CN107419869A - The installation method and mounting structure of shingle nail - Google Patents

The installation method and mounting structure of shingle nail Download PDF

Info

Publication number
CN107419869A
CN107419869A CN201710332074.9A CN201710332074A CN107419869A CN 107419869 A CN107419869 A CN 107419869A CN 201710332074 A CN201710332074 A CN 201710332074A CN 107419869 A CN107419869 A CN 107419869A
Authority
CN
China
Prior art keywords
keel
shingle nail
keel shoe
truss
shoe
Prior art date
Application number
CN201710332074.9A
Other languages
Chinese (zh)
Other versions
CN107419869B (en
Inventor
陈汉成
陈泓名
陈智坚
张锐
Original Assignee
深圳海外装饰工程有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 深圳海外装饰工程有限公司 filed Critical 深圳海外装饰工程有限公司
Priority to CN201710332074.9A priority Critical patent/CN107419869B/en
Publication of CN107419869A publication Critical patent/CN107419869A/en
Application granted granted Critical
Publication of CN107419869B publication Critical patent/CN107419869B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection . Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection . Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • E04B1/80Heat insulating elements slab-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • E04B1/945Load-supporting structures specially adapted therefor

Abstract

The present invention discloses the installation method and mounting structure of a kind of shingle nail, and the installation method of the wherein shingle nail comprises the following steps:A, fixed multiple installed parts are arranged at intervals in truss, multiple installed parts;B, for fixed keel shoe in multiple installed parts, each installed part both passes through keel shoe, and is manifested by keel shoe, and surface of the keel shoe away from truss is formed with multiple holding areas;C, a laying at least shingle nail manifests the end face of keel shoe, at least one holding area of shingle nail partial occlusion keel shoe so that shingle nail is collectively forming the breach for connecting holding area with keel shoe in an at least installed part;D, an at least warming plate is filled in corresponding holding area by breach, repeat step C to step D, lays the end face that at least another shingle nail manifests keel shoe at least another installed part.It is more steady that the present invention installs shingle nail, and the precision of installation is higher, and overall structure is more compact.

Description

The installation method and mounting structure of shingle nail
Technical field
The present invention relates to the technical field of shingle nail installation, the installation method and installation knot of more particularly to a kind of shingle nail Structure.
Background technology
Shingle nail in the market when mounted, first lay warming plate in the outside of keel shoe, then cover shingle nail in The outside of warming plate, it is finally by connector that shingle nail is affixed with keel shoe.Because warming plate has toughness, easily occur local Deformation, when covering shingle nail in the outside of warming plate, shingle nail is connected to warming plate, and the local of warming plate produces to shingle nail Unbalanced active force, shingle nail is caused to be installed with this unstable, the error of installation is big, and warming plate is layed in keel shoe Outside, volume is increased, make structure not compact.
The content of the invention
The main object of the present invention is to provide a kind of installation method of shingle nail, it is intended to ensures that shingle nail installation is steady, peace The precision of dress is high, and overall structure is more compact.
To achieve the above object, the present invention proposes a kind of installation method of shingle nail, and the installation method of the shingle nail includes Following steps:
A, fixed multiple installed parts are arranged at intervals in truss, multiple installed parts;
B, for fixed keel shoe in the multiple installed part, each installed part both passes through the keel shoe, and by the keel Frame manifests, and surface of the keel shoe away from truss is formed with multiple holding areas;
C, a laying at least shingle nail manifests the end face of the keel shoe, the metope plate part in an at least installed part Block at least one holding area of keel shoe so that the shingle nail has been collectively forming with the keel shoe connects described house The breach in region;
D, an at least warming plate is filled in the corresponding holding area by the breach,
Repeat step C to step D, lay at least another shingle nail and manifest the keel shoe at least another installed part End face.
Preferably, it is further comprising the steps of before step C after step B:
Lay some flame-retardant boards and manifested not higher than the installed part described backwards to the surface of truss, flame-retardant board in keel shoe The height of keel shoe.
Preferably, step B comprises the following steps:
The keel shoe includes multiple spaced first keel and multiple spaced second keel, each two phase The first adjacent keel connect at least two second keel simultaneously, the first adjacent keel of each two and connect with two first keel Two the second keel connect surround a holding area.
Preferably, it is further comprising the steps of before step D after step C:Connected respectively by the both ends of each fastener One shingle nail and the keel shoe, the fixed shingle nail is in the keel shoe.
Preferably, it is further comprising the steps of before step C:
The height of truss is measured, when the height of truss is more than specified altitude, reserves and stretches close to the surface of keel shoe in truss Contracting seam region.
The present invention also proposes a kind of mounting structure of shingle nail, and the mounting structure of the shingle nail includes truss, is fixedly arranged on institute Truss and spaced multiple installed parts are stated, the keel shoe of the installed part is fixedly arranged on, is layed in the multiple of the installed part Shingle nail and multiple warming plates,
Each installed part both passes through the keel shoe, and is manifested by the keel shoe,
Surface of the keel shoe away from truss formed with multiple holding areas,
Each shingle nail is layed in the end face that an at least installed part manifests the keel shoe, and each metope plate part hides At least one holding area of keel shoe is kept off, each shingle nail is collectively forming lacking for the corresponding holding area of connection with keel shoe Mouthful,
Each warming plate is placed in a holding area by the breach.
Preferably, the mounting structure of the shingle nail also includes multiple flame-retardant boards, and the flame-retardant board is layed in the keel shoe back of the body To the surface of truss, the flame-retardant board manifests the height of the keel shoe not higher than the installed part.
Preferably, the keel shoe includes multiple spaced first keel and multiple spaced second keel, The first adjacent keel of each two connect at least two second keel simultaneously, the first adjacent keel of each two and with this two the Two the second keel that one keel abut surround a holding area.
Preferably, in addition to multiple fasteners, the both ends of each fastener connect a shingle nail and the keel shoe respectively.
Preferably, multiple shingle nails form a wall, and the wall is provided with least one expansion joint.
Technical solution of the present invention is by passing sequentially through fixed keel shoe in multiple installed parts, surface of the keel shoe away from truss Formed with multiple holding areas, each installed part both passes through keel shoe, and is manifested by keel shoe, laying an at least shingle nail in An at least installed part manifests the end face of keel shoe, at least one holding area of shingle nail partial occlusion keel shoe so that wall Panel is collectively forming the breach for connecting holding area with keel shoe, and an at least warming plate is filled in corresponding accommodating by breach In region, repeat above-mentioned part steps and lay the end face that at least another shingle nail manifests keel shoe at least another installed part, Installed part is first passed through with this to be positioned shingle nail, and shingle nail is fixedly arranged on keel shoe, then is filled warming plate, makes guarantor The installation of warm plate does not influence the installation of shingle nail, makes shingle nail installation more steady, the precision of installation is high, and warming plate is placed in dragon In the holding area that skeleton surrounds, also make overall structure more compact.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Structure according to these accompanying drawings obtains other accompanying drawings.
Fig. 1 is the schematic flow sheet of the embodiment of installation method one of shingle nail of the present invention;
Fig. 2 is the schematic flow sheet of another embodiment of installation method of shingle nail of the present invention;
Fig. 3 is the step S20 of the installation method of shingle nail of the present invention refinement schematic flow sheet;
Fig. 4 is the schematic flow sheet of the another embodiment of installation method of shingle nail of the present invention;
Fig. 5 is the partial schematic diagram of the mounting structure of shingle nail of the present invention.
Drawing reference numeral explanation:
Label Title Label Title
10 Truss 40 Shingle nail
20 Installed part 50 Warming plate
30 Keel shoe 60 Flame-retardant board
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only the part of the embodiment of the present invention, rather than whole embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its His embodiment, belongs to the scope of protection of the invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention In explaining the relative position relation under a certain particular pose (as shown in drawings) between each part, motion conditions etc., if should When particular pose changes, then directionality instruction also correspondingly changes therewith.
In the present invention, unless otherwise clearly defined and limited, term " connection ", " fixation " etc. should be interpreted broadly, For example, " fixation " can be fixedly connected or be detachably connected, or integrally;Can mechanically connect;Can be straight Connect connected, can also be indirectly connected by intermediary, can be connection or the phase interaction of two elements of two element internals With relation, limited unless otherwise clear and definite.For the ordinary skill in the art, on can understanding as the case may be State the concrete meaning of term in the present invention.
In addition, in the present invention such as relating to the description of " first ", " second " etc. be only used for describe purpose, and it is not intended that Indicate or imply its relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", At least one this feature can be expressed or be implicitly included to the feature of " second ".In addition, the technical side between each embodiment Case can be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when the combination of technical scheme Occur conflicting or will be understood that the combination of this technical scheme is not present when can not realize, also not in the guarantor of application claims Within the scope of shield.
The present invention proposes a kind of installation method of shingle nail.
Reference picture 1, in an embodiment of the present invention, the installation method of the shingle nail comprise the following steps:
S10:Fixed multiple installed parts 20 are arranged at intervals in truss, multiple installed parts 20;
S20:Fixed keel shoe 30 both passes through keel shoe 30 in multiple installed parts 20, each installed part 20, and by keel shoe 30 manifest, and surface of the keel shoe 30 away from truss 10 (does not indicate) formed with multiple holding areas;
S50:A laying at least shingle nail 40 manifests the end face of keel shoe 30, shingle nail 40 in an at least installed part 20 Divide at least one holding area (not indicating) for blocking keel shoe 30 so that shingle nail 40 has been collectively forming with keel shoe 30 and connected The breach of holding area (not indicating);
S60:An at least warming plate 50 is filled in corresponding holding area (not indicating) by breach;
S70:Repeat step S50 to step S60, lay at least another shingle nail 40 and manifested at least another installed part 20 The end face of keel shoe 30.
Above-mentioned installed part 20 is preferably square through-pipe, and is zinc-plated material, and shingle nail 40 is preferably fire-resistant gypsum panel, is incubated Plate 50 is preferably rock wool, and an embodiment is that the fixed multiple installations of installation of the modes such as bolt or welding are passed sequentially through on truss 10 Part 20, multiple one sides of the installed part 20 away from truss 10 are generally aligned in the same plane, in order to which shingle nail 40 carries out installation positioning, then Again by the fixed installation keel shoe 30 of the modes such as bolt or welding on installed part 20, the outer surface of the keel shoe 30 also is located at together One plane, and multiple holding areas (not indicating) are formed among keel shoe 30.
Then start to lay shingle nail 40, and a perpendicular or horizontal shingle nail 40, and part can be laid according to practice of construction Block holding area (not indicating) corresponding to keel shoe 30, each holding area (not indicating) at least side blocked formed with Breach.Shingle nail 40 is connected to installed part 20, and can be connected by screw in keel shoe 30, can be from metope when installing metope 40 Four built in boundaries of the middle part of plate 40 to shingle nail 40.Filling warming plate 50 in most backward holding area (not indicating), can be by every The breach of one holding area (not indicating) at least side is filled, and ensures that warming plate 50 will fasten, and is not loosened, not across falling. Next shingle nail 40 is progressively installed again according to the above method, until the multiple shingle nails 40 for completing whole wall are installed.
Technical solution of the present invention is by passing sequentially through fixed keel shoe 30 in multiple installed parts 20, and keel shoe 30 is away from truss 10 surface (does not indicate) formed with multiple holding areas, and each installed part 20 both passes through keel shoe 30, and is shown by keel shoe 30 Expose, a laying at least shingle nail 40 manifests the end face of keel shoe 30, the partial occlusion of shingle nail 40 in an at least installed part 20 At least one holding area (not indicating) of keel shoe 30 so that shingle nail 40 has been collectively forming with keel shoe 30 and has connected accommodating area The breach in domain (not indicating), an at least warming plate 50 is filled in corresponding holding area (not indicating) by breach, in repetition State part steps and lay the end face that at least another shingle nail 40 manifests keel shoe 30 at least another installed part 20, first led to this Cross installed part 20 to be positioned shingle nail 40, and shingle nail 40 is fixedly arranged on keel shoe 30, then be filled warming plate 50, make The installation of warming plate 50 does not influence the installation of shingle nail 40, installs shingle nail 40 more steady, the precision of installation is high, and is incubated Plate 50 is placed in the holding area (not indicating) that keel shoe 30 surrounds, and also makes overall structure more compact.
Reference picture 2, it is preferable that further comprising the steps of before step S50 after after step S20:
S40:Lay some flame-retardant boards 60 and be not higher than installed part 20 backwards to the surface of truss 10, flame-retardant board 60 in keel shoe 30 Manifest the height of keel shoe 30.
Because installed part 20 manifests keel shoe 30, when shingle nail 40 is connected to installed part 20 and is fixedly arranged on keel shoe 30 When, shingle nail 40 (is not indicated) with outer surface of the keel shoe 30 away from truss 10 formed with idle area, and flame-retardant board 60 can be placed in In the idle area (not indicating), and flame-retardant board 60 manifests the height of keel shoe 30 not higher than installed part 20, makes flame-retardant board 60 not to installing shingle nail 40 afterwards when cause to interfere, ensure shingle nail 40 install precision.
Reference picture 3, it is preferable that step S20 specifically includes following steps:
S21:Keel shoe 30 includes multiple spaced first keel and multiple spaced second keel, each two Adjacent the first keel connect at least two second keel simultaneously, the first adjacent keel of each two and with two first keel Two the second keel of connection surround a holding area (not indicating).The first above-mentioned keel and the second keel can by welding, The modes such as screw carry out affixed, can be also in reinforcement connection by corner brace, can make surface of the keel shoe 30 away from truss 10 with this A plane can be formed.
Reference picture 4, it is further, further comprising the steps of before step S60 after step S50:Also include following step Suddenly:
S80:A shingle nail 40 and keel shoe 30, fixed metope are connected respectively by the both ends of each fastener (not indicating) Plate 40 is in keel shoe 30.
Above-mentioned fastener (not indicating) can be screw, and shingle nail 40 is fixed using screw with keel shoe 30.Screw length It should match with the thickness of shingle nail 40, when shingle nail 40 is lamina, 25mm screws can be used, when shingle nail 40 is bilayer 35mm screws are used during plate, and the cap nut of screw should sink to metope plate surface 1mm.
Further, gap is equipped between every two adjacent shingle nails 40, the width in gap is 4mm~6mm.By Gap is equipped between adjacent shingle nail two-by-two 40, overall accumulated error can be reduced, improves the installation accuracy of shingle nail 40.
Reference picture 2, further, S50:Start to lay shingle nail 40, laying shingle nail 40 manifests in installed part 20 It is further comprising the steps of before the step of one end of keel shoe 30:
S30:The height of truss 10 is measured, when the height of truss 10 is more than specified altitude, in truss 10 close to keel shoe 30 Surface reserve expansion joint area.
One embodiment is:Total construction size of truss 10 is measured, when truss 10 is grown more than 12m, in truss 10 Expansion joint area is reserved on surface, carries out installing installed part 20 below and shingle nail 40 avoids the expansion joint area, by stretching Contracting seam makes the installation of the shingle nail 40 is overall to be not easy to be influenceed by expanding with heat and contract with cold, and the wall overall structure for forming shingle nail 40 is more steady It is fixed.
Reference picture 5, the present invention also propose a kind of mounting structure of shingle nail, and the structure of shingle nail installation includes truss 10th, truss 10 and spaced multiple installed parts 20 are fixedly arranged on, the keel shoe 30 of installed part 20 is fixedly arranged on, is layed in installed part 20 multiple shingle nails 40 and multiple warming plates 50,
Each installed part 20 both passes through keel shoe 30, and is manifested by keel shoe 30,
Surface of the keel shoe 30 away from truss 10 (does not indicate) formed with multiple holding areas,
Each shingle nail 40 is layed in the end face that an at least installed part 20 manifests keel shoe 30, each shingle nail 40 Divide at least one holding area (not indicating) for blocking keel shoe 30, each shingle nail 40 has been collectively forming with keel shoe 30 to be connected The breach of corresponding holding area (not indicating),
Each warming plate 50 is placed in a holding area (not indicating) by breach.
One embodiment is that the fixed multiple installed parts 20 of installation of the modes such as bolt or welding are passed sequentially through on truss 10, more Individual one side of the installed part 20 away from truss 10 is generally aligned in the same plane, and in order to which shingle nail 40 carries out installation positioning, is then being installed Same put down also is located at by the fixed installation keel shoe 30 of the modes such as bolt or welding, the outer surface of the keel shoe 30 again on part 20 Face, and multiple holding areas (not indicating) are formed among keel shoe 30.Then start to lay shingle nail 40, and can be according to reality Construction, laying one is erected or a horizontal shingle nail 40, and blocks part holding area (not indicating) corresponding to keel shoe 30, and this is blocked Each holding area (not indicating) at least side leaving certain gaps uncovered by the economic plan, shingle nail 40 is connected to installed part 20, and is connected by screw In keel shoe 30., can be from the middle part of shingle nail 40 to the Four built in boundaries of shingle nail 40 when shingle nail 40 is installed.Most backward accommodating area Filling warming plate 50, the breach that at least side (can not be indicated) by each holding area are filled in domain (not indicating), and Ensure that warming plate 50 will fasten, do not loosen, not across falling.Next shingle nail 40 is progressively installed again according to the above method, until completing The shingle nail 40 of whole wall is installed.With this shingle nail 40 is installed more steady, the error of installation is smaller, and warming plate 50 is put In the holding area (not indicating) surrounded in keel shoe 30, also make overall structure more compact.
Preferably, the mounting structure of the shingle nail also includes multiple flame-retardant boards 60, and flame-retardant board 60 is layed in keel shoe 30 Backwards to the surface of truss 10, flame-retardant board 60 manifests the height of keel shoe 30 not higher than installed part 20.
Above-mentioned flame-retardant board 60 can be carried out fire-retardant by rounding into wood chip or by flitch slicing into scantling block to wood chip Three layers or the glued board of multilayer formed again with adhesive gluing after processing, generally uses odd-level wood chip, and make adjacent layer wood chip The orthogonal gluing of machine direction form.Flame-retardant board 60 can clamping or screw is affixed is placed in idle area (not indicating), The fireproof security performance of shingle nail 40 can be improved by flame-retardant board 60.
Preferably, keel shoe 30 includes multiple spaced first keel and multiple spaced second keel, often Two the first adjacent keel connect at least two second keel simultaneously, the first adjacent keel of each two and with this two first Two the second keel that keel abut surround a holding area (not indicating).Above-mentioned the first keel and the second keel can pass through weldering Connect, the mode such as screw carries out affixed, can be also in reinforcement connection by corner brace, table of the keel shoe 30 away from truss 10 can be made with this Face forms a plane.
Preferably, in addition to multiple fasteners (not indicating), the both ends of each fastener (not indicating) connect a wall respectively Panel 40 and keel shoe 30.Above-mentioned fastener (not indicating) is preferably screw, further, every two adjacent shingle nails 40 it Between be equipped with gap, the width in gap is 4mm~6mm.By being equipped with gap between adjacent shingle nail two-by-two 40, can reduce Overall accumulated error, improve the installation accuracy of shingle nail 40.
Preferably, multiple shingle nails 40 form a wall, and wall is provided with least one expansion joint (not shown).
One embodiment is:Total construction size of truss 10 is measured, when truss 10 is grown more than 12m, in truss 10 Expansion joint area is reserved on surface, carries out installing installed part 20 below and shingle nail 40 avoids the expansion joint area, finally lead to Crossing installation expansion joint makes the overall wall knot for being not easy to be influenceed by expanding with heat and contract with cold, forming shingle nail 40 of the installation of the shingle nail 40 Structure is more stable.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the scope of the invention, it is every at this Under the inventive concept of invention, the equivalent structure transformation made using description of the invention and accompanying drawing content, or directly/use indirectly It is included in other related technical areas in the scope of patent protection of the present invention.

Claims (10)

1. a kind of installation method of shingle nail, it is characterised in that comprise the following steps:
A, fixed multiple installed parts are arranged at intervals in truss, multiple installed parts;
B, for fixed keel shoe in the multiple installed part, each installed part both passes through the keel shoe, and is shown by the keel shoe Expose, surface of the keel shoe away from truss is formed with multiple holding areas;
C, a laying at least shingle nail manifests the end face of the keel shoe, the shingle nail partial occlusion in an at least installed part At least one holding area of keel shoe so that the shingle nail has been collectively forming with the keel shoe and has connected the holding area Breach;
D, an at least warming plate is filled in the corresponding holding area by the breach,
Repeat step C to step D, lay the end that at least another shingle nail manifests the keel shoe at least another installed part Face.
2. the installation method of shingle nail as claimed in claim 1, it is characterised in that after step B, also include before step C Following steps:
Lay some flame-retardant boards and manifest the keel not higher than the installed part backwards to the surface of truss, flame-retardant board in keel shoe The height of frame.
3. the installation method of shingle nail as claimed in claim 1, it is characterised in that step B comprises the following steps:
The keel shoe includes multiple spaced first keel and multiple spaced second keel, each two are adjacent First keel connect at least two second keel simultaneously, the first adjacent keel of each two and are connected with two first keel Two the second keel surround a holding area.
4. the installation method of the shingle nail as described in claim 1-3 is any, it is characterised in that after step C, before step D It is further comprising the steps of:A shingle nail and the keel shoe, the fixed metope are connected respectively by the both ends of each fastener Plate is in the keel shoe.
5. the installation method of the shingle nail as described in claim 1-3 is any, it is characterised in that before step C, in addition to it is following Step:
The height of truss is measured, when the height of truss is more than specified altitude, in truss close to the reserved expansion joint in the surface of keel shoe Region.
6. a kind of mounting structure of shingle nail, it is characterised in that including truss, be fixedly arranged on the truss and spaced multiple Installed part, the keel shoe for being fixedly arranged on the installed part, the multiple shingle nails for being layed in the installed part and multiple warming plates,
Each installed part both passes through the keel shoe, and is manifested by the keel shoe,
Surface of the keel shoe away from truss formed with multiple holding areas,
Each shingle nail is layed in the end face that an at least installed part manifests the keel shoe, each shingle nail partial occlusion dragon At least one holding area of skeleton, each shingle nail are collectively forming the breach for connecting corresponding holding area with keel shoe,
Each warming plate is placed in a holding area by the breach.
7. the mounting structure of shingle nail as claimed in claim 6, it is characterised in that the mounting structure of the shingle nail also includes more Individual flame-retardant board, the flame-retardant board are layed in keel shoe and shown backwards to the surface of truss, the flame-retardant board not higher than the installed part Expose the height of the keel shoe.
8. the mounting structure of shingle nail as claimed in claim 6, it is characterised in that the keel shoe includes multiple interval settings The first keel and multiple spaced second keel, the first adjacent keel of each two simultaneously connect at least two second dragon Bone, the first adjacent keel of each two and surrounds a holding area with two the second keel that two first keel abut.
9. the mounting structure of the shingle nail as described in claim 6-8 is any, it is characterised in that also including multiple fasteners, often The both ends of one fastener connect a shingle nail and the keel shoe respectively.
10. the mounting structure of the shingle nail as described in claim 6-8 is any, it is characterised in that multiple shingle nails are formed One wall, the wall are provided with least one expansion joint.
CN201710332074.9A 2017-05-11 2017-05-11 Mounting method and mounting structure of wall panel Active CN107419869B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710332074.9A CN107419869B (en) 2017-05-11 2017-05-11 Mounting method and mounting structure of wall panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710332074.9A CN107419869B (en) 2017-05-11 2017-05-11 Mounting method and mounting structure of wall panel

Publications (2)

Publication Number Publication Date
CN107419869A true CN107419869A (en) 2017-12-01
CN107419869B CN107419869B (en) 2020-05-22

Family

ID=60425845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710332074.9A Active CN107419869B (en) 2017-05-11 2017-05-11 Mounting method and mounting structure of wall panel

Country Status (1)

Country Link
CN (1) CN107419869B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030008723A (en) * 2001-07-19 2003-01-29 문석주 Stone exterior wall pannel for frame construction building and method of manufacturing the same
CN201133044Y (en) * 2007-11-30 2008-10-15 康玉范 Internal insulation wall of assembled composite thermal insulation board inner wall
JP2010037873A (en) * 2008-08-07 2010-02-18 Sekisui House Ltd Interior wall structure
CN102051923A (en) * 2010-12-07 2011-05-11 北京城建建设工程有限公司 Fireproofing retardant cement calcium silicate board insulating wall body and construction method thereof
CN102828615A (en) * 2012-09-11 2012-12-19 中国建筑第二工程局有限公司 Pattern plate system of overlapped shear wall and construction method thereof
CN104563427A (en) * 2014-12-31 2015-04-29 杭锦旗亿利朗新材料科技有限公司 Glaze decoration insulation integration external wall panel and manufacture technology thereof
CN106320574A (en) * 2016-10-17 2017-01-11 澄筑投资控股(上海)有限公司 Light-gauge steel joist composite concrete wallboard
CN104831843B (en) * 2015-03-17 2017-09-19 杭州斯泰新材料技术有限公司 The attachment structure of curtain wall metal structure vertical keel and vertical keel and lateral keel

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030008723A (en) * 2001-07-19 2003-01-29 문석주 Stone exterior wall pannel for frame construction building and method of manufacturing the same
CN201133044Y (en) * 2007-11-30 2008-10-15 康玉范 Internal insulation wall of assembled composite thermal insulation board inner wall
JP2010037873A (en) * 2008-08-07 2010-02-18 Sekisui House Ltd Interior wall structure
CN102051923A (en) * 2010-12-07 2011-05-11 北京城建建设工程有限公司 Fireproofing retardant cement calcium silicate board insulating wall body and construction method thereof
CN102828615A (en) * 2012-09-11 2012-12-19 中国建筑第二工程局有限公司 Pattern plate system of overlapped shear wall and construction method thereof
CN104563427A (en) * 2014-12-31 2015-04-29 杭锦旗亿利朗新材料科技有限公司 Glaze decoration insulation integration external wall panel and manufacture technology thereof
CN104831843B (en) * 2015-03-17 2017-09-19 杭州斯泰新材料技术有限公司 The attachment structure of curtain wall metal structure vertical keel and vertical keel and lateral keel
CN106320574A (en) * 2016-10-17 2017-01-11 澄筑投资控股(上海)有限公司 Light-gauge steel joist composite concrete wallboard

Also Published As

Publication number Publication date
CN107419869B (en) 2020-05-22

Similar Documents

Publication Publication Date Title
US8813456B2 (en) Bridging connector
US10145108B2 (en) Panel and method for fabricating, installing and utilizing a panel
US9534376B2 (en) Laser configured hook column anchors and anchoring systems utilizing the same
CA2727800C (en) Anchor system for composite panel
US4373314A (en) Masonry veneer wall anchor
US6099768A (en) Modular building panel and method for constructing the same
CA1302727C (en) Masonry veneer wall anchor
US7162847B2 (en) Apparatus and method for fabricating foam wall panels
US3090164A (en) Wall construction and resilient runner therefor
US6854228B2 (en) Prefabricated sealed composite insulating panel and method of utilizing same to insulate a building
RU2287643C2 (en) Building
US20160208489A1 (en) Construction panel system and methods of assembly thereof
US5642597A (en) Drywall mounting bracket
US7797902B2 (en) Backing metal fixture and external wall constructing structure using the same
US20140069040A1 (en) Contruction panel system and methods of assembly thereof
US4561230A (en) Truss assembly and truss hanger and connector hanger for use with trusses
US20040206045A1 (en) Lightweight precast concrete wall panel system
US20120317923A1 (en) Structural insulated building panel
US4896469A (en) Prefabricated building panel assembly
US7836660B2 (en) Method of making a composite building panel
US6308491B1 (en) Structural insulated panel
US7823364B2 (en) Fire-retardant cementitious shear board having metal backing with tab for use as underlayment panel for floor or roof
US8677718B2 (en) Retrofit mounting clip for an exterior building surface
US20080168728A1 (en) Wall system
US9206609B2 (en) Thermal break wall systems and thermal adjustable clip

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant