CN107313354A CN201710706670.9A CN201710706670A CN107313354A CN 107313354 A CN107313354 A CN 107313354A CN 201710706670 A CN201710706670 A CN 201710706670A CN 107313354 A CN107313354 A CN 107313354A
Authority
CN
China
Prior art keywords
hydraulic
hydraulic pressure
pressure terminal
displacement
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710706670.9A
Other languages
Chinese (zh)
Inventor
林鑫
杨浩
于海萍
楼永高
马春辉
谢晓阳
宋刚
于传江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI PUDONG NEW DISTRICT ROAD CONSTRUCTION DEVELOPMENT Co Ltd
Original Assignee
SHANGHAI PUDONG NEW DISTRICT ROAD CONSTRUCTION DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI PUDONG NEW DISTRICT ROAD CONSTRUCTION DEVELOPMENT Co Ltd filed Critical SHANGHAI PUDONG NEW DISTRICT ROAD CONSTRUCTION DEVELOPMENT Co Ltd
Priority to CN201710706670.9A priority Critical patent/CN107313354A/en
Publication of CN107313354A publication Critical patent/CN107313354A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of Arch Bridge Construction tie-rod regulating system, and it includes:Hydraulic system, displacement transducer and console;The hydraulic system includes hydraulic pressure terminal and hydraulic power unit, and the hydraulic power unit provides hydraulic oil for the hydraulic pressure terminal, adjusts the hydraulic coupling of the hydraulic pressure terminal output;The hydraulic system is used to apply active force to arch rib;Institute's displacement sensors are used for the end displacement amount for measuring arch rib;The console is connected by data wire with the hydraulic power unit and displacement transducer;The hydraulic pressure terminal is used to apply active force to arch rib end, institute's displacement sensors are used for the displacement of curb girder arch rib end and measurement result are transferred into console, and the console controls the The hydraulic oil provided for the hydraulic pressure terminal of the hydraulic power unit according to the data of institute's displacement sensors.

Description

A kind of Arch Bridge Construction tie-rod regulating system
Technical field
The present invention relates to a kind of Arch Bridge Construction tie-rod regulating system, more particularly to a kind of arch bridge fitting the arch first then fitting the girder formula construction tie-rod Regulating system.
Background technology
In recent years, through tied arch bridge because with structure stress rationally, cost economic, bridge type be attractive in appearance and surrounding environment The advantages of harmony is good, so as to be used widely in urban road bridges construction.
As shown in figure 1, through tied arch bridge 100 includes arch rib 101, bridge pier 102 and tie-rod 103.Generally single span, Have two across or three stride continuous.Bowstring arch bridge is by the interior prestressing force applied of tie-rod 103, and the level for offsetting the generation of arch rib 101 is pushed away Power, makes bridge pier 102 without horizontal thrust is subjected to, and efficiently solves conventional arch bridge and occurs that abutment displacement, vault decline, arch rib opens The problems such as splitting.Built, divided according to working procedure using cast in situs more than bowstring arch bridge, after mainly having first beam rear arch method and first encircleing Liang Fa, and in the construction technology of fitting the arch first then fitting the girder method, the two ends of arch rib 101 produce horizontal displacement and cause arch rib during constructing tie beam 101 deformations, influence construction quality.In this patent, arch rib 101 can be described as arch rib again.
The content of the invention
The invention aims to overcome deficiency of the prior art, there is provided a kind of Arch Bridge Construction tie-rod regulating system.
To realize object above, the present invention is achieved through the following technical solutions:
A kind of Arch Bridge Construction tie-rod regulating system, it is characterised in that including:
Hydraulic system;The hydraulic system includes hydraulic pressure terminal and hydraulic power unit, and the hydraulic power unit is that the hydraulic pressure is whole End provides hydraulic oil, adjusts the hydraulic coupling of the hydraulic pressure terminal output;The hydraulic system is used to apply active force to arch rib;
Displacement transducer;Institute's displacement sensors are used for the end displacement amount for measuring arch rib;
Console;The console is connected by data wire with the hydraulic power unit and displacement transducer;
The hydraulic pressure terminal is used to apply arch rib end active force, and institute's displacement sensors are used for curb girder arch rib end Measurement result is simultaneously transferred to console by displacement, and the console controls the hydraulic pressure according to the data of institute's displacement sensors The The hydraulic oil provided for the hydraulic pressure terminal of pumping plant.
According to one embodiment of present invention, institute's displacement sensors include fixing end and telescopic lever.
According to one embodiment of present invention, the hydraulic pressure terminal is feed-through hydraulic jack.
According to one embodiment of present invention, mechanical anti-back anchor device is provided with the inside of the hydraulic pressure terminal, be used for Prevent hydraulic pressure terminal decompression from causing tie-rod slip.
According to one embodiment of present invention, the arch bridge is the arch bridge that fitting the arch first then fitting the girder formula construction method is manufactured.
Compared with prior art, following beneficial effect can be achieved in the present invention:
(1) a kind of Arch Bridge Construction tie-rod regulating system that the present invention is provided, can be achieved auto-adjustment control, can be applied in binder The work stage carries out real-time monitoring, substitutes original artificial control mode, it is to avoid and manual operation error is reduced, method is simple, operation Convenient, control accuracy is high, available for the tie-rod internal force regulation in the arch bridge fitting the arch first then fitting the girder formula work progress of each across footpath, maintains main arch Optimal distance, reduces structural acessory internal force, improves construction quality and efficiency of construction.
(2) a kind of Arch Bridge Construction tie-rod regulating system that the present invention is provided, pressurize, mechanical anti-back anchor are closed by hydraulic pressure ring Two layers of preventing mechanism, effective guarantee construction safety.
Brief description of the drawings
Fig. 1 is the structural representation for the through tied arch bridge mentioned in background technology.
Fig. 2 is a kind of structural representation of Arch Bridge Construction tie-rod regulating system of the present invention.
Fig. 3 is the structural representation of hydraulic pressure terminal in Fig. 2.
Fig. 4 is the structural representation of displacement transducer in Fig. 2.
Embodiment
The present invention is described in detail below in conjunction with the accompanying drawings.
Referring to Fig. 2-4, a kind of Arch Bridge Construction tie-rod regulating system, including hydraulic system 1, displacement transducer 2 and console 3.The hydraulic system 1 includes hydraulic pressure terminal 11 and hydraulic power unit 12, and the hydraulic pressure terminal 11 is arranged on the two ends of tie-rod 01, institute Hydraulic power unit 12 is stated to be connected with the hydraulic pressure terminal 11 by hydraulic line 13.Hydraulic power unit 12 is that hydraulic pressure terminal 11 provides hydraulic pressure Oil, the amount of force of the output of hydraulic pressure terminal 11 is adjusted according to the The hydraulic oil for being conveyed to hydraulic pressure terminal 11.Hydraulic power unit 12 with Console 3 is connected by data wire.The hydraulic pressure terminal 11 is that can be driven and the device of output action power by hydraulic oil.The present invention In one embodiment in, jack can be used.Preferably use centre-hole jack.More preferably, it is whole in the hydraulic pressure The inside at end 11 is provided with mechanical anti-back anchor device 111, for preventing the emergency situations such as the decompression of hydraulic pressure terminal 11 from causing tie-rod to take off Anchor.
Institute's displacement sensors 2 include fixing end 21 and telescopic lever 22, and the fixing end 21 is fixedly installed, described flexible Pull bar 22 is fixedly connected with the end of arch rib 101.Displacement transducer 2 is used for the displacement of the end of curb girder arch rib 101, and will measurement As a result following consoles 3 are conveyed to.The console 3 is connected by data wire 31 with displacement transducer 2.
The displacement data that institute's displacement sensors 2 are collected is transmitted to console 3, the console 3 by data wire 31 Control hydraulic power unit 12 to the pressurising of hydraulic pressure terminal 11, bleed off pressure, opened so as to adjust the tensioning of tie-rod 101 or put.
The built-in intelligence control system of console 3, the intelligence control system is fed back according to institute's displacement sensors 2 Displacement data, hydraulic power unit 12 described in intelligent control to the pressurising of hydraulic pressure terminal 11, bleed off pressure.
The measurement data of the real-time reception displacement transducer 2 of console 3, according to the default adjustment criteria of program, to liquid Press pump station 12 sends pressurising, bleeds off pressure instruction.The hydraulic power unit 12 is connected to after instruction, is carried out pressurising to hydraulic pressure terminal 11, is bled off pressure, Complete the tensioning of tie-rod and put to open, regulation change of arch costal shape changes with arch angle displacement in scope of design.
The hydraulic power unit 12 closes pressurize in stopping construction stage ring, forms first time preventing mechanism.It is described mechanical anti- Move back anchor device and be manually moved to the supporting section bottom of hydraulic pressure terminal 11 in the stopping construction stage, form second layer preventing mechanism.
Institute's displacement sensors 2 are preferably rod-pulling type micrometer, measurement range ± 15cm, measurement accuracy ± 0.1mm.
Compared with prior art, following beneficial effect can be achieved in the present invention:
(1) a kind of Arch Bridge Construction tie-rod regulating system that the present invention is provided, can be achieved auto-adjustment control, can be applied in binder The work stage carries out real-time monitoring, substitutes original artificial control mode, it is to avoid and manual operation error is reduced, method is simple, operation Convenient, control accuracy is high, available for the tie-rod internal force regulation in the arch bridge fitting the arch first then fitting the girder formula work progress of each across footpath, maintains main arch Optimal distance, reduces structural acessory internal force, improves construction quality and efficiency of construction.
(2) a kind of Arch Bridge Construction tie-rod regulating system that the present invention is provided, pressurize, mechanical anti-back anchor are closed by hydraulic pressure ring Two layers of preventing mechanism, effective guarantee construction safety.
Embodiment in the present invention is only used for that the present invention will be described, and is not construed as limiting the scope of claims limitation, Other substantial equivalent replacements that those skilled in that art are contemplated that, all fall in the scope of protection of the present invention.

Claims (5)

1. a kind of Arch Bridge Construction tie-rod regulating system, it is characterised in that including:
Hydraulic system;The hydraulic system includes hydraulic pressure terminal and hydraulic power unit, and the hydraulic power unit is that the hydraulic pressure terminal is carried Feed flow is pressed oil, and adjusts the hydraulic coupling of the hydraulic pressure terminal output;The hydraulic system is used to apply active force to arch rib;
Displacement transducer;Institute's displacement sensors are used for the end displacement amount for measuring arch rib;
Console;The console is connected by data wire with the hydraulic power unit and displacement transducer;
The hydraulic pressure terminal is used to apply arch rib end active force, and institute's displacement sensors are used for the displacement of curb girder arch rib end Measure and measurement result is transferred to console, the console controls the hydraulic power unit according to the data of institute's displacement sensors The The hydraulic oil provided for the hydraulic pressure terminal.
2. a kind of Arch Bridge Construction tie-rod regulating system according to claim 1, it is characterised in that institute's displacement sensors bag Include fixing end and telescopic lever.
3. a kind of Arch Bridge Construction tie-rod regulating system according to claim 1, it is characterised in that the hydraulic pressure terminal is to wear Core type hydraulic jack.
4. a kind of Arch Bridge Construction tie-rod regulating system according to claim 1 or 3, it is characterised in that whole in the hydraulic pressure The inside at end is provided with mechanical anti-back anchor device, for preventing hydraulic pressure terminal decompression from causing tie-rod slip.
5. a kind of Arch Bridge Construction tie-rod regulating system according to claim 1, it is characterised in that after the arch bridge is first encircles The arch bridge of beam type construction method manufacture.
CN201710706670.9A 2017-08-17 2017-08-17 A kind of Arch Bridge Construction tie-rod regulating system Pending CN107313354A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710706670.9A CN107313354A (en) 2017-08-17 2017-08-17 A kind of Arch Bridge Construction tie-rod regulating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710706670.9A CN107313354A (en) 2017-08-17 2017-08-17 A kind of Arch Bridge Construction tie-rod regulating system

Publications (1)

Publication Number Publication Date
CN107313354A true CN107313354A (en) 2017-11-03

Family

ID=60176164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710706670.9A Pending CN107313354A (en) 2017-08-17 2017-08-17 A kind of Arch Bridge Construction tie-rod regulating system

Country Status (1)

Country Link
CN (1) CN107313354A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221694A (en) * 2018-01-19 2018-06-29 中铁大桥局集团有限公司 The method for installing long-span arch bridge tie-rod
CN108505449A (en) * 2018-05-07 2018-09-07 安徽省公路桥梁工程有限公司 The construction method of holder lifting system in a kind of CFST Arch Bridge water
CN108589539A (en) * 2018-04-27 2018-09-28 广西路桥工程集团有限公司 A kind of interim tie-rod is across installation method
CN110593076A (en) * 2019-09-29 2019-12-20 广西路桥工程集团有限公司 Steel pipe concrete tied arch bridge hunch seat horizontal displacement monitoring and control system
CN113846571A (en) * 2021-11-10 2021-12-28 广西路桥工程集团有限公司 Method for drawing and crossing temporary tie bar
CN113882256A (en) * 2021-08-17 2022-01-04 中国港湾工程有限责任公司 Adhesion hinged type sectional prefabricated assembled arch bridge and intelligent construction control method
CN114108445A (en) * 2021-09-17 2022-03-01 上海建工一建集团有限公司 Longitudinal beam and arch rib forming control device of steel arch bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002294633A (en) * 2001-03-30 2002-10-09 Mitsubishi Heavy Ind Ltd Method and device for constructing arch-shaped structural body
CN102353350A (en) * 2011-07-06 2012-02-15 西南交通大学 Apparatus for measuring structure horizontal displacement relative to roadbed
CN203904842U (en) * 2014-05-23 2014-10-29 安徽红星机电科技股份有限公司 Prestress tension automatic control system for cable-stayed bridge
CN106480829A (en) * 2016-12-13 2017-03-08 上海浦东新区公路建设发展有限公司 Derrick type arch bridge suspender intelligently changes system
CN207259964U (en) * 2017-08-17 2018-04-20 上海浦东新区公路建设发展有限公司 A kind of Arch Bridge Construction tie-rod regulating system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002294633A (en) * 2001-03-30 2002-10-09 Mitsubishi Heavy Ind Ltd Method and device for constructing arch-shaped structural body
CN102353350A (en) * 2011-07-06 2012-02-15 西南交通大学 Apparatus for measuring structure horizontal displacement relative to roadbed
CN203904842U (en) * 2014-05-23 2014-10-29 安徽红星机电科技股份有限公司 Prestress tension automatic control system for cable-stayed bridge
CN106480829A (en) * 2016-12-13 2017-03-08 上海浦东新区公路建设发展有限公司 Derrick type arch bridge suspender intelligently changes system
CN207259964U (en) * 2017-08-17 2018-04-20 上海浦东新区公路建设发展有限公司 A kind of Arch Bridge Construction tie-rod regulating system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵谦等: "京杭运河特大桥主桥刚架系杆拱施工技术" *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221694A (en) * 2018-01-19 2018-06-29 中铁大桥局集团有限公司 The method for installing long-span arch bridge tie-rod
CN108221694B (en) * 2018-01-19 2019-06-21 中铁大桥局集团有限公司 Method for installing tie rods of long-span arch bridges
CN108589539A (en) * 2018-04-27 2018-09-28 广西路桥工程集团有限公司 A kind of interim tie-rod is across installation method
CN108589539B (en) * 2018-04-27 2019-12-31 广西路桥工程集团有限公司 Crossing installation method for temporary tie bar
CN108505449A (en) * 2018-05-07 2018-09-07 安徽省公路桥梁工程有限公司 The construction method of holder lifting system in a kind of CFST Arch Bridge water
CN108505449B (en) * 2018-05-07 2019-09-03 安徽省公路桥梁工程有限公司 A construction method for the hoisting system of the underwater support of a concrete-filled steel tube arch bridge
CN110593076A (en) * 2019-09-29 2019-12-20 广西路桥工程集团有限公司 Steel pipe concrete tied arch bridge hunch seat horizontal displacement monitoring and control system
CN113882256A (en) * 2021-08-17 2022-01-04 中国港湾工程有限责任公司 Adhesion hinged type sectional prefabricated assembled arch bridge and intelligent construction control method
CN113882256B (en) * 2021-08-17 2024-06-25 中国港湾工程有限责任公司 Adhesion hinged type segmented prefabricated assembled arch bridge and intelligent construction control method
CN114108445A (en) * 2021-09-17 2022-03-01 上海建工一建集团有限公司 Longitudinal beam and arch rib forming control device of steel arch bridge
CN113846571A (en) * 2021-11-10 2021-12-28 广西路桥工程集团有限公司 Method for drawing and crossing temporary tie bar

Similar Documents

Publication Publication Date Title
CN107313354A (en) A kind of Arch Bridge Construction tie-rod regulating system
CN101684638B (en) Assembly method of section box girder
CN207259964U (en) A kind of Arch Bridge Construction tie-rod regulating system
CN103938552B (en) Steel truss arched bridge self-balancing cantilever construction method and the spacing bearing of main pier
CN101787678B (en) Large-span section assembling bridge manufacturing machine and assembling construction process thereof
CN102162209B (en) High-speed turnout switch tie for speed of 350km per hour and manufacturing method thereof
CN109747037A (en) A kind of elder generation's post-tensioned prestressing combines the U-shaped beam prefabricated construction technology of large span of construction
CN102330428B (en) Rigidity-adjusting deformation box type compression-dispersion anchor cable
CN107190627A (en) Part earth anchored suspension bridge and its construction method
CN108660935A (en) A kind of construction method of reinforced concrete arch bridge
CN201172797Y (en) Portable movable mould frame bridging machine
CN105926444A (en) Concrete arch bridge arching method
MX2009012586A (en) Process and device for reinforcing and lightening the construction of floors and roofs.
CN104153303A (en) Method for replacing self-balancing backpressure type bridge single-support
CN106638334B (en) A kind of external prestressing strengthening device and its construction method
CN105365036A (en) Process for mounting template for manufacturing sectional box girders
CN104652293A (en) Cable-stayed bridge structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN112609577A (en) Continuous beam segment prefabrication and assembly method
CN109281250A (en) Construction method of linear and prestressed control of arch ring of top-supported external cable-connected arch bridge
CN105951608A (en) Pushing construction method for corrugated steel web prestressed concrete combination beam
CN203965074U (en) The stress monitoring system of reinforced concrete tie-rod in a kind of bowstring arch bridge
CN105040594A (en) Variable cross-section box girder bridge closure segment construction method
IL172296A (en) Gantry with auto-adjusting prestressing
CN117604909A (en) A construction method for the Helong section and its adjacent sections after delayed construction of wet joints
CN218059911U (en) Basket pre-compaction device is hung to assembled

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination