CN107359546A - A kind of livewire work action bars decision connects the special drainage thread of lead and fixes locking bar - Google Patents

A kind of livewire work action bars decision connects the special drainage thread of lead and fixes locking bar Download PDF

Info

Publication number
CN107359546A
CN107359546A CN201710856306.0A CN201710856306A CN107359546A CN 107359546 A CN107359546 A CN 107359546A CN 201710856306 A CN201710856306 A CN 201710856306A CN 107359546 A CN107359546 A CN 107359546A
Authority
CN
China
Prior art keywords
wire
locking
lead
rod
drainage thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710856306.0A
Other languages
Chinese (zh)
Inventor
马超
李高合
刘博�
王康
王永生
王新娜
龚先权
宁博扬
孙耀芹
郝宁
陈金辉
林琳
樊浩
刘学琴
郝旭东
顾超
王显全
胥莹
孙振
张媛媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Training Center of State Grid Jibei Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Training Center of State Grid Jibei Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Training Center of State Grid Jibei Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Training Center of State Grid Jibei Electric Power Co Ltd
Priority to CN201710856306.0A priority Critical patent/CN107359546A/en
Publication of CN107359546A publication Critical patent/CN107359546A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本发明公开了一种带电作业操作杆法断接引线专用引流线固定锁杆,包括绝缘杆、设于绝缘杆顶端用于悬挂于导线上的挂钩以及通过抱箍卡装在绝缘杆中部用于锁紧引流线的引线锁紧机构,挂钩与引线锁紧机构之间的间距通过抱箍调整为电气安全距离。本发明用于在采用绝缘操作杆法进行带电接引线作业的过程中,能够将引流线和被引流的导线可靠地进行定位及夹持,能够避免引流线和导线因外界环境影响而发生摆动和松动现象的发生,同时还保证了引流线和导线之间的安全距离,为作业人员提供了安全可靠的作业环境。

The invention discloses a special drain wire fixing locking rod for disconnecting the lead wire by the operating rod method of live work, which includes an insulating rod, a hook arranged at the top of the insulating rod for hanging on the wire, and clamped in the middle of the insulating rod by a hoop for Lock the lead wire locking mechanism of the drain wire, and the distance between the hook and the lead wire locking mechanism is adjusted to an electrical safety distance through the hoop. The invention is used to reliably position and clamp the drain wire and the drained wire in the process of using the insulating operating rod method to carry out the live lead wire connection operation, and can avoid the swinging and clamping of the drain wire and the wire due to the influence of the external environment. The occurrence of loose phenomenon also ensures the safe distance between the drain wire and the wire, and provides a safe and reliable working environment for the operators.

Description

一种带电作业操作杆法断接引线专用引流线固定锁杆A special drainage wire fixed lock rod for live work operating rod method disconnection lead wire

技术领域technical field

本发明涉及电力线路带电作业技术领域,特别是一种电力线路带线作业操作杆法断接引线工作中专用引流线固定锁杆。The invention relates to the technical field of live work on electric power lines, in particular to a special drainage wire fixing lock rod in the operation rod method for disconnecting lead wires in the electric line live working operation.

背景技术Background technique

电力系统的电气设备在长期运行中需要经常进行测试、检查和维修,其中带电作业是为了避免检修停电从而保证正常供电的有效措施。在电力线路带电检修作业过程中,采用操作杆作业法来进行断接引流线是使用最平凡、工具数量和设备最少、工具重量最轻而且效率最高的一种作业方法。The electrical equipment of the power system needs to be tested, inspected and repaired frequently during long-term operation, and live work is an effective measure to avoid maintenance blackouts and ensure normal power supply. In the process of live overhaul of power lines, using the operating rod method to disconnect the drain wire is the most common method with the least number of tools and equipment, the lightest tool weight and the highest efficiency.

目前,由于线路设备的更新换代和作业方法的不断进步,在对设备安全和人员安全的要求上也变得更加严格。然而,传统的操作杆短接引流线的工作模式都是将受电侧引线固定好后置于悬空状态,然后再逐相进行接引;当接上其中任何一相后,其他的两相包括横担都同时视为带电体。在现场作业中由于环境的许多不确定因素,例如风或者人员的换位等都会对未安装的引线造成摆动和误碰,造成相间的安全距离和人身安全距离无法得到保证,容易发生安全事故。At present, due to the upgrading of line equipment and the continuous improvement of operating methods, the requirements for equipment safety and personnel safety have become more stringent. However, the working mode of the traditional operating rod short-circuiting the drain wire is to fix the lead wire on the receiving side and place it in a suspended state, and then connect it phase by phase; when any one of the phases is connected, the other two phases include Both crossarms are regarded as electrified bodies at the same time. In the field operation, due to many uncertain factors of the environment, such as wind or personnel transposition, etc., the uninstalled lead wires will swing and accidentally touch, resulting in the safety distance between phases and personal safety cannot be guaranteed, and safety accidents are prone to occur.

发明内容Contents of the invention

本发明需要解决的技术问题是提供一种带电作业操作杆法断接引线专用引流线固定锁杆,能够将引线固定在锁杆上,并在锁杆头与引线之间留出有足够的绝缘距离后再挂在导线上,使引线既没有带电也能锁得牢固,保障带电作业人员和设备的安全。The technical problem to be solved by the present invention is to provide a special drain wire fixing lock rod for live work operation rod method to disconnect the lead wire, which can fix the lead wire on the lock rod and leave enough insulation between the lock rod head and the lead wire. Then hang it on the wire after the distance, so that the lead wire can be locked firmly without being charged, and the safety of live workers and equipment is guaranteed.

为解决上述技术问题,本发明所采取的技术方案如下。In order to solve the above technical problems, the technical solutions adopted by the present invention are as follows.

一种带电作业操作杆法断接引线专用引流线固定锁杆,包括绝缘杆、设于绝缘杆顶端用于悬挂于导线上的挂钩以及通过抱箍卡装在绝缘杆中部用于锁紧引流线的引线锁紧机构,挂钩与引线锁紧机构之间的间距通过抱箍调整为电气安全距离。A special drainage wire fixing lock rod for disconnecting the lead wire by the operating rod method of live work, including an insulating rod, a hook set on the top of the insulating rod for hanging on the wire, and clamped in the middle of the insulating rod by a hoop to lock the drain wire The lead wire locking mechanism, the distance between the hook and the lead wire locking mechanism is adjusted to an electrical safety distance through the hoop.

上述一种带电作业操作杆法断接引线专用引流线固定锁杆,所述挂钩包括内设有锁钩机构的倒U型主体,锁钩机构包括左右对称设置在倒U型主体内的两个框型锁舌、拉拽框型锁舌以释放导线的绝缘小绳以及复位框型锁舌的锁紧弹簧。The above-mentioned special drainage wire fixed locking rod for disconnecting the lead wire by the operating rod method of live work, the hook includes an inverted U-shaped main body with a locking hook mechanism inside, and the locking hook mechanism includes two left and right symmetrically arranged in the inverted U-shaped main body. The box bolt, the insulated cord that pulls on the box bolt to release the wires, and the locking spring that resets the box bolt.

上述一种带电作业操作杆法断接引线专用引流线固定锁杆,所述框型锁舌包括锁紧面板以及固定设置在锁紧面板顶端的导向板和固定设置在锁紧面板底端的定位板,定位板的长度短于到导向板的长度;所述定位板的外端通过销轴在倒U型主体底端;所述绝缘小绳的一端与导向板的外端固定连接,绝缘小绳的另一端穿过绝缘杆后伸出绝缘杆外;所述复位弹簧的底端通过定位杆固定在倒U型主体上,复位弹簧的顶端与导向板的底端面固定连接。The above-mentioned special drain wire fixed lock rod for live work operating rod method disconnection lead wire, the frame-shaped lock tongue includes a locking panel, a guide plate fixed on the top of the locking panel and a positioning plate fixed on the bottom of the locking panel , the length of the positioning plate is shorter than the length to the guide plate; the outer end of the positioning plate is at the bottom of the inverted U-shaped main body through a pin; one end of the small insulating rope is fixedly connected with the outer end of the guiding plate, and the small insulating rope The other end of the back-moving spring extends out of the insulating rod after passing through the insulating rod; the bottom end of the return spring is fixed on the inverted U-shaped main body through the positioning rod, and the top of the return spring is fixedly connected with the bottom end surface of the guide plate.

上述一种带电作业操作杆法断接引线专用引流线固定锁杆,所述锁紧面板设置为内凹的弧面。In the above-mentioned special drain wire fixing lock rod for live work operating rod method disconnection lead wire, the locking panel is set as a concave arc surface.

上述一种带电作业操作杆法断接引线专用引流线固定锁杆,所述引线锁紧机构包括固定在抱箍外端面上的立板,立板的顶端固定连接有开口朝下的曲面固定槽,立板的底端垂直设置有连接板,连接杆与曲面固定槽之间设置有竖立的柱形锁紧弹簧,柱形锁紧弹簧的顶端设置有锁紧帽,所述锁紧帽的底端面固定连接有控制柱形锁紧弹簧压缩或释放的绝缘小绳,所述绝缘小绳穿过柱形锁紧弹簧内通道、连接板以及绝缘杆后引出。The above-mentioned special drain wire fixing lock rod for disconnecting the lead wire by the operating rod method of live work, the lead wire locking mechanism includes a vertical plate fixed on the outer end surface of the hoop, and the top of the vertical plate is fixedly connected with a curved surface fixing groove with the opening facing downward. , the bottom end of the vertical plate is vertically provided with a connecting plate, an upright cylindrical locking spring is arranged between the connecting rod and the curved surface fixing groove, and a locking cap is arranged on the top of the cylindrical locking spring, and the bottom of the locking cap The end face is fixedly connected with an insulating small rope that controls the compression or release of the cylindrical locking spring, and the insulating small rope is drawn out after passing through the inner channel of the cylindrical locking spring, the connecting plate and the insulating rod.

由于采用了以上技术方案,本发明所取得技术进步如下。Due to the adoption of the above technical solutions, the technological progress achieved by the present invention is as follows.

本发明用于在采用绝缘操作杆法进行带电接引线作业的过程中,能够将引流线和被引流的导线可靠地进行定位及夹持,能够避免引流线和导线因外界环境影响而发生摆动和松动现象的发生,同时还保证了引流线和导线之间的安全距离,为作业人员提供了安全可靠的作业环境。The invention is used to reliably position and clamp the drain wire and the drained wire in the process of using the insulating operating rod method to carry out the live lead wire connection operation, and can avoid the swinging and clamping of the drain wire and the wire due to the influence of the external environment. The occurrence of loose phenomenon also ensures the safe distance between the drain wire and the wire, and provides a safe and reliable working environment for the operators.

附图说明Description of drawings

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2为本发明所述锁钩机构的内部结构示意图。引线锁紧机构Fig. 2 is a schematic diagram of the internal structure of the hook mechanism of the present invention. Lead locking mechanism

其中:1.绝缘杆,2.抱箍,3.曲面固定槽,4.柱形锁紧弹簧,5.倒U型主体,6.锁钩机构,61.框型锁舌,62.定位杆,63.锁紧弹簧,7.销轴,8.导向杆,9.绝缘小绳。Among them: 1. Insulation rod, 2. Hoop, 3. Curved surface fixing groove, 4. Cylindrical locking spring, 5. Inverted U-shaped main body, 6. Lock hook mechanism, 61. Frame-shaped lock tongue, 62. Positioning rod , 63. locking spring, 7. bearing pin, 8. guide rod, 9. small insulating rope.

具体实施方式detailed description

下面将结合具体实施例对本发明进行进一步详细说明。The present invention will be further described in detail below in conjunction with specific embodiments.

一种带电作业操作杆法断接引线专用引流线固定锁杆,其结构如图1所示,包括绝缘杆1、挂钩以及引线锁紧机构;挂钩设于绝缘杆顶端,用于将整个固定锁杆悬挂于导线上;引线锁紧机构通过抱箍2卡装在绝缘杆中部,用于锁紧引流线;挂钩与引线锁紧机构之间的间距通过抱箍调整为电气安全距离,以保证带电作业人员和设备的安全。本发明中,绝缘杆、挂钩以及引线锁紧机构均采用环氧树脂绝缘材料制作,绝缘杆还可采用中空的伸缩杆。A special drainage wire fixed lock rod for disconnecting the lead wire by the operating rod method of live work, its structure is shown in Figure 1, including an insulating rod 1, a hook and a lead wire locking mechanism; the hook is arranged on the top of the insulating rod for locking the entire fixed The rod is suspended on the wire; the lead wire locking mechanism is clamped in the middle of the insulating rod through the hoop 2 to lock the drain wire; the distance between the hook and the lead wire locking mechanism is adjusted to an electrical safety distance through the hoop to ensure the live wire Safety of workers and equipment. In the present invention, the insulating rod, the hook and the lead wire locking mechanism are all made of epoxy resin insulating material, and the insulating rod can also be a hollow telescopic rod.

挂钩的结构如图1所示,包括倒U型主体5,倒U型主体5内设有锁钩机构,用于锁紧导线,防止挂钩松脱滑动。The structure of the hook is shown in Figure 1, including an inverted U-shaped main body 5, and a locking hook mechanism is arranged inside the inverted U-shaped main body 5, which is used to lock the wire and prevent the hook from loosening and sliding.

锁钩机构的结构如图2所示,包括左右对称设置在倒U型主体5内的两个框型锁舌61、绝缘小绳以及锁紧弹簧,通过拉拽绝缘小绳改变框型锁舌在倒U型主体内的位置,以释放导线;锁紧弹簧不仅用于卡紧导线,还用在导线释放后复位框型锁舌。The structure of the lock hook mechanism is shown in Figure 2, including two frame-shaped deadbolts 61 symmetrically arranged in the inverted U-shaped main body 5, an insulating small rope and a locking spring, and the frame-shaped deadbolt can be changed by pulling the insulating small rope. Position inside the inverted U-shaped body to release the wire; the locking spring is not only used to clamp the wire, but also to reset the frame lock tongue after the wire is released.

框型锁舌61包括锁紧面板、导向板和定位板,导向板固定设置在锁紧面板顶端。锁紧面板设置为内凹的弧面,以方便两个框型锁舌能够包裹住导线,防止损伤导线;定位板固定设置在锁紧面板底端,绝缘小绳的一端与导向板的外端固定连接,绝缘小绳的另一端穿过绝缘杆后伸出绝缘杆外;定位板的外端通过销轴在倒U型主体底端;定位板的长度短于到导向板的长度;复位弹簧的底端通过定位杆62固定在倒U型主体上,复位弹簧的顶端与导向板的底端面固定连接。用于卡紧导线时,使导线从两个框型锁舌底部之间的卡口进入到两个框型锁舌的弧面之间,导线便可在牢固地卡紧在锁钩机构中;用于释放导线时,向下拉动绝缘小绳时,框型锁舌的顶部张开向上顶推绝缘杆便可将导线释放,当导线释放后,松开绝缘小绳,框型锁舌便可在复位弹簧的作用下恢复原位。The frame-shaped locking tongue 61 includes a locking panel, a guide plate and a positioning plate, and the guide plate is fixedly arranged on the top of the locking panel. The locking panel is set as a concave arc surface, so that the two frame-shaped lock tongues can wrap the wires to prevent damage to the wires; the positioning plate is fixed at the bottom of the locking panel, and one end of the insulating rope is connected to the outer end of the guide plate. Fixed connection, the other end of the small insulating rope passes through the insulating rod and extends out of the insulating rod; the outer end of the positioning plate is at the bottom of the inverted U-shaped main body through the pin shaft; the length of the positioning plate is shorter than the length to the guide plate; the return spring The bottom end of the back spring is fixed on the inverted U-shaped main body by a positioning rod 62, and the top end of the back-moving spring is fixedly connected with the bottom end surface of the guide plate. When it is used to clamp the wire, the wire enters from the bayonet between the bottoms of the two frame-shaped lock tongues into the arc surface of the two frame-shaped lock tongues, and the wire can be firmly clamped in the hook mechanism; When it is used to release the wire, when the small insulating rope is pulled down, the top of the frame-shaped deadbolt opens and the insulating rod is pushed upward to release the wire. After the wire is released, loosen the small insulating rope, and the frame-shaped deadbolt can Return to the original position under the action of the return spring.

本实施例中,定位板与锁紧面板的连接处设置为便于导线进入的弧形结构,还可以避免损伤导线;导向板的头部可设置为倒U型主体顶端弧度相应的过渡弧形结构。In this embodiment, the connection between the positioning plate and the locking panel is set as an arc-shaped structure that is convenient for wires to enter, and can also avoid damage to the wires; the head of the guide plate can be set as a transitional arc-shaped structure corresponding to the arc at the top of the inverted U-shaped main body .

引线锁紧机构用于卡紧引流线,其结构如图1所示,包括固定在抱箍外端面上的立板,立板的顶端固定连接有开口朝下的曲面固定槽3,立板的底端垂直设置有连接板,连接杆与曲面固定槽之间设置有竖立的柱形锁紧弹簧4,柱形锁紧弹簧的顶端设置有锁紧帽,锁紧帽的底端面固定连接有控制柱形锁紧弹簧压缩或释放的绝缘小绳,绝缘小绳穿过柱形锁紧弹簧内通道、连接板以及绝缘杆后引出。用于夹紧引流线时,向下拉动绝缘小绳,柱形锁紧弹簧向下运动,使锁紧帽和曲面固定槽之间打开,引流线进入曲面固定槽后,松开绝缘小绳,锁紧帽在柱形锁紧弹簧的作用下将引流线夹紧在曲面固定槽中,可靠保证了引流线不会发生松动和摆动现象。The lead wire locking mechanism is used to clamp the drainage wire. Its structure is shown in Figure 1. It includes a vertical plate fixed on the outer end surface of the hoop. The top of the vertical plate is fixedly connected with a curved surface fixing groove 3 with the opening facing downward. The bottom end is vertically provided with a connecting plate, and an upright cylindrical locking spring 4 is arranged between the connecting rod and the curved surface fixing groove. The small insulating rope compressed or released by the cylindrical locking spring is led out after passing through the inner channel of the cylindrical locking spring, the connecting plate and the insulating rod. When used to clamp the drainage wire, pull down the small insulating rope, and the cylindrical locking spring moves downward to open the gap between the locking cap and the curved surface fixing groove. After the drainage wire enters the curved surface fixing groove, loosen the small insulating rope. The locking cap clamps the drainage wire in the fixed groove on the curved surface under the action of the cylindrical locking spring, which reliably ensures that the drainage wire will not loosen and swing.

本发明使用时,首先根据电气安全距离,调整抱箍和引线锁紧机构在绝缘杆上的位置;然后,将操作引线锁紧机构上的绝缘小绳将引流线固定在引线锁紧机构中,然后操作挂钩,将固定锁杆整体悬挂在被引流的导线上,同时确保了引流线和挂钩不会发生松动和摆动现象,同时保证了两者直接之间的安全距离,为作业人员提供了安全可靠的作业环境。When the present invention is in use, first adjust the position of the hoop and the lead wire locking mechanism on the insulating rod according to the electrical safety distance; then, fix the drain wire in the lead wire locking mechanism by operating the small insulating rope on the lead wire locking mechanism, Then operate the hook to hang the fixed lock bar on the drained wire as a whole, while ensuring that the drain wire and the hook will not loosen and swing, and at the same time ensure a safe distance between the two, providing safety for operators. Reliable working environment.

Claims (5)

1. a kind of livewire work action bars decision connects the special drainage thread of lead and fixes locking bar, it is characterised in that:Including insulating bar (1), be used for the hook that hangs on wire located at insulating bar top and pass through anchor ear(2)It is installed in the middle part of insulating bar and is used to lock The lead retaining mechanism of tight drainage thread, link up with the spacing between lead retaining mechanism by anchor ear be adjusted to electrical safety away from From.
2. a kind of livewire work action bars decision according to claim 1 connects the special drainage thread of lead and fixes locking bar, it is special Sign is:The hook includes the interior inverted U main body for being provided with latch hook mechanism(5), latch hook mechanism is including being symmetrical set in U Type main body(5)Two interior frame-type dead bolts(61), pull frame-type dead bolt with discharge the insulation marline of wire and reset frame-type lock The locking spring of tongue.
3. a kind of livewire work action bars decision according to claim 2 connects the special drainage thread of lead and fixes locking bar, it is special Sign is:The frame-type dead bolt(61)Set including locking panel and the guide plate for being fixedly installed on locking panel top with fixed Put the location-plate in locking panel bottom, the length for being shorter in length than guide plate of location-plate;The outer end of the location-plate passes through Bearing pin is in inverted U main body bottom;One end of the insulation marline is fixedly connected with the outer end of guide plate, the other end for the marline that insulate Stretched out after through insulating bar outside insulating bar;The bottom of the back-moving spring passes through locating rod(62)It is fixed in inverted U main body, it is multiple The position top of spring is fixedly connected with the bottom face of guide plate.
4. a kind of livewire work action bars decision according to claim 3 connects the special drainage thread of lead and fixes locking bar, it is special Sign is:The locking panel is arranged to the cambered surface of indent.
5. a kind of livewire work action bars decision according to claim 1 connects the special drainage thread of lead and fixes locking bar, it is special Sign is:The lead retaining mechanism includes the riser being fixed on anchor ear outer face, and the top of riser is fixedly connected with opening Curved surface fixing groove directed downwardly(3), the bottom of riser is vertically installed with connecting plate, is provided between connecting rod and curved surface fixing groove perpendicular Vertical cylindricality locking spring(4), the top of cylindricality locking spring is provided with locking cap, and the bottom face of the locking cap is fixedly connected There is the insulation marline for controlling the compression of cylindricality locking spring or release, the insulation marline passes through cylindricality locking spring internal channel, connected Drawn after fishplate bar and insulating bar.
CN201710856306.0A 2017-09-21 2017-09-21 A kind of livewire work action bars decision connects the special drainage thread of lead and fixes locking bar Pending CN107359546A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710856306.0A CN107359546A (en) 2017-09-21 2017-09-21 A kind of livewire work action bars decision connects the special drainage thread of lead and fixes locking bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710856306.0A CN107359546A (en) 2017-09-21 2017-09-21 A kind of livewire work action bars decision connects the special drainage thread of lead and fixes locking bar

Publications (1)

Publication Number Publication Date
CN107359546A true CN107359546A (en) 2017-11-17

Family

ID=60291109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710856306.0A Pending CN107359546A (en) 2017-09-21 2017-09-21 A kind of livewire work action bars decision connects the special drainage thread of lead and fixes locking bar

Country Status (1)

Country Link
CN (1) CN107359546A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108011327A (en) * 2017-12-22 2018-05-08 国网河北省电力有限公司武邑县供电分公司 A kind of temporary connecting device of high pressure drainage thread
CN108808558A (en) * 2018-07-26 2018-11-13 国网青海省电力公司海东供电公司 Lead for distribution uninterrupted operation is fixed and interim suspension arrangement
CN109066470A (en) * 2018-09-18 2018-12-21 国网江苏省电力有限公司镇江供电分公司 Insulate branch-cut bridge device
CN111029228A (en) * 2019-12-19 2020-04-17 国网浙江省电力有限公司温州供电公司 A quick-connect drop-out fuse
CN111082356A (en) * 2019-11-18 2020-04-28 国网浙江慈溪市供电有限公司 A insulating bar for changing arrester multiplexer utensil
CN112066960A (en) * 2020-09-08 2020-12-11 中铁第五勘察设计院集团有限公司 Auxiliary device and prism for CPⅢ measurement of maglev traffic rail control network
CN112490935A (en) * 2020-12-11 2021-03-12 国网江苏省电力有限公司盐城供电分公司 Insulating hanging rod
CN114069528A (en) * 2021-11-24 2022-02-18 国网新疆电力有限公司和田供电公司 Lead wire breaking and connecting fixing device
CN114284936A (en) * 2021-11-29 2022-04-05 国网浙江省电力有限公司宁波供电公司 Live working drainage wire fixing device
CN115036848A (en) * 2022-07-26 2022-09-09 慈溪市输变电工程有限公司 Q-shaped insulating hanger
CN115173303A (en) * 2022-07-05 2022-10-11 重庆东晟来电力设备有限公司 Method and device for picking and hanging back rope cross arm of pole-climbing live-line work safety belt
CN116742524A (en) * 2023-06-21 2023-09-12 国网伊犁伊河供电有限责任公司 Insulated operating rod for breaking and connecting flow lines for live work

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000092637A (en) * 1998-09-14 2000-03-31 Furukawa Electric Co Ltd:The Subscriber drop-in pull-in method and apparatus, and drop-in hanging bracket
CN203135010U (en) * 2013-01-06 2013-08-14 辽宁省电力有限公司铁岭供电公司 Hook type ground wire having locking notch
CN203278084U (en) * 2013-04-18 2013-11-06 国家电网公司 Special tool for fixing mesophase drainage wire in 10KV live working
CN203932818U (en) * 2014-06-10 2014-11-05 国网山东诸城市供电公司 A kind of hot line maintenance potential transfer deadlock lever
CN204030026U (en) * 2014-08-22 2014-12-17 国家电网公司 Gravity self-locking formula Anti-dropping earthing clip
CN205264881U (en) * 2015-12-11 2016-05-25 国家电网公司 Adjustable angle's earth connection end
CN205565036U (en) * 2016-05-03 2016-09-07 国网江西省电力公司南昌供电分公司 Electric power wire overhauls with meeting ground wire device convenient to operation
CN205666351U (en) * 2016-06-06 2016-10-26 国网山东省电力公司阳谷县供电公司 Earth connection insulating bar
CN206022672U (en) * 2016-09-23 2017-03-15 国网河南省电力公司南阳供电公司 A ground clamp
CN107492829A (en) * 2017-08-29 2017-12-19 华北电力科学研究院有限责任公司 Branch's lead fixes locking bar and the powered method for connecing lead of distribution line

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000092637A (en) * 1998-09-14 2000-03-31 Furukawa Electric Co Ltd:The Subscriber drop-in pull-in method and apparatus, and drop-in hanging bracket
CN203135010U (en) * 2013-01-06 2013-08-14 辽宁省电力有限公司铁岭供电公司 Hook type ground wire having locking notch
CN203278084U (en) * 2013-04-18 2013-11-06 国家电网公司 Special tool for fixing mesophase drainage wire in 10KV live working
CN203932818U (en) * 2014-06-10 2014-11-05 国网山东诸城市供电公司 A kind of hot line maintenance potential transfer deadlock lever
CN204030026U (en) * 2014-08-22 2014-12-17 国家电网公司 Gravity self-locking formula Anti-dropping earthing clip
CN205264881U (en) * 2015-12-11 2016-05-25 国家电网公司 Adjustable angle's earth connection end
CN205565036U (en) * 2016-05-03 2016-09-07 国网江西省电力公司南昌供电分公司 Electric power wire overhauls with meeting ground wire device convenient to operation
CN205666351U (en) * 2016-06-06 2016-10-26 国网山东省电力公司阳谷县供电公司 Earth connection insulating bar
CN206022672U (en) * 2016-09-23 2017-03-15 国网河南省电力公司南阳供电公司 A ground clamp
CN107492829A (en) * 2017-08-29 2017-12-19 华北电力科学研究院有限责任公司 Branch's lead fixes locking bar and the powered method for connecing lead of distribution line

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108011327B (en) * 2017-12-22 2019-12-17 国网河北省电力有限公司武邑县供电分公司 A temporary connection device for high-voltage drainage wire
CN108011327A (en) * 2017-12-22 2018-05-08 国网河北省电力有限公司武邑县供电分公司 A kind of temporary connecting device of high pressure drainage thread
CN108808558B (en) * 2018-07-26 2025-02-25 国网青海省电力公司海东供电公司 Lead fixing and temporary suspension device for non-stop power supply operation of distribution network
CN108808558A (en) * 2018-07-26 2018-11-13 国网青海省电力公司海东供电公司 Lead for distribution uninterrupted operation is fixed and interim suspension arrangement
CN109066470A (en) * 2018-09-18 2018-12-21 国网江苏省电力有限公司镇江供电分公司 Insulate branch-cut bridge device
CN111082356A (en) * 2019-11-18 2020-04-28 国网浙江慈溪市供电有限公司 A insulating bar for changing arrester multiplexer utensil
CN111029228A (en) * 2019-12-19 2020-04-17 国网浙江省电力有限公司温州供电公司 A quick-connect drop-out fuse
CN112066960A (en) * 2020-09-08 2020-12-11 中铁第五勘察设计院集团有限公司 Auxiliary device and prism for CPⅢ measurement of maglev traffic rail control network
CN112490935A (en) * 2020-12-11 2021-03-12 国网江苏省电力有限公司盐城供电分公司 Insulating hanging rod
CN114069528A (en) * 2021-11-24 2022-02-18 国网新疆电力有限公司和田供电公司 Lead wire breaking and connecting fixing device
CN114284936B (en) * 2021-11-29 2023-11-14 国网浙江省电力有限公司宁波供电公司 Live working drainage line fixing device
CN114284936A (en) * 2021-11-29 2022-04-05 国网浙江省电力有限公司宁波供电公司 Live working drainage wire fixing device
CN115173303A (en) * 2022-07-05 2022-10-11 重庆东晟来电力设备有限公司 Method and device for picking and hanging back rope cross arm of pole-climbing live-line work safety belt
CN115173303B (en) * 2022-07-05 2023-12-19 重庆东晟来电力设备有限公司 Method and device for unhooking and hanging back rope cross arm of pole climbing live working safety belt
CN115036848A (en) * 2022-07-26 2022-09-09 慈溪市输变电工程有限公司 Q-shaped insulating hanger
CN115036848B (en) * 2022-07-26 2024-06-11 慈溪市输变电工程有限公司 Q-type insulating hanger
CN116742524A (en) * 2023-06-21 2023-09-12 国网伊犁伊河供电有限责任公司 Insulated operating rod for breaking and connecting flow lines for live work

Similar Documents

Publication Publication Date Title
CN107359546A (en) A kind of livewire work action bars decision connects the special drainage thread of lead and fixes locking bar
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN107069562B (en) Replacing insulator under electrified method and load transfer device
CN204103316U (en) For the charged insulation eagle's beak pliers action bars disconnected of isolated circuit breaker
CN206471747U (en) It is a kind of can charged for replacement insulator arrangement
WO2012088986A1 (en) Maintenance tool used for direct current transmission line
CN207098447U (en) A kind of drainage thread fixing device
CN104882825A (en) High-voltage live lead disconnecting device and lead method, and high-voltage live lead connecting device and lead method
CN105356371A (en) Same-tower multi-loop power transmission line strain insulator string electrification replacing method and device
CN101546894B (en) Method for replacing 220KV steel pipe tower composite insulator electrifiedly
CN106450835A (en) Shoe manufacturer high voltage wire landing device
CN102255261A (en) Shifting device for two-circuit hot-line work of transmission line
CN103474909A (en) Method for replacing multi-loop strain insulator string in drainage wire supporting distance expanding hot-line working
CN106785521A (en) A kind of combined type ground wire group
CN106711843A (en) Pole fitting erection device for climbing operation maintenance
CN204741228U (en) Insulating couple of three -phase short circuit grounding
CN105449612A (en) A conductive wire insulation support plate apparatus
CN209434748U (en) Side of wire yoke plate clamp for vertical rotary replacement direct current grounding pole line tension string
CN102545102B (en) 1000-Kv tension-resistant horizontal insulator charged exchange device
CN206442059U (en) A kind of insulated gin
CN201584691U (en) Special tool for 220KV double-circuit common-tower line accessing tension-resistance high-pressure high-electric field
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN207052957U (en) A kind of power distribution cabinet of convenient lifting
CN204858403U (en) Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity
CN205123134U (en) Lead wire fixing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171117

RJ01 Rejection of invention patent application after publication