CN107425297A - A kind of drainage thread quick lap joint instrument for earth potential working - Google Patents
A kind of drainage thread quick lap joint instrument for earth potential working Download PDFInfo
- Publication number
- CN107425297A CN107425297A CN201710297140.3A CN201710297140A CN107425297A CN 107425297 A CN107425297 A CN 107425297A CN 201710297140 A CN201710297140 A CN 201710297140A CN 107425297 A CN107425297 A CN 107425297A
- Authority
- CN
- China
- Prior art keywords
- seat
- clamp
- main
- clamping
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R4/00—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
- H01R4/24—Connections using contact members penetrating or cutting insulation or cable strands
- H01R4/2404—Connections using contact members penetrating or cutting insulation or cable strands the contact members having teeth, prongs, pins or needles penetrating the insulation
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R11/00—Individual connecting elements providing two or more spaced connecting locations for conductive members which are, or may be, thereby interconnected, e.g. end pieces for wires or cables supported by the wire or cable and having means for facilitating electrical connection to some other wire, terminal, or conductive member, blocks of binding posts
- H01R11/01—Individual connecting elements providing two or more spaced connecting locations for conductive members which are, or may be, thereby interconnected, e.g. end pieces for wires or cables supported by the wire or cable and having means for facilitating electrical connection to some other wire, terminal, or conductive member, blocks of binding posts characterised by the form or arrangement of the conductive interconnection between the connecting locations
Landscapes
- Clamps And Clips (AREA)
Abstract
本发明公开了一种用于地电位作业的引流线快速搭接工具,属于电力操作设备技术领域,包括配合用于夹紧绝缘导线的主夹座和副夹座,还包括套杆,主夹座上设有滑槽,副夹座活动设于滑槽内,套杆前端连接于副夹座,套杆带动副夹座相对于主夹座移动夹紧绝缘导线;主夹座上设有用于夹紧引流线的夹块,主、副夹座夹紧绝缘导线且夹块夹紧引流线时,绝缘导线和引流线之间实现电流导通。本发明提供快速搭接工具,使引流线的搭接工作可采用地电位作业的方式完成,大大减少了搭接工作过程中投入的人力和需要用到的设备,搭接所需的工作时间大大缩短。采用本发明的快速搭接工具,可以在不停止供电的情况下实现有效搭接,保证供电的连续性和可靠性。
The invention discloses a quick lapping tool for drain wires used for ground potential work, which belongs to the technical field of electric power operation equipment, and includes a main clip seat and a secondary clip seat for clamping insulated wires, and also includes a sleeve rod, a main clip There is a chute on the seat, the auxiliary clamp seat is movable in the chute, the front end of the sleeve rod is connected to the auxiliary clamp seat, and the sleeve rod drives the auxiliary clamp base to move relative to the main clamp base to clamp the insulated wire; the main clamp base is equipped with a When the clamp block for clamping the drain wire is clamped, the main and auxiliary clamp seats clamp the insulated wire and the clamp block clamps the drain wire, current conduction is realized between the insulated wire and the drain wire. The invention provides a quick lapping tool, so that the lapping work of the drain wire can be completed by using the ground potential operation, which greatly reduces the manpower and equipment needed in the lapping process, and greatly reduces the working time required for lapping. shorten. By adopting the quick lapping tool of the present invention, effective lapping can be realized without stopping power supply, thereby ensuring the continuity and reliability of power supply.
Description
技术领域technical field
本发明涉及电力操作设备技术领域,尤其涉及一种用于地电位作业的引流线快速搭接工具。The invention relates to the technical field of electric power operation equipment, in particular to a quick bonding tool for drain wires used for ground potential work.
背景技术Background technique
随着社会经济的发展,对配网线路的供电连续性、可靠性要求越来越高,当单回绝缘线路配变高压引线发生并沟线夹过热时,需要采用旁路作业方法实现线路的引流,因此利用操作杆式旁路作业的带电作业场合越来越多。但是利用现有的操作杆用于地电位作业时,必行对绝缘导线进行剥线工作,工序繁琐,施工困难。另外,由于对绝缘导线进行了剥线工作,绝缘导线的绝缘外层被破坏,在雷击等天气情况下易发生故障,不能有效保证电网的用电安全性。With the development of society and economy, the requirements for power supply continuity and reliability of distribution network lines are getting higher and higher. When the single-circuit insulated line distribution transformer high-voltage leads are overheated, it is necessary to use the bypass operation method to realize the line protection. Drainage, so there are more and more live working occasions using operating rod bypass operations. However, when the existing operating rod is used for ground potential work, it is necessary to strip the insulated wires, the process is cumbersome, and the construction is difficult. In addition, due to the stripping work on the insulated wires, the outer insulation layer of the insulated wires is damaged, and it is prone to failure in weather conditions such as lightning strikes, which cannot effectively ensure the safety of electricity use in the grid.
发明内容Contents of the invention
为了解决上述现有技术中存在的缺点和不足,本发明提供了一种在无需对绝缘导线进行剥线的前提下实现绝缘导线与引流线快速搭接的用于地电位作业的引流线快速搭接工具。In order to solve the shortcomings and deficiencies in the above-mentioned prior art, the present invention provides a fast lapping of drain wires for ground potential work without stripping the insulated wires. connect tool.
为了实现上述技术目的,本发明提供的用于地电位作业的引流线快速搭接工具,包括配合用于夹紧绝缘导线的主夹座和副夹座,还包括套杆,主夹座上设有滑槽,副夹座活动设于滑槽内,套杆前端连接于副夹座,套杆带动副夹座相对于主夹座移动夹紧绝缘导线;所述主夹座上设有用于夹紧引流线的夹块,主、副夹座夹紧绝缘导线且夹块夹紧引流线时,绝缘导线和引流线之间实现电流导通。In order to achieve the above technical purpose, the quick bonding tool for drain wires used in ground potential work provided by the present invention includes a main clip seat and a secondary clip seat for clamping insulated wires, and also includes a sleeve rod. The main clip seat is equipped with There is a chute, the auxiliary clamp seat is movable in the chute, the front end of the sleeve rod is connected to the auxiliary clamp seat, and the sleeve rod drives the auxiliary clamp base to move and clamp the insulated wire relative to the main clamp base; When the clamping block tightens the drain wire, the main and auxiliary clamp seats clamp the insulated wire and the clamp block clamps the drain wire, current conduction is realized between the insulated wire and the drain wire.
优选的,所述主夹座上设有螺杆,螺杆前端转动连接于副夹座,螺杆后端设有传动块,套杆前端开设有与传动块匹配的传动孔,套杆通过螺杆带动副夹座相对于主夹座移动。Preferably, the main clamp seat is provided with a screw, the front end of the screw is rotatably connected to the auxiliary clamp seat, the rear end of the screw is provided with a transmission block, the front end of the sleeve rod is provided with a transmission hole matching the transmission block, and the sleeve rod drives the auxiliary clamp through the screw rod The seat moves relative to the main clamp seat.
优选的,所述螺杆前端设有传动凸起,副夹座内设有传动套,传动套上设有与传动凸起匹配的凹孔,螺杆前端通过传动凸起和凹孔的配合固定连接于传动套;所述传动套的周向外壁上设有环形卡槽,副夹座内设有销杆,销杆的一端抵于环形卡槽内。Preferably, the front end of the screw is provided with a transmission protrusion, a transmission sleeve is provided in the sub-clamp, and a concave hole matching the transmission protrusion is provided on the transmission sleeve, and the front end of the screw is fixedly connected to the transmission protrusion and the concave hole. The transmission sleeve; the circumferential outer wall of the transmission sleeve is provided with an annular slot, and a pin rod is provided in the sub-clamp seat, and one end of the pin rod abuts against the annular slot.
优选的,所述主夹座上设有与螺杆匹配的螺纹孔,螺纹孔的轴向与副夹座的移动方向一致,螺杆通过与螺纹孔的配合活动设于主夹座上。Preferably, the main holder is provided with a threaded hole matching the screw, the axial direction of the threaded hole is consistent with the moving direction of the auxiliary holder, and the screw is arranged on the main holder through cooperation with the threaded hole.
优选的,所述套杆的前端设有定位板,定位板上设有向前凸出的定位柱,主夹座的后端设有定位座,定位座上开设有供定位柱穿过的定位孔和供螺杆穿过的通孔。Preferably, the front end of the sleeve rod is provided with a positioning plate, the positioning plate is provided with a positioning post protruding forward, the rear end of the main clamp seat is provided with a positioning seat, and a positioning seat is provided on the positioning seat for the positioning post to pass through. Holes and through holes for the screw to pass through.
优选的,所述定位板上开设有与套杆匹配的圆孔,定位板通过圆孔活动套设于套杆上,套杆后端固定有座板,定位板和座板之间设有弹簧,弹簧套设于套杆的外部且两端分别连接于定位板和座板。Preferably, the positioning plate is provided with a round hole matching the sleeve rod, the positioning plate is movably sleeved on the sleeve rod through the round hole, the rear end of the sleeve rod is fixed with a seat plate, and a spring is arranged between the positioning plate and the seat plate , the spring is sleeved on the outside of the sleeve rod and the two ends are respectively connected to the positioning plate and the seat plate.
优选的,所述引流线快速搭接工具还包括绝缘的连杆,套杆后端设有向后凸出的连接部,连杆前端开设有与连接部匹配的连接孔,连杆前端通过连接孔和连接部的配合固定连接于套杆后端;所述连杆后端设有防滑手柄。Preferably, the quick-connecting tool for drainage wires also includes an insulated connecting rod. The hole and the connecting portion are fixedly connected to the rear end of the sleeve rod; the rear end of the connecting rod is provided with a non-slip handle.
优选的,所述主夹座上设有斜向凸出的侧夹座,侧夹座上开设有供引流线卡入的夹槽和连通于夹槽的槽口,夹块活动设于侧夹座上。Preferably, the main clamping seat is provided with an obliquely protruding side clamping seat, and the side clamping seat is provided with a clamping groove for the drainage line to snap into and a notch connected to the clamping groove, and the clamping block is movable on the side clamping seat.
优选的,所述主夹座上设有用于带动夹块移动的螺栓,侧夹座上设有与夹槽相对的凸台,凸台上设有与螺栓匹配的螺孔,螺栓通过与螺孔的配合活动设于凸台上且前端朝向夹槽,夹块固定于螺栓的前端。Preferably, the main clamping seat is provided with bolts for driving the clamp block to move, the side clamping seat is provided with a boss opposite to the clamping groove, and the boss is provided with a screw hole matching the bolt, and the bolt passes through the screw hole The cooperating activities are arranged on the boss with the front end facing the clamping groove, and the clamping block is fixed on the front end of the bolt.
优选的,所述主夹座上开设有用于夹紧绝缘导线的主夹槽,副夹座上开设有用于夹紧绝缘导线的副夹槽,绝缘导线设有绝缘层,主夹槽的内壁和副夹槽的内壁上均设有若干用于刺穿绝缘层的尖刺。Preferably, the main clamp seat is provided with a main clamp groove for clamping the insulated wire, and the secondary clamp seat is provided with a secondary clamp groove for clamping the insulated wire, the insulated wire is provided with an insulating layer, the inner wall of the main clamp groove and The inner walls of the auxiliary clamp grooves are provided with a number of sharp thorns for piercing the insulating layer.
采用上述技术方案后,本发明提供的用于地电位作业的引流线快速搭接工具具有如下优点:After adopting the above-mentioned technical scheme, the quick-lapping tool for drainage wires provided by the present invention for ground potential work has the following advantages:
1、本发明提供的用于地电位作业的引流线快速搭接工具,对现有结构的线夹进行了改进,在现有线夹的基础上假加设了套杆,使引流线的搭接工作可采用地电位作业的方式完成,大大减少了搭接工作过程中投入的人力和需要用到的设备,搭接所需的工作时间大大缩短,搭接的工作效率得到有效提升。另外,采用本发明的引流线快速搭接工具,可以在不停止供电的情况下实现有效搭接,便于保证供电的连续性和可靠性。1. The quick lapping tool for drainage wires provided by the present invention for ground potential work improves the wire clips of the existing structure. On the basis of the existing wire clips, a set rod is assumed to make the lapping of the drainage wires The work can be done in the way of ground potential operation, which greatly reduces the manpower and equipment needed in the lap jointing process, greatly shortens the working time required for lap jointing, and effectively improves the work efficiency of lap jointing. In addition, by adopting the quick bonding tool for drain wires of the present invention, effective bonding can be realized without stopping the power supply, so as to ensure the continuity and reliability of the power supply.
2、主夹座上设置螺杆,螺杆前端连接于副夹座,螺杆后端通过传动块和传动孔的配合连接于套杆。套杆转动时,通过螺杆的作用带动副夹座在主夹座的滑槽内移动,从而实现夹紧绝缘导线的目的,结构简单,易于实现。2. A screw is arranged on the main clamping seat, the front end of the screw is connected to the auxiliary clamping seat, and the rear end of the screw is connected to the sleeve rod through the cooperation of the transmission block and the transmission hole. When the sleeve rod rotates, the action of the screw rod drives the auxiliary clamp seat to move in the chute of the main clamp seat, so as to achieve the purpose of clamping the insulated wire. The structure is simple and easy to realize.
3、螺杆前端设置传动凸起,副夹座内设置传动套和销杆,销杆的一端抵于传动套周向外壁上的换形卡槽内。螺杆转动时带动传动套转动,传动套转动时通过销杆的作用带动副夹座在主夹座上的滑槽内移动。3. A transmission protrusion is provided at the front end of the screw rod, a transmission sleeve and a pin rod are provided in the sub-clamp seat, and one end of the pin rod abuts against the shape-changing groove on the peripheral outer wall of the transmission sleeve. When the screw rod rotates, it drives the transmission sleeve to rotate, and when the transmission sleeve rotates, the secondary holder moves in the chute on the main holder through the action of the pin rod.
4、螺杆通过与螺纹孔的配合转动设于主夹座上,螺杆的安装结构简单,便于装配。螺杆的轴向与副夹座的移动方向一致,螺杆的转动通过传动套和销杆的作用转变成副夹座的移动,从而实现夹紧绝缘导线的目的。4. The screw rod is set on the main clamp seat by cooperating with the threaded hole. The installation structure of the screw rod is simple and easy to assemble. The axial direction of the screw is consistent with the moving direction of the sub-clamp, and the rotation of the screw is transformed into the movement of the sub-clamp through the action of the transmission sleeve and the pin rod, so as to achieve the purpose of clamping the insulated wire.
5、套杆前端设置定位板,定位板上设置定位柱,主夹座后端设置带定位孔的定位座。套杆与螺杆连接带动副夹座移动时,定位柱插入定位孔内,实现主夹座和套杆间的定位,能提高螺杆运动的稳定性,进而提高副夹座移动夹紧绝缘导线的稳定性。5. A positioning plate is set at the front end of the sleeve rod, a positioning column is set on the positioning plate, and a positioning seat with a positioning hole is set at the rear end of the main clamp seat. When the sleeve rod is connected with the screw to drive the sub clamp to move, the positioning column is inserted into the positioning hole to realize the positioning between the main clamp and the sleeve rod, which can improve the stability of the screw movement, and then improve the stability of the sub clamp to move and clamp the insulated wire sex.
6、定位板活动套设于套杆上,套杆后端固定座板,定位板和座板之间设置弹簧。套杆通过螺杆带动副夹座移动夹紧绝缘导线时,弹簧受力压缩变形。当副夹座移动到位后,操作人员稍微松开套杆,定位板在弹簧的作用下向前移动,定位板带动定位座移动,定位座移动能使传动块更加顺畅地自套杆前端的传动孔脱离,提高使用便利性。6. The positioning plate is movably sleeved on the sleeve rod, the rear end of the sleeve rod is fixed to the seat plate, and a spring is arranged between the positioning plate and the seat plate. When the sleeve rod drives the auxiliary clamp seat to move and clamp the insulated wire through the screw rod, the spring is compressed and deformed under force. When the sub-clamp is in place, the operator loosens the rod slightly, the positioning plate moves forward under the action of the spring, the positioning plate drives the positioning seat to move, and the movement of the positioning seat can make the transmission block more smoothly drive from the front end of the sleeve rod. Holes are detached for increased ease of use.
7、引流线快速搭接工具还包括设于套杆后端且绝缘的连杆,连杆和套杆之间通过连接部和连接孔的配合实现固定连接,通过连杆的作用能提高搭接工具地电位作业的操作距离,提高通用性。7. The quick lapping tool for drainage wire also includes an insulated connecting rod located at the rear end of the sleeve rod. The fixed connection between the connecting rod and the sleeve rod is realized through the cooperation of the connecting part and the connecting hole, and the function of the connecting rod can improve the overlap. The operating distance of the tool ground potential operation improves the versatility.
8、主夹座上设置侧夹座,侧夹座上开设夹槽和槽口,夹块活动设于侧夹座上。将引流线自槽口处卡入夹槽内,然后移动夹块使其将引流线紧抵在夹槽内即可实现引流线的夹紧,用于夹紧引流线的结构简单,易于操作。8. The side clamp seat is set on the main clamp seat, the clamp groove and notch are set on the side clamp seat, and the clamp block is movable on the side clamp seat. The drainage wire is clamped into the clamping groove from the notch, and then the clamping block is moved to press the drainage wire against the clamping groove to realize the clamping of the drainage wire. The structure for clamping the drainage wire is simple and easy to operate.
9、侧夹座上设置凸台,凸台上开设螺孔,螺栓通过与螺孔的螺纹配合活动安装于凸台上,夹块固定于螺栓的前端。转动螺栓即可带动夹块相对于夹槽移动,实现通过夹块将引流线紧抵在夹槽内的目的,结构简单,便于操作。9. A boss is set on the side clamping seat, and a screw hole is set on the boss, and the bolt is movably installed on the boss by cooperating with the thread of the screw hole, and the clamping block is fixed on the front end of the bolt. Turning the bolt can drive the clamping block to move relative to the clamping groove, so as to achieve the purpose of pressing the drain wire against the clamping groove through the clamping block, and the structure is simple and easy to operate.
10、主夹槽和副夹槽的内壁均设置尖刺,主、副夹座夹紧绝缘导线后,尖刺刺穿绝缘导线的绝缘层,绝缘导线和引流线之间通过搭接工具实现电流的导通,保证供电。10. Spikes are set on the inner walls of the main clamping groove and the auxiliary clamping groove. After the main and auxiliary clamping seats clamp the insulated wires, the spikes pierce the insulation layer of the insulated wires. conduction to ensure power supply.
由于尖刺直接将绝缘层刺破,进行搭接操作前无需对绝缘导线进行剥线工作,操作工序减少,且有效规避了因剥线带来的触电风险。另外,尖刺刺穿绝缘层后,主夹座和副夹座紧贴于绝缘导线的外表面,主、副夹座形成遮蔽罩,恢复绝缘导线的绝缘性能,防止绝缘层刺破处在雷击等天气情况下引发用电危险。Because the spikes directly pierce the insulating layer, there is no need to strip the insulated wires before the lapping operation, the operating procedures are reduced, and the risk of electric shock caused by stripping is effectively avoided. In addition, after the spike pierces the insulating layer, the main clamp and the auxiliary clamp are closely attached to the outer surface of the insulated wire, and the main and auxiliary clamps form a shield to restore the insulation performance of the insulated wire and prevent lightning strikes at the point where the insulation layer is pierced. Electricity hazards caused by weather conditions.
附图说明Description of drawings
图1为本发明实施例一用于地电位作业的引流线快速搭接工具的主视图;Fig. 1 is the front view of the drain wire rapid lapping tool for ground potential work according to the embodiment of the present invention;
图2为图1的左视图;Fig. 2 is the left view of Fig. 1;
图3为本发明实施例一用于地电位作业的引流线快速搭接工具中主夹座的竖向剖视图;Fig. 3 is a vertical cross-sectional view of the main clamping seat in the fast lapping tool for drain wires used for ground potential work according to Embodiment 1 of the present invention;
图4为本发明实施例一用于地电位作业的引流线快速搭接工具中螺杆和传动套的示意图;Fig. 4 is a schematic diagram of a screw and a drive sleeve in a quick lapping tool for drain wires for ground potential work according to Embodiment 1 of the present invention;
图5为本发明实施例一用于地电位作业的引流线快速搭接工具中套杆的立体图;Fig. 5 is a perspective view of a sleeve rod in a quick lapping tool for drain wires for ground potential work according to Embodiment 1 of the present invention;
图6为本发明实施例一用于地电位作业的引流线快速搭接工具中定位板的俯视图;Fig. 6 is a top view of a positioning plate in a quick lapping tool for drainage wires for ground potential work according to Embodiment 1 of the present invention;
图7为本发明实施例一用于地电位作业的引流线快速搭接工具中定位座的俯视图;Fig. 7 is a top view of the positioning seat in the quick lapping tool for drainage wires used for ground potential work according to Embodiment 1 of the present invention;
图8为本发明实施例一用于地电位作业的引流线快速搭接工具中夹块和螺栓的示意图。Fig. 8 is a schematic diagram of clamping blocks and bolts in a quick lapping tool for drain wires for ground potential work according to Embodiment 1 of the present invention.
图中,1-主夹座,11-侧夹座,111-夹槽,112-槽口,113-凸台,114-螺孔,12-滑槽,13-螺纹孔,14-固定槽,15-定位座,151-定位孔,152-通孔,16-钩状头部,17-主夹槽,18-尖刺,2-副夹座,21-传动套,22-凹孔,23-环形卡槽,24-销杆,25-副夹槽,3-套杆,31-传动孔,32-定位板,33-定位柱,34-圆孔,35-座板,36-弹簧,37-连接部,38-销孔,4-连杆,41-防滑手柄,5-绝缘导线,6-引流线,7-夹块,71-螺栓,72-夹紧面,8-螺杆,81-传动凸起,82-传动块。In the figure, 1-main clamp seat, 11-side clamp seat, 111-clamp groove, 112-notch, 113-boss, 114-screw hole, 12-chute, 13-thread hole, 14-fixing groove, 15-Positioning seat, 151-Positioning hole, 152-Through hole, 16-Hooked head, 17-Main clip groove, 18-Spiked, 2-Secondary clip seat, 21-Drive sleeve, 22-Concave hole, 23 -Annular card slot, 24-pin rod, 25-secondary clip groove, 3-sleeve rod, 31-drive hole, 32-positioning plate, 33-positioning column, 34-round hole, 35-seat plate, 36-spring, 37-connection part, 38-pin hole, 4-connecting rod, 41-non-slip handle, 5-insulated wire, 6-drainage wire, 7-clamp block, 71-bolt, 72-clamping surface, 8-screw, 81 - transmission protrusion, 82 - transmission block.
具体实施方式detailed description
下面结合附图和具体实施例对本发明作进一步说明。需要理解的是,下述的“上”、“下”、“左”、“右”、“纵向”、“横向”、“内”、“外”、“竖直”、“水平”、“顶”、“底”等指示方位或位置关系的词语仅基于附图所示的方位或位置关系,仅为了便于描述本发明和简化描述,而不是指示或暗示所指的装置/元件必须具有特定的方位或以特定的方位构造和操作,因此不能理解为对本发明的限制。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the following "up", "down", "left", "right", "vertical", "horizontal", "inner", "outer", "vertical", "horizontal", " Words such as "top", "bottom", etc. indicating orientation or positional relationship are only based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device/element must have a specific orientation or are constructed and operative in a particular orientation and therefore are not to be construed as limiting the invention.
实施例一Embodiment one
如图1、图2所示,本发明实施例一提供的用于地电位作业的引流线快速搭接工具,包括主夹座1、副夹座2、套杆3和绝缘的连杆4。主夹座1和副夹座2配合用于夹紧绝缘导线5,主夹座的侧部设有凸出的侧夹座11,侧夹座上设有用于夹紧引流线6的夹块7。主、副夹座1、2夹紧绝缘导线5且夹块7夹紧引流线6时,绝缘导线和引流线之间实现电流导通。As shown in FIG. 1 and FIG. 2 , the quick bonding tool for drain wires for ground potential work provided by Embodiment 1 of the present invention includes a main clamp seat 1 , a secondary clamp seat 2 , a sleeve rod 3 and an insulated connecting rod 4 . The main clamp seat 1 and the auxiliary clamp seat 2 cooperate to clamp the insulated wire 5, and the side of the main clamp seat is provided with a protruding side clamp seat 11, and the side clamp seat is provided with a clamp block 7 for clamping the drain wire 6 . When the main and auxiliary clamp seats 1 and 2 clamp the insulated wire 5 and the clamp block 7 clamps the drain wire 6, the current conduction is realized between the insulated wire and the drain wire.
如图3所示,主夹座1的上部设有竖向延伸的滑槽12,副夹座2的一侧活动设于滑槽内。主夹座1的下部开设有连通于滑槽且轴向竖直的螺纹孔13,螺纹孔内通过螺纹配合设有轴向竖直的螺杆8,螺杆8的前端连接于副夹座2,螺杆的后端连接于套杆3。As shown in FIG. 3 , a vertically extending chute 12 is provided on the upper part of the main holder 1 , and one side of the auxiliary holder 2 is movable in the chute. The lower part of the main clamp seat 1 is provided with a threaded hole 13 which is connected to the chute and is axially vertical. In the threaded hole, an axially vertical screw rod 8 is provided through thread fit. The front end of the screw rod 8 is connected to the auxiliary clamp seat 2. The rear end is connected to sleeve bar 3.
如图4所示,螺杆8的前端设有向前凸出的传动凸起81,副夹座2的底部嵌装有可转动的传动套21,传动套上设有底部开口的凹孔22,凹孔与传动凸起匹配,螺杆前端通过传动凸起和凹孔的配合固定连接于传动套。As shown in Figure 4, the front end of the screw rod 8 is provided with a forwardly protruding transmission protrusion 81, and the bottom of the sub-clamp seat 2 is embedded with a rotatable transmission sleeve 21, and the transmission sleeve is provided with a concave hole 22 with a bottom opening. The concave hole matches the transmission protrusion, and the front end of the screw rod is fixedly connected to the transmission sleeve through the cooperation of the transmission protrusion and the concave hole.
传动套21的周向外壁上设有环形卡槽23,副夹座2内固定有一水平的销杆24,销杆的一端抵于环形卡槽内。本实施例中,销杆24的长度方向与传动套的某一径向一致。An annular slot 23 is arranged on the circumferential outer wall of the transmission sleeve 21 , and a horizontal pin 24 is fixed inside the sub-clamp seat 2 , and one end of the pin rests in the annular slot. In this embodiment, the length direction of the pin rod 24 is consistent with a certain radial direction of the transmission sleeve.
螺杆8的后端固定有传动块82,如图5所示,套杆3的前端开设有与传动块82匹配的传动孔31,套杆前端通过传动孔和传动块的配合活动连接于螺杆。本实施例中,传动块82呈正四边形或正五边形或正六边形,传动孔31呈与传动块相同的形状,实现传动连接。The rear end of screw rod 8 is fixed with drive block 82, and as shown in Figure 5, the front end of sleeve bar 3 is provided with the drive hole 31 that matches drive block 82, and cover bar front end is movably connected to screw rod by the cooperation of drive hole and drive block. In this embodiment, the transmission block 82 is in the shape of a regular quadrilateral, regular pentagon or regular hexagon, and the transmission hole 31 is in the same shape as the transmission block to realize the transmission connection.
套杆3的后端设有向后凸出的连接部37,连杆4的前端开设有与连接部匹配的连接孔,连杆前端通过连接孔和连接部的配合固定连接于套杆后端。本实施例中,连杆4后端设有防滑手柄41,为了加固套杆3和连杆4之间的固定连接,连杆前端和连接部37上均开设有销孔38,销孔内固定有插销。The rear end of the sleeve rod 3 is provided with a connecting portion 37 protruding backward, and the front end of the connecting rod 4 is provided with a connecting hole matching the connecting portion, and the front end of the connecting rod is fixedly connected to the rear end of the sleeve rod through the cooperation of the connecting hole and the connecting portion. . In this embodiment, the rear end of the connecting rod 4 is provided with an anti-skid handle 41. In order to strengthen the fixed connection between the sleeve rod 3 and the connecting rod 4, a pin hole 38 is provided on the front end of the connecting rod and the connecting part 37, and the pin hole 38 is fixed in the pin hole. There are latches.
套杆3的前端设有定位板32,如图6所示,定位板上设有向前凸出的定位柱33,定位板的中心处设有圆孔34,定位板通过圆孔活动套设于套杆3上。套杆后端固定有座板35,定位板32和座板35之间设有弹簧36,弹簧套设于套杆3的外部且两端分别连接于定位板和座板。The front end of sleeve bar 3 is provided with positioning plate 32, as shown in Figure 6, positioning plate is provided with the positioning post 33 that protrudes forward, and the center of positioning plate is provided with circular hole 34, and positioning plate is movable sleeved by circular hole. on the sleeve rod 3. A seat plate 35 is fixed at the rear end of the cover rod, and a spring 36 is arranged between the positioning plate 32 and the seat plate 35. The spring is sleeved on the outside of the cover rod 3 and its two ends are respectively connected to the positioning plate and the seat plate.
主夹座1的后端开设有固定槽14,固定槽内固定有定位座15。如图7所示,定位座上开设有供定位柱33穿过的定位孔151和供螺杆8穿过的通孔152。The rear end of the main clip seat 1 is provided with a fixing groove 14, and a positioning seat 15 is fixed in the fixing groove. As shown in FIG. 7 , a positioning hole 151 through which the positioning post 33 passes and a through hole 152 through which the screw rod 8 passes are opened on the positioning seat.
本实施例中,定位柱33设有两根且分别位于套杆3的两侧,定位座15上的定位孔151也开设有两个。In this embodiment, there are two positioning posts 33 located on both sides of the sleeve rod 3 , and two positioning holes 151 on the positioning seat 15 are also provided.
如图3所示,侧夹座11上开设有供引流线6卡入的夹槽111和连通于夹槽的槽口112,侧夹座上还设有与夹槽111相对的凸台113,凸台上设有螺孔114。如图8所示,夹块7通过与螺孔114匹配的螺栓71活动设于凸台113上,夹块固定于螺栓的前端,夹块7在朝向夹槽111的端面上设有内凹的夹紧面72。As shown in Figure 3, the side clip seat 11 is provided with a clip groove 111 for the drainage wire 6 to snap into and a notch 112 communicating with the clip groove, and a boss 113 opposite to the clip groove 111 is also provided on the side clip seat. Screw holes 114 are provided on the boss. As shown in Figure 8, the clamping block 7 is movable on the boss 113 through the bolt 71 matched with the screw hole 114, the clamping block is fixed on the front end of the bolt, and the clamping block 7 is provided with a concave groove on the end face facing the clamping groove 111. Clamping face 72 .
主夹座1上设有伸出的钩状头部16,钩状头部在朝向副夹座2的端面上设有内凹的主夹槽17。副夹座2伸出滑槽12的一端在朝向主夹槽17的表面上设有内凹的副夹槽25,主夹槽的内壁和副夹槽的内壁上均设有若干用于刺穿绝缘层的尖刺18。本实施例中,尖刺18设有至少四对。The main clamp seat 1 is provided with a protruding hook-shaped head 16 , and the hook-shaped head is provided with a concave main clamp groove 17 on the end surface facing the secondary clamp seat 2 . One end of the secondary clamp seat 2 protruding from the chute 12 is provided with a concave secondary clamp groove 25 on the surface facing the main clamp groove 17, and the inner wall of the main clamp groove and the inner wall of the secondary clamp groove are provided with a number of holes for piercing. Insulation spikes 18 . In this embodiment, there are at least four pairs of spikes 18 .
本实施例中,主夹座1和副夹座2均为铝质。为了提高尖刺18部位的强度,尖刺局部可以设置成铁质。In this embodiment, both the main holder 1 and the auxiliary holder 2 are made of aluminum. In order to improve the strength of the spikes 18, the spikes can be partially made of iron.
操作前时,使套杆3和连杆4固定连接。操作时,先将引流线6自槽口112处卡入夹槽111内,转动螺栓71,使夹块7夹紧引流线6,引流线限位于夹槽111内壁和夹紧面72之间。然后,将螺杆后端的传动块82卡入套杆3前端的传动孔31内。支起连杆4,使绝缘导线5自主、副夹座1、2间的空隙卡入主、副夹槽17、25内。转动连杆4,套杆3通过螺杆8带动副夹座2相对于主夹座1移动,直至主、副夹座1、2夹紧绝缘导线。Before the operation, the sleeve rod 3 and the connecting rod 4 are fixedly connected. During operation, the drainage wire 6 is first snapped into the clamping groove 111 from the notch 112, and the bolt 71 is rotated so that the clamp block 7 clamps the drainage wire 6, and the drainage wire is limited between the inner wall of the clamping groove 111 and the clamping surface 72. Then, snap the transmission block 82 at the rear end of the screw into the transmission hole 31 at the front end of the sleeve rod 3 . Connecting rod 4 is supported, and insulated wire 5 is snapped in the main and auxiliary clip grooves 17,25 autonomously, and the gap between the secondary clamp seats 1,2. Rotate the connecting rod 4, and the sleeve rod 3 drives the auxiliary clamp seat 2 to move relative to the main clamp seat 1 through the screw rod 8 until the main and auxiliary clamp seats 1, 2 clamp the insulated wire.
主、副夹座1、2夹紧绝缘导线时,尖刺18刺穿绝缘导线5的绝缘层,绝缘导线和引流线之间6通过搭接工具实现电流的导通,保证供电。When the main and auxiliary holders 1 and 2 clamp the insulated wires, the spikes 18 pierce the insulation layer of the insulated wires 5, and the 6 between the insulated wires and the drain wire realizes the conduction of the current by the lapping tool to ensure power supply.
套杆3通过螺杆8带动副夹座2移动夹紧绝缘导线5时,弹簧36受力压缩变形。当副夹座2移动到位后,操作人员稍微松开套杆3,定位板32在弹簧的作用下向前移动,定位板带动定位座15移动,定位座移动能使传动块82更加顺畅地自套杆3前端的传动孔31脱离,提高使用便利性。When the sleeve rod 3 drives the auxiliary clamp seat 2 to move and clamp the insulated wire 5 through the screw rod 8, the spring 36 is compressed and deformed under force. After the auxiliary clip seat 2 is moved in place, the operator loosens the sleeve rod 3 slightly, and the positioning plate 32 moves forward under the action of the spring, and the positioning plate drives the positioning seat 15 to move, and the movement of the positioning seat can make the transmission block 82 automatically move more smoothly. The transmission hole 31 at the front end of the sleeve rod 3 is disengaged, which improves the convenience of use.
采用本实施例的引流线速搭接工具时,由于尖刺直接将绝缘层刺破,进行搭接操作前无需对绝缘导线进行剥线工作,操作工序减少,且有效规避了因剥线带来的触电风险。另外,尖刺刺穿绝缘层后,主夹座和副夹座紧贴于绝缘导线的外表面,主、副夹座形成遮蔽罩,恢复绝缘导线的绝缘性能,防止绝缘层刺破处在雷击等天气情况下引发用电危险。When using the current-drainage wire-speed lapping tool of this embodiment, because the sharp thorns directly pierce the insulating layer, there is no need to strip the insulated wires before the lapping operation, the operating procedures are reduced, and the problems caused by stripping are effectively avoided. risk of electric shock. In addition, after the spike pierces the insulating layer, the main clamp and the auxiliary clamp are closely attached to the outer surface of the insulated wire, and the main and auxiliary clamps form a shield to restore the insulation performance of the insulated wire and prevent lightning strikes at the point where the insulation layer is pierced. Electricity hazards caused by weather conditions.
通过套杆和连杆的组合使用,使引流线的搭接工作可采用地电位作业的方式完成,大大减少了搭接工作过程中投入的人力和需要用到的设备,搭接所需的工作时间大大缩短,搭接的工作效率得到有效提升。Through the combined use of sleeve rods and connecting rods, the lapping work of the drainage wires can be completed by ground potential operation, which greatly reduces the manpower and equipment needed in the lapping process, and the work required for lapping The time is greatly shortened, and the work efficiency of lap joints is effectively improved.
上述各部件的前端指使用时远离工作人员的一端,各部件的后端指使用时靠近工作人员的一端。The front end of each of the above components refers to the end away from the staff during use, and the rear end of each component refers to the end close to the staff during use.
除上述优选实施例外,本发明还有其他的实施方式,本领域技术人员可以根据本发明作出各种改变和变形,只要不脱离本发明的精神,均应属于本发明权利要求书中所定义的范围。Except above-mentioned preferred embodiment, the present invention also has other implementation modes, those skilled in the art can make various changes and distortions according to the present invention, as long as not departing from the spirit of the present invention, all should belong to the defined in the claims of the present invention scope.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710297140.3A CN107425297A (en) | 2017-04-28 | 2017-04-28 | A kind of drainage thread quick lap joint instrument for earth potential working |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710297140.3A CN107425297A (en) | 2017-04-28 | 2017-04-28 | A kind of drainage thread quick lap joint instrument for earth potential working |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107425297A true CN107425297A (en) | 2017-12-01 |
Family
ID=60424852
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710297140.3A Pending CN107425297A (en) | 2017-04-28 | 2017-04-28 | A kind of drainage thread quick lap joint instrument for earth potential working |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107425297A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108963502A (en) * | 2018-07-24 | 2018-12-07 | 国网青海省电力公司海东供电公司 | Connection jaws termination and air switch |
| CN109473908A (en) * | 2018-04-17 | 2019-03-15 | 国网浙江桐乡市供电有限公司 | A device and a wire clip for quickly overlapping lead wires and a method of using the same |
| CN109921330A (en) * | 2018-12-27 | 2019-06-21 | 国网浙江龙游县供电有限公司 | A kind of insulation lapping bar for medial potential working |
| CN111463595A (en) * | 2020-05-15 | 2020-07-28 | 国网江苏省电力有限公司扬州供电分公司 | A multifunctional drainage grounding device |
| CN111864501A (en) * | 2020-07-24 | 2020-10-30 | 南京欧霖霏科技有限公司 | A take insulating operating system of fire with electricity for electric power trade |
| CN115588862A (en) * | 2022-10-09 | 2023-01-10 | 广州番禺电缆集团有限公司 | Fully Insulated Quick Drain Clips |
| CN117613759A (en) * | 2023-11-29 | 2024-02-27 | 国网江苏省电力有限公司连云港供电分公司 | A new type of drainage device for live work |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101771247A (en) * | 2008-12-30 | 2010-07-07 | 上海市南电力工程有限公司 | Tool for jointing temporary lead wire under live working on rainy day for distribution line and method thereof |
| CN204067618U (en) * | 2014-08-13 | 2014-12-31 | 国家电网公司 | Novel charged early warning earth connection |
| CN206657864U (en) * | 2017-04-28 | 2017-11-21 | 国网浙江慈溪市供电公司 | A kind of drainage thread quick lap joint instrument for earth potential working |
-
2017
- 2017-04-28 CN CN201710297140.3A patent/CN107425297A/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101771247A (en) * | 2008-12-30 | 2010-07-07 | 上海市南电力工程有限公司 | Tool for jointing temporary lead wire under live working on rainy day for distribution line and method thereof |
| CN204067618U (en) * | 2014-08-13 | 2014-12-31 | 国家电网公司 | Novel charged early warning earth connection |
| CN206657864U (en) * | 2017-04-28 | 2017-11-21 | 国网浙江慈溪市供电公司 | A kind of drainage thread quick lap joint instrument for earth potential working |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109473908A (en) * | 2018-04-17 | 2019-03-15 | 国网浙江桐乡市供电有限公司 | A device and a wire clip for quickly overlapping lead wires and a method of using the same |
| CN109473908B (en) * | 2018-04-17 | 2020-10-16 | 国网浙江桐乡市供电有限公司 | Device for rapidly overlapping lead, wire clamp and using method of wire clamp |
| CN108963502A (en) * | 2018-07-24 | 2018-12-07 | 国网青海省电力公司海东供电公司 | Connection jaws termination and air switch |
| CN109921330A (en) * | 2018-12-27 | 2019-06-21 | 国网浙江龙游县供电有限公司 | A kind of insulation lapping bar for medial potential working |
| CN111463595A (en) * | 2020-05-15 | 2020-07-28 | 国网江苏省电力有限公司扬州供电分公司 | A multifunctional drainage grounding device |
| CN111463595B (en) * | 2020-05-15 | 2025-03-28 | 国网江苏省电力有限公司扬州供电分公司 | A multifunctional drainage grounding device |
| CN111864501A (en) * | 2020-07-24 | 2020-10-30 | 南京欧霖霏科技有限公司 | A take insulating operating system of fire with electricity for electric power trade |
| CN111864501B (en) * | 2020-07-24 | 2021-08-06 | 陕西专壹知识产权运营有限公司 | A take insulating operating system of fire with electricity for electric power trade |
| CN115588862A (en) * | 2022-10-09 | 2023-01-10 | 广州番禺电缆集团有限公司 | Fully Insulated Quick Drain Clips |
| CN117613759A (en) * | 2023-11-29 | 2024-02-27 | 国网江苏省电力有限公司连云港供电分公司 | A new type of drainage device for live work |
| CN117613759B (en) * | 2023-11-29 | 2024-06-07 | 国网江苏省电力有限公司连云港供电分公司 | Drainage device for live working |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107425297A (en) | A kind of drainage thread quick lap joint instrument for earth potential working | |
| CN101593942B (en) | 10-kilovolt insulated circuit operating rod type bypass working method | |
| CN108155602B (en) | An insulation puncture wire clamp clamping device and quick installation tool | |
| CN206657864U (en) | A kind of drainage thread quick lap joint instrument for earth potential working | |
| CN110247205A (en) | It is a kind of it is novel can multidirectional adjusting power transformation earthing clamp | |
| CN206516767U (en) | A kind of multipurpose ground connection pincers | |
| CN108695604B (en) | J-shaped wire clamping and electric fire-catching device and system and J-shaped wire clamping and clamping mechanism | |
| CN117199851A (en) | An electric remote control installation tool for grounding hanging rings based on insulating rods | |
| CN209766678U (en) | Live loading and unloading clamp | |
| CN201508917U (en) | Fire hook for ground potential of insulated wire | |
| CN104348122B (en) | Ground potential mounting type shunt wire clamp device and mounting method thereof | |
| CN105186402A (en) | Multifunctional cable head preparation device | |
| CN110601095B (en) | Combined type parallel ditch lap joint device capable of carrying out live working and operation method thereof | |
| CN205104855U (en) | Multi -functional cable head production device | |
| CN203774469U (en) | Portable, general and combined operation tool for high-voltage electric appliances | |
| CN207709922U (en) | Pipe piercing machine clamping device | |
| CN208986493U (en) | Rotary ground wire shorting bar | |
| CN210577680U (en) | Tool for rapidly increasing distance between power lines | |
| CN208570980U (en) | A kind of dedicated large contact surface conduction wire clamp of insulating bar | |
| CN212062712U (en) | Power cable grounding device suitable for different sizes | |
| CN203607569U (en) | A ground wire head restraint | |
| CN110829270B (en) | Special operating tool for live lead clamp | |
| CN211351017U (en) | A auxiliary fixtures for parallel groove clamp installation | |
| CN203734207U (en) | LF type connecting board clamp for insulator string live replacement of 220kV line | |
| CN209626453U (en) | It is a kind of it is novel can multidirectional adjusting power transformation earthing clamp |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171201 |