CN107366897A - A kind of Pollutant in Coal Burning Boiler emission reduction optimization collaboration fume afterheat deep exploitation system - Google Patents
A kind of Pollutant in Coal Burning Boiler emission reduction optimization collaboration fume afterheat deep exploitation system Download PDFInfo
- Publication number
- CN107366897A CN107366897A CN201710541211.XA CN201710541211A CN107366897A CN 107366897 A CN107366897 A CN 107366897A CN 201710541211 A CN201710541211 A CN 201710541211A CN 107366897 A CN107366897 A CN 107366897A
- Authority
- CN
- China
- Prior art keywords
- temperature
- flue
- low
- water
- heat exchanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22D—PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
- F22D1/00—Feed-water heaters, i.e. economisers or like preheaters
- F22D1/36—Water and air preheating systems
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J15/00—Arrangements of devices for treating smoke or fumes
- F23J15/02—Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J2215/00—Preventing emissions
- F23J2215/10—Nitrogen; Compounds thereof
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J2215/00—Preventing emissions
- F23J2215/20—Sulfur; Compounds thereof
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J2217/00—Intercepting solids
- F23J2217/10—Intercepting solids by filters
- F23J2217/102—Intercepting solids by filters electrostatic
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Treating Waste Gases (AREA)
- Chimneys And Flues (AREA)
- Air Supply (AREA)
Abstract
本发明涉及一种燃煤锅炉污染物减排优化协同烟气余热深度利用系统,其既可减少系统中的传热损失、增加烟气余热利用率,又可实现污染物减排设备入口烟温的调控,兼顾了机组节能减排能力的提升。该系统包括锅炉主烟道、高温旁路烟道和低温旁路烟道,其中锅炉主烟道中沿烟气流向依次布置一级高压省煤器、SCR烟气脱硝系统、高温空气预热器、低温空气预热器、电除尘器、一级低温烟水换热器、脱硫塔和烟囱;高温旁路烟道中沿烟气流向依次布置二级高压省煤器和高温烟水换热器;低温旁路烟道中布置二级低温烟水换热器;一级高压省煤器与二级高压省煤器串联布置;送风机出口的气水换热器与一级低温烟水换热器通过循环水泵实现闭式水循环换热。
The invention relates to a coal-fired boiler pollutant emission reduction optimization cooperative flue gas waste heat depth utilization system, which can not only reduce the heat transfer loss in the system, increase the utilization rate of flue gas waste heat, but also realize the flue gas temperature at the inlet of pollutant emission reduction equipment The regulation of the unit takes into account the improvement of the unit's energy-saving and emission-reduction capabilities. The system includes a boiler main flue, a high-temperature bypass flue and a low-temperature bypass flue, in which a first-stage high-pressure economizer, SCR flue gas denitrification system, high-temperature air preheater, Low-temperature air preheater, electrostatic precipitator, primary low-temperature flue-water heat exchanger, desulfurization tower and chimney; high-temperature bypass flue arranges secondary high-pressure economizer and high-temperature flue-water heat exchanger in sequence along the flue gas flow direction; low-temperature The second-level low-temperature smoke-water heat exchanger is arranged in the bypass flue; the first-level high-pressure economizer and the second-level high-pressure economizer are arranged in series; the air-water heat exchanger at the outlet of the blower and the first-level low-temperature smoke-water heat exchanger pass through the circulating water pump Realize closed water circulation heat exchange.
Description
技术领域technical field
本发明涉及燃煤发电领域,具体涉及一种燃煤锅炉污染物减排优化协同烟气余热深度利用系统。The invention relates to the field of coal-fired power generation, in particular to a coal-fired boiler pollutant emission reduction optimization cooperative flue gas waste heat depth utilization system.
背景技术Background technique
煤在我国是主要的一次能源,占能源消耗总量的60%以上,其中发电煤耗约占到了50%。对于燃煤锅炉,排烟热损失是影响锅炉热效率的主要因素,其约占锅炉热损失的50%以上,若按排烟温度130-160℃估算,对锅炉尾部烟气余热进行回收,每年可节约标煤0.7亿吨左右;另外,燃煤锅炉产生的NOx、SO2和粉尘等污染物排放量约占全国总排放量的39%、31%和14%,因此,烟气余热利用和污染物减排一直是国内外学者开展燃煤机组节能减排研究的主要方向。Coal is the main primary energy in my country, accounting for more than 60% of the total energy consumption, of which coal consumption for power generation accounts for about 50%. For coal-fired boilers, exhaust heat loss is the main factor affecting the thermal efficiency of the boiler, which accounts for more than 50% of the boiler heat loss. If the exhaust gas temperature is estimated at 130-160°C, the waste heat of the flue gas at the tail of the boiler can be recovered every year. Save about 70 million tons of standard coal; in addition, the emissions of pollutants such as NOx, SO2 and dust generated by coal-fired boilers account for about 39%, 31% and 14% of the total national emissions. Emission reduction has always been the main direction for domestic and foreign scholars to carry out research on energy conservation and emission reduction of coal-fired units.
目前,燃煤锅炉烟气余热利用主要采用安装在锅炉尾部的低压省煤器回收排烟余热,用以加热汽轮机凝结水,从而排挤相应的回热抽气,被排挤的蒸汽返回汽轮机继续做功,继而提高机组的经济性,降低热耗率和发电煤耗,该项技术应用广泛,但其同时也存在余热能级低,余热利用少等问题。污染物减排设备主要采用安装在锅炉尾部烟道中的SCR烟气脱硝系统、电除尘和脱硫塔对污染物进行脱除,其基本可使NOx、SO2和粉尘的排放达到国家标准。然而通过现场应用,发现这些设备普遍存在入口烟温偏离最佳值的问题,直接影响设备运行的可靠性和经济性,主要体现在以下方面:(1)SCR烟气脱硝系统入口烟温偏低,低负荷下更为突出,导致脱硝效率下降,严重时甚至会出现无法投运的情况;(2)电除尘入口烟温偏高,导致除尘效率相应降低;(3)脱硫塔入口烟道偏高,导致脱硫耗水量增加。可是,在传统的燃煤锅炉风烟系统中,这些设备缺乏烟温调节手段,无法有效控制入口烟温,从而制约了燃煤机组的节能减排能力。鉴于以上问题,国内外学者对燃煤锅炉烟气余热利用系统和污染物减排系统分别进行了诸多专项研究,也取得了较大成效,但由于烟气余热利用系统和污染物减排系统具有较大的关联性,两者在运行调节过程中不开避免会存在随动性,无法兼顾不同设备的运行性能,从而限制了机组节能减排能力的挖掘。At present, the utilization of flue gas waste heat of coal-fired boilers mainly adopts the low-pressure economizer installed at the tail of the boiler to recover the exhaust waste heat, which is used to heat the condensate water of the steam turbine, thereby displacing the corresponding reheated exhaust gas, and the displaced steam returns to the steam turbine to continue to work. Then improve the economy of the unit, reduce the heat consumption rate and coal consumption for power generation. This technology is widely used, but it also has problems such as low energy level of waste heat and less use of waste heat. Pollutant emission reduction equipment mainly adopts SCR flue gas denitrification system installed in the boiler tail flue, electrostatic precipitator and desulfurization tower to remove pollutants, which can basically make the emission of NOx, SO2 and dust meet the national standard. However, through field application, it is found that these devices generally have the problem that the inlet flue gas temperature deviates from the optimal value, which directly affects the reliability and economy of equipment operation, mainly reflected in the following aspects: (1) The inlet flue gas temperature of the SCR flue gas denitrification system is low , which is more prominent under low load, resulting in a decrease in denitrification efficiency, and in severe cases, it may even fail to be put into operation; (2) The flue gas temperature at the inlet of the electrostatic precipitator is too high, resulting in a corresponding decrease in dust removal efficiency; (3) The flue at the inlet of the desulfurization tower is biased High, resulting in increased desulfurization water consumption. However, in the traditional coal-fired boiler air-smoke system, these devices lack the means to adjust the smoke temperature, and cannot effectively control the inlet smoke temperature, thus restricting the energy-saving and emission-reduction capabilities of the coal-fired unit. In view of the above problems, scholars at home and abroad have carried out many special studies on the waste heat utilization system of coal-fired boilers and the pollutant emission reduction system, and have achieved great results. Large correlation, if the two are not turned on during the operation adjustment process, there will be follow-up, and the operation performance of different equipment cannot be taken into account, thus limiting the mining of the unit's energy-saving and emission-reduction capabilities.
发明内容Contents of the invention
本发明为了克服以上技术的不足,提供了一种减少系统中的传热损失、增加烟气余热利用率且污染物减排设备入口烟温可调的燃煤锅炉污染物减排优化协同烟气余热深度利用系统。In order to overcome the deficiencies of the above technologies, the present invention provides a coal-fired boiler pollutant emission reduction optimization collaborative flue gas that reduces the heat transfer loss in the system, increases the utilization rate of flue gas waste heat, and can adjust the flue gas temperature at the entrance of the pollutant emission reduction equipment. Waste heat deep utilization system.
本发明克服其技术问题所采用的技术方案是:The technical scheme that the present invention overcomes its technical problem adopts is:
一种燃煤锅炉污染物减排优化协同烟气余热深度利用系统,包括锅炉的主烟道以及烟囱,所述主烟道中的烟气依次经过一级高压省煤器、SCR烟气脱硝系统、高温空气预热器、低温空气预热器、电除尘器、一级低温烟水换热器、脱硫塔及烟囱,还包括:A coal-fired boiler pollutant emission reduction optimization cooperative flue gas waste heat depth utilization system, including the main flue of the boiler and the chimney, the flue gas in the main flue passes through the first-level high-pressure economizer, SCR flue gas denitrification system, High-temperature air preheater, low-temperature air preheater, electrostatic precipitator, first-stage low-temperature smoke-water heat exchanger, desulfurization tower and chimney, including:
高温旁路烟道,其进口端连接于SCR烟气脱硝系统与高温空气预热器之间的主烟道中,其出口端连接于高温空气预热器与低温空气预热器之间的主烟道中,所述高温旁路烟道中沿烟气流动方向依次设置二级高压省煤器和高温烟水换热器,所述二级高压省煤器与一级高压省煤器串联布置,二级高压省煤器的进水管连接于高压加热器的出水管,其出水管连接于一级高压省煤器的进水管,所述高温烟水换热器的进水管连接于给水泵的出口管,其出水管连接于二级高压省煤器的进水管;The high-temperature bypass flue, whose inlet end is connected to the main flue between the SCR flue gas denitrification system and the high-temperature air preheater, and whose outlet is connected to the main flue between the high-temperature air preheater and the low-temperature air preheater In the high-temperature bypass flue, a secondary high-pressure economizer and a high-temperature flue-water heat exchanger are arranged in sequence along the flue gas flow direction. The secondary high-pressure economizer is arranged in series with the primary high-pressure economizer. The water inlet pipe of the high-pressure economizer is connected to the water outlet pipe of the high-pressure heater, and the water outlet pipe is connected to the water inlet pipe of the first-stage high-pressure economizer, and the water inlet pipe of the high-temperature smoke-water heat exchanger is connected to the outlet pipe of the feed water pump. Its outlet pipe is connected to the inlet pipe of the secondary high-pressure economizer;
低温旁路烟道,其进口端连接于高温空气预热器与低温空气预热器之间的主烟道中,其出口端连接于低温空气预热器与电除尘器之间的主烟道中,所述低温旁路烟道中布置有二级低温烟水换热器,所述二级低温烟水换热器的进水管连接于低压加热器的凝结水管,其出水管连接于除氧器入口管。The low-temperature bypass flue, whose inlet end is connected to the main flue between the high-temperature air preheater and the low-temperature air preheater, and whose outlet end is connected to the main flue between the low-temperature air preheater and the electrostatic precipitator, A secondary low-temperature smoke-water heat exchanger is arranged in the low-temperature bypass flue, the water inlet pipe of the secondary low-temperature smoke-water heat exchanger is connected to the condensate pipe of the low-pressure heater, and the water outlet pipe is connected to the inlet pipe of the deaerator .
为了调节低温空气预热器入口空气温度和脱硫塔入口烟气温度,还包括气水换热器,气水换热器设置于锅炉的送风机的出口与低温空气预热器之间的风道中;所述气水换热器与一级低温烟水换热器通过循环水泵进行闭式水循环换热。In order to adjust the inlet air temperature of the low-temperature air preheater and the flue gas temperature at the inlet of the desulfurization tower, an air-water heat exchanger is also included, and the air-water heat exchanger is arranged in the air duct between the outlet of the boiler blower and the low-temperature air preheater; The air-water heat exchanger and the first-stage low-temperature smoke-water heat exchanger perform closed water circulation heat exchange through a circulating water pump.
为了优化给水温度、SCR脱硝系统入口烟温和高温旁路烟道的烟气余热利用,还包括设置于高温旁路烟道上的高温旁路调节阀。In order to optimize the waste heat utilization of the feed water temperature, the inlet flue gas temperature of the SCR denitrification system and the high-temperature bypass flue, a high-temperature bypass regulating valve is also included on the high-temperature bypass flue.
为了优化电除尘入口烟气温度、低温旁路烟道烟气余热利用,还包括设置于低温旁路烟道上的低温旁路调节阀。In order to optimize the flue gas temperature at the inlet of the electrostatic precipitator and the waste heat utilization of the flue gas in the low-temperature bypass flue, a low-temperature bypass regulating valve is also included on the low-temperature bypass flue.
本发明的有益效果是:通过空预器烟气旁路、高压省煤器分级和低温烟水换热器的合理布置,提升了烟气余热的能级,增加了烟气余热的利用率,同时又实现了SCR烟气脱硝系统、电除尘器和脱硫塔入口烟温的调控,显著提高了燃煤锅炉污染物减排设备运行的可靠性和经济性;另外,通过空气预热器分级、空预器烟气旁路和送风加热系统之间的有机耦合,既降低了风烟温度梯度,减少了传热㶲损失,又提高了空预器冷端温度,改善了氨逃逸导致空预器堵塞的问题。The beneficial effects of the present invention are: through the air preheater flue gas bypass, the high-pressure economizer classification and the reasonable arrangement of the low-temperature flue-water heat exchanger, the energy level of flue gas waste heat is improved, and the utilization rate of flue gas waste heat is increased. At the same time, the regulation of the flue gas temperature at the entrance of the SCR flue gas denitrification system, electrostatic precipitator and desulfurization tower has been realized, which has significantly improved the reliability and economical efficiency of the operation of coal-fired boiler pollutant emission reduction equipment; in addition, through the air preheater classification, The organic coupling between the flue gas bypass of the air preheater and the supply air heating system not only reduces the temperature gradient of the air and smoke, reduces heat transfer exergy loss, but also increases the temperature of the cold end of the air preheater, and improves the air preheating caused by ammonia escape. problem of clogging.
附图说明Description of drawings
图1为本发明的系统结构连接示意图;Fig. 1 is a schematic diagram of system structure connection of the present invention;
图中,1.主烟道 2.一级高压省煤器 3.SCR烟气脱硝系统 4.高温空气预热器 5.低温空气预热器 6.电除尘器 7.一级低温烟水换热器 8.脱硫塔 9.烟囱 10.高温旁路烟道11.高温旁路调节阀 12.二级高压省煤器 13.高温烟水换热器 14.低温旁路烟道 15.低温旁路调节阀 16.二级低温烟水换热器 17.给水泵18.高压加热器 19.低压加热器 20.除氧器 21.送风机 22.气水换热器 23.循环水泵 24.锅炉。In the figure, 1. Main flue 2. First-level high-pressure economizer 3. SCR flue gas denitrification system 4. High-temperature air preheater 5. Low-temperature air preheater 6. Electric dust collector 7. First-level low-temperature smoke-water exchange Heater 8. Desulfurization tower 9. Chimney 10. High temperature bypass flue 11. High temperature bypass regulating valve 12. Secondary high pressure economizer 13. High temperature flue water heat exchanger 14. Low temperature bypass flue 15. Low temperature bypass Road regulating valve 16. Secondary low-temperature smoke-water heat exchanger 17. Feed water pump 18. High-pressure heater 19. Low-pressure heater 20. Deaerator 21. Blower fan 22. Air-water heat exchanger 23. Circulating water pump 24. Boiler.
具体实施方式detailed description
下面结合附图1对本发明做进一步说明。The present invention will be further described below in conjunction with accompanying drawing 1.
一种燃煤锅炉污染物减排优化协同烟气余热深度利用系统,包括锅炉24的主烟道1以及烟囱9,主烟道1中的烟气依次经过一级高压省煤器2、SCR烟气脱硝系统3、高温空气预热器4、低温空气预热器5、电除尘器6、一级低温烟水换热器7、脱硫塔8及烟囱9。还包括:高温旁路烟道10,其进口端连接于SCR烟气脱硝系统3与高温空气预热器4之间的主烟道1中,其出口端连接于高温空气预热器4与低温空气预热器5之间的主烟道1中,高温旁路烟道10中沿烟气流动方向依次设置二级高压省煤器12和高温烟水换热器13,二级高压省煤器12与一级高压省煤器2串联布置,二级高压省煤器12的进水管连接于高压加热器18的出水管,其出水管连接于一级高压省煤器2的进水管,高温烟水换热器13的进水管连接于给水泵17的出口管,其出水管连接于二级高压省煤器12的进水管。给水泵17出口的给水先经高温烟水换热器13后,再与高压加热器18的出水混合进入二级高压省煤器12,最后流入与之串联的主烟道1中的一级高压省煤器2中。给水泵17的给水经高温烟水换热器13吸收烟气热量,同时排挤部分高压加热器18回热抽气,实现烟气的余热回收利用。由于高温烟水换热器13所处烟温比传统低压省煤器所处烟温高1-2倍,从而使烟气余热能级升高、余热利用量增大。高温旁路烟道10中的二级高压省煤器12与主烟道1中的一级高压省煤器2串联,不仅可保证锅炉24给水温度满足要求,而且可提升主烟道1中的SCR烟气脱硝系统3的入口烟温,继而提高其低负荷运行的可靠性。A coal-fired boiler pollutant emission reduction optimization cooperative flue gas waste heat deep utilization system, including the main flue 1 and the chimney 9 of the boiler 24, the flue gas in the main flue 1 passes through the first-stage high-pressure economizer 2, SCR flue gas successively Gas denitrification system 3, high-temperature air preheater 4, low-temperature air preheater 5, electrostatic precipitator 6, primary low-temperature smoke-water heat exchanger 7, desulfurization tower 8 and chimney 9. It also includes: a high-temperature bypass flue 10, whose inlet end is connected to the main flue 1 between the SCR flue gas denitrification system 3 and the high-temperature air preheater 4, and whose outlet end is connected to the high-temperature air preheater 4 and the low-temperature In the main flue 1 between the air preheaters 5, in the high-temperature bypass flue 10, a secondary high-pressure economizer 12 and a high-temperature flue-water heat exchanger 13 are arranged in sequence along the flue gas flow direction, and a secondary high-pressure economizer 12 is arranged in series with the first-stage high-pressure economizer 2, the inlet pipe of the second-stage high-pressure economizer 12 is connected to the outlet pipe of the high-pressure heater 18, and the outlet pipe is connected to the inlet pipe of the first-stage high-pressure economizer 2, and the high-temperature smoke The water inlet pipe of the water heat exchanger 13 is connected to the outlet pipe of the feed water pump 17 , and its outlet pipe is connected to the water inlet pipe of the secondary high-pressure economizer 12 . The feed water at the outlet of the feed water pump 17 first passes through the high-temperature flue-water heat exchanger 13, then mixes with the outlet water of the high-pressure heater 18, enters the secondary high-pressure economizer 12, and finally flows into the primary high-pressure boiler in the main flue 1 connected in series. Economizer 2 in. The feed water of the feed water pump 17 absorbs the heat of the flue gas through the high-temperature flue-water heat exchanger 13, and at the same time displaces part of the high-pressure heater 18 to reheat and extract air, so as to realize the waste heat recovery and utilization of the flue gas. Since the flue gas temperature of the high-temperature flue-water heat exchanger 13 is 1-2 times higher than that of the traditional low-pressure economizer, the waste heat energy level of the flue gas increases and the utilization of waste heat increases. The secondary high-pressure economizer 12 in the high-temperature bypass flue 10 is connected in series with the primary high-pressure economizer 2 in the main flue 1, which not only ensures that the feed water temperature of the boiler 24 meets the requirements, but also increases the temperature of the main flue 1. The inlet flue temperature of the SCR flue gas denitrification system 3, thereby improving the reliability of its low-load operation.
还包括低温旁路烟道14,其进口端连接于高温空气预热器4与低温空气预热器5之间的主烟道1中,其出口端连接于低温空气预热器5与电除尘器6之间的主烟道1中,低温旁路烟道14中布置有二级低温烟水换热器16,二级低温烟水换热器16的进水管连接于低压加热器19的凝结水管,其出水管连接于除氧器20入口管。低压加热器19凝结水吸收烟气热量,同时排挤部分低压加热器19回热抽气,实现烟气的余热回收利用,其中二级低温烟水换热器16与除氧器20的水温之间应符合“温度对口、梯级利用”的原则,以使传热损失最小、余热利用最大。It also includes a low-temperature bypass flue 14, whose inlet end is connected to the main flue 1 between the high-temperature air preheater 4 and the low-temperature air preheater 5, and whose outlet end is connected to the low-temperature air preheater 5 and the electric dust collector In the main flue 1 between the devices 6, a secondary low-temperature smoke-water heat exchanger 16 is arranged in the low-temperature bypass flue 14, and the water inlet pipe of the secondary low-temperature smoke-water heat exchanger 16 is connected to the condensation of the low-pressure heater 19. Water pipe, its outlet pipe is connected to deaerator 20 inlet pipes. The condensed water in the low-pressure heater 19 absorbs the heat of the flue gas, and at the same time displaces part of the low-pressure heater 19 to recover heat and extract air, so as to realize the waste heat recovery and utilization of the flue gas. It should comply with the principle of "temperature matching and cascade utilization" to minimize heat transfer loss and maximize waste heat utilization.
还包括气水换热器22,气水换热器22设置于锅炉24的送风机21的出口与低温空气预热器5之间的风道中;气水换热器22与一级低温烟水换热器7通过循环水泵23进行闭式水循环换热。其不仅可降低脱硫塔8的入口烟温,减少脱硫耗水量,而且可提高低温空气预热器5的入口空气温度,降低传热㶲损失,同时能有效改善氨逃逸导致空预器堵塞的问题,从而实现“双赢”。It also includes an air-water heat exchanger 22, which is arranged in the air duct between the outlet of the blower 21 of the boiler 24 and the low-temperature air preheater 5; Heater 7 performs closed water circulation heat exchange through circulating water pump 23 . It can not only reduce the flue gas temperature at the inlet of the desulfurization tower 8, reduce the desulfurization water consumption, but also increase the inlet air temperature of the low-temperature air preheater 5, reduce heat transfer exergy loss, and effectively improve the problem of air preheater blockage caused by ammonia escape , so as to achieve "win-win".
进一步的,还包括设置于高温旁路烟道10上的高温旁路调节阀11。为了使给水温度、SCR脱硝系统3入口烟温和高温旁路烟道10的烟气余热利用最优化,在运行中可通过调节高温旁路调节阀11的开度和给水泵17出口给水流量得以实现。Further, it also includes a high-temperature bypass regulating valve 11 arranged on the high-temperature bypass flue 10 . In order to optimize the utilization of the feedwater temperature, the flue gas temperature at the inlet of the SCR denitrification system 3 and the waste heat of the flue gas in the high-temperature bypass flue 10, it can be realized by adjusting the opening degree of the high-temperature bypass regulating valve 11 and the feedwater flow rate at the outlet of the feedwater pump 17 during operation. .
进一步的,还包括低温旁路烟道14上的低温旁路调节阀15,为了使电除尘器6的除尘效率和低温旁路烟道14的烟气余热利用最优化,在运行中可通过调节低温旁路调节阀15的开度和低压加热器19凝结水的流量得以实现。Further, it also includes a low-temperature bypass regulating valve 15 on the low-temperature bypass flue 14. In order to optimize the dust removal efficiency of the electrostatic precipitator 6 and the utilization of waste heat of the flue gas in the low-temperature bypass flue 14, it can be adjusted during operation. The opening degree of the low-temperature bypass regulating valve 15 and the flow rate of the condensed water of the low-pressure heater 19 are realized.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710541211.XA CN107366897B (en) | 2017-07-05 | 2017-07-05 | A kind of Pollutant in Coal Burning Boiler emission reduction optimization collaboration fume afterheat deep exploitation system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710541211.XA CN107366897B (en) | 2017-07-05 | 2017-07-05 | A kind of Pollutant in Coal Burning Boiler emission reduction optimization collaboration fume afterheat deep exploitation system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN107366897A true CN107366897A (en) | 2017-11-21 |
| CN107366897B CN107366897B (en) | 2019-03-26 |
Family
ID=60305868
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710541211.XA Active CN107366897B (en) | 2017-07-05 | 2017-07-05 | A kind of Pollutant in Coal Burning Boiler emission reduction optimization collaboration fume afterheat deep exploitation system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107366897B (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108730952A (en) * | 2018-08-09 | 2018-11-02 | 哈尔滨锅炉厂有限责任公司 | For flue series arrangement before and after generating plant pulverized coal boiler economizer |
| CN109724099A (en) * | 2019-01-30 | 2019-05-07 | 江苏罗奈德流体科技有限公司 | A kind of boiler flue gas dewhitening process and device |
| CN110686405A (en) * | 2019-08-09 | 2020-01-14 | 上海外高桥第三发电有限责任公司 | A device and method for heating denitrification pyrolysis furnace air using regenerative heat |
| CN112128732A (en) * | 2020-09-03 | 2020-12-25 | 中国能源建设集团江苏省电力设计院有限公司 | Waste steam and flue gas waste heat energy quality coupling and improving system |
| CN113915633A (en) * | 2021-11-17 | 2022-01-11 | 西安热工研究院有限公司 | System for adjusting SCR inlet smoke temperature and control method |
| CN116293636A (en) * | 2023-02-27 | 2023-06-23 | 杭州蕴泽环境科技有限公司 | System and method for recycling waste heat from boiler flue gas exhaust |
| CN116351221A (en) * | 2023-03-13 | 2023-06-30 | 新疆天富环保科技有限公司 | System and method for recycling flue gas waste heat in ammonia desulfurization process |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102330967A (en) * | 2011-10-24 | 2012-01-25 | 中国电力工程顾问集团华东电力设计院 | Flue gas energy cascade utilization system |
| CN103062754A (en) * | 2012-12-28 | 2013-04-24 | 华北电力大学 | Power station machine furnace integrated cold end comprehensive optimization system |
| CN105318313A (en) * | 2015-04-29 | 2016-02-10 | 太原理工大学 | Smoke waste-heat utilization system based on selective catalytic reduction (SCR) denitration device |
| CN105371291A (en) * | 2015-11-09 | 2016-03-02 | 华电电力科学研究院 | System capable of utilizing smoke waste heat in gradient mode for assisting in removing SO3 and improving dust removing efficiency |
-
2017
- 2017-07-05 CN CN201710541211.XA patent/CN107366897B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102330967A (en) * | 2011-10-24 | 2012-01-25 | 中国电力工程顾问集团华东电力设计院 | Flue gas energy cascade utilization system |
| CN103062754A (en) * | 2012-12-28 | 2013-04-24 | 华北电力大学 | Power station machine furnace integrated cold end comprehensive optimization system |
| CN105318313A (en) * | 2015-04-29 | 2016-02-10 | 太原理工大学 | Smoke waste-heat utilization system based on selective catalytic reduction (SCR) denitration device |
| CN105371291A (en) * | 2015-11-09 | 2016-03-02 | 华电电力科学研究院 | System capable of utilizing smoke waste heat in gradient mode for assisting in removing SO3 and improving dust removing efficiency |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108730952A (en) * | 2018-08-09 | 2018-11-02 | 哈尔滨锅炉厂有限责任公司 | For flue series arrangement before and after generating plant pulverized coal boiler economizer |
| CN109724099A (en) * | 2019-01-30 | 2019-05-07 | 江苏罗奈德流体科技有限公司 | A kind of boiler flue gas dewhitening process and device |
| CN110686405A (en) * | 2019-08-09 | 2020-01-14 | 上海外高桥第三发电有限责任公司 | A device and method for heating denitrification pyrolysis furnace air using regenerative heat |
| CN112128732A (en) * | 2020-09-03 | 2020-12-25 | 中国能源建设集团江苏省电力设计院有限公司 | Waste steam and flue gas waste heat energy quality coupling and improving system |
| CN112128732B (en) * | 2020-09-03 | 2022-06-10 | 中国能源建设集团江苏省电力设计院有限公司 | Waste steam and flue gas waste heat energy quality coupling and improving system |
| CN113915633A (en) * | 2021-11-17 | 2022-01-11 | 西安热工研究院有限公司 | System for adjusting SCR inlet smoke temperature and control method |
| CN116293636A (en) * | 2023-02-27 | 2023-06-23 | 杭州蕴泽环境科技有限公司 | System and method for recycling waste heat from boiler flue gas exhaust |
| CN116351221A (en) * | 2023-03-13 | 2023-06-30 | 新疆天富环保科技有限公司 | System and method for recycling flue gas waste heat in ammonia desulfurization process |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107366897B (en) | 2019-03-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202432505U (en) | Flue gas waste heat recovery utilization system of coal burning boiler | |
| WO2018014768A1 (en) | Residual heat reuse system for turbine-boiler integrated heat energy circulation | |
| CN103062754B (en) | Power station machine furnace integrated cold end comprehensive optimization system | |
| CN107366897B (en) | A kind of Pollutant in Coal Burning Boiler emission reduction optimization collaboration fume afterheat deep exploitation system | |
| CN202177093U (en) | Multi-level efficient displacement type fume waste-heat utilization system | |
| CN103104907B (en) | Heating structure and heating method of boiler based on partitioned flue and multistage air preheating | |
| CN205383589U (en) | Novel energy -efficient application system of afterbody flue gas heat energy set | |
| CN105180146B (en) | A kind of cogeneration power plant fume afterheat is multistage to reclaim utilization system | |
| CN113803706B (en) | Power generation system based on hot air recycling and utilizing waste heat of tail flue gas of boiler | |
| CN203131797U (en) | Device capable of improving efficiency of thermal power unit by utilizing residual heat of boiler flue gas step wise | |
| CN109668165B (en) | Hot secondary air and flue gas waste heat utilization system and thermal power generation unit | |
| CN103486566A (en) | Waste heat utilization system capable of guaranteeing lignite boiler dry output and SCR safe flue gas temperature | |
| CN201764527U (en) | Thermal power plant boiler exhaust heat recovery and utilization system | |
| CN102767822B (en) | Integrated system for pre-heating air and condensed water of turbine in grading manner by using boiler smoke | |
| CN106090971A (en) | A kind of combined steam flue gas MGGH system and method | |
| CN104990063A (en) | Hot primary air waste heat utilization device coupled with air heater system in use | |
| CN106123002A (en) | A kind of flue gas MGGH system and method using condensation water heat exchange | |
| CN203671577U (en) | Efficient waste heat recovery system of machine and boiler coupled air cooling power station | |
| CN204593353U (en) | A kind of integrated system of deep exploitation residual heat from boiler fume | |
| CN110486711A (en) | A low-temperature economizer system for high-sulfur coal units | |
| CN112128732B (en) | Waste steam and flue gas waste heat energy quality coupling and improving system | |
| CN107149873A (en) | A kind of energy-saving full load denitrating system | |
| CN202762308U (en) | Deep energy-saving system based on flue gas desulfurization and denitrification process optimization | |
| CN201866755U (en) | Flue gas waste heat recovery system for boiler in thermal power plant | |
| CN107345656A (en) | A kind of steam raising plant using residual heat from boiler fume |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |