CN107391843B - Dynamic calculation method for submarine cable operation cost - Google Patents

Dynamic calculation method for submarine cable operation cost Download PDF

Info

Publication number
CN107391843B
CN107391843B CN201710598534.2A CN201710598534A CN107391843B CN 107391843 B CN107391843 B CN 107391843B CN 201710598534 A CN201710598534 A CN 201710598534A CN 107391843 B CN107391843 B CN 107391843B
Authority
CN
China
Prior art keywords
cost
submarine cable
submarine
data
routing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710598534.2A
Other languages
Chinese (zh)
Other versions
CN107391843A (en
Inventor
乔小瑞
吕共欣
舒畅
任飞
王瑛剑
冯祥成
魏巍
陈津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhichen Haixin Technology Co ltd
Naval University of Engineering PLA
Original Assignee
Shenzhen Zhichen Haixin Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhichen Haixin Technology Co ltd filed Critical Shenzhen Zhichen Haixin Technology Co ltd
Priority to CN201710598534.2A priority Critical patent/CN107391843B/en
Publication of CN107391843A publication Critical patent/CN107391843A/en
Application granted granted Critical
Publication of CN107391843B publication Critical patent/CN107391843B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/16Cables, cable trees or wire harnesses

Abstract

The invention discloses a submarine cable operation cost dynamic calculation method, which comprises the steps of collecting and obtaining submarine parameters, setting the type of an initial route submarine cable, establishing a submarine profile model, and setting a submarine cable assembly according to the submarine profile model; and establishing the data of the submarine cable assembly and a cost list of the routing points, calculating the cost information of the routing points, and producing the cost list according to the cost information of the routing points. The method realizes the whole course guidance and cost control of submarine cable laying, so that the submarine cable laying work is smoothly and effectively carried out.

Description

Dynamic calculation method for submarine cable operation cost
Technical Field
The invention relates to the technical field of submarine cable routing, in particular to a submarine cable operation cost control method.
Background
With the development of communication technology, information exchange is more common, and long-distance communication needs to be provided with communication cables to ensure the rapid transmission of information.
China's coastline is about 1.8 kilometers, and has over 5000 islands or islands, some of which have long-term life of human groups. The development of islands and the protection of sea resources need to establish a submarine cable communication resource network, compared with the difficulty of land erection, the difficulty of submarine cable laying is common, along with the daily change of various technologies, the cable industry is also upgraded in a new round of industry and changes to the high-tech field, and the research and development of submarine cables, the manufacture of soft joints, the laying and online monitoring of submarine cables become one of the most technical representative problems in the cable industry
The submarine cable laying construction process is complex and has higher precision requirement, and the construction cost cannot be quantitatively evaluated in the construction process, so that excessive waste is caused, and therefore, the method for providing the submarine cable construction cost management process is very necessary.
Disclosure of Invention
Aiming at the defects in the technology, the invention aims to provide a dynamic calculation method for the operating cost of a submarine cable, so as to realize the whole course guidance and cost control of submarine cable laying and ensure that the submarine cable laying work is smoothly and effectively carried out.
To achieve the above object, the present invention is achieved as follows.
A dynamic calculation method for operating cost of submarine cables is characterized by comprising the following steps:
101. collecting and acquiring seabed parameters;
the seabed parameters comprise water depth layer data, pressure data and geological layer data.
102. Setting an initial routing submarine cable type, wherein the submarine cable type is created in a route, can be a default submarine cable type, and can also be a submarine cable type specified by a user and used for drawing a routing style;
103. establishing a submarine profile model according to the surveyed submarine parameters;
specifically, a CAD file is adopted to obtain water depth layer data and geological layer data, and a submarine profile model schematic diagram is established; the water depth layer data and the geological layer data are data collected in advance. The seabed profile model comprises a plurality of routing points.
104. Arranging a submarine cable assembly according to the submarine profile model;
the submarine cable assembly comprises a submarine cable type, a submarine cable length, a connector equipment attribute and the like; and each routing point of the routing is provided with a corresponding submarine cable assembly.
105. Establishing a cost list of the data of the submarine cable assembly and the routing points;
establishing a corresponding cost list according to the data of the submarine cable assembly set by the route and the route points or other supplementary data; the supplementary data refers to calculation data which the user needs to be added specifically, such as water temperature, ocean current, climate data and the like.
The cost list and the corresponding routing line have a binding relationship, and the corresponding routing point and the submarine cable assembly are bound firstly, and then the corresponding cost list can be created.
106. Cost information for the route points is calculated,
the cost information of the routing point comprises corresponding submarine cable type cost information, joint cost information and other cost information;
and acquiring unit price of the type of the submarine cable, and calculating cost information of the type of the corresponding submarine cable by combining the length of the type of the submarine cable. Wherein, the submarine cable type cost is the submarine cable type length (meter) and the submarine cable type unit price (yuan/meter).
And acquiring the unit price of the joint according to the submarine cable joint data, wherein a joint equipment unit price input column is arranged in a submarine cable joint basic data table, and corresponding joint expenses are required to be filled corresponding to different joints for acquiring the basic cost condition of joint construction.
And acquiring other expense information according to the routing point, editing the attribute of the corresponding routing point after the routing is drawn, and calculating other expense information, such as estimated ship operation expense, labor cost and the like.
107. Producing a cost list according to the cost information of the routing point;
and generating a corresponding cost list and a cost list according to the bound routing information, wherein the cost list is arranged according to the sequence of the type of the submarine cable, the connector of the submarine cable and other expenses, and each group of data is displayed in a single column.
Further, the cost list may further generate a total cost, in which the sum of the total prices of each item in the cost list is the total cost, and the total cost is displayed in the last row of the cost list.
The total submarine cable cost is (1 single type submarine cable cost + 2 single type submarine cable cost + … + n single type submarine cable cost) + (submarine cable joint cost 1+ 2 submarine cable joint cost + … + n submarine cable joint cost) + (other cost 1+ other cost 2+ … + other cost n).
According to the method for dynamically calculating the operating cost of the submarine cable, the cost calculation of the construction period of each link in the submarine cable construction process is controlled through the service terminal, so that the whole course guidance and cost control of submarine cable laying are realized, the submarine cable laying work is smoothly and effectively carried out, and the construction and cost optimization are realized to the maximum extent.
Drawings
FIG. 1 is a flow chart of an implementation of the present invention.
Detailed Description
In order to more clearly describe the present invention, the present invention will be further described with reference to the accompanying drawings.
The invention discloses a submarine cable operation cost dynamic calculation method, which realizes cost calculation for controlling the construction period of each link in the submarine cable construction process through a service terminal, and is characterized by comprising the following steps:
s01, setting an initial routing submarine cable type according to the desktop research result, and providing a routing submarine cable default type for drawing a routing pattern when routing creation is needed.
S02, establishing a submarine profile model according to the surveyed submarine parameters, picking up water depth layer data and geological layer data by adopting a CAD file, and establishing a submarine profile schematic diagram;
s03, arranging submarine cable types corresponding to different terrains in the submarine cable assembly according to the submarine profile model.
S04 obtaining the submarine cable type length according to the submarine cable type set by the submarine cable assembly.
S05 sets the submarine cable joint equipment attributes according to the submarine topography model.
S06, establishing corresponding cost list according to the data of the submarine cable assembly set by the route and the supplementary data of other expenses of the route point. The cost list and the corresponding route line have a binding relationship, and the corresponding cost list can be created only after the corresponding route line segment is bound.
S07, acquiring the unit price attribute of the submarine cable type according to the submarine cable basic data, and calculating the corresponding submarine cable type cost information by combining the submarine cable type length. The submarine cable basic data is used for filling unit price information of the corresponding submarine cable type when different types of submarine cable data are created, and the unit price information is used for cost calculation.
Cost of single type submarine cable (length of submarine cable) unit price (Yuan/M)
S08, acquiring the unit price of the joint according to the submarine cable joint data, wherein a joint equipment unit price input column is arranged in a submarine cable joint basic data sheet, and corresponding joint expenses are filled corresponding to different joints and used for acquiring the basic cost condition of joint construction.
S09, obtaining other cost information according to the route point, after the route is drawn, editing the attribute of the corresponding route point, filling other cost information in the window, and adding the estimated ship operation cost.
S10, generating a corresponding cost list according to the bound routing information, wherein the cost list is arranged according to the sequence of the submarine cable type, the submarine cable joint and other expenses. Each set of data is displayed in a separate column.
S11 establishes a total cost from the cost list, where the sum of the total prices for each item in the middle of the cost list is the total cost, which is displayed in the last row of the cost list.
The total cost of the submarine cable is (single type submarine cable cost 1+ single type submarine cable cost 2+ … + single type submarine cable cost n) + (submarine cable joint cost 1+ submarine cable joint cost 2+ … + submarine cable joint cost n) + (other cost 1+ other cost 2+ … + other cost n)
According to the method for dynamically calculating the operating cost of the submarine cable, the submarine condition is counted, the cost calculation of the construction period of each link in the submarine cable construction process is controlled by combining the service terminal, the whole process guidance and the cost control of submarine cable laying are realized, the submarine cable laying work is smoothly and effectively carried out, and the construction and the cost optimization are realized to the maximum extent.
The above disclosure is only for a few specific embodiments of the present invention, but the present invention is not limited thereto, and any variations that can be made by those skilled in the art are intended to fall within the scope of the present invention.

Claims (4)

1. A dynamic computation method for operation cost of submarine cable is characterized by comprising the following steps
The method comprises the following steps:
101. collecting and acquiring seabed parameters;
102. setting an initial routing submarine cable type for drawing a routing style;
103. establishing a submarine profile model according to the surveyed submarine parameters;
104. arranging a submarine cable assembly according to the submarine profile model;
105. establishing a cost list of the data of the submarine cable assembly and the routing points;
establishing a corresponding cost list according to the data of the submarine cable assembly set by the route and the route points or other supplementary data;
106. cost information for the route points is calculated,
107. producing a cost list according to the cost information of the routing point;
generating a corresponding cost list according to the bound routing information, wherein the cost list is arranged according to the sequence of the submarine cable type, the submarine cable joint and other expenses, and each group of data is displayed in a single column;
in step 106, the cost information of the routing point includes corresponding submarine cable type cost information, joint cost information, and other cost information;
acquiring unit price of a submarine cable type, and calculating cost information corresponding to the submarine cable type by combining the submarine cable type length; wherein, the submarine cable type cost is the submarine cable type length (meter) and the submarine cable type unit price (yuan/meter);
acquiring the unit price of the joint according to the submarine cable joint data, and calculating the corresponding joint cost;
acquiring other cost information according to the routing point, and calculating other cost information through the attribute of the corresponding routing point after the routing is drawn;
in step 107, the cost list may further generate a total cost, where the sum of the total prices of each item in the cost list is the total cost, and the total cost is displayed in the last row of the cost list;
the total submarine cable cost is (single type submarine cable cost 1+ single type submarine cable cost 2+ … + single type submarine cable cost n) + (submarine cable joint cost 1+ submarine cable joint cost 2+ … + submarine cable joint cost n) + (other cost 1+ other cost 2+ … + other cost n);
in step 105, the supplementary data refers to calculation data that a user needs to add specifically, and the supplementary data includes water temperature, ocean current and climate data;
the cost list and the corresponding routing line have a binding relationship, and the corresponding routing point and the submarine cable assembly are bound firstly, and then the corresponding cost list can be created.
2. The method according to claim 1, wherein in step 101, the seabed parameters include water depth map data, pressure data and geological map data.
3. The method according to claim 1, wherein in step 103, a CAD file is used to obtain water depth layer data and geological layer data, and a submarine profile model diagram is created; the water depth layer data and the geological layer data are data collected in advance; the seabed profile model comprises a plurality of routing points.
4. The method of claim 1, wherein in step 104, the submarine cable assembly comprises submarine cable type, length, and joint equipment properties; and each routing point of the routing is provided with a corresponding submarine cable assembly.
CN201710598534.2A 2017-07-21 2017-07-21 Dynamic calculation method for submarine cable operation cost Active CN107391843B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710598534.2A CN107391843B (en) 2017-07-21 2017-07-21 Dynamic calculation method for submarine cable operation cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710598534.2A CN107391843B (en) 2017-07-21 2017-07-21 Dynamic calculation method for submarine cable operation cost

Publications (2)

Publication Number Publication Date
CN107391843A CN107391843A (en) 2017-11-24
CN107391843B true CN107391843B (en) 2020-12-18

Family

ID=60337394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710598534.2A Active CN107391843B (en) 2017-07-21 2017-07-21 Dynamic calculation method for submarine cable operation cost

Country Status (1)

Country Link
CN (1) CN107391843B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11031757B2 (en) * 2019-09-20 2021-06-08 Google Llc Submarine cable route planning tool

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5446804A (en) * 1994-04-14 1995-08-29 Hewlett-Packard Company Magnifying digital image using edge mapping
CN103258300B (en) * 2013-04-15 2016-03-23 河北省电力勘测设计研究院 The method of cable testing bridge in design cable passage of thermal power plant
CN103678909B (en) * 2013-12-11 2017-01-25 中国能源建设集团广东省电力设计研究院有限公司 Submarine cable life cycle cost obtaining method and submarine cable type selecting method
CN105656076B (en) * 2015-11-26 2018-06-15 国网江苏省电力公司经济技术研究院 The acquisition methods of marine wind electric field extra large cable wiring
CN106026079B (en) * 2016-05-18 2018-12-14 河海大学 Wind power collection system of offshore wind power plant topological structure comprehensive estimation method
CN106096079B (en) * 2016-05-26 2020-05-01 中国能源建设集团广东省电力设计研究院有限公司 Design method and system for improving cable laying length precision
CN106021800B (en) * 2016-06-06 2019-02-12 中国科学院力学研究所 A kind of seabed rugged topography long-distance transport pipes route selection method
CN106410842B (en) * 2016-09-29 2019-02-22 上海电力学院 A kind of wind power collection system of offshore wind power plant method of cost accounting based on life cycle management

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Fiber optic submarine cables cuts cost modeling and cable protection aspects;AliAl-Lawati;《Optical Fiber Technology》;20150331;第22卷;第68-75页 *
以全寿命周期成本为判据的近海风电场高压海底电缆选型标准;刘刚 等;《高电压技术》;20150831;第41卷(第8期);第2674-2680页 *
海底光缆工程设计简介;魏澎 等;《电信传输》;20060930(第9期);第36-41页 *

Also Published As

Publication number Publication date
CN107391843A (en) 2017-11-24

Similar Documents

Publication Publication Date Title
CN102760255B (en) Underground electric network data management and Electric Power Network Planning system and management method
CN108776999B (en) Grid contour line drawing method based on ocean Internet of things
CN103955566A (en) Electric transmission line three-dimensional design method based on Google Earth and electric transmission line three-dimensional design system based on Google Earth
KR101450133B1 (en) System and Method for Providing Underground Utilities Cross Section Information based on Augmented Reality
CN106445987B (en) The building of CIR geographic information database and verification method
CN104778747A (en) Three-dimensional modeling method for electric power underground pipe network
CN102609517A (en) Method and system for online vector map comprehensive services
CN110929363B (en) Communication line investigation design method and system
CN107102833A (en) Line information interactive approach and electronic equipment
CN107391843B (en) Dynamic calculation method for submarine cable operation cost
CN105101228B (en) The pre- addressing algorithm of the modified multi-operator of quadruple
CN112541584B (en) Deep neural network model parallel mode selection method
CN103036705B (en) The visualization system of pipeline and fiber optic resource management system
CN105844680A (en) Method for collecting onsite surveying and positioning information for rural distribution network designs
CN108009289A (en) A kind of grid weather forecast manufacturing system, method and device
CN116681265B (en) Resource allocation method, device, computer equipment and readable storage medium
CN105743693A (en) Communication network line topology-building and updating method and communication network line topology-building and updating system based on GIS
CN109344439A (en) A kind of modeling of building block formula and its simulative construction method based on BIM
CN108804637A (en) The method for drafting and device of Optical Cable
CN110766792A (en) Grid calculation order coding method based on ArcGIS hydrological analysis tool
CN105094829B (en) A kind of method for automatically generating Satellite TT information flow chart
CN107220425A (en) Extra large cable operation control method, device and service terminal
CN105550249A (en) Pipeline data processing system
CN107423520A (en) Based on CAD secondary development rapid extraction pipeline information SWMM modeling methods
CN103089307A (en) Mine safety production command and dispatching system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Qiao Xiaorui

Inventor after: Lv Gongxin

Inventor after: Shu Chang

Inventor after: Ren Fei

Inventor after: Wang Yingjian

Inventor after: Feng Xiangcheng

Inventor after: Wei Wei

Inventor after: Chen Jin

Inventor before: Ren Fei

Inventor before: Feng Xiangcheng

Inventor before: Lv Gongxin

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220815

Address after: 430030 No.717 Jiefang Avenue, Qiaokou District, Wuhan City, Hubei Province

Patentee after: NAVAL University OF ENGINEERING

Patentee after: SHENZHEN ZHICHEN HAIXIN TECHNOLOGY CO.,LTD.

Address before: 518000 Room 201 / 202, 2nd floor, building 205, chegongmiao factory building, chegongmiao Industrial Zone, Futian District, Shenzhen City, Guangdong Province

Patentee before: SHENZHEN ZHICHEN HAIXIN TECHNOLOGY CO.,LTD.