, thickness 4-8cm, the height 2-4cm of the outwardly or inside groove of its both sides, brake lining both sides are in width Longitudinally disposed trash rack at 1/3 is spent, brake lining is set integrally with trash rack right-angled intersection, and is provided with brake lining axle, lock in infall Bobbin both ends protrude brake lining 10cm and are provided with bearing, gear are set on the bearing top of upper end, in the lower end of brake lining and two sides Rubber strip is set.
2) side door is made, side door is rectangular steel plates, thickness 5-8mm, width 20-30cm, height 30-50cm, in top Between upward steel rod is set as side door lift arm, the screw thread that side door lift arm top is provided with screw thread and side door switching mechanism is ratcheting Interlock.
3) in the pumping plant pump chamber water inlet longitudinally disposed Dun Qiang in both sides, top sets upper beam, bottom between the pier wall of left and right two Bottom girder is set, and the longitudinally disposed brake lining trash rack from left to right between upper beam and bottom girder, brake lining trash rack is with the axle at brake lining axle both ends Hold and be arranged in upper beam bearing block corresponding with bottom girder, if cogged one end is arranged on upper beam, chain is set on each gear Bar, chain are connected interaction with being arranged on the brake lining switching mechanism on Dun Qiang tops.
4) door opening is set in the Dun Qiang bottoms of either side, side door, side door or so is set on the outside of door opening and is provided with track below, Rubber blanket is provided with track, upward side door lift arm is set among side door top, and side door lift arm is provided with several fixations Ring, side door lift arm top are provided with length 50-100cm screw threads, the ratcheting gearing of screw thread of screw thread and side door switching mechanism.
Block water the application method of trash rack the invention also discloses above-mentioned pumping plant, and its feature includes following technique and step Suddenly:
1) pumping plant after the completion of constructing blocks water trash rack, first rotary side door open/close machine, lifts side door, and water flows into pump chamber Make hydraulic pressure inside and outside brake lining parallel, then the brake lining switching mechanism that turns clockwise, brake lining is rotated by 90 ° opening water flowing, and trash rack also with With being rotated by 90 °, it is horizontally installed between two brake linings when stopping debris by, pumping for water pump, current are from flowing into pump chamber between trash rack.
2) when needing repairing water pump, reverse rotation side door open/close machine, decline and close side door, another mistake hour hands rotation brake lining Switching mechanism, brake lining are rotated by 90 ° closure and form gate stop current by draining the water in pump chamber, you can implement maintenance activity.
3) after repairing, work of drawing water can be continued by implementing above-mentioned steps 1.
During normal pumping, brake lining is adjusted to open mode by brake lining switching mechanism, water can smoothly enter, and pasture and water Debris is blocked in outside trash rack;During maintenance, brake lining is adjusted to closed mode by brake lining switching mechanism, as gate, water It cannot be introduced into pump chamber.When maintenance is finished, it is necessary to during water flowing, the side door set on Dun Qiang is enabled, makes hydraulic balance inside and outside pump chamber, then Using brake lining switching mechanism, brake lining is opened, in water flowing state.
Beneficial effect
The present invention has following technique effect after using above technical scheme:The brake lining of the present invention rotatably blocks water trash rack With following technical characterstic:1st, land occupation is saved, saves construction costs, a pumping plant can 100-300 square metres of Economization on land; Reduce the expenses such as concrete, steel etc. and basement process.2nd, safety and stability, efficient energy-saving, on the rotary trash rack of brake lining Manually or electrically opening and closing device, operation are very convenient for portion's installation.3rd, brake lining width and thickness can be set as needed, accommodation Greatly.4th, the connection edge of brake lining is designed with rubber strip, good in hydraulic pressure seal performance, antileaking.
Brief description of the drawings
Fig. 1 is closed mode positive structure schematic of the present invention;
Fig. 2 is Fig. 1 open mode positive structure diagram;
Fig. 3 is Fig. 1 overlooking the structure diagrams;
Fig. 4 is Fig. 2 overlooking the structure diagrams;
Fig. 5 is dimensional structure diagram on the inside of Fig. 1;
Fig. 6 is dimensional structure diagram on the inside of Fig. 2;
Fig. 7 is the brake lining trash rack overlooking the structure diagram of the present invention;
Fig. 8 is Fig. 7 dimensional structure diagrams.
Wherein, 1- Dun Qiang, 1.1- grid step, 2- upper beams, 3- brake linings, 4- trash racks, 5- brake lining switching mechanisms, 6- side doors Switching mechanism, 7- bottom girders, 8- side door lift arms, 9- retainer rings, 10- side doors, 11- tracks, 12- gears, 13- brake lining axles, 14- rubbers Adhesive tape, 15- bearings.
Embodiment
To make the purpose of the application and technical scheme clearer, the technical scheme of the application is carried out below in conjunction with accompanying drawing Clearly and completely describe.Described embodiment is the part of the embodiment of the application, rather than whole embodiments, is based on Described embodiments herein, those of ordinary skill in the art are obtained all on the premise of without creative work Other embodiment, belong to the scope of the application protection.
Embodiment 1:Refer to the attached drawing, a kind of pumping plant block water trash rack, including upper beam 2, the bottom girder being arranged on pump chamber pier wall 1 7, brake lining 3, the trash rack 4 being arranged between upper beam 1, bottom girder 7, it is characterised in that described brake lining 3 is handed over the cross of trash rack 4 Fork is set integrally, and is provided with brake lining axle 13 in infall, and multiple trash racks 4 of brake lining 3 are disposed longitudinally on upper beam with brake lining axle 13 2nd, between bottom girder 7, each trash rack 4 of brake lining 3 is connected with the brake lining switching mechanism 5 being arranged on pier wall 1, and the brake lining that turns clockwise is opened Close mechanism 5, horizontal brake lining 3 rotates to be longitudinally opened water flowing, and the trash rack 4 of longitudinal direction rotate to be transverse barriers debris by, Rotate counterclockwise brake lining switching mechanism 5, brake lining 3 rotate to be laterally closure formed gate stop current pass through.
Further preferred scheme, described brake lining 3 are rectangle chip strip, and the both sides of brake lining 3 are longitudinal at width 1/3 Provided with trash rack 4, brake lining 3 is set integrally with the right-angled intersection of trash rack 4, and is provided with brake lining axle 13, brake lining axle 13 in infall Both ends protrusion brake lining certain length is simultaneously provided with bearing 15, and bearing 15 is arranged at corresponding upper beam 2, in the bearing block on bottom girder 7, and Gear 12 is provided with the brake lining axle 13 of upper end, each gear 12 is connected by chain with the brake lining switching mechanism 5 being located on pier wall 1 Form interlinked mechanism.
Further preferred scheme, the lower end and two sides of described brake lining 3 are provided with rubber strip 14, the lower end rubber of brake lining 3 Bar 14 is bonded with the close-fitting of bottom girder 7, and the rubber strip 14 of 3 liang of sides of brake lining fits in the rubber strip 14 of adjacent brake lining side when closing On, it can seal and block water, prevent leakage.
Further preferred scheme, the brake lining 3 are arranged between upper beam 2, bottom girder 7 from left to right, one brake lining 3 of rightmost Complete gate is formed in the grid step 1.1 that the rubber strip 14 of side is fitted on pier wall 1 when closing, has and stops brake lining and resistance Water purpose.
Further preferred scheme, described either side pier wall 1, which is provided with side door 10, can make brake lining opening and closing light, avoid Hydraulic pressure is excessive to be opened brake lining difficulty or causes to deform.
Further preferred scheme, described side door 10 are provided with the side door switching mechanism that side door lift arm 8 connects top 6, side door lift arm 8 is provided with retainer ring 9, and the outside of side door 10 is provided with track 11, rubber blanket, pre- preventing water leakage are provided with track 11.
The present embodiment also discloses above-mentioned pumping plant and blocked water the construction method of trash rack, including following technique and step:
1) brake lining 3 is made first, and brake lining 3 is rectangular slat steel plate welding production, steel plate thickness 2-4mm, 3 long 150- of brake lining 300cm, wide 30-50cm, thickness 4-8cm, the height 2-4cm of the outwardly or inside groove of its both sides, the both sides of brake lining 3 are in width Longitudinally disposed trash rack 4 at 1/3 is spent, brake lining 3 is set integrally with the right-angled intersection of trash rack 4, and is provided with brake lining axle in infall 13, the both ends of brake lining axle 13 protrusion brake lining 10cm are simultaneously provided with bearing 15, gear 12 are set on the top of bearing 14 of upper end, in brake lining 3 Lower end and two sides set rubber strip 14.
2) side door 10 is made, side door 10 is rectangular steel plates, thickness 5-8mm, width 20-30cm, height 30-50cm, upper Upward steel rod is set to be provided with screw thread and side door switching mechanism 6 as side door lift arm 8, the top of side door lift arm 8 among portion The ratcheting gearing of screw thread.
3) in the longitudinally disposed pier wall 1 in pumping plant pump chamber water inlet both sides, top sets upper beam 2, bottom between the pier wall 1 of left and right two Portion sets bottom girder 7, and the longitudinally disposed trash rack 4 of brake lining 3 from left to right between upper beam 2 and bottom girder 7, the trash rack 4 of brake lining 3 is with brake lining axle The bearing 15 at 13 both ends is arranged on upper beam 2 and in 7 corresponding bearing block of bottom girder, one end provided with gear 12 is arranged on upper beam 2, Chain is set on each gear 12, and chain is connected interaction with being arranged on the brake lining switching mechanism 5 on the top of pier wall 1.
4) door opening is set in the bottom of pier wall 1 of either side, side door 10 is set on the outside of door opening, side door 10 or so and be provided with below Track 11, rubber blanket is provided with track 11, upward side door lift arm 8 is set among the top of side door 10, on side door lift arm 8 Provided with several retainer rings 9, the top of side door lift arm 8 is provided with length 50-100cm screw threads, the screw thread of screw thread and side door switching mechanism 6 Ratcheting gearing.
The present embodiment also discloses above-mentioned pumping plant and blocked water the application method of trash rack, and its feature includes following technique and step Suddenly:
1) pumping plant after the completion of constructing blocks water trash rack, first rotary side door open/close machine 6, lifts side door 10, and water flows into Pump chamber makes hydraulic pressure inside and outside brake lining 3 parallel, then the brake lining switching mechanism 5 that turns clockwise, and brake lining 3 is rotated by 90 ° opening water flowing, and blocks dirt Grid 4, which also follow, to be rotated by 90 °, and is horizontally installed between two brake linings when stopping debris by, pumping for water pump, current are between trash rack 4 Flow into pump chamber.
2) when needing repairing water pump, reverse rotation side door open/close machine 6, decline and close side door 10, then rotate counterclockwise Brake lining switching mechanism 5, brake lining 3 are rotated by 90 ° closure and form gate stop current by draining the water in pump chamber, you can implement dimension Repair operation.
3) after repairing, above-mentioned steps 1 are implemented) work of drawing water can be continued.
During normal pumping, brake lining is adjusted to open mode by brake lining switching mechanism, water can smoothly enter, and pasture and water Debris is blocked in outside by trash rack;During maintenance, brake lining is adjusted to closed mode by brake lining switching mechanism, as gate, Water cannot be introduced into pump chamber.When maintenance is finished, it is necessary to during water flowing, the side door set on Dun Qiang is enabled, makes hydraulic balance inside and outside pump chamber, Brake lining switching mechanism is reused, brake lining is opened, in water flowing state.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, all terms used herein, including technology art Language and scientific terminology, there is the general understanding identical meaning with the those of ordinary skill in the application art.Should also Understand, those terms defined in such as general dictionary, which should be understood that, to be had and the meaning in the context of prior art The consistent meaning of justice, and unless defined as here, will not be with idealizing or the implication of overly formal be explained.
The implication of " inside and outside " described herein referred to relative to equipment itself, the side inside sensing equipment To be interior, on the contrary is outer.The implication of " connection " described herein can be between part to be directly connected to can also be portion It is indirectly connected between part by other parts.Using the above-mentioned desirable embodiment according to the application as enlightenment, pass through above-mentioned explanation Content, relevant staff completely can in the range of without departing from this item application technological thought, carry out various change and Modification.

Claims (1)

  1. The construction of trash rack, application method 1. a kind of pumping plant blocks water, including upper beam (2), the bottom girder being arranged on pump chamber Dun Qiang (1) (7) brake lining (3), the trash rack (4), being arranged between upper beam (2), bottom girder (7), it is characterised in that described brake lining (3) is with blocking Dirty grid (4) right-angled intersection is set integrally, and is provided with brake lining axle (13) in infall, and multiple brake lining (3) trash racks (4) are with brake lining Axle (13) is disposed longitudinally between upper beam (2), bottom girder (7), each brake lining (3) trash rack (4) and the brake lining being arranged on Dun Qiang (1) Switching mechanism (5) connects, and turn clockwise brake lining switching mechanism (5), and horizontal brake lining (3) rotates to be longitudinally opened water flowing, and The trash rack (4) of longitudinal direction rotates to be transverse barriers debris by the way that rotate counterclockwise brake lining switching mechanism (5), brake lining (3) rotates to be Laterally closure forms gate stop current and passed through;
    Either side Dun Qiang (1) is provided with side door (10), and described side door (10) is provided with the side on side door lift arm (8) connection top Door open/close machine (6), side door lift arm (8) are provided with retainer ring (9), track (11), track (11) are provided with the outside of side door (10) It is interior to be provided with rubber blanket;
    Described pumping plant blocks water the construction of trash rack, application method, it is characterised in that including following technique and step:
    1) brake lining (3) is made first, and brake lining (3) be rectangular slat steel plate welding production, steel plate thickness 2-4mm, and brake lining (3) is grown 150-300cm, wide 30-50cm, thickness 4-8cm, the height 2-4cm of the outwardly or inside groove of its both sides, brake lining (3) two Side longitudinally disposed trash rack (4) at width 1/3, brake lining (3) is set integrally with trash rack (4) right-angled intersection, and is being intersected Place is provided with brake lining axle (13), and brake lining axle (13) both ends protrusion brake lining 10cm is simultaneously provided with bearing (15), on the bearing (14) of upper end Portion sets gear (12), and rubber strip (14) is set in the lower end of brake lining (3) and two sides;
    2) side door (10) is made, side door (10) is rectangular steel plates, thickness 5-8mm, width 20-30cm, height 30-50cm, upper Upward steel rod is set to be provided with screw thread and side door switching mechanism as side door lift arm (8), side door lift arm (8) top among portion (6) the ratcheting gearing of screw thread;
    3) in the longitudinally disposed Dun Qiang in pumping plant pump chamber water inlet both sides (1), between the Dun Qiang of left and right two (1) top set upper beam (2), Bottom sets bottom girder (7), longitudinally disposed brake lining (3) trash rack (4) from left to right between upper beam (2) and bottom girder (7), brake lining (3) Trash rack (4) is arranged in upper beam (2) bearing block corresponding with bottom girder (7) with the bearing (15) at brake lining axle (13) both ends, is provided with One end of gear (12) is arranged on upper beam (2), chain is set on each gear (12), chain is with being arranged on Dun Qiang (1) top Brake lining switching mechanism (5) connection it is interactive;
    4) door opening is set in Dun Qiang (1) bottom of either side, side door (10), side door (10) or so are set on the outside of door opening and set below There is track (11), rubber blanket is provided with track (11), upward side door lift arm (8), side are set among side door (10) top Door lift arm (8) is provided with several retainer rings (9), and side door lift arm (8) top is provided with length 50-100cm screw threads, screw thread and side The ratcheting gearing of screw thread of door open/close machine (6);
    5) complete construction procedure 1) -4) after pumping plant block water trash rack, first rotary side door open/close machine (6), lift side door (10), water, which flows into pump chamber, makes the water surface inside and outside brake lining (3) parallel, then the brake lining switching mechanism (5) that turns clockwise, brake lining (3) rotation 90 ° of opening water flowings, and trash rack (4) is also followed and is rotated by 90 °, stop debris is by the way that water pump is taken out between being horizontally installed on two brake linings During water, current flow into pump chamber between trash rack (4);
    6) when needing repairing water pump, reverse rotation side door open/close machine (6), decline and close side door (10), then rotate counterclockwise Brake lining switching mechanism (5), brake lining (3) are rotated by 90 ° closure and form gate stop current by draining the water in pump chamber, you can real Apply maintenance activity;
    7) after repairing, above-mentioned steps 5 are implemented) work of drawing water, repeat step 5 can be continued) -6) carry out drawing water or repairing for water pump Work.
CN201710780001.6A 2015-07-27 2015-07-27 Pumping plant blocks water the construction of trash rack, application method Withdrawn CN107447730A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710780001.6A CN107447730A (en) 2015-07-27 2015-07-27 Pumping plant blocks water the construction of trash rack, application method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510442902.5A CN105133546B (en) 2015-07-27 2015-07-27 Pumping plant blocks water trash rack and its construction and application method
CN201710780001.6A CN107447730A (en) 2015-07-27 2015-07-27 Pumping plant blocks water the construction of trash rack, application method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510442902.5A Division CN105133546B (en) 2015-07-27 2015-07-27 Pumping plant blocks water trash rack and its construction and application method

Publications (1)

Publication Number Publication Date
CN107447730A true CN107447730A (en) 2017-12-08

Family

ID=54719095

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201710780001.6A Withdrawn CN107447730A (en) 2015-07-27 2015-07-27 Pumping plant blocks water the construction of trash rack, application method
CN201710779996.4A Withdrawn CN107524117A (en) 2015-07-27 2015-07-27 A kind of pumping plant blocks water the construction method of trash rack
CN201510442902.5A Active CN105133546B (en) 2015-07-27 2015-07-27 Pumping plant blocks water trash rack and its construction and application method

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201710779996.4A Withdrawn CN107524117A (en) 2015-07-27 2015-07-27 A kind of pumping plant blocks water the construction method of trash rack
CN201510442902.5A Active CN105133546B (en) 2015-07-27 2015-07-27 Pumping plant blocks water trash rack and its construction and application method

Country Status (1)

Country Link
CN (3) CN107447730A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07292645A (en) * 1994-04-20 1995-11-07 Kanden Kogyo Kk Flap opening and shutting screen gate
CN2315141Y (en) * 1997-11-11 1999-04-21 张有清 Blind turbine opening water gate
CN1310268A (en) * 2000-02-22 2001-08-29 石云波 Microfriction rotary gate
CN202482835U (en) * 2011-12-07 2012-10-10 扬州众大水利机电设备制造有限公司 Rotary sluice gate
KR20130112149A (en) * 2012-04-03 2013-10-14 기인서 Dust separator for pump and pump gate of one body type having dust separator
CN103850225A (en) * 2014-02-21 2014-06-11 武汉圣禹排水系统有限公司 Multistage middle shaft rapid flushing gate
CN204034418U (en) * 2014-07-03 2014-12-24 中国神华能源股份有限公司 For the circulation of generating set
CN204418133U (en) * 2015-01-30 2015-06-24 三峡大学 A kind of rotary retaining and sluice gate
CN204456008U (en) * 2015-02-28 2015-07-08 淮安市水利勘测设计研究院有限公司 Vertical axle rotating type steel-slag sand

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2457120Y (en) * 2000-09-12 2001-10-31 秘军海 Rotary dirt cleaner
CN1740454A (en) * 2005-06-14 2006-03-01 陈飞 Rake teeth type dredger
CN102650124A (en) * 2012-05-14 2012-08-29 扬州楚门机电设备制造有限公司 Movable trash rack
KR101293308B1 (en) * 2013-02-07 2013-08-05 주식회사 우승산업 Protecting device for with drawingthe sludge on a screen
CN104452673B (en) * 2014-12-08 2016-08-24 广西大学 A kind of adjustable trash rack for water inlet

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07292645A (en) * 1994-04-20 1995-11-07 Kanden Kogyo Kk Flap opening and shutting screen gate
CN2315141Y (en) * 1997-11-11 1999-04-21 张有清 Blind turbine opening water gate
CN1310268A (en) * 2000-02-22 2001-08-29 石云波 Microfriction rotary gate
CN202482835U (en) * 2011-12-07 2012-10-10 扬州众大水利机电设备制造有限公司 Rotary sluice gate
KR20130112149A (en) * 2012-04-03 2013-10-14 기인서 Dust separator for pump and pump gate of one body type having dust separator
CN103850225A (en) * 2014-02-21 2014-06-11 武汉圣禹排水系统有限公司 Multistage middle shaft rapid flushing gate
CN204034418U (en) * 2014-07-03 2014-12-24 中国神华能源股份有限公司 For the circulation of generating set
CN204418133U (en) * 2015-01-30 2015-06-24 三峡大学 A kind of rotary retaining and sluice gate
CN204456008U (en) * 2015-02-28 2015-07-08 淮安市水利勘测设计研究院有限公司 Vertical axle rotating type steel-slag sand

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
清华大学水利系著: "《水工建筑物 教学参考用》", 28 February 1974, 清华大学水利系 *

Also Published As

Publication number Publication date
CN105133546A (en) 2015-12-09
CN107524117A (en) 2017-12-29
CN105133546B (en) 2018-01-23

Similar Documents

Publication Publication Date Title
CN105064286B (en) A kind of pumping plant blocks water trash rack flashboard and its manufacture, construction and application method
CN107022979A (en) A kind of software pumping plant gate trash rack
CN204919496U (en) Integral type pump station gate trash rack bars piece
CN105064293B (en) A kind of manufacture method of integral type pumping plant gate trash rack grid
CN204825811U (en) Pump station arc trash rack bars piece that blocks water
CN105133546B (en) Pumping plant blocks water trash rack and its construction and application method
CN105064287B (en) Construction method for integral type pumping station gate drain grating
CN104947634B (en) A kind of pumping plant louvered blocks water trash rack grid and its manufacture, construction and application method
CN104975584B (en) Rotatable trash rack and its construction and the application method of blocking water of pumping plant arc shaped rotary
CN204940210U (en) A kind of pumping plant blocks water trashrack
CN105002866B (en) A kind of pumping plant blocks water the construction method of trash rack brake lining
CN104975583B (en) Pumping plant louvered blocks water the construction method of trash rack
CN104975585B (en) Pumping plant burst rotatably blocks water trash rack and its construction and application method
CN205077450U (en) Pump station tripe formula trash rack that blocks water
CN205000302U (en) Pump station trash rack flashboard that blocks water
CN205062760U (en) Integral type pump station gate trash rack
CN205046524U (en) Pump station burst rotation type trash rack that blocks water
CN205000301U (en) Pump station trash rack brake lining that blocks water
CN205046525U (en) Pump station arc rotation type trash rack that blocks water
CN205088636U (en) Software pump station gate trash rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171208

WW01 Invention patent application withdrawn after publication